View Full Version : OMDURMAN | 99199 Children's Cancer Hospital | Approved
AMJAD M A RAHMAN August 21st, 2011, 01:36 PM 99199 Children's Cancer Hospital - Under Construction- Khartoum.
http://www.99199.org.sd
http://www.gmrup.com/do.php?img=1370843 (http://www.gmrup.com/)
http://www.gmrup.com/do.php?img=1370828 (http://www.gmrup.com/)
http://www.gmrup.com/do.php?img=1370829 (http://www.gmrup.com/)
http://www.gmrup.com/do.php?img=1370825 (http://www.gmrup.com/)
http://www.gmrup.com/do.php?img=1370826 (http://www.gmrup.com/)
http://www.gmrup.com/do.php?img=1370831 (http://www.gmrup.com/)
http://www.gmrup.com/do.php?img=1370832 (http://www.gmrup.com/)
http://www.gmrup.com/do.php?img=1370833 (http://www.gmrup.com/)
http://www.gmrup.com/do.php?img=1370830 (http://www.gmrup.com/)
LADEN August 21st, 2011, 08:16 PM wow! More of these are needed! Is it just for cancer or for all children?
AMJAD M A RAHMAN August 22nd, 2011, 09:25 PM It is for all types of cancer in children.
The Nomadic Warrior August 25th, 2011, 08:21 PM Now this is real development
lady gaga September 1st, 2011, 10:28 PM وضع حجر اساس مستشفى 99199 لعلاج سرطان الاطفال بالمجان في السودان
--------------------------------------------------------------------------------
خالص التحايا
كل الود
تتشرف جمعية مستشفى سرطان الاطفال 99199 ان تدعوكم لحضور فعاليات احتفال وضع حجر اساس مستشفى 99199 لعلاج سرطان الاطفال بالمجا في السودان،، يمتد الاحتفال لمدة اسبوع يبدأ من يوم الاحد 17-7 وحتى يوم السبت 23-7
سوف يكون برنامج الاحتفال كالاتي:
من يوم الاحد 17-7 وحتى الخميس 21-7 سيكون هنالك مرسم لاطفال المدارس للمشاركة في حمل هم المستشفى
...يوم الاربعاء 20-7 سيكون هنالك مؤتمر صحفي بارض المشروع للكشف عن المخطط الهندسي للمشروع والاعلام عن برنامج الاحتفال الرئيسي
يوم الجمعة الموافق 22-7 سيكون هنالك موكب من مقر الجمعية وحتى ارض المشروع يحمل معه حجر الاساس الذي سوف يوضع،، خط سير الموكب يشمل الخرطوم - بحري - امدرمان
يوم السبت الموافق 23/7 سيكون الاحتفال الرئيسي لوضع حجر الاساس بارض المشروع
ستتم موافاتكم بالمواعيد تباعا ان شاء الله
وشكرا،،
ايد على ايد ح نبنيهو ان شاء الله
للاستفسار تلفون 0123991995
المكان : ارض المشروع،، امدرمان - شارع العرضة - جامعة الاحفاد - مدرسة علم النفس القديمة
AMJAD M A RAHMAN March 6th, 2012, 05:53 PM http://www.gmrup.com/d3/up13310491541.jpg (http://www.gmrup.com/)
http://www.gmrup.com/d3/up13310491542.jpg (http://www.gmrup.com/)
http://www.gmrup.com/d3/up13310491553.jpg (http://www.gmrup.com/)
http://www.gmrup.com/d3/up13310491554.jpg (http://www.gmrup.com/)
lady gaga March 6th, 2012, 07:25 PM Nice pics amjad great to see this hospital finally moves forward :okay: is it approved or is it still proposed ???
AMJAD M A RAHMAN March 6th, 2012, 08:32 PM it`s approved men zaaaaamaaaan!!!
