View Full Version : #COMPLETED: Mag 214 Tower, 39F Res, Plot R2 (JLT)


SA BOY
October 31st, 2004, 11:33 AM
Name: Mag Tower
Location: JLT
Plot: ?
Floors: 39
Height: ?
Use: Residential
Cost: ?
Start Construction: 2004
End Construction: 2006

http://www.skyscrapercity.com/photopost/data/503/11020Mag_214_Tower.jpg

sign board by sa boy :)

http://www.ayuplanet.com/dxblover/Sign Boards/Mag Tower.jpg

Dubai-Lover
October 31st, 2004, 11:51 AM
this is the one i found yesterday during researches
i even have the official render (check post #1)
again, great effort giles :)

Dubai-Lover
October 31st, 2004, 11:54 AM
description by property dealer

Excellent location in Jumeirah Lakes. Tower surrounded by lake on three sides.The apartment overlooks the lake directly and is on the fouth floor very close to the lake.Apt no.408
Pay only 10 % now. Balance spread over two and a half years.
Construction started.
Possession in Dec 2006.
There will be shops and restaurants on the ground and mezzanine level.Fully equipped kitchen.
24 hour security
24 hour reception
High speed internet and cable access.
Huge swimmingpool
Games room
Gymnasium,HealthClub,Spa,Jacuzzi.
Garden and walking boulevard.

ahmedr
October 31st, 2004, 04:05 PM
I like it alot.

SA BOY
November 1st, 2004, 10:58 AM
very ceasar pelli

SA BOY
November 1st, 2004, 11:01 AM
could someone mail them about its height. They have been receptive to a mail I sent many months ago and gave me the heights

Dubai-Lover
November 1st, 2004, 11:20 AM
which company shall i contact?
tried to find amg, but impossible

Trances
November 2nd, 2004, 04:28 AM
nice shape

SA BOY
November 2nd, 2004, 06:49 AM
I meant the architects

Dubai-Lover
November 20th, 2004, 07:39 PM
giles - altin said he has the impression mag 214 is located on the s cluster

new dubai gate is only 2 clusters away. you have found these 2 on your own. how lang was the drive from new dubai gate to mag tower?
just to have an idea where it might be!

Dubai_Boy
November 20th, 2004, 11:09 PM
not bad , oh yeah btw , there is a new tower called the double tower two 20 floor towers in one in the Dubai marina at a cost of 100 mill derhams booooring , compared to the big boys :/

Dubai-Lover
November 20th, 2004, 11:16 PM
more info on this one duai boy?
if yes, please create own thread

Dubai_Boy
November 20th, 2004, 11:18 PM
برج مزدوج جديد في مرسى دبي

فازت الدولية للمشروعات (مقرها البحرين) وبوفيز لنديز الاسترالية بعقد خدمات الادارة والاستشارات لمشروع البرج المزدوج الذي يقام في دبي مارينا بتكلفة 100 مليون درهم (2,27 مليون دولار). سيشمل كل برج 20 طابقاً، بتصميم من شركة آر. ام. جي. إم البريطانية لصالح شركة الحصان الأسود الاستثمارية السعودية. « ميد»

http://www.albayan.ae/servlet/Satellite?cid=1099998394726&pagename=Bayan%2FBayanArticle%2FBayanArticle&c=Page



thats all i have for now ;/

SA BOY
November 21st, 2004, 05:55 AM
Dubai Gate and Mag tower were very close say 200meters apart

Dubai-Lover
November 21st, 2004, 11:50 AM
great
at least we roughly know where it is

Dubai-Lover
November 24th, 2004, 11:21 PM
hehe, i found the exact location, got another one! YES!
and you were right giles and altin


mag 214 is located on R2 plot


and look what has happened to the dmcc project on the very left. there now is a lake!!!! maybe we'll see these brown mega towers, which have signboards up along jlt site, in this one day


http://www.gigroup.net/images/mag214/location.gif

SA BOY
November 25th, 2004, 08:16 AM
still need a height from K&A architects. Has someone mailed them?

