vspdwd
November 20th, 2011, 05:34 AM
Hello everybody! This thread has been created to update ssc members about the ongoing 4-laning of the Hubli-Dharwad highway.
The tree cutting along the 20 km stretch started in June/July 2011 and actual works started in November 2011.:cheers:
The deadline for completing the project is 2013 end (i.e. 2 years).

vspdwd
November 20th, 2011, 05:34 AM
http://farm7.staticflickr.com/6224/6367059823_ea28ee26d4_z.jpg

vspdwd
November 20th, 2011, 05:39 AM
Cross posting from the Hubli-Dharwad-Belgaum thread
4-laning excavation near APMC.:cheers:
The yellow stone mark seems to be the far end of the new alignment.
http://farm7.static.flickr.com/6115/6340092033_312dbd5bb0_b.jpg

engineer.akash
November 20th, 2011, 07:30 AM
Great thread,Hope to see lot of updates coming in :cheers:

s.yogendra
November 20th, 2011, 04:59 PM
nice thread vspdwd :)

looking forward for regular pic updates frm u

Shivanand
November 22nd, 2011, 08:56 AM
Can anybody tell me that what is the duration of this project, means when it suppose to finish.

vspdwd
November 22nd, 2011, 01:58 PM
^^
Always read the first post...:)

vspdwd
November 23rd, 2011, 04:11 PM
http://farm7.staticflickr.com/6229/6389410255_39c4cc5b18_b.jpg

vspdwd
December 1st, 2011, 12:47 PM
BSNL shifting lines, HESCOM shifting electric poles and excavation under progress simultaneously...:cheers:
Here are a few random pics near Navanagar

http://farm8.staticflickr.com/7172/6435809581_43f038cee2_b.jpg

http://farm8.staticflickr.com/7024/6435808827_aea559f402_b.jpg

http://farm8.staticflickr.com/7020/6435809847_208de28c9c_b.jpg

engineer.akash
December 1st, 2011, 05:38 PM
^^Excellent pics

gouravrattihalli
December 2nd, 2011, 01:43 PM
http://www.sutpindia.com/docs/4am11nov11_HubliDharwad.pdf
:banana::banana::banana::banana::banana:

vspdwd
December 2nd, 2011, 06:40 PM
^^Great link Gaurav....Thank you.:)

engineer.akash
December 2nd, 2011, 06:44 PM
^^Great link Gaurav....Thank you.:)

No use but :( Politicians themselves are opposing it and no funds add to it.

vspdwd
December 3rd, 2011, 11:20 AM
^^lets keep our fingers crossed :)....right now all focus on 4-laning and its on in full swing...:banana:

chetanvh08
December 8th, 2011, 06:41 PM
Hubli dharwad 4 way

http://img502.imageshack.us/img502/3328/dsc0014cq.jpg (http://imageshack.us/photo/my-images/502/dsc0014cq.jpg/)

http://img577.imageshack.us/img577/1681/dsc0012wc.jpg (http://imageshack.us/photo/my-images/577/dsc0012wc.jpg/)

http://img685.imageshack.us/img685/1823/dsc0011wuj.jpg (http://imageshack.us/photo/my-images/685/dsc0011wuj.jpg/)

http://img403.imageshack.us/img403/1403/dsc0010nd.jpg (http://imageshack.us/photo/my-images/403/dsc0010nd.jpg/)

http://img248.imageshack.us/img248/7191/dsc0007rb.jpg (http://imageshack.us/photo/my-images/248/dsc0007rb.jpg/)

http://img856.imageshack.us/img856/7158/dsc0005yz.jpg (http://imageshack.us/photo/my-images/856/dsc0005yz.jpg/)

vspdwd
December 8th, 2011, 07:06 PM
^^Nice updates man!:)
Does anyone know whether this road will have service lanes?

engineer.akash
December 8th, 2011, 07:07 PM
^^Nice updates man!:)
Does anyone know whether this road will have service lanes?

I don't think it can have service lanes,no space.

vspdwd
December 8th, 2011, 07:10 PM
I don't think it can have service lanes,no space.
I had read in a newspaper long ago that it would have service lanes outside city limits...Dont know what happened later.
No service lanes implies it will again be a 2-lane road bcoz we will have motorists coming from the wrong side of the road forgetting that they are not Americans...:lol::lol:

engineer.akash
December 8th, 2011, 07:13 PM
The best part of it is that it is going to be concreted

vspdwd
December 8th, 2011, 07:19 PM
The nest part of this road is that it is going to be concreted
Concrete roads are good as far as its life is concerned. But concrete roads have never been as smooth and quiet as asphalt roads...

engineer.akash
December 8th, 2011, 07:22 PM
Concrete roads are good as far as its life is concerned. But concrete roads have never been as smooth and quiet as asphalt roads...

You can have an asphalt topping for that.But I have always loved that Nipanni-Hubli concrete NH4 :cheers:

vspdwd
December 8th, 2011, 07:28 PM
But I have always loved that Nipanni-Hubli concrete NH4:cheers:
Its quite a noisy and bumpy ride.
The best part about this road and upcoming roads in Hubli-Dharwad is that ducts will be provided under the roads at frequent distances so that they are not dug up after construction.:cheers:

engineer.akash
December 8th, 2011, 07:35 PM
Its quite a noisy and bumpy ride.
The best part about this road and upcoming roads in Hubli-Dharwad is that ducts will be provided under the roads at frequent distances so that they are not dug up after construction.:cheers:

yes heard about that sometime back.Which are the roads covered under that concept?

vspdwd
December 8th, 2011, 07:37 PM
yes heard about that sometime back.Which are the roads covered under that concept?
No idea....Usually concepts remain concepts in India!:lol:

vspdwd
December 12th, 2011, 01:34 PM
http://farm8.staticflickr.com/7020/6498742289_060db93833_b.jpg
http://farm8.staticflickr.com/7153/6498742919_092285055a_b.jpg
http://farm8.staticflickr.com/7150/6498741937_4197a3f9d6_b.jpg
http://farm8.staticflickr.com/7025/6498741165_0679d9bca8_b.jpg

s.yogendra
December 12th, 2011, 04:41 PM
^^
thank u for the pics vspdwd :)

vspdwd
December 12th, 2011, 05:30 PM
^^
thank u for the pics vspdwd :)
you are welcome yogendra....:)

2nd pic shows new alignment of electric poles....:)
http://farm8.staticflickr.com/7007/6499796897_3cec6a4e29_b.jpg

vspdwd
December 16th, 2011, 01:57 PM
sorry for the poor quality...
http://farm8.staticflickr.com/7006/6520525415_2523fb0949_b.jpg
http://farm8.staticflickr.com/7151/6520525049_a0a6574884_b.jpg
http://farm8.staticflickr.com/7019/6520524739_344295714d_b.jpg

engineer.akash
December 16th, 2011, 05:27 PM
nice updates:)

Shivanand
December 19th, 2011, 04:54 AM
Hello friends its news from Government officials that the BRTS between Hubli-Dharwad mostly cancelled because of our dirty politicians who have there land towards the road and they are not ready to loose. So our BJP MLA,s hands are very powerfull in this issue so we(H_D people) have to demand and we should get that project for Future, otherwise we will be always in backward for development... Shame on The DIRTY POLITICIANS.......

vspdwd
December 19th, 2011, 11:11 AM
^^Hey shivanand which govt officials did you ask?
Regarding politicians, they were dirty, are dirty and will remain dirty forever....and may become dirtier.
But BRTS requires huge space which hardly exists between Hubli and Dharwad. Not only politicians but common people too
will lose their land. Even if the project continues there will be huge delays because of protests for compensation etc. So it was quite obvious that BRTS wouldn't be feasible.

vspdwd
December 23rd, 2011, 11:07 AM
H-D 4 laning.. near SDMCDS, Sattur

http://img163.imageshack.us/img163/9964/imag0348r.jpg
____________________________________________________
http://img192.imageshack.us/img192/2448/imag0349g.jpg
:cheers:

doc.aneesh
December 23rd, 2011, 12:19 PM
^^ I see you already have :) @vspdwd

vspdwd
December 23rd, 2011, 01:00 PM
^^
Yup doc. :)
This thread was hidden deep down the forum. May be that's why you did not see it. From next time plz post directly here.:)

vspdwd
December 24th, 2011, 12:53 PM
http://farm8.staticflickr.com/7008/6563708805_b7c8e90566_b.jpg
http://farm8.staticflickr.com/7018/6563709265_0218280403_b.jpg

Manjunath kasigavi
December 25th, 2011, 03:38 AM
:storm::storm::storm::storm:
Minister Jagadish shettar yesterday confirmed that they're not going to start the work on brts now... :bash::bash::bash::bash:
And he also quoted that, "it's not been cancelled, but they'll take it up as soon as 4 - laning gets completed...."

