View Full Version : [Mostar] - Construction Update
MIMICA August 23rd, 2005, 01:55 AM MOSTAR
construction thread
http://upload.wikimedia.org/wikipedia/en/7/7c/Mostargrb.gif
Mostar is a city of 105,448 (2003) in Bosnia and Herzegovina, the center of the Herzegovina-Neretva Canton of the Federation.
The unofficial capital of Herzegovina, Mostar is situated on the Neretva river. Mostar has an international airport, located in the nearby village of Ortiješ.
Mostar was named after its Old Bridge (Stari Most) and the towers on its sides, "the bridge keepers" (mostars in Bosnian/Croatian).
History
Founded in the late 15th century, Mostar was the chief administrative city for the Ottoman Empire in the Herzegovina region. The Austro-Hungarian Empire absorbed Mostar in 1878 and then it became part of Yugoslavia in the aftermath of World War I.
After World War II, Mostar developed a production of tobacco, bauxite, wine and aluminium products. Several dams ("Grabovica", "Salakovac", "Mostar") were built in the region to harness the hydroelectric power of the Neretva.
Bosnian war
Between 1992 and 1993, after Bosnia and Herzegovina declared independence from Yugoslavia, the town was subject to a nine month siege.
Damaged buildings remain prominent throughout the old townThe Yugoslav People's Army (JNA) first bombed Mostar on April 3rd, 1992 and over the following week gradually established control over a large part of the town. On April 8th, the Herzegovina Croats founded the Croatian Defense Council (Hrvatsko Vijeće Obrane, HVO) as their military formation which engaged the JNA forces in combat. The JNA shelling damaged or destroyed a number of civilian objects. Among them were a Franciscan monastery, the Catholic cathedral and the bishop's palace, with a library of 50,000 books, as well as the Karadžoz-bey mosque, Roznamed-ij-Ibrahim-efendija mosque and twelve other mosques.
On June 12th, the HVO military force amassed enough weaponry and manpower to force the JNA troops out of Mostar, together with several smaller formations made up of Bosniaks. The 4th Corps of the Army of Bosnia and Herzegovina, the primary military formation of the Bosniaks, was founded the same year in Mostar. During the siege that ensued, the city was bombarded by the Bosnian Serbs from the mountains to the east.
In 1993, the Bosnian Croats and Bosniaks began a long struggle for control of Mostar. The Bosnian Croats launched an offensive on May 9th where they relentlessly bombarded the Bosniak quarter of the city, reducing much of it to ruin, including numerous other mosques and houses from the Ottoman era, including the Kujundžiluk.
The 16th century stone bridge Stari Most that had been built by Mimar Hayruddin, by order from emperor Suleiman the Magnificent, was destroyed on November 9th by Bosnian Croat mortar fire.
A cease-fire was signed on February 25th, 1994. The city remained divided between the two hostile parties. Some normalization ensued with a redistricting in 1995 and reestablishment of the ability to move between the two parts of the city in 1996.
Reconstruction
The Old Bridge in Mostar was destroyed in the Bosnian war; this picture shows its reconstruction in June 2003Since the end of the wider war in 1995, great progress is being made in the reconstruction of the city of Mostar. The city was under direct monitoring from a European Union envoy, several elections were held and each nation was accommodated with regard to political control over the city. Over 15 million dollars has been spent on restoration.
A monumental project to rebuild the Old Bridge to the original design, and restore surrounding structures was initiated in 1999 and mostly completed by Spring 2004. The money for this reconstruction was donated by the United States, Turkey, Italy, the Netherlands, and Croatia. A grand opening was held on July 23, 2004 under heavy security.
In July 2005, UNESCO finally inscribed the Old Bridge and its closest vicinity on the World Heritage List. Previously, the inscription had been repeatedly deferred on account of poor quality of post-war reconstructions and deplorable use of modern materials in the old town.
MIMICA August 23rd, 2005, 01:58 AM PROJECT
Source: http://www.skyscrapercity.com/showthread.php?p=5147919&posted=1#post5147919
MOSTAR
Villa Neretva
http://www.pid.co.ba/foto/bigimages/Picture%20006.jpg
http://www.pid.co.ba/foto/bigimages/Picture%20014.jpg
MIMICA August 23rd, 2005, 02:07 AM NEWS
Source: http://www.fena.ba/uk/vijest.html?fena_id=FMO95718&rubrika=ES
FIRST DIRECT FLIGHT FROM USA TO MOSTAR AIRPORT
MOSTAR, Aug 9 (FENA) - US Boeing 757 with 210 passengers landed at Mostar Airport today, by which the first direct flight from the USA to the airport was realized.
It is a charter flight from Alabama with pilgrims to Muđugorje , among whom Marija Pavlović, the visionary, was.
“This day was waited for a long time” declared for journalists the manager of Mostar Airport, Marin Raspudić, pointing out that today’s event is extremely important for Mostar Airport because without marketing investments possibility was opened for air -linking of Mostar and the entire region with the USA.
He also announced possibility for direct air-service from USA and vice-versa to be launched from the next year on weekly basis, what will depend on the level of equipment of Mostar Airport.
Additional financial funds for equipment and adequate infrastructure will be necessary for the direct line to be launched, Raspudić said.
Director of the Mostar City Statute Implementation Unit, Richard Williams, pointed out that this is a great step forward both for Mostar and development of tourism.
Marija Pavlović, the visionary, said that today’s event is a stimulus for pilgrims, as well as for local people to do their best to make Mostar Airport extremely important for the region.
(Fena) mc
MIMICA August 23rd, 2005, 02:09 AM NEWS
Source: http://see.oneworld.net/article/view/116027/1/3260
“Mostar – World Cultural Heritage” Round-table Held
http://see.oneworld.net/ezimagecatalogue/catalogue/variations/18599-200x200.jpg
The inclusion of the Old Bridge in Mostar and the Old City on UNESCO’s list of world cultural heritage is a huge achievement for Bosnia and Herzegovina and introduces a brighter future for B&H cultural heritage, concluded the round-table discussion “Mostar – Global Cultural Heritage: Perspectives for the Coming 10 Years”.
Zeljana Zovko, the B&H Ambassador to UNESCO said that Bosnia and Herzegovina has no other object on the UNESCO list, but that nominations of other B&H areas, such as Vjetrenica Cave and the Menhirs near Mostar, are expected in near future.
Amra Hadzimuhamedovic from the National Commission for Conservation of Cultural Monuments, mentioned several other likely candidates: Blidinje, the Bridge at Visegrad, the towns of Pocitelj and Blagaj, and added that the Commission intensified its activities on the set UNESCO criteria.
"We have to establish a national fund for permanent protection and conservation, adopt the appropriate legislation and unify the executive procedures", emphasized Hadzimuhamedovic.
Zovko and Ljubo Beslic, the Mayor of Mostar, agreed that Mostar’s entry onto the world cultural heritage list was, primarily, the project of the City of Mostar, which should bring prosperity to the city and the state. Beslic also mentioned the need to create a good economic environment and educate the citizens about the culture of living, in order to keep Mostar on the UNESCO list in the coming decade.
Ambassador Zovko thanked the media for their positive reporting on B&H, presenting the country in better light as capable of creating a better future for all. The media reporting was an important step towards the entry of Mostar on the cultural heritage list.
Mayor Beslic thanked all people and institutions that lobbied for Mostar and this project, the Presidency of B&H, Government ministries, the National Commission of Conservation of cultural monuments, political parties and citizens of Mostar.