SA BOY
November 25th, 2004, 09:22 AM
Also need to change the title now we have the plot number

Dubai-Lover
November 25th, 2004, 09:57 AM
changed title
can you give me their email adress? i'll do it then

SA BOY
November 25th, 2004, 10:12 AM
Dubai
Tel: +971 4 2222203
Fax: +971 4 2281014
P.O.Box: 5091
Email: kadub@emirates.net.ae

Dubai-Lover
December 18th, 2004, 01:44 AM
coincidentally found the homepage of the property developer, mag group

http://www.magpd.com

Dubai-Lover
December 18th, 2004, 01:44 AM
contacted for height

SA BOY
December 18th, 2004, 06:08 AM
and an immage for the Dubai land tower as well? these are the towers they are doing listed from their website:
Two Towers in Jumeirah Lake Tower/ Al Nakheel

One Tower in Jebel Ali-Palm Island/ Al Nakheel

One Tower in Downtown - Dubai Land

One Tower in Dubai Marina

One Towers in Khan Lake in Sharjah

Dubai-Lover
December 18th, 2004, 08:25 AM
let's wait if they reply anyway
if yes, i'll contact them once more

AltinD
February 26th, 2005, 10:21 AM
Puerto Madera Tower, a 250 meters proposal for Buenos Aires, Argentina. It was never built:

http://img132.exs.cx/img132/5569/untitled9zs.jpg

Remove the third section near the top and some floors on the other two, and you get the Mag 214 tower.

Krazy
March 1st, 2005, 08:13 AM
Slightly different render or is it the same?

http://gigroup.net/images/mag214/mag214.gif

Krazy
March 1st, 2005, 08:15 AM
http://gigroup.net/images/mag214/location.gif

Dubai-Lover
May 20th, 2005, 07:56 AM
Transemirates to build MAG tower

By Saifur Rahman, Staff Reporter

Dubai :
Dubai-based property developers Moafaq Al Gaddah (MAG) Group PDD has awarded the main contract to build its MAG 214 Tower to Transemirates Contracting, a Dubai-based construction company.

"This is one of our contracts as far as the construction of freehold properties is concerned," Mohammad Nimer, director of the group, told Gulf News yesterday.

The building will be part of the Jumeirah Lake Towers complex, developed by Nakheel, a Dubai-based property developer.

Seventy-eight towers are being built at the complex in Dubai.

The Group did not disclose the value of the contract, but the project is expected to cost more than Dh200 million.

MAG Group has lined up seven new projects, including residential buildings, commercial towers and logistics facilities.

In March, it started offering units of MAG 218 Tower, a 66-floor freehold residential building at Dubai Marina. The tower is valued at more than Dh350 million.

Dar Al Handasah, who designed the project, has been appointed the designer and supervisor to oversee the smooth construction of the project.

Asteco has been appointed the sales and marketing agent of the project, while Amlak will support buyers with mortgage finance.

"We are also closely working with Dar Al Handasah on MAG 218 Tower. Currently, they are finalising the detailed design, which will go on tendering in August. It could be an open tender," Nimer said.

"Construction will take about two and a half years to complete," he added.

MAG Group is also rolling out two towers at the Dubai International Financial Centre, MAG 224 tower near Khan lake in Sharjah, an office building in Naif-Mussallah area in downtown Dubai, MAG 222 in The Palm, Jebel Ali, and MAG 220 in Dubailand's City of Arabia.

The two towers at the Dubai International Financial Centre will be worth more than Dh400 million.

"The overall value of our development would be in excess of Dh1.5 billion," Nimer said.

AltinD
May 26th, 2005, 05:06 PM
http://img.photobucket.com/albums/v705/altind/JLTMAG214.jpg

Þróndeimr
May 28th, 2005, 11:48 AM
A traditional design, but not a bad one.

ncon
July 8th, 2005, 08:30 AM
sorry if i'm disturbing but i try to search and could not find so i started it

the tower :

http://img178.echo.cx/img178/3408/mypictures5ml.jpg

Dubai-Lover
July 8th, 2005, 05:33 PM
great render
but the tower is only averagee i'd say

dubaiflo
July 8th, 2005, 06:55 PM
i like the huge name on the top...but the rest..

Dubai-Lover
July 25th, 2005, 02:06 PM
updated website
a hell lot of construction photos now on www.magpd.com

from july 21

http://www.magpd.com/admin/construction/images/pic19.pjpeg

http://www.magpd.com/admin/construction/images/pic10.pjpeg

http://www.magpd.com/admin/construction/images/pic7.pjpeg

dazz
July 25th, 2005, 02:42 PM
it looks like alien tripods from War of the Worlds is attacking those men! :runaway:

Imre
July 25th, 2005, 05:08 PM
Alien vs. Predator ! :)
:rofl: :rofl: :rofl: :rofl: :rofl: :rofl: :rofl: :rofl:

Trances
July 26th, 2005, 01:37 AM
LOL dazz

AltinD
October 25th, 2005, 10:06 PM
http://************/f067id.jpg

AltinD
January 7th, 2006, 04:36 PM
06/01/2006

http://************/jtap8z.jpg

dubaiflo
January 7th, 2006, 04:50 PM
long time gone and another one coming up. can you believe it. thanks altin.

btw i pm ed you , i need your help for SZR plot map.. pleaaaaaase... :D

Stephan23
January 9th, 2006, 10:08 AM
Great, another one!!