:tongue::tongue::tongue::tongue::tongue::tongue::tongue::tongue:

sujaysjn
December 31st, 2011, 07:47 AM
Any updates on this road?

vspdwd
December 31st, 2011, 07:50 AM
Any updates on this road?
95% trees cut. Right now BSNL shifting its lines.:)

Suj Mangalore
January 2nd, 2012, 05:09 PM
Its quite a noisy and bumpy ride.
The best part about this road and upcoming roads in Hubli-Dharwad is that ducts will be provided under the roads at frequent distances so that they are not dug up after construction.:cheers:

Wow this concept is interesting.
Now they wont start digging the roads soon after its ashpalted for laying the pipes or cables:lol::lol::lol:

sujaysjn
January 7th, 2012, 07:13 AM
Now after BRTS is approved, how the 4-lane work is progressing?

vspdwd
January 7th, 2012, 03:06 PM
^^ levelling is being done near IT office and Rayapur.
Most parts have been dug up for shifting water and bsnl lines!:bash:

s.yogendra
January 7th, 2012, 05:50 PM
Now after BRTS is approved, how the 4-lane work is progressing?

when did BRTS has been approved?

engineer.akash
January 8th, 2012, 06:30 AM
^^ levelling is being done near IT office and Rayapur.
Most parts have been dug up for shifting water and bsnl lines!:bash:

Good update there.

vspdwd
January 8th, 2012, 06:41 AM
when did BRTS has been approved?
^^

BANGALORE: Karnataka government today gave its green signal to take up second phase of Bangalore metro project at an investment of about Rs 27,000 crore.

Water Resources Minister Basavaraj Bommai told reporters after a cabinet meeting, chaired by Chief Minister D V Sadananda Gowda, that the second phase covering 72 km is planned to be completed by 2017.

The 42-km first phase is slated to be completed by next year-end.

Higher Education Minister V S Acharya said the Cabinet also gave the go-ahead for improving 831 km of 11 roads under the Karnataka State Highway Improvement Project (KSHIP), second stage, first phase, with a USD 351 million loan assistance from the World Bank.

It was also decided to establish a modern agriculture market on a 20-acre plot at Byatarayanapura here. It would have cold storage, grading and marketing facilities. Sobha Developers would be given the contract to develop this project, expected to be ready in two years.

The government would spend Rs 105 crore for this project, while Sobha Developers would also make some investments, Acharya said.

A bus rapid transit system for the twin cities of Hubli-Dharwad also got the Cabinet nod. In this Rs 452 project, there would be two dedicated lanes for state-run buses plying between the two cities.

The Cabinet also finalised the know partner and transaction advisor for the Global Investors' Meet scheduled for June this year, with Ernst & Young winning the contract, Acharya added.
http://economictimes.indiatimes.com/news/news-by-industry/transportation/railways/rs-27000-crore-bangalore-metro-phase-ii-approved/articleshow/11355477.cms
:cheers:

vspdwd
January 17th, 2012, 05:44 AM
HUBLI: The Hubli-Dharwad four-lane road will be complete by May 2013 and it is a Rs 177 crore project, said district minister Jagadish Shettar.

Speaking to mediapersons here on Monday, Shettar said that the project would take 2 years to finish. There are no objections for land acquisition from property owners. They will give the land for road widening because it's a public work and will help them also, he said.

There are no objections from anyone between Sana College and ISKCON temple, so the work will start from that place. The road will be widened by 30 metres. From Naveen Hotel to Vidyagiri, concrete roads will be made. "For the four-lane road we have to occupy nearly 40 acres of land," he added.

Shettar gave the clarification for the delay of the four-lane project, and said, "We planned to start the BRTS and four-lane project at a time, so it took a 7 to 8 month delay to start the project."

"Hubli-Dharwad Bus Rapid Transit System (BRTS) project has got approval from the cabinet, and we will send the project file to central government, after getting its permission, it will go for the approval from the World Bank. It may take six months for all this," he said.

The BRTS project will get more funds from the state government and the remaining funds will given by the central government and World Bank. Ten percent amount will be provided by the Hubli-Dharwad Municipal Corporation.
:)

vspdwd
January 17th, 2012, 06:24 AM
Near APMC
http://farm8.staticflickr.com/7027/6712620489_5590965255_z.jpg

http://farm8.staticflickr.com/7160/6712621411_02c39de369_z.jpg

http://farm8.staticflickr.com/7167/6712620939_f76e762435_z.jpg

Near KMF, Dharwad
http://farm8.staticflickr.com/7146/6712622947_52ec9d71f3_z.jpg

s.yogendra
January 17th, 2012, 08:33 AM
Four-lane Hubli-Dharwad road by May 2013

Rural Development and Panchayat Raj Minister and district-in-charge Jagadish Shettar said that four-laning of the road between Hubli and Dharwad had gathered momentum and the work was likely to be completed by the end of May 2013.

He was addressing a press conference here on Monday after inspecting the ongoing work on the 19.5 km road.

Mr. Shettar said that the Karnataka Road Development Corporation had started work on the road and added that. shifting of the power, water supply lines and telephone cables had begun.

He said that 40 acres of land had been acquired for four-laning the existing two-lane road. “Of the 19.5 km of road, a 13 kilometre stretch between Naveen Hotel in Hubli and Vidyagiri in Dharwad will be concretised while the rest will be asphalted,” the Minister said.

He added that the four-lane road would be 17.5 meters wide and there would be 10 metre wide service roads.

Mr. Shettar said that the work on the concrete road would begin from the centre of the existing road. “Work will begin immediately on the three km stretch between Sana College and the ISKCON temple,” he said. “The work on providing an alternative road for the public has already begun,” he said.

The Minister said there would be no toll for the usage of the four-lane road.

Mr. Shettar said the Cabinet had given its nod for construction of a Bus Rapid Transit System between the twin cities. “The proposal will now be sent to the Union Government for approval,” he said.

Mr. Shettar said that the BRTS project was likely to be implemented in two phases and another 40 to 50 acres of land would have to be acquired for it.

He said it would take another two years for the BRTS project to take off as it had to go through several phases of approval and planning.

Deputy Commissioner of Dharwad Darpan Jain said the process of acquiring 168 acres of land for constructing a bypass road connecting the Bijapur-Gadag road and Pune-Bangalore National Highway had begun.

http://www.thehindu.com/todays-paper/tp-national/tp-karnataka/article2807125.ece

rsrikanth05
January 17th, 2012, 08:12 PM
Who is executing this project?
KRDCL or NHAI?
Also, will it be part of the NH stretch?

engineer.akash
January 17th, 2012, 08:16 PM
Who is executing this project?
KRDCL or NHAI?
Also, will it be part of the NH stretch?

KRDCL,

No, as vspdwd says it is a SH now with no toll booth,It is more or less like a city road with Hubli and Dharwad already merged (twin cities) :)

rsrikanth05
January 18th, 2012, 08:02 AM
KRDCL,

No, as vspdwd says it is a SH now with no toll booth,It is more or less like a city road with Hubli and Dharwad already merged (twin cities) :)
Signal free?

engineer.akash
January 18th, 2012, 08:37 AM
Signal free?

I Doubt that,signal free is the bypass :)

rsrikanth05
January 18th, 2012, 10:41 AM
I Doubt that,signal free is the bypass :)
You mean the two lane toll road?

engineer.akash
January 18th, 2012, 10:41 AM
You mean the two lane toll road?

yes lol

Manjunath kasigavi
January 18th, 2012, 10:47 AM
No it is not signal free :)

Manjunath kasigavi
January 18th, 2012, 10:49 AM
Signals are there near KIMS , Navanagar , RTO office etc etc

rsrikanth05
January 18th, 2012, 10:56 AM
Any chance of that 'bypass' being widened?
OR will it too die like the CBE Bypass?

engineer.akash
January 18th, 2012, 10:59 AM
Any chance of that 'bypass' being widened?
OR will it too die like the CBE Bypass?

