zees
August 6th, 2005, 06:57 AM
For more info on the Project visit
http://www.billysgreenwood.com/
http://www.billysgreenwood.com/
|
View Full Version : Billy's Green Wood, Karachi zees August 6th, 2005, 06:57 AM For more info on the Project visit http://www.billysgreenwood.com/ zees August 6th, 2005, 07:06 AM http://www.billysgreenwood.com/images/site_map_28.jpg http://www.billysgreenwood.com/images/site_map_40.jpg http://www.billysgreenwood.com/images/site_map_51.jpg Concept A calm and serene residential area surrounded by lush green meadows, sparkling water bodies and shady trees; equipped with every luxury and convenience. This project is the vision of Mr. Hafeez Butt who conceived this idea on his return from a London trip, where he had a chance to visit a similar township. Back home in Pakistan, he set on to replicate the charm and beauty of that complex in a place that was far from the hustle and bustle of the city, yet close enough to be within short commuting distance to city and back. Finding the right architect to bring this idea into shape was the next step. After rejecting several options, Mr. Butt found the people who could match his vision. And so the project entered into the planning stage. A lot of thinking went into deciding the location of this natural paradise. Various options such as Steel Town and the suburbs were considered but disregarded as they were too far from the city for a convenient living. Eventually, Mr. Butt came up with the idea of developing Green Wood near the Northern Bypass and Lyari Express. A mere 20 minute drive from the city centre and much before the planned DHA Phase IX, this area was agreed upon as the ideal location for this green heaven. And so came into being the Billy’s Green Wood Residency. So come with us as we take you to the place where Nature Lives in Luxury. http://www.billysgreenwood.com/images/duplex_24.jpg http://www.billysgreenwood.com/images/condominium_24.jpg http://www.billysgreenwood.com/images/cottage_24.jpg http://www.billysgreenwood.com/images/about_green_wood_24.jpg Facilities Green Wood Residency is completely self-sufficient with all facilities for day-to-day living. It has its own shopping complex, mosque, dispe-nsary and ambulance service as well as living quarters for staff and a dedicated power generation system. The communityhigh school is staffed by experienced teachers and provides schooling to all resident children. So while you savour the pleasures of countryside living, we take care of all your daily needs and comforts. Billy’s Green Wood Residency Shopping Complex ensures that you find everything close to your residence, may it be grocery, electronic goods or designer brands it has it all. As a resident you have complete access to the Green Wood deluxe swimming pool, which includes a Jacuzzi and a children’s pool. You can also enjoy the facilities of the estate clubhouse and sports complex that has tennis, badminton and volleyball courts. http://www.billysgreenwood.com/images/08%20B.jpg http://www.billysgreenwood.com/images/Facilities%20Image%2003.jpg http://www.billysgreenwood.com/images/05%20C.jpg http://www.billysgreenwood.com/images/Facilities%20Image%2005.jpg Rkhan August 6th, 2005, 08:54 AM Very Nice! Looks awesome. huit August 6th, 2005, 11:48 AM Looks really cool... londonindyboy August 6th, 2005, 02:01 PM i dont like the exterior Khanabadosh August 6th, 2005, 02:13 PM Nice. UnitedPakistan August 6th, 2005, 02:48 PM Better name? zees August 6th, 2005, 04:31 PM This will be build near Super Highway, dwell in the lap of nature pakboy August 6th, 2005, 06:17 PM yes i have been seeing the adverton geo, it looks awsome. oogabooga August 6th, 2005, 07:33 PM Ah yes right beside super highway! Such a picturesque setting! :sleepy: The renderings look as if they snatched em' out of The Sims or something :tongue3: but still its a leap forward for Pakistani standards! And what the hell is that race course doing around the apartments? :crazy: pakboy August 6th, 2005, 08:18 PM And what the hell is that race course doing around the apartments? :crazy: well i like it, plus they dont have lots of land, and if you notice, most people go jogging on the footpaths, so its a good idea to putt a jogging track there. HasanB