Dubai-Lover
January 13th, 2006, 07:41 PM
today

http://************/k4dpc3.jpg

Dubai-Lover
February 10th, 2006, 09:02 PM
today

http://i1.************/ngws2f.jpg

AltinD
February 26th, 2006, 07:29 PM
25/02/2006

http://i1.************/okohp1.jpg

Stephan23
May 15th, 2006, 02:21 PM
In what floor we are?? 20?

AltinD
May 22nd, 2006, 11:07 PM
21/05/2006

http://i4.************/10f3mtf.jpg

AltinD
July 9th, 2006, 09:16 PM
08/07/2006

http://i6.************/1zeuyci.jpg

colemonkee
July 10th, 2006, 06:59 PM
Nice shot. Is that a facade test at the bottom?

Dubai-Lover
August 1st, 2006, 07:18 PM
july 30

http://i7.************/21mx37n.jpg

Krazy
August 1st, 2006, 09:27 PM
about 10 more floors to go... good stuff

Imre
October 6th, 2006, 01:33 PM
09/10/2006

http://img220.imageshack.us/img220/8554/img4572cw7.jpg (http://imageshack.us)

Imre
February 22nd, 2007, 11:58 AM
22/02/2007

MAG 214

http://img98.imageshack.us/img98/6561/photo63ob7.jpg (http://imageshack.us)

Imre
April 28th, 2007, 07:53 PM
http://img339.imageshack.us/img339/6510/imresolt02fr7.jpg (http://imageshack.us)

http://img126.imageshack.us/img126/1969/copyofcopyofsh01lakevieob9.jpg (http://imageshack.us)

Imre
April 28th, 2007, 07:56 PM
http://img244.imageshack.us/img244/645/imresolt05ut4.jpg (http://imageshack.us)

http://img126.imageshack.us/img126/1746/imresolt04xw2.jpg (http://imageshack.us)

http://img244.imageshack.us/img244/1227/imresolt06eg1.jpg (http://imageshack.us)

http://img126.imageshack.us/img126/7249/imresolt07nf8.jpg (http://imageshack.us)

Imre
April 28th, 2007, 07:57 PM
http://img126.imageshack.us/img126/7316/imresolt08nw1.jpg (http://imageshack.us)

http://img126.imageshack.us/img126/9315/imresolt09ye5.jpg (http://imageshack.us)

http://img410.imageshack.us/img410/2634/imresolt10te0.jpg (http://imageshack.us)

THE DUBAI GUYS
May 14th, 2007, 04:54 PM
Asteco wins MAG 214 deal

Dubai based Asteco has won the contract to manage the MAG 214, a 40 storey freehold residential tower at Jumeirah Lake Towers which is due for completion in October. As part of its one year contract, Asteco will provide a range of services, including the management of all common areas of the property and it will help to establish a co-owners' committee. The property contains 306 apartments and one penthouse.

United Arab Emirates: 2 hours, 1 minute ago

R

Imre
May 18th, 2007, 04:38 PM
18/May/2007

MAG 214

http://img185.imageshack.us/img185/883/imresolt034pm2.jpg (http://imageshack.us)

http://img508.imageshack.us/img508/7871/imresolt035pa5.jpg (http://imageshack.us)

GoDubai!
May 19th, 2007, 12:47 PM
The finishing touches do make this tower look a bit nicer. I don't so much care for the facade or design, but it isn't all bad. It is in very similar form to a rather prestigious tower being built in Damascus, the home of the founder of the company. I'm not sure, but I believe that may be an Emaar project. In that project the central tower is quite attractive, somewhat Islamic in design and works just right. The MAG 214 seems sort of a copy of that, but does not quite work in this very different setting, with its eclectic mix of buildings. Still, it is nice to see that the finished project looks a bit better than the renders.

Imre
June 7th, 2007, 02:01 PM
07/June/2007

MAG 214 from Goldcrest Views

http://img292.imageshack.us/img292/5835/imresolt028qs6.jpg (http://imageshack.us)

http://img520.imageshack.us/img520/7326/imresolt030ii2.jpg (http://imageshack.us)

Insane alex
June 10th, 2007, 01:38 PM
This one is really cool! :D

CANBOZ
June 14th, 2007, 12:03 PM
Do any one have interior photos of MAG214 other than the ones in MAG website?