There is enough space for bypass to be widened,but widening would be of no use once this SH (old NH 4 aka PB road) gets 4/6 laned that too concerete for 75% length.:cheers: Bypass would then be used only by trucks.

rsrikanth05
January 18th, 2012, 12:14 PM
There is enough space for bypass to be widened,but widening would be of no use once this SH (old NH 4 aka PB road) gets 4/6 laned that too concerete for 75% length.:cheers: Bypass would then be used only by trucks.
I see.

sujaysjn
January 18th, 2012, 02:58 PM
I Doubt that,signal free is the bypass :)



It will become signal free out side city limts when BRTS is implemented, BRTS plan is having underpasses to be built at the places like Navanagar, Unkal etc.

engineer.akash
January 18th, 2012, 03:07 PM
It will become signal free out side city limts when BRTS is implemented, BRTS plan is having underpasses to be built at the places like Navanagar, Unkal etc.

As per shettar BRTS will take some more time to get approval etc...So till then this SH as a city road with 4/6 lanes would not be a signal free road.

Please get us some pics of the Gokul- Bypass 4 lane link road u/c that is more or less like a Chord road within the Ring road which is shaping up.:cheers:

engineer.akash
January 18th, 2012, 03:41 PM
Manjok have a look at the bypass and PB road, both are almost forming the ring road,now with plans afoot to link gadag road with NH4,will ensure the completionof the lower arc of the ring road,likewise in dharwad the upper half is served by NH4 and PB road themselves Figure B :cheers:

Figure A

Shows the parallel action :)

http://img254.imageshack.us/img254/4715/86388757.jpg

engineer.akash
January 18th, 2012, 03:43 PM
FIGURE B

Showing the upper arc of the ring road which is closed by NH4 and PB road

http://img831.imageshack.us/img831/8710/42754450.jpg

Check out the two chord roads connecting NH and PB road :cheers:

engineer.akash
January 18th, 2012, 03:44 PM
FIGURE C

http://img861.imageshack.us/img861/3363/50249752.jpg

We need more of such chord roads connecting the two, form a ladder :cheers:

engineer.akash
January 18th, 2012, 03:47 PM
FIGURE D

Gokul road and NH 4 getting linked by a 4 lane road

http://img848.imageshack.us/img848/3425/17937660.jpg

rsrikanth05
January 18th, 2012, 03:54 PM
^^ Nice plans dude.

engineer.akash
January 18th, 2012, 04:02 PM
FIGURE E

Four-lane Hubli-Dharwad road by May 2013

Deputy Commissioner of Dharwad Darpan Jain said the process of acquiring 168 acres of land for constructing a bypass road connecting the Bijapur-Gadag road and Pune-Bangalore National Highway had begun.

http://www.thehindu.com/todays-paper/tp-national/tp-karnataka/article2807125.ece

http://img252.imageshack.us/img252/2236/arfc.jpg

I guess this is how it links up the both

@rsrikanth

Thanks bhai.Hubli-Dharwad has always been an interesting site for me,though people of Hubli-Dharwad complain that they don't have a ring road like that in Mysore or Gulbarga,but I knew Hubli-Dharwad had a ring road way back in 1998 itself when NH Bypass was opened.

If they wish they can run a road parallel to both NH and PB road in between them exclusive for BRTS.But who is gonna fund :P

engineer.akash
January 18th, 2012, 04:12 PM
FUTURE BRTS MAP OF HUBLI??

Instead of running the BRTS along the edge i.e. on PB road they can build an exclusive third link with chord roads and have dedicated bus lanes,that will pave way for planned growth in between the two parallel roads and also ensuring speedy connectivity between the twins.

I wish to link that exclusive bus lane with Gokul road which is wide enough to accommodate BRTS and link Hubli city.

http://img40.imageshack.us/img40/8076/brtshubli.jpg

vspdwd
January 18th, 2012, 04:51 PM
You cannot use NH4 as ring road dude! :lol::lol:
Its a tolled road!:lol:

engineer.akash
January 18th, 2012, 04:54 PM
^^ ;)

Theoretically it is a part of the ring road :tongue2: BOT ka yahi drawback hai, future mein bhi isko hum use nahi kar sakthae :(

rsrikanth05
January 18th, 2012, 05:08 PM
You cannot use NH4 as ring road dude! :lol::lol:
Its a tolled road!:lol:
You can. Outer Ring Road in Hyderabad is tolled. Peripheral Ring Road in Bangalore is tolled.

engineer.akash
January 18th, 2012, 05:14 PM
You can. Outer Ring Road in Hyderabad is tolled. Peripheral Ring Road in Bangalore is tolled.

Exactly,but I think he meant free ring road.:P BTW vspdwd is the road wide enough in front of the commissionerate or they need to axe some portion of its garden?

http://img19.imageshack.us/img19/5517/image0398.jpg

Copyright Shrikanth

vspdwd
January 18th, 2012, 05:29 PM
You can. Outer Ring Road in Hyderabad is tolled. Peripheral Ring Road in Bangalore is tolled.
Ya may be..
But who is going to use it in HD?:)

vspdwd
January 18th, 2012, 05:30 PM
Exactly,but I think he meant free ring road.:P BTW vspdwd is the road wide enough in front of the commissionerate or they need to axe some portion of its garden?

http://img19.imageshack.us/img19/5517/image0398.jpg

Copyright Shrikanth
You wont see that compound and garden after two years...:lol:

s.yogendra
January 18th, 2012, 05:35 PM
don't worry in future even state highways will be tolled

year back state govt. has proposed to toll bangalore mysore road & mysore bantwal road some how our dist. minister got it postponed till 2012 let us see what happens

engineer.akash
January 18th, 2012, 05:36 PM
You wont see that compound and garden after two years...:lol:

After one year you mean,2013 scheduled to open.

vspdwd
January 18th, 2012, 05:44 PM
^^
Ya we are in 2012!:)
But most projects never meet the deadline..
BRTS proj will still push the deadline.

sujaysjn
January 18th, 2012, 11:02 PM
FIGURE E



http://img252.imageshack.us/img252/2236/arfc.jpg

I guess this is how it links up the both

@rsrikanth

Thanks bhai.Hubli-Dharwad has always been an interesting site for me,though people of Hubli-Dharwad complain that they don't have a ring road like that in Mysore or Gulbarga,but I knew Hubli-Dharwad had a ring road way back in 1998 itself when NH Bypass was opened.

If they wish they can run a road parallel to both NH and PB road in between them exclusive for BRTS.But who is gonna fund :P


You missed to show the link between NH 218 (Solapur Road) to NH 63 (Gadag Road). It connects 3 NHs (NH 218, NH 63 and NH 4)

rsrikanth05
January 19th, 2012, 09:08 AM
Ya may be..
But who is going to use it in HD?:)
Hubli Dharwad is the second largest urban agglomeration in K'taka. Easily, people can use it.

engineer.akash
January 19th, 2012, 09:46 AM
Hubli Dharwad is the second largest urban agglomeration in K'taka. Easily, people can use it.

It anyway lies on the busy Mumbai-Bangalore route :)

Suj Mangalore
January 19th, 2012, 12:21 PM
FUTURE BRTS MAP OF HUBLI??

Instead of running the BRTS along the edge i.e. on PB road they can build an exclusive third link with chord roads and have dedicated bus lanes,that will pave way for planned growth in between the two parallel roads and also ensuring speedy connectivity between the twins.

I wish to link that exclusive bus lane with Gokul road which is wide enough to accommodate BRTS and link Hubli city.

http://img40.imageshack.us/img40/8076/brtshubli.jpg

Excellent akash,your real genius:):applause:
There is a link missing between NH 63 and NH 218.
So Its almost a half Ring road???

rsrikanth05
January 19th, 2012, 02:59 PM
It anyway lies on the busy Mumbai-Bangalore route :)
And will help trucks stay out of the city.

sujaysjn
January 31st, 2012, 03:59 PM
Any updates on this project? Photos please.

vspdwd
February 1st, 2012, 10:21 AM
Any updates on this project? Photos please.

Work has come to a standstill. May be they are waiting for the BRTS approval?!

sujaysjn
February 4th, 2012, 11:00 AM
Still work is on hold??

vspdwd
February 4th, 2012, 11:57 AM
^^Yes...
Where are you from?:)

sujaysjn
February 4th, 2012, 02:39 PM
^^Yes...
Where are you from?:)

basically I am from Navanagar, Hubli, but presently living in Singapore, coming to India next week.:banana:

vspdwd
February 6th, 2012, 10:42 AM
Some more trees being axed near SDM...

http://img19.imageshack.us/img19/2166/photo0406a.jpg

http://img850.imageshack.us/img850/9283/photo0407o.jpg

s.yogendra
February 6th, 2012, 04:34 PM
ho big trees man :sad2:

vspdwd
February 6th, 2012, 05:54 PM
^^those were medium width trees....there were broader trees than those..:ohno:

engineer.akash
March 4th, 2012, 04:39 PM
What is the status now?

vspdwd
March 4th, 2012, 06:41 PM
^^
Nothing much.
GVR has put up a new 'Work in Progress: Speed Limit 30kmph' sign board near IT office on Friday. Guess they are going to start from there.

rsrikanth05
March 5th, 2012, 02:24 PM
It is a regular four lane road no?

vspdwd
March 5th, 2012, 02:39 PM
It is a regular four lane road no?
Regular in the sense?

rsrikanth05
March 5th, 2012, 07:14 PM
Regular in the sense?
Road with standard alignment and intersections. No service lanes, and/or grade separators.

engineer.akash
March 5th, 2012, 07:18 PM
Road with standard alignment and intersections. No service lanes, and/or grade separators.

