View Full Version : BUCHAREST | Ana Tower | 28 fl | 120m | App
Le Clerk March 29th, 2011, 08:10 PM Copos şi GTC au bătut palma pentru Ana Tower (http://www.zf.ro/mediafax-biz-exclusiv/copos-si-gtc-au-batut-palma-pentru-un-turn-de-birouri-8109435)
architectural solution confirmed for the project of Ana Tower:http://www.ana.ro/despre-ana-tower
120 m, 28 floors, 67.000 sqm.
http://img164.imageshack.us/img164/7046/imgrighttower.jpg
http://img269.imageshack.us/img269/4338/thumb854x10003905124420x.jpg (http://img269.imageshack.us/i/thumb854x10003905124420x.jpg/)
the initial project:
http://img188.imageshack.us/img188/4299/87103604.jpg (http://img188.imageshack.us/i/87103604.jpg/)
Works should start this year. For now, let's leave it here until site preparation is confirmed. :cheers:
Gendo March 29th, 2011, 09:08 PM Is this in Bucharest? That should be stated at the beginning of the thread title.
That window pattern makes it look like a 130 story building.
Eric Offereins March 29th, 2011, 09:45 PM Perhaps a moderator can change the thread title?
Le Clerk March 30th, 2011, 03:41 PM Is this in Bucharest? That should be stated at the beginning of the thread title.
That window pattern makes it look like a 130 story building.
Yes, it's in Bucharest. I'll ask the mod to change the title. Thanks. :cheers:
BG_PATRIOT April 7th, 2011, 04:44 AM The 2nd design is definitively much better. I love it :cheers:
Le Clerk April 7th, 2011, 10:11 AM Agreed! :cheers:
Le Clerk April 19th, 2011, 09:06 AM The construction works at the Ana Tower office building in Bucharest will begin in 3 to 6 months following an investment of EUR 70 million
The construction works at the Ana Tower office building near the Crowne Plaza hotel in Bucharest will begin in three to six months. The building will have an area of 33,000 sqm and will imply an investment of EUR 70 million. George Copos owns 3,500 sqm near the Crowne Plaza Hotel, also controlled by the businessman, where he had announced the development of an office tower in 2008. Because of the financial crisis, the project was postponed. According to the data published by GTC, by 2012 the company will complete the Ana office project, 50% of which it controls. (Romanian Source) (http://www.fic.ro/newsletter-net/index.php?section=newsfront&luna=april&an=2011&numar=19.php#link3.3)
:banana::cheers:
BG_PATRIOT April 20th, 2011, 06:03 AM Great news. Another lovely addition to Bucharest's skyline :okay:
Le Clerk April 26th, 2011, 10:35 PM Apparently, the project was changed again. This tie radically. It lost the high-tech lines and looks more classical now. :(
project changed for Ana Tower:
http://img508.imageshack.us/img508/3709/a25i.jpg
http://img856.imageshack.us/img856/6765/a26hd.jpg
http://img820.imageshack.us/img820/2112/a05ad.jpg
http://img6.imageshack.us/img6/7648/a24ev.jpg
BG_PATRIOT April 27th, 2011, 05:26 PM Quite boring if you ask me :ohno: I preferred the old design better
btw, why is there an HSBC Peru tower tag in the thread :lol:
Le Clerk April 27th, 2011, 05:57 PM Quite boring if you ask me :ohno: I preferred the old design better
True. :(
btw, why is there an HSBC Peru tower tag in the thread :lol:
Dunno. :lol:
Le Clerk June 6th, 2011, 10:31 PM @Mods: could you please move this to U/C? :cheers:
GTC starts development of a new landmark office building in a prime location in Bucharest
The building called Ana Tower, will be located in the close vicinity of GTC’s latest award-winning office project - City Gate. The project will be a 50-50% partnership between GTC Romania and Ana Group, while GTC will be managing the project on behalf of the joint venture.
Ana Tower will provide approximately 30,000 sqm of A-class office space located on 24 floors in the most attractive office destination in Bucharest, in the north part of the city. Tenants and visitors of the property will enjoy, apart from the prestigious location and high standard offices, many amenities that include also two hotels located next to the building and excellent public transportation access.
Ana Tower is the fifth office building which GTC develops in Bucharest, after Europe House, America House, City Gate South and City Gate North.
“We are confident that Ana Tower will attract strong demand from renowned tenants” – says Shimon Galon, GTC Romania Country Manager. “We plan to start the construction this year and to complete the building at the beginning of 2013”. Source (http://www.gtc.com.pl/article/916)
Le Clerk June 6th, 2011, 10:40 PM ^^
http://img848.imageshack.us/img848/2905/anatower2008.jpg
http://img703.imageshack.us/img703/6137/anatower5.jpg
http://img835.imageshack.us/img835/1101/anatower6.jpg
http://img534.imageshack.us/img534/9254/anatower3.jpg
Source (http://b365.realitatea.net/news/un-nou-zgarie-nori-se-va-ridica-in-capitala-ana-tower-vezi-cum-va-arata/)
|
|