CANBOZ
June 28th, 2007, 02:24 PM
http://img120.imageshack.us/img120/6866/28062007278zm2.jpg

http://img517.imageshack.us/img517/7022/28062007276pp6.jpg

http://img177.imageshack.us/img177/1006/28062007277gu9.jpg

Imre
July 14th, 2007, 04:39 PM
14/July/2007

MAG 214 TOWER

http://img253.imageshack.us/img253/2483/imresolt054va0.jpg (http://imageshack.us)

bizzybonita
July 26th, 2007, 10:53 PM
check out pic(s) from MAG 214 SITE
http://www.magpd.com/admin/construction/images/Resize%20of%20DSC01543.JPG

http://www.magpd.com/admin/construction/images/Resize%20of%20DSC01259.JPG

http://www.magpd.com/admin/construction/images/Resize%20of%20DSC01262.JPG

http://www.magpd.com/admin/construction/images/Resize%20of%20DSC01250.JPGhttp://www.magpd.com/admin/construction/images/Resize%20of%20DSC01258.JPG
http://www.magpd.com/admin/construction/images/Resize%20of%20DSC01241.JPG

http://www.magpd.com/admin/construction/images/Resize%20of%20DSC01242.JPG

http://www.magpd.com/admin/construction/images/Resize%20of%20DSC01245.JPG

http://www.magpd.com/admin/construction/images/Resize%20of%20DSC01244.JPG

http://www.magpd.com/admin/construction/images/Resize%20of%20DSC01246.JPG

http://www.magpd.com/admin/construction/images/Resize%20of%20DSC01247.JPG

http://www.magpd.com/admin/construction/images/Resize%20of%20DSC01227.JPG

http://www.magpd.com/admin/construction/images/Resize%20of%20DSC01228.JPG

http://www.magpd.com/admin/construction/images/Resize%20of%20DSC01233.JPG

http://www.magpd.com/admin/construction/images/Resize%20of%20DSC01217.JPG

http://www.magpd.com/admin/construction/images/Resize%20of%20DSC01218.JPG

http://www.magpd.com/admin/construction/images/Resize%20of%20DSC01220.JPG

http://www.magpd.com/admin/construction/images/Resize%20of%20DSC01221.JPG

http://www.magpd.com/admin/construction/images/Resize%20of%20DSC01225.JPG

bizzybonita
July 26th, 2007, 11:00 PM
http://www.magpd.com/admin/construction/images/Resize%20of%20DSC03617.JPG

http://www.magpd.com/admin/construction/images/Resize%20of%20DSC03616.JPG

http://www.magpd.com/admin/construction/images/Resize%20of%20DSC03606.JPG

http://www.magpd.com/admin/construction/images/Resize%20of%20DSC02545.JPG

http://www.magpd.com/admin/construction/images/Resize%20of%20DSC02549.JPG

http://www.magpd.com/admin/construction/images/Resize%20of%20DSC02542.JPG

http://www.magpd.com/admin/construction/images/Resize%20of%20DSC02536.JPG

Tony 90
July 27th, 2007, 12:54 PM
Excellent photos:)
This looks almost complete, when is the handover?

viky
July 27th, 2007, 01:59 PM
Tower looks nice including interiors. Buyers of this building are fortunate I suppose.

CANBOZ
July 28th, 2007, 08:36 AM
Approximate handover is October or November 2007 as MAG Property Development officials told us

Imre
October 19th, 2007, 06:15 PM
18/October/2007


http://img98.imageshack.us/img98/9070/imresolt085sf5.jpg (http://imageshack.us)

http://img512.imageshack.us/img512/3938/imresolt088ee8.jpg (http://imageshack.us)

samindxb
October 30th, 2007, 04:31 PM
hi guys,
any updates on MAG 214? DEWA? hand over date?
Thanks
Sam

Imre
October 30th, 2007, 04:59 PM
if you see from outside the building looks ready , I think they are waiting for the DEWA.

samindxb
October 30th, 2007, 05:17 PM
You're right Imre, the inside is 99% completed for a few months now. Last time I visited the tower, they were working on the Lobby, and the retails areas, but only a couple of workers was on site.
Al Waleed Paradise (R1) and particularly Al Saqran tower (R3) are far from completion. Could it affect the DEWA connection of MAG 214?