Flyovers in city limits in Hubli and there is a proposal to start BRTS between the two cities,the idea was mooted by Prof Shivanand from CEPT university Ahmedabad who hails from Dharwad.He is the architect of Ahmedabad BRTS.Hope to see him working on a BRTS project in his home city.

rsrikanth05
March 5th, 2012, 07:20 PM
Flyovers in city limits in Hubli and there is a proposal to start BRTS between the two cities,the idea was mooted by Prof Shivanand from CEPT university Ahmedabad who hails from Dharwad.He is the architect of Ahmedabad BRTS.Hope to see him working on a BRTS project in his home city.
Aah, then by Govt standards, this road will become 'hitech'.

engineer.akash
March 15th, 2012, 02:24 PM
Someone update

vspdwd
March 15th, 2012, 03:10 PM
^^nothing to update!:lol::lol:
they have created ecological imbalance in advance and cooling their heels somewhere!:nuts:

engineer.akash
March 15th, 2012, 05:37 PM
Is there a road linking Gokul road and H-D intra city highway :P If yes then we must urgently develop it and if no we must urgently build one

vspdwd
March 15th, 2012, 07:33 PM
^^there is one road that connects Gokul road to Unkal cross in Hubli. But it is just a 2 lane road and too congested to develop into a 4 lane.

doc.aneesh
March 16th, 2012, 03:46 AM
^^there is one road that connects Gokul road to Unkal cross in Hubli. But it is just a 2 lane road and too congested to develop into a 4 lane.

It is almost parallel to PB road and only about a 100m apart

vspdwd
March 16th, 2012, 05:43 AM
It is almost parallel to PB road and only about a 100m apart
Yes but at least it will decongest the main road to Hosur to some extent.

engineer.akash
March 17th, 2012, 08:04 AM
^^They need to develop it

sujaysjn
March 24th, 2012, 06:45 AM
Any updates on the road works?

vspdwd
March 24th, 2012, 06:58 AM
Any updates on the road works?
Engineers are conducting surveys. They are doing final measurements i guess?!

vspdwd
March 26th, 2012, 11:29 AM
Finally! Road works resume near RTO.:banana::banana:

sujaysjn
March 26th, 2012, 04:10 PM
Finally! Road works resume near RTO.:banana::banana:



great news!

sujaysjn
March 31st, 2012, 06:18 AM
plz can some one get us photos of road works?

vspdwd
March 31st, 2012, 12:28 PM
plz can some one get us photos of road works?
Coming soon.:)

Shivanand
April 1st, 2012, 08:38 AM
Yes vspdwd, from RTO office to Navanagar work started with full swing.

engineer.akash
April 1st, 2012, 08:46 AM
Pics post madro :cheers:

DrYaqoob
April 2nd, 2012, 12:37 PM
Yes vspdwd, from RTO office to Navanagar work started with full swing.

Yes i too saw the work started infront of RTO....:banana:

chetanvh08
April 3rd, 2012, 07:06 AM
Yes i too saw the work started infront of RTO....:banana:

Can Some one post the pics of it...?

engineer.akash
April 4th, 2012, 10:57 AM
http://www.deccanheraldepaper.com/pdf/2012/04/03/20120403a_003104001.jpg

Don't wait for BRTS just go ahead

DrYaqoob
April 6th, 2012, 01:47 PM
HUBLI-DHARWAD 4-Lane Road (future BRTS)

Navanagar

http://img15.imageshack.us/img15/9295/brt1l.jpg

DrYaqoob
April 6th, 2012, 01:50 PM
http://img27.imageshack.us/img27/5168/brt2.jpg

DrYaqoob
April 6th, 2012, 01:54 PM
Infront of HESCOM

http://img4.imageshack.us/img4/902/brt3.jpg

engineer.akash
April 6th, 2012, 02:02 PM
Nice updates please post more pics :cheers:

DrYaqoob
April 6th, 2012, 02:18 PM
Infront of RTO metalling started

http://img861.imageshack.us/img861/2202/brt5c.jpg

DrYaqoob
April 6th, 2012, 02:23 PM
http://img51.imageshack.us/img51/1472/brt6.jpg

engineer.akash
April 6th, 2012, 02:28 PM
^^There is so much space available still

DrYaqoob
April 6th, 2012, 02:34 PM
They should start BRTS as early as possible and acquire the land or else political hurdles will erupt later.......
When u hit it first time.....then hit it hard

Suj Mangalore
April 6th, 2012, 02:35 PM
^^
Wonderful snaps and updates yaqoob saab.
Thanks for resizing the pics,now it looks more beautiful.
Well Hubli Dharwad kadi mali aagakhathaythenu??:)

engineer.akash
April 6th, 2012, 02:37 PM
^^
Wonderful snaps and updates yaqoob saab.
Thanks for resizing the pic,now it looks more beautiful.
Well Hubli Dharwad kadi mali aagakhataythenu??:)

Adh eno antharala.....Belgaum hudgirna namba baradhu dharwad malli na nambabaradhu ...Correct enri pa? :)

DrYaqoob
April 6th, 2012, 02:40 PM
Houdrippa....Dharwad mali yavaag bartyti goutillrrippa...

Suj Mangalore
April 6th, 2012, 02:41 PM
Adh eno antharala.....Belgaum hudgirna namba baradhu dharwad malli na nambabaradhu ...Correct enri pa? :)

Baal chelu math heldh nodri neevu:)

DrYaqoob
April 6th, 2012, 02:42 PM
Infront of Bhairidevara Koppa Dargah

http://img9.imageshack.us/img9/1424/brt7.jpg

DrYaqoob
April 6th, 2012, 02:48 PM
Heritage Bridge

http://img21.imageshack.us/img21/6433/brt8.jpg

engineer.akash
April 6th, 2012, 02:52 PM
There is so much space man why the hell are they waiting for land acquisition?

DrYaqoob
April 6th, 2012, 02:53 PM
SANA CAMPUS - from here till VIDYAGIRI Dharwad it will be concrete road.

http://img23.imageshack.us/img23/2519/brt9.jpg

DrYaqoob
April 6th, 2012, 02:55 PM
Think they need more than 180 feet plus there will be intersections,foot path,over bridges and under bridges....

DrYaqoob
April 6th, 2012, 03:03 PM
Eshwar Nagar - Before APMC Main Entrance

http://img718.imageshack.us/img718/4858/brt11h.jpg

DrYaqoob
April 6th, 2012, 03:15 PM
Infront of APMC Amargol

http://img851.imageshack.us/img851/4489/brt12.jpg

DrYaqoob
April 6th, 2012, 03:19 PM
VOLKSWAGON SHOWROOM

http://img259.imageshack.us/img259/5109/brt13.jpg

DrYaqoob
April 6th, 2012, 03:27 PM
http://img692.imageshack.us/img692/5389/brt14.jpg

DrYaqoob
April 6th, 2012, 03:33 PM
http://img638.imageshack.us/img638/7211/brt15.jpg

DrYaqoob
April 6th, 2012, 03:40 PM
http://img59.imageshack.us/img59/9131/brt16n.jpg

:banana: :banana: :banana: :banana: :banana:

mangalore mania
April 6th, 2012, 04:00 PM
Adh eno antharala.....Belgaum hudgirna namba baradhu dharwad malli na nambabaradhu ...Correct enri pa? :)

I feel girls in general from any place should not be believed easily

engineer.akash
April 6th, 2012, 04:05 PM
Yaqoob plz continue posting small sized images, don't know why my system is taking time to download the page.Anybody else facing the same problem? :ohno:

rsrikanth05
April 6th, 2012, 04:17 PM
Nice pics. How wide is the median going to be?

doc.aneesh
April 6th, 2012, 04:25 PM
@akash - Nan dost obba belgaumnaaga Mali aagakatthaithanth helakatthidda :)

DrYaqoob
April 6th, 2012, 04:27 PM
Presently it will be a 4-lane road later converted into BRTS (6-Lane) God Only Knows When... ? :ohno:

DrYaqoob
April 6th, 2012, 04:30 PM
Nice pics. How wide is the median going to be?

