January 7th, 2012, 06:33 PM
Several largescale infrastructural projects are either being constructed or being planned in the Greater Aarhus Area right now tackling the increasing amounts of traffic. This thread allows for a brief overview, sharing of news and debate of that particular development. The scope for this thread is restricted to small municipal projects in the City of Aarhus, projects of medium size in the Greater Aarhus Area and large projects of regional interest in East Jutland.
» Under construction
Marselis Tunnel Stage 1 (http://marselisboulevard.dk/) | Construction period: 2010-2014
Short description: The Marselis Tunnel Stage 1 involves construction of a new levelled junction at Viby Ringvej and Aarhus Syd motorvejen as seen below. Furthermore three new rail road bridges and a new pedestrian bridge are being constructed at Langenæs to allow for an expansion of Åhavevej to four lanes. Along the southern side of Åhavevej a noise dampening soil rampart with vegetation is also constructed to save the neighbouring allotment houses from traffic noise.
Facts: Cost of 305 million DKR | Financing by City of Aarhus, State of Denmark and the European Union | Builder is City of Aarhus | Engineer is Rambøll | Constructors are Arkil, Stürup and CG Jensen
http://www.marselisboulevard.dk/file/268/jpg/e41a38d689b51eade2772d10ac6aa36e
https://lh6.googleusercontent.com/-3Bc0jxF9nLc/TwiFsOvxAjI/AAAAAAAAA_E/T9Rt_ChBvzs/s800/36f43bcaebcce489353e65ea6bd29df2.png
Reopening of Aarhus River Final Stage (http://www.urbanmediaspace.dk/) | Construction period: 2012-2015
Short description: As part of the building project Urban Mediaspace mostly known for the new building containing head library and citizen service in Aarhus is also the final reopening of Aarhus River that has been covered for decades making room for road traffic.
Facts: Cost is unknown | Financing by City of Aarhus and Realdania | Builder is City of Aarhus | Engineer is Rambøll | Architect is Kristine Jensens Tegnestue | Constructor is NCC Construction Danmark
https://lh3.googleusercontent.com/-1n5k2hITPBI/Tsv6rj0Fg6I/AAAAAAAAA1Y/r4bc9eNALXU/s800/multimediehuset_set_fra_oven_stor.png
Aarhus Docklands Traffic (http://www.debynaerehavnearealer.dk/da.aspx) | Construction period: 2009-?
Short description: City of Aarhus is developing a new urban district on the harbour front entitled Aarhus Docklands. The former harbour area needs new infrastructure to facilitate that development. This includes new canals, roads, urban installations of various sorts, bridges and a new central and wide access road that ties the area together called Bernhard Jensens Boulevard after one of Aarhus' most influential former mayors. A secondary access road from the harbour to Østbanetorvet, a new junction at Nørreport and the first parts of Bernhardt Jensens Boulevard have already been built
http://i1236.photobucket.com/albums/ff442/ignor1/letbanenordhavnen.jpg
» Under planning
Marselis Tunnel Stage 2 (http://www.marselistunnel.dk/) | Construction period: Likely 2012-2017
Short description: This stage of the project involves construction of the actual road tunnel from just beyond the new railway bridges to the Port of Aarhus removing the truck and cargo traffic from the urban space and environment along the road Marselis Boulevard whilst at the same time long term securing the vital cargo traffic to the harbour in Aarhus, Denmark's largest container port.
Facts: Cost of 1.35 billion DKR | Financing by City of Aarhus, Port of Aarhus, State of Denmark and the European Union | Builder is City of Aarhus | Engineer is Rambøll | Constructors have not yet been chosen
https://lh6.googleusercontent.com/-gkzYA4OsKGU/TwiFpnNz1DI/AAAAAAAAA-8/6p7vzvh3Wc8/s800/b3beda752c3bc48c191adee14299af02.png
Light Rail Stage 1 (http://www.midttrafik.dk/letbane/in+english/stage+1) | Construction period: 2013-2016
Short description: The 1st stage of a new light rail system in the Greater Aarhus Area have been under planning for a long time. A new light rail line will be constructed from Nørreport to Lystrup through Randersvej connecting Aarhus Central Station and the inner city with Aarhus University, Aarhus University Hospital, the Skejby business area, Denmark's Radio and the new suburbs Lisbjerg and Elev. Furthermore two existing local railways Aarhus-Odder and Aarhus-Grenaa will be integrated in the project and serviced by light rail material.
