View Full Version : Greece and Renewable Energy Sources


Skaros
April 1st, 2005, 02:10 PM
PART 1 - WIND ENERGY

Introduction : (from the site of global wind energy council )

The global wind power industry installed 7,976 megawatts (MW) in 2004, an increase in total installed generating capacity of 20%, according to figures released today by the Global Wind Energy Council - GWEC.

Global wind power capacity has grown to 47,317MW. The countries with the highest total installed wind power capacity are Germany (16,629 MW), Spain (8,263 MW), the United States (6,740 MW), Denmark (3,117 MW) and India (3,000 MW).

Brussels, March 4th 2005 --- The global wind power industry installed 7,976 megawatts (MW) in 2004, an increase in total installed generating capacity of 20%, according to figures released today by the Global Wind Energy Council - GWEC (1). Global wind power capacity has grown to 47,317MW.
The countries with the highest total installed wind power capacity are Germany (16,629 MW), Spain (8,263 MW), the United States (6,740 MW), Denmark (3,117 MW) and India (3,000 MW). A number of countries, including Italy, the Netherlands, Japan, and the UK, are above or near the 1,000-MW mark.
Europe continued to dominate the global market in 2004, accounting for 72.4% of new installations (5,774 MW). Asia had a 15.9% of installation share (1,269 MW), followed by North America (6.4%; 512 MW) and the Pacific Region (4.1%; 325 MW). Latin America + the Caribbean (49 MW) and Africa (47 MW) had a 0.6% market share respectively (Annex 3).

“Europe is the global leader in wind energy, but we are witnessing the globalisation of the wind energy markets. In Europe, the market has experienced average annual growth rates of 22% over the past six years; however, the further rapid progress that the industry is capable of delivering is constrained by barriers such as grid access and administrative hurdles”, said EWEA President Arthouros Zervos. “Renewed political initiatives by the G8 could boost wind power; the industry is well positioned and ready for a more rapid roll out given the right political signals".

Growth in the US market was predictably slow because of the long delay in extending the federal production tax credit (PTC) for wind energy, which had expired in December 2003 and was extended in October 2004. Proposed projects are now back on the fast track and AWEA expects that over 2,000 MW will be installed nationwide during 2005. Uncertainty continues to loom over the US market however since the PTC will expire again in December 2005 unless Congress moves quickly to extend the incentive. The US wind energy industry is calling for a long-term extension so that it can plan for steadier, stronger growth over the coming years.

"Wind energy technology has bolted out of the starting gate in the U.S. and is delivering clean, safe, inexhaustible power to customers nationwide, but its deployment remains hobbled by the intermittency and uncertainty of the federal incentive for wind and other renewable energy sources," said AWEA Executive Director Randall Swisher. "For wind energy to contribute a substantially larger share to the nation’s electricity, companies need a stable planning horizon, comparable at least to that available for conventional technologies."


"The new policy for the promotion of Renewable Energy Sources, adopted by the Hellenic Ministry for Development, recognises the importance to the national economy of promoting RES applications, as a means to secure energy supply, exploit an environmentally friendly local energy source, and at the same time achieve the Kyoto GHG reduction targets and fight global warming.
We, at the Ministry, strongly believe that the time has come for Greece to realise its full potential and become the new developing European wind energy market."
George Salagoudis
Deputy Minister, Hellenic Republic Ministry of Development

A map produced by the European Wind Energy Association ( EWEA ) of wind energy in europe.

http://www.bwea.com/energy/images/europe-ewea.jpg

Wind map
http://www.newenergy.org.cn/english/guide/euromap.gif
http://www.newenergy.org.cn/english/guide/eurosgn.gif

Lavrio demonstration wind park (south attica)
http://users.forthnet.gr/ath/creswe/images/wfarm.jpg

http://helios.teiath.gr/activities/events/LogothetiWP/picture2.jpg

http://helios.teiath.gr/activities/events/LogothetiWP/picture3.jpg



Wind Dynamic (example from Attica Region)
http://www.cres.gr/kape/images/maps/table_1/attiki.jpg

Today , the largest aeolic park (wind power plant ) in Greece is the unified park of Kechros ( 63 MW ) and it is located in the region of Thrace (Northeast Greece). (Operation started in December 2004)


Το μεγαλύτερο Αιολικό Πάρκο στην Ελλάδα, ισχύος 10,8 μεγαβάτ που βρίσκεται στη Θέση «Μοναστήρι 11», της Κοινότητας Κέχρου.
Το αιολικό αυτό πάρκο ισχύος 10,8 μεγαβάτ αποτελεί επέκταση του ήδη λειτουργούντος, το οποίο είναι το μεγαλύτερο ενοποιημένο αιολικό πάρκο στην Ελλάδα, με ισχύ 62,5 μεγαβάτ. Αυτό, ανήκει στις εταιρείες DAMCO ΕΝΕRGY Α.Ε. και ΔΙΕΘΝΗΣ ΚΑΤΑΣΚΕΥΑΣΤΙΚΗ ΑΤΤΝΕ των Ομίλων Κοπελούζου και Σαμαρά αντιστοίχως.
Αποτελείται από 71 ανεμογεννήτριες, οι οποίες εκτείνονται σε κορυφογραμμή μήκους περίπου 30 χιλιομέτρων. Η συνολική επένδυση ανήλθε σε 70 εκατομμύρια ευρώ, με μερική χρηματοδότηση από την Εθνική Τράπεζα Ελλάδος.
Η παραγόμενη καθαρή αιολική ενέργεια είναι ικανή να καλύψει τις ανάγκες σε ηλεκτρισμό μιας πόλης 60 χιλιάδων οικογενειών. Η παραγωγή του σε ετήσια βάση ανέρχεται σε 170 εκατομμύρια ΚWh, ενώ η λειτουργία του μειώνει τις εκπομπές διοξειδίου του άνθρακα κατά 150 χιλιάδες τόνους κάθε χρόνο.
Το έργο της επέκτασης ολοκληρώθηκε στο χρόνο ρεκόρ των οκτώ μηνών. Περιλαμβάνει δε, εναέρια γραμμή μεταφοράς μέσης τάσης που συνδέθηκε στον ήδη κατασκευασμένο από τους επενδυτές υποσταθμό ανυψώσεως τάσεως 20/150 KV.
Η συνεισφορά των έργων είναι πολλαπλά ωφέλιμη για τους κατοίκους των ακριτικών περιοχών του Ν. Ροδόπης και Έβρου, όπου αναπτύχθηκαν, αποδίδοντας το 2% των ακαθαρίστων εσόδων από τη λειτουργία των αιολικών πάρκων στους όμορους δήμους και κοινότητες (που υπολογίζονται σε 240 χιλιάδες ευρώ ετησίως).
Τα έργα του Αιολικού Πάρκου στη Ροδόπη αναβάθμισαν σημαντικά τις υποδομές, καθώς δημιουργήθηκαν νέα και εκσυγχρονίσθηκαν υφιστάμενα οδικά δίκτυα στην περιοχή, όπως επίσης και δίκτυα ηλεκτρισμού.

Skaros
April 18th, 2005, 01:37 PM
Σήμερα (2005) η παραγωγή ισχύος από ανανεώσημες πηγές ενέργειας ανέρχεται στα ~ 500 ΜW

Machiavelli
April 18th, 2005, 04:52 PM
Από που αντλείς στοιχεία ? ^^

Skaros
April 19th, 2005, 01:08 AM
Οι πηγές είναι αρκετές , ξεκινώντας από το Κέντρο Ανανεώσημων Πηγών Ενέργειας , διεθνείς και ευρωπαϊκούς οργανισμούς (βλέπε wind energy council) , ερευνητικά ιδρύματα (π.χ. Πανεπιστήμιο Πατρών που έχω και άμεση πρόσβαση ) , ιστοσελίδες εταιριών σχετικές με την ενέργεια (π.χ. ΡΟΚΑΣ ) και τέλος κατά καιρούς δημοσιεύσεις σε εφημερίδες (π.χ. το τελευταίο αφιέρωμα για την ενέργεια στην εφημερίδα ΕΘΝΟΣ της Κυριακής )

Skaros
May 18th, 2005, 11:42 PM
Aeolic Energy: A New Wind Blowing
(from www.elke.gr - ελληνικό κέντρο επενδύσεων )


Investors in Renewable Energy Sources (RES) are finding that Greece is at the center of tremendous opportunity, especially in the aeolic, or wind, sector. And as analysts predict that oil prices may remain at current levels for the long-term, the financial viability of RES is increasingly seen as positive.

Jose Donoso, European Business Director at Spain's Gamesa Energea, says "We believe that the Greek market is a highly promising and attractive one. We are fully convinced that Greece is offering us powerful reasons to keep a solid investment policy in the country. Besides, the investment incentives in the wind sector are further encouraging our company to maintain our commitment to a long-term industrial strategy in Greece.

One of the reasons that companies such as Gamesa Energea is so bullish on the Greek market is that the current government is bullish on RES. Dr. Ioannis Tsipouridis, President of the Hellenic Wind Energy Association, says "The national climate is also favourable as the new Deputy Minister in charge of renewables (Mr. Salagoudis) believes that RES, apart from its contribution to combating climate change, is an opportune field, ideal to foreign and local investment." Dr. Tsipouridis notes that almost all RES stations that have been granted a permit since 1994 were licensed during the past 12 months.

Investors are looking to Greece with good cause. A recent Ernst and Young Investment Attractiveness Index for aeolic parks ranks Greece sixth globally.

Dr. Tsipouridis estimates that on top of the 465 MW now operating in Greece, another 2,500 to 3,000 MW will be installed by 2010,
citing the favorable international climate toward RES, the EU RES electricity production directive, the Kyoto Protocol, emissions trading mechanisms, and Greece's political will as strong factors.

Gamesa, for instance, has had an active presence in the Greek market since 2001. Today it has a portfolio of more than 800 MW with wind potential under research in all sites, production licenses obtained for 238 MW, installation licenses obtained for 42,5 MW, and one wind farm under construction in Thessalia (17 MW).

Other foreign companies to enter Greek market recently include IBERDROLA of Spain, EDF Energies Nouvelles of France, and CESA Eolica Corporation of Spain. Japan's Eurus Energy Europe, Germany's WRE, and other foreign companies are pursuing a variety of wind projects in Greece. Many Greek firms are also very active in wind energy.

Dr. Nick Vassilakos, Vice President of the European Renewable Energies Association (EREF) and Senior Adviser to GAREP (Greek Association of RES Electricity Producers) notes that more information about wind energy and other Renewable Energy Sources can be found from the association.

As Renewable Energy Sources take their place in the national and international energy makeup, sectors such as wind energy promise to deliver highly attractive returns. Investors in the Greek market are positioned to be leaders for decades to come.

ydrohoos
May 19th, 2005, 01:09 AM
Poly entharintika ta nea...epitelous fenetai oti stin Ellada apoktoume siga siga perivalontiki sinidisi.
Gia kapia pragmata omos den eimai sigouros Skaros.....akou..

OI ependiseis se aiolika parka pera apo perivalontiko ofelos exoun thetiko antiktipo kai se kapio allo tomea? Sto provlima tis anergias gia paradigma den nomizo oti prokeite na voithisoun giati ta aiolika parka den nomizo na xreiazontai poly prosopiko para kapious texnikous pou tha epivlepoun ti leitourgia tous.?

To oikonomiko ofelos pio akrivos tha einai? Tha eina fthinoteri i energia ? Mallon makroprothesma tha einai, e?

Genika gia tin Ellada exei simasia i diatirisi tou katharou perivalontos opote oi ananeosimes piges energias mporoun na prosferoun katalitika se auto. Apo tin alli to fysiko kalos gia tin Ellada apotelei sigritiko pleonektima kai ploutoparagogiki pigi. Anysixo loipon ligo gia to ti antiktipo tha exei i egatastasi anamogeniotrion se perioxes pou theorountai omorfes. Efoson malista ta nisia kai ta vouna tis Elladas apoteloun eunoikes topothesies gia tin egatastasi tous fovame min toixon kai arxizoun na egathistoun anemogenitries anexelegta - opou tous goustari - xoris sevasmo gia to fysiko kalos kai tous katikous ton perioxon.

Episis to gegonos oti autes oi ependiseis proerxontai kyrios apo xenes etairies me kanei na eimai ligo kaxypoptos gia tis eilikrineis prothesis tous na sevastoun to Elliniko perivalon. Odigos ton ependiseon tous pistevo pos tha einai to kerdos (vasiki arxi tou kapitalismou) para i idea tis oikologias.

Tha ithela na do Ellinikes eteries na einai Leaders stin paragogi aiolikis energias
giati exo tin pepithisi oti sta Ellinika panepistimia ginete axiologi ereuna pano sto antikimeno.

Telos- kata ti gnomi mou i Ellada prepei na mpei oso pio dinamika ginete stis anerxomenes agores ananeosimon pigon energias. An prepei na ginoun ependiseis simera prepi na ginoun se tomis opos autos kai genikotera se tomeis pou tha mporesoume na ekmetaleutoume to ipsilis piotitas empsuxo dynamiko mas. (leme oti exoume kala myala ... naloipon i eukeria mas).

O logos pou prepi na kanoume simera tolmira vimata einai oti, se autous tou tomeis, oi ependiseis einai sta prota tous stadia kai to sigritiko pleonektima sinithos se nees agores kerdizete apo tous organisnous pou parousiazoun tis pio protoporiakes idees, se antithesi me tis pio orimes agores stis opies oi oikonomies klimakas paizoun poly pio symantiko rolo. ........ Gia paradigma den tha mporousame me tipota na sinagonistoume p.x tin Volkswagen an ependiame stin autokinitoviomixania. Sigoura omos exoume poly kales pithanotites - parousiazontas kati protoporiako - apenanti se mikroteres eteries oi opies einai episis nees stin agora energias apo ananeosimes piges. H agora einai akoma anixti.....mporoume na diekdikisoume ena sevasto kommati tis.

I hliaki energia einai to idio paragogiki ?

ydrohoos
May 19th, 2005, 01:41 AM
GREECE BUILDS WORLD'S BIGGEST SOLAR PHOTOVOLTAIC (PV) POWER
STATION Greenpeace: Solar power breaks through cost barrier on Crete

Athens/Amsterdam, 12.6.1997 - Solar power today enters a new era
with the Greek Governments' decision to begin the construction
of the world's largest solar photovoltaic (PV) power station on
the island of Crete. The solar power station is part of a two
year campaign by Greenpeace to transform Crete into a solar
powered island.

The Greek Energy Minister Vasso Papandreou today agreed to fund
the first 5 Megawatt tranche of a proposed 50 Megawatt PV power
station on Crete with the U.S. company ENRON SOLAR. The European
Union (EU) and the Greek government will fund 55% of the capital
costs. Total investment is 17.75 million US dollars. Enron
Solar's plan submitted to the Greek Government proposes building
9 Megawatts a year subsequently to reach 50 Megawatts by 2003.
The current largest PV power station is 3.3 Megawatts in Italy.

Following the Greek Governments' announcement, Thilo Bode
Executive Director said "This smashes conventional assumptions
on solar power in terms of scale and costs. The solar age is no
longer a future dream but a reality today".

At 50 Megawatts, the Crete solar power station would be fifteen
times larger than any other solar PV installation in the
world, be more than four times cheaper than the average costs
of PV, and provide electricity for nearly 100,000 people, an
eighth of Crete's population. The given costs of electricity
given by Enron Solar for the first 5 Megawatts of the 50
Megawatt proposal is below 8.5 cents/kWh, cheaper than a third
of Crete's fossil fuel electricity.

A Greenpeace report released today "Plugging into the sun -
kickstarting the solar age in Crete" demonstrates that the 50
Megawatt solar power station on Crete could catalyse a global
breakthrough in commercial markets "If the world builds the
equivalent of eight of these solar power stations, we can
create a $27 billion dollar market for solar PV and create
several 100.000 jobs".

"This is the type of energy investment which Governments must
now implement if we are to have any chance of avoiding dangerous
climate change and if countries are to meet their own greenhouse
gas reduction commitments" Bode said.

Negotiations for legally binding greenhouse gas reductions will
be finalised in December at a meeting of the Climate Change
Convention in Kyoto, Japan. Greenpeace is calling for a minimum
20% cut in carbon dioxide levels by 2005 on 1990 levels, and to
begin negotiations for a fossil fuel phaseout, and in
particular, a halt to new oil exploration.

Following the Government's announcement the Energy Minster will
hold a press conference to discuss other solar issues with
Greenpeace on its ship MV Sirius which is on a solar tour of
the Mediterranean. -ends-

note to editors:
The full report with a global overview of current trends and
costs in solar photovoltaic plus video footage and stills are
available from Greenpeace International



Has any body got any idea about what has happened with this project?

I would not be surprised if it has been cancelled because as you have read in the article above, the money grabbers of Enron were to play an important role in this development. I believe that you know that Enron is bankrupt energy giant which was involved a few years ago in the most prolific accounting scandal in the world - ever. The likes of George W. Bush and Dick Chenney had important ties with that filthy company.

tzinos
May 19th, 2005, 03:13 AM
kapou tha einai petameno, katw apo kana grafeio...

Skaros
September 16th, 2005, 01:26 AM
The Greek Association of RES Electricity Producers


As the energy market in Greece moves swiftly toward full deregulation, the private sector is responding with dynamic interest. Dozens of new players are now actively part of what promises to be one of the most growth-oriented sectors during the next decade—energy. Electricity from renewable energy sources will increasingly be part of the national energy balance and investors are eyeing a wide variety of opportunities.

The Greek Association of RES Electricity Producers (GAREP), a private, non-profit organization that was founded in March 1997, has more than 60 Greek and foreign companies as members, which own and operate about 40 wind parks totaling more than 260 MW of installed capacity.

Members are companies that have made RES investments in Greece or have obtained administrative licenses for implementing RES investments in the immediate future.

According to Dr. Nick Vassilakos, Vice President of the European Renewable Energies Association (EREF) and Senior Adviser to GAREP, “The Association, through its 8-year intense activisation in the RES sector in Greece, has accumulated a tremendous amount of technical/financial know-how, practical experience and legal/administrative expertise, and has established strong and effective working relations with the pertinent Ministries and public organizations, at the central, regional, prefectural and local level. All this accumulated knowledge and problem-solving capabilities are constantly being shared among GAREP member companies, both Greek and international, and represent a wealth of top-level information, which is valuable to any foreign company that wishes to invest in the rapidly growing RES sector in Greece and to join the Association.”

As an industry association, GAREP represents its members before domestic and international authorities and organizations in an effort to promote members' interests and develop professional relationships.

GAREP is an active participant in policy recommendations to the government, by encouraging the most suitable legal framework to promote and exploit Renewable Energy Sources. In addition, GAREP makes specific recommendations toward a healthy market environment within the RES sector and is closely involved in applying codes of ethical commercial behavior.

Within GAREP are committees that deal with institutional matters that interest members in their interface with public and private organizations and with public authorities including the Public Power Corporation (PPC), the Center for Renewable Energy Sources (CRES), the Greek Forum for the promotion of Renewable Energy Sources (ELFORES), the Regulatory Authority for Energy (RAE), the Greek Transmission System Operator (GTSO), the Ministry of Development (YPAN) and others.

Skaros
September 16th, 2005, 01:28 AM
Windgenerators located at the island of Karpathos , south Aegean sea

http://www.windsurfing-karpathos.com/images/wingenerator.jpg

http://www.windsurfing-karpathos.com/images/wingenerators.jpg

Raleigh-NC
September 16th, 2005, 04:11 PM
Lots of great information... and photos :)

Skaros
September 19th, 2005, 12:28 PM
Η Εταιρία "ΑΙΟΛΙΚΗ ΠΑΝΑΧΑΙΚΟΥ Α.Ε."

εγκατάσταση ανεμογεννητριών, 41 συνολικά (ισχύος 900ΚW η κάθε μία, και συνολικής ισχύος του σταθμού 35 MWH.) ,


New project under construction (allready the windgenerators are installed) from the company "Eoliki Panachaikou" .
41 windgenerators (900KW each , total power production 35MWH ) + option aproved for 16 more windgenerators.

5-7 % of the needs of the city of Patras will be covered by the production of the new wind energy project on the mount Panachaiko (~1900m highest peak)



Κατά πλειοψηφία εγκρίθηκε από το Νομαρχιακό Συμβούλιο Αχαΐας, η επέκταση του Αιολικού Πάρκου, που κατασκευάζεται σε περιοχή του Παναχαϊκού όρους, με την τοποθέτηση επιπλέον 16 ανεμογεννητριών, πέραν των 41 που είχαν ήδη εγκριθεί.

Σύμφωνα με όσα ακούστηκαν στη συνεδρίαση, η επένδυση αποσκοπεί στην παραγωγή 12 εκατομμυρίων Κιλοβατώρων ετησίως, που αντιστοιχούν στο 5% - 7% των αναγκών της Πάτρας σε ηλεκτρικό ρεύμα, ενώ σημαντικά θα είναι τα ανταποδοτικά οφέλη για τους δήμους της Πάτρας και του Ρίου, αφού θα λαμβάνουν το 2% επί του τζίρου της επιχείρησης.

Ο Καθηγητής του Πανεπιστημίου Πατρών και Νομαρχιακός Σύμβουλος Αττικής, Δημοσθένης Αγορής, υποστήριξε πως το υπό κατασκευή Αιολικό Πάρκο, μόνο οφέλη μπορεί να προσδώσει στην περιοχή, παρά τις ανησυχίες που εξέφρασαν κάτοικοι της περιοχής και εκπρόσωποι περιβαλλοντικών οργανώσεων.


Vestas receives order for 41 units of V52-850 kW wind turbines for Greece


The Vestas Group has received an order for 41 units of V52-850 kW wind turbines for a project located near the town of Patras, on the Peloponnese in Greece.

The order has been placed by EOLIKI Panachaikou S.A., a company whose main investor and shareholder is CESA HELLAS, S.A. a Greek subsidiary of the Spanish company Corporación Eólica CESA, SA, which owns and operates several wind farms in Spain.

The order is for a turnkey project including a 5-year warranty, service and maintenance agreement. Delivery of the wind power plant will begin in July 2005 and commercial operation is scheduled to take place during the first quarter of 2006.


“The new Greek government has announced energy as an area of priority, which among others is expected to make the permitting process easier,” says Ditlev Engel, President and CEO of Vestas Wind Systems A/S and continues: “The development in Greece is positive and the Panachaikou project indicates that also foreign investors like CESA S.A. are interested in the Greek market”.

Skaros
October 22nd, 2005, 12:30 PM
21 - 10 - 2005
www.ana.gr

Development minister inaugurates windpower park in the Peloponnese

Development Minister Dimitris Sioufas on Friday inaugurated a windpower park in the prefect of Argolida, in the Peloponnese.

The windpower park is the first integrated such programme in the Peloponnese region and it took around 18 months to be completed. The park includes 12 winpower generators and will have a production capacity of 70 million KW. Energy produced by the park will be distributed to Public Power Corporation's electricity grid in the country.

The Greek minister, in his inauguration speech, said it was a remarkable project for the region that would benefit the country as a whole. "The government is committed to earmark funds from a Fourth Community Support Framework for the development of Greek regions," Sioufas said.

A Development ministry's plan to deregulate the country's electricity, natural gas and bio-fuel markets aims to secure 20 percent of energy needs from alternative energy sources by 2010.

Skaros
November 19th, 2005, 01:20 AM
H Eλλάδα στην εποχή της αιολικής ενέργειας


Από τη σημερινή Καθημερινή ένα ενδιαφέρον άρθρο...

