Skaros
March 17th, 2005, 03:18 AM
The Preveza-Aktio Underwater Tunnel, Greece
Υποθαλάσσια Σήραγγα Πρέβεζας - Ακτίου
( from www.akteotunnel.com )
Location
http://www.akteotunnel.com/EN/HTML/Info/Topo8esia/Big/BIG_FOTO/1.jpg
http://www.akteotunnel.com/EN/HTML/Info/Topo8esia/Big/BIG_FOTO/2.jpg
The Preveza – Aktio Crossing has a total length of 1982m. and is made up of
Sub sea section of total length 909m.
Underground section of total length 661m.
Entry and Exit ramps of total length 412m.
The road approaches are part of the project
The undersea road passes through the Aktio - Preveza tunnel providing the quickest connection between Aitoloakarnania and South Greece with the road along the seaside of Preveza - Thesprotia Prefectures and Igoumenitsas Port.
The Preveza-Aktio Tunnel consists of a 910 m long immersed part and a 660 m long cut and cover part.
The cross section has a free clearance with a width of 10.6 m and a height of 5.4 m includes a 4.0 m side land and a 1.3 m wide pavement in each direction.
The tunnel was opened for traffic in July 2002.
http://www.akteotunnel.com/EN/HTML/Info/Ktiria/Big/BIG_FOTO/4.jpg
http://www.akteotunnel.com/EN/HTML/Info/Ktiria/Big/BIG_FOTO/2.jpg
http://www.akteotunnel.com/EN/HTML/Info/HM/Big/BIG_FOTO/3.jpg
http://www.akteotunnel.com/EN/HTML/Info/HM/Big/BIG_FOTO/5.jpg
http://www.akteotunnel.com/EN/HTML/Info/HM/Big/BIG_FOTO/4.jpg
Υποθαλάσσια Σήραγγα Πρέβεζας - Ακτίου
( from www.akteotunnel.com )
Location
http://www.akteotunnel.com/EN/HTML/Info/Topo8esia/Big/BIG_FOTO/1.jpg
http://www.akteotunnel.com/EN/HTML/Info/Topo8esia/Big/BIG_FOTO/2.jpg
The Preveza – Aktio Crossing has a total length of 1982m. and is made up of
Sub sea section of total length 909m.
Underground section of total length 661m.
Entry and Exit ramps of total length 412m.
The road approaches are part of the project
The undersea road passes through the Aktio - Preveza tunnel providing the quickest connection between Aitoloakarnania and South Greece with the road along the seaside of Preveza - Thesprotia Prefectures and Igoumenitsas Port.
The Preveza-Aktio Tunnel consists of a 910 m long immersed part and a 660 m long cut and cover part.
The cross section has a free clearance with a width of 10.6 m and a height of 5.4 m includes a 4.0 m side land and a 1.3 m wide pavement in each direction.
The tunnel was opened for traffic in July 2002.
http://www.akteotunnel.com/EN/HTML/Info/Ktiria/Big/BIG_FOTO/4.jpg
http://www.akteotunnel.com/EN/HTML/Info/Ktiria/Big/BIG_FOTO/2.jpg
http://www.akteotunnel.com/EN/HTML/Info/HM/Big/BIG_FOTO/3.jpg
http://www.akteotunnel.com/EN/HTML/Info/HM/Big/BIG_FOTO/5.jpg
http://www.akteotunnel.com/EN/HTML/Info/HM/Big/BIG_FOTO/4.jpg