Facts: Cost of 1.2 billion DKR | Financing by City of Aarhus, neighbouring municipalities, Central Denmark Region and the State of Denmark | Builder is Aarhus Letbane I/S | Engineer is unknown | Architect is Preben Skaarup Landskab | Constructors have not yet been chosen
http://www.cfmoller.com/imgintra/VVM-for-Aarhus-Letbane-Arkitektfirmaet-C-F-Moeller-img-17804-w805-h291-tD.jpg
http://www.midttrafik.dk/files/Midttrafik/Billeder/Letbane/Etape%201/Etape%201%20Gren%C3%A5-Odder%20-%20kort.jpg
Light Rail Stage 2 (http://www.midttrafik.dk/letbane/forside+-+letbane) | Construction period: Likely 2016-?
Short description: The planning of stage 2 of the light rail system is already ongoing. No political decision has been made of what lines to prioritize in the 2nd stage but below is a map of the lines being considered marked in blue.
Facts: Cost is unknown | Financing by City of Aarhus, neighbouring municipalities, Central Denmark Region and the State of Denmark | Builder is the Aarhus light rail consortium | Engineer have not yet been chosen | Architect is (likely) Preben Skaarup Landskab | Constructors have not yet been chosen
https://lh5.googleusercontent.com/-Onu_20NmATI/TpoCdc-dX6I/AAAAAAAAAyg/DMZM1Vz2K18/s800/Fase%2525201%252520kort.png
Expansion of Route 26 - Highway Aarhus-Hammel (http://www.vejdirektoratet.dk/dokumentniveau.asp?page=document&objno=74604) | Construction period: Not yet approved
Short description: An upgrade of Route 26 between Aarhus-Viborg in some stretches to motortraffic road and between Aarhus-Hammel to highway is being planned by the Danish state. In 2012 a necessary VVM (Examination of environment consequenses) will be made public.
Facts: Cost is unknown | Financing by the State of Denmark | Builder is Vejdirektoratet | Engineer have not yet been chosen | Constructors have not yet been chosen
http://www.vejdirektoratet.dk/imageblob/image.asp?type=image&id=284263
Extension of Djurslandmotorvejen to Aarhus Airport (http://www.vejdirektoratet.dk/dokumentniveau.asp?page=document&objno=282567) | Construction period: Not yet approved
Short description: In 2010 the highway Djurslandmotorvejen was inaugurated connecting E45 with the Municipality of Syddjurs. It was never fully realized with highway to Aarhus Airport and an examination of the costs of doing so is now being conducted by the Danish state.
http://www.vejdirektoratet.dk/imageblob/image.asp?type=image&id=282568
Expansion of Port of Aarhus (http://aarhushavn.dk/en/welcome.htm) | Construction period: Ongoing
Short description: Since the end of the nineties large sums have been invested in new harbour areas, quays and cranes. The latest were expansion of the container terminal in 2007 and new bulk cranes in 2011. Coming expansions include a new Omniterminal and a new ferry terminal but those plans have currently been put on hold because of the economical crisis.
http://i152.photobucket.com/albums/s186/Asbjoern/Screenshot-16-07-201000_35_30.jpg
New Bus Terminal (http://www.aarhus.dk/da/borger/trafik/Trafikpolitik-og-planer/Busterminal-i-Aarhus.aspx) | Construction period: 2013-?
Short description: The current bus terminal was constructed in . It has been discussed for several years now to move the bus terminal closer to Aarhus Central station and in 2011 it was finally decided to move and integrate it as part of Aarhus Central Station making it an even more vital traffic hub for local, regional and inter-city traffic on wheels and rails. City of Aarhus has partnered with the private firm Steen & Strøm, who is helping finance the project in the interest of expanding their shopping mall Bruun's Galleri on top of the new bus terminal.