AMJAD M A RAHMAN March 6th, 2012, 08:33 PM now they are collecting money to Start Construction :)
lady gaga March 6th, 2012, 08:37 PM Oh then the titel should say approved not u/c
lady gaga March 6th, 2012, 08:38 PM How many beds in.the.hospital and what it's area ?
AMJAD M A RAHMAN March 6th, 2012, 08:45 PM المكان : ارض المشروع،، امدرمان - شارع العرضة - جامعة الاحفاد - مدرسة علم النفس القديمة
للتبرع 99199 بنك الخرطوم
xAbd0o March 6th, 2012, 08:47 PM Nice :cheers2:
BTW will treatment be completely relied on donations?
lady gaga March 6th, 2012, 08:48 PM So this is not even in Khartoum its in Omdurman ?? Lol i have to pm one of the .mods to Change.these wrong infos
lady gaga March 6th, 2012, 08:50 PM Nice :cheers2:
BTW will treatment be completely relied on donations?
I think so but amjad can give you full answer
AMJAD M A RAHMAN March 6th, 2012, 08:50 PM no it`s U/C NOW ...BTW i mean it`s in Khartoum STATE .:)
AMJAD M A RAHMAN March 6th, 2012, 08:52 PM Nice :cheers2:
BTW will treatment be completely relied on donations?
YES LIKE IN EGYPT :)
lady gaga March 6th, 2012, 08:56 PM no it`s U/C NOW ...BTW i mean it`s in Khartoum STATE .:)
But it says Omdurman :? And it's not ready to constructed
AMJAD M A RAHMAN March 6th, 2012, 08:59 PM ولاية الخرطوم تتكون من ثلاث مدن الخرطوم وام درمان وبحري
وضعوا حجر الاساس خلاص وتقريبا بدء الانشاء
Amged March 6th, 2012, 09:31 PM Nice Amged
Can you provide me more information (engineering) about the project
I am thinking to post it in sudacon.net
AMJAD M A RAHMAN March 6th, 2012, 09:36 PM yes sure That it is
Project Components of
The Children’s Cancer Hospital
Project Goal
To construct, in Sudan, the first specialized Children Cancer Hospital (CCH) that provides professional medical and paramedical services for free to diagnose and treat children with cancer from the ages 0 – 18 years.
The CCH will not only provide medical services to our children with cancer but will also:
1. Carry on research on causes of the disease
2. Develop and training staff on the field
3. Provide patients with schooling, mind development activates and adequate entertainment in hospital (specially patients on long stay)
4. Provide a wide range of awareness programs (for communities and for families with cancer patients)
Project Justification
It is estimated that there are 14,000 new cases of cancer every year in Sudan. 20% of malignancies occur in children. That means 2,700-3,000 children are affected per year. Nevertheless, Sudan has limited facilities for treating children with cancer. In addition, medical services, diagnostic and early detection facilities are lacking in many parts of the country.
Poverty In Sudan, is not helping as 40% live below the poverty line - earning less than 1 US$ per day. If treatment is not free and available, the family might not take great strides to bring the child to medical attention. If we take the example of a family of 8 children, parents will be reluctant to accompany the sick child to the nearest medical centre and would therefore rely on Al Faky to cure the child.
Technically, there is no justification to the high mortality rate among children with cancer especially because a lot of these tumours are curable disease, with a high cure rate that exceeds 80%.
Top 10 Children’s Cancer in Sudan
Organ Frequency %
Blood , spleen 748 26.8 %
Lymph nodes 625 22.4 %
Eye 212 7.6 %
Kidney 175 6.3 %
Brain 150 5.4 %
Bones 113 4.1 %
Nasopharyngeal 83 3.0 %
Nervous system 66 2.4 %
Soft tissue 44 1.6 %
Skin 28 1 %
Top 10 children cancers 2244 80.6 %
Other children cancers 545 19.4 %
Age distribution
Age No %
Un known age 4 1
<4 804 28.8%
5- 9 862 30.9%
10 – 14 917 32.9%
15 -19 202 7.2
Total 2789 100 %
The treatment and follow-up period, for children, varies between 6 month to 3 years followed by a 5 years monitoring period. This applies to curable diseases like ALL types of leukaemia; whereas, in cases like nasopharyngeal cancer the child will have to be followed-up till the end of his/her life, same as in adults.
