Menzel Ledjmet East Project Block 405B Bassin de Berkine (Ouargla)

Valeurs du projet : 1,849 Mds$ (1,3 Mds€= 1,101Mds€+)

Capacité : 09 millions m3 / j (soit 3 milliards m3 / an)
10 000 bbl/jour de condensât.
14 000 bbl/jour de GPL.
8 350 bbl/jour d’huile.

Partenaire : First Calgary Petroleum LP (FCPLP) (Canada)

Réalisation : SAIPEM Spa (Italie) et SAIPEM Contracting Algérie Spa

Date de réception : Mars 2012

http://img269.imageshack.us/img269/9864/saipem101.jpg

LYES
January 12th, 2011, 02:08 AM
Sonatrach - First Calgary Petroleum LP / SAIPEM Spa - SAIPEM Contracting Algérie Spa
22/03/2009


http://www.sonatrach-dz.com/images/logo-news.gif
Sonatrach et son partenaire First Calgary Petroleum LP (FCPLP), ont procédé le dimanche 22 mars 2009, à Alger, en présence de Monsieur Chakib Khelil, Ministre de l’Energie et des Mines, à la signature d’un contrat de type EPC portant sur la réalisation des installations de production et de traitement des gaz humides et de l’huile des gisements de MLE (Menzel Ledjmet Est) & CAFC (Central Area Field Complexe) du périmètre LEDJMET (Bloc 405b) ainsi que celles des canalisations d’évacuation du gaz, du GPL et du condensat vers Gassi-Touil et d’huile vers PK0 (Point Kilométrique 0).
Le périmètre de LEDJMET est situé dans le bassin de Berkine, à environ 350 km au Sud Est de Hassi Messaoud.
Le montant de ce contrat signé avec le groupement d’entreprises constitué de SAIPEM Spa (Italie) et SAIPEM Contracting Algérie Spa, est de 1,101 milliards d’ Euros et de 30,45 milliards DA.

Une fois réalisées, ces installations, permettront de traiter :
• 09 millions m3 / j (soit 3 milliards m3 / an)
• 10 000 bbl/jour de condensât.
• 14 000 bbl/jour de GPL.
• 8 350 bbl/jour d’huile.

Le délai de réalisation est de 36 mois et la réception provisoire du projet est prévue en mars 2012.


Source : SONATRACH (http://www.sonatrach-dz.com/cgi-bin/pg-newspro.cgi?id_news=1681)

LYES
January 12th, 2011, 02:45 AM
http://img208.imageshack.us/img208/541/lmej1.jpg

LYES
January 12th, 2011, 02:47 AM
Saipem signe un contrat de 1,84 Mds$ en Algérie

http://www.econostrum.info/photo/art/default/1289874-1692795.jpg?v=1289521202

ITALIE / ALGERIE. Le groupe pétrolier italien Saipem a signé avec son homologue algérien Sonatrach un contrat triennal de 1,849 Mds$ (1,3 Mds€) pour la réalisation d'installations de production et de traitement de gaz et de pétrole dans le désert algérien.

Le contrat a été signé dimanche 22 mars à Alger entre le groupement constitué de Saipem (Italie) et Saipem contracting Algérie et Sonatrach et son partenaire canadien First Calgary Petroleum LP (FCPLP).

Il porte sur la réalisation à l’horizon 2012 des installations de production et de traitement de gaz humides et de l'huile des gisements de Menzel Ledjmet Est (MLE) et Central Area Field Complexe (CAFC) du périmètre Ledjmet situé dans le bassin de Berkine, à 350 km au sud-est du site pétrolifère de Hassi Messaoud.

Ces installations permettront de traiter 3 milliards m3/an de gaz, 10.000 barils par jour de condensat, 14.000 barils par jour de GPL et 8.350 barils par jour d'huile.