Του Νικου Νικολαου

Tέλος βάζει η κυβέρνηση στο χάος της αδειοδότησης για την κατασκευή συστημάτων αξιοποίησης των Aνανεώσιμων Πηγών Eνέργειας (AΠE) στη χώρα μας, με την προώθηση νομοσχεδίου που κατατίθεται στη Bουλή για ψήφιση, το αργότερο τον Iανουάριο του 2006. Mε τον νόμο αυτό που επεξεργάστηκαν η πολιτική ηγεσία του υπουργείου Aνάπτυξης, σε συνεργασία με το Kέντρο Aνανεώσιμων Πηγών Eνέργειας (KAΠE) και τη Pυθμιστική Aρχή Eνέργειας (PAE), προσαρμόζεται η ελληνική νομοθεσία στην Kοινοτική Oδηγία 2001/77, σχετικά με την παραγωγή ηλεκτρικής ενέργειας από AΠE.

H σημερινή ηγεσία του υπουργείου Aνάπτυξης από καιρό έχει αποσαφηνίσει ότι θεωρεί τον τομέα των AΠE ως ένα από τους πλέον ελκυστικούς τομείς για την προσέλκυση επενδύσεων. Δεν είναι τυχαίο ότι στον χώρο αυτό, δραστηριοποιούνται, τα τελευταία χρόνια, μεγάλοι επενδυτικοί όμιλοι, όπως η εταιρεία POKAΣ ABEE, η TEPNA A.E., ο Oμιλος Kοπελούζου, η Eλληνική Tεχνοδομική, αλλά και μεγάλες ξένες επιχειρήσεις που είτε μέσω εξαγορών (IBERDROLA, EDF), είτε με απευθείας επενδύσεις (GAMESA, JASPER), προσπαθούν να λάβουν θέση και να πρωταγωνιστήσουν στην αγορά αυτή.

Eιδικά, ο τομέας των αιολικών πάρκων που παρουσιάζει το μεγαλύτερο ενδιαφέρον φαίνεται να αποκτά πλέον μια νέα δυναμική, καθώς και το ενδιαφέρον είναι μεγάλο, αλλά και η χώρα μας διαθέτει ισχυρό και πλούσιο αιολικό δυναμικό. Σε κάθε περίπτωση, το βέβαιο είναι ότι υπάρχουν όλες οι προϋποθέσεις για την παραγωγή σημαντικού ποσοστού ηλεκτρικής ενέργειας, με σκοπό την κάλυψη των ολοένα και μεγαλύτερων ενεργειακών αναγκών της χώρας.

H προώθηση των AΠE στο ενεργειακό μας ισοζύγιο, γίνεται ακόμη πιο επίκαιρη, λόγω της έναρξης της λειτουργίας του Xρηματιστηρίου των Pύπων που επιβαρύνει με δεκάδες εκατομμύρια ευρώ τη ΔEH, γεγονός που οφείλεται κυρίως στις ρυπογόνες λιγνιτικές μονάδες της Δυτικής Mακεδονίας και της Mεγαλόπολης.

Στο υπουργείο Aνάπτυξης, γνωρίζουν πολύ καλά ότι η χώρα μας ξεκινάει από πολύ χαμηλή αφετηρία. Eίναι χαρακτηριστικό ότι μόλις το 5% της συνολικής ακαθάριστης εγχώριας κατανάλωσης ενέργειας στη χώρα μας προέρχεται από AΠE, ενώ η συμμετοχή τους στη συνολική παραγωγή ηλεκτρικής ενέργειας ανέρχεται στο 10%, μόλις στο μισό του ενδεικτικού στόχου που έχει τεθεί για τη χώρα μας από την Oδηγία 2001/77, για το 2010.

Eίναι χαρακτηριστικό ότι σήμερα, λειτουργούν στη χώρα μας συστήματα AΠE συνολικής εγκατεστημένης ισχύος 566 MW, ενώ έχουν, επιπλέον, χορηγηθεί άδειες εγκατάστασης που αντιστοιχούν σε ισχύ 220 MW.
Παράλληλα, έχουν εκδοθεί, μέχρι σήμερα, άδειες παραγωγής ηλεκτρικής ενέργειας από AΠE, συνολικής ισχύος 4.646 MW, ενώ οι αιτήσεις για χορήγηση αδειών παραγωγής αντιστοιχούν σε 22,700 MW(!) δηλαδή διπλάσιες σε σχέση με τη συνολική εγκατεστημένη ισχύ του συστήματος ηλεκτρικής ενέργειας.

Tα μεγαλύτερα εμπόδια στην ανάπτυξη των AΠE, και ιδίως των αιολικών πάρκων στη χώρα μας, αποτελούν η έλλειψη ενός χωροταξικού σχεδίου, σε συνδυασμό με τις αντιδράσεις μικρών οργανωμένων ομάδων σε διάφορες περιοχές που υπάρχει σημαντικό επενδυτικό ενδιαφέρον. Aλλωστε, έχει μείνει στην ιστορία, ο προπηλακισμός του τέως γενικού γραμματέα του υπουργείου Aνάπτυξης κ. Kαλουδιώτη από ομάδα Λακώνων, όταν επιχείρησε να τους μιλήσει για τα οφέλη από την αιολική ενέργεια και τις δυνατότητες για επενδύσεις στον τομέα αυτό σε μια περιοχή με πλούσιο αιολικό δυναμικό.

Hδη, το YΠEXΩΔE έχει συστήσει επιτροπή, με σκοπό την κατάρτιση Eιδικού Xωροταξικού Σχεδίου για τις περιοχές με υψηλό αιολικό δυναμικό, ώστε οι επενδύσεις να προχωρούν απρόσκοπτα, χωρίς τις γνωστές περιπέτειες και εμπλοκές που καταλήγουν στο Συμβούλιο της Eπικρατείας. Eίναι γεγονός, ότι πολλές επενδύσεις έχουν μείνει πίσω, όπως η περίπτωση ιαπωνικής εταιρείας, με μεγάλη τεχνογνωσία στον χώρο των αιολικών και των AΠE, την επένδυση της οποίας, στη Λακωνία, είχε καταφέρει να μπλοκάρει μια ομάδα 7-8 ατόμων με συνεχείς προσφυγές στο Συμβούλιο της Eπικρατείας.

Eπιπλέον, πριν από λίγο καιρό, τόσο το υπουργείο Aνάπτυξης όσο και η κυβέρνηση έθεσαν ως προτεραιότητα τη χρηματοδότηση, μέσω του Eπιχειρησιακού Προγράμματος «Aνταγωνιστικότητα», των δικτύων διασύνδεσης των AΠE με το Σύστημα Mεταφοράς. O λόγος έγκειται στο ότι για να λειτουργήσει ένα αιολικό πάρκο δεν αρκεί να λάβει μια εταιρεία άδεια παραγωγής, αλλά θα πρέπει να διασφαλίζεται η σύνδεση με το Σύστημα Mεταφοράς Hλεκτρισμού της χώρας, γεγονός που, σε πολλές περιπτώσεις, καθυστερεί ή και ματαιώνει επενδύσεις στον τομέα της αιολικής ενέργειας. Mέσω του νέου μέτρου 6,5 του EΠAN, οι επενδύσεις σε AΠE θα επιχορηγηθούν με επιπλέον 40 εκατ. ευρώ για τη διασύνδεσή τους είτε με το Δίκτυο ή το Σύστημα Mεταφοράς. Aυτή ήταν μια σημαντική παρέμβαση που έγινε με τις ευλογίες του υπουργού Aνάπτυξης κ. Δ. Σιούφα, αλλά δεν αρκεί.

Στη μείωση, λοιπόν, της γραφειοκρατίας των αδειοδοτήσεων και της κατάρτισης Eιδικού Xωροταξικού Σχεδίου προχωράει η κυβέρνηση, θέτοντας κάθε δυνατή προσπάθεια να βάλει τάξη στο χάος του παρελθόντος, προσδοκώντας παράλληλα, να προσελκύσει επενδύσεις ύψους έως και 1 με 1,5 δισ. ευρώ στον τομέα των AΠE, τα επόμενα χρόνια. Tο συμπέρασμα που βγάζει κανείς, λοιπόν, είναι ότι γίνεται μια σοβαρή προσπάθεια, η οποία όμως θα κριθεί από το αποτέλεσμά της.

Skaros
November 19th, 2005, 02:20 AM
Pilot hydrogen production unit is launched today


www.ekathimerini.gr , www.cres.gr

http://www.cres.gr/kape/images/left_stretch_wind.jpg

Development Minister Dimitris Sioufas today will inaugurate Europe’s first wind power-driven hydrogen production plant in Keratea, southern Attica.

The unit, located in the Center for Renewable Energy Sources’ (CRES) wind park, will be powered by a 500KW wind generator and have a production capacity of 5 cubic meters of hydrogen per hour.

The product will be bottled and used in future in fuel cells or hydrogen-fueled vehicles. The plant was created in the framework of an EU-sponsored research project and with the participation, apart from CRES, of private listed firm Rokas.

Skaros
November 23rd, 2005, 06:27 PM
New Wind park in Crete

www.ekathimerini.com 23/11/2005

A new wind park of 9.35 megawatts (MW) capacity is to be inaugurated in the Kissamos district of Hania in Crete on Saturday by a subsidiary of Electricite de France (EDF), which recently launched a 36MW facility near Kranidi, Peloponnese.
EDF has announced a 500-million-euro program of investment in renewable energy sources in Greece over three years, for which it has obtained the necessary licenses.

Skaros
December 15th, 2005, 01:44 PM
Φωτογραφίες από τα εγκαίνια της μονάδας παραγωγής υδρογόνου από ανεμογεννήτριες από τον υπουργό κ. Σιούφα

http://www.cres.gr/kape/hmerida/files/ydrogen/images/PB191749.jpg

http://www.cres.gr/kape/hmerida/files/ydrogen/images/PB191785.jpg

http://www.cres.gr/kape/hmerida/files/ydrogen/images/PB191958.jpg

http://www.cres.gr/kape/hmerida/files/ydrogen/images/PB191973.jpg

Skaros
May 28th, 2006, 07:17 PM
Some amazing news dear friends!!!!!!!


Plans announced by 3 big energy groups (kopelouzos , Mytilinaios ,Rokas ) for investments of ~ 4 billion euro (!!!!) in wind energy production !!!
The plans include the creation of many wind parks among the islands of the aegean sea !!


1) ROKAS

44 wind parks Lesbos , Chios , Limnos - 1,636 MW - 2.4 Billion EUro investment

GREECE'S ROKAS INVESTS 2.4BLN EURO IN WIND FARM


www.ansamed.it

(ANSAmed) - ATHENS, MAY 23 -
Greecés biggest wind-power producer Rokas announced it will invest 2.4 billion euros (USD3.1 billion) in a wind farm and power transmission system.
The move marks one of the biggest investments in wind energy in the world, Kathimerini reports.
The company said it has applied for approval from the energy regulator to install 44 wind parks with a combined generating capacity of 1,636 megawatts and to link them to three islands in the northern Aegean - Chios, Lesvos and Lemnos.
The total cost of the investment, part of Rokas's plan in renewable energy resources, is estimated to reach 2.4 billion euros and is one of the largest projects worldwide in the area of wind energy. Spanish power utility Iberdrola holds a 49.9% stake in Rokas.
In an effort to meet its commitments under the Kyoto protocol on climate change, Greece aims to have renewable energy sources make up 20% of its energy needs by 2010, compared with a current 10%.
Greece now has only about 475 MW of installed wind-power capacity which covers only a tiny slice of the country's energy needs of 52,000 gigawatts per hour (GWh). Rokas accounts for about 40% of total Greek wind power production. (ANSAmed). MRR

2) KOPELOUZOS

Andros , Paros , Tinos , Naxos islands - 400 MW (700 million euro investment)

3) MYTILINAIOS

Milos , Kimolos , Polyaigos , Serifos - 800 MW (1 billion euro investment)



Επενδυτική τριχοτόμηση του... «εναέριου χώρου»
Kεφαλαια άνω των 4 δισ. ευρώ αναμένουν το «πράσινο φως» των αδειοδοτικών αρχών, για αιολικά πάρκα στα νησιά του Αιγαίου

Της Xρυσας Λιαγγου

Aσφαλή ηλεκτροδότηση για τα νησιά της χώρας, υπόσχεται ο Aίολος. Aυτό τουλάχιστον προκύπτει από το επίσημο επενδυτικό ενδιαφέρον για παραγωγή ηλεκτρικής ενέργειας από αιολικά πάρκα.

Kεφάλαια άνω των 4 δισ. ευρώ, εκ των οποίων περίπου τα μισά προέρχονται από το εξωτερικό, αναμένουν το « πράσινο φως » των αδειοδοτικών αρχών, για να στηρίξουν επενδύσεις, που θα δημιουργήσουν νέα δεδομένα στη μέχρι τώρα αναξιόπιστη και κατακερματισμένη αγορά ηλεκτρισμού του νησιωτικού συστήματος.

Για πρώτη φορά από το 1994 που η αγορά των ανανεώσιμων πηγών ενέργειας απελευθερώθηκε, τα νησιά βρίσκονται στο επίκεντρο του επενδυτικού ενδιαφέροντος με φιλόδοξα σχέδια για την παραγωγή συνολικά 2.800 MW περίπου από αιολικά πάρκα.

Ο πρόεδρος της ΡΑΕ

H ισχύς αντιπροσωπεύει ποσοστό 30-40% της συνολικής εγκατεστημένης ισχύος της χώρας και όπως δηλώνει στην «K» ο πρόεδρος της Pυθμιστικής Aρχής Eνέργειας ( PAE ) κ. Mιχάλης Kαραμανής

«αγγίζει τα όρια του συστήματος» που σημαίνει, ότι μεγαλύτερη ισχύ δεν θα μπορούσε να απορροφηθεί.

Aκόμη όμως και η ισχύς από τα υφιστάμενα επενδυτικά σχέδια που έχουν κατατεθεί στη PAE και αναμένουν αξιολόγηση, δεν είναι βέβαιο ότι μπορεί να απορροφηθεί από το σύστημα.

«Aυτό είναι κάτι που θα πρέπει να το διερευνήσουμε και ίσως χρειαστεί να απευθυνθούμε πέραν του ΔEΣMHE και σε ειδικούς συμβούλους», δηλώνει ο κ. Kαραμανής. « Iσως οι επενδυτές κληθούν να προχωρήσουν σε ένα συνδυασμό αιολικών πάρκων με αντλιοταμιευτήρες. Oι επενδύσεις αυτές μας δίνουν τη δυνατότητα αποθήκευσης της ηλεκτρικής ενέργειας όταν περισσεύει η παραγωγή από αιολικά. Bεβαίως ανεβάζουν το συνολικό κόστος από 30% -40% μέχρι και διπλασιαμό καμία φορά, αλλά εάν κριθεί απαραίτητο θα το απαιτήσουμε από τους επενδυτές προκειμένου να γνωμοδοτήσουμε θετικά ως αρμόδια αρχή για την υλοποίηση των επενδύσεων » σημειώνει ο ίδιος.

Bλέπει « κατ' αρχήν θετικά » το ενδιαφέρον για μεγάλες επενδύσεις στα νησιά, κυρίως λόγω των συνεργειών που δημιουργούνται με τις υπηρεσίες κοινής ωφέλειας και το περιβάλλον.

« Eκτός από την εξασφάλιση καθαρής ενέργειας, αφού δεν θα χρειάζεται να καταναλώνουμε πετρέλαιο που εκτός από εισαγόμενο και ακριβό είναι και ρυπογόνο, θα αποφύγουμε και το κόστος υπηρεσιών κοινής ωφέλειας που μόνο για τα νησιά ανέρχεται σε 300 εκ. ευρώ ετησίως » . Oι επενδύσεις αυτές αποτελούν εξάλλου και μια μεγάλη ευκαιρία για είσροή ξένων κεφαλαίων, σημειώνει ο κ. Kαραμανής αναφερόμενος στο γιγαντιαίο πρότζεκτ της POKAΣ AE, στην οποία συμμετέχει με ποσοστό 49,9% η ισπανική Ibertrola.

Θεωρεί ότι τεχνικά είναι εφικτά τα επενδυτικά σχέδια και των τριών Oμίλων Kοπελούζου, Mυτιληναίου και POKA) τόσο σε ό,τι αφορά τα αιολικά πάρκα, όσο και τις υποθαλάσσιες διασυνδέσ εις με το ηπειρωτικό σύστημα της χώρας. «Eκεί που ακόμα υπάρχουν ερωτηματικά είναι η αποδοχή τους από τους κατοίκους» δηλώνει ο κ. Kαραμανής, θίγοντας μία μεγάλη και διαχρονική πληγή αυτού του είδους επενδύσεων.

H αποδοχή των επενδύσεων από τις τοπικές κοινωνίες, παραμένει ένα από τα « ρίσκα » και για τους ίδιους τους επενδυτές. Aκόμη και οι πλέον αισιόδοξοι, που εκτιμούν ότι έχουν διασφαλίσει τη συναίνεση του τοπικού παράγοντα, εξακολουθούν να διακατέχονται από ανασφάλεια, αφού οι αντιδράσεις μπορεί να εκδηλωθούν ανά πάσα στιγμή ακόμη και μετά την λειτουργία της επένδυσης. Στο σύνολό τους όμως οι επενδυτές εμφανίζονται πιο αισιόδοξοι σε σχέση με τις τοπικές κοινωνίες, καθώς διαπιστώνουν μια «ωρίμανση» στις μεταξύ τους σχέσεις.

Η POKAΣ AE

«H τοπική κοινωνία υποδέχτηκε με ζεστασιά και ανταπόκριση το επενδυτικό μας σχέδιο. Tο αγκάλιασαν από την πρώτη στιγμή, έχουμε πάρει μέχρι και ευχαριστήριες επιστολές» τονίζει σχετικά στην « K » ο διευθύνων σύμβουλος της POKAΣ AE κ. Mατθαίος Tρούλλης. Tη θετική αυτή στάση των κατοίκων στα νησιά Xίο, Λέσβο και Λήμνο, όπου η POKAΣ αναμένεται να εγκαταστήσει 44 αιολικά πάρκα ισχύος 1.636 MW, επενδύοντας συνολικά ( μαζί με τις υποθαλάσσιες διασυνδέσεις ) 2,4 δισ. ευρώ, συνδέει ο κ. Tρούλλης, κυρίως με το ενεργειακό τους πρόβλημα.

« Tα τρία αυτά ακριτικά νησιά υποφέρουν περισσότερο από το κακό δίκτυο ηλεκτροδότησης. Eίναι εθνική ανάγκη να μην κοιτάνε απέναντι την Tουρκία για να λύσουν το ενεργειακό τους πρόβλημα. Mε αυτή την επένδυση νιώθουν ότι το λύνουν. Aποβλέπουν επίσης και στα οικονομικά ωφέλη από το τέλος, ύψους 2,5% επί του ετήσιου τζίρου, υπέρ της Tοπικής Aυτοδιοίκησης» τονίζει ο κ. Tρούλλης. Σημείωνει επίσης, τα οφέλη για το περιββάλον αλλά και τις συνολικότερες συνέργειες για την εθνική οικονομία. «Mόνο από την εξοικονόμηση πετρελαίου θα έχουμε όφελος της τάξης του 1,5 δισ. ευρώ ετησίως ( για το σύνολο των νησιών ) , χωρίς να συνυπολογιστούν τα οφέλη από τον περιορισμό των ρύπων», σημειώνει ο ίδιος.

Σε ό,τι αφορά αυτή καθ' αυτή την επένδυση, την χαρακτηρίζει « γιγαντιαία, με ρίσκα βεβαίως, λόγω της μεγάλης απόστασης υποθαλάσσιας διασύνδεσης. Eίναι μία μεγάλη πρόκληση για όλους, πρόκειται για την μεγαλύτερη επένδυση παγκοσμίως στον τομέα, την οποία όμως εγγυάται οικονομικά και τεχνικά η

Ibertrola » τονίζει και υπογραμμίζει ότι «πρόκειται για μία άμεση επένδυση κεφαλαίων του εξωτερικού στη χώρα μας » . Tο έργο, σύμφωνα με τον ίδιο και βάσει της προμελέτης που έχει γίνει είναι βιώσιμο και εκτιμάται ότι μπορεί να ολοκληρωθεί σε διάστημα δύο ετών από τη στιγμή που θα αδειοδοτηθεί.

Σε ό,τι αφορά τον ανταγωνισμό, η εταιρεία Pόκας, η πρώτη που δραστηροποιήθηκε στην αγορά, εμφανίζεται να καλωσορίζει τους νέους παίκτες. « Xαίρομαι που υπάρχει ενδιαφέρον. H αγορά χωράει πολλούς σωστούς παίκτες» σημειώνει, για να θίξει και το φαινόμενο των «διαφόρων αετονύχηδων που σπεύδουν να πάρουν άδεια για να την πουλήσουν στη συνέχεια » .

Ο Δ. Κοπελούζος

Tην πλήρη συναίνεση της τοπικής κοινωνίας φαίνεται ότι έχει διασφαλίσει και ο Oμιλος Kοπελούζου, ο οποίος από κοινού με τον Oμιλο Σαμαρά προωθεί την εγκατάσταση 400 MW στα νησιά Aνδρο, Tήνο, Πάρο και Nάξο και τη διασύνδεσή τους μέσω Σύρου με το Λαύριο, επένδυση συνολικού ύψους 700 εκ. ευρώ.

« Eχουμε διασφαλίσει τη συναίνεση των τοπικών κοινωνιών. Θα έλεγα μάλιστα ότι εμάς μας κάλεσε πρώτη η τοπική κοινωνία να δραστηριοποιηθούμε» τονίζει χαρακτηριστικά στην « K » ο επικεφαλής του Oμίλου κ. Δημήτρης Kοπελούζος. « Tο πρότζεκτ για τις Kυκλάδες, σέβεται απολύτως το περιβάλλον και εντάσσεται πλήρως στον σχεδιασμό του ΔEΣMHE για την ανάπτυξη του ελληνικού συστήματος» τονίζει ο ίδιος και συμπληρώνει: « - ξυπηρετεί και τα συμφέροντα της ΔEH, αφού με τη χρήση του, απαλλάσσεται από το τεράστιο κόστος λειτουργίας των τοπικών μονάδων, αλλά και την υποχρέωση για άμεσες επενδύσεις στα νησιά αυτά, προκειμένου να αυξήσει την εγκατεστημένη ισχύ και να αντιμετωπίσει τη συνεχώς αυξανόμενη ζήτηση σε ηλεκτρική ενέργεια » . Tο μόνο αγκάθι, σύμφωνα με το κ. Kοπελούζου για το σύνολο αυτών των έργων είναι τα περιβαλλοντικά. «Tο πόσο γρήγορα θα κινηθεί το YΠEXΩΔE για τις εγκρίσεις των απαιτούμενων μελετών είναι καθοριστικός παράγοντας για την πορεία υλοποίησής τους» τονίζει. Tόσο ο ίδιος πάντως, όσο και οι εκπρόσωποι των Oμίλων Mυτιληναίου και Pόκα, σημειώνουν την καταλυτική για τις επενδύσεις σημασία του πλαισίου που κατατέθηκε την περασμένη εβδομάδα στη Bουλή. « O νόμος είναι θετικός. O κ. Σιούφας έκανε ένα νόμο που ευνοεί τις επενδύσεις» δηλώνει χαρακτηριστικά.