Thanks...Srikanth

Details not known....

engineer.akash
April 6th, 2012, 05:26 PM
@akash - Nan dost obba belgaumnaaga Mali aagakatthaithanth helakatthidda :)

Nice,I was in Belgaum last week,amazing city

sujaysjn
April 7th, 2012, 05:31 AM
Yaqoob plz continue posting small sized images, don't know why my system is taking time to download the page.Anybody else facing the same problem? :ohno:
Hi Akash, i am not facing any issues downloading pages..

sujaysjn
April 7th, 2012, 05:42 AM
HUBLI-DHARWAD 4-Lane Road (future BRTS)

Navanagar

http://img15.imageshack.us/img15/9295/brt1l.jpg

Glad to know, work has started from my place (Namma sundara Navanagar!).

vspdwd
April 8th, 2012, 07:34 AM
Great updates DrYaqoob!:banana:
You have brought life to this thread again!:)

DrYaqoob
April 8th, 2012, 11:58 AM
Presently it will be a 4-lane road later converted into BRTS (6-Lane) God Only Knows When... ? :ohno:

G o K.......

God only Knows.........

or

Govt of Karnataka.........

:lol: :lol: :lol:

sujaysjn
April 8th, 2012, 04:31 PM
G o K.......

God only Knows.........

or

Govt of Karnataka.........

:lol: :lol: :lol:


well said :nuts::nuts::nuts:

sujaysjn
April 11th, 2012, 03:10 PM
any new development in this work?

s.yogendra
April 11th, 2012, 05:26 PM
HUBLI-DHARWAD 4-Lane Road (future BRTS)

Navanagar

http://img15.imageshack.us/img15/9295/brt1l.jpg

amazing to see that this buses are still running :)

sujaysjn
April 14th, 2012, 11:23 AM
Any new photos please??

DrYaqoob
April 28th, 2012, 11:39 PM
The work for 4-lane is in progress.....
Road digging started from HESCOM to KSLU Cross for major drain works and Traffic diversion sign boards placed in that stretch......

DrYaqoob
April 28th, 2012, 11:58 PM
APMC -Volkswagon Showroom Stretch

http://img10.imageshack.us/img10/2727/volkswagon.jpg

engineer.akash
April 28th, 2012, 11:59 PM
They have not shifted those electric cables Yaqoob?

DrYaqoob
April 29th, 2012, 12:03 AM
They have not shifted those electric cables Yaqoob?

They have put new ones but the old ones may be still in use.......:ohno:

engineer.akash
April 29th, 2012, 12:05 AM
They have put new ones but the old ones may be still in use.......:ohno:

That is risky when bull dozers and road rollers are at work,what if the pole with live wire snaps?

DrYaqoob
April 29th, 2012, 12:06 AM
APMC Stretch

http://img521.imageshack.us/img521/7017/apmc.jpg

DrYaqoob
April 29th, 2012, 12:08 AM
BHAIRIDEVAR KOPPA

http://img831.imageshack.us/img831/489/bkoppa.jpg

DrYaqoob
April 29th, 2012, 12:13 AM
http://img801.imageshack.us/img801/9397/bkoppa1.jpg

DrYaqoob
April 29th, 2012, 12:15 AM
The Traffic is so heavy its risky to drive in this condition.....

Hope BRTS will be implemented as early as possible......:)

DrYaqoob
April 29th, 2012, 12:19 AM
They are digging existing road and concrete drainage work going on.....

I could not take the pics because of the traffic .....

DrYaqoob
May 2nd, 2012, 07:10 PM
http://a7.sphotos.ak.fbcdn.net/hphotos-ak-ash3/581165_10150802935433399_622253398_9595727_1243740727_n.jpg

:banana::banana::banana:

DrYaqoob
May 3rd, 2012, 08:19 AM
Karnataka to replicate Ahmedabad’s bus rapid transport system model


AHMEDABAD: The city is lending a helping hand to Hubli-Dharwad, the second-largest urban spread in Karnataka after Bangalore. The Centre for Environmental Planning and Technology (Cept) University has shown the way to the aggregation, which is suffering because of overloaded public transport service, by designing a BRTS for the twin city.

A Rs 450-crore project has been proposed, including Bus Rapid Transport System (BRTS) between Hubli and Dharwad. Cept University has been roped in as a consultant for the project which covers a stretch of 22.2 km.

"We have suggested lanes for overtaking on the 20-km stretch, which is something we do not have in Ahmedabad. There is heavy road traffic on the stretch as Hubli is a commercial hub and Dharwad an educational centre. It is estimated that around 2 lakh people commute every day on the 20-km stretch between Hubli-Navanagar and Dharwad. An efficient public transport system is urgently needed there," said Shivanand Swamy of Cept, a key member of the team that designed BRTS in Ahmedabad.

The chairman of North Western Karnatak Road Transport Corporation (NWKRTC) Mallikarjun Savakar; chairman of Hubli-Dharwad Urban Development Authority Lingaraj Patil; visited Ahmedabad on Wednesday to observe the services of BRTS in Ahmedabad.

Managing director of NWKRTC Hemaraju said, "Ahmedabad has the best BRTS service in the country, and we plan to replicate the same in the twin cities." World Bank has already offered a loan.

This would be the fourth BRTS project for which CEPT has been invited to design. Earlier, it was invited to design for Ahmedabad, Surat and Indore BRTS systems. The next project will be implemented in Vadodara soon.

http://timesofindia.indiatimes.com/c...w/12972984.cms

sujaysjn
May 5th, 2012, 03:04 AM
I heard from my father that work of shifting cable from old electrical poles to new electrical poles and removing the old electrical poles has been almost completed from ISCON to APMC..:banana:

engineer.akash
May 8th, 2012, 08:17 AM
http://www.deccanheraldepaper.com/pdf/2012/05/08/20120508a_003104002.jpg

So kamal nath has given green signal,great!

engineer.akash
May 8th, 2012, 08:26 AM
NWKRTC may shift new Hubli bus-stand (http://www.thehindu.com/todays-paper/tp-national/tp-karnataka/article3386374.ece)

The plan is to move it from Gokul Road to Hosur

Improvement ahead?:Minister for Rural Development and Panchayat Raj Jagadish Shettar inaugurating the newly formed Dharwad division of the North West Karnataka Road Transport Corporation in Dharwad on Friday.
The North West Karnataka Road Transport Corporation (NWKRTC) is planning to shift the new Hubli bus-stand from Gokul Road to Hosur, according to Minister for Rural Development and Panchayat Raj Jagadish Shettar.

Speaking after inaugurating the newly formed NWKRTC Dharwad division here on Friday, Mr. Shettar said if the plan worked out, the new bus-stand would be shifted to the premises of the Hubli depot at Hosur, and the depot to Gokul Road. The Bus Rapid Transport System (BRTS) proposed for Hubli-Dharwad had necessitated this change, which would be convenient for passengers, he added.

Facelift

The Cabinet had given its approval to BRTS, under which bus-stands and terminals would get a facelift. A team of local legislators and others recently visited Ahmedabad to study BRTS, which had been working there for the last three years.

It could be used as a model for Hubli-Dharwad with certain modifications, the Minister said.

Mr. Shettar said efforts were on to convince the Union government to sanction projects under the Jawaharlal Nehru National Urban Renewal Mission (JNNURM) for Hubli-Dharwad. As the population of Hubli-Dharwad had reached 10 lakh, the city was eligible for it, he said.

Hubli rocking!!

Cosmicbliss
May 8th, 2012, 08:28 AM
Dr. Yaqoob/Akash, Kannada article mein kya likha hai Hubli-Dharwad 4laning ke baare mein?

DrYaqoob
May 8th, 2012, 08:35 AM
Dr. Yaqoob/Akash, Kannada article mein kya likha hai Hubli-Dharwad 4laning ke baare mein?

Quote karo kounsa Kannada article.....?

I will tell u.............:)

rsrikanth05
May 8th, 2012, 08:49 AM
Where does this road start and end?

DrYaqoob
May 8th, 2012, 08:56 AM
Starts @ Hosur Cross Hubli and Ends @ Jubilee Circle Dharwad

rsrikanth05
May 8th, 2012, 09:14 AM
Starts @ Hosur Cross Hubli and Ends @ Jubilee Circle Dharwad
Thanks.

engineer.akash
May 8th, 2012, 11:29 AM
Dr Yaqoob can we have some recent pics?