Imre
October 30th, 2007, 05:29 PM
I think not, because if you see the Goldcrest Views (V2) , it has already got a DEWA , V3 and V1 also far from the completion.

Imre
November 3rd, 2007, 03:21 PM
amazing :)

03/November/2007

MAG 214

http://img526.imageshack.us/img526/6795/imresolt41wx2.jpg (http://imageshack.us)

DUBAI-Boomtown
November 3rd, 2007, 03:24 PM
beautiful glas facade! ^^

samindxb
January 10th, 2008, 07:30 AM
Hi Guys,
Any updates on MAG 214? Still no light in the tower at night? doesn't sound really good for the handover, no? Is the lobby finished? Do you think they still can stick their last schedule for March 2008?

Maha
January 17th, 2008, 08:07 AM
They withdrew their application for completion certificate about a month ago. Up to now it seems like they will not be able to finish before mid February, if they are lucky (mostly trouble with DEWA, but they have other works too). I'd say March 2008 seems reasonable.

samindxb
January 23rd, 2008, 06:20 AM
Hi Guys,
Some lights were on yesterday night in MAG 214. It's coming! ;-)

samindxb
February 10th, 2008, 11:38 AM
Hi Maha,
Do you have any update reagrding the completion certificate for MAG 214?Do you have an idea when the hand over will be done?
Thanks

CANBOZ
March 6th, 2008, 06:13 AM
Hi,
As we told by the MAGPD the handover of the flats will be done by the end of March to early April.
Even one of my friend received handover letter for 9 Apr. We are also expecting to receive soon.
I believe it has come to an end.

Maha
March 6th, 2008, 07:28 AM
Yes, soon.

Tony 90
March 7th, 2008, 09:10 AM
Some pics on mag website.
http://www.magpd.com/214under.htm

bizzybonita
March 21st, 2008, 02:47 PM
http://www.gowealthy.com/realestate/construction_updates/uae/dubai/jumeirahlaketowers/mag214/images/feb08_02.jpg

Ni3lS
April 10th, 2008, 07:00 PM
Looks like a render, Nice :D

Tony 90
April 24th, 2008, 04:49 PM
MAG Group Property Development, Dubai-headquartered real estate firm, has handed over the keys to 306 apartments and penthouses at 43-storey MAG 214 building in the Jumeirah Lakes Towers development on Dubai's Sheikh Zayed Road.
Mohammed Nimer, CEO, MAG Group Property Development, said, "We excel in designing, finishing and customer satisfaction and focus on delivering our promises".

MAG 214 is one of several competitively priced buildings being developed by the company aimed at the mid-range market and appealing to Dubai's burgeoning middle income families. Jumeirah Lakes Towers is a dynamic waterfront real estate development with residential and office towers alongside hotels, leisure and retail outlets.:)

dubaiguy7
May 12th, 2009, 06:52 PM
Mag 214 2 bed +study for sale.

give me a call if interested. its vacant. 0503163367

Imre
December 7th, 2009, 11:38 AM
Press release

Immediate release 7 December 2009

Helping owners to manage their buildings

Progressive developers assist owners associations to bring greater confidence and transparency to Dubai property market, says Asteco

In moves to bring even greater confidence and transparency to the Dubai property market, progressive development companies are aiding the formation of owners associations to manage their buildings ahead of a widely anticipated new law.

“While Dubai awaits the regulations which support the jointly-owned property law, we have been working for several years with a number of high profile clients well ahead of implementation,” said Nicole Betts, Senior Manager, Asteco Association Management.

“We have been helping companies establish informal owner associations, set up service charge and budgeting models, set community rules as well as facility management and service provider selection procedures based on best international practices,” she added.

Asteco, the largest property services company in the United Arab Emirates, has been actively advising developers on the concept of jointly owned property and common area management since 2004.

Jointly owned residential properties include high rise apartments or low rise villa communities. Common areas that are jointly owned may include shared recreational facilities including gyms and swimming pools as well as common area services such as maintenance, landscaping, security, pest control and cleaning.

“Under current law legal responsibility is with the developer but some companies are actively encouraging owners to take control for themselves – albeit at this stage this has to be done under the developer’s name,” Betts said.

“A good example is the MAG Group which is dedicated to transparency,” she added. “We have worked with them from conception of their MAG 214 Jumeirah Lakes Towers project through to delivering onsite management services to an informal owners association. Our team works closely with the owners’ management board to assist them to preserve, maintain and enhance the tower.”