Children with cancer are very susceptible to infections, especially those who have leukaemia, or those on chemotherapy. .
The Project Components
The below departments are highly specialized and offer counselling, diagnostic work-up, planning of radiotherapy, chemotherapy treatment and transfusion of blood products.
Main Components of the Project:
1. Entrance with Ambulance facility (to drop and collect patients)
2. Outpatient department
a. Reception and waiting area
b. Emergency Unit
3. Impatient department
a. Intensive care unite
b. Insulation Unite
4. Radiation therapy department
5. Surgery department
6. Diagnostic department
7. Ambulance and Mobile Clinics
8. Blood bank
9. Pharmacy
10. Hospitals Medical Teams (Offices/Clinics/checking area)
11. Clinics:
a. Specialists
b. Part-time Consultants
12. Library (Traditional and electronic/multimedia)
13. Hospital Administration (Offices)
14. Offices of 99199 CHILDREN’S CANCER HOSPITAL ASSOCIATION
15. Essential Services and Support Groups
a. Training and Conference Hall
b. Rest House for families from outside Khartoum
c. Schooling
d. Social Workers quarter
e. Volunteers quarter
16. General Services
a. Kitchens
b. Maintenance Workshop - In house medical equipment maintenance unit
c. Stores:
i. Medical Consumables Stores (cold and dry)
ii. Pharmaceuticals Stores (cold and dry)
iii. Food stores (cold and dry)
d. Laundry and cleaners
e. Security
f. Waste collection and disposal area
g. Water treatment facility
h. Power generation unit
i. Public area:
i. Public toilets.
ii. Cafeteria.
iii. Shops.
17. Accommodation (Campus)
a. Medical Doctors
b. Nurses
c. Services staff
18. Adequate Landscaping
Brief Description of the Project’s Components
1. Entrance with Ambulance Facility
2. Outpatient department
This department has a maximum capacity of 60 chemo beds.
To receiving approximately 180 patients’ visits every day when functioning with full capacity.
Assessment and Triage room of 12 beds, in this area, a nurse checks the child's temperature, blood pressure and pulse, as well as height and weight and blood samples.
Day-care/Drop in clinic
Emergency area
Combined clinics e.g. orthopaedic, ophthalmology, …
Outpatient Personnel
Head nurse 2
Registered nurse 8
Floor clerk 2
Clerk stenographer 2
Nurse aid 4
Orderly 2
Cashier 2
Fellow doctors 4
Social workers 4
Total 30 Persons
3. Impatient Department of a maximum capacity of 150 inpatient beds.
Each room has one patient with a possible capacity of two beds to be set according to the urgent needs. This facility is expected to provide service to 2700- 3000 patients per year.
Intensive care unit of 18 beds is affiliated with this facility.
Insulation unit of 18 beds for patients susceptible to infections.
Entertainment and play area with :
Cafeteria
Gift Shop
Play area
Number of Persons in the Impatient facility
Paediatric oncologist 4
Nurse manager 2
Registered nurse 16
Floor clerk 6
Nurse aids 12
Orderly 4
Fellow doctor 6
Social workers 4
Psychomotor therapist 2
Total 56 Persons
4. Radiation Therapy Department:
It plays a major role in the management of children patients with malignant diseases in Sudan and offers a wide range of standard radiotherapy techniques for different sites which may be used with chemotherapy concomitantly or sequentially.
5. Surgery Department
The hospital includes two operation rooms with adjacent appendages.