Mardi 24 Mars 2009

Source : William Allaire Econostrum (http://www.econostrum.info/Saipem-signe-un-contrat-de-184-Mds-en-Algerie_a946.html)

LYES
January 12th, 2011, 12:15 PM
La Base de Vie (2009)

http://farm3.static.flickr.com/2777/4030227802_5d74dc7f35_b.jpg

LYES
January 12th, 2011, 12:17 PM
http://farm3.static.flickr.com/2702/4106332115_590c5c2ce3_z.jpg

LYES
January 12th, 2011, 12:17 PM
http://farm3.static.flickr.com/2773/4069954038_4757f5ae79_b.jpg

LYES
January 12th, 2011, 12:18 PM
http://farm3.static.flickr.com/2619/4106315543_d33b9aef5c_b.jpg

LYES
January 12th, 2011, 12:18 PM
http://farm3.static.flickr.com/2555/4107004806_a40232efc2_b.jpg

LYES
January 12th, 2011, 12:19 PM
http://farm3.static.flickr.com/2563/4107006718_d12e3622a8_b.jpg

LYES
January 12th, 2011, 12:20 PM
http://farm3.static.flickr.com/2495/4106313841_0ee3841c6a_b.jpg

LYES
February 26th, 2012, 12:41 PM
http://farm7.staticflickr.com/6149/6038464105_499651a6b6_b.jpg (http://www.flickr.com/photos/7693187@N08/6038464105/)
DSCN4057 (http://www.flickr.com/photos/7693187@N08/6038464105/) par accidori (http://www.flickr.com/people/7693187@N08/), sur Flickr

LYES
February 26th, 2012, 12:42 PM
http://farm7.staticflickr.com/6210/6038495883_618d5c4856_b.jpg (http://www.flickr.com/photos/7693187@N08/6038495883/)
DSCN4127 (http://www.flickr.com/photos/7693187@N08/6038495883/) par accidori (http://www.flickr.com/people/7693187@N08/), sur Flickr

LYES
February 26th, 2012, 12:42 PM
http://farm7.staticflickr.com/6078/6038486039_92f95e66e0_b.jpg (http://www.flickr.com/photos/7693187@N08/6038486039/)
DSCN4111 (http://www.flickr.com/photos/7693187@N08/6038486039/) par accidori (http://www.flickr.com/people/7693187@N08/), sur Flickr

LYES
February 26th, 2012, 12:43 PM
http://farm7.staticflickr.com/6146/6038444019_07f5238313_b.jpg (http://www.flickr.com/photos/7693187@N08/6038444019/)
DSCN4180 (http://www.flickr.com/photos/7693187@N08/6038444019/) par accidori (http://www.flickr.com/people/7693187@N08/), sur Flickr

LYES
February 26th, 2012, 12:46 PM
http://farm7.staticflickr.com/6087/6039034106_97c5e4d577_b.jpg (http://www.flickr.com/photos/7693187@N08/6039034106/)
DSCN4108 (http://www.flickr.com/photos/7693187@N08/6039034106/) par accidori (http://www.flickr.com/people/7693187@N08/), sur Flickr

abdeka
December 12th, 2012, 12:21 AM
http://img651.imageshack.us/img651/5255/83271855.jpg (http://imageshack.us/photo/my-images/651/83271855.jpg/)

MLE Team
http://www.panoramio.com/photo/83271855

LYES
December 29th, 2012, 02:38 PM
Client: Saipem S.p.A.
Activity: Construction gas treatment plant
Status: Ongoing
Period: 2010 - ongoing
Amount: € 30.500.000,00