Facts: Cost is unknown | Financing by City of Aarhus and Steen & Strøm | Builder: City of Aarhus | Architect is COBE and TRANSFORM | Constructor has not yet been chosen
https://lh6.googleusercontent.com/-bObiB3s9Eoo/TfiKxGqle7I/AAAAAAAAAx8/fQ_V7jGdNWY/s800/Ny%252520busterminal%252520og%252520udvidelse%252520af%252520Bruun%252527s%252520Galleri%2525202.jpg
https://lh3.googleusercontent.com/-FJx5LLRMp30/TfiKDsH0EsI/AAAAAAAAAx8/ohLBenm6OJQ/s800/Ny%252520busterminal%252520og%252520udvidelse%252520af%252520Bruun%252527s%252520Galleri.jpg
Relocation and expansion of Herredsvej (http://www.aarhus.dk/da/borger/trafik/Trafikpolitik-og-planer/Forlaegning-af-Herredsvej.aspx) | Construction period: 2012-?
Short description: As part of building the new university hospital in Skejby a relocation and expansion of the road Herredsvej to four lanes have been decided. The new road will be 2.1 km and construction is expected to begin in 2012.
Facts: Cost of 89 million DKR | Financing by City of Aarhus | Builder is City of Aarhus | Engineer is unknown | Constructor has not yet been chosen
https://lh4.googleusercontent.com/--W33xTJEN08/TfFYZRFZJ1I/AAAAAAAAAx8/EzF2slkoiL0/s800/Herredsvejs%252520forl%2525C3%2525A6gning.jpg
New Bering-Beder Road (http://www.aarhus.dk/da/borger/trafik/Trafikpolitik-og-planer/Bering-Beder-vejen.aspx) | Construction period: Unknown
Short description: A new four lane road in the southern parts of Aarhus is planned to complete the new ring 3 along with the highways E45 and Djurslandmotorvejen. Because of cuts in the municipal budget of City of Aarhus in 2010 it was decided to put the project on hold and wait with the funding until 2015. Planning is still going ahead though.
http://i152.photobucket.com/albums/s186/Asbjoern/Screenshot-16-07-201000_26_23.jpg
New Roads in Gellerup (http://www.helhedsplangellerup.dk/da.aspx) | Construction period: 2013-?
Short description: The suburban district Gellerup in Brabrand will undergo major redevelopment over the coming years and to facilitate that a new road system will be constructed. The most important characteristic of the new road system is the construction of a new central street going from the shopping mall City Vest in the south to the multicultural Bazar Vest in the north. The pulse of the new urban district will be along that street.
https://lh5.googleusercontent.com/-nFo87xvveis/Tw7cLqEA9pI/AAAAAAAAA_0/bkXkMfpOOPE/s800/GetDokument.aspx%25253Fid%25253D1903.png
» Under construction
Marselis Tunnel Stage 1 (http://marselisboulevard.dk/) | Construction period: 2010-2014
Short description: The Marselis Tunnel Stage 1 involves construction of a new levelled junction at Viby Ringvej and Aarhus Syd motorvejen as seen below. Furthermore three new rail road bridges and a new pedestrian bridge are being constructed at Langenæs to allow for an expansion of Åhavevej to four lanes. Along the southern side of Åhavevej a noise dampening soil rampart with vegetation is also constructed to save the neighbouring allotment houses from traffic noise.
Facts: Cost of 305 million DKR | Financing by City of Aarhus, State of Denmark and the European Union | Builder is City of Aarhus | Engineer is Rambøll | Constructors are Arkil, Stürup and CG Jensen
http://www.marselisboulevard.dk/file/268/jpg/e41a38d689b51eade2772d10ac6aa36e
https://lh6.googleusercontent.com/-3Bc0jxF9nLc/TwiFsOvxAjI/AAAAAAAAA_E/T9Rt_ChBvzs/s800/36f43bcaebcce489353e65ea6bd29df2.png
Reopening of Aarhus River Final Stage (http://www.urbanmediaspace.dk/) | Construction period: 2012-2015
Short description: As part of the building project Urban Mediaspace mostly known for the new building containing head library and citizen service in Aarhus is also the final reopening of Aarhus River that has been covered for decades making room for road traffic.
Facts: Cost is unknown | Financing by City of Aarhus and Realdania | Builder is City of Aarhus | Engineer is Rambøll | Architect is Kristine Jensens Tegnestue | Constructor is NCC Construction Danmark
https://lh3.googleusercontent.com/-1n5k2hITPBI/Tsv6rj0Fg6I/AAAAAAAAA1Y/r4bc9eNALXU/s800/multimediehuset_set_fra_oven_stor.png
Aarhus Docklands Traffic (http://www.debynaerehavnearealer.dk/da.aspx) | Construction period: 2009-?