6. Diagnostic Department
A. Diagnostic imaging facilities which include the following
Radiotherapy
Computed tomography
Magnetic resonance imaging
Positron- emission tomography scanning
Ultrasonography
Radionuclide imaging.
B. Laboratory which includes the following:
Histology
Pathology
Haematology
Cytology.
Microbiology.
Biochemistry
7. Ambulance and Mobile Clinics
8. Blood bank
Blood banking, the process of collecting (donation), testing, processing, and storing blood for later use (transfusion), is a cornerstone of emergency and surgical medicine and is dependent on the clinical laboratory for ensuring the safe use of blood and its components.
9. Pharmacy
10. Hospitals Medical Teams
Other Medical Persons
Primary paediatrician 4
Radiologists 2
Surgeon 2
Pathologist 2
Clinical pharmacist 2
Pharmacist 4
Labs technician 16
Radiology technicians 12
Total 44 Persons
11. Clinics
a. Specialist and Part-time Consultants
i. Paediatric sub specialists will be available on a part time basis upon consultation requests and the following will be contracted for a part – time employment during this phase:
Infectious diseases specialist 2
Intensive care specialist 2
Gastroenterologist 2
Paediatric surgeon 2
Total 8 Persons
12. Library (Traditional and electronic/multimedia)
13. Hospital Administration Offices
Management and supportive services
a. Medical director 2
b. Executive officer 2
c. Administrative assistant 2
d. Database assistant 2
e. Clinical pharmacist 2
f. Lab technicians 6
g. Radiology technicians 6
h. Paediatric radiologist 2
i. Office boy 2
j. Procurement officer 2
k. Security officer 2
l. Security guards 10
Total 40 Persons
14. 99199 CHILDREN’S CANCER HOSPITAL ASSOCIATION Offices
15. Essential Services and Support Groups
A. Nutritionist
B. Psychological & palliative care department
C. Education services for Long Stay Children with cancer
D. Research, Education & training department
Along with outstanding patient care and research, 99199 children's hospital focuses on educating and training the next generation of doctors, nurses, researchers and academic leaders. With adequate telecommunication facilities and in direct link with other teaching
E. Patient/Family Support Services Campus (Rest House for the families of the patients from outside Khartoum)
16. General Services
1. Kitchens
2. Maintenance Workshop - In house medical equipment maintenance unit
3. Stores:
a. Medical Consumables Stores (cold and dry)
b. Pharmaceutical Stores (cold and dry)
c. Food stores (cold and dry)
4. Laundry and cleaners
5. Security
6. Waste collection and disposal area
7. Water treatment facility
8. Power generation unit
9. Public service area:
a. Public toilets.
b. Cafeteria.
c. Shops.
17. Staff accommodation (Campus)
1. Doctors
2. Nurses
3. Services staff
lady gaga March 7th, 2012, 04:57 PM Nice Amged
Can you provide me more information (engineering) about the project
I am thinking to post it in sudacon.net
Go ahead :)
Amged March 7th, 2012, 05:07 PM Go ahead :)
That is it
http://www.sudacon.net/2012/03/99199.html
:)
lady gaga March 7th, 2012, 07:12 PM That is it
http://www.sudacon.net/2012/03/99199.html
:)
Wonderful great work :)
Amged March 7th, 2012, 09:19 PM Wonderful great work :)
oh THANKS
AMJAD M A RAHMAN March 7th, 2012, 09:56 PM WOOOW!! amazing
Thanks alot :)
moslab72 March 12th, 2012, 11:50 AM Thank u very much for the update Amjad...
.
AMJAD M A RAHMAN September 7th, 2012, 01:56 PM Great news !!!
the construction will start this month Inshallah.
lady gaga September 7th, 2012, 02:57 PM If everything is went on the first plan, hope to see some construction updates
Amged September 7th, 2012, 08:58 PM Great news !!!
the construction will start this month Inshallah.
Al7mdo lilah
Please update us "By photo"
|
|