(http://en.sicilsaldo.it/var/sicilsaldo/storage/images/gallerie-fotografiche/impianto-trattamento-gas-mle-algeria/impianto-mle-algeria/6811-1-ita-IT/Impianto-MLE-Algeria.jpg)
http://en.sicilsaldo.it/var/sicilsaldo/storage/images/gallerie-fotografiche/impianto-trattamento-gas-mle-algeria/impianto-mle-algeria/6811-1-ita-IT/Impianto-MLE-Algeria.jpg http://en.sicilsaldo.it/var/sicilsaldo/storage/images/gallerie-fotografiche/impianto-trattamento-gas-mle-algeria/panoramica-impianto-mle-algeria/6828-1-ita-IT/Panoramica-Impianto-MLE-Algeria.jpghttp://en.sicilsaldo.it/var/sicilsaldo/storage/images/gallerie-fotografiche/impianto-trattamento-gas-mle-algeria/particolare-impianto-mle-algeria/6836-1-ita-IT/particolare-Impianto-MLE-Algeria.jpg http://en.sicilsaldo.it/var/sicilsaldo/storage/images/references/new-projects/gas-treatment-plant-mle/4765-4-ita-IT/Gas-treatment-plant-MLE_imagelarge.jpg

http://en.sicilsaldo.it/References/New-projects/Gas-treatment-plant-MLE#

karim2096
February 4th, 2013, 04:00 PM
Completed

Mise en production du gisement Menzel Ledjmet Est dans le bassin de Berkine (Sonatrach)



ALGER - L’association Sonatrach-ENI a mis en production le gisement de gaz humide MLE (Menzel Ledjmet Est) situé dans le périmètre Ledjmet dans le bassin Berkine (bloc 405b) à 220 km au sud-est de Hassi Messaoud (Ouargla), a-t-on appris lundi auprès de Sonatrach.

La mise en production du gisement a été faite jeudi dernier par Sonatrach et son partenaire italien ENI, a indiqué un communiqué de Sonatrach.

Le périmètre Ledjmet comprend deux gisements à savoir, un gisement de gaz humide (MLE) et un gisement d’huile et de gaz CAFC (Central Area Field Complex), a ajouté le communiqué.

Les capacités installées de MLE assurent la production et le traitement du gaz humide permettant ainsi de disposer de neuf (9) millions de mètres cubes (m3) par jour de gaz commercial, soit trois (3) milliards de m3 par an, de 12.000 barils par jour de GPL, de 10.000 barils par jour de condensat et de 5.000 barils par jour d’huile.

L’arrivée de ces nouvelles productions de pétrole et de gaz "permettra à Sonatrach d’atteindre les objectifs en termes d’augmentation des capacités afin d’assurer l’approvisionnement du marché national et ses livraisons au marché international", a noté la même source.

Le plan de développement du gisement MLE par l’association Sonatrach-First Calgary Petroleums Ltd (FCP, Canada, acquis en 2008 par l’Italien ENI) a reçu en février 2007 l’approbation de l’Agence nationale de valorisation des ressources en hydrocarbures (Alnaft).

D’un coût global d’environ 1,3 milliard de dollars, le plan de développement, approuvé en 2007, comprenait la construction d’une usine de traitement et la mise en place d’un réseau de collecte et des canalisations d’évacuation.

Les frais de développement étaient engagés au cours de la période 2007-2009 et sont supportés à hauteur de 75% pour FCP et de 25% pour Sonatrach.

En outre, la totalité de la production gazière provenant de MLE sera commercialisée par Sonatrach pour le compte de l’association liant les deux opérateurs du projet.

L’acquisition par ENI de FCP a été effectuée fin 2008 en vertu d’un accord signé en septembre de la même année entre les deux compagnies pour un montant de 923 millions de dollars canadiens (609 millions d’euros).

Cette acquisition a entraîné une augmentation des réserves d’ENI en Algérie de 190 millions de Barils équivalent pétrole (BEP).
http://www.aps.dz/Mise-en-production-du-gisement.html

abdeka
February 4th, 2013, 04:12 PM
=> Completed!

HBOY116
February 5th, 2013, 04:58 PM
xfqog9pJzU8

Rossignolneuf
February 5th, 2013, 11:11 PM
2HYI6i4vdD0