MIMICA August 23rd, 2005, 02:32 AM http://www.skyscrapercity.com/showpost.php?p=5149324&postcount=2
I really like the Villa Neretva construction project. It looks very modern, yet classic next to the Old Town of Mostar. What do you people think? Feel free to post your opinions. :yes:
MIMICA August 23rd, 2005, 05:27 AM PROJECT
Source: http://img.photobucket.com/albums/v305/TimurTaljanovic/ProjekatuMostaru.jpg
MOSTAR
http://img.photobucket.com/albums/v305/TimurTaljanovic/ProjekatuMostaru.jpg
MIMICA August 23rd, 2005, 06:18 AM PICTURES
Source: http://img.photobucket.com/albums/v305/TimurTaljanovic/slikastarogmosta.jpg
MOSTAR
http://img.photobucket.com/albums/v305/TimurTaljanovic/slikastarogmosta.jpg
yugoboy August 23rd, 2005, 06:32 AM Great Job Mimica! :)
Here is just one more, of many projects going on in Mostar right now.
Rekonstrukcija hotela “Neretva” U Mostaru
Temeljna rekonstrukcija, hotela Neretva, koji je izgrađen 1892. godine u pseudo-maurskom stilu. Hotel je razoren ratnim razaranjima, a nalazi se na listi spomenika kulture BiH, te će se vanjski izgled objekta zadržati, dok će se sadržaji unutar hotela prilagoditi kategoriji hotela sa 5 zvjezdica.
http://www.prevodi-vertalingen.com/bridgesformostovi/mostar/nrtva1.jpg
(Picture of Hotel before Destruction)
MIMICA August 23rd, 2005, 07:26 AM Great Job Mimica! :)
Here is just one more, of many projects going on in Mostar right now.
Rekonstrukcija hotela “Neretva” U Mostaru
Temeljna rekonstrukcija, hotela Neretva, koji je izgrađen 1892. godine u pseudo-maurskom stilu. Hotel je razoren ratnim razaranjima, a nalazi se na listi spomenika kulture BiH, te će se vanjski izgled objekta zadržati, dok će se sadržaji unutar hotela prilagoditi kategoriji hotela sa 5 zvjezdica.
http://www.prevodi-vertalingen.com/bridgesformostovi/mostar/nrtva1.jpg
(Picture of Hotel before Destruction)
I think the project looks much better now than it did before the war. :yes: Hotel Neretva will be great for more tourism potential in Mostar. Just imagine the view! :)
LordMarshall August 23rd, 2005, 07:26 AM great info and great pics. keep them coming.. :)
MIMICA August 23rd, 2005, 07:27 AM PROJECT
Source: http://photobucket.com/albums/v305/TimurTaljanovic/?sc=1
MOSTAR
http://img.photobucket.com/albums/v305/TimurTaljanovic/ProjekatuMostaru2.jpg
http://img.photobucket.com/albums/v305/TimurTaljanovic/ProjekatuMostaru3.jpg
MIMICA August 23rd, 2005, 07:29 AM For those projects I don’t have the name to, I apologize. They are all different projects, unless I specify in the post. :)
MIMICA August 23rd, 2005, 08:12 AM PROJECT
Source: http://photobucket.com/albums/v305/TimurTaljanovic/?sc=1
MOSTAR
http://img.photobucket.com/albums/v305/TimurTaljanovic/ProjekatuMostaru4.jpg
MIMICA August 23rd, 2005, 08:15 AM PICTURES
Source: http://photobucket.com/albums/v305/TimurTaljanovic/?sc=1
MOSTAR
http://img.photobucket.com/albums/v305/TimurTaljanovic/slikeodmostara.jpg
MIMICA August 23rd, 2005, 08:23 AM PROJECT
Source: http://www.sunvalley.ba/o_projektu.html
MOSTAR
Sun Valley
http://www.sunvalley.ba/slike/en_project_3b.jpg
http://www.sunvalley.ba/galery/faza2/m/PIC00002.jpg
http://www.sunvalley.ba/galery/faza2/m/PIC00007.jpg
http://www.sunvalley.ba/galery/faza2/m/PIC00010.jpg
http://img.photobucket.com/albums/v305/TimurTaljanovic/sunvalley1.jpg
http://img.photobucket.com/albums/v305/TimurTaljanovic/sunvalley2.jpg
MIMICA August 23rd, 2005, 08:27 AM I drove by Sun Valley, so I didn’t get a great look at the project. It seemed to be coming close to completion. The project itself is really nice, implying the modern/classic look, and clean. Hopefully some pictures will be updated of it.
Are there any comments on the projects posted at the moment?
LordMarshall August 23rd, 2005, 08:32 AM http://www.hering.ba/reference.asp
Zgrada Gospodarske Komore FBiH u Mostaru
http://www.hering.ba/slike/katalog/komora.jpg
SJEMENARNA Š. BRIJEG, prodajni centar Mostar 2002
http://www.hering.ba/slike/katalog/ref_now_sjemenarna.JPG
JELIĆ AUTO Mostar, betonska konstrukcija 2002
http://www.hering.ba/slike/katalog/ref_end_jelic_auto.JPG
HERCEGOVINA VINO Mostar 2001
http://www.hering.ba/slike/katalog/ref_end_hercvino.JPG
MIMICA August 23rd, 2005, 08:45 AM Great updates LordMarshall! :yes:
http://www.hering.ba/slike/katalog/komora.jpg
This construction project seems to be interesting. The colors aren’t see very often.
LordMarshall August 23rd, 2005, 09:04 AM I hope to see more info on Hotel Neretva a speedy reconstruction, done properly would help Mostar and most importantly it would enhance that part of town. With the Villa Neretva right next door it looks great.
LordMarshall August 23rd, 2005, 09:06 AM I hope more projects like Sun Vally start up. it looks great :yes:
Medofish August 23rd, 2005, 02:49 PM Yup, Villa Neretva looks interesting. Timur, I was surprised when I saw you made this thread. I hope you, and others, will update it regulary.
I wish two things for this thread: many showed projects and not so much spam. Cheers!
mirza-sm August 23rd, 2005, 03:49 PM The Rondo Building
http://www.baumit.com/imperia/md/images/baumitba/references/25_a.jpg
yugoboy August 23rd, 2005, 10:20 PM I think the project looks much better now than it did before the war. :yes: Hotel Neretva will be great for more tourism potential in Mostar. Just imagine the view! :)
I agree with you that the Villa Neretva will look A LOT better, but the Hotel Neretva will Look the same.
Here is a picture, of how it will look when it's finished. :)
http://img151.imageshack.us/img151/3520/image36616yz.jpg (http://imageshack.us)
BTW, Great Updates!
MIMICA August 24th, 2005, 06:51 AM I agree with you that the Villa Neretva will look A LOT better, but the Hotel Neretva will Look the same.
Here is a picture, of how it will look when it's finished. :)
http://img151.imageshack.us/img151/3520/image36616yz.jpg (http://imageshack.us)
BTW, Great Updates!
From what I can see from the rendering, the construction project will be nice. All these new projects being built on the Neretva is a smart idea. It provides a great view, and makes the city even more charming.
Currently there are three construction projects being built on the Neretva.
:cheers1:
MIMICA August 24th, 2005, 06:52 AM The Rondo Building
http://www.baumit.com/imperia/md/images/baumitba/references/25_a.jpg
The construction project there has already been completed. It's an extremely large shopping centre! I took some small pictures of the building/s. I'll upload them later. :)
EDIT: Pictures have been posted of the Rondo Shopping Centre on post 26!
MIMICA August 24th, 2005, 08:13 AM PROJECT
Source: http://photobucket.com/albums/v305/TimurTaljanovic/?sc=1
MOSTAR
Rondo Shopping Centre
http://img.photobucket.com/albums/v305/TimurTaljanovic/mostarmall7.jpg
http://img.photobucket.com/albums/v305/TimurTaljanovic/mostarmall6.jpg
http://img.photobucket.com/albums/v305/TimurTaljanovic/mostarmall5.jpg
http://img.photobucket.com/albums/v305/TimurTaljanovic/mostarmall4.jpg
http://img.photobucket.com/albums/v305/TimurTaljanovic/mostarmall3.jpg
http://img.photobucket.com/albums/v305/TimurTaljanovic/mostarmall.jpg
MIMICA August 24th, 2005, 08:18 AM You can really see how large the project is from the pictures posted above. I couldn’t get a whole shot of the shopping center, but I could get small segments of it.
http://img.photobucket.com/albums/v305/TimurTaljanovic/mostarmall4.jpg
From this picture you can see approximately 20% - 25% of the projects length. At the end of the building, there is a fountain under construction. The area will look really nice when entirely finished. :yes:
Just for the note, this (http://www.skyscrapercity.com/showpost.php?p=5151249&postcount=6) project is right across the street from the Rondo Shopping Centre.