Ο Ομιλος Μυτιληναίου

Aπό πλευράς του Oμίλου Mυτιληναίου, ανώτατα στελέχη, εκφράζουν επίσης αισιοδοξία για την υλοποίηση του επενδυτικού τους σχεδίου. Φέρονται επίσης να έχουν προεξοφλήσει τη συναίνεση της τοπικής κοινωνίας, διατηρούν ωστόσο επιφυλάξεις, αφού όπως σημειώνουν «ανά πάσα στιγμή ακόμη και μετά τη λειτουργία της επένδυσης μπορεί να αντιμετωπίσεις πρόβλημα. Eίναι η μεγάλη ανασφάλεια όλων αυτών των έργων». Διαπιστώνουν πάντως «μία ωριμότητα μεταξύ επενδυτών και τοπικών κοινωνιών». O Oμιλος Mυτιληναίου προωθεί την εγκατάσταση αιολικών πάρκων ισχύος 800 MW στα νησιά Mήλο, Kίμωλο, Πολύαιγο και Σέριφο και τη διασύνδεσή τους με το δίκτυο του Λαυρίου, επένδυση συνολικού προϋπολογισμού περίπου 1 δισ. ευρώ. H υλοποίηση της επένδυσης, αναφέρει ανώτατο στέλεχος του Oμίλου, πέραν από μια αξιόπιστη λύση στην ηλεκτροδότηση των νησιών, θα προσφέρει και υποστήριξη στο Nότιο Σύστημα που αντιμετωπίζει προβλήματα ευστάθειας. Σε ό,τι αφορά το νέο πλαίσιο, υπογραμμίζει ότι «βρίσκεται στη σωστή κατεύθυνση». Θα πρέπει να σημειωθεί ότι και οι τρεις Oμιλοι βλέπουν θετικά μία συνεργασία με τη ΔEH, η οποία έχει σχεδιάσει παραγωγή ισχύος 1540 MW με εταίρο ή 770 αυτόνομα.


Aς ελπίσουμε όλα να πάνε καλά και να υλοποιηθούν οι παραπάνω γιγάντιες επενδύσεις που ίσως για πρώτη φορά στην ιστορία θα βοηθήσουν τη χώρα να "ξεκολλήσει" από την ενεργειακή της εξάρτηση από το πετρέλαιο...

Skaros
June 16th, 2006, 02:06 PM
Κατασκευή φωτοβολταϊκής μονάδας στην Πάτρα
Συνολική επένδυση 40 εκ. ευρώ


Η πρώτη ελληνική καθετοποιημένη μονάδα παραγωγής φωτοβολταϊκών στοιχείων πολυκρυσταλλικού πυριτίου κατασκευάζεται από την εταιρεία Solar Cells Hellas S.A. στη βιομηχανική περιοχή της Πάτρας, με την επιστημονική και τεχνική υποστήριξη του Κέντρου Ανανεώσιμων Πηγών Ενέργειας ( ΚΑΠΕ ).

Τα φωτοβολταϊκά συστήματα αποτελούν, όπως τονίζουν επιστημονικά στελέχη του ΚΑΠΕ, μία από τις σημαντικότερες ανανεώσιμες ενεργειακές τεχνολογίες παραγωγής ηλεκτρικής ενέργειας που μπορούν να συνεισφέρουν σημαντικά στην προστασία του περιβάλλοντος και στην ενεργειακή ανεξαρτησία. Οι δυνατότητες αξιοποίησής τους είναι πολύ μεγάλες ειδικά στη χώρα μας που διαθέτει μεγάλα διαστήματα ηλιοφάνειας. Μπορούν να ενταχθούν σε όλους του χώρους και διατίθενται σε διάφορους τύπους, αυτόνομα συστήματα, κεντρικά συστήματα κ.ά.

Solar Cells Hellas: Greek Photovoltaic Unit

Solar Cells Hellas S.A is about to build its first Greek unit for the production of multicrystal photovoltaic silicon cells in the Patras Industrial Park.
This investment was positively evaluated by ELKE and was subsidized by the new Investment Law with a total of 25.2 million EURO.
The unit, one of the few in Europe, will generate 116 new employment positions when fully operational. It is also expected to boost the industrial potential of the region and result in multiple benefits for the wider area. Many raw materials to be used will originate locally. Furthermore, the investment will provide the Greek market with know-how in a new sector and will promote the application of photovoltaic systems in Greece.

gm2263
November 28th, 2007, 01:56 PM
Err, I think this thead needs some revival since A LOT took place from the last update.

Skaros
December 1st, 2007, 02:45 PM
Thanks gm , you are right there are some news since the last update...

ROKAS S.A. member of http://www.rokasgroup.gr/images/iberdrola.gif

ROKAS is a pioneer in the development of wind energy in Greece as in 1998 the company set in operation the first private wind farm in Greece, which marked the beginning for the production of electric energy by private producers. Today, ROKAS operates 13 wind farms of 193.3 MW total capacity.

ROKAS windpark map

http://www.rokasgroup.gr/images/map.jpg

MetroGuardian
December 15th, 2007, 11:37 PM
To φωτοβολταϊκό πάρκο που ετοιμάζει η ΔΕΗ [DEHr.AT] Σχετικά άρθρα στη Μεγαλόπολη παρουασίασε σήμερα ο πρόεδρος και διευθύνων σύμβουλος της επιχείρησης, Τάκης Αθανασόπουλος.

Ο κ. Αθανασόπουλος είπε ότι το φωτοβολταϊκό αυτό πάρκο θα είναι ισχύος 50 μεγαβάτ και πρόκειται για το δεύτερο μεγαλύτερο της Ευρώπης, ενώ σημείωσε πως θα απασχολεί με την ολοκλήρωσή του το έργο 70-100 άτομα σε μόνιμη βάση και θα αποτελέσει τουριστικό πόλο έλξης αφού πολλοί είναι αυτοί που θα θέλουν να επισκεφθούν και να το δουν από κοντά.

Ο πρόεδρος της ΔΕΗ ανέφερε επίσης ότι το 2011 θα είναι έτοιμο να λειτουργήσει και το συγκρότημα παραγωγής ηλεκτρικού ρεύματος που ετοιμάζεται στην περιοχή με φυσικό αέριο συνολικής ισχύος 800 μεγαβάτ.


http://www.naftemporiki.gr/news/static/07/12/15/1452617.htm

greecelightning
December 16th, 2007, 12:58 AM
Great news! :)

greecelightning
December 16th, 2007, 09:50 PM
"Στην Αττική 550 σχολεία σε 45 δήμους έχουν συνδεθεί με το δίκτυο φυσικού αερίου. Οι εργασίες κατασκευής έχουν ήδη ολοκληρωθεί και αυτήν τη στιγμή λειτουργούν περίπου 380 εσωτερικές εγκαταστάσεις.

Το κόστος για την υποκατάσταση των συμβατικών καυσίμων με φυσικό αέριο είναι 3,2 εκατ. ευρώ. Υπολογίζεται ότι μέχρι τα τέλη του 2008 θα έχουν συνδεθεί συνολικά 988 σχολεία (στη β φάση του έργου που ξεκινά τον Φεβρουάριο πρόκειται να συνδεθούν με το φυσικό αέριο επιπλέον 438 σχολεία).

Επίσης το έργο απλώνεται σταδιακά και στην υπόλοιπη Ελλάδα, με τη Θεσσαλονίκη (100) να πρωτοστατεί στα σχολεία που θερμαίνονται με φυσικό αέριο και να ακολουθούν οι νομοί Μαγνησίας (30) και Λάρισας (40). "

http://www.ethnos.gr/article.asp?catid=11424&subid=2&tag=8787&pubid=200465

MetroGuardian
January 14th, 2008, 12:39 PM
Τον τελευταίο ενάμιση χρόνο εκκρεμούν για εξέταση από τη Ρυθμιστική Αρχή Ενέργειας αιτήσεις που αντιστοιχούν σε 12.000 μεγαβάτ (ΜW) ισχύος αιολικής ενέργειας, ξεπερνούν δηλαδή το σύνολο της εγκατεστημένης ισχύος της ΔΕΗ που ανέρχεται σε 11.500 ΜW. Παράλληλα έχουν ήδη αδειοδοτηθεί αιολικά πάρκα ισχύος 6.000 ΜW στο διασυνδεδεμένο σύστημα, ενώ αυτά τα οποία έχουν κατασκευαστεί και λειτουργούν δεν ξεπερνούν τα 850 ΜW.

http://www.tanea.gr//Article.aspx?d=20080114&nid=7172820&sn=&spid=631

SouthernEuropean
January 30th, 2008, 12:14 AM
Hey there guys,check these news from my hometown,Trikala:

Το δεύτερο φωτοβολταϊκό πάρκο της εταιρείας Δερπανόπουλος Ενεργειακή Α.Ε., βρίσκεται σε φάση ολοκλήρωσης.

Το νέο έργο ισχύος 97,650 KWp με δυνατότητα επέκτασης στα 99,225 KWp εκτελείται επίσης με σύστημα ιχνηλάτησης ηλίου και βελτιωμένη σχεδίαση στη χρήση μετατροπέων.

http://img87.imageshack.us/img87/6614/entriktv6.jpg

Στην ολοκλήρωση του έργου συμμετέχει εξειδικευμένο προσωπικό της εταιρείας FireWall Energy Construction Ε.Π.Ε. πιστοποιημένης κατά ISO9001:2000 για σχεδιασμό εγκατάσταση συντήρηση και τεχνική υποστήριξη συστημάτων παραγωγής από ανανεώσιμες ενέργειας ( φωτοβολταϊκά συστήματα) με αριθμό πιστοποίησης 01 100 073701.

http://img135.imageshack.us/img135/285/entrik2gz6.jpg

Όλο το τεχνικό και εργατικό δυναμικό της εταιρείας έχει εκπαιδευτεί και συνεργάζεται για την υλοποίηση του συγκεκριμένου έργου και των λοιπών που κατασκευάζει, με το Γερμανικό οίκο a&f Stahl – und Maschinenbau GmbH του GILDEMAISTER GROUP και με τον Ελβετικό οίκο Sputnik Engineering AG.

Επόμενα στάδια για την ολοκλήρωση του έργου είναι ο τεχνικός έλεγχος από την αρμόδια τεχνική διεύθυνση της ΔΕΗ για την πληρότητα της κατασκευής και την συμβατότητα με το δίκτυό της.

http://img301.imageshack.us/img301/3743/entrik3fd3.jpg

εκπρόσωπος της εταιρείας FireWall Energy Construction Ε.Π.Ε. , κ. Αθανάσιος Καραπάνος δήλωσε την πλήρη ικανοποίησή του για την συνεργασία με την πρωτοπόρο στην υλοποίηση φωτοβολταικών συστημάτων εταιρεία Δερπανόπουλος Ενεργειακή Α.Ε. και την εμμονή της στην εγκατάσταση συστημάτων τεχνολογίας αιχμής.


Nice eh? :okay:

Skaros
January 31st, 2008, 01:45 AM
@southern very interesting news , well done trikala (also a pioneer city in Greece in providing free wifi services)

Mount Panachaiko wind park as seen from the campus of UPatras
http://img149.imageshack.us/img149/1450/panachaikowindgeneratorpl5.jpg

MetroGuardian
February 6th, 2008, 01:13 PM
^ Το μεγαλύτερο στην Ελλάδα μέχρι στιγμής.

Δεν ξέρω τι ακριβώς βρίσκεται πίσω από την ανάπτυξη των αιολικών πάρκων στην Ελλάδα και για ποιό λόγο η κυβέρνηση καθυστερεί τόσο την εξάπλωση τους. Ιδιωτικά δεν υπάρχει απολύτως κανένα πρόβλημα. Αν η κυβέρνηση αρχίσει να αδειοδοτεί τα κεφάλαια είναι έτοιμα να πέσουν μέσα. Αυτή τη στιγμή οι αιτήσεις για εγκατάσταση αιολικού πάρκου ξεπερνούν τη συνολική εγκαταστημένη ισχύ της χώρας (υδροηλεκτρικά, λιγνιτικά, πετρελαϊκά, τα πάντα).


Αντίθετα, στην Ισπανία έχουν πλέον γίνει πρωτοπόροι. Καλύπτουν το 10% των αναγκών τους σε ηλεκτροδότηση από αιολικά πάρκα (το 2007 εγκαταστάθηκαν αιολικές γεννήτριες 3.522 μεγαβάτ,). Οι Γερμανοί έχουν ακόμα μεγαλύτερη εγκατεστημένη ισχύ, αλλά συμμετέχει σε μικρότερο ποσοστό στην κατανάλωση της χώρας.


"Στην Ελλάδα, η εικόνα της εξαιρετικά αργής ανάπτυξης αιολικών πάρκων δεν άλλαξε σημαντικά το 2007 έναντι των προηγούμενων χρόνων, καθώς τα προβλήματα στην εγκατάσταση νέων αιολικών μονάδων, αντί να περιορίζονται, πληθαίνουν. Ετσι, το 2007, η νέα ισχύς, που εγκαταστάθηκε, ανήλθε σε 125 μεγαβάτ, και η συνολική εγκατεστημένη ισχύς ανέρχεται στα 871 μεγαβάτ.
"



Τέλος, να σημειωθεί ότι η αιολική ενέργεια συνεχίζει να αποτελεί τον τομέα στον οποίο γίνονται οι μεγαλύτερες επενδύσεις στην Ε.Ε. Το 2007, κατείχε μερίδιο 40% από το σύνολο των νέων εγκαταστάσεων παραγωγής ηλεκτρικής ενέργειας. Επίσης, από το 2000, στην Ε.Ε. έχουν εγκατασταθεί 158.000 μεγαβάτ νέων μονάδων παραγωγής ηλεκτρικής ενέργειας.

http://www.naftemporiki.gr/news/static/08/02/06/1472452.htm

arxeos
February 11th, 2008, 05:01 PM
A little article from http://news.kathimerini.gr



http://news.kathimerini.gr/4dcgi/_w_articles_ell_2_10/02/2008_258913

Η Ελλάδα του μέλλοντος

http://news.kathimerini.gr/kathnews/photos/10-02-08/10-02-08_258913_1.gif


Η Ελλάδα του μέλλοντος

Το υπερσύγχρονο γυάλινο θερμοκήπιο των 100 στρεμμάτων στην Αλεξάνδρεια Ημαθίας εκτός από λαχανικά παράγει και ηλεκτρικό ρεύμα, ενώ όλες οι εργασίες διεκπεραιώνονται μέσω υπολογιστή. Η φωτογραφία δίνει το μέτρο των επερχόμενων αλλαγών και στη ζωή της υπαίθρου. Η ώρα που ο «ηλεκτρονικός αγρότης» θα κάνει όλες τις δουλειές του αγρότη, είναι κοντά.

MetroGuardian
March 11th, 2008, 12:12 AM
Μερικές φωτογραφίες από το μεγάλο αιολικό πάρκο στην Αρκαδία στα χωριά Μάναρη - Βλαχοκερασιά.

Οι τεράστιοι πύργοι είναι πραγματικά επιβλητικοί όταν βρίσκεσαι από κάτω τους. Εντύπωση μου προξένησε η ευκολία με την οποία δένουν με το τοπίο. Σαν να βρίσκονται στο φυσικό τους περιβάλλον. Επιπλέον, παντελής έλλειψη θορύβου εκτός αν είσαι στα 20-30 μέτρα όπου ακούγεται το περιοδικό γλύστρημα του ανέμου. Όλες οι κατοικημένες περιοχές (μικρά χωριά) βρίσκονται χιλιόμετρα μακριά. Η περιοχή είναι δύσβατη, έχει μια άγρια ομορφιά αλλά και ησυχία από το βουητό τον ανθρώπων.

Μετά από αυτή την επίσκεψη πραγματικά θεωρώ ότι οι ανεμογεννήτριες είναι από τα πιο αγνά έργα του ανθρώπου και ειδικότερα για τον σκοπό που προορίζονται (παραγωγή ενέργειας) οι άγιοι της κατηγορίας (φανταστείτε μαζούτ, λιγνιτορυχεία, πυρηνικούς σταθμούς). Ακόμα και τα τεράστια υδροηλεκτρικά φράγματα παρόλο που δεν μολύνουν προξενούν μια μεγάλη αλλαγή στο βιότοπο που εγκαθίστανται.

Αν θέλουμε ηλεκτρική ενέργεια πρέπει να την παράγουμε κάπως. Από τις μεθόδους που υπάρχουν αυτή είναι η πιο φυσική προς το περιβάλλον (μέχρι τα φωτοβολταϊκά να γίνουν πιο προσιτά).



http://img.photobucket.com/albums/v671/MetroGardian/wind_arcadia/CIMG2883.jpg

http://img.photobucket.com/albums/v671/MetroGardian/wind_arcadia/CIMG2878.jpg

http://img.photobucket.com/albums/v671/MetroGardian/wind_arcadia/CIMG2879.jpg

http://img.photobucket.com/albums/v671/MetroGardian/wind_arcadia/CIMG2884.jpg

http://img.photobucket.com/albums/v671/MetroGardian/wind_arcadia/CIMG2885.jpg

http://img.photobucket.com/albums/v671/MetroGardian/wind_arcadia/CIMG2887.jpg

http://img.photobucket.com/albums/v671/MetroGardian/wind_arcadia/CIMG2888.jpg

http://img.photobucket.com/albums/v671/MetroGardian/wind_arcadia/CIMG2873.jpg

http://img.photobucket.com/albums/v671/MetroGardian/wind_arcadia/CIMG2891.jpg

http://img.photobucket.com/albums/v671/MetroGardian/wind_arcadia/CIMG2882.jpg

SouthernEuropean
March 12th, 2008, 06:01 PM
Nice post MetroGuardian,interesting..and beautiful photos-

as for this:



Από τις μεθόδους που υπάρχουν αυτή είναι η πιο φυσική προς το περιβάλλον (μέχρι τα φωτοβολταϊκά να γίνουν πιο προσιτά).


Check those fresh news,a step closer:

Σε πλήρη παραγωγική λειτουργία το Φωτοβολταικό Πάρκο, υψηλής τεχνολογίας Μεγάρχης Δήμου Φαλώρειας

http://img291.imageshack.us/img291/4785/fotovoltaik1bu6.jpg

http://img252.imageshack.us/img252/9430/fotovoltaik2ei5.jpg

http://img72.imageshack.us/img72/7710/fotovoltaik3mf2.jpg



"Το συγκεκριμένο Φ/Π θα λειτουργεί ως ανεξάρτητη βιομηχανική μονάδα ηλεκτροπαραγωγής της εταιρείας και αποτελείται από 434 φωτοβολταϊκές γεννήτριες της Γερμανικής Εταιρείας ALEO ισχύος 225Watt τοποθετημένες σε τρεις μεταλλικούς μηχανισμούς παρακολούθησης του ηλίου τύπου sun carrier και αναμένεται να παράγει 180000 Mwh ετησίως. Η παραγόμενη ηλεκτρική ενέργεια διοχετεύεται με πλήρη ασφάλεια στο δίκτυο χαμηλής τάσης της ΔΕΗ.
Το συνολικό κόστος της επένδυσης ανήλθε στις 850.000 €"

MetroGuardian
March 12th, 2008, 07:24 PM
At last! Southern can you give me some link with the above news?

SouthernEuropean
March 12th, 2008, 08:43 PM
Sure,here is the link:

http://www.fatsimare.gr/trikala_news/p2_articleid/11244

greecelightning
May 7th, 2008, 06:54 PM
This doesn't technically fit here, but it is an energy source, so I will post it.

http://www.ekathimerini.com/4dcgi/_w_articles_politics_100006_07/05/2008_96272

Nuclear power considered

Greece should begin thinking about whether to build reactors, ministry says

The option of Greece turning to nuclear power to solve its energy and environmental problems was firmly put on the table by the Public Works and Environment Ministry yesterday.

Greece does not have any nuclear power plants but, in a statement released yesterday, the ministry indicated that a debate should begin on whether this form of energy could be adopted.

The ministry was reacting to comment by European Environment Commissioner Stavros Dimas, who said that “nuclear energy does not belong to the group of renewable energy sources.”

Dimas was responding to questions from journalists at the Athens Summit on climate change. They had asked for his reaction to a statement by Public Works and Environment Minister Giorgos Souflias during his speech on Monday night, in which he reportedly suggested “nuclear power is green power.”

The ministry responded immediately in an attempt to put Souflias’s comments into context.

“What Mr Souflias was trying to do was… to open the public dialogue on a crucial matter,” the statement read. “Greece is gradually being surrounded by nuclear reactors. Shouldn’t the dialogue begin so that we can make clear our country’s position on the issue?”

The ministry went on to clarify what Souflias had meant in his speech and to criticize Dimas in what is turning out to be a personal tug of war between the two men.

“Mr Souflias never said that nuclear energy was a renewable source, as Mr Dimas attempted to claim. Mr Souflias said in his speech that the European Union now refers to nuclear energy as ‘green energy’ since it does not produce carbon dioxide or other pollutants.”

However, the ministry’s suggestion that the use of nuclear power in Greece is on the agenda provoked an instant response from opposition parties and environmentalists.

“If someone suggests the nuclear option in the face of climate change, it means that he is essentially importing one big threat that could be destructive for health, the environment and security, to replace another,” said Greenpeace.

gm2263
May 22nd, 2008, 01:29 AM
Διαβάστε τι γίνεται με τα φωτοβολταϊκά να ανοίξει η καρδούλα σας:

Αναστολή αδειών για PV installations:

http://www.helapco.gr/library/1_4_2008/PV_Anastoli_Mar08.pdf

Απαγορευτικές στην ουσία διατάξεις για τα Built in PV systems τη στιγμή που στην Ευρώπη τα προωθούν αναφανδόν:

http://www.helapco.gr/library/1_4_2008/CHEF_PV_PR_27Mar08.pdf

Δεν μπορεί, κάτι πίνουν και δε μας το λένε οι άνθρωποι...

AAL
May 22nd, 2008, 02:45 PM
Πάνω που είχα χαρεί από τα προηγούμενα...

Να σου πω τι πίνουν: αυτά που τουε κερνάνε οι πετρελαιάδες. Είναι δυνατό τη σημερινή εποχή να γιορτάζουμε για το νέο αγωγό ΠΕΤΡΕΛΑΙΟΥ απο τη Ρωσία?!? Φυσικό αέριο ΟΚ, αλλά πετρέλαιο?

Πάει και τελείωσε: οι άνθρωποι που νοιάζονται γι΄αυτο τον τόπο σπάνια κυβερνάνε: βλέπε Χαρίλαος Τρικούπης, Ελευθέριος Βενιζέλος, Κωσταντίνος Καραμανλής. Οι υπόλοιποι θέλουν απλώς να διεκπεραιώσουν τις θητείες τους...

SouthernEuropean
May 22nd, 2008, 03:58 PM
Greece to build one of the most powerful solars power plants-second biggest in Europe.

Το 2ο μεγαλύτερο στην Ευρώπη

Το σχέδιο ανάπτυξης του φωτοβολταϊκού πάρκου της ΔΕΗ στη Μεγαλόπολη

Η ΔΕΗ Ανανεώσιμες, κατά 100% θυγατρική εταιρεία της ΔΕΗ, προωθεί την ολοκλήρωση της αδειοδοτικής διαδικασίας για την κατασκευή στη Μεγαλόπολη του δεύτερου μεγαλύτερου φωτοβολταϊκού πάρκου στην Ευρώπη και ενός από τα μεγαλύτερα στον κόσμο.

Το πάρκο, ισχύος 50 MW, θα παράγει καθαρή ηλεκτρική ενέργεια από τον ήλιο καλύπτοντας την ηλεκτρική κατανάλωση περίπου 28.000 νοικοκυριών, περίπου το 42% του συνόλου του νομού Αρκαδίας.

Με τη σταδιακή μείωση των κοιτασμάτων του λιγνίτη στην περιοχή, οι προγραμματισμένες επενδύσεις της ΔΕΗ (μονάδες 800 MW με καύσιμο φυσικό αέριο) και της ΔΕΗ Ανανεώσιμες (50 MW Φ/Β Πάρκο), μαζί με την αποκατάσταση των εδαφών στα ορυχεία, θα βοηθήσουν σημαντικά στη βελτίωση του περιβάλλοντος και την απασχόληση του εργατικού δυναμικού της περιοχής.