August 6th, 2005, 08:57 PM Ah yes right beside super highway! Such a picturesque setting! :sleepy: The renderings look as if they snatched em' out of The Sims or something :tongue3: but still its a leap forward for Pakistani standards! And what the hell is that race course doing around the apartments? :crazy: lol i totally agree about the renderings ! I think its a good project though, it looks like when its built it may well be a nice and calm place. UnitedPakistan August 7th, 2005, 04:03 AM Yeah those idiots put that advert on Geo every 2 minutes. I feel like puking pakboy August 7th, 2005, 07:20 AM damm, every time i put on geo, there showing this. UnitedPakistan August 7th, 2005, 08:16 AM Thanks god for DVR otherwise i would go and burn the whole complex down. Intoxication August 9th, 2005, 04:06 AM Looks nice! PakistaniSoul August 9th, 2005, 04:44 AM Now days everytime i put On geo They put on the advert for The ugly lookin Project Northern Hieghts in every break it comes up pakboy August 9th, 2005, 05:16 AM wat is northen heights, NewYork-wala August 10th, 2005, 02:22 AM Who is Bill? pakboy August 10th, 2005, 03:20 AM ^^^^^^^^^ richest man in the world and chairman of microsoft :) rabail March 19th, 2008, 05:30 AM Hi! I'm a new member to this forum and I absolutely love it. I feel so happy that I can "see" updates of Pakistan without actually being there so thank you all for that. Now for Billy's, just curious to know what is the development with this project. Any updates? Intoxication March 19th, 2008, 05:58 AM Ah yes right beside super highway! Such a picturesque setting! :sleepy: The renderings look as if they snatched em' out of The Sims or something :tongue3: but still its a leap forward for Pakistani standards! And what the hell is that race course doing around the apartments? :crazy: Hey! I like The Sims. Pakia March 19th, 2008, 11:29 AM Hi! I'm a new member to this forum and I absolutely love it. I feel so happy that I can "see" updates of Pakistan without actually being there so thank you all for that. Now for Billy's, just curious to know what is the development with this project. Any updates? Welcome Rabail! progress updates on this project? well...don't know if there are any Sufi Pistol March 21st, 2008, 03:47 PM HYDERABAD, March 18: District Nazim Kanwar Naveed Jamil here on Monday night laid the foundation stone of Ghangra Mori bypass which would be completed in six months as per schedule at a cost of Rs900 million. Speaking on the occasion he said that work on eight flyovers, one underpass, and five bridges was in progress at a hectic pace. He said all these projects will be completed within a year. Nazim city taluka, Javed Jabbar; naib taluka nazim Latif, Shujauddin Shaikh, Hyderabad Development Package Project Director Syed Sarfaraz Ali Shah, officers of the district government and a large number of people of the area attended the inaugural ceremony. Mr Kanwar Naveed said that the district government was striving hard to convert the historical city of Hyderabad into an ultra modern city by providing modern facilities to its citizens. He pointed out that in view of the ever increasing traffic problems there was a dire need of constructing alternative routes to save people from inconvenience. http://www.dawn.com/2008/03/19/local25.htm Read the thread title and again look at your post :doh: etranger March 22nd, 2008, 07:28 AM the pictures of this thing look like they've been lifted from that game 'the sims' Intoxication March 22nd, 2008, 12:51 PM the pictures of this thing look like they've been lifted from that game 'the sims' Like I said before: Hey! I like The Sims. iLuVkArAcHi October 8th, 2008, 08:17 AM CONDOMINIUM - TOWER I http://www.billysgreenwood.com/images/Tower%201%20a.JPG http://www.billysgreenwood.com/images/Tower%201%20b.JPG http://www.billysgreenwood.com/images/Tower%201%20c.JPG http://www.billysgreenwood.com/images/Tower%201%20d.JPG http://www.billysgreenwood.com/images/Tower%201%20e.JPG http://www.billysgreenwood.com/images/Tower%201%20f.JPG http://www.billysgreenwood.com/images/Tower%201%20g.JPG http://www.billysgreenwood.com/images/tower%201%20h.JPG CONDOMINIUM - TOWER III http://www.billysgreenwood.com/images/Tower%203%20a.JPG