MIMICA August 24th, 2005, 08:53 AM PICTURES
Source: http://www.skyscrapercity.com/showthread.php?t=222235&page=3&pp=10
MOSTAR
Old Town
http://img273.echo.cx/img273/4793/342041873vrlyptph5bq.jpg
http://img180.echo.cx/img180/8139/12ln.jpg
http://img180.echo.cx/img180/7679/16ku.jpg
MIMICA August 24th, 2005, 08:55 AM Those three pictures posted above all are one of my favorites. New Mostar may be expanding and progressing very quickly, but the Old Town is what the city is known for. All the tourists’ eager to see what the magnificent Ottoman Empire built is breathtaking. :eek:
I hope you all enjoy the pictures, they really show the Old Town well. :yes:
MIMICA August 24th, 2005, 09:20 AM http://www.hering.ba/slike/katalog/ref_now_sjemenarna.JPG
This building didn’t really look familiar to me at first. I remember seeing something similar to it, but I couldn’t make the connection.
This project is located in New Mostar, on a long street with many projects. This whole street is basically a newer commerce area of the city. Car dealerships, office complexes, supermarkets, and other sorts of buildings have all been constructed in the last 2 years in New Mostar.
So basically, I didn’t recognize the building because there has been so much construction on the whole area.
mirza-sm August 24th, 2005, 03:03 PM WOW Rondo is really huuuuuge :D thats my first destination when i come to Mostar :P
mirza-sm August 24th, 2005, 03:06 PM Btw great pictures mimica :yes:
SinCity August 25th, 2005, 03:09 AM Nice surprise with the Rondo Shopping Complex Mimica. Looks really classy. :okay:
MIMICA August 25th, 2005, 06:18 AM I agree. The Rondo Shopping Centre seems quite classy, but modern at the same time. I truly like the design.
Thanks for the compliment on the pictures. :yes:
SinCity August 25th, 2005, 07:09 AM ^^ Mimica if you uncover more pics of Rondo make sure to throw them up here. I'd like to see more of this complex. looks ace! :okay:
MIMICA August 25th, 2005, 07:25 AM ^^ Mimica if you uncover more pics of Rondo make sure to throw them up here. I'd like to see more of this complex. looks ace! :okay:
I agree. The complex does look exceptionally well. The point I was trying to get through was that Mostar is getting a whole new facelift. There are construction projects in many areas of the New Mostar, and some even in the Old Town.
I’ll try to get more pictures on the Rondo Shopping Centre, but I’m actually striving to find more than just the Rondo. I stupidly didn’t take too many pictures of Mostar construction or new buildings when I was in the city. Now I regret it. :no:
MIMICA August 25th, 2005, 07:36 AM THE CONSTRUCTION PROJECTS DISCUSSED SO FAR (with names):
Rondo Shopping Centre -
http://www.skyscrapercity.com/showpost.php?p=5168640&postcount=26
Zgrada Gospodarska Komore -
http://www.hering.ba/slike/katalog/komora.jpg
Prodajni Centar -
http://www.hering.ba/slike/katalog/ref_end_jelic_auto.JPG
Hercegovina Vino -
http://www.hering.ba/slike/katalog/ref_end_hercvino.JPG
Sun Valley -
http://www.skyscrapercity.com/showpost.php?p=5152459&postcount=15
Villa Neretva -
http://www.skyscrapercity.com/showpost.php?p=5149324&postcount=2
Hotel Neretva -
http://www.skyscrapercity.com/showpost.php?p=5151815&postcount=8
THE CONSTRUCTION PROJECTS DISCUSSED SO FAR (without names):
Mostar construction project 1 -
http://www.skyscrapercity.com/showpost.php?p=5152406&postcount=13
Mostar construction project 2 -
http://www.skyscrapercity.com/showpost.php?p=5152147&postcount=11
Mostar construction project 3 -
http://www.skyscrapercity.com/showpost.php?p=5151249&postcount=6
Mostar construction project 4 -
http://www.skyscrapercity.com/showpost.php?p=5182257&postcount=42
SinCity August 25th, 2005, 07:42 AM Great update Mimica! :okay:
MIMICA August 25th, 2005, 07:44 AM Great update Mimica! :okay:
Thank you. :)
MIMICA August 25th, 2005, 09:45 AM There is a lot of new façade reconstruction/painting in the Old Town of Mostar. Hopefully I’ll find some more pictures of the work being done on facades. :yes:
MIMICA August 25th, 2005, 09:46 AM PICTURES
Source: http://photobucket.com/albums/v305/TimurTaljanovic/?sc=1
MOSTAR
http://img.photobucket.com/albums/v305/TimurTaljanovic/mostarslike7.jpg
http://img.photobucket.com/albums/v305/TimurTaljanovic/mostarslike6.jpg
http://img.photobucket.com/albums/v305/TimurTaljanovic/mostarslike5.jpg
http://img.photobucket.com/albums/v305/TimurTaljanovic/mostarslike4.jpg
http://img.photobucket.com/albums/v305/TimurTaljanovic/mostarslike3.jpg
http://img.photobucket.com/albums/v305/TimurTaljanovic/mostarslike2.jpg
http://img.photobucket.com/albums/v305/TimurTaljanovic/mostarslike1.jpg
MIMICA August 25th, 2005, 02:07 PM PROJECT
Source: http://photobucket.com/albums/v305/TimurTaljanovic/
MOSTAR
There is a construction project of an office in the Old Town. This may sound like a bad idea, but I saw the rendering on my way to the post office. It will blend in nicely with the surrounding buildings, with a glass façade.
Sadly, this is the only picture I found of it. There are currently two cranes working on the construction project.
http://img.photobucket.com/albums/v305/TimurTaljanovic/most23235.jpg
MIMICA August 25th, 2005, 02:14 PM http://www.skyscrapercity.com/showpost.php?p=5179721&postcount=37
I decided to make this post (link provided above) the list of the construction projects. It will be updated whenever a construction project has been posted in the thread. Enjoy! :)
mirza-sm August 25th, 2005, 03:22 PM Wow mimica u really got something going on there ;) keep up the good work :yes:
Medofish August 26th, 2005, 12:21 AM Čestitam na trudu, ima tu i nekih zanimljivih stvari ;)
LordMarshall August 26th, 2005, 12:35 AM Excelent work dude. Great projects.
mirza-sm August 26th, 2005, 02:35 AM Btw when were u in Mostar and didnt tell me ?? :gaah: hehe :D
MIMICA August 26th, 2005, 07:32 AM Thank you all for the compliments. :yes:
MIMICA August 26th, 2005, 09:37 AM http://img151.imageshack.us/img151/3520/image36616yz.jpg
Does anyone have the pictures of Hotel Neretva before the war? I’d like to see if there are changes being made during the reconstruction process. :yes:
:cheers1:
MIMICA August 26th, 2005, 09:43 AM Old Town was extremely beautiful before the Bosnian war. During the attack on Mostar, the city was damaged severely. Since then, there have been many investments into reconstructing the Old Town, as well as the rest of the city.
So, I thought this would be an interesting comparison.
