View Full Version : new buildings height
The Mad Hatter!! November 13th, 2004, 01:47 AM met 2-------- 229m(751.12 ft) 72 stories
-------------------------------------
900 biscayne-217m(711.76 ft) 60 stories
------------ -------------------------
infinity------- 192m(629.76 ft) 52stories
------------ ------------------------
marina blue 191m(626.48ft) 60 stories
-------------------------------------
plaza-brickell 186m (610.08ft) 56stories
-------------------------------------
ten museum 178m (583.84ft) 50 stories
-------------------------------------
quantum 169m (554.32ft) 52 stories
-------------------------------------
opera tower 166m (544.48ft) 56 stories
-------------------------------------
plaza-brickell 160m (524.80ft) 48 stories
-------------------------------------
one miami 140m (459.20ft) 44 stories
------------ -------------------------
one miami 137 (449.36ft) 45stories
-------------------------------------
blue 130m (426.40ft) 36stories
-------------------------------------
1800 club 129m (423.12ft) 40 stories
this is from emporis (http://www.emporis.com/en/wm/ci/bu/sk/li/?id=101321&bt=2&ht=2&sro=1)
BHK24 November 13th, 2004, 02:44 AM Thanks for the info Uptown-Midtown
MIAballinboi November 13th, 2004, 06:24 AM thnx for the new heights, lol chuck did u join emporis team and gave em the heights?
wow miami will have 5 700 footers including the marquis 63 stories 712 feet thnx to chuck
The Mad Hatter!! November 13th, 2004, 03:56 PM top 20
1.fourseasons
2.wachovia
3.met2
4.900 biscayne
5.infinity
6.marina blue
7.boa
8.plaza
9.ten museum
10.quantum
11.opera tower
12.plaza2
13.santa maria
14.stephen b. clark
15.jade
16.one biscayne
17.espirito santo
18.miami center
19.3 tequesta
20.one miami
MIAballinboi November 13th, 2004, 04:41 PM great list thnx uptown!
this is yet probably only like half of the new high projects theyre still missing, i say all of 20 or even 25 building will be well over 500 feet
ChuckScraperMiami#1 November 13th, 2004, 06:09 PM But Remember MEN :) , Its Really MET 3, that will be First, But the Newspaper will Tell you Next Month, December, 2005 THE SALES of MET 3 Begin and The Whole Foods Market will be the Ground Floor, Contract Already signed and they Have a Permit to begin Construction in May, 2005.
Its Strange, BUT TRUE, Somebody IS WRONG Here, and he'll be SORRY. Believe Me , I WAS THERE, Friday , November 12th, 2005, ITS A Done DEAL, Thats why The SALES Trailer will be Staying on the MET 2 SITE, Because their Starting Met 3 FIRST !!! :cheers:
The Mad Hatter!! November 13th, 2004, 06:13 PM yea met2 is slated to be completed in 2008
ChuckScraperMiami#1 November 13th, 2004, 06:15 PM THE TALLEST ONE is Going UP First !!!, END OF STORY.
The Mad Hatter!! November 13th, 2004, 06:25 PM stop typing the same thing over and over chuck
ChuckScraperMiami#1 November 13th, 2004, 07:11 PM NO Problem Uptown-Midtown, if your going to type false news, then go somewhere esle, ALL I'm Saying is the TALLEST MET TOWER will be BUILT FIRST and thats IT !!!