Short description: City of Aarhus is developing a new urban district on the harbour front entitled Aarhus Docklands. The former harbour area needs new infrastructure to facilitate that development. This includes new canals, roads, urban installations of various sorts, bridges and a new central and wide access road that ties the area together called Bernhard Jensens Boulevard after one of Aarhus' most influential former mayors. A secondary access road from the harbour to Østbanetorvet, a new junction at Nørreport and the first parts of Bernhardt Jensens Boulevard have already been built
http://i1236.photobucket.com/albums/ff442/ignor1/letbanenordhavnen.jpg
» Under planning
Marselis Tunnel Stage 2 (http://www.marselistunnel.dk/) | Construction period: Likely 2012-2017
Short description: This stage of the project involves construction of the actual road tunnel from just beyond the new railway bridges to the Port of Aarhus removing the truck and cargo traffic from the urban space and environment along the road Marselis Boulevard whilst at the same time long term securing the vital cargo traffic to the harbour in Aarhus, Denmark's largest container port.
Facts: Cost of 1.35 billion DKR | Financing by City of Aarhus, Port of Aarhus, State of Denmark and the European Union | Builder is City of Aarhus | Engineer is Rambøll | Constructors have not yet been chosen
https://lh6.googleusercontent.com/-gkzYA4OsKGU/TwiFpnNz1DI/AAAAAAAAA-8/6p7vzvh3Wc8/s800/b3beda752c3bc48c191adee14299af02.png
Light Rail Stage 1 (http://www.midttrafik.dk/letbane/in+english/stage+1) | Construction period: 2013-2016
Short description: The 1st stage of a new light rail system in the Greater Aarhus Area have been under planning for a long time. A new light rail line will be constructed from Nørreport to Lystrup through Randersvej connecting Aarhus Central Station and the inner city with Aarhus University, Aarhus University Hospital, the Skejby business area, Denmark's Radio and the new suburbs Lisbjerg and Elev. Furthermore two existing local railways Aarhus-Odder and Aarhus-Grenaa will be integrated in the project and serviced by light rail material.
Facts: Cost of 1.2 billion DKR | Financing by City of Aarhus, neighbouring municipalities, Central Denmark Region and the State of Denmark | Builder is Aarhus Letbane I/S | Engineer is unknown | Architect is Preben Skaarup Landskab | Constructors have not yet been chosen
http://www.cfmoller.com/imgintra/VVM-for-Aarhus-Letbane-Arkitektfirmaet-C-F-Moeller-img-17804-w805-h291-tD.jpg
http://www.midttrafik.dk/files/Midttrafik/Billeder/Letbane/Etape%201/Etape%201%20Gren%C3%A5-Odder%20-%20kort.jpg
Light Rail Stage 2 (http://www.midttrafik.dk/letbane/forside+-+letbane) | Construction period: Likely 2016-?
Short description: The planning of stage 2 of the light rail system is already ongoing. No political decision has been made of what lines to prioritize in the 2nd stage but below is a map of the lines being considered marked in blue.
Facts: Cost is unknown | Financing by City of Aarhus, neighbouring municipalities, Central Denmark Region and the State of Denmark | Builder is the Aarhus light rail consortium | Engineer have not yet been chosen | Architect is (likely) Preben Skaarup Landskab | Constructors have not yet been chosen
https://lh5.googleusercontent.com/-Onu_20NmATI/TpoCdc-dX6I/AAAAAAAAAyg/DMZM1Vz2K18/s800/Fase%2525201%252520kort.png
Expansion of Route 26 - Highway Aarhus-Hammel (http://www.vejdirektoratet.dk/dokumentniveau.asp?page=document&objno=74604) | Construction period: Not yet approved
Short description: An upgrade of Route 26 between Aarhus-Viborg in some stretches to motortraffic road and between Aarhus-Hammel to highway is being planned by the Danish state. In 2012 a necessary VVM (Examination of environment consequenses) will be made public.