Mostar (before the war)
http://www.haverford.edu/relg/sells/mostar/mostar_aerial.gif
Mostar 1996
http://mishami.image.pbase.com/u41/kleine/large/33456544.mostar.jpg
http://www.haverford.edu/relg/sells/mostar/stari_most2.jpg
http://www.nato.int/sfor/misc/mostar/981208c.jpg
Mostar 2005
http://img273.echo.cx/img273/4793/342041873vrlyptph5bq.jpg
http://photos1.blogger.com/img/10/915/640/Mostar%2007%2021%2004b.jpg
Medofish August 26th, 2005, 02:23 PM During the attack on Mostar, the city was damaged severely.
Actually it's not like Mostar was attacked by anyone, it was true civil war on the streets there for a few years.
Indexi August 26th, 2005, 04:36 PM Actually it's not like Mostar was attacked by anyone, it was true civil war on the streets there for a few years.
Mostar wasn't attacked by anyone? :weirdo:
Medofish August 26th, 2005, 05:37 PM No. Bosniaks attacked Serbs and Croats, Croats attacked Serbs and Bosniaks, but since they were all Mostarci (people of Mostar), you can't say Mostar was attacked by anyone.
Medofish August 26th, 2005, 05:39 PM Mostar (before the war)
http://www.haverford.edu/relg/sells/mostar/mostar_aerial.gif
Whoa, this photo is very nice, it shows how city of Aleksa Šantić was, and will be beautiful ;)
mirza-sm August 26th, 2005, 06:04 PM well if there wasnt any attacks on Mostar,if there was war only between Mostarci,why did they wreck down their own bridge ??if they care about the city,and i belive they did cuz theyre Mostarci,why would they wreck down one of the citys simbols? that makes no sense :|
Medofish August 26th, 2005, 06:18 PM I don't know, I'm not Mostarac.
MIMICA August 27th, 2005, 06:11 PM Please stop involving politics in this thread. :)
MIMICA August 30th, 2005, 04:01 AM PICTURES
Source: http://www.skyscrapercity.com/showthread.php?t=250816&page=2&pp=10
MOSTAR
http://img84.imageshack.us/img84/7964/17qe.jpg
http://img84.imageshack.us/img84/143/24cf1.jpg
MIMICA August 31st, 2005, 04:57 AM I’m surprised no one has commented on the pictures. They might be one of the best pictures of Old Town Mostar, and no one comments on it. :D
Amazing! ;)
Please excuse the first picture that was edited with the arrows and text. Those lines represent the former Bosniak and Croat sides. Those luckily don’t exist anymore today. :yes:
MIMICA August 31st, 2005, 05:02 AM http://img84.imageshack.us/img84/143/24cf1.jpg
I’d like to point out how all the buildings have newly placed red tiles on the roof, making the Old Town from a high view very beautiful.
mirza-sm September 5th, 2005, 07:38 PM http://i21.photobucket.com/albums/b290/skyscraper_BiH/Image2994.jpg
:cheer:
MIMICA September 5th, 2005, 09:18 PM http://i21.photobucket.com/albums/b290/skyscraper_BiH/Image2994.jpg
:cheer:
Those news alone made my day. :yes: Great news for Mostar, and the rest of Bosnia and Herzegovina (B&H). It’s really good how all the tourist numbers have been increasing a lot over B&H.
SinCity September 6th, 2005, 02:24 AM Great news indeed for Mostar. :)
mirza-sm September 6th, 2005, 03:09 PM heheh well only great news come with me :|:D
mirza-sm September 9th, 2005, 06:25 PM and here are more of them :P
http://i21.photobucket.com/albums/b290/skyscraper_BiH/Image3061.jpg
mirza-sm September 9th, 2005, 06:27 PM http://i21.photobucket.com/albums/b290/skyscraper_BiH/Image3064.jpg
MIMICA January 27th, 2006, 04:19 AM *bump* ;)
More updates coming...
MIMICA January 27th, 2006, 04:25 AM Here are some pictures of the recently completed Vila Neretva. :)
http://www.pid.co.ba/foto/bigimages/P9265943.jpg
http://www.pid.co.ba/foto/bigimages/P9265945.jpg
http://www.pid.co.ba/foto/bigimages/P9265949.jpg
http://www.pid.co.ba/foto/bigimages/P9265950.jpg
http://www.pid.co.ba/foto/bigimages/P9265954.jpg
http://www.pid.co.ba/foto/bigimages/P9265966.jpg
http://www.pid.co.ba/foto/bigimages/P9265969.jpg
http://www.pid.co.ba/foto/bigimages/P9265975.jpg
http://www.pid.co.ba/foto/bigimages/P9265985.jpg
Here are some pictures of the view from the top of Vila Neretva. ;)
http://www.pid.co.ba/pogled/bigimages/istok%20wiev%2002.jpg
http://www.pid.co.ba/pogled/bigimages/istok%20wiev%2004.jpg
MIMICA January 27th, 2006, 04:28 AM Here are some pictures of the update progress on Sun City.
http://www.sunvalley.ba/nimg/09.jpg
http://www.sunvalley.ba/nimg/13.jpg
As you can see, the project is almost done. Just the front needs to be paved and some greenery planted, and the project is done. The apartments are currently on sale.
MIMICA January 27th, 2006, 04:30 AM Temeljac za "Fealovu" novu tvornicu
http://www.oslobodjenje.ba/images/stories/dnevno/24jan/ekob.jpg
Investicija vrijedna 32 miliona KM
MOSTAR - Prigodnom svečanošću u krugu Tvornice Aluminij u ponedjeljak su počeli radovi na novoj tvornici za preradu aluminija Feal d.o.o.
“Sretni smo jer znamo da izgradnja nove tvornice što će upošljavati 100 novih radnika puno znači za Mostar, regiju, ali i cijelu BiH”, kazao je generalni direktor Alumnija Mijo Brajković.
Širokobriješki Feal i mostarski gigant Aluminij zajedno su ušli u ovaj projekt, a proizvodnja bi trebala početi već u kolovozu ove godine.
“Nema dvojbe da nova tvornica ima perspektivu, prije svega i zato što smo u ovom poslu s jednom takvom uspješnom tvrtkom kao što je Aluminij. Uz sve to već imamo i osigurano tržište. U novoj tvornici bit će instalirana najnovija tehnologija za proizvodnju aluminijskih profila i tlačno-ljevačkih proizvoda, čime će se mostarski Feal svrstati uz bok najsavremenijih tvornica za preradu aluminija u Evropi i svijetu. Vrijednost ovog projekta je 32 miliona KM”, kazao je Ante Musa, direktor mostarskog Feala.
O značaju ove investicije govorio je i predsjedatelj Predsjedništva BiH Ivo Miro Jović, kazavši da za Bosnu i Hercegovinu, kao zemlju u postkonfliktnom periodu, ovakvi projekti iznimno mnogo znače jer garantiraju da će ljudi, vidjevši da mogu živjeti u svojoj domovini, ostajati, a ne odlaziti iz nje.
MIMICA January 27th, 2006, 04:34 AM Svečano otvoreni radovi na izgradnji nove tvrtke FE-AL d.o.o. Mostar
http://www.aluminij.ba/Pics/_nov20060123153534.jpg
U krugu tvornice Aluminij d.d. Mostar generalni direktor Aluminija mr. Mijo Brajković i vlasnik Feala iz Širokog Brijega Jozo Bogdan, uz predsjedatelja Predsjedništva BiH Ivu Miru Jovića kao i brojne goste svečano su otvorili radove na izgradnji nove tvornice za preradu aluminija FE-AL d.o.o. Mostar. Riječ je o projektu vrijednom 32 milijuna KM. Kapacitet nove tvornice je 9.000 tona metala, a proizvodit će aluminijske profile i tlačno-ljevačke proizvode. U novoj tvornici će biti instalirana najnovija tehnologija, čime će se nova tvornica svrstati uz bok najsuvremenijih tvornica za preradu aluminija u Europi i svijetu. Predviđena tehnologija nema negativan utjecaj na okoliš. Nova tvornica bi trebala zapošljavati oko 100 novih radnika.