ChuckScraperMiami#1 November 13th, 2004, 07:20 PM Uptown-Midtown :) and Everyone :) , I'm Just Posting the FACTS, I Don't Care WHAT MET it is !, THE TALLEST MET Tower Will be Built FIRST on that NORTHWEST Dupont Plaza Parking Lot Whre the Digging HAS Already BEGUN to Clear the SITE, If its MET 2 or Met 3, ITS Going up FIRST to 72 Stories, and The Height according to the Sales Personnel There Said it will be Higher than the Four Seasons, WHICH is REALLY Only 69 Stories, and That's a FACT, There is NOTHING about Two TALL Buildings in the MET PROJECT. They Already Have the CITY OF MIAMI Approval and the PERMITS to Build what They HAVE !, I work for the County , and YOU Can't change your PERMIT once ISSUED to ORDER TO BUILD. It will Have a HEIGHT of between 812 TO 840 FEET :) , And in LATE, 2008 IT WILL BE COMPLETED on time to be the Next TALLEST Building SOUTH of ATLANTA !!! :cheers:
The Mad Hatter!! November 13th, 2004, 07:23 PM hey i'm posting what i know,you have all right to post what you know.but we really don't know whats going to happen until its finished
ChuckScraperMiami#1 November 13th, 2004, 07:36 PM hey i'm posting what i know,you have all right to post what you know.but we really don't know whats going to happen until its finished
TRUE Uptown-MIDTOWN :) , I couldn't Disagree with What you just Said. LETS see in LATE, 2008, WHAT Happens !, Then We'll know 4 Years BACK who was Right, I'll see you Then BRO, lol. :cheers:
The Mad Hatter!! November 13th, 2004, 07:51 PM ok,well getting back to the point i think the met people are doing all of this for free promotion and to get people hyped up for their project.
Dale November 13th, 2004, 10:46 PM uptown-midtown, it almost seems that you don't want Miami to get a new tallest if it means your being mistaken.
The Mad Hatter!! November 13th, 2004, 11:25 PM no,i hope im mistaken and met2 and met3 are the next two tallest towers in miami.now i just said that met 3 would block either wachovia or boa which have been miami's signature towers for a long while.
ChuckScraperMiami#1 November 14th, 2004, 04:02 AM Everyone :) , This Blocking the View of TOWERS is really annoying me. DID they Have this Problem in AVENTURA?, NO. DID they have this Problem in Sunny Isles Beach?, NO. DID thay have this Problem in Coral Gables?, NO. DID They have this Problem in Miami Beach?, NO. So, Please Tell me, Why this Blocking the view Problem "ONLY IN MIAMI ", Does Everything has to be , " ONLY IN MIAMI " ? :cheers:
Dale November 14th, 2004, 05:01 AM Block 'em. Survival of the (Tallest).
nimbyhater November 14th, 2004, 07:38 AM whens met 1 gonna start construction?
The Mad Hatter!! November 14th, 2004, 04:44 PM soon i hope
Dale November 14th, 2004, 07:55 PM December
ChuckScraperMiami#1 November 14th, 2004, 10:55 PM January
Dale November 14th, 2004, 11:19 PM Wow ! From July to Aug to Sept to Nov to Dec and now to Jan. What's the holdup ?
The Mad Hatter!! November 14th, 2004, 11:31 PM i think there so confused that they don't even know what they're going to build
Dale November 14th, 2004, 11:34 PM Just remember that emporis gets confused too.
ChuckScraperMiami#1 November 14th, 2004, 11:40 PM Wow ! From July to Aug to Sept to Nov to Dec and now to Jan. What's the holdup ?
February
Dale November 15th, 2004, 12:51 AM Terrible news. Just got an email back from MDM and they're pulling the plug on the whole deal, INSTEAD THEY ARE GOING TO BUILD THE WORLD'S TALLEST NATHAN'S HOTDOGS ON THE MET 1 SITE, TO BE COMPLETED IN TIME FOR THE 2007 SUPER BOWL !!! :cheers:
mianight69 November 15th, 2004, 01:49 PM Terrible news. Just got an email back from MDM and they're pulling the plug on the whole deal, INSTEAD THEY ARE GOING TO BUILD THE WORLD'S TALLEST NATHAN'S HOTDOGS ON THE MET 1 SITE, TO BE COMPLETED IN TIME FOR THE 2007 SUPER BOWL !!! :cheers:
What???
Is The Met not going to be constructed?
Tell me its 50 Bisc. that the plug has been pulled on; please tell its not The Met.