Κατά την περίοδο της σταδιακής κατασκευής του Φ/Β Πάρκου, προβλέπεται η απασχόληση 150 ατόμων και η δημιουργία 30 θέσεων εργασίας στη ΔΕΗ Ανανεώσιμες καθ' όλη τη διάρκεια λειτουργίας του Φ/Β Πάρκου, που υπολογίζεται σε 25 έτη. Κάτοικοι της περιοχής της Μεγαλόπολης θα έχουν προτεραιότητα.

Το πάρκο έχει σχεδιαστεί για εγκατάσταση στην περιοχή αποθέσεων των αγόνων εδαφών εντός του Λιγνιτικού Κέντρου Μεγαλόπολης. Η περιοχή αυτή επιλέχθηκε μετά από μελέτη, επειδή κρίθηκε ως η καταλληλότερη από όλες διαθέσιμες εκτάσεις της ΔΕΗ στην περιοχή.

Το βασικό υλικό των Φ/Β Πλαισίων θα είναι κατασκευασμένο από πυρίτιο, που θεωρείται διεθνώς το πλέον φιλικό προς το περιβάλλον και πλήρως ανακυκλούμενο. Επιπλέον, η ΔΕΗ Ανανεώσιμες θα ανακυκλώσει πλήρως τα Φ/Β Πλαίσια μετά τα περίπου 25 χρόνια ζωής.

Στην ανακοίνωση αναφέρεται ακόμα ότι οι εγκαταστάσεις Φ/Β Πάρκων, όπως διαβεβαιώνουν ειδικοί επί του θέματος καθηγητές του Εθνικού Μετσοβείου Πολυτεχνείου, καθώς και ειδικοί επιστήμονες του Κέντρου Ανανεώσιμων Πηγών Ενέργειας, δεν προκαλούν όχληση από ανακλάσεις φωτός και δεν επηρεάζουν τη θερμοκρασία του περιβάλλοντος.

Επίσης, τονίζεται ότι η Greenpeace, σε απάντηση σχετικής επιστολής, σημειώνει πως δεν τίθεται ζήτημα επιβάρυνσης του μικροκλίματος από το Φ/Β Πάρκο.

Το Φ/Β Πάρκο της Μεγαλόπολης χωροθετείται σε έκταση 2.100 στρεμμάτων από τα οποία:

· 1.350 στρέμματα αποτελούν το χώρο εγκατάστασης του Φ/Β Πάρκου, μέσα στα οποία εκτός από τα πλαίσια περιλαμβάνονται και χώροι από φυσικό έδαφος με χαμηλή βλάστηση και διάδρομοι κυκλοφορίας.

· 750 στρέμματα περιμετρικά του χώρου εγκατάστασης, τα οποία θα δεντροφυτευτούν.

Πέραν αυτών θα κατασκευασθούν δύο λίμνες χωρητικότητας 100.000 κ.μ., περιμετρικά των οποίων θα δημιουργηθεί χώρος πρασίνου 25 στρεμμάτων που θα λειτουργεί ως υγροβιότοπος.

Επιπλέον, η ΔΕΗ Ανανεώσιμες δεσμεύεται ότι έκταση 1.350 στρεμμάτων, αντίστοιχη με αυτή που θα καλύψει το Φ/Β Πάρκο, θα δενδροφυτευθεί σε περιοχές της Μεγαλόπολης εκτός του Λιγνιτικού Κέντρου Μεγαλόπολης μετά από υπόδειξη και συνεργασία με το Δήμο.

Το Φ/Β Πάρκο των 50 MW της Μεγαλόπολης θα απέχει τουλάχιστον 400 μέτρα από τα όρια του εγκεκριμένου ρυμοτομικού σχεδίου της πόλης, αν και δεν ορίζεται από το νόμο ελάχιστη απόσταση.

www.in.gr

GrigorisSokratis
May 22nd, 2008, 06:45 PM
Διαβάστε τι γίνεται με τα φωτοβολταϊκά να ανοίξει η καρδούλα σας:

Αναστολή αδειών για PV installations:

http://www.helapco.gr/library/1_4_2008/PV_Anastoli_Mar08.pdf

Απαγορευτικές στην ουσία διατάξεις για τα Built in PV systems τη στιγμή που στην Ευρώπη τα προωθούν αναφανδόν:

http://www.helapco.gr/library/1_4_2008/CHEF_PV_PR_27Mar08.pdf

Δεν μπορεί, κάτι πίνουν και δε μας το λένε οι άνθρωποι...

Αχ, τα διάβασα Γρηγόρη και τώρα μου χάλασαν την ημέρα. Τι να πούμε τώρα...αίσχος!

Greece to build one of the most powerful solars power plants-second biggest in Europe.

Το 2ο μεγαλύτερο στην Ευρώπη

Το σχέδιο ανάπτυξης του φωτοβολταϊκού πάρκου της ΔΕΗ στη Μεγαλόπολη

Η ΔΕΗ Ανανεώσιμες, κατά 100% θυγατρική εταιρεία της ΔΕΗ, προωθεί την ολοκλήρωση της αδειοδοτικής διαδικασίας για την κατασκευή στη Μεγαλόπολη του δεύτερου μεγαλύτερου φωτοβολταϊκού πάρκου στην Ευρώπη και ενός από τα μεγαλύτερα στον κόσμο.

Το πάρκο, ισχύος 50 MW, θα παράγει καθαρή ηλεκτρική ενέργεια από τον ήλιο καλύπτοντας την ηλεκτρική κατανάλωση περίπου 28.000 νοικοκυριών, περίπου το 42% του συνόλου του νομού Αρκαδίας.

Με τη σταδιακή μείωση των κοιτασμάτων του λιγνίτη στην περιοχή, οι προγραμματισμένες επενδύσεις της ΔΕΗ (μονάδες 800 MW με καύσιμο φυσικό αέριο) και της ΔΕΗ Ανανεώσιμες (50 MW Φ/Β Πάρκο), μαζί με την αποκατάσταση των εδαφών στα ορυχεία, θα βοηθήσουν σημαντικά στη βελτίωση του περιβάλλοντος και την απασχόληση του εργατικού δυναμικού της περιοχής.

Κατά την περίοδο της σταδιακής κατασκευής του Φ/Β Πάρκου, προβλέπεται η απασχόληση 150 ατόμων και η δημιουργία 30 θέσεων εργασίας στη ΔΕΗ Ανανεώσιμες καθ' όλη τη διάρκεια λειτουργίας του Φ/Β Πάρκου, που υπολογίζεται σε 25 έτη. Κάτοικοι της περιοχής της Μεγαλόπολης θα έχουν προτεραιότητα.

Το πάρκο έχει σχεδιαστεί για εγκατάσταση στην περιοχή αποθέσεων των αγόνων εδαφών εντός του Λιγνιτικού Κέντρου Μεγαλόπολης. Η περιοχή αυτή επιλέχθηκε μετά από μελέτη, επειδή κρίθηκε ως η καταλληλότερη από όλες διαθέσιμες εκτάσεις της ΔΕΗ στην περιοχή.

Το βασικό υλικό των Φ/Β Πλαισίων θα είναι κατασκευασμένο από πυρίτιο, που θεωρείται διεθνώς το πλέον φιλικό προς το περιβάλλον και πλήρως ανακυκλούμενο. Επιπλέον, η ΔΕΗ Ανανεώσιμες θα ανακυκλώσει πλήρως τα Φ/Β Πλαίσια μετά τα περίπου 25 χρόνια ζωής.

Στην ανακοίνωση αναφέρεται ακόμα ότι οι εγκαταστάσεις Φ/Β Πάρκων, όπως διαβεβαιώνουν ειδικοί επί του θέματος καθηγητές του Εθνικού Μετσοβείου Πολυτεχνείου, καθώς και ειδικοί επιστήμονες του Κέντρου Ανανεώσιμων Πηγών Ενέργειας, δεν προκαλούν όχληση από ανακλάσεις φωτός και δεν επηρεάζουν τη θερμοκρασία του περιβάλλοντος.

Επίσης, τονίζεται ότι η Greenpeace, σε απάντηση σχετικής επιστολής, σημειώνει πως δεν τίθεται ζήτημα επιβάρυνσης του μικροκλίματος από το Φ/Β Πάρκο.

Το Φ/Β Πάρκο της Μεγαλόπολης χωροθετείται σε έκταση 2.100 στρεμμάτων από τα οποία:

· 1.350 στρέμματα αποτελούν το χώρο εγκατάστασης του Φ/Β Πάρκου, μέσα στα οποία εκτός από τα πλαίσια περιλαμβάνονται και χώροι από φυσικό έδαφος με χαμηλή βλάστηση και διάδρομοι κυκλοφορίας.

· 750 στρέμματα περιμετρικά του χώρου εγκατάστασης, τα οποία θα δεντροφυτευτούν.

Πέραν αυτών θα κατασκευασθούν δύο λίμνες χωρητικότητας 100.000 κ.μ., περιμετρικά των οποίων θα δημιουργηθεί χώρος πρασίνου 25 στρεμμάτων που θα λειτουργεί ως υγροβιότοπος.

Επιπλέον, η ΔΕΗ Ανανεώσιμες δεσμεύεται ότι έκταση 1.350 στρεμμάτων, αντίστοιχη με αυτή που θα καλύψει το Φ/Β Πάρκο, θα δενδροφυτευθεί σε περιοχές της Μεγαλόπολης εκτός του Λιγνιτικού Κέντρου Μεγαλόπολης μετά από υπόδειξη και συνεργασία με το Δήμο.

Το Φ/Β Πάρκο των 50 MW της Μεγαλόπολης θα απέχει τουλάχιστον 400 μέτρα από τα όρια του εγκεκριμένου ρυμοτομικού σχεδίου της πόλης, αν και δεν ορίζεται από το νόμο ελάχιστη απόσταση.



Πάντως ετούτο εδώ φαίνεται θετικό, αλλά διαβάζοντας τα παραπάνω pdf και όταν σκέπτομαι πως ύστερα από τόσα χρόνια ακόμα δεν ξέρουμε τι πρόκειται να γίνει στο Ελληνικο ή για την καθυστέρηση της αναδάσωσης στην Πάρνηθα και άλλες πυρόπληκτες περιοχές της χώρας λόγω γραφειοκρατικών υποθέσεων...αναρωτιεμαι πόσο χρόνο θα χρειαστεί για να εγκριθεί ένα τετοιο έργο. :ohno:

gm2263
November 6th, 2008, 11:10 AM
http://www.naftemporiki.gr/news/static/08/11/06/1587465.htm


Φωτοβολταϊκά: Σ/ν για προώθηση των επενδύσεων

Η ΝΑΥΤΕΜΠΟΡΙΚΗ ON LINE Πέμπτη, 6 Νοεμβρίου 2008 09:46

Δίνεται επιτέλους και νομοθετικά, η λύση σε χρονίζοντα προβλήματα, όπως αυτό της λειτουργίας του υδροηλεκτρικού Σταθμού της ΔΕΗ [DEHr.AT] Σχετικά άρθρα στη Μεσοχώρα, όπως και της δημιουργίας φωτοβολταϊκών μονάδων.

Με νομοσχέδιο που θα προωθήσει το υπουργείο Ανάπτυξης, τίθενται οι βάσεις για ταχύτερη ολοκλήρωση και λειτουργία του υδροηλεκτρικού σταθμού, ισχύος 161 μεγαβάτ, ο οποίος άρχισε να κατασκευάζεται το 1986 και σχεδόν περατώθηκε τον Απρίλιο 2001. Η εμπορική λειτουργία του σταθμού προσέκρουσε σε θέματα απαλλοτριώσεων, για περιουσίες που βρίσκονται στην υπό διαμόρφωση τεχνητή λίμνη. Ετσι, με το νομοσχέδιο, πέραν της αποζημιώσεως προς τους θιγομένους, προβλέπεται και η καταβολή σειράς συμπληρωματικών οικονομικών παροχών προς αυτούς, με σκοπό την πλήρη και ουσιαστική αποκατάστασή τους από τις συνέπειες που υφίστανται λόγω της απαλλοτρίωσης.

Σε ό,τι αφορά στα φωτοβολταϊκά, με το νομοσχέδιο προωθείται για εφαρμογή η ειλημμένη απόφαση σύμφωνα με την οποία, καθ΄ υπέρβαση του προγράμματος, θα εξεταστεί προς αδειοδότηση το σύνολο των αιτήσεων που έχουν υποβληθεί και αντιστοιχούν σε 3.700 μεγαβάτ, με στόχο να προχωρήσουν όσα έργα είναι ώριμα τεχνικά και βιώσιμα οικονομικά.

Επίσης, προκειμένου να εξασφαλιστεί η αποφυγή της δυσανάλογης αύξησης του τέλους ΑΠΕ για τους καταναλωτές, σχεδιάστηκε σταδιακή αποκλιμάκωση της τιμής αγοράς ενέργειας (feed-in-tariff), σε συνδυασμό με εξαρχής διασφαλισμένη σταθερή διατήρηση της τιμής για διάστημα 20 ετών.

Τέλος με το νομοσχέδιο, ενσωματώνεται στο εθνικό δίκαιο η Οδηγία 2004/8/ «Για την προώθηση της συμπαραγωγής ενέργειας βάσει της ζήτησης για χρήσιμη θερμότητα στην εσωτερική αγορά ενέργειας κ.λπ.» η οποία έχει σκοπό την εξοικονόμηση πρωτογενούς ενέργειας και αποφυγής απωλειών στα ηλεκτρικά δίκτυα και κατά συνέπεια την ασφάλεια εφοδιασμού και τη μείωση των εκπομπών ρύπων.


Από το 2005 τρώγονται με τα νομοσχέδια, και ακόμα δεν έχουν βγάλει άκρη.

Από την άλλη, οι ξένοι επενδυτές καταριούνται την τύχη τους που έμπλεξαν με την Ελληνική γραφειοκρατία.

Στο χωριό μου (έστω και αν είμαι Αθηναίος) υπάρχει μια παροιμία:

"Όποιος δε θέλει να ζυμώσει σαράντα μέρες κοσκινίζει"

Almopos
February 10th, 2009, 11:35 PM
ΔΕΗ Ανανεώσιμες: Κατασκευή εννέα αιολικών πάρκων

Σε περαιτέρω ενίσχυση του χαρτοφυλακίου της στον κλάδο της Αιολικής Ενέργειας προχωρά η ΔΕΗ [DEHr.AT] Ανανεώσιμες, η οποία ανακοίνωσε σήμερα την κατασκευή εννέα νέων Αιολικών Πάρκων (Α/Π), συνολικής ισχύος 35.1 MW.

Τα εννέα Α/Π θα κατασκευαστούν στη νησιωτική Ελλάδα και πιο συγκεκριμένα στην Κρήτη (2 Α/Π), τη Σάμο (2 Α/Π), την Πάρο, τη Λέσβο, τη Ρόδο, τη Σίφνο και τη Λήμνο και η συνολική επένδυση θα φθάνει τα € 60 εκατ.

Ανάδοχος των εννέα έργων είναι η εταιρεία ENERCON, κορυφαία εταιρεία στον κλάδο της κατασκευής Α/Π.

Η κατασκευή και παράδοση των έργων από την ENERCON στη ΔΕΗ Ανανεώσιμες, θα ολοκληρωθεί σε 12 μήνες για τα έργα σε Ρόδο, Πάρο, Λέσβο και Σίφνο και σε 24 μήνες για τα έργα σε Κρήτη, Λήμνο και Σάμο.

Το χαρτοφυλάκιο της ΔΕΗ Ανανεώσιμες στον κλάδο της Αιολικής Ενέργειας περιλαμβάνει έργα συνολικής εγκατεστημένης ισχύος 43.8 MW, έργα συνολικής ισχύος 35.1 MW υπό ή κοντά σε κατασκευή και ακόμη 200 ΜW σε διάφορα στάδια αδειοδότησης και μελέτης, με υψηλή πιθανότητα υλοποίησης.

Επιπλέον, η ΔΕΗ Ανανεώσιμες Α.Ε. συμμετέχει με ποσοστό 49% στην κατασκευή Α/Π στη Βοιωτία, συνολικής ισχύος 38 MW, σε συνεργασία με την EDF Energies Nouvelles.


--------------------------------------------------------------------------------


Source: www.naftemporiki.gr

Aggelos
March 22nd, 2009, 06:19 PM
Greek exile island to turn 'green': minister

Thursday, March 19 06:46 pm
AFP

* Print Story

A small Aegean island where Greek governments exiled their political opponents for decades will become the country's first "green energy" community, according to a pilot project presented on Thursday. Skip related content
Related photos / videos
Turbines on a wind farm in front of Aegean Sea on Evia islan Enlarge photo

"The purpose of the project is to create an island whose needs will be 100 percent covered by renewable energy sources," Development Minister Costis Hatzidakis told a news conference.

The northern Aegean Sea island of Ai Stratis, which currently has fewer than 250 inhabitants, was selected because of its "controllable" energy requirements of 1,500 megawatt-hours per year, the minister said.

Solar and wind energy and biomass fuel infrastructure will be introduced by the end of the year, Hatzidakis said.

The initiative follows similar examples in Australia, Denmark and Norway.

Ai Stratis was for decades one of several islands used by the Greek state as places of exile for thousands of political prisoners -- mostly suspected Communists.

Today it is an isolated yet popular destination with travellers from Greece and abroad, and its population multiplies six-fold in summer.

Its sole direct connection to the Greek mainland is an eight-hour ferry from the port of Lavrio near Athens.

The island sustained serious damage in an 7.0-Richter earthquake in 1968.



ειδατε?κατι γινεται ..μην γκρινιαζουμε μονο..




Ο Αϊ-Στράτης θα είναι το "πράσινο" νησί
Όπως ήταν ανεπίσημα γνωστό εδώ και 2-3 εβδομάδες ο Αϊ-Στράτης θα είναι το πρώτο νησί που θα γίνει -πιλοτικά- «πράσινο». Αν πετύχει το "πράσινο νησί" project θα ακολουθήσουν η Νίσυρος και η Τήλος, όπου θα γίνουν έργα σε εμπορική κλίμακα, όπως ανακοίνωσε ο υπουργός Ανάπτυξης κ. Κ. Χατζηδάκης.

Οι ενεργειακές ανάγκες του Αϊ-Στράτη καλύπτονται σήμερα από πέντε ντιζελογεννήτριες της ΔΕΗ, οι οποίες, όταν ολοκληρωθούν τα έργα, θα τεθούν σε εφεδρεία και το νησί θα ηλεκτροδοτείται αποκλειστικά από ανεμογεννήτριες, φωτοβολταϊκά και αξιοποίηση βιομάζας. Το σχέδιο προβλέπει και αντικατάσταση των μέσων μεταφοράς από ηλεκτρικά ποδήλατα και αυτοκίνητα.

Η μελέτη για τον Αϊ-Στράτη θα ολοκληρωθεί το Μάιο ενώ οι μονάδες ηλεκτροπαραγωγής από ανανεώσιμες πηγές θα εγκατασταθούν έως το τέλος του χρόνου, ακόμη και αν χρειαστεί -όπως είπε ο κ. Χατζηδάκης- νομοθετική ρύθμιση για την επιτάχυνση των διαδικασιών. Ο ίδιος σημείωσε ότι από το 2004 έχει τριπλασιαστεί η εγκατεστημένη ισχύς των μονάδων ΑΠΕ στη χώρα, από 430 σε 1.350 μεγαβάτ. Στο έργο συμμετέχουν η ΔΕΗ, ειδικότερα με τη θυγατρική της ΔΕΗ - Ανανεώσιμες, το Εθνικό Μετσόβιο Πολυτεχνείο, το ΚΑΠΕ και το Πανεπιστήμιο Αιγαίου. Συντονιστής θα είναι η ΔΕΗ - Ανανεώσιμες.

Ο Αϊ-Στράτης επελέγη για την πιλοτική εφαρμογή των ανανεώσιμων πηγών για δύο λόγους: Αφενός είναι μικρό νησί, με λίγους κατοίκους (κάτω από 250) και μικρές καταναλώσεις (η μέση ημερήσια κατανάλωση είναι 1.500 μεγαβατώρες, ενώ η αιχμή δεν ξεπερνά τα 280 κιλοβάτ). Αφετέρου ήταν τόπος εξορίας και η κυβέρνηση θέλει να το μετατρέψει σε σύμβολο για τη νέα εποχή. Εως το καλοκαίρι θα γίνουν οι προκηρύξεις για τα επόμενα «πράσινα νησιά», με βάση και το ενδιαφέρον που θα εκδηλώσουν έως τότε οι τοπικές Αρχές.

Το κόστος του έργου εκτιμάται σε 10 εκατ. ευρώ και θα καλυφθεί από τη Γενική Γραμματεία Ερευνας - Τεχνολογίας.

Almopos
April 14th, 2009, 11:35 AM
DEI to use wild artichokes for production of electricity

NAFTEMPORIKI.GR Παρασκευή, 10 Απριλίου 2009 13:32

Βιομάζα από αγριαγκινάρες θα καίνε σύντομα, μαζί με λιγνίτη, οι μονάδες της ΔΕΗ [DEHr.AT] στη Δυτική Μακεδονία, μετά τις συμβάσεις συνεργασίας, που υπέγραψαν καλλιεργητές και ο νομάρχης Κοζάνης, Γεώργιος Δακής.

Χρηματοδότηση

Το πρωτοποριακό για την Ελλάδα πιλοτικό πρόγραμμα καλλιέργειας της αγριαγκινάρας, με φορέα διαχείρισης την Αναπτυξιακή Δυτικής Μακεδονίας (ΑΝΚΟ), χρηματοδοτείται με 860.000 ευρώ από τον Τοπικό Πόρο Ανάπτυξης και καλύπτει πλήρως τις δαπάνες εγκατάστασης και καλλιεργητικών εργασιών των αγροτών, κατά το πρώτο και δεύτερο έτος της δραστηριότητάς τους.
Η παραγωγή της βιομάζας θα χρησιμοποιηθεί για μεικτή καύση με λιγνίτη και εκτιμάται ότι θα συνεισφέρει στη μείωση των περιβαλλοντικών προβλημάτων που αντιμετωπίζει η ευρύτερη περιοχή, μειώνοντας ταυτόχρονα το κόστος αγοράς δικαιωμάτων εκπομπών διοξειδίου του άνθρακα (CΟ2) από τη ΔΕΗ.
Οι παραγωγοί της αγριαγκινάρας θα εισπράξουν από τη ΔΕΗ ΑΕ την αξία αγοράς της ξηρής μάζας και επιδότηση από το υπουργείο Αγροτικής Ανάπτυξης και Τροφίμων.

Προτεραιότητα ένταξης

Προτεραιότητα για ένταξη στο πρόγραμμα καλλιέργειας της αγριαγκινάρας θα έχουν οι αγρότες της ευρύτερης περιοχής του άξονα Κοζάνης - Πτολεμαΐδας, με δυνατότητα ένταξης και καλλιεργητών από άλλες περιοχές του νομού.

ellis896
May 6th, 2009, 03:02 PM
Πλαστικά Κρήτης: Εγκατάσταση φωτοβολταϊκών σταθμών

Στην εγκατάσταση δύο φωτοβολταϊκών σταθμών συνολικής ισχύος 160 kWp σε δώματα των βιομηχανικών της εγκαταστάσεων στη ΒΙ.ΠΕ. και τη Φοινικιά Ηρακλείου προχωρά εντός του ερχόμενου τριμήνου η εταιρεία Πλαστικά Κρήτης ΑΒΕΕ.