"Izgradnja tvornica i zapošljavanje jedina je prava perspektiva BiH. Na žalost često puta neki u tijelima vlasti nemaju razumijevanja za gospodarstvo i razvoj. Ipak Aluminij će uvijek podržavati razvojne projekte i vjerujem kako će se u budućnosti, na bazi aluminija i aluminijskih legura, širom države sve više otvarati nova postrojenja za preradu aluminija", kazao je Brajković.
Predsjedatelj Predsjedništva BiH Ivo Miro Jović iskazujući potporu projektu izgradnje nove tvornice kazao je kako će se jačanjem gospodarstva uveliko doprinijeti boljim i bržim pregovorima BiH s Europskom unijom o integracijama i pridruživanju. "Ovaj projekt je dokaz kako i BiH ima uspješne menadžere", zaključio je Jović.
Direktor nove tvornice FE-AL d.o.o. Mostar Ante Musa naglasio je kako će tvrtka biti dovršena do kolovoza ove godine, te da će imati dva objekta površine od oko 8 tisuća četvornih metara. Već su dogovoreni poslovi kupnje novih presa i potrebnih strojeva za proizvodnju aluminijskih profila, ali i elemenata za autoindustriju i brodogradnju.
MIMICA January 27th, 2006, 04:36 AM Mostar - FEAL will build a new addition to the Mostar Aluminum Plant worth 15 million EUROS
Tvrtka FE-AL d.o.o. Mostar zaposlit će 100 radnika
MOSTAR – U krugu tvornice Aluminij d.d. Mostar jučer je svečano obilježen početak radova na izgradnji tvornice za preradu aluminija FE-AL d.o.o. Mostar. Mijo Brajković, generalni direktor tvrtke Aluminij d.d. Mostar koja je suvlasnik nove tvornice, kazao je da će izgradnja trajati do kolovoza ove godine, kada bi trebala započeti i proizvodnja. “Sretni smo da je u Mostaru počela izgradnja ove tvornice, čijom izgradnjom ispunjavamo svoja obećanja da će se aluminij početi prerađivati tamo gdje se i proizvodi”, kazao je Brajković istaknuvši da će se izgradnjom nove tvornice stvoriti mogućnost daljnjeg razvoja postojećih i izgradnje novih malih i srednjih tvrtki za preradu aluminija. “Smatram da se ništa ljepše nije moglo dogoditi gradu Mostaru, regiji, ali i cijeloj državi, jer je otvaranje novih poduzeća jedini put za zapošljavanje i cjelokupni napredak”, naglasio je Brajković te dodao da početak izgradnje ove tvrtke predstavlja i svojevrsni početak gradnje nove elektrolize. “Budući da mi s ovim kapacitetima ne bi bili u mogućnosti opskrbljivati novu tvrtku, krećemo u jednu novu investiciju kako bi povećali proizvodnju za 15.000 tona. Vrijednost ove investicije iznosit će oko 30 milijuna eura i ona, zajedno s otvaranjem ove nove tvrtke, predstavlja početak izgradnje nove elektrolize”, kazao je Brajković.
Otvaranje 100 radnih mjesta
Direktor novoosnovane tvrtke FE-AL d.o.o. Mostar Ante Musa kazao je da će novoizgrađena tvrtka imati svjetlu budućnost jer ima osigurane sve preduvjete za njezin normalan rad i funkcioniranje. “Uvezali smo se s jednom velikom tvornicom kao što je Aluminij, ali i s mnoštvom drugih tvornica koje se oslanjaju na ovog proizvođača aluminija. Na dugoročnom planu, osim ovih pogona, planiramo proširiti i pogone na tlačno lijevanje i viši stupanj prerade aluminijskih profila”, kazao je Musa istaknuvši da će nova tvornica, u koju će biti uloženo oko 15 milijuna eura, godišnje prerađivati 10.000 tona aluminija te će zapošljavati minimalno 100 radnika. “Moram reći da su u tijeku i pregovori s poznatim svjetskim tvrtkama kao što su Audi i Volkswagen i mislim da je suradnja s njima izvjesna. Zbog toga poduzimamo sve kako bi se nova tvrtka tehnološki osposobila za prerađivanje različitih prešačkih legura koje se koriste u autoindustriji, brodogradnji i elektroindustriji”, kazao je Musa. Predsjedatelj Predsjedništva BiH Ivo Miro Jović koji je također nazočio svečanom obilježavanju početka radova na izgradnji nove tvornice kazao je da njezina izgradnja ima ogromno značenje za uništeno bh. gospodarstvo. Ovaj svijetli primjer pokazuje da jednim uspješnim menadžmentom naša država može napraviti velike iskorake. Inače, većinski vlasnik tvrtke FE-AL d.o.o Mostar bit će tvrtka FEAL d.o.o Široki brijeg, i Aluminij d.d. Mostar kao manjinski vlasnik. Željko Marijanović
MIMICA January 27th, 2006, 04:37 AM Mostar: Mountain resort and horse farm
Gradi se Planinarski dom na Rujištu
Da je zanimanje za izletište Rujište veliko, svjedoče i sve češća ulaganja kako domaćih tako i stranih investitora. Prema riječima Mensuda Durakovića, voditelja podružnice Mostar Turističke zajednice Hercegovačko-neretvanske županije, radovi na izgradnji motela u blizini porušene žičare su več počeli, dok austrijski investitori ispituju teren, kako bi počeli sa projektom razvoja eko turizma, za koji Rujište pruža odlične uvjete.
Austrijanci prave farmu konja!?
- Austrijanci su prije izvjesnog vremena boravili u Mostaru, gdje su na Rujištu vršili ispitivanja sastava tla, zraka, te floru i faunu, i može se reći kako su itekako zainteresirani da otkupe lokaciju u Hanskom polju, gdje bi napravili farmu konja, kaže je Duraković.
On je, tako e, napomenuo kako su ovi investitori zainteresovani i za porušeni planinarski dom, te da će se, najvjerovatnije, odlučiti za njegovu rekonstrukciju.
- Rujište je pogodno za razvoj eko turizma i zimskog turizma, zbog toga i ne čudi sve veće zanimanje stranaca za ovu planinu. Ona pruža odlične uvjete za ugošćavanje turista i za sportsku rekreaciju, istaknuo je Duraković
Mostarci prave žičaru
Što se tiče mostarskih investitora, koji su ozbiljni u svojim nastojanjima da donekle osposobe Rujište za zimski turizam, Duraković je kazao kako je investitor Miler iz Mostara započeo sa obnovom porušenog planinarskog doma na Rujištu.
- Već su završeni radovi na betoniranju „mrtve“ i prve deke. Iako su ovo tek početni radovi, može se očekivati da radovi na ovom objektu budu završeni do srpnja, veli Duraković, uz napomenu kako će investitor, koji gradi ovaj dom, obnoviti i razrušenu žičaru na ovoj planini, te uraditi i 1200 metara trim staze.
- Do ljeta će radovi biti gotovi i tada ćemo moći ugostiti i prve velike grupe turista, koje će moći uživati u zimskim ljepotama Rujišta.
Duraković je na kraju napomenuo kako je ulaganje u planinu Rujište pun pogodak, s obzirom na uvjete koje pruža ista.
MIMICA January 27th, 2006, 04:39 AM Mostar - Construction of a New Sport Center will start this Year.
Na Balinovcu niče novi sportski centar
MOSTAR - Početkom travnja Mostar bi na Balinovcu trebao dobiti novi sportsko-kulturni objekt, u sklopu kojeg bi se trebao nalaziti balon s umjetnom travom koji bi se koristio za mali nogomet, tenis i odbojku. Točnije, objekt će se nalaziti preko puta hotela Bevanda. Odmah do balona, istodobno se gradi objekt u kojem će se nalaziti prostorije Izviđačkog kluba Radobolja. Investitor i vlasnik objekta je Odred izviđača Radobolja.