JR79 November 15th, 2004, 03:40 PM Chuck I hope you're right about Met 2/3 and that Emporis is wrong about the height. I've been e-mailing those people for almost a year asking them to update their list but gave up when I never got a reply. I'm surprised they finally got around to it, but of course they're still missing some. I thought the Opera tower as going to be 60 stories. This is their ad in the herald: http://newspaperads.miami.com/RopAds.aspx?adv=168908
Roark November 15th, 2004, 08:12 PM Terrible news. Just got an email back from MDM and they're pulling the plug on the whole deal, INSTEAD THEY ARE GOING TO BUILD THE WORLD'S TALLEST NATHAN'S HOTDOGS ON THE MET 1 SITE, TO BE COMPLETED IN TIME FOR THE 2007 SUPER BOWL !!! :cheers:
That's great news about the 85 story Nathan's! Is it true that they are going to name the tower after the guy that ate 70 hot dogs?
ESPN reports that the same guy just won the Krystal Burger eating championship. What an amazing athelete. They should add 8 more foods, and make a glouton's decathalon. IN TIME FOR THE 2007 SuperBOWL.
ChuckScraperMiami#1 November 18th, 2004, 04:44 AM ROARK :) and DALE :) , You MEN are SO FUNNY, a NATHAN's HOT DOG TOWER in Downtown MIAMI, LOL, Your Cracking :bash: ME UP, Lets Add Some Ketchup and Mustard. :cheers:
jzquince69 November 18th, 2004, 06:45 PM Hey guys, I emailed Paul Cucuzza at emporis about Met 2 at 72/750 ft. He put it as proposed. I got it from Chuck. I updated him regarding Met 3 breaking ground next year before Met 2 also. But, I don't think he'll update met 3 unless Chuck can acquire an exact height.
ChuckScraperMiami#1 November 20th, 2004, 04:59 AM Hey guys, I emailed Paul Cucuzza at emporis about Met 2 at 72/750 ft. He put it as proposed. I got it from Chuck. I updated him regarding Met 3 breaking ground next year before Met 2 also. But, I don't think he'll update met 3 unless Chuck can acquire an exact height.
Jzquince :) , THANKS :) , I needed That, lol, YES I'm keeping my Height of MET 3 at 836 FEET in LATE, 2008, When The TALLEST MET is Completed. When MET 3 Actually Starts in May-June, 2005, We should be able to Find Out the WHOLE Truth, and Nothing BUT the Truth, So Help Me , GOD. :cheers:
jzquince69 November 20th, 2004, 04:57 PM Chuck, is that height of 836 ft. your prediction, or did they quote you that height (MDM)? Hmmm, 836 feet... where have I seen that before?... Holy Hialeah! Toll Road 836 is the Dolphin Expressway! Wow. Is this an omen? Maybe you're right... :)
But seriously, I'd like nothing more that to see Met 3 at the top of that list on emporis ASAP. It shows progress...
jzquince69 November 20th, 2004, 05:00 PM Oh, Chuck, regarding the Watson Island deal. What ever happened to the 80 story condo tower proposal? I emailed Paul at emporis about the Island Gardens hotel at 53 floors. He wasn't familiar with the proposal (which was approved, i read on this site).
We need to get that 80 story condo tower proposal on the proposed/approved list asap as well. keep up the good work. :)
MIAballinboi November 20th, 2004, 05:30 PM come one chuuck 80 stories, drive with ur truck with 4 men in the back, and get the info lool
nimbyhater November 20th, 2004, 10:33 PM no man, hes got the crappy county car, he passes the pickups wit the mexicans on 95 on their way to the constructions sites tellin crappy turkey jokes, u should no chuck better than that by now man... geeezzz..... lol
The Mad Hatter!! November 20th, 2004, 10:58 PM the county has some good cars
nimbyhater November 20th, 2004, 11:02 PM then i havent seen em, theyre always like crappy like saturn ion-type cars, w/e, the county shouldnt b spending money on good cvars neways when theryes like 70 kids in hgih skols out in kendall
The Mad Hatter!! November 20th, 2004, 11:04 PM don't they got like dodge rams
nimbyhater November 20th, 2004, 11:12 PM if they do, ive never seen em, we need u here chuck! fill us in
The Mad Hatter!! November 20th, 2004, 11:33 PM http://www.miamidade.gov/surplussales/faqs.asp#What%20kinds%20of%20vehicles%20do%20you%20sell%20at%20auction?