http://www.billysgreenwood.com/images/Tower%203%20b.JPG http://www.billysgreenwood.com/images/Tower%203%20c.JPG CONDOMINIUM - TOWER IV http://www.billysgreenwood.com/images/Tower%204%20a.JPG http://www.billysgreenwood.com/images/Tower%204%20b.JPG http://www.billysgreenwood.com/images/Tower%204%20c.JPG http://www.billysgreenwood.com/images/Tower%204%20d.JPG DUPLEXES http://www.billysgreenwood.com/images/Duplex%20A.JPG http://www.billysgreenwood.com/images/Duplex%20B.JPG http://www.billysgreenwood.com/images/Duplex%20C.JPG http://www.billysgreenwood.com/images/Duplex%20D.JPG COTTAGES http://www.billysgreenwood.com/images/Cottages%20A.JPG http://www.billysgreenwood.com/images/Cottages%20B.JPG http://www.billysgreenwood.com/images/Cottages%20C.JPG http://www.billysgreenwood.com/images/Cottages%20D.JPG http://www.billysgreenwood.com/images/Cottages%20E.JPG http://www.billysgreenwood.com/images/Cottages%20F.JPG BOUNDRY WALL http://www.billysgreenwood.com/images/Boundry%20Wall.JPG http://www.billysgreenwood.com/images/Boundry%20Wall%202.JPG The images are bit older the current progress is much more than this and the good thing i lkie about this project is they are also doing landscaping with the construction and you can see lot of greenery on the construction site iLuVkArAcHi October 8th, 2008, 08:19 AM 1. The construction of Billy's Greenwood Residency is speedily in progress. 2. The project consists on the following Building Categories: (i) Condominium: 2 floor parking + 14 storeyed residential – FOUR Towers Each having two parts. (ii) Cottages: 14 Buildings Consisting G + 3, Pent Houses (iii) Duplexes: 7 Buildings Consisting G + 1 / II + III , Pent Houses (iv) Shopping Complex (v) Building for High School (vi) Masjid (vii) Swimming pools and Gymnasium (viii) Indoor Games - Construction of the Project started w.e.f July 2006 i.e. after approval of revised Designed Drawings due to Earth Quake DT: 8-10-05. - As overall about 20% works have been completed and construction work in under progress as per schedule of construction as under:- GENERAL Excavation work and 1:4:8 concreting has been completed at the entire Project for isolated and Raft Foundations. CONDOMINIUMS: TOWER - I: (i) Raft Foundations completed. (ii) Concreting slab / Beams completed upto 6th slab on both parts i.e. upto level + 55’ – 0. (iii) Block Masonry followed after slab / beam cartrings and completed upto level + 35’ – 0. Elevational Structure completed upto level + 35’ – 0. TOWER - II: 1. Excavation and 1:4:8 has already been completed. 2. Under Ground Water Tanks Construction for Tower I / II and II / III are speedily in progress. After 100% completion of U.G.W.T both the sides of Tower II the work of Raft Foundation shall be started. TOWER - III: 1. After completion of excavation, 1:4:8 concreting, Raft Foundation and Retaining walls the Structure Work is speedily in progress. 2. Both the Car parking Floors Slab / Beam have been Casted i.e. upto level + 15’ – 0 the Slab/ Beam concreting has been completed. Other works are in Progress. TOWER - IV: Excavation and 1:4:8 concreting has been completed. Raft Foundation concreting is in progress and 60% Works have been completed, while works of STEEL FIXING for remaining RAFT AREA is in progress. COTTAGES: # 01: (i) After completion of Excavation, 1:4:8 and Foundation concreting, Structure work upto 4th Slab / Beam has been completed U.G.WT. Also completed. (ii) Block Masonry work upto 3rd Floor / 4th Slab has been completed. (iii) Other works are under Progress. # 02: (i) After completion of Excavation, 1:4:8 and Foundation concreting, Structure work upto 4th Slab / Beam has been completed U.G.WT. Also completed. (ii) Block Masonry work upto 2nd Floor Both Slab has been completed. # 03: (i) After completion of Excavation, 1:4:8 and Foundation concreting, Structure work upto 2nd Slab / Beam has been completed U.G.WT. Also completed. (ii) Block Masonry work upto 2nd Floor has been completed. # 04: (i) After completion of Excavation, 1:4:8 and Foundation concreting, Structure work upto 2nd Slab / Beam has been completed U.G.WT. Also completed. (ii) Block Masonry work upto 1st Floor completed. # 05: (i) After completion of Excavation, 1:4:8 and Foundation concreting, Structure work upto 2nd