Završetak radova do travnja
Prema riječima Jakiše Stančića, predsjednika Izviđačkog kluba Radobolja, radovi na projektu su počeli u prosincu, a trebali bi biti gotovi početkom travnja. “Prije početka izgradnje prvo smo pribavili potrebnu dokumentaciju. To je trajalo malo duže, ali je i razumljivo budući da se radi o izgradnji objekta koji se nalazi na javnoj površini. Zemljište je u vlasništvu grada, a u posjedu je odreda izviđača. Prije rata tu je bila dvorana mjesne zajednice koju su koristili izviđači. Do ovog projekta je došlo tako što smo pronašli zajednički interes s određenim ljudima koji su bili spremni uložiti sredstva u izgradnju objekta.
Balon s umjetnom travom
Izvođač radova je građevinska tvrtka Temelj iz Mostara”, rekao je Stančić objasnivši kako bi cijeli projekt trebao izgledati. Stančić kaže da bi se na tom mjestu trebao nalaziti balon s umjetnom travom, gdje će biti teren za mali nogomet, a moći će se koristiti i za tenis i odbojku. Uz taj teren će biti jedan objekt u kojem će biti smještene svlačionice. “Osim toga, tu će se nalaziti i prostor od 105 metara četvornih koji će koristiti izviđači. U tom prostoru će se nalaziti jedna dvorana te dva ureda i prostor za odlaganje. Dvoranu ćemo koristiti za naše aktivnosti, a najvjerojatnije ćemo napraviti i raspored za korištenje dvorane jer ćemo imati svakodnevne aktivnosti, a tako ćemo pružiti mladima priliku da koriste taj prostor te da se u njoj predstavljaju pjesnici, glazbenici, glumci i drugi. Osim toga, imamo i neke planove za rad s djecom s posebnim potrebama”, dodao je Stančić. U planu imaju i formiranje malonogometnog kluba Radobolja, koji bi imao i svoje mlađe uzraste. Dalibor Drlje
SinCity January 27th, 2006, 04:40 AM Brilliant stuff for Mostar. Thanks Timur. :okay:
MIMICA January 27th, 2006, 04:42 AM Brilliant stuff for Mostar. Thanks Timur. :okay:
Thanks! :)
SinCity January 27th, 2006, 04:50 AM Vila Neretva looks great. I'm glad Mostar is beggining to shine again. Returning to its former glory :yes:
MIMICA January 27th, 2006, 04:52 AM Vila Neretva looks great. I'm glad Mostar is beggining to shine again. Returning to its former glory :yes:
Well, now that it's getting all the tourism back the city is going to prosper probably much more than it did during the Yugoslav times. When I was there last summer, I couldn't look in a direction and not see a tourist group. :yes:
LordMarshall January 27th, 2006, 07:49 AM great updates and thanks for bringing the thread back :okay:
MIMICA January 27th, 2006, 08:32 AM http://img151.imageshack.us/img151/3520/image36616yz.jpg
Since the completion of Vila Neretva, the reconstruction of Hotel Neretva is going to (or already has) begun. Above is a rendering of what it will look like when completed.
MIMICA January 28th, 2006, 12:56 AM Can a Moderator please change the title to [Mostar] Construction Update ? :?
Uskoro početak gradnje južne mostarske obilaznice
Južna mostarska zaobilaznica jedan je od najvrijednijih cestovnih projekata u Hercegovini. Kada cesta bude završena Mostar će se rasteretiti prometa teških vozila i istovremeno osigurati kvalitetna prometna veza zapadne Hercegovine s autocestom na koridoru 5c.
MOSTAR – Pripreme za izgradnju južne mostarske zaobilaznice u završnoj su fazi. U tijeku je eksproprijacija zemljišta, te pribavljanje dozvola za građenje i urbanističke suglasnosti. Uskoro će se znati i tko će dobiti posao izgradnje prvog kilometra te ceste na potezu od Troskota do Miljkovića, za što je Federalna vlada osigurala 2.400.000 KM. Kako neslužbeno saznajemo u konkurenciji su, uz ostale, poduzeća Putevi Grude, mostarski HP Investing te čapljinska tvtka Neretva – Konstruktor.
Južna mostarska zaobilaznica jedan je od najvrijednijih cestovnih projekata u Hercegovini. Kada cesta bude završena Mostar će se rasteretiti prometa teških vozila i istovremeno osigurati kvalitetna prometna veza zapadne Hercegovine s autocestom na koridoru 5c. Trasa zaobilaznice u dužini od 12,5 kilometara od naselja Polog do Miljkovića imat će dvije kolovozne trake, od Miljkovića, do Rodoča tri trake, da bi na kraju na prilazu autputu dobila profil brze ceste s 4 kolovozne trake.
Vrijednost cijelog projekta procjenjuje se na oko 40 do 50 milijuna konvertibilnih maraka. Budući Federacija BiH iz proračunskih sredstava nije u stanju sama isfinancirati ovaj projekat bit će nužno tražiti druge načine financiranja.
Prema riječima generalnog direktora cesta F BiH Ljube Pravdića Europska banka za obnovu i razvoj financira izradu studije izvodljivosti i studije utjecaja na okoliš Južne mostarske zaobilaznice. Izrada te studije uvjet je za dobijanje povoljnih kreditnih sredstava međunarodnih financijskih institucija, na koja se računa u zatvaranju financijske konstukcije ovog projekta.
27.1.2006.
M.Š. / Pincom.info
lakerdar123 January 28th, 2006, 05:15 AM very nice. may i ask whats the largest proposed project for this city.
dejan January 28th, 2006, 05:37 AM No you may not ask.
:p
MIMICA January 28th, 2006, 05:41 AM very nice. may i ask whats the largest proposed project for this city.
I don't know. Like I said, the last time I was in Mostar was this summer. My camera was basically broken, but I saw plenty of development. The city itself is making huge strides to modernize everywhere. Large industries and tourism have really helped the city out. Just taking a short walk around the Old Town really shows you how much tourism is coming to Mostar. The narrow streets are flooded with people speaking different languages and interested to know more about the city.
MIMICA January 28th, 2006, 05:44 AM http://www.aluminij.ba/Pics/_nov20060123153534.jpg
Since the downtown of Mostar is very dense with historical architecture, most new developments have been going on near the downtown (about 5-10 minutes driving). As you can see in the picture above, the flat land in the new part of Mostar is being used wisely and it’s starting to look great.
Everyone can agree that Mostar has huge potentials.
Here are some pictures of the change that has occured in Mostar in the past 10 years.
After the war:
http://www.nato.int/sfor/misc/mostar/981208c.jpg
Mostar 2005:
http://img273.echo.cx/img273/4793/342041873vrlyptph5bq.jpg
If Mostar got the attention and investments that Sarajevo has received, it would be even higher than it is today. What most people in B&H admire from Mostar is how it brought itself up with a small amount of help.
MIMICA January 28th, 2006, 06:14 AM I've been looking back at some pictures of Mostar posted on SkyscraperCity, and you can see some good examples of how the tourism is kicking back into the area.
http://img74.echo.cx/img74/752/17gi.jpg
http://img82.echo.cx/img82/710/68gf.jpg
http://img82.echo.cx/img82/3219/76xy.jpg
dejan January 28th, 2006, 06:30 AM The old town with the bridge is amazing! It's like some dream world especially with the river and environment!!:)
MIMICA January 28th, 2006, 06:34 AM The old town with the bridge is amazing! It's like some dream world especially with the river and environment!!:)
I can't find many pictures of the rest of Mostar's Old Town, but I can guarantee you it has just as much potential. The whole city has such diversity; it goes from old architecture and river to modern buildings and such. I think what gives Mostar the most charm is that it has little narrow streets and things like that. I mean, just this summer I went walking around to become familiar with it, and I walked through a dark alley way and found myself on the most beautiful hidden cafe. It was almost directly under the bridge and you could see the people moving along.