The Mad Hatter!! November 20th, 2004, 11:37 PM hey these cars are cheap,chuck do you guys really mess up these cars.coz these things seem like a good offer
i bet theres a catch these cars probaly have like 100k+ miles,if not i might have to go to one of these auctions
MIAballinboi November 21st, 2004, 04:54 AM lol cheap cars
ChuckScraperMiami#1 November 21st, 2004, 05:13 AM come one chuuck 80 stories, drive with ur truck with 4 men in the back, and get the info lool
MIAballinboi :) , I'M Driving With My Pick-Up Truck with My 4 Construction Men Dressed up as Turkeys Totally STUFFED with INFO on that 80 Story Condo Tower to be PROPOSED on Watson Island sometime in December at the City Meeting , I HOPE, This Time UGO COLOMBO :) should be finished with HIS PLANS !!! :cheers: GOBBLE, GOBBLE !
MIAballinboi November 21st, 2004, 03:44 PM lol i hope theyre stuffed with alot of info and height lool thnx chuck
The Mad Hatter!! November 24th, 2004, 11:12 PM new update onyx2 49 stories 166m 544ft
ChuckScraperMiami#1 November 27th, 2004, 12:17 AM hey these cars are cheap,chuck do you guys really mess up these cars.coz these things seem like a good offer
i bet theres a catch these cars probaly have like 100k+ miles,if not i might have to go to one of these auctions
TRUE UPTOWN-Midtown :) , I drive them from Construction Site to Other Construction sites and Get my Jeep Pick-up Truck Dirty and Messy with 4 Mexican Construction Workers in my Back Bed getting Paid CASH at 5 bucks a Hour Telling Turkey JOKES and Getting their Heads cut off Yesterday for Thanksgiving, LOL. :cheers:
pulgoso33 September 14th, 2005, 06:55 AM Hi ChuckScraperMiami, I'm doing a little research here in Miami about the MET3... I saw the project today, looks great, many people told me...ohh man you should try to buy a condo there...blablabla... however.. there's a guy, a realtor, that is telling me that they've been trying to start building met1,2,3 for about 4 years now and they only began to build met 1 so far...
So, do you know how accurate is that? I mean... Is MET going to become real in 2008 ??
thanks
Dale September 14th, 2005, 02:52 PM Part of the delays could be attributed to redesign. Part to the necessary archealogical excavation. Last I heard (which was several months ago), Met 3 was selling very well.
ChuckScraperMiami#1 September 15th, 2005, 02:13 AM Hi ChuckScraperMiami, I'm doing a little research here in Miami about the MET3... I saw the project today, looks great, many people told me...ohh man you should try to buy a condo there...blablabla... however.. there's a guy, a realtor, that is telling me that they've been trying to start building met1,2,3 for about 4 years now and they only began to build met 1 so far...
So, do you know how accurate is that? I mean... Is MET going to become real in 2008 ??
thanks
Hello Pulgoso :) , MET 1 will be completed with the MET SQUARE Movie theater in early 2008, but for MET 3 , still having its Groundbreaking in Late December, 2005, will be Completed by Christmas, 2009, with a Grand opening of the new Whole Foods Market in January or February, 2010. Why so long you ask, its the Huge foundation to take up to 5 months to complete for the 866 Foot , 74 floor Tower with a Huge square spire on top. As for MET 2, I still see this tower starting in Late , 2006, at 65 floors and being completed by 2011.
Pulgoso, Welcome to the Florida Forum, and please visit us in the Miami Forum , too.
Please Vote in the : Which Florida City do you Like overall, Poll, here in our sunshine state, Thanks and Welcome again. :cheers:
Dale September 15th, 2005, 05:14 AM Chuck -
We've waited so long for this bad boy to get started that I might just have to drive down for a special grounbreaking event.
And with my 3,500+ posts, I'll damn sure expect the red carpet treatment. :)
SDK4 September 16th, 2005, 09:10 PM When the MET complex is finished, it will be a beast of a project. One of the best I have ever seen. :)
|
|