View Full Version : MINSK | Perspolis Hotel | 141m | 39 fl | Prep


Minsk
April 16th, 2011, 10:42 PM
HOTEL***** "PERSPOLIS"

Location: Minsk, Nemiga street
Construction period: 2011-2014
Number of floors: 39
Investor: "Pers Polis Invest"

http://cs9558.vkontakte.ru/u91996072/121355978/x_a65a3bdb.jpg

http://cs9558.vkontakte.ru/u91996072/121355978/x_e8b627ba.jpg

http://cs9558.vkontakte.ru/u91996072/121355978/x_9437934c.jpg

Singidunum
April 16th, 2011, 11:23 PM
I like it

Darhet
April 17th, 2011, 03:05 PM
Probably wrong section.Is it already under construction?

Iluminat
April 17th, 2011, 03:16 PM
Not sure if I like this concrete intrications, they look a bit too Central Asian if you ask me.

Minsk
April 17th, 2011, 03:27 PM
I don't like this tracery. In my opinion it would be better withouit it or with belarussian national ornament.

Minsk
April 17th, 2011, 03:30 PM
Probably wrong section.Is it already under construction?


Yes.

http://photobelta.by/apimages/139026.jpg

http://photobelta.by/apimages/139024.jpg

http://photobelta.by/apimages/139025.jpg

Manitopiaaa
April 18th, 2011, 08:15 AM
....what is this. Why is there Arabic lettering in the bottom pics? Why isn't it called "PersEpolis"?

Bricken Ridge
April 18th, 2011, 09:36 AM
Looking at the facade, I can now say the heater grill in my old apartment in NYC has a bigger purpose.

Dar-io
April 23rd, 2011, 10:13 PM
....what is this. Why is there Arabic lettering in the bottom pics? Why isn't it called "PersEpolis"?

It`s on Pharsi. Iranian developers!

rosulje
April 23rd, 2011, 10:40 PM
nice :cheers:

webeagle12
April 24th, 2011, 11:31 PM
Looking at the facade, I can now say the heater grill in my old apartment in NYC has a bigger purpose.

:lol:

Cracovia
April 25th, 2011, 01:24 AM
It`s on Pharsi. Iranian developers!

The friendship is flourishing

Minsk
August 15th, 2011, 12:42 AM
13.8.11.

Silence ((

http://cs4478.vkontakte.ru/u91996072/121355978/x_86457e63.jpg

http://cs4478.vkontakte.ru/u91996072/121355978/x_6281ee34.jpg

Minsk
September 21st, 2011, 09:47 PM
It will be 141m, but I don't know with spire or no.

New renders:

http://perspolis.by/ru/wp-content/blogs.dir/2/files/pers-polis-hotel/1_2.jpg

http://perspolis.by/ru/wp-content/blogs.dir/2/files/pers-polis-hotel/1_3.jpg

http://perspolis.by/ru/wp-content/blogs.dir/2/files/pers-polis-hotel/1_4.jpg

http://perspolis.by/ru/wp-content/blogs.dir/2/files/pers-polis-hotel/27.jpg

http://perspolis.by/ru/wp-content/blogs.dir/2/files/pers-polis-hotel/51.jpg

http://perspolis.by/ru/wp-content/blogs.dir/2/files/pers-polis-hotel/a3-f61.jpg

http://perspolis.by/ru/wp-content/blogs.dir/2/files/pers-polis-hotel/a3-f62.jpg

http://perspolis.by/ru/wp-content/blogs.dir/2/files/pers-polis-hotel/a3-f63.jpg

http://perspolis.by/ru/wp-content/blogs.dir/2/files/pers-polis-hotel/a3-f91.jpg

http://perspolis.by/ru/wp-content/blogs.dir/2/files/pers-polis-hotel/a3-f912.jpg

http://perspolis.by/ru/wp-content/blogs.dir/2/files/pers-polis-hotel/untitled-3.jpg

The construction has begun.

http://realt.onliner.by/wp-content/uploads/2011/09/DSC_2634.jpg

http://realt.onliner.by/wp-content/uploads/2011/09/DSC_2646.jpg

http://realt.onliner.by/wp-content/uploads/2011/09/DSC_2636.jpg

Ni3lS
September 21st, 2011, 10:04 PM
Yea this is not U/C but Prep. Misleading!

Minsk
September 21st, 2011, 10:17 PM
Sorry! But I hope, that it will be U/C soon. It's investment project and I think the President will closely monitor its implementation.

xJamaax
September 23rd, 2011, 12:55 AM
Classic but I hope the fence-like structure will be maintained otherwise the building will look awful suppose there are stains.

SO143
September 23rd, 2011, 02:34 AM
Sweet, i especially like it's exterior design :applause:

Andy_L
September 24th, 2011, 10:40 PM
I think the 160 meters will be with spire

Minsk
October 10th, 2011, 07:20 AM
The project will be changed

http://realt.onliner.by/wp-content/uploads/2011/10/331.jpg

Relining of communications at the construction site of a skyscraper hotel, Perspolis in Minsk has barely begun, and already has learned about making fundamental changes to the project. The most important thing - instead of a single storey high-rise 35-Iranian investors to build two skyscrapers next to each other. And the second building will be almost an exact copy of the first. Another caveat - both buildings will be shifted to the Bogushevich square. As explained to a correspondent of Realt Onliner in "Pers Polis Invest" is associated with complaints of tenants, which is set near the building.

http://realt.onliner.by/wp-content/uploads/2011/10/DSC_2943.jpg

http://realt.onliner.by/wp-content/uploads/2011/10/DSC_2938.jpg

Minsk
October 12th, 2011, 08:37 AM
New design

http://realt.onliner.by/wp-content/uploads/2011/10/alt2-12.jpg

http://realt.onliner.by/wp-content/uploads/2011/10/alt2-22.jpg

http://realt.onliner.by/wp-content/uploads/2011/10/alt2-33.jpg

Gedimin
January 21st, 2012, 05:39 PM
hopefully the design was changed again

http://realt.onliner.by/wp-content/uploads/2012/01/DSC_4225f.jpg

left tower will be offices and the right a hotel, both 40 floors high

Minsk
January 21st, 2012, 06:32 PM
But it's not official info)