All those small attributes really add to the charm of the city.
dejan January 28th, 2006, 08:02 AM Especially this picture
http://img273.echo.cx/img273/4793/342041873vrlyptph5bq.jpg
Very very beautiful:) The river and small mountain complete it!:)
lakerdar123 January 28th, 2006, 09:11 PM very nice and thanks for the info.
SinCity October 30th, 2006, 02:02 AM Any updates for Mostar? :)
BL October 30th, 2006, 03:53 PM i guess no
LordMarshall October 31st, 2006, 01:32 AM i guess no
you guessed wrong...
LordMarshall October 31st, 2006, 01:33 AM Izviđači od danas u novom centru!
MOSTAR - Izviđači Izviđačkog odreda "Radobolja" Mostar jučer su svečano otvorili novi sportsko-kulturni objekt koji se nalazi na Trgu Tihomira Mišića na Balinovcu. Uz mnoštvo pjesme, plesa i recitacija izviđači su svojim gostima pokazali i mali dio onoga što su naučili u izviđačima. Goste je u ime izviđača pozdravila Melinda Čehić, načelnica Izviđačkog odreda "Radobolja".
Najviše se oduševili najmlađi
"Čuli ste našu himnu logorskoj vatri, a ova simbolična vatra i njezina svjetlost neka nam bude vodilja na putu kojim idemo, a to je ljubav prema Bogu, prirodi i ljudima bez obzira na rasu, vjeru i podrijetlo", poručila je Melinda Čehić. Nakon prigodna pozdrava Sportsko-kulturni centar pjesmom i recitacijama otvorili su Hrvoje Marić, Marina Krtalić i Andreja Jarak, učenici Osnovne škole Silvija Strahimira Kranjčevića. Osim učenika Osnovne škole Silvija Strahimira Kranjčevića, izviđače i njihove goste zabavljala su zvučna mostarska estradna imena kao što su Dragan Petković, Romeo Nikolić, Dado Pandža i Željka Bošnjak. Euforija je najviše vladala na licima najmlađih izviđača koji su plesali na pjesme te nakon toga svojim roditeljima i gostima pokazali što to oni znaju. "U izviđačima sam tek nekoliko tjedana i jako mi se sviđa njihov program i ovo današnje otvaranje. Sviđa mi se ovaj sportsko-kulturni centar, a najljepše mi je igralište s umjetnom travom. Mislim da ću u izviđačima ostati još dugo", kazala nam je Sara Soldo. Nakon zabavno-glazbenog programa, izviđači su zajedno sa svojim gostima iz Konjica, Sarajeva, Zenice i Splita te izviđačima veteranima proveli veselo i ugodno izviđačko prijepodne. "Danas nas je i vrijeme lijepo poslužilo, tako da se sve poklopilo kako bi ovaj dan ostao u sjećanju svih nas. Izviđači su svima pokazali što rade na našim skupovima, te koje igre upražnjavaju na našim natjecanjima", istaknuo je Jakiša Stančić, predsjednik Izviđačkog odreda "Radobolja".
Centar otvoren za sve
Podsjetimo, radovi na sportsko-kulturnom objektu u vlasništvu Izviđačkog odreda "Radobolja" započeli su u prosincu prošle godine, a trebali su se završiti do travnja ove godine. Međutim, prema riječima Jakiše Stančića, predsjednika Izviđačkog odreda "Radobolja", zbog poteškoća s pribavljanjem potrebne dokumentacije objekt je službeno otvoren tek jučer. Osim izviđača Izviđačkog odreda "Radobolja", novootvorenim centrom moći će se služiti i djeca svih osnovnih škola koje rade po planu i programu na hrvatskom jeziku, djeca s posebnim potrebama te razne sportske organizacije. "Dvoranu s umjetnom travom koristit ćemo za naše aktivnosti, a najvjerojatnije ćemo napraviti i raspored za korištenje dvorane jer ćemo imati svakodnevne aktivnosti, a tako ćemo pružiti mladima priliku da koriste taj prostor te da se u njoj predstavljaju pjesnici, glazbenici, glumci i ostali. Osim toga, imamo i planove za rad s djecom s posebnim potrebama", zaključio je Stančić
Link: http://www.dnevni-list.ba/?mdls=1&mdls_tip=2&nid=7246
LordMarshall October 31st, 2006, 01:35 AM Proračun u idućoj godini oko 38,5 milijuna maraka
MOSTAR - Grad Mostar jučer je dobio okvirni izgled proračuna za iduću fiskalnu 2007. te projekcije gradskih proračuna za 2008. i 2009., kako je to i propisano zakonskim propisima iz oblasti fiskalne politike. Ti okvirni dokumenti poslužit će za izradu rebalansa gradskoga proračuna za ovu i izradu nacrta proračuna za sljedeću godinu, a pred Vijećem bi se trebali naći do kraja prosinca.
Proračun manji za pola milijuna maraka
Prema okvirnom izgledu proračuna za 2007., trebao bi iznositi oko 38,6 milijuna maraka, što će biti za oko pola milijuna maraka manje u odnosu na ovogodišnji proračun. Projekcije proračuna za 2008. i 2009. pokazale su da bi se gradski proračuni trebali kretati između 39,7 i 40,9 milijuna maraka. Predsjednik Kluba koalicije predvođene HDZ-om u Gradskom vijeću Mostara Oliver Soldo kazao je da su prikazane procjene izgleda proračuna dobre i da se u njima vidi određeni rast priliva sredstava. "Apeliram na gradonačelnika i njegove suradnike da se u izradi idućih proračuna vode i podatcima koje imamo o rastu BDP-a. Porast BDP-a pokazuje nam kako će vjerojatno doći do priliva novih proračunskih sredstava iz poreznih prihoda, zbog čega apeliram da se i proračun projicira u skladu s porastom BDP-a od sedam do devet posto, koliko trenutačno iznosi", kazao je Soldo. S njegovim stavom i tim prijedlozima složio se i prvi čovjek Mostara dodavši ipak da se u obzir moraju uzeti i konkretne činjenice. "Primjedba je na mjestu i prihvaćamo je kao jednu od smjernica za izradu idućeg proračuna. Ovakve projekcije svakako smo mislili uvrstiti u buduće proračune, ali se na to nismo odlučili u ovom trenutku jer još uvijek nemamo usvojen zakon o raspodjeli sredstava iz neizravnog oporezivanja, što u globalnom smislu može utjecati na ukupni izgled proračuna", kazao je Bešlić dodavši da bi najbolje bilo za osnovu povećanja proračuna uzeti pet posto porasta BDP-a.
Imovina Parkova iznosi 2,5 milijuna maraka
Za polovinu mjeseca prosinca zakazano je treće ročište o prodaji dijela zemljišta i imovine JP-a Parkovi, koji se nalaze u stečajnom postupku. Prema dosadašnjim informacijama iz stečajne uprave JP-a Parkovi, cijena toj imovini trebala bi iznositi oko 2,5 milijuna maraka. Gradu Mostaru bilo je ponuđeno da se i ovoga puta natječe za kupovinu zemljišta u ovom iznosu, međutim, iz objektivnih razloga to nije prihvaćeno. "Gradsko vijeće ocijenilo je da u ovom trenutku nemamo dovoljno sredstava kako bismo se natjecali za kupovinu ove imovine, ali to ne znači da u nastavku stečajnog postupka nećemo i dalje biti zainteresirani za njegovu kupovinu pod nešto drukčijim uvjetima i nižim cijenama. Također, moram istaknuti da smo donijeli zaključak prema kojemu se ne može vršiti prenamjena ovog prostora u slučaju da ga netko kupi na idućem ročištu", kazao je predsjednik Vijeća Murat Ćorić. Na jučerašnjoj sjednici, osim više predmeta iz oblasti imovinsko-pravnih odnosa, Vijeće je donijelo i odluke koje su vezane uz određivanje deficitarnih fakultetskih zanimanja koja će biti subvencionirana kroz stipendije, odluku o obveznom uklanjanju ambrozije te odluku od uporabi i zaštiti imena, grba i zastave Grada Mostara, te su potvrđeni mandati za nove vijećnice Gordanu Knežić i Radojku Jusufović koje su zamijenile Radmilu Komadinu i Zorana Mandelbauma.