DrYaqoob
May 8th, 2012, 11:34 AM
Dr Yaqoob can we have some recent pics?

Im not in Hubli right now......:)

Vspdwd or Manjunath or Chetan may try to post some......:cheers:

vspdwd
May 8th, 2012, 01:59 PM
Im not in Hubli right now......:)

Vspdwd or Manjunath or Chetan may try to post some......:cheers:
I can do that by this weekend. My freaking mobile which had a good cam is out of order right now.:bash:

engineer.akash
May 8th, 2012, 02:01 PM
I can do that by this weekend. My freaking mobile which had a good cam is out of order right now.

Please no mobile pics,carry a good digi cam and get us bright pics :) Hubli-Dharwad needs more hi resolution pics to be presented here.

vspdwd
May 8th, 2012, 02:32 PM
^^:lol:
Cant carry a digi-cam everyday to work.:)

rtatscrape
May 8th, 2012, 06:04 PM
http://www.deccanheraldepaper.com/pdf/2012/05/08/20120508a_003104002.jpg

So kamal nath has given green signal,great!

When is BRTS going to be implemented if Kamalnath has given the green signal
Anyways great news :banana::banana::banana::nuts:

chetanvh08
May 9th, 2012, 10:32 AM
Four way road



http://img694.imageshack.us/img694/1899/09052012.jpg (http://imageshack.us/photo/my-images/694/09052012.jpg/)

http://img502.imageshack.us/img502/3012/09052012010.jpg (http://imageshack.us/photo/my-images/502/09052012010.jpg/)

http://img535.imageshack.us/img535/2539/09052012009.jpg (http://imageshack.us/photo/my-images/535/09052012009.jpg/)

chetanvh08
May 9th, 2012, 10:33 AM
http://img210.imageshack.us/img210/3320/09052012008.jpg (http://imageshack.us/photo/my-images/210/09052012008.jpg/)

http://img138.imageshack.us/img138/6646/09052012007.jpg (http://imageshack.us/photo/my-images/138/09052012007.jpg/)

http://img818.imageshack.us/img818/3162/09052012004.jpg (http://imageshack.us/photo/my-images/818/09052012004.jpg/)

chetanvh08
May 9th, 2012, 10:33 AM
http://img404.imageshack.us/img404/4228/09052012003.jpg (http://imageshack.us/photo/my-images/404/09052012003.jpg/)

http://img6.imageshack.us/img6/4439/09052012002.jpg (http://imageshack.us/photo/my-images/6/09052012002.jpg/)

http://img10.imageshack.us/img10/2503/09052012001.jpg (http://imageshack.us/photo/my-images/10/09052012001.jpg/)

DrYaqoob
May 9th, 2012, 11:18 AM
Thanks Chetan for Hubli-Dharwad 4-lane updates.......:)

chetanvh08
May 9th, 2012, 01:24 PM
Thanks Chetan for Hubli-Dharwad 4-lane updates.......:)

:cheers::cheers::cheers::cheers::cheers:

rsrikanth05
May 9th, 2012, 03:12 PM
Man that two lane road is wiiide!!!

engineer.akash
May 9th, 2012, 03:29 PM
Man that two lane road is wiiide!!!

yes it is more like 1.5 +1.5 lanes :nuts:

vspdwd
May 9th, 2012, 04:08 PM
^^Yes. It has shoulders on both sides from Unkal Cross to SDM.

engineer.akash
May 9th, 2012, 04:14 PM
There is so much space still available and with BRTS plans in place more space is definitely required,along which stretches do they need to acquire land?

DrYaqoob
May 9th, 2012, 04:24 PM
There is so much space still available and with BRTS plans in place more space is definitely required,along which stretches do they need to acquire land?

Main traffic zone is Hosur Cross to Sai Nagar Cross....as this area has number of educational institutes and residential areas...

Unakal to APMC......Lot of Traffic because of Trucks going to APMC

Next is Navanagar to Rayapur Industrial area.....Floating population joins here from Satellite township of Navanagar and has many govt offices and industries......

Next is Sattur to Gandhi Nagar / Vidya Giri......Again lots Colleges esp.SDM Medical/Dental Colleges...and JSS Vidyagiri....

Then...Vidya Giri to Jubilee Circle ....again city traffic is high in this Stretch........:)

vspdwd
May 9th, 2012, 04:25 PM
^^It seems spacious near Navanagar in that pic.
But for 8-laned road huge land needs to be acquired and thats where problems arise.:ohno:

engineer.akash
May 9th, 2012, 04:29 PM
^^It seems spacious near Navanagar in that pic.
But for 8-laned road huge land needs to be acquired and thats where problems arise.:ohno:

Dr Yaqoob can you put those stretches on map? green for spacious and red for congested,we can get some idea about those lands which need to be acquired.

rsrikanth05
May 9th, 2012, 04:34 PM
Will there be any flyovers on the stretch?

engineer.akash
May 9th, 2012, 04:39 PM
Will there be any flyovers on the stretch?

Yes two of them at Hosur circle and RC circle

DrYaqoob
May 9th, 2012, 04:43 PM
Please Read this.......:)

http://www.sutpindia.com/docs/4am11nov11_HubliDharwad.pdf

Well planned study...:banana:

DrYaqoob
May 9th, 2012, 04:47 PM
http://img594.imageshack.us/img594/58/brt1c.jpg

Copyrights @ www.sutpindia.com

DrYaqoob
May 9th, 2012, 04:50 PM
http://img528.imageshack.us/img528/5168/brt2.jpg

http://img209.imageshack.us/img209/902/brt3.jpg

http://img84.imageshack.us/img84/3194/brt4.jpg

Copyrights @ www.sutpindia.com

DrYaqoob
May 9th, 2012, 04:52 PM
http://img525.imageshack.us/img525/3894/brt5.jpg

http://img513.imageshack.us/img513/1472/brt6.jpg

Copyrights @ www.sutpindia.com

DrYaqoob
May 9th, 2012, 05:00 PM
Karnataka Govt. rope in Consultant for Hubli-Dharwad BRTS
Thursday, 03 May, 2012

The Karnataka Government has roped in the Centre for Environmental Planning and Technology (CEPT) University as consultant for designing the BRTS project.

Karnataka is planning a Bus Rapid Transport System (BRTS) between Hubli and Dharwad to ease the traffic congestion in the city. The proposed BRTS project entailing Rs 450 crore will be second-largest urban spread in Karnataka after Bangalore. The stretch covers a distance of 22.2 km. The project is likely to be funded by the state government, Hubli-Dharwad Municipal Corporation and loan from World Bank.

http://www.projectstoday.com/News/NewsDetails.aspx?smid=24&nid=40497

rtatscrape
May 10th, 2012, 07:34 AM
This IS Really great news

engineer.akash
May 11th, 2012, 06:10 AM
http://www.deccanheraldepaper.com/pdf/2012/05/11/20120511a_003104002.jpg

Is there enough land?Where land is scarce Flyover is the solution?

gouravrattihalli
May 11th, 2012, 07:49 AM
Is there enough land?Where land is scarce Flyover is the solution?

I don't think that there is enough land on the entire strech to construct 8 lane but 6 lane possible....

Cosmicbliss
May 11th, 2012, 09:20 PM
Quote karo kounsa Kannada article.....?

I will tell u.............:)

pehla wala. Jisme bus ka picture bhi hai.

DrYaqoob
May 12th, 2012, 08:52 AM
pehla wala. Jisme bus ka picture bhi hai.

Yehi likha hai ki.....

Union Urban Development Minister Mr Kamal Nath has announced that 22 kms of BRTS will be constructed between Hubli-Dharwad with the help of world bank.

Mr Pralhad Joshi MP Dharwad North has requested Mr Kamal Nath to include Hubli-Dharwad in the 2-Phase of JNNURM.

DrYaqoob
May 15th, 2012, 03:11 PM
http://img842.imageshack.us/img842/9990/brts.jpg

Copyrights @ Udayavani

Cosmicbliss
May 15th, 2012, 08:15 PM
Dr. Yaqoob, can you please tell me the gist?

DrYaqoob
May 16th, 2012, 07:19 AM
Dr. Yaqoob, can you please tell me the gist?

Hi Cosmicbliss....