Mohammed Nimer, CEO of MAG Group Property Development, added: “We have always operated in an environment of transparency so it was natural for us to introduce best practice in property management to enable owners to truly run their own buildings.”

Asteco has also been working with another developer for the V3 Tower, also at Jumeirah Lakes, where handover to owners commenced recently. “Our role is to administer day-to-day operations and assist in the formation of an informal owners association and a management board,” Betts added.

“Both of these are examples of transparent and comprehensive best practices, providing all-inclusive fee structures which enable easy budgeting for both owners associations and developers. They provide a level of confidence that enables people to feel more comfortable about buying in Dubai – a win-win for both owners and developers in today’s lacklustre market.”

The Asteco Property Management Association Management Services team became an independent division of the company in 2007 and has quickly grown with the emergence of the sector in the Dubai property industry.

Of Asteco’s property management business - consisting of about 3,500 buildings - about 10% by value is now handled by the Association Management Services team, Betts said.

“The division has become increasingly active in providing consultancy services to developers to assist them to prepare to become compliant when regulations are enacted,” she added. “We are also encouraging more developers to begin the process now in order to make their properties appealing to potential buyers.”

For more information about Asteco, please visit www.asteco.com

Photo caption:

MAG 214 Jumeirah Lakes Towers - an example of an owners’ association taking control of the building with the help of a progressive developer.

http://2.bp.blogspot.com/_MJP0UXD31gE/SxzaDmkdbTI/AAAAAAAAddc/klV9VL34tNA/s400/MAG+214.jpg

zrusky
December 8th, 2009, 08:21 AM
Press release

Immediate release 7 December 2009

Helping owners to manage their buildings

Progressive developers assist owners associations to bring greater confidence and transparency to Dubai property market, says Asteco



Is this really true?

a-modjo
March 13th, 2010, 06:22 PM
I like this tower!

Panoramic views are great

http://img291.imageshack.us/img291/6876/viewmag214small.jpg


Developers could make swimming pool a bit larger


http://img411.imageshack.us/img411/4259/smallpool.jpg

Ledgerous
December 7th, 2010, 10:50 AM
The www.my-community.com website now has MAG 214 is on there as well!

If your an owner or tenant in MAG 214 you've probably already got access to it?? Whats are your thoughts??

www.my-community.com/community/mag214

msamre
July 21st, 2011, 12:58 AM
The www.my-community.com website now has MAG 214 is on there as well!

If your an owner or tenant in MAG 214 you've probably already got access to it?? Whats are your thoughts??

www.my-community.com/community/mag214

Nice Tower

bizzybonita
September 27th, 2011, 04:19 PM
Suicide, or saw her fall from the eighth floor

Died or, Iranian nationality, and her baby after falling from the window of their apartment in a building "MAG214" Towers Jumeirah Lakes, Dubai this morning, according to Director General of Inquiries and Criminal Investigations, General Khalil Ibrahim Al Mansouri, who pointed out that the child fell first, and committed suicide his mother, then under shock, knowing that the father is outside the State.

Mansouri said that "the incident occurred at around seven in the morning, when I got the mother to deliver her eldest daughter (15 years) to the school bus, and while in the street was surprised by her son, a small (5 years) overlooking from the window of the apartment which is located on the eighth floor, I shouted it to deter him, and tried to guard the building as well, but the child fell from the window, "the guard and attempts to capture him failed.

He added that the mother did not bear the shock, ran hysterically to the apartment and she was crying hard by the novel neighbors and witnesses, pointing out that no one expected her reaction, and were surprised by the women stand in the window what has happened to everyone in a state of astonishment, and threw herself behind her, which led to her death in the scene.

The witnesses said they heard screaming severe in the morning, rushed to the source to find the body of a young child between the arms of his older sister, who was crying heavily, while seeing his mother being hysterically to her apartment and before they realize what happened to the child, surprised the mother throw herself from the apartment.

Al Mansouri said that the Commander in Chief of Dubai Police, Lieutenant General Dahi Khalfan Tamim, he located himself through the operating room, moved with his deputy, Maj. Gen. Khamis Mattar decorated, to the scene to inspect the incident.

He said he was moved to Rashid Hospital Aljthmanyen to complete the necessary procedures, stressing that this painful incident has left its mark in the hearts of everyone.

And wished the Director General of Inquiries and Criminal Investigation on parents not to leave young children alone in the house, pointing out that this family moved to this apartment a month ago and the only one.

http://www.emaratalyoum.com/local-section/accidents/2011-09-27-1.426000