Link: http://www.dnevni-list.ba/?mdls=1&mdls_tip=2&nid=7223
LordMarshall October 31st, 2006, 01:36 AM Nove investicije u mostarsku infrastrukturu
MOSTAR - U mostarskom novom naselju D na Bijelom brijegu jučer su otpočeli radovi na izgradnji ceste dužine 615 metara i širine pet metara, kao i nogostupa s obje strane ceste. Ta je dionica već dugi niz godina bila trn u oku stanovnika Bijelog brijega, ali i vlasti, koje su se svakodnevno susretale s nelagodnostima i pritužbama građana. "Ovo je vrlo bitan događaj za ovaj dio grada i vjerujem da će projekt biti završen u idućih 45 dana na zadovoljstvo građana koji žive na tom području, kao i nas koji investiramo", naglasio je gradonačelnik Mostara Ljubo Bešlić.
Stube prema Bijelom brijegu dobivaju rasvjetu
Iz Ureda gradonačelnika prije nekoliko dana dobili smo informaciju da će se istodobno s izgradnjom ceste realizirati i radovi na popravljanju javne rasvjete na stubama koje vode od Studentskog doma do naselja Bijeli brijeg. Na zahtjev Gradske uprave, radnici Elektroprivrede HZ HB ovaj tjedan započet će s postavljanjem kvalitetnih rasvjetnih tijela koja će biti ograđena žicom jer se već nekoliko puta događalo da se postavljena rasvjeta uništi nekoliko sati nakon postavljanja. Vrijednost radova kojima će se urediti prometnica u takozvanom novom naselju na Bijelom brijegu, iznad Studentskog doma, iznosi 274.108 maraka, a rok za izvođenje radova je 45 dana od dana uvođenja izvođača u posao.
Uskoro rekonstrukcija i Mukoše
"U idućem razdoblju, točnije za nekoliko dana, potpisat ćemo ugovor s Federalnim ministarstvom za izbjegle i raseljene osobe koji podrazumijeva izgradnju i rekonstrukciju zgrade Mukoša. Ovaj grad će u dogledno vrijeme imati ugodniji ambijent za življenje", rekao je Bešlić. Tvrtka Inter Invest dobila je posao na izgradnji navedene ceste, dok će nadzor nad radovima dobiti tvrtka Projektni zavod Hercegovina.
Link: http://www.dnevni-list.ba/?mdls=1&mdls_tip=2&nid=7170
LordMarshall October 31st, 2006, 01:39 AM Federalni MIO/PIO seli u Mostar!
MOSTAR/SARAJEVO - Cjelokupni Federalni zavod za mirovinsko-invalidsko osiguranje seli svoje sjedište u Mostar, zajedno s još pet ministarstava federalne Vlade, čija sjedišta već postoje u ovom gradu. Sjedište Federalnog zavoda po zakonu bi i trebalo biti u Mostaru, međutim u praksi se Federalni MIO/PIO još uvijek nije objedinio. Kako nam je kazao Ivan Rogić, zamjenik direktora Federalnog zavoda MIO/PIO, postoji nada da će se u suradnji s novom federalnom vladom kompletna institucija premjestiti u Mostar. “Nadam se da ćemo u zajedništvu s novom federalnom vladom prebaciti sjedište ove institucije u Mostar, gdje bi po zakonu i trebalo biti”, istaknuo je Rogić dodavši da se nada kako će se u sljedećem razdoblju uspjeti realizirati ta zakonska obveza.
Elektronski računski centar
Prema njegovim riječima, u ponedjeljak će se održati i sjednica Upravnog odbora Zavoda na kojoj će se, između ostalog, donijeti i novi konačni nacrt pravilnika o unutarnjem ustrojstvu tog zavoda. Ono što predstavlja zapreku u radu Zavoda je i Elektronski računski centar (ERC) u Sarajevu koji još uvijek funkcionira kao zasebna institucija koju je utemeljila federalna Vlada, a na taj problem posebno je ukazao Rogić odgovarajući na naše pitanje o smetnjama u radu tog zavoda. Međutim, prema njegovim riječima, Zakon o mirovinsko-invalidskom osiguranju i njegovoj organizaciji navodi da bi taj centar trebao biti unutar Federalnog zavoda. Elektronski računski centar, u biti, unutar sebe ima sve podatke o dojavama i prijavama radnika, kao i evidencije svih onih koji su u sustavu osiguranja. Međutim, ti podatci se odnose na ona područja koja su nekada bila pod dijelom koji je nadzirao bivši Društveni fond PIO u Sarajevu. “Dakle, ovaj centar ne obuhvaća 33 općine koje su bile pod nadzorom bivšeg MIO-a u Mostaru”, naglasio je Rogić.
Slučaj Hercegovačke banke
Inače, na sjednici Upravnog odbora će se, osim unutarnjeg ustrojstva Zavoda, razgovarati i o slučaju Hercegovačke banke i vraćanju duga Federalnom zavodu MIO/PIO te o povratu novca vezano uz hotel ERO. “Ono što mogu reći jest da umirovljenici mogu očekivati isplatu mirovina 31. listopada”, kazao je Rogić i dodao da se mirovine toga dana mogu očekivati na bankama i poštama.
Link: http://www.dnevni-list.ba/?mdls=1&mdls_tip=2&nid=7216
LordMarshall October 31st, 2006, 01:50 AM Uskoro nove jednosmjerne ulice
MOSTAR - Unatoč činjenici da je novi sustav jednosmjernih ulica u početku izazvao negodovanje i neodobravanje Mostaraca, gradske vlasti su zadovoljne učinkom jednosmjernih ulica i to pravilo planiraju provesti na još nekoliko mostarskih ulica. Prema riječima Dražena Vrljića, stručnog savjetnika za prometno planiranje, s ovim načinom reguliranja prometa vidno su se smanjile dosadašnje gužve i nesreće koje su bile prije uvođenja jednosmjernih ulica.
Smanjen broj nesreća
"Reakcije vozača su u početku bile čudne, jer ljudi su naučili voziti mehanički ne obraćajući pozornost na prometne znakove. U ovom slučaju nema nekih velikih konfliktnih situacija na novoprobijenom križanju u Ulici Stjepana Radića i smanjili smo dosadašnje gužve", kazao je Vrljić dodavši da osim onih zalutalih vozača koji ne obraćaju pozornost na prometne znakove do sada nije bilo nikakvih nezgoda, tako da su od ljudi s viših pozicija vlasti dobili pohvalu za reguliranje prometa u toj ulici, a i ostali građani su priznali da je sadašnja regulacija prometa bolja nego ranije. "Koliko znam dosad nije bilo evidentiranih prometnih nesreća osim onih u prvih nekoliko dana kada vozači nisu obraćali pozornost na prometne znakove. Od kada je policija počela intervenirati na tom dijelu prometnice, do danas nema nikakvih podataka da je bilo prometnih nesreća. Stoga, mi ovaj projekt smatramo uspješnim", istaknuo je Vrljić.
Prometna signalizacija od prije rata
Budući da se ovaj način reguliranja prometa pokazao dobrim, Mostar će uskoro dobiti i nove jednosmjerne ulice. Vrljić je istaknuo da će ulica od katedrale do Rondoa uskoro postati jednosmjernom. "Ova ulica je posebno problematična iz razloga što se u njoj ne mogu mimoići dva teretna automobila, a da ne oštete platane koji su zakonom zaštićeni. Budući da je to magistralna cesta koja povezuje prometnice M6 i M17, moramo nešto poduzeti. Na ovaj sustav reguliranja prometa prelazimo iz razloga što se