HDMC Commissioner Mr K.V.Trilokchandra had a meeting with various officials and the Embarque NGO/Consultancy regarding BRTS between Hubli and Dharwad.They discussed about pedestrian paths,underpass,Bus shelters,Recreation parks between twin cities which are coming up under BRTS project.

vspdwd
May 17th, 2012, 05:07 AM
http://img85.imageshack.us/img85/4646/dsc08029t.jpg

sujaysjn
May 17th, 2012, 12:44 PM
4 lane work is going on swing i think:banana: If possible can some please post latest photos ??

chetanvh08
May 17th, 2012, 01:31 PM
4 lane work is going on swing i think:banana: If possible can some please post latest photos ??

Hello sujaysjn
i had posted the latest pics only just took last Friday only :)

engineer.akash
May 17th, 2012, 07:56 PM
BRTS still has'not got nod from Union govt or world bank.Anyway the 4 lane road will ease traffic to a great extent.Also flyovers are not part of BRTS.HDMC must look at funding options,bangalore centric Govt needs to take care of its tier two cities.

rtatscrape
May 18th, 2012, 07:30 AM
BRTS still has'not got nod from Union govt or world bank.Anyway the 4 lane road will ease traffic to a great extent.Also flyovers are not part of BRTS.HDMC must look at funding options,bangalore centric Govt needs to take care of its tier two cities.

BRTS has been approved but the money has not been sanctioned:nuts::nuts::nuts::cheers:

sujaysjn
May 26th, 2012, 09:08 AM
Hello sujaysjn
i had posted the latest pics only just took last Friday only :)

Hey Chetan, now it is since almost two weeks, no updates on H-D 4 lane works.. Can you/some one please post photos??

vspdwd
May 26th, 2012, 10:18 AM
Hey Chetan, now it is since almost two weeks, no updates on H-D 4 lane works.. Can you/some one please post photos??
Here is a quick update.
:)
Road widened from sana college to amargol and from rto to navanagar to ease works. Also the excav
ation work has reached till navanagar bus stand.

DrYaqoob
May 26th, 2012, 10:21 AM
Here is a quick update.
:)
Road widened from sana college to amargol and from rto to navanagar to ease works. Also the excav
ation work has reached till navanagar bus stand.

Thanks for the updates......:)

pics if u have....?

DrYaqoob
May 26th, 2012, 02:15 PM
2633 trees were cut for 4-lane project between Hubli-Dharwad

http://img36.imageshack.us/img36/9828/brtstree.gif
Source : Sanjevani

The District administration / HDMC / Forest Dept should take steps to restore the green cover between twincities....:)

vspdwd
May 26th, 2012, 04:33 PM
Thanks for the updates......:)

pics if u have....?
Will try to bring tomorrow.

Also huge trees are being cut inside dharwad city.

DrYaqoob
May 26th, 2012, 04:37 PM
Will try to bring tomorrow.

Also huge trees are being cut inside dharwad city.

Where...? Hotel Dharwar / Court Circle....? or toll naka...?

Dharwad will loose its greenary..

sujaysjn
May 26th, 2012, 05:06 PM
Here is a quick update.
:)
Road widened from sana college to amargol and from rto to navanagar to ease works. Also the excav
ation work has reached till navanagar bus stand.

Thanks vspdwd..

vspdwd
May 26th, 2012, 05:58 PM
Where...? Hotel Dharwar / Court Circle....? or toll naka...?

Dharwad will loose its greenary..

Between court circle n jubilee circle..

DrYaqoob
May 27th, 2012, 08:48 AM
ಚತುಷ್ಪಥ ನಿರ್ಮಾಣ ಅನುಮತಿಗಿಂತ ಹೆಚ್ಚು ಗಿಡಗಳು ನಾಶ
ವಿಕ ಸುದ್ದಿಲೋಕ | May 27, 2012, 05.00AM IST

ಧಾರವಾಡ : ಹು-ಧಾ ಅವಳಿ ನಗರದ ಮಧ್ಯೆ ಚತುಷ್ಪಥ ನಿರ್ಮಾಣಕ್ಕಾಗಿ ನಡೆಯುತ್ತಿರುವ ಮರಗಳ ತೆರವುಗೊಳಿಸುವ ಕಾರ್ಯಾಚರಣೆಯಲ್ಲಿ ಸಾಕಷ್ಟು ವ್ಯತ್ಯಾಸಗಳು ಕಂಡು ಬರುತ್ತಿವೆ ಎಂದು ಪರಿಸರವಾದಿ ಅಕ್ಷಯ್ ಹೆಬ್ಳೀಕರ್, ಸಂತೋಷ ನರಗುಂದ ದೂರಿದರು.
ಶನಿವಾರ ಜಂಟಿ ಸುದ್ದಿಗೋಷ್ಠಿಯಲ್ಲಿ ಮಾತನಾಡಿದ ಅವರು, ಪರಿಸರ ಇಲಾಖೆಯು 19.4 ಕಿ.ಮೀ. ಉದ್ದ ಹು-ಧಾ ಚತುಷ್ಪಥ ಮಧ್ಯೆ ಇರುವ 1200 ಗಿಡಗಳನ್ನು ಕಡಿಯಲು ಅನುಮತಿ ನೀಡಿತ್ತಾದರೂ ಈಗಾಗಲೇ ಗುತ್ತಿಗೆದಾರರು 2700ಕ್ಕೂ ಹೆಚ್ಚು ಗಿಡ ಕಡಿದಿರುವುದು ದಾಖಲೆಗಳಿಂದ ಕಂಡು ಬಂದಿದೆ ಎಂದರು.
ಈ ಗುತ್ತಿಗೆಯನ್ನು ಚೆನ್ನೈದ ಜಿವಿಆರ್ ಇನ್ಫ್ರಾ ಪ್ರಾಜೆಕ್ಟ್ಸ್ ಲಿ.ಗೆ ನೀಡಲಾಗಿದೆ. ಗುತ್ತಿಗೆಯ ಒಟ್ಟು ಮೊತ್ತ 119 ಕೋಟಿ ರೂ.ಗಳದ್ದಾಗಿದೆ. ಯೋಜನೆಯಡಿ ಮರ ಕಡಿದ ಬಳಿಕ ಹೊಸದಾಗಿ ನಿರ್ಮಾಣವಾಗುವ ರಸ್ತೆಗುಂಟ 4000 ಸಸಿ ನೆಡಲು ಕರ್ನಾಟಕ ರಸ್ತೆ ಅಭಿವೃದ್ಧಿ ನಿಗಮ (ಕೆಆರ್*ಡಿಸಿಎಲ್)ವು ಅರಣ್ಯ ಇಲಾಖೆಗೆ 27 ಲಕ್ಷ ರೂ.ಗಳನ್ನು ಈಗಾಗಲೇ ಪಾವತಿಸಿದೆ ಎಂದರು.
ಕೆಆರ್*ಡಿಸಿಎಲ್*ನವರು 1200 ಮರ ಕಡಿಯಲು ಅನುಮತಿ ನೀಡಿದ್ದಾರೆ. ಆದರೆ, ಗುತ್ತಿಗೆದಾರರ ದಾಖಲಾತಿಗಳಲ್ಲಿ 2633 ಮರಗಳನ್ನು ಕಡಿಯುವ ಆದೇಶ ಇರುವುದು ಅನೇಕ ಸಂಶಯಗಳಿಗೆ ಕಾರಣವಾಗಿದೆ ಎಂದು ಹೆಬ್ಳೀಕರ ಮತ್ತು ನರಗುಂದ ಅಭಿಪ್ರಾಯ ವ್ಯಕ್ತಪಡಿಸಿದರು.
ಪ್ರತಿ ಮರವು ಕನಿಷ್ಠ 10 ಜನರಿಗಾಗುವಷ್ಟು ಆಮ್ಲಜನಕ ಉತ್ಪಾದಿಸುತ್ತದೆ. ಈ ಕಡಿದಿರುವ ಮರಗಳನ್ನು ಲೆಕ್ಕ ಹಾಕಿದರೆ 26330 ಜನರಿಗಾಗುವಷ್ಟು ಆಮ್ಲಜನಕದ ಉತ್ಪಾದನೆ ಕಡಿಮೆಯಾದಂತಾಗಿದೆ. ಮರಗಳ ಕಡಿದಿರುವುದರಿಂದ ಪರಿಸರ, ಪ್ರಾಣಿ, ಪಕ್ಷಿಗಳ ಮೇಲಾಗುವ ಪರಿಣಾಮವೂ ಆಪಾರವಾಗಿದೆ ಎಂದವರು ತಿಳಿಸಿದರು.
ಈಗ ಕಡಿದ ಗಿಡಗಳು ನೂರಾರು ವರ್ಷಗಳ ಹಿಂದಿನವು. ಇವುಗಳ ಮೌಲ್ಯ ಲೆಕ್ಕಕ್ಕೆ ಹಿಡಿಯದಷ್ಟಿದೆ. ಇಂಥ ಸಂದರ್ಭದಲ್ಲಿ ಹೊಸ ಸಸಿಗಳನ್ನು ನೆಟ್ಟು ಈಗ ಕಡಿದ ಗಿಡಗಳ ಹಂತಕ್ಕೆ ತರಲು ಬೇಕಾದ ಸಮಯವನ್ನು ಸರಕಾರ ಲೆಕ್ಕಕ್ಕೆ ಹಿಡಿಯುತ್ತಲೇ ಎಂದವರು ಅಸಮಾಧಾನ ವ್ಯಕ್ತಪಡಿಸಿದರು.
ಅಭಿವೃದ್ಧಿಗೆ ತಮ್ಮ ತಕರಾರಿಲ್ಲ. ಆದರೆ, ಅಭಿವೃದ್ಧಿ ಹೆಸರಿನಲ್ಲಿ ಪರಿಸರ ಮೇಲಾಗುತ್ತಿರುವ ಹಾನಿಯನ್ನು ಗಣನೀಯ ಪ್ರಮಾಣದಲ್ಲಿ ತಗ್ಗಿಸುವ ಯಾವುದೇ ಪ್ರಯತ್ನ ಆಗದಿರುವುದು ಗಂಭೀರ ವಿಷಯವಾಗಿದೆ ಎಂದರು.
ಇಂಡಿಯಾ ಅಗೇನಸ್ಟ್ ಕರೆಪ್ಶನ್*ನ ಫರೀದ ಹಬೀಬ್, ಸತ್ಯಶೋಧನಾ ಸಮಿತಿಯ ಅರವಿಂದ ಮೇಟಿ ಸುದ್ದಿಗೋಷ್ಠಿಯಲ್ಲಿದ್ದರು.