Slab / Beam has been completed U.G.WT. Also completed. (ii) Block Masonry work upto 1st Floor completed. # 06: (i) After completion of Excavation, 1:4:8 and Foundation concreting, Structure work upto 2nd Slab / Beam has been completed U.G.WT. Also completed. (ii) Block Masonry work upto 1st Floor completed. # 7,8,9,10,11: (i) After completion of Excavation, 1:4:8 and Foundation concreting, SITU – Carting under Plinth Beam is in Progress. (ii) U.G.W.T have been carted and testing under Progress. # 12, 13, 14: (i) After completion of Excavation, 1:4:8 concreting has been completed. (ii) Concreting of Foundation is under Progress. (iii) Pedestal / Stem Columns Concreting also is in Progress. DUPLEXES: # 01: (i) After completion of Excavation, 1:4:8 and Foundation concreting, Structure work upto 3rd Slab / Beam has been completed U.G.WT. Also completed. (ii) Block Masonry work upto 2nd Floor has been completed. # 02: (i) After completion of Excavation, 1:4:8 and Foundation concreting, Structure work upto 2nd Slab / Beam has been completed U.G.WT. Also completed. (ii) Block Masonry work upto 1st Floor / 4th Slab has been completed. # 3,4: (i) After completion of Excavation, 1:4:8 and Foundation concreting, Structure of Plinth Beam has been carted and 1:4:8, Flooring at Plinth Level also Completed. (ii) Block Masonry at G – Floor is in Progress. # 05: (i) After completion of Excavation, 1:4:8 and Foundation concreting, Structure of Plinth Beam has been carted and 1:4:8, Flooring at Plinth Level also Completed. (ii) Block Masonry at G – Floor is in Progress. # 06: After completion of Excavation, 1:4:8 and Foundation concreting, The SITU – Casting for under Plinth Beam is in Progress. U.G.W.T. Also Completed. # 07: Excavation and 1:4:8 concreting has been completed. Foundations concreting is in Progress. QUALITY CONTROL: 1. The works under progress are being carried out under highly Experienced and qualified team of supervision staff. Specifications are also being strictly followed. The quality of material is also being cheeked before its use. 2. Practice of preparation of cubes at site from randomly selected batched of concrete for laborty testing 7 days/ 28 days is being followed. The cubes are being tested from reputed laboratories as well as from the N.E.D.University of Engineering and Technology. Karachi. 3. The Sample of construction Material like, Steel, Cement, Aggregate are also being got tested from the renowned laboratories. PROJECT CONSTRUCTION ACTIVITIES SCHEDULED FOR THE MONTH OF APRIL 2008: TOWER - 1: 1. SLAB/Beam casting at Part -1 and Part-11 Level +65’-0 2. Column Stairs Step 1, Lift #01 to be casted for level+75’-0 at part-1. TOWER - 2: 1. Completions of U.G.W.T. 100% for Tower-1/11 and 11/111. 2. Layout for Columns / lifts and Retaining Walls. TOWER - 3: 1. Columns casting for Part -1 and Part-11for level +25’-0. 2. Casting Slab /beam at part -1 Level+25’-0. TOWER - 4: Completions of Balance Concreting of Raft Foundation. COTTAGES: # 01: 1. Casting Top Slab/ Beam for Pent House and Elevation Completion. 2. Completion of Block Masonary up to pent House. # 02: 1. Casting Column for Top Floor. 2. Completion of Block Masonary for Pent House. # 03: 1. Casting Slab/ Beam No. 4th. 2. Completion of Block Masonary up to 4th Slab. # 04: 1. Casting Columns for 4th Slab/ Beam. 2. Completion of Block Masonary up to 4th Slab. # 05: 1. Casting 111 Slab/ Beam. 2. Completion of Block Masonary up to 3rd Slab. # 06: 1. Casting G.F Columns. 2. Completion of Block Masonary at Ground Floor. # 7, 8, 9, 10, 11: Completion of SITU casting for Plinth Beam. # 12, 13, 14: 1. Completion of Foundation Casting. 2. Completion of Pedestal / Stem Columns Casting. 3. Preparation for SITU Casting and 1:4:8 Concreting. DUPLEXES: # 01: 1. Casting Column for 4th Slab/Beam. 2. Completion of Block Masonary up to 4th Slab. # 02: 1. Casting 3rd Slab / Beam. 2. Casting Column for 4th Slab/Beam 3. Completion of Block Masonary up to 4th Slab. # 03, 04: 1. Casting G.F Column. 2. Completion G.F Block Masonary. # 05, 06: Casting Plinth Beam and 1:4:8 Flooring. # 07: 1. Completion of Foundation Concreting. 