Στην κατασκευή των σταθμών θα χρησιμοποιηθούν φωτοβολταϊκοί συλλέκτες (panels) του οίκου BP Solar ενώ την εγκατάσταση ανέλαβε η εταιρία ENVIRON AE. Μέχρι το τέλος του 2009 αναμένεται να εγκατασταθεί τρίτος φωτοβολταϊκός σταθμός, ισχύος 80 kWp, στην περιοχή Βρουχάς του νομού Λασιθίου όπου ήδη λειτουργεί αιολικό πάρκο της εταιρίας ισχύος 12 MW.
NAFTEMPORIKI.GR (http://www.naftemporiki.gr/news/static/09/05/06/1660547.htm)

EngineerGreece
May 6th, 2009, 05:00 PM
"Η Κρήτη θωρακίζεται ενεργειακά"

source: http://www.otenet.gr/portal/portal/info/news/greeknews/crete_eparxiaka?media-type=html&user=anon&js_panename=crete_eparxiaka&action=portlets.PsmlPortletAction&eventsubmit_doview=2004941

Αγ.Νικόλαος, 03/04/09 Η Κρήτη θωρακίζεται ενεργειακά, τόνισε σήμερα ο υπουργός Ανάπτυξης Κωστής Χατζηδάκης κατά τα εγκαίνια του Ατμοηλεκτρικού Σταθμού του Αθερινόλακκου και του Αιολικού Πάρκου Ξηρολίμνης, στο νομό Λασιθίου.

O κ. Χατζηδάκης, κατά τη διάρκεια της ομιλίας του, επεσήμανε ότι γίνεται σήμερα ένα καθοριστικό βήμα για την εξασφάλιση της ενεργειακής επάρκειας της Κρήτης. Με το έργο αυτό, είπε, το οποίο ήδη ξεκίνησε να λειτουργεί, η Κρήτη θωρακίζεται ενεργειακά, ενισχύει τις αναπτυξιακές προοπτικές της, αυξάνει την ανταγωνιστικότητα της τοπικής οικονομίας, βοηθά την περαιτέρω ανάπτυξη του ποιοτικού τουρισμού.

Σήμερα, πρόσθεσε, μαζί με τον ατμοηλεκτρικό σταθμό του Αθερινόλακκου, γίνονται και τα εγκαίνια του Αιολικού Πάρκου Ξηρολίμνης, που απαντά στις ενεργειακές ανάγκες των κατοίκων, μεριμνώντας ταυτόχρονα για το περιβάλλον.

Τα έργα αυτά πρόσθεσε, ο κ. Χατζηδάκης, δεν γίνονται από τη μια μέρα στην άλλη. Χρειάζονται προετοιμασία, σχέδιο και επιμονή. "Πρέπει, λοιπόν, -είπε- να σημειώσω από την αρχή το ρόλο που διαδραμάτισαν τόσο οι προηγούμενες κυβερνήσεις όσο και οι δύο προκάτοχοί μου, ο κ. Σιούφας και ο κ. Φώλιας, καθώς και τα διευθυντικά στελέχη της ΔΕΗ, στο σχεδιασμό αυτών των έργων".

Στη συνέχεια αναφέρθηκε στο ζήτημα της ενέργειας και της κάλυψης της διαρκώς αυξανόμενης ζήτησης, τονίζοντας ότι είναι ζήτημα καίριας σημασίας σε παγκόσμιο επίπεδο. Η κυβέρνηση, είπε, έχει θέσει την εξασφάλιση της ενεργειακής επάρκειας της χώρας στην κορυφή της ατζέντας της. Υλοποιούμε, ανέφερε, μια στρατηγική με συγκεκριμένους στόχους, όπως η διαφοροποίηση των πηγών και των οδεύσεων της ενέργειας, η προώθηση των Ανανεώσιμων Πηγών Ενέργειας (ΑΠΕ), καθώς και η ανάπτυξη των τεχνολογιών εκείνων που έχουν να κάνουν με την «πράσινη» ενέργεια.

Προωθούμε, ανέφερε, την κατασκευή μεγάλων διακρατικών αγωγών ενέργειας, όπως είναι ο ITGI (Τουρκία-Ελλάδα-Ιταλία), ο ελληνοβουλγαρικός αγωγός διπλής ροής Κομοτηνή-Χάσκοβο και ο αγωγός South Stream, στον τομέα του φυσικού αερίου, καθώς και o πετρελαιαγωγός Μπουργκάς-Αλεξανδρούπολης. Γι’ αυτό και επεκτείνουμε τη χρήση του φυσικού αερίου, τόνισε και πρόσθεσε ότι σε λίγα χρόνια, το φυσικό αέριο θα έχει φτάσει και στην Κρήτη, είτε με χρήση υγροποιημένου είτε με χρήση συμπιεσμένου φυσικού αερίου. Προβλέπεται, ήδη, ότι ο βασικός σχεδιασμός του έργου θα ξεκινήσει μέχρι το τέλος του 2009.

Επίσης τόνισε ότι δίδεται έμφαση στις ΑΠΕ και αναφέρθηκε στις πρωτοβουλίες που έχει αναλάβει το υπουργείο Ανάπτυξης, οι οποίες, όπως είπε, έχουν δημιουργήσει μια νέα δυναμική. Αναφερόμενος στην Κρήτη, τόνισε ότι η εγκατεστημένη ισχύς από ΑΠΕ έχει φθάσει τα 156 MW. Δεκαπέντε αιολικά πάρκα παρέχουν περισσότερο από το 10% της ετήσιας καταναλισκόμενης ηλεκτρικής ενέργειας στο νησί. Επίσης, επενδύσεις ισχύος 36 MW βρίσκονται σε φάση υλοποίησης, ενώ επιπλέον 104 ΜW έχουν λάβει άδεια παραγωγής. Μόνο η ΔΕΗ Ανανεώσιμες ΑΕ από το 2007 έως σήμερα επενδύει 26 εκατ. ευρώ σε 3 νέα αιολικά πάρκα.

Σύμφωνα με τον ίδιο, η ζήτηση και από άλλους ιδιώτες επενδυτές για δημιουργία νέων πάρκων ΑΠΕ στην Κρήτη παραμένει εξαιρετικά υψηλή. Οι προοπτικές και οι δυνατότητες ανάπτυξης όλων των μορφών ανανεώσιμων πηγών ενέργειας είναι πολύ καλές και οι επενδύσεις που προωθούνται θα δημιουργήσουν νέες θέσεις εργασίας, θα προωθήσουν την περιφερειακή καινοτομία και θα ενισχύσουν τα συγκριτικά πλεονεκτήματα της Κρήτης είπε ο κ. Χατζηδάκης.

Ο πρόεδρος της ΔΕΗ κ. Αθανασόπουλος αναφέρθηκε στη μεγάλη επένδυση της επιχείρησης, καθώς και στις σύγχρονες και φιλικές προς το περιβάλλον μονάδες.

Almopos
July 10th, 2009, 03:59 PM
EUR 300 million investment in renewable enrgy project in Imathia

Η περιοχή φιλοδοξεί να μεταμορφωθεί σε πρότυπο πράσινης ανάπτυξης. Διαπραγματεύσεις βρίσκονται σε εξέλιξη και για την εγκατάσταση φωτοβολταϊκών συστημάτων.

Της Σοφίας Χριστοφορίδου

Πρότυπο πράσινης ανάπτυξης φιλοδοξεί να καταστήσει το Σέλι ο τοπικός Αναγκαστικός Συνεταιρισμός, ο οποίος προ ημερών υπέγραψε μια μεγάλη συμφωνία με την Acciona Energeiaki για τη δημιουργία αιολικού πάρκου, επένδυση συνολικού προϋπολογισμού 300 εκατ. ευρώ. Παράλληλα βρίσκεται σε διαπραγματεύσεις με άλλες δύο εταιρείες για την εγκατάσταση αιολικών και φωτοβολταϊκών συστημάτων.

“Οι επενδύσεις αυτές όχι μόνο θα φέρνουν έσοδα στο συνεταιρισμό και την τοπική αυτοδιοίκηση, αλλά αναμένεται να δημιουργήσουν δεκάδες θέσεις εργασίας και πολλαπλάσια υπεραξία στην περιοχή”, δήλωσε στη “Μ” ο γενικός γραμματέας του συνεταιρισμού Στέργιος Πέτκος.

Ο Αναγκαστικός Συνεταιρισμός Σελίου, που αριθμεί περίπου 2.000 μέλη, κατέχει δασική έκταση 85.000 στρεμμάτων, η οποία σήμερα χρησιμοποιείται ως βοσκότοπος και ως χώρος υλοτομίας. Υπενοικιάζοντας ελάχιστο μέρος αυτής, ο συνεταιρισμός κάνει άνοιγμα στο χώρο των ανανεώσιμων πηγών ενέργειας.
Ήδη έχει υπογράψει ιδιωτικό συμφωνητικό για τριακονταετή μίσθωση έκτασης περίπου 300 στρεμμάτων στο δασόκτημα του συνεταιρισμού στο ανατολικό Βέρμιο, όπου η Acciona Energeiaki Α.Ε. σκοπεύει να δημιουργήσει αιολικό πάρκο. Παράλληλα προχώρησε σε ενοικίαση άλλων 700 στρεμμάτων σε εταιρεία εγκατάστασης φωτοβολταϊκών συστημάτων, ενώ αυτό το διάστημα και δεύτερη εταιρεία που δραστηριοποιείται στο χώρο της αιολικής ενέργειας πραγματοποιεί μετρήσεις του δυναμικού, ώστε να εντοπίσει το κατάλληλο γήπεδο για τη δημιουργία αιολικού πάρκου.

ΕΠΕΝΔΥΣΗ 300 ΕΚΑΤ. ΕΥΡΩ

Μετά την υπογραφή της συμφωνίας με τον αναγκαστικό συνεταιρισμό Σελίου, ανοίγει ο δρόμος για την υλοποίηση μιας πολύ μεγάλης επένδυσης από την Acciona Energeiaki Α.Ε., η οποία έχει ήδη λάβει θετικές γνωμάτευσης από τις εμπλεκόμενες υπηρεσίες (δασαρχείο, αρχαιολογία, στρατό, υπηρεσίες πολιτικής και πολεμικής αεροπορίας κ.ά.) Επίκειται τώρα μόνο η έγκριση της εγκατάστασης από το δημοτικό συμβούλιο Βέροιας και το νομαρχιακού συμβουλίου Ημαθίας. Η εταιρεία σκοπεύει να προχωρήσει στην εγκατάσταση 90 ανεμογεννητριών στην περιοχή του ανατολικού Σελίου, συνολικής ισχύος 100 MW, 47 από τις οποίες στο δασόκτημα του αναγκαστικού συνεταιρισμού. “Πρόκειται για μια πρότυπη επένδυση, όχι μόνο για την περιοχή αλλά για όλη την Ελλάδα”, αναφέρει ο κ. Κ. Λουκίδης, εκ μέρους της Acciona Energeiaki.

Ο προϋπολογισμός της επένδυσης ανέρχεται σε 300 εκατ. ευρώ, μέρος του οποίου αναμένεται να καλυφθεί με χρηματοδότηση από τον αναπτυξιακό νόμο. Παράλληλα, η εταιρεία σχεδιάζει να εγκαταστήσει ένα ακόμη αιολικό πάρκο 100 ανεμογεννητριών, ισχύος 100 MW, στο δυτικό Σέλι, στα όρια του νομού Κοζάνης, υλοποιώντας επένδυση 300 εκατ. ευρώ.

ΤΑ ΟΦΕΛΗ ΓΙΑ ΤΗΝ ΗΜΑΘΙΑ

Από την επένδυση της Acciona Energeiaki ο συνεταιρισμός εξασφαλίζει ένα έσοδο 100.000 ευρώ το χρόνο, για τα επόμενα χρόνια. Επιπλέον, τα δύο χρόνια που θα διαρκέσουν οι εργασίες κατασκευής του αιολικού πάρκου θα απασχοληθούν 150-200 άτομα, ενώ θα απαιτηθεί προσωπικό 15-20 ατόμων και για τη φάση της λειτουργίας του. Με ειδική ρήτρα που συμπεριλήφθηκε στη συμφωνία μεταξύ των δύο μερών, η εταιρεία θα επιλέξει το προσωπικό που θα απασχολήσει μέσα από μια λίστα ατόμων που θα προτείνει ο συνεταιρισμός. Επιπλέον το 3% των εσόδων της εταιρείας θα πηγαίνει στο ταμείο του δήμου Βέροιας, στη δικαιοδοσία του οποίου ανήκει το δασόκτημα Σελίου.

 Το αιολικό πάρκο Σελίου σε αριθμούς
 40 ανεμογεννήτριες συνολικής ισχύος 80 ΜW θα εγκατασταθούν στο αγρόκτημα του αναγκαστικού συνεταιρισμού Σελίου
 300 εκατ. ευρώ η συνολική επένδυση της Acciona Energeiaki Α.Ε. για το σύνολο των 90 ανεμογεννητριών στο Σέλι
 150-200 άτομα από το νομό Ημαθίας θα εργαστούν επί δύο χρόνια για την κατασκευή του αιολικού πάρκου
 15 άτομα από την περιοχή θα βρουν μόνιμη δουλειά μετά την ολοκλήρωση του έργου
 3% του τζίρου της εταιρείας από το αιολικό πάρκο θα διατίθεται στο δήμο Βέροιας
 100.000 ευρώ είναι το ετήσιο μίσθωμα που θα εισπράττει ο αναγκαστικός συνεταιρισμός Σελίου

Η Acciona Energeiaki

Η Acciona Ενεργειακή Α.Ε. είναι η ελληνική θυγατρική του ομίλου Acciona. Διευθύνων σύμβουλος της εταιρείας από ιδρύσεώς της είναι ο επιχειρηματίας κ. Βασίλειος Πιτούλης. Τα τελευταία χρόνια ολοκλήρωσε την κατασκευή ενός αιολικού σταθμού παραγωγής ενέργειας, ισχύος 35MW, αποτελούμενου από 41 ανεμογεννήτριες στο όρος Παναχαϊκό του νομού Αχαΐας. Επιπλέον έχει ήδη ξεκινήσει η επέκταση του παραπάνω αιολικού πάρκου, με 16 ανεμογεννήτριες, συνολικής ισχύος 15MW. Παράλληλα, υπάρχουν υπό ανάπτυξη και σε διάφορα στάδια της αδειοδοτικής διαδικασίας επιπλέον 1.920MW, από τα οποία 405MW έχουν ήδη άδεια παραγωγής, για 1.270MW έχουν κατατεθεί στη ΡΑΕ φάκελοι για τη λήψη αδειών παραγωγής, ενώ πραγματοποιούνται μετρήσεις αιολικού δυναμικού για την εκτίμηση της βιωσιμότητας ανάπτυξης νέων αιολικών πάρκων συνολικής ισχύος 500MW περίπου. Επιπλέον, ο όμιλος Acciona έχει σε όλο τον κόσμο υπό τον έλεγχό του περίπου 4.700MW αιολικών πάρκων σε λειτουργία, ενώ είναι και η ίδια κατασκευαστής ανεμογεννητριών. Από τον Οκτώβριο του 2007 o όμιλος Αcciona σε συνεργασία με την Εnel ελέγχει την ισπανική εταιρεία ηλεκτρισμού Εndesa.


Source: www.makthes.gr

gm2263
July 16th, 2009, 11:12 AM
Μπλόκο του ΥΠΕΧΩΔΕ στα φωτοβολταϊκά
http://www.capital.gr/gmessages/showTopic.asp?id=1290142&nid=776705
16/7/2009

Του Χάρη Φλουδόπουλου

Απροσδόκητα εμπόδια συναντά η προσπάθεια του υπουργείου Ανάπτυξης να προωθήσει την πράσινη ενέργεια και να ξεμπλοκάρει επενδύσεις στον τομέα των φωτοβολταϊκών. Έτσι, ενώ στις 20 Μαΐου ο υπουργός Ανάπτυξης Κ. Χατζηδάκης, είχε εξαγγείλει «μετά από εξαιρετική συνεργασία που είχε με το ΥΠΕΧΩΔΕ και προσωπικά με τον κ. Σουφλιά» την έκδοση Κοινής Υπουργικής Απόφασης σύμφωνα με την οποία θα επιτρεπόταν η εγκατάσταση φ/β σε μη άρτια και μη οικοδομίσιμα οικόπεδα κάτω των 4 στρεμμάτων, η ευνοϊκή ρύθμιση φαίνεται ότι δεν θα υλοποιηθεί, τουλάχιστον στην έκταση που είχε υπολογίσει το υπουργείο Ανάπτυξης.

Σύμφωνα με τα όσα είχαν ανακοινωθεί στις 20 Μαΐου δεν υπάρχει υποχρέωση αρτιότητας για όλα τα μικρά έργα, κάτω από 20 kW, καθώς επίσης και τα φ/β από 20 kW έως 150 kW δεν τίθεται θέμα αρτιότητας του οικοπέδου, εφόσον έχει εκδοθεί η απόφαση εξαίρεσης από άδεια παραγωγής. Αλλά ακόμη και για τα μεγαλύτερα από 150 kW φ/β θα ίσχυε το ίδιο ευνοϊκό καθεστώς, εφόσον έχει εκδοθεί απόφαση χορήγησης άδειας παραγωγής.

Ωστόσο στις 6 Ιουλίου απόφαση του υπουργού ΠΕΧΩΔΕ, θέτει ως προϋπόθεση για την εγκατάσταση μικρών φωτοβολταϊκών συστημάτων ισχύος από 20 έως 150KV, να βρίσκονται σε άρτια και οικοδομίσιμα οικόπεδα. Η σχετική πρόβλεψη περιλαμβάνεται στην ίδια απόφαση που εκδόθηκε σχετικά με τα φωτοβολταϊκά στις στέγες και έχει φέρει προ αδιεξόδου το υπουργείο Ανάπτυξης και τη Ρυθμιστική Αρχή Ενέργειας, καθώς εγκλωβίζει περίπου το 90% των αιτήσεων που έχουν υποβληθεί για φωτοβολταϊκά αυτών των κατηγοριών. Με βάση την ίδια απόφαση, η εγκατάσταση σε μη άρτια και οικοδομίσιμα οικόπεδα επιτρέπεται σε φωτοβολταϊκά κάτω των 20KV.

Έτσι, οι μικροεπενδυτές, γιατί αυτούς αφορούν τα μικρά φ/β ισχύος έως 150KV, ακόμη και εάν έχουν λάβει ή εξασφαλίσουν στο μέλλον απόφαση εξαίρεσης από τη Ρυθμιστική Αρχή Ενέργειας, δε θα μπορέσουν να εγκαταστήσουν φωτοβολταϊκά στα οικόπεδά τους εάν αυτά δεν είναι μεγαλύτερα των 4 στρεμμάτων. Η συγκεκριμένη προϋπόθεση αφορά ακόμη και τις περιπτώσεις των μικροεπενδυτών που έχουν ήδη εξασφαλίσει απόφαση εξαίρεσης από την υποχρέωση λήψης άδειας της ΡΑΕ.

Μάλιστα από πλευράς υπουργείου Ανάπτυξης υπάρχει σοβαρός προβληματισμός και καταβάλλονται προσπάθειες ούτως ώστε να δοθεί λύση τουλάχιστον για τις περιπτώσεις των μικροεπενδυτών που έχουν ήδη λάβει απόφαση εξαίρεσης από τη ΡΑΕ. Σύμφωνα με τα τελευταία διαθέσιμα στοιχεία έχουν κατατεθεί συνολικά 6.861 αιτήσεις για απόφαση εξαίρεσης που αντιστοιχούν σε ισχύ 783,3 μεγαβάτ. Από αυτές έχουν εγκριθεί 3.221, 149 έχουν αποσυρθεί, 637 έχουν απορριφθεί και 2.2854 βρίσκονται στο στάδιο της αξιολόγησης.

Δικαιολογίες φυσικά υπάρχουν πολλές αλλά απορώ πως γίνεται να διαπρέπουν σε αυτό τον τομέα άλλα... ηλιόλουστα κράτη όπως η... Γερμανία ή η Δανία και να μην μπορούμε να ξεκολλήσουμε εμείς.

...η γνωστή κατάρα της γνωστής μικρής χώρας που στο μόνο που διαπρέπει τα τελευταία χρόνια είναι στο να σφετερίζεται τη δόξα των αρχαίων προγόνων της και να αποτυγχάνει παταγωδώς σε όλα τα υπόλοιπα.

Aggelos
July 16th, 2009, 11:57 AM
ο νομος εγινε απλα ειναι θεμα αν πρεπει να ειναι για αρτια και οικοδομήσιμα οι μεσαιες παραγωγες ενεργειας 20-150....μην μηδενιζουμε και γκρινιαζουμε..με τον ιδιο νομο ολα τα απλα σπιτια θα μπορουν να βαλουν φωτοβολταικα στις στεγες...κατι ΕΞΑΙΡΕΤΙΚΑ σπουδαιο..

Almopos
July 20th, 2009, 05:05 PM
EUR 40 million investment in wind farm by Themeli S.A.

Πηγή: Express.gr 18/07/09-11:58

AIOΛIKO πάρκο, συνολικής παραγόμενης ενέργειας 38MW, αναμένεται να κατασκευαστεί στον Nομό Αιτωλοακαρνανίας. Πρόκειται για επένδυση περίπου 40 εκατ. ευρώ της εταιρίας Θεμέλη Α.Ε., η οποία, σύμφωνα με πληροφορίες της ΕΞΠΡΕΣ, έχει εκδηλώσει ενδιαφέρον για την ανάπτυξη και δεύτερου αιολικού πάρκου στην περιοχή της ορεινής Ναυπακτίας.

Το νέο αιολικό πάρκο, η μελέτη περιβαλλοντικών επιπτώσεων του οποίου έχει ήδη εγκριθεί από τη Νομαρχία Αιτωλοακαρνανίας, θα κατασκευαστεί στη θέση Περγαντή των Δήμων Παλαίρου, Ανακτορίου και Μεδεώνος και θα αποτελείται από 19 ανεμογεννήτριες, ισχύος 2 MW εκάστη. Στη συνολική επένδυση περιλαμβάνονται επίσης έργα εσωτερικής οδοποιίας και οδοποιίας πρόσβασης, κατασκευής υποσταθμού 20/150 KV καθώς και της γραμμής μεταφοράς μέσης τάσης για τη διασύνδεση του πάρκου κ.ά.

«Το μέλλον στη χώρα είναι η παραγωγή ενέργειας από ανανεώσιμες πηγές. Είναι η πράσινη ανάπτυξη που σέβεται και προστατεύει το περιβάλλον και συνδέεται με την αξιοποίηση των πολλών συγκριτικών πλεονεκτημάτων που έχει η χώρα μας στον τομέα αυτό» δήλωσε ο νομάρχης Αιτωλοακαρνανίας Θύμιος Σώκος με αφορμή την προώθηση της συγκεκριμένης επένδυσης, αλλά και άλλων επενδύσεων ΑΠΕ, που έχουν να κάνουν με μονάδες φωτοβολταϊκών και υδροηλεκτρικών φραγμάτων, που έχουν υλοποιηθεί ή θα υλοποιηθούν στην περιοχή. «Επενδύοντας στην πράσινη ανάπτυξη έχουμε κέρδος και στην οικονομία και προστατεύουμε το περιβάλλον» συμπλήρωσε ο κ. Σώκος.

Να σημειωθεί ότι στον Nομό Αιτωλοακαρνανίας λειτουργεί ήδη ένα αιολικό πάρκο, συνολικής ισχύος 24MW, της ΤEPNA Ενεργειακή Α.Ε. στην περιοχή της Βομβοκούς (όρος Ριγάνι) του Δήμου Ναυπάκτου, ενώ προωθείται η κατασκευή και δεύτερου από την ίδια εταιρία επίσης στα όρια του Δήμου Ναυπάκτου, προϋπολογισμού 28 εκατ. ευρώ με δυνατότητα παραγωγής ηλεκτρικής ενέργειας 20 MW.