DrYaqoob
May 27th, 2012, 08:59 AM
Traffic Jam on Hubli-Dharwad Road due to cutting of trees for 4-lane project

http://img825.imageshack.us/img825/8104/hdm1.jpg

engineer.akash
May 27th, 2012, 09:53 AM
Vspdwd get us some pics man

rsrikanth05
May 28th, 2012, 08:55 AM
Can someone mark the two ends of this on the map please?

engineer.akash
May 28th, 2012, 06:13 PM
‘Mission 4,000' to increase green cover in twin cities

Rashtrotthana Sankalp Trust in association with environmentalists and the general public will be planting 4,000 saplings along the proposed four-lane road between Hubli and Dharwad.

President of the trust Santhosh Nargund told presspersons here on Sunday that as part of the road expansion works, the authorities had felled huge trees without considering the damage that had caused to the environment. The trust had launched the initiative to enhance the green cover in the twin cities.

Mr. Santhosh said that the trust would be launching the initiative under the name ‘Mission 4,000'. “Various civil society organisations, environmentalists have already pledged their support to this cause.

The trust is also creating awareness on this grave environmental issue among the citizens through sessions in schools, colleges and on internet”, he said.

The trust would celebrate World Environment Day on June 5 and would launch ‘Greener Hubli-Dharwad Campaign'.

Mr. Nargund said that while the Ministry of Environment and Forestry had permitted felling of 1,200 trees to make way for the proposed four-lane road, the Divisional Forest Officer had given sanction for chopping down 1,700 trees. “Going a step further, the contractor entrusted with the work has chopped down 2,633 trees”, he said.

Mr. Santhosh said that the trust wanted to make up for the loss of such a large number of trees.

The Hindu (http://www.thehindu.com/todays-paper/tp-national/tp-karnataka/article3463889.ece)

engineer.akash
June 3rd, 2012, 04:21 PM
Guys this road which you can see in the pic is the airport road-bypass link

http://farm8.staticflickr.com/7249/7017396537_c21dbd9598_b.jpg

Posting it here as a record

vspdwd
June 4th, 2012, 01:34 PM
Got some pic updates....
Sorry for the bad quality..since that was the best position i could get from a moving bus's window.:lol:

vspdwd
June 4th, 2012, 01:35 PM
Near APMC
http://img853.imageshack.us/img853/7905/20120530093933966.jpg

vspdwd
June 4th, 2012, 01:42 PM
Near APMC
http://img137.imageshack.us/img137/1044/20120604151110486.jpg

vspdwd
June 4th, 2012, 01:43 PM
Near APMC
http://img443.imageshack.us/img443/1034/20120604151120788e.jpg

vspdwd
June 4th, 2012, 01:43 PM
Near Navanagar
http://img831.imageshack.us/img831/3755/2012060411225635.jpg

vspdwd
June 4th, 2012, 01:44 PM
Near Navanagar
http://img442.imageshack.us/img442/6384/20120604112243676.jpg

vspdwd
June 4th, 2012, 01:45 PM
Near RTO
http://img405.imageshack.us/img405/9111/20120604112136685.jpg

vspdwd
June 4th, 2012, 01:46 PM
Near RTO
http://img827.imageshack.us/img827/362/20120604112144162.jpg

vspdwd
June 4th, 2012, 01:47 PM
Near IT Dept
http://img3.imageshack.us/img3/427/20120604112207492.jpg

vspdwd
June 4th, 2012, 01:47 PM
Culvert near IT Dept
http://img444.imageshack.us/img444/7354/20120604112229687.jpg

vspdwd
June 4th, 2012, 01:48 PM
Near RTO
http://img715.imageshack.us/img715/97/20120604151720718.jpg

vspdwd
June 4th, 2012, 01:49 PM
In all, 4 culverts are coming up within a distance of 1 km from Navanagar to RTO.:)

sujaysjn
June 4th, 2012, 03:16 PM
Nice photos vsp!

engineer.akash
June 4th, 2012, 04:37 PM
Super updates. :cheers:

vspdwd
June 4th, 2012, 05:45 PM
^^Thanks to both of you:)

s.yogendra
June 4th, 2012, 07:15 PM
thank u VSPDWD :)

is it 4lane? what happened to BRTS

vspdwd
June 4th, 2012, 07:26 PM
thank u VSPDWD :)

is it 4lane? what happened to BRTS

Yes..its four lane...
I think they are still waiting for some sort of go ahead signal for the brts..

engineer.akash
June 4th, 2012, 07:27 PM
VSPDWD next time get us pics of those stretches where cosiderabl;e work is over,we want to see the quality of work :cheers:

KRDCL is good.

Manjunath kasigavi
June 4th, 2012, 07:28 PM
Nice updates vsp:banana:

DrYaqoob
June 4th, 2012, 07:42 PM
Thanks vsp.....:)

Today i had been to Dharwad....wow it was raining at few stretch between Hubli-Dharwad with cool breeze of Dharwad....

4-Lane work under progress

road extension from Sana Campus to APMC

UGD works @ RTO and Hescom.....:cheers:

engineer.akash
June 4th, 2012, 07:44 PM
When are we going to see the pics? :cheers:

DrYaqoob
June 4th, 2012, 07:48 PM
it was raining so couldnt take pics.....later i will post KIMS campus pics ......:)

vspdwd
June 5th, 2012, 04:42 AM
VSPDWD next time get us pics of those stretches where cosiderabl;e work is over,we want to see the quality of work :cheers:

KRDCL is good.

This is the only stretch where considerable work is over..they have started to excavate from rto to iskcon.

chetanvh08
June 5th, 2012, 12:10 PM
awesome pics vspdwd....:)

bcsagar
June 5th, 2012, 01:17 PM
Yes..its four lane...
I think they are still waiting for some sort of go ahead signal for the brts..


KRDCL should implement 4 lane with paved shoulders like NHAI.
The quality of work is good, but...

Mysore Highway is example with just 2 lanes each side with muddy shoulders.
This leads to accidents while overtaking & also 2 wheelers/ large slow moving vehicles block traffic flow/speed.

It is really dangerous the way Taxis overtake on Mysore road, besides absence of bypass for major towns.

vspdwd
June 5th, 2012, 04:23 PM
KRDCL should implement 4 lane with paved shoulders like NHAI.
The quality of work is good, but...

Mysore Highway is example with just 2 lanes each side with muddy shoulders.
This leads to accidents while overtaking & also 2 wheelers/ large slow moving vehicles block traffic flow/speed.

It is really dangerous the way Taxis overtake on Mysore road, besides absence of bypass for major towns.
I agree..