Facts: Cost is unknown | Financing by the State of Denmark | Builder is Vejdirektoratet | Engineer have not yet been chosen | Constructors have not yet been chosen
http://www.vejdirektoratet.dk/imageblob/image.asp?type=image&id=284263
Extension of Djurslandmotorvejen to Aarhus Airport (http://www.vejdirektoratet.dk/dokumentniveau.asp?page=document&objno=282567) | Construction period: Not yet approved
Short description: In 2010 the highway Djurslandmotorvejen was inaugurated connecting E45 with the Municipality of Syddjurs. It was never fully realized with highway to Aarhus Airport and an examination of the costs of doing so is now being conducted by the Danish state.
http://www.vejdirektoratet.dk/imageblob/image.asp?type=image&id=282568
Expansion of Port of Aarhus (http://aarhushavn.dk/en/welcome.htm) | Construction period: Ongoing
Short description: Since the end of the nineties large sums have been invested in new harbour areas, quays and cranes. The latest were expansion of the container terminal in 2007 and new bulk cranes in 2011. Coming expansions include a new Omniterminal and a new ferry terminal but those plans have currently been put on hold because of the economical crisis.
http://i152.photobucket.com/albums/s186/Asbjoern/Screenshot-16-07-201000_35_30.jpg
New Bus Terminal (http://www.aarhus.dk/da/borger/trafik/Trafikpolitik-og-planer/Busterminal-i-Aarhus.aspx) | Construction period: 2013-?
Short description: The current bus terminal was constructed in . It has been discussed for several years now to move the bus terminal closer to Aarhus Central station and in 2011 it was finally decided to move and integrate it as part of Aarhus Central Station making it an even more vital traffic hub for local, regional and inter-city traffic on wheels and rails. City of Aarhus has partnered with the private firm Steen & Strøm, who is helping finance the project in the interest of expanding their shopping mall Bruun's Galleri on top of the new bus terminal.
Facts: Cost is unknown | Financing by City of Aarhus and Steen & Strøm | Builder: City of Aarhus | Architect is COBE and TRANSFORM | Constructor has not yet been chosen
https://lh6.googleusercontent.com/-bObiB3s9Eoo/TfiKxGqle7I/AAAAAAAAAx8/fQ_V7jGdNWY/s800/Ny%252520busterminal%252520og%252520udvidelse%252520af%252520Bruun%252527s%252520Galleri%2525202.jpg
https://lh3.googleusercontent.com/-FJx5LLRMp30/TfiKDsH0EsI/AAAAAAAAAx8/ohLBenm6OJQ/s800/Ny%252520busterminal%252520og%252520udvidelse%252520af%252520Bruun%252527s%252520Galleri.jpg
Relocation and expansion of Herredsvej (http://www.aarhus.dk/da/borger/trafik/Trafikpolitik-og-planer/Forlaegning-af-Herredsvej.aspx) | Construction period: 2012-?
Short description: As part of building the new university hospital in Skejby a relocation and expansion of the road Herredsvej to four lanes have been decided. The new road will be 2.1 km and construction is expected to begin in 2012.
Facts: Cost of 89 million DKR | Financing by City of Aarhus | Builder is City of Aarhus | Engineer is unknown | Constructor has not yet been chosen
https://lh4.googleusercontent.com/--W33xTJEN08/TfFYZRFZJ1I/AAAAAAAAAx8/EzF2slkoiL0/s800/Herredsvejs%252520forl%2525C3%2525A6gning.jpg
New Bering-Beder Road (http://www.aarhus.dk/da/borger/trafik/Trafikpolitik-og-planer/Bering-Beder-vejen.aspx) | Construction period: Unknown
Short description: A new four lane road in the southern parts of Aarhus is planned to complete the new ring 3 along with the highways E45 and Djurslandmotorvejen. Because of cuts in the municipal budget of City of Aarhus in 2010 it was decided to put the project on hold and wait with the funding until 2015. Planning is still going ahead though.
http://i152.photobucket.com/albums/s186/Asbjoern/Screenshot-16-07-201000_26_23.jpg
New Roads in Gellerup (http://www.helhedsplangellerup.dk/da.aspx) | Construction period: 2013-?
Short description: The suburban district Gellerup in Brabrand will undergo major redevelopment over the coming years and to facilitate that a new road system will be constructed. The most important characteristic of the new road system is the construction of a new central street going from the shopping mall City Vest in the south to the multicultural Bazar Vest in the north. The pulse of the new urban district will be along that street.
https://lh5.googleusercontent.com/-nFo87xvveis/Tw7cLqEA9pI/AAAAAAAAA_0/bkXkMfpOOPE/s800/GetDokument.aspx%25253Fid%25253D1903.png