2. Completion of Pedestal / Stem Columns. AAAJ October 8th, 2008, 09:24 AM nice project :) Aadil.Aijaz October 8th, 2008, 02:02 PM what is the completion date??? brightside. October 8th, 2008, 02:20 PM American style condos! :happy: _BPS_ October 8th, 2008, 11:26 PM ^^^^^^^^^ richest man in the world and chairman of microsoft :) richest man in the world is actually from the rothschild family - the bankers that own & print US dollars as well as the Pound Pakia October 9th, 2008, 01:12 AM It may be sorta ugly but atleast it'd be completed. There is nothing uglier than incomplete building projects! pakboy October 9th, 2008, 02:59 AM richest man in the world is actually from the rothschild family - the bankers that own & print US dollars as well as the Pound they are a family, not a person iLuVkArAcHi May 20th, 2009, 08:47 AM Duplex http://www.billysgreenwood.com/images/Image%20Gallery%2006.jpg Duplex http://www.billysgreenwood.com/images/Image%20Gallery%2001.jpg Cottages http://www.billysgreenwood.com/images/Image%20Gallery%2013.jpg Cottage Block http://www.billysgreenwood.com/images/Image%20Gallery%2014.jpg Cottage & Duplexes http://www.billysgreenwood.com/images/Image%20Gallery%2007.jpg iLuVkArAcHi May 20th, 2009, 08:49 AM Condominium http://www.billysgreenwood.com/images/Image%20Gallery%2012.jpg Amenities http://www.billysgreenwood.com/images/Image%20Gallery%2009.jpg Amenities Area http://www.billysgreenwood.com/images/Image%20Gallery%2010.jpg Main Entrance http://www.billysgreenwood.com/images/Image%20Gallery%2004.jpg Rock Work http://www.billysgreenwood.com/images/Image%20Gallery%2005.jpg Lake http://www.billysgreenwood.com/images/Image%20Gallery%2002.jpg Landscaping http://www.billysgreenwood.com/images/Image%20Gallery%2003.jpg Walking Path http://www.billysgreenwood.com/images/Image%20Gallery%2008.jpg Boundrywall http://www.billysgreenwood.com/images/Image%20Gallery%2011.jpg Aadil.Aijaz May 20th, 2009, 08:50 AM ^^ Not so good colour. :ohno: iLuVkArAcHi May 20th, 2009, 08:55 AM http://www.billysgreenwood.com/walkthroughhigh.htm abidi2009 May 20th, 2009, 12:35 PM WoW.....Nice pics! Faddie May 20th, 2009, 01:22 PM Good to see that this project is Alive !!!!! I forget iLuVkArAcHi February 1st, 2010, 01:08 PM Highway Gate http://www.billysgreenwood.com/images/Highway%20Gate02.JPG http://www.billysgreenwood.com/images/DSC_0007.JPG Tower I http://www.billysgreenwood.com/images/DSC_0019.JPG Duplex View http://www.billysgreenwood.com/images/DSC_0023.JPG http://www.billysgreenwood.com/images/DSC_0027.JPG Lake http://www.billysgreenwood.com/images/DSC_0035.JPG http://www.billysgreenwood.com/images/DSC_0044.JPG Duplex-Lake View http://www.billysgreenwood.com/images/DSC_0036.JPG http://www.billysgreenwood.com/images/DSC_0041.JPG Duplex-Cottages http://www.billysgreenwood.com/images/DSC_0047.JPG Cottages http://www.billysgreenwood.com/images/DSC_0054.JPG Cottages & Garden http://www.billysgreenwood.com/images/DSC_0053.JPG http://www.billysgreenwood.com/images/DSC_0057.JPG http://www.billysgreenwood.com/images/DSC_0069.JPG Tower I-Duplex http://www.billysgreenwood.com/images/DSC_0070.JPG Swimming Pool View http://www.billysgreenwood.com/images/DSC_0124.JPG Cottage View Waterfall http://www.billysgreenwood.com/images/DSC_0131.JPG iLuVkArAcHi February 1st, 2010, 01:17 PM Children Play Area http://www.billysgreenwood.com/images/DSC_0072.JPG http://www.billysgreenwood.com/images/DSC_0083.JPG http://www.billysgreenwood.com/images/DSC_0084.JPG http://www.billysgreenwood.com/images/DSC_0081.JPG http://www.billysgreenwood.com/images/DSC_0087.JPG Tower-III - Cottages - Swimming Pool http://www.billysgreenwood.com/images/DSC_0085.JPG Tennis Court http://www.billysgreenwood.com/images/DSC_0100.JPG Basketball Court http://www.billysgreenwood.com/images/DSC_0106.JPG Mosque http://www.billysgreenwood.com/images/DSC_0107.JPG School http://www.billysgreenwood.com/images/DSC_0110.JPG Club House http://www.billysgreenwood.com/images/DSC_0111.JPG Mini Zoo http://www.billysgreenwood.com/images/DSC_0113.JPG Guard Room - Rockary http://www.billysgreenwood.com/images/DSC_0132.JPG shahmeer February 1st, 2010, 01:32 PM kwel pic the project looks good aswell pspguy123 February 2nd, 2010, 12:41 AM lol @ the tennis court. brightside. February 2nd, 2010, 08:10 AM Good progress since October. hero g March 5th, 2011, 04:26 AM video I7gTR0rny50 |