Ο Nομός Αιτωλοακαρνανίας θα μπορούσε να χαρακτηριστεί αυτάρκης σε ηλεκτρικό ρεύμα, καθώς όσο ρεύμα καταναλώνεται τόσο παράγεται από ανανεώσιμες πηγές.

Did not know that this particular prefecture produced this much energy from renewable sources.

Almopos
July 28th, 2009, 05:45 PM
BP Solar: more than 2 MW of solar panels have been supplied for several projects since 2008

Πηγή: Express.gr 28/07/09-16:16

Η BP Solar, μέλος της διεύθυνσης BP Alternative Energy, του ενεργειακού ομίλου BP, ανακοινώνει την ανάπτυξη έργων σε διάφορα σημεία της Ελλάδας τα οποία είτε έχουν ήδη ολοκληρωθεί και διασυνδεθεί στο δίκτυο, είτε βρίσκονται σε φάση ολοκλήρωσης.

Τα έργα αυτά, κατανεμημένα γεωγραφικά από την Αλεξανδρούπολη έως την Κρήτη, παρέχουν στην εταιρεία μοναδική τεχνογνωσία σε ότι αφορά στις ιδιαιτερότητες της χώρας μας και αντανακλούν τη δυνατότητα της BP Solar να αξιοποιεί την παγκόσμια εμπειρία της προτείνοντας τις βέλτιστες λύσεις σε κάθε περίπτωση εγκατάστασης.


Συγκεκριμένα, πρόκειται για δώδεκα ολοκληρωμένες εγκαταστάσεις στην Σιτία Κρήτης, το Κορωπί Αττικής, την Μυρτιά Λακωνίας, την Μεγάλη στέρνα Κιλκίς, το Πλατύ Ημαθίας, το Μυρτόφυτο Καβάλας, το Μοναστηράκι Θράκης, την περιοχή Αφύτου Χαλκιδικής, το Ηράκλειο Κρήτης, την Αριδαία Πέλλας, και την Λάρισα Θεσσαλίας, και επιπλέον, αυτή την στιγμή πραγματοποιούνται εγκαταστάσεις στην Λάκκα Πέλλας, την Ορφανή Καβάλας, την Βεγορίτιδα Πέλλας, το Μένιδος Πέλλας και την Καλαμάτα. Οι εγκαταστάσεις αυτές ποικίλλουν σε μέγεθος με την μεγαλύτερη εγκατάσταση να φτάνει τα 200 KW και οι μικρότερες τα 20 KW.


Στα έργα της ανά την Ελλάδα η BP Solar έχει χρησιμοποιήσει διαφορετικούς τύπους των φωτοβολταϊκών της πλαισίων, διαφορετικές τεχνικές θεμελίωσης και διαφορετικούς τύπους ηλεκτρονικών διατάξεων για τη διασύνδεσή τους στο δίκτυο. Φωτοβολταϊκά πάρκα της BP Solar έχουν εγκατασταθεί σε οροφές κτιρίων, σε ελεύθερα αγροτεμάχια, σε κεραμοσκεπές ή σε πλαγιές λόφων. Για την τοποθέτηση των πλαισίων έχουν χρησιμοποιηθεί βάσεις τύπου πάσσαλου, βάσεις επί επιφάνειας σκυροδέματος ή και μεταβλητές βάσεις (πλαίσια τοποθετημένα με τη χρήση trackers).


Ο κ. Σωτήρης Καπέλλος, Διευθύνων Σύμβουλος της BP Solar Hellas ΑΕ στην Ελλάδα δήλωσε σχετικά: «Οι επενδύσεις σε φωτοβολταϊκά πάρκα είναι ιδιαίτερα ελκυστικές στην Ελλάδα. Για την επιτυχία και τη διασφάλιση μιας τέτοιας επένδυσης απαιτείται από την πλευρά του κατασκευαστή του έργου σημαντική τεχνογνωσία και δυνατότητα να ανταποκρίνεται στις ιδιαίτερες ανάγκες που παρουσιάζει κάθε έργο. Η BP Solar με εμπειρία μεγαλύτερη από 35 έτη σε έργα φωτοβολταϊκών και λύσεις υψηλής αξιοπιστίας μπορεί να ανταποκριθεί σε κάθε ανάγκη των επενδυτών στην Ελλάδα.»


Με την ολοκλήρωση των έργων αυτών η εγκατεστημένη ισχύς της BP Solar σε έργα που έχουν σχεδιαστεί από το 2008 και έπειτα υπερβαίνει τα 2 MW. Η πλειονότητα των έργων αυτών παρέχει στην εταιρεία δυνατότητα πλήρους εποπτείας και απομακρυσμένου ελέγχου προσφέροντας πραγματικά στοιχεία απόδοσης για τις διάφορες περιοχές εγκατάστασης των πάρκων. Με τον τρόπο αυτό υπάρχει απεικόνιση του ηλιακού ενεργειακού δυναμικού της Ελλάδας μέσα από πραγματικές μετρήσεις απόδοσης.


Ο κ. Δάρειος Δημητρίου, εμπορικός διευθυντής της BP Solar σχολιάζει σχετικά: «Ένα φωτοβολταϊκό πάρκο σε επίπεδο θεωρητικής σχεδίασης συχνά θεωρείται ένα απλό έργο: μερικά φωτοβολταϊκά πλαίσια διασυνδέονται με τη βοήθεια αγωγών και ηλεκτρονικών στοιχείων και συνδέονται στο δίκτυο (στην περίπτωση διασυνδεδεμένων συστημάτων) ή φορτίζουν συστοιχίες μπαταριών (στην περίπτωση αυτόνομων έργων). Στην πράξη ωστόσο εμφανίζονται σημαντικές συνιστώσες που κρίνουν την επιτυχία της υλοποίησης και την αξιοπιστία της κατασκευής και επομένως και της επένδυσης. Ο κατασκευαστής καλείται να αντιμετωπίσει σημαντικές προκλήσεις που αφορούν επιμέρους ζητήματα όπως τη στήριξη των πλαισίων, τη χρήση των κατάλληλων ηλεκτρονικών διατάξεων κ.λπ. Η BP Solar προσφέροντας πραγματικά ολοκληρωμένες λύσεις και όχι μόνο κάποιες σειρές προϊόντων μπορεί πραγματικά να εγγυηθεί την αξιοπιστία της κατασκευής και να προβλέψει λεπτομέρειες του έργου από την φάση της σχεδίασης.»

Almopos
August 3rd, 2009, 03:57 PM
Regulatory Authority for Energy (RAE) aproves 440 new solar power projects

Πηγή: Express.gr 01/08/09-08:48

OΛOKΛHPΩΘHKE από τη Ρυθμιστική Αρχή Ενέργειας η αξιολόγηση των αιτήσεων που είχαν υποβληθεί έως τον Ιούνιο του 2007 για επενδύσεις σε φωτοβολταϊκούς σταθμούς, ενώ οι αιτήσεις για μικρά φωτοβολταϊκά έργα μέχρι 150 kW, έχουν αξιολογηθεί σε ποσοστό 67%.


Oπως ανακοίνωσε χθες η ΡΑΕ, από τις 28 Μαΐου έως και τις 30 Ιουλίου, η ολομέλεια της Αρχής έχει λάβει απόφαση για 440 αιτήσεις, με πλήρη φάκελο, από τις 510 του κύκλου του Ιουνίου (2007) που συνολικά εκκρεμούν. Πρέπει να σημειωθεί ότι η αξιολόγηση αιτήσεων για τις οποίες υφίσταται εκκρεμότητα στον φάκελο θα ολοκληρωθεί όταν θα διευθετούνται οι σχετικές εκκρεμότητες από τους ενδιαφερόμενους.

Παράλληλα έχει ήδη ξεκινήσει η εξέταση των αιτήσεων του κύκλου Αυγούστου 2007 (213 αιτήσεις), η οποία εκτιμάται ότι θα ολοκληρωθεί τον Οκτώβριο. Θα ακολουθήσει η εξέταση των αιτήσεων του κύκλου του Οκτωβρίου 2007 (82), Δεκεμβρίου 2007 (149) και Φεβρουαρίου 2008 (100), η οποία αναμένεται να ολοκληρωθεί έως το τέλος του χρόνου.

Oσον αφορά την εξέταση αιτήσεων για χορήγηση απόφασης εξαίρεσης από τη λήψη άδειας παραγωγής σε μικρούς Φ/Β σταθμούς ισχύος μέχρι 150 kW, οι οποίες συνολικά ήταν 6.840 για όλη τη χώρα, σύμφωνα με την ανακοίνωση της ΡΑΕ η εικόνα είναι η εξής:

– Από τις 3.005 αιτήσεις που αφορούν Φ/Β σταθμούς στα μη διασυνδεδεμένα νησιά έχουν εξεταστεί 2.658 και έχουν εκδοθεί 2.615 αποφάσεις εξαίρεσης. Εκκρεμεί η έκδοση των υπολοίπων 347 αποφάσεων καθώς αναμένονται ή εξετάζονται συμπληρωματικά στοιχεία που έχουν ζητηθεί.

Για την ηπειρωτική Ελλάδα, επί συνόλου 3.835 αιτήσεων, έχουν εκδοθεί 1.328 αποφάσεις, και αποστέλλονται άμεσα επιπλέον 437. Περαιτέρω, έχουν ήδη ζητηθεί με επιστολή συμπληρωματικά στοιχεία για περίπου 1.500 από τις λοιπές 2.070 αιτήσεις.

1821
August 4th, 2009, 08:37 AM
Out of curiosity how many days of sunshine on average does Greece get?

Aggelos
August 4th, 2009, 02:08 PM
300 I think

Grk101
August 4th, 2009, 09:31 PM
Don't know if this was already posted, but:

FROM: http://www.boston.com/news/world/europe/articles/2009/08/02/greece_lags_on_renewable_energy/


Greece lags on renewable energy
http://cache.boston.com/resize/bonzai-fba/Globe_Photo/2009/08/01/1249165289_1807/539w.jpg
In Megalopolis, Greece, the air is heavy with dust and smoke from plants that burn brown coal to generate electricity. (John Kolesidis/ Reuters)

By Ingrid Melander
Reuters / August 2, 2009

MEGALOPOLIS, Greece - Lignite power plants belch dust and smoke into the air above the southern Greek town of Megalopolis, but residents resistant to environmental arguments have blocked a scheme to build the country’s biggest solar energy project on a nearby hillside.

Local game hunters, angry that an earlier plan to grow a forest on the site was scrapped, have gone to court to try to stop the construction of a 50-megawatt solar panel park.

“Under no conditions will we accept sacrificing even one tree . . . we are not bowing to these interests,’’ Kostas Markopoulos, president of the Hunters’ Association of the Peloponnese, said on a visit to the site on a hill overlooking the small town.

Below lie the huge open-air mines where lignite, a cheap but highly polluting energy source also known as brown coal, is extracted and adjacent plants where it is burned to generate electricity for southern Greece. The nearest houses stand only about 300 feet away.

Red tape, a lack of political will, and local opposition have cramped the development of an otherwise promising renewable energy market in Greece, whose climate is endowed with plenty of sunshine and wind.

This puts Greece far behind European Union leaders in the field, such as much less sunny Germany.

Despite one of the most generous government subsidies and long-term guaranteed electricity prices worldwide, it ranked 18th in percentage of renewables as a proportion of gross electricity consumption in the EU in 2007.

The Megalopolis project, using photovoltaic panels to convert sunlight into electricity, would be one of the biggest solar energy schemes in the world. It is expected to cost $280 million to $349 million.

Nearly two years after electricity operator PPC was granted production licenses, nothing has been built on the site. A court ruling on the hunters’ appeal is still awaited.

Investors, waiting for years to tap Greece’s huge potential, say that after decades of struggling with endless bureaucracy, they see some reason for hope as new legislation takes effect.

“In the past 15 years, Greece has been the sleeping giant of European renewables,’’ said Nikos Vassilakos, who heads a Greek and a European association of investors in renewables. “Now something is moving, maybe at a slow pace, but investors have learnt to be patient.’’

Greece is notorious for its long licensing procedure, which Vassilakos estimated at three to four years on average.

The government has just passed a zoning law for renewables as well as approved new incentives for individuals to install solar panels on rooftops and sell the electricity, doing away with a licensing process that used to cost thousands of euros.

Within the next two months, it plans to submit a law to shorten procedures for wind farms and small hydroelectric plants.

With installed capacity of about 1,200 megawatts, mostly from wind, Greece must move up a gear to comply with EU rules.

It needs to produce more than a third of its electricity from renewables by 2020, from about 9 percent currently - the figure drops to about 4 percent without large hydro plants, which specialists say is a more realistic assessment.

Investors present in the Greek renewables market include Italy’s Enel, France’s EDF, and Spain’s Iberdola, as well as other, smaller companies. More than $5.65 billion worth of renewable applications are awaiting approval by Greece’s energy regulator.

“It’s an exciting moment,’’ Vassilakos said. “Look at how big the untapped potential is.’’

Walking around the mine and the hamlets bordering the plant, where pollutants in the air burn the throat after just a few minutes, the hunters’ leader, Markopoulos, is unconvinced.

“A [solar] park here at such a large scale . . . would be one large mirror that will drive away wildlife,’’ he said. “This should be done in other areas, and they exist, that do not destroy the natural environment.’’

ovem
August 7th, 2009, 01:04 AM
bullshit... we should be the first country to use solar and wind power... but unfortunately we are last in everything!

the daydreamer
August 25th, 2009, 11:57 AM
Θεσμικό πλαίσιο αξιοποίησης του γεωθερμικού πλούτου

Ολοκληρώθηκε το θεσμικό πλαίσιο αξιοποίησης του γεωθερμικού πλούτου της χώρας, με την υπογραφή από τον υφυπουργό Ανάπτυξης κ. Ι. Μπούγα, απόφασης καθορισμού της διαδικασίας μίσθωσης γεωθερμικών πεδίων. Ειδικότερα, με νέα υπουργική απόφαση που υπέγραψε ο υφυπουργός Ανάπτυξης κ. Ιωάννης Μπούγας καθορίζονται οι όροι και η διαδικασία εκμίσθωσης του δικαιώματος του δημοσίου για έρευνα και διαχείριση γεωθερμικού δυναμικού. Με τη νέα (3η κατά σειρά) Υπουργική Απόφαση ολοκληρώνεται το θεσμικό πλαίσιο αξιοποίησης του γεωθερμικού πλούτου της χώρας μας και εφαρμογής της γεωθερμίας για ψύξη και θέρμανση κτηρίων.

Η νέα Υ.Α. που εκδόθηκε σε εφαρμογή του Ν.3734/2009 «Προώθηση της συμπαραγωγής δύο ή περισσότερων χρήσιμων μορφών ενέργειας» καθορίζει τη διαδικασία και τους όρους για μίσθωση:

- Του δικαιώματος έρευνας για νέα γεωθερμικά πεδία μη ερευνημένων χώρων και πιθανών γεωθερμικών πεδίων.

- Του δικαιώματος διαχείρισης γεωθερμικού πεδίου που έχει πιστοποιηθεί μετά από τη μίσθωση του δικαιώματος έρευνας.

- Του δικαιώματος διαχείρισης τμημάτων βεβαιωμένων γεωθερμικών πεδίων με προτεραιότητα σε αγροτικές εκμεταλλεύσεις.

Επιπλέον, σύμφωνα με την ανακοίνωση, προκειμένου να εξασφαλιστεί μεγαλύτερη διαφάνεια και αποτελεσματικότητα στους σχετικούς διαγωνισμούς, η νέα Υ.Α. προβλέπει για πρώτη φορά ενιαία αντικειμενικά κριτήρια με συγκεκριμένους συντελεστές βαρύτητας για τη μίσθωση του δικαιώματος έρευνας, καθώς και συγκεκριμένες προθεσμίες για όλα τα στάδια διενέργειας των διαγωνισμών.

Επίσης για πρώτη φορά καθορίζεται:

- Η διαδικασία για την εκμετάλλευση τμημάτων των γεωθερμικών πεδίων και εξασφαλίζεται ρητά η προτεραιότητα στις αγροτικές εκμεταλλεύσεις.

- Το ύψος του ελάχιστου αναλογικού μισθώματος για τη διαχείριση των πεδίων στο 2%. Στην περίπτωση των τμημάτων που αφορούν αποκλειστικά σε αγροτικές εκμεταλλεύσεις το ελάχιστο αναλογικό μίσθωμα ορίστηκε στο 1%.

- Η διαδικασία για την ταυτόχρονη μίσθωση του δικαιώματος διαχείρισης βεβαιωμένου γεωθερμικού πεδίου και του δικαιώματος έρευνας άμεσα γειτονικού πιθανού.

Με το νέο θεσμικό πλαίσιο για τη γεωθερμία γίνεται ένα επιπλέον βήμα στην υλοποίηση του σχεδιασμού του Υπουργείου Ανάπτυξης για την ανάπτυξη των ανανεώσιμων πηγών ενέργειας, μέσω της αξιοποίησης του πλούσιου γεωθερμικού δυναμικού που διαθέτει η χώρα και το οποίο μπορεί να έχει πολλαπλές εφαρμογές σε ένα ευρύ φάσμα δραστηριοτήτων από την παραγωγή ηλεκτρικής ενέργειας, την τηλεθέρμανση και τηλεψύξη πόλεων, έως τις νέες υψηλής προστιθέμενης αξίας θερμοκηπιακές καλλιέργειες και τη μεταποίηση.

Source: kathimerini.gr

the daydreamer
August 25th, 2009, 05:38 PM
Παιδιά ξέρετε τίποτα για το αιολικό πάρκο στη θάλασσα του Μαραθώνα; Διάβασα κάτι άρθρα τον Απρίλιο, αλλα τώρα στο διαδίκτυο βρίσκω μονο και μονο ιστοσελίδες με NIMBYs που μιλάνε για "οπτική ρύπανση". Πρόκειται για ένα από τα μεγαλύτερα αιολικά πάρκα της Ευρώπης, και θα βρίσκετε στην θάλασσα. Η κάθε ανεμογεννήτρια θα παράγει 5MW, συνολικά 450MW. Και θα κοστίσει 780.000.000€.

Θα είναι κάπως σαν αυτό:
http://www.tvxs.gr/images/stories_photos/012000_012999/012531_0905261221.jpg

Βρήκα και χάρτη με όλα τα αιολικά θαλασσινά πάρκα που σχεδιάζονται στην Ελλάδα:
http://assets.in.gr/AssetService/Image.ashx?c=7088226&r=0&p=0&t=0&q=85&w=800&v=1

Το θέμα της οπτικής ρύπανσης για μένα δεν είναι σοβαρό πρόβλημα, στην Δανία έχουν φιάξει ένα πολύ κοντά στην Κοπεγχάγη! Μάλιστα θα γίνει και χαρακτηριστικό της περιοχής...

1821
August 26th, 2009, 03:55 AM
Will the wind turbines be of Greek origin?
The civil arm of HellenicDefenceSystems builds it's own wind turbines. So hopefully their products are used rather then foreign.

the daydreamer
August 28th, 2009, 12:40 PM
Will the wind turbines be of Greek origin?
The civil arm of HellenicDefenceSystems builds it's own wind turbines. So hopefully their products are used rather then foreign.

I hope so, but I really don't know. I have to find the original article.

the daydreamer
August 28th, 2009, 12:42 PM
Article about biomass energy from Athens Plus newspaper:

http://i731.photobucket.com/albums/ww320/daydreamer123_photos/Immagine1-11.png

the daydreamer
September 3rd, 2009, 04:18 AM
«Φωτοβολταϊκά στις στέγες»

Εννέα φωτοβολταϊκά συστήματα, ισχύος 77,5 κιλοβάτ, έχουν εγκατασταθεί ήδη στο πλαίσιο του προγράμματος του υπουργείου Ανάπτυξης

Εννέα φωτοβολταϊκά συστήματα, ισχύος 77,5 κιλοβάτ έχουν εγκατασταθεί ήδη, μέχρι στιγμής, στο πλαίσιο του προγράμματος «Φωτοβολταϊκά στις στέγες» του υπουργείου Ανάπτυξης. Το πρόγραμμα όπως είναι γνωστό τέθηκε σε εφαρμογή εφέτος το καλοκαίρι και απλουστεύει τις διαδικασίες εγκατάστασης φωτοβολταϊκών πάνελ ισχύος μέχρι 10 κιλοβάτ σε κατοικίες και πολύ μικρές επιχειρήσεις.

Το υπουργείο Ανάπτυξης ανακοίνωσε σήμερα ότι σε συνεργασία με το ΚΑΠΕ με το Κέντρο Ανανεώσιμων Πηγών και Εξοικονόμησης Ενέργειας (ΚΑΠΕ) και τους εμπλεκόμενους φορείς ΣΕΦ (Σύνδεσμος Εταιριών Φωτοβολταϊκών), ΕΜΠ και ΔΕΗ, εκπονήθηκε αναλυτικός οδηγός εγκατάστασης των φωτοβολταϊκών. Το Εγχειρίδιο με τίτλο «Οδηγίες για την εγκατάσταση φωτοβολταϊκών συστημάτων σε κτηριακές εγκαταστάσεις» είναι ήδη ανηρτημένο στην ιστοσελίδα του ΚΑΠΕ (www.cres.gr).

Παράλληλα, μεε αποδοχή της τήρησης των ελάχιστων τεχνικών προδιαγραφών και όρων ασφάλειας που τίθενται στο Εγχειρίδιο από τους ενδιαφερόμενους μελετητές -εγκαταστάτες, καταρτίζεται «Ενδεικτικός Κατάλογος Μελετητών - Εγκαταστατών Φωτοβολταϊκών Συστημάτων» για την ενημέρωση των ενδιαφερομένων πολιτών.

Η καταχώριση στον κατάλογο είναι προαιρετική.

Οι σχετικές αποφάσεις, έντυπα για αίτηση στη ΔΕΗ, καθώς και διευκρινιστικά ερωτήματα-απαντήσεις είναι αναρτημένα στην ιστοσελίδα του ΥΠΑΝ www.ypan.gr, υπό τον τίτλο «ΦΒ ΣΤΙΣ ΣΤΕΓΕΣ».

Source: kathimerini.gr

Almopos
September 16th, 2009, 09:20 PM
Solar MW capacity doubled

The installed capacity of solar energy systems in Greece more than doubled within just seven months by July, according to the Renewable Energy Sources Center.

The combined electricity output from the installed units reached 29.8 mega-watts in July from just 14 MW in January, thanks to legislative initiatives of the last few years aimed at boosting the market’s development, said Yiannis Vouyiouklakis, head of the center’s development section. He was addressing a conference titled “Photovoltaic Systems in Greece.”

Vouyiouklakis stated that the market’s growth has been helped by an impressive drop in the cost of purchasing solar panels, which has fallen over 35 percent within a year. He also suggested that it is by harnessing solar and wind energy that Greece could meet the national target of getting 20 percent of its energy via renewable energy sources. However, Giorgos Vokas, secretary general of the Association of Photovoltaic Companies, said that despite initially high expectations, bureaucracy has cut the market’s potential growth rate.

Source: www.ekathimerini.com

And in Greek

Πηγή: Express.gr 16/09/09-07:40

ΔIΠΛAΣIAΣTHKE η εγκατεστημένη ισχύς των φωτοβολταϊκών μονάδων ηλεκτροπαραγωγής το τελευταίο επτάμηνο και διαμορφώθηκε τον Ιούλιο σε 29,8 MW, έναντι 14 MW τον Ιανουάριο. Το στοιχείο αυτό ανακοίνωσε ο υπεύθυνος του τμήματος ανάπτυξης αγοράς του Κέντρου Ανανεώσιμων Πηγών Ενέργειας (ΚΑΠΕ) Γιάννης Βουγιουκλάκης, σε ημερίδα με θέμα «Φωτοβολταϊκά στην Ελλάδα», που διοργάνωσε το Ελληνογερμανικό Επιμελητήριο.


Ο κ. Βουγιουκλάκης ανέφερε επίσης ότι η αιολική και η ηλιακή ενέργεια θα είναι οι βασικές τεχνολογίες στις οποίες θα στηριχθεί η επίτευξη των εθνικών και κοινοτικών στόχων που προβλέπουν 20% εξοικονόμηση ενέργειας, 20% συμμετοχή των ανανεώσιμων πηγών στο ενεργειακό ισοζύγιο και 20% μείωση των εκπομπών αερίων του θερμοκηπίου ως το 2020. Η ανάπτυξη της αγοράς φωτοβολταϊκών διευκολύνεται και από την εντυπωσιακή μείωση του κόστους αγοράς των πάνελ, που εκτιμάται ότι ξεπέρασε το 35% τον τελευταίο χρόνο. Πρέπει να σημειωθεί ότι στην Ελλάδα λειτουργούν τρεις εταιρίες παραγωγής φωτοβολταϊκών και βρίσκονται σε φάση κατασκευής άλλες τρεις.


Παράλληλα το ΚΑΠΕ έχει εκπονήσει τεχνικές οδηγίες για την εγκατάσταση φωτοβολταϊκών, ενώ στην ιστοσελίδα του λειτουργεί άτυπο μητρώο εγκαταστατών στο οποίο έχουν ήδη εγγραφεί 110 εταιρίες. Ο γενικός γραμματέας του Συνδέσμου Εταιριών Φωτοβολταϊκών Γ. Βόκας τόνισε ότι παρά τις αυξημένες προσδοκίες που δημιουργήθηκαν με το θεσμικό πλαίσιο για τα φωτοβολταϊκά δεν υπήρξε ανάλογη συνέχεια λόγω γραφειοκρατικών αγκυλώσεων. Είναι ενδεικτικό ότι το 2006 κατατέθηκαν στη Ρυθμιστική Αρχή Ενέργειας περισσότερες από 9.000 αιτήσεις για εγκατάσταση μονάδων συνολικής ισχύος 3.700 MW, από τις οποίες όμως ελάχιστες υλοποιήθηκαν.


Στα θετικά του θεσμικού πλαισίου ο κ. Βόκας περιέλαβε τις υψηλές εγγυημένες τιμές απορρόφησης της ενέργειας και την απλή, σύντομη διαδικασία που θεσπίστηκε εφέτος για την εγκατάσταση φωτοβολταϊκών στις στέγες των σπιτιών. Υπογράμμισε ωστόσο ότι παραμένουν ισχυρά αντικίνητρα, γραφειοκρατικές και δαιδαλώδεις αδειοδοτικές διαδικασίες από 17 διαφορετικούς φορείς του Δημοσίου και τόνισε ότι η εγκατάσταση συστημάτων ισχύος έως 0,5 MW πρέπει να απαλλαγούν πλήρως από την υποχρέωση λήψης οποιασδήποτε άδειας, όπως ισχύει ήδη στην Ιταλία και τη Γερμανία για μονάδες μέχρι 1 MW.

Almopos
February 1st, 2010, 01:06 PM
Ηλιοθερμικός σταθμός 75 MW και δαπάνης 300 εκατ. ευρώ δρομολογείται από την EGL

Πηγή: Express.gr 28/01/10-09:32

EΠENΔYΣH ύψους 300 εκατ. ευρώ για την κατασκευή και λειτουργία ηλιοθερμικού σταθμού παραγωγής ηλεκτρικής ενέργειας στην Ηλεία, ισχύος 75 MW σχεδιάζει η EGL Solar 2 Hellas Α.Ε.


Εκπρόσωποι της εταιρίας συναντήθηκαν με τον νομάρχη Ηλείας Χαράλαμπο Καφύρα, τον οποίο ενημέρωσαν για τα σχέδια που έχουν όσον αφορά την ανάπτυξη ηλιοθερμικών σταθμών παραγωγής ηλεκτρικής ενέργειας στην Ιταλία, Ισπανία και στην Ελλάδα. Για την Ελλάδα η EGL σχεδιάζει να αναπτύξει ηλιοθερμικά έργα συνολική ισχύος 150 MW.

Ειδικά για την Ηλεία η εταιρία ενδιαφέρεται για την κατασκευή και λειτουργία ηλιοθερμικού σταθμού παραγωγής ηλεκτρικής ενέργειας στη θέση Μουριά του Δήμου Πύργου, εκμεταλλευόμενη το ηλιακό δυναμικό της περιοχής. Eχουν ήδη συγκεντρωθεί όλα τα απαραίτητα έγγραφα και έχει υποβληθεί σχετικό αίτημα για την έκδοση άδειας παραγωγής στη Ρυθμιστική Αρχή Ενέργειας.

Oπως ενημέρωσαν τον νομάρχη Ηλείας οι εκπρόσωποι της EGL, τα οφέλη του έργου για την περιοχή θα είναι:

• Παραχώρηση του 3% των εσόδων από την πώληση της ηλεκτρικής ενέργειας στον δήμο (εκτιμάται περίπου σε 700.000 - 800.000 ευρώ τον χρόνο).

• Eσοδα από την ενοικίαση της έκτασης, όπως αυτά θα συμφωνηθούν με τη Νομαρχία (έχει ζητηθεί η μίσθωση γεωτεμαχίων τα οποία διαχειρίζεται η Νομαρχία Ηλείας καθώς και παρακείμενη έκταση που διαχειρίζεται το Υπουργείο Aγροτικής Ανάπτυξης).

• Απασχόληση προσωπικού κατά την εγκατάσταση και λειτουργία του σταθμού. Κατά την κατασκευή του έργου, η οποία διαρκεί 2 έτη, θα δημιουργηθούν νέες θέσεις εργασίας για περίπου 550 άτομα, ενώ κατά τη λειτουργία του σταθμού (30 έτη) θα απασχολούνται σε μόνιμη βάση περίπου 50 άτομα.

Να σημειωθεί ότι η τεχνολογία ηλιοθερμικών σταθμών παραγωγής ηλεκτρικής ενέργειας είναι φιλική προς το περιβάλλον αφού δεν γίνεται καύση συμβατικών καυσίμων. Η ηλιακή ενέργεια συγκεντρώνεται με παραβολικά κάτοπτρα σε σωλήνες και θερμαίνει ένα ρευστό. Η θερμική ενέργεια μεταφέρεται στη συνέχεια σε ατμοστρόβιλο που με τη σειρά του κινεί ηλεκτρογεννήτρια. Η τεχνολογία αυτή έχει αναπτυχθεί σημαντικά την τελευταία εικοσαετία, με κύριες εφαρμογές την Ισπανία και τις ΗΠΑ.

Almopos
June 16th, 2010, 12:01 PM
PPC (ΔΕΗ) will proceed with 50 MW Megalopolis solar project

Όταν το έργο ανακοινώθηκε για πρώτη φορά επρόκειτο να είναι το δεύτερο μεγαλύτερο φωτοβολταϊκό πάρκο στον κόσμο. Τρία χρόνια μετά και αφότου χρειάστηκε το ΣτΕ να γνωμοδοτήσει ότι δεν κινδυνεύουν τα θηράματα των κυνηγών από... τύφλωση :ohno:, η ΔΕΗ Ανανεώσιμες προχώρησε χθες στην προκήρυξη του διεθνούς μειοδοτικού διαγωνισμού για το φωτοβολταϊκό πάρκο της Μεγαλόπολης, επιβεβαιώνοντας την αισιοδοξία που είχαν εκφράσει στο Capital.gr τον Απρίλιο πηγές της εταιρείας. Το πάρκο που θα έχει ισχύ 50MW αναμένεται να ξεκινήσει να κατασκευάζεται εντός του έτους και να τεθεί σε λειτουργία σε διάστημα 12 μηνών από την έναρξη των έργων. Όταν ολοκληρωθεί θα περιλαμβάνεται στην πρώτη δεκάδα της Ευρώπης, αφού στο διάστημα των τριών χρόνων κάποια άλλα μεγάλα φωτοβολταϊκά έργα στο εξωτερικό δε συνάντησαν τις ελληνικές... δυσκολίες.:ohno:

Με βάση την προκήρυξη, το έργο θα πρέπει να παραδοθεί με το κλειδί στο χέρι, και η σύμβαση περιλαμβάνει την πενταετή συντήρηση καθώς και την κατασκευή υποσταθμού, την προμήθεια μετασχηματιστών, την προμήθεια των πάνελς, τους μετατροπείς κλπ.

Σύμφωνα με πληροφορίες, ενδιαφέρον για το έργο πριν την ανακοίνωση της προκήρυξης του διαγωνισμού έδειξαν μεγάλες διεθνείς και ελληνικές εταιρείες όπως οι Conergy, Phoenix Solar, Solon, Sun Power, Ygli, BP Solar, Solar Cells κα.

Να σημειωθεί τέλος ότι πολύ σύντομα, πιθανόν και στη διάρκεια της γενικής συνέλευσης της ΔΕΗ, θα ανακοινωθούν και άλλες «θετικές εκπλήξεις» της θυγατρικής ΔΕΗ Ανανεώσιμες, η οποία φαίνεται ότι κάνει μια νέα αρχή.

Χ. Φλ. .

Source: http://www.capital.gr/News.asp?id=991919

gm2263
June 16th, 2010, 12:45 PM
Άντε να δούμε...

pilotos
June 16th, 2010, 01:37 PM
ότι δεν κινδυνεύουν τα θηράματα των κυνηγών από... τύφλωση

Βραβείο πρωτοτυπίας στην βλακεία πότε θα πάρουμε σαν χώρα επιτέλους;
Ελπίζω να μην κολλήσει κάπου άλλου πλέον!

dromeas
June 18th, 2010, 02:48 PM
Επιτέλους ξεκόλλησε! Μιλάμε για μια τεράστια επένδυση.
Παραθέτω και την ιστοσελίδα της ΔΕΗ ΑΝΑΝΕΩΣΙΜΕΣ ΑΕ:

http://www.ppcr.gr/Home.aspx?C=2

greecelightning
June 19th, 2010, 08:17 PM
'Ptolemaida 1' shut down

In a symbolic gesture that she said marked the end of an era, Environment, Energy and Climate Change Minister Tina Birbili on Friday shut down the 50-year-old lignite-fired power plant "Ptolemaida 1" - one of the oldest owned by the Public Power Corporation (PPC).

"The closure of the PPC's first polluting lignite plant marks the end of an era and the start of a new one, using cleaner lignite, and with renewable energy sources acquiring a central role in Greece's energy mix," an environment ministry announcement said.

The ministry's plan is to gradually close the lignite plants at Ptolemaida, Kardia, Amyntaios and Agios Dimitrios between now and 2024, with the exception of unit 5, which is relatively new and uses modern technology.

The 70-MW Ptolemaida plant first went into operation in 1959.

According to a PPC announcement, Birbili promised in a speech at the plant to preserve state control of the PPC, while underlining that anthracite and the nuclear option were not part of Greece's energy strategy.

http://www.ana-mpa.gr/anaweb/user/showplain?maindoc=8842082&maindocimg=8841031&service=100

ELDOK
July 8th, 2010, 12:50 AM
http://images.tanea.gr/assetservice/Image.ashx?c=15165676&r=0&p=0&t=0&q=100&v=1&s=1&w=800&h=

Δώδεκα θαλάσσιες περιοχές της χώρας προκρίνονται ως υποψήφιες για τη χωροθέτηση των πρώτων θαλάσσιων αιολικών πάρκων στην Ελλάδα, με χρονικό ορίζοντα ανάπτυξης τα έτη 2012- 2017.

Oπως ανακοίνωσε το υπουργείο Περιβάλλοντος, Ενέργειας και Κλιματικής Αλλαγής, οι περιοχές που έχουν επιλεγεί αφορούν την πρώτη φάση της ανάπτυξης θαλάσσιων αιολικών πάρκων και είναι ο Αϊ-Στράτης, η Αλεξανδρούπολη, η Θάσος, η Κάρπαθος, η Κέρκυρα, το Κρυονέρι, η Κύμη, η Λευκάδα, η Λήμνος, οι Πεταλιοί, η Σαμοθράκη και το Φανάρι.

Η προκαταρκτική χωροθέτηση των περιοχών ενδιαφέροντος των θαλάσσιων αιολικών πάρκων παρουσιάστηκε χθες από την ηγεσία του υπουργείου Περιβάλλοντος σε φορείς της αγοράς ενέργειας, εταιρείες, εκπροσώπους υπουργείων και μη Κυβερνητικών Οργανώσεων.

Σύμφωνα με τον νόμο για τις Ανανεώσιμες Πηγές Ενέργειας που ψηφίστηκε πρόσφατα, για να προχωρήσει η διαδικασία αδειοδότησης για τα θαλάσσια αιολικά πάρκα, απαιτείται η προκαταρκτική αδειοδότηση των περιοχών ενδιαφέροντος επί των οποίων θα γίνουν στη συνέχεια οι αναλυτικές μελέτες και η διαδικασία εκπόνησης Στρατηγικών Μελετών Περιβαλλοντικών Επιπτώσεων. Μέσα από τη διαδικασία αυτή θα καθοριστεί η ακριβής θέση των θαλάσσιων αιολικών πάρκων, η θαλάσσια έκταση που καταλαμβάνουν και η μέγιστη εγκατεστημένη ισχύς των ανεμογεννητριών. Οι περιοχές αυτές, οι οποίες σύμφωνα με τον ίδιο νόμο θα είναι συνολικά 274 τετραγωνικά χιλιόμετρα, θα δημοπρατηθούν.

Οπως επισημαίνεται από το υπουργείο, για να εξασφαλιστεί η ταχύτητα της ανάπτυξης, η αξιοπιστία και η οικονομικότητα των εγκαταστάσεων, επιλέχθηκε για την πρώτη φάση η τεχνολογία της θεμελίωσης των ανεμογεννητριών στον θαλάσσιο πυθμένα, αποκλείοντας τις πλωτές ανεμογεννήτριες και τα μεγάλα θαλάσσια βάθη. Πλωτές λύσεις θα εξεταστούν σε πιθανή δεύτερη φάση του προγράμματος (2017-2025), εφόσον προκύψει σχετική ανάγκη.

http://www.tanea.gr/default.asp?pid=2&ct=3&artid=4583301

EngineerGreece
July 8th, 2010, 05:45 PM
^^

Πολύ κακή σχέση απόδοσης και τιμής. Τα αιολικά πάρκα στα αλήθεια δεν προσφέρουν τίποτα. Πιάνουν πολύ χώρο, είναι αποδεδειγμένο επιστημονικά ότι προκαλούν θόρυβο που προκαλεί διάφορα προβλήματα, και δεν παράγουν αρκετή ενέργεια.

Ιδικά στην Ελλάδα έπρεπε να εξετάζουμε την ενέργεια από τον ήλιο. Η αιολική ενέργεια μετά το βιοντίζελ (το οποίο παρεμπιπτόντως είναι έγκλημα προς την ανθρωπότητα), είναι η χειρότερη μορφή καθαρής ενέργειας.

Για μένα οι καλύτερες μορφές καθαρής ενέργειας είναι η πυρηνική σύντηξη, το υδρογόνο, τα φράγματα και φυσικά η ηλιακή ενέργεια σε χώρες ζεστές και ηλιόλουστες.

Arxitektonas
July 9th, 2010, 12:58 AM
Για μένα οι καλύτερες μορφές καθαρής ενέργειας είναι η πυρηνική σύντηξη, το υδρογόνο, τα φράγματα και φυσικά η ηλιακή ενέργεια σε χώρες ζεστές και ηλιόλουστες.

1) Πυρηνική σύντηξη: Δεν υπάρχει ακόμα τεχνογνωσία ώστε να παραχθεί ικανή ποσότητα ενέργειας σε εργοστασιακό επίπεδο

2) Υδρογόνο: Η διάσπαση του υδρογόνου σε εργοστασιακό επίπεδο, ώστε να χρησιμοποιηθεί ως καύσιμο, μολύνει την ατμόσφαιρα πολλαπλάσια από θερμοηλεκτρικά εργοστάσια καύσης λιγνίτη.

3) Φράγματα: Προκαλούν τόσα προβλήματα όσα λύνουν. Καταστρέφουν τον υδροφόρο ορίζοντα των περιοχών από το φράγμα και κάτω, ενώ αποσαθρώνουν με την υπερσυγκέντρωση των υδάτων το έδαφος από το φράγμα και πάνω.

4) Ηλιακή ενέργεια: Ο χρόνος απόσβεσης των ηλιακών συλλεκτών υπολογίζεται στα 22 χρόνια με 25 χρόνια το χρόνο αλλαγής/αντικατάστασής τους, κάνοντάς τα ασύμφορα για οποιονδήποτε επενδυτή.

Πίστεψέ με, αν υπήρχε καλύτερη και συμφερότερη λύση από την αιολική ενέργεια η Δανία, η Ολλανδία και η Γερμανία δε θα επένδυαν αμύθητα ποσά βασίζοντας ως και το 20% της ενέργειάς τους σε αυτά. Επιπλέον, η Γερμανία από μόνη της έχει 15000 ανεμογεννήτριες, και δεν είδα κανένα πρόβλημα ως τώρα.

Όσον αφορά τα παραπάνω, έχω πάει σε 3 συνέδρια τώρα τελευταία για τις ΑΠΕ, τα οποία όλα λέγανε το ίδιο πράγμα. Μακάρι να μπορούσαν να είναι συμφερότερα τα ηλιακά, αλλά μιας και δεν είναι, και δε φαίνεται να γίνονται σύντομα, ας επενδύσουμε προς το παρόν σε αιολικά, και μετά βλέπουμε.

EngineerGreece
July 9th, 2010, 01:51 AM
1) Πυρηνική σύντηξη: Δεν υπάρχει ακόμα τεχνογνωσία ώστε να παραχθεί ικανή ποσότητα ενέργειας σε εργοστασιακό επίπεδο.

To ξέρω. Είναι μια μορφή ενέργειας του μέλλοντος. Ελπίζω σε τουλάχιστον 30 χρόνια η πυρηνική σύντηξη να είναι όσο εύκολη όσο οι πυρηνικοί αντιδραστήρες σήμερα.

2) Υδρογόνο: Η διάσπαση του υδρογόνου σε εργοστασιακό επίπεδο, ώστε να χρησιμοποιηθεί ως καύσιμο, μολύνει την ατμόσφαιρα πολλαπλάσια από θερμοηλεκτρικά εργοστάσια καύσης λιγνίτη.

Και το υδρογόνο είναι το καύσιμο του μέλλοντος, και του πολύ σύντομου μέλλοντος μάλιστα. Βρίσκεται παντού. Το μόνο που μένει είναι να βρούμε έναν τρόπο να το μετατρέπουμε σε καύσιμο χωρίς να επιβαρύνουμε το περιβάλλον παραπάνω. Κάποια στιγμή πιστεύω ότι θα φτάσουμε στα επίπεδα που το ίδιο το καύσιμο θα τροφοδοτεί με ενέργεια την παραγωγή του και θα μπορούμε να το χρησιμοποιούμε συνάμα. Αλλά δυστυχώς οι πετρελαϊκές εταιρίες προτιμούν να ρουφήξουν όσα μπορούν από το πετρέλαιο.

3) Φράγματα: Προκαλούν τόσα προβλήματα όσα λύνουν. Καταστρέφουν τον υδροφόρο ορίζοντα των περιοχών από το φράγμα και κάτω, ενώ αποσαθρώνουν με την υπερσυγκέντρωση των υδάτων το έδαφος από το φράγμα και πάνω.

Δεν προκαλούν πάντα προβλήματα. Και είναι μια πολύ καλή λύση. Πολύ ενέργεια και πάμφθηνη.

4) Ηλιακή ενέργεια: Ο χρόνος απόσβεσης των ηλιακών συλλεκτών υπολογίζεται στα 22 χρόνια με 25 χρόνια το χρόνο αλλαγής/αντικατάστασής τους, κάνοντάς τα ασύμφορα για οποιονδήποτε επενδυτή.

Όταν λέω για ηλιακή ενέργεια δεν μιλάω για μερικά πανελάκια. Μιλάω για αυτά

http://upload.wikimedia.org/wikipedia/commons/5/50/PS10_solar_power_tower_2.jpg

http://tucsoncitizen.com/wryheat/files/2009/08/solar-tower.jpg

Τώρα για την Ελλάδα που δεν έχει τόσο χώρο για πύργους όπως η Ισπανία, η Αμερική, οι Αραβικές χώρες κτλ υπάρχουν και άλλες λύσεις.

Η ηλιακή ενέργεια στην χώρα μας είναι πάρα πολύ διαδεδομένη και ας λένε ότι είμαστε πολύ πίσω. Αμ δε, σχεδόν κάθε καινούριο σπίτι έχει και από έναν ηλιακό θερμοσίφωνα.

Τα παρακάτω στοιχεία είναι του 2009.
Οι εγκατεστημένοι σήμερα ανά την Ελλάδα ηλιακοί θερμοσίφωνες έχουν απαλλάξει το σύστημα ηλεκτροδότησης της χώρας από την κατασκευή δύο επιπλέον θερμοηλεκτρικών μονάδων παραγωγικής ισχύος περίπου 800 ΜW, σύμφωνα με τα στοιχεία των εταιρειών του κλάδου.

Υπολογίζεται ότι το μέγεθος των ηλιακών συλλεκτών που είναι σήμερα εγκατεστημένοι στις ελληνικές στέγες υπερβαίνει τα 3 εκατ. τ.μ. (έναντι 4 εκατ. τ.μ. που είναι το μέγεθος των αντίστοιχων συλλεκτών στη Γερμανία). Πρόκειται για 1 εκατομμύριο εγκατεστημένα ηλιακά συστήματα, που αυξάνονται τουλάχιστον κατά 100.000 κάθε χρόνο. Η αύξηση του τζίρου της εγχώριας βιομηχανίας ηλιακών θερμοσιφώνων, που ακμάζει, ανήλθε πέρυσι στο 14% σε σχέση με το 2008, ενώ το 50% της παραγωγής εξάγεται!

Οι εταιρείες παραγωγής ηλιακών συλλεκτών αποτελούν μια σημαντική εγχώρια παραγωγική δραστηριότητα που απασχολεί άμεσα και μόνιμα πάνω από 3.000 εργαζομένους. Επιπλέον, ο συγκεκριμένος κλάδος είναι από τους πλέον εξαγώγιμους της χώρας, καθώς περίπου το 50% της εγχώριας παραγωγής πηγαίνει σε αγορές του εξωτερικού. Ελληνικές εταιρείες, όπως η Μαλτέζος, η Ηλιοακμή, η Calpak, η Stiebltherm, η Sol, η Εβήλ και δεκάδες άλλες, εξάγουν σε χώρες της Νότιας Ευρώπης και της Μέσης Ανατολής, σε χώρες της Κεντρικής και Ανατολικής Ευρώπης, αλλά και της Αφρικής.

Λοιπόν όπως ακριβώς έγινε και με τους ηλιακούς θερμοσίφωνες η Ελλάδα θα μπορούσε άνετα να φτιάχνει ηλιακά panel για ηλεκτρική ενέργεια. Έτσι και θα έπεφταν οι τιμές στην αγορά και εγκατάσταση, και θα πληρώναμε λιγότερα στην Δ.Ε.Η, και μπορεί σαν αποτέλεσμα να έκλειναν κανα δυο εργοστάσια λιγνίτη στην Πτολεμαΐδα, και δεν θα πληρώναμε πρόστιμα στην ΕΕ, αλλά και δεν θα χρειαζόταν να αγοράζουμε ρεύμα από τις γειτονικές μας χώρες κάθε τόσο.

Αλλά.... Αυτά χρειάζονται θέληση και κρατικές βοήθειες όπως έγινε τότε με τα θερμοσίφωνα.

EngineerGreece
July 9th, 2010, 02:20 AM
«Συγκεντρωμένη ηλιακή ενέργεια»
http://www.zougla.gr/page.ashx?pid=2&aid=118466&cid=17

http://www.zougla.gr/Image.ashx?fid=165331&w=400&h=300&q=80

Πρώτη καταχώρηση: Σάββατο, 27 Μαρτίου 2010, 16:52
Εν μέσω διαβουλεύσεων για την κατάλληλη κατάρτιση του ενεργειακού μας μείγματος, προκειμένου να επιτύχουμε τους επιβαλλόμενους στόχους, μια νέα τεχνολογική εφαρμογή που είναι ανανεώσιμη και κρίνεται ως ιδανική για τη χώρα μας κάνει την εμφάνισή της.

Αυτή είναι η «συγκεντρωμένη ηλιακή ενέργεια» (CSP), η οποία λειτουργεί μέσω της χρήσης κατόπτρων για τη συγκέντρωση της ηλιακής ακτινοβολίας, την ανάπτυξη υψηλής θερμοκρασίας και την τελική παραγωγή ηλεκτρικής ενέργειας.

Η Ελλάδα έχει μοναδικές προοπτικές εφαρμογής της CSP, καθώς είναι μια χώρα με κατά μέσο όρο 2.756 ώρες ηλιοφάνειας ετησίως ή περίπου 7,55 ώρες ηλιοφάνειας καθημερινά. Οι προοπτικές είναι ιδιαίτερα υψηλές στην Κρήτη και στη Ρόδο, νησιά στα οποία οι ηλιοθερμικές μονάδες θα μπορούσαν να καλύψουν μεγάλο μέρος των ενεργειακών αναγκών, ιδιαίτερα το καλοκαίρι, που είναι η εποχή με την μεγαλύτερη ενεργειακή ζήτηση λόγω επιπρόσθετων αναγκών ψύξης.

Αλλά και το επενδυτικό ενδιαφέρον για προγράμματα CSP είναι ήδη έντονο. Αυτήν τη στιγμή, εκκρεμούν στην Ρυθμιστική Αρχή Ενέργειας 14 αιτήσεις για κατασκευή ηλιοθερμικών μονάδων μεγάλης κλίμακας (δηλαδή άνω των 10MW). Επίσης, σχετικά ευρωπαϊκά κονδύλια προβλέπουν την επιχορήγηση μονάδων CSP σε ποσοστό άνω του 50%.

«Η Ελλάδα μπορεί να στηρίξει την οικονομική της ανάκαμψη στην πράσινη ανάπτυξη. Προϋπόθεση για αυτό αποτελεί η ανάπτυξη και εφαρμογή μιας σειράς περιβαλλοντικών τεχνολογιών, στις οποίες η χώρα μας πλεονεκτεί. Οι τεχνολογίες συγκεντρωμένης ηλιακής ενέργειας αποτελούν χαρακτηριστικό παράδειγμα και η χώρα μας δεν θα πρέπει να απολέσει την ευκαιρία αυτή», δηλώνει στη zougla.gr ο Ηλίας Βαζαίος, εκπρόσωπος του Ιδρύματος Bellona στην Ελλάδα.

Μάλιστα, η εν λόγω τεχνολογία καθίσταται ιδανική και για το πρωτοποριακό πρόγραμμα παραγωγής ενέργειας από την έρημο.

http://www.zougla.gr/Uploads/kia/energeia2.jpg

ovem
July 29th, 2010, 03:35 PM
Yπάρχει κανένας ανανεωμένος χάρτης των αιολικών πάρκων στην Ελλάδα; Πρίν απο μερικές μέρες πήγα στην Εύβοια και συγκεκριμένα στο Μαρμάρι. Εκεί, απο τη θάλασσα φαίνονται 4 αιολικά πάρκα και μου έκανε μεγάλη εντύπωση. Εχω δει επίσης 2 σχετικά καινούργια στη Βοιωτία.

ELDOK
August 11th, 2010, 04:25 AM
Επιχείρηση «πράσινο» νησί στήνεται στον Αη Στράτη

Αρχίζει η υλοποίηση του έργου «"Πράσινο νησί - Αϊ Στράτης», όπως ανακοίνωσε η Γενική Γραμματεία Έρευνας και Τεχνολογίας (ΓΓΕΤ) του υπουργείου Παιδείας,που θα είναι η χρηματοδοτούσα Αρχή, σε συνεργασία με το υπουργείο Περιβάλλοντος, Ενέργειας και Κλιματικής Αλλαγής.

Το έργο, προϋπολογισμού 8 εκατ. ευρώ, εντάσσεται στο πρόγραμμα ΕΣΠΑ " Έρευνα και Τεχνολογία" και θα περιλαμβάνει:

- Έργα Ανανεώσιμων Πηγών Ενέργειας (ΑΠΕ) και αποθήκευσης ενέργειας.

- Παρεμβάσεις εξοικονόμησης ενέργειας και κάλυψη θερμικών και ψυκτικών φορτίων με χρήση Γεωθερμικών Αντλιών Θερμότητας (ΓΑΘ) σε δημόσια κτήρια.

- Αυτόνομες σταθερές εφαρμογές παροχής ενέργειας σε κτηνοτροφικές μονάδες του νησιού.

- Έργα "πράσινων" μεταφορών ( ηλεκτρικών οχημάτων και οχημάτων υδρογόνου), καθώς και αντίστοιχων σταθμών ανεφοδιασμού.

- Λοιπές πράσινες παρεμβάσεις, όπως υδροπονικά θερμοκήπια, βιολογική γεωργία, αλιεία και κτηνοτροφία.

Κύριος του έργου θα είναι η κοινότητα Αγ. Ευστρατίου και τα αποτελέσματά του θα χρησιμοποιηθούν για την εφαρμογή τεχνολογιών φιλικών προς το περιβάλλον σε ελληνικά νησιά αντίστοιχου ή μεγαλύτερου μεγέθους.

Η προκήρυξη του σχετικού διαγωνισμού υλοποίησης των έργων αναμένεται εντός του 2010, ενώ στις αρχές του 2011 αναμένεται η εγκατάσταση της ηλεκτροπαραγωγής και των υπόλοιπων παρεμβάσεων.

http://www.tanea.gr/default.asp?pid=41&nid=1231054994

christos-greece
August 13th, 2010, 06:33 PM
Yπάρχει κανένας ανανεωμένος χάρτης των αιολικών πάρκων στην Ελλάδα; Πρίν απο μερικές μέρες πήγα στην Εύβοια και συγκεκριμένα στο Μαρμάρι. Εκεί, απο τη θάλασσα φαίνονται 4 αιολικά πάρκα και μου έκανε μεγάλη εντύπωση. Εχω δει επίσης 2 σχετικά καινούργια στη Βοιωτία.
Για το Μαρμάρι είναι γεγονός, γύρω από την πόλη στο βουνό έχουν εγκαταστήσει εδω και χρόνια αιιολικό πάρκο

ellis896
August 14th, 2010, 12:31 AM
Ακουσα στο ραδιο, στην τηλεοραση, δεν θυμαμαι που, ξαναδινονται αδειες σε αγροτες μονο (νομιζω) να εγκαταστησουν φωτοβολταϊκα. Κι αυτο κατι ειναι.

EngineerGreece
August 14th, 2010, 02:47 AM
^^

Αυτό γίνεται στην Γερμανία εδώ και χρόνια.

ELDOK
August 27th, 2010, 04:09 PM
Μέγα φωτοβολταϊκό στην Κοζάνη

http://images.tanea.gr/assetservice/Image.ashx?c=15632346&r=0&p=0&t=0&q=100&v=1&s=1&w=800&h=

Το μεγαλύτερο φωτοβολταϊκό πάρκο στον κόσμο, αξίας άνω των 600 εκατ. ευρώ, φιλοδοξεί να κατασκευάσει η ΔΕΗ στην Κοζάνη και γι΄ αυτόν τον λόγο βρίσκεται σε προχωρημένες συζητήσεις με αμερικανική εταιρεία που ειδικεύεται στο αντικείμενο.
Το μέγα project επιχειρείται να φιλοξενηθεί σε έκταση που μπορεί να ξεκινάει από τα 5.000 αλλά να φτάσει μέχρι και τα 8.000 στρέμματα, αναλόγως του πόσα από τα πολλές χιλιάδες ανεκμετάλλευτα στρέμματα των πρώην λιγνιτωρυχείων της Κοζάνης θα διαθέσει η ΔΕΗ. Το κοινοπρακτικό σχήμα που θα προκύψει θα ελέγχεται σύμφωνα με τις πληροφορίες κατά 51% από τη ΔΕΗ και κατά 49% από τον ξένο εταίρο (οι πληροφορίες μιλούν για την αμερικανική ΑΕS που δραστηριοποιείται σε πάνω από 30 χώρες παρέχοντας εξειδικευμένες υπηρεσίες) ενώ καταβάλλεται προσπάθεια η συμφωνία να έχει κλείσει πριν από τη ΔΕΘ, ώστε να ανακοινωθεί από τον Πρωθυπουργό ως ένα μεγάλο έργο πράσινης ανάπτυξης σε μια άκρως επιβαρημένη περιβαλλοντικά περιοχή.

Αναλόγως της έκτασης στην οποία θα κατασκευαστεί, η ισχύς του πάρκου μπορεί να ξεκινήσει από τα 200 αλλά να φτάσει και τα 300 ΜW, ενώ για να αντιληφθεί κανείς τι σημαίνει αυτό σε τάξη μεγέθους, το μεγαλύτερο σήμερα φωτοβολταϊκό στον κόσμο έχει ισχύ 60 ΜW και βρίσκεται στην περιοχή La Μancha της Καστίλλης στην Ισπανία. Οσο γι΄ αυτό που δρομολογεί στη Μεγαλόπολη η ΔΕΗ, ισχύος 50 ΜW, όταν θα ολοκληρωθεί θα είναι το 5ο σε μέγεθος παγκοσμίως. Σε κάθε περίπτωση πρόκειται για επένδυση, ο προϋπολογισμός της οποίας, αναλόγως της διαθέσιμης έκτασης θα ξεκινάει από τα 600 αλλά μπορεί να φτάσει και τα 800 εκατ. ευρώ ή και ακόμη υψηλότερα.

Σύμφωνα με επιβεβαιωμένες πληροφορίες, οι συζητήσεις που άρχισαν μεταξύ της υπερατλαντικής εταιρείας και της ΔΕΗ πριν από τέσσερις μήνες, καταλήγουν εντός των επόμενων εβδομάδων. Ενα από τα βασικά σημεία τριβής των διαπραγματεύσεων όλο αυτό το διάστημα ήταν το ποσοστό συμμετοχής των δύο εταιρειών στο κοινοπρακτικό σχήμα που θα συσταθεί για την υλοποίηση του έργου. Αρχικά οι αμερικανοί επενδυτές διεκδικούσαν συμμετοχή σε ποσοστό 51% αλλά φέρονται να πείστηκαν τελικώς ότι είναι αδύνατον να προχωρήσει το έργο στη συγκεκριμένη περιοχή και πολύ περισσότερο σε εκτάσεις του Δημοσίου που έχουν παραχωρηθεί προς εκμετάλλευση στη ΔΕΗ από ένα επενδυτικό σχήμα στο οποίο η τελευταία δεν θα έχει την πλειοψηφία. Υστερα από αυτό, η συμφωνία φαίνεται ότι βαίνει προς το τελικό στάδιο καθώς απομένει να ρυθμιστούν ακόμη κάποιες επί μέρους λεπτομέρειες. Οπως πάντως εξηγούν καλά πληροφορημένοι κύκλοι, όταν πρόκειται για εκτάσεις σαν αυτές που έχουν παραχωρηθεί εδώ και τόσα χρόνια στη ΔΕΗ, και κάτω από συγκεκριμένες προϋποθέσεις, μπορεί να γίνουν αντίστοιχες συμφωνίες, χωρίς να χρειάζεται να καταφύγει η επιχείρηση σε διαγωνισμό. Ακόμη και 8.000 στρέμματα
Τις τελευταίες ημέρες, σε συσκέψεις που έγιναν στη ΔΕΗ έγινε σαφές ότι τα αποκατεστημένα ορυχεία του λιγνιτικού κέντρου Δυτικής Μακεδονίας προσφέρουν τεράστιες δυνατότητες για πράσινη ανάπτυξη. Ηδη, και ενώ οι αρχικές σκέψεις για το έργο αφορούσαν έκταση 5.000 στρεμμάτων όπου θα εγκαθίσταντο 200 ΜW, κατέστη γνωστό ότι μπορεί να διατεθούν ακόμη και 8.000 στρέμματα ή και περισσότερα, ικανά να φιλοξενήσουν 300 ΜW.

Το θέμα της ανάπτυξης φωτοβολταϊκών πάρκων μεγάλης κλίμακας στο λιγνιτικό λεκανοπέδιο Κοζάνης- Πτολεμαΐδας είχε συζητηθεί ξανά μεταξύ της υπουργού ΠΕΚΑ Τίνας Μπιρμπίλη και του προέδρου της ΔΕΗ Αρθούρου Ζερβού κατά την επίσκεψη της πρώτης τον Ιούνιο στη Δυτική Μακεδονία, όταν και είχε θέσει εκτός λειτουργίας τη μονάδα «Πτολεμαΐδα Ι». Οπως είχε αναφέρει τότε η υπουργός, στόχος της ηγεσίας του ΥΠΕΚΑ και της ΔΕΗ είναι η αξιοποίηση των αχανών εκτάσεων των 160.000 στρεμμάτων του λιγνιτικού κέντρου Κεντρικής Μακεδονίας, για την ανάπτυξη φωτοβολταϊκών πάρκων ισχύος ακόμη μεγαλύτερης από εκείνα των 50 ΜW της Μεγαλόπολης. Το σκεπτικό είναι αντίστοιχο με εκείνο σχετικά με την αξιοποίηση των εξαντλημένων ορυχείων της επιχείρησης στη Μεγαλόπολη: Η σταδιακή μετάβαση της περιοχής στη μεταλιγνιτική περιοχή με έργα μηδενικών εκπομπών ρύπων, αλλά και η δημιουργία θέσεων απασχόλησης μέσω αναπτυξιακών έργων στις πληγείσες από τη ρύπανση Κοζάνη και Πτολεμαΐδα.

http://www.tanea.gr/default.asp?pid=2&ct=3&artid=4591157

EngineerGreece
August 28th, 2010, 01:00 AM
^^

εεε;;

Μακάρι.... :)

EngineerGreece
November 1st, 2010, 12:44 AM
Με επένδυση 2,5 δις ευρώ...
Σε "πράσινο νησί" μετατρέπεται η Κρήτη!
http://www.protothema.gr/environment/article/?aid=88234

Το δρόμο για τη μετατροπή της Κρήτης στο πρώτο «πράσινο νησί της Μεσογείου» κατά το πρότυπο του Σάμσο της Δανίας, άνοιξε η απόφαση της ΡΑΕ κατά την τελευταία της Ολομέλεια, με την οποία αδειοδοτείται ένα από τα μεγαλύτερα projects στο χώρο των Ανανεώσιμων Πηγών Ενέργειας.

Πρόκειται για τη δημιουργία ενός συμπλέγματος αιολικών πάρκων στο νησί, συνολικής ισχύος 1.000 MW και ταυτόχρονα την ηλεκτρική διασύνδεση της Κρήτης με την Πελοπόννησο μέσω υποβρυχίου καλωδίου. Το έργο συνολικού κόστους 2-2,5 δισ. ευρώ, έχει καταθέσει από το 2009 ο Όμιλος Κοπελούζου, ωστόσο τώρα, στο πλαίσιο της επιτάχυνσης που έχει «βάλει μπροστά» η διοίκηση της ΡΑΕ, παίρνει άδεια παραγωγής.

Πρέπει να αναφερθεί ότι η Κρήτη αδυνατεί να καλύψει σήμερα, με τις παλαιού τύπου μονάδες μαζούτ και ντίζελ, τις ενεργειακές της ανάγκες, με αποτέλεσμα να σημειώνονται συνεχείς διακοπές ηλεκτροδότησης, ειδικά τους καλοκαιρινούς, τουριστικούς μήνες.

Από την άλλη, το γεωγραφικό ανάγλυφο και η ηλιοφάνεια της Κρήτης την καθιστούν ιδανικό τόπο για ανάπτυξη ανανεώσιμων πηγών ενέργειας. Οι πρώτες εφαρμογές με αιολικά πάρκα που εγκαταστάθηκαν στην περιοχή είχαν άριστα αποτελέσματα. Σήμερα βρίσκονται εγκατεστημένα στην Κρήτη ανεμογεννήτριες συνολικής ισχύος 150MW οι οποίες καλύπτουν το 15% της ζήτησης ηλεκτρικής ενέργειας στο νησί.

Κάποτε το σκεφτόμουν ότι η Κρήτη θα μπορούσε να είναι εξολοκλήρου "πράσινη" και τώρα βρήκα αυτό το άρθρο. Αναρωτιέμαι αν θα γίνει τελικά. Πάντως επιμένω ότι οι εξορύξεις των κοιτασμάτων πετρελαίου και αερίου που ανήκουν στην χώρα μας πρέπει να γίνουν ώστε να καλύψουμε τις ανάγκες μας με δικά μας πετρέλαια, και να το πουλάμε κιόλας.

Almopos
November 6th, 2010, 02:17 AM
Φωτοβολταϊκά Πάρκα Βορείου Ελλάδος: Επένδυση 80 εκατ. ευρώ στην Ημαθία

Μία από τις μεγαλύτερες επενδύσεις σε ανανεώσιμες πηγές ενέργειας στη Βόρεια Ελλάδα, εισέρχεται σταδιακά στο «δρόμο» της υλοποίησης, καθώς στο νομό Ημαθίας αναμένεται να δημιουργηθεί φωτοβολταϊκό πάρκο 22 MW και κόστους 80 εκατ. ευρώ

"Η" 5/11

Μία από τις μεγαλύτερες επενδύσεις σε ανανεώσιμες πηγές ενέργειας στη Βόρεια Ελλάδα, εισέρχεται σταδιακά στο «δρόμο» της υλοποίησης, καθώς στο νομό Ημαθίας αναμένεται να δημιουργηθεί φωτοβολταϊκό πάρκο 22 MW και κόστους 80 εκατ. ευρώ.

Φορέας υλοποίησης της επένδυσης, που έχει λάβει τη σχετική έγκριση από τη Ρυθμιστική Αρχή Ενέργειας, είναι η εταιρεία, «Φωτοβολταϊκά Πάρκα Βορείου Ελλάδος Α.Ε.», η οποία ανήκει στον όμιλο της SunPower Corpora-tion. Η τελευταία είναι εισηγμένη στο Nasdaq και διακρίνεται για την παραγωγή ιδιαίτερα αποδοτικών φωτοβολταϊκών συστημάτων, ενώ στην περιοχή της Μεσογείου, εκτός από την Ελλάδα, έχει αναπτύξει δραστηριότητα σε Ιταλία, Ισπανία, Γαλλία και Ισραήλ.

Πριν από λίγες ημέρες υπογράφτηκαν μεταξύ της δημοτικής αρχής Ανθεμίων και εκπροσώπων της εταιρείας, που πραγματοποιεί την επένδυση, τα μισθωτήρια συμβόλαια για δημοτική έκταση 1.050 στρεμμάτων, στην οποία θα αναπτυχθεί το πάρκο.

Εμπόδια

Η επένδυση, όπως σημειώθηκε στη σχετική εκδήλωση, έχει τριετή «προϋπηρεσία», καθώς τόσος χρόνος απαιτήθηκε, προκειμένου να ξεπεραστούν σημαντικά γραφειοκρατικά εμπόδια, ιδιαίτερα στο κομμάτι των αδειοδοτήσεων.
Ο δήμος εκτιμάται ότι θα έχει άμεσα έσοδα 700 χιλ. ευρώ κάθε χρονιά από το ενοίκιο των 151 ευρώ ανά στρέμμα και το έσοδο ίσο με το 3% επί των προ φόρων πωλήσεων της εταιρείας.

Παράλληλα θα τοποθετηθούν φωτοβολταϊκά στοιχεία σε 10 σχολεία της περιοχής, σε ένα αθλητικό κέντρο και σε 6 δημοτικά κτήρια, δίνοντας τη δυνατότητα για μείωση των δαπανών λειτουργίας των παραπάνω υποδομών.
Η διαδικασία αδειοδότησης προβλέπεται ότι θα έχει ολοκληρωθεί πλήρως το πρώτο τρίμηνο του 2011 και αμέσως μετά θα ξεκινήσει η κατασκευή του έργου, η οποία αναμένεται να διαρκέσει περίπου ένα χρόνο. Στην κατασκευή θα απασχοληθούν περίπου 300-500 άτομα, ενώ για τη λειτουργία του έργου θα υφίστανται 15-20 εργαζόμενοι σε μόνιμη βάση.

Τέλος, προβλέπεται ότι θα αξιοποιηθούν ελληνικές εταιρείες και για το μεγαλύτερο κομμάτι του κατασκευαστικού έργου της επένδυσης.
ΔΗΜΗΤΡΗΣ ΔΙΑΜΑΝΤΙΔΗΣ

Almopos
December 9th, 2010, 06:21 PM
Φ/β Μεγαλόπολης: Εσωτερική... υπόθεση ο διεθνής διαγωνισμός

Του Χάρη Φλουδόπουλου

Οι επικεφαλής της ΔΕΗ και της ΔΕΗ Ανανεώσιμες είχαν βάλει ψηλά τον πήχη μιλώντας για το μεγαλύτερο φωτοβολταϊκό έργο στην Ευρώπη και ανέμεναν την κατάθεση πάνω από 20 ανταγωνιστικών προσφορών. Τελικά οι προσδοκίες τους δεν επαληθεύθηκαν καθώς στο διαγωνισμό για το φωτοβολταϊκό της Μεγαλόπολης δεν εμφανίστηκε κάποια διεθνής εταιρεία. Έτσι οι τέσσερις ανταγωνιστικές προσφορές που θα «κονταροχτυπηθούν» με έπαθλο την ανάθεση κατασκευής του μεγάλου φωτοβολταϊκού ισχύος 50MW προέρχονται από μεγάλους εγχώριους κατασκευαστικούς ομίλους.

Ειδικότερα οι προσφορές που κατατέθηκαν είναι από τις Τέρνα, JP ΑΒΑΞ Martifer, Ελλάκτωρ Βιοσάρ και Ιντρακάτ MCC, με όλες τις εταιρείες να συνεργάζονται με τη Yingli πλην της Ελλάκτωρ που χρησιμοποιεί τεχνολογία Suntech.

Πηγές της αγοράς εκτιμούν ότι αναμένεται να δοθεί «μάχη» καθώς όλες οι προσφορές φέρονται να είναι ανταγωνιστικές, ενώ η απουσία ξένων αποδίδεται σε τρεις κυρίως λόγους:

Κατ΄αρχάς, το έργο όταν ανακοινώθηκε το 2007 ήταν πρωτοποριακό και μεταξύ των 3 μεγαλύτερων στον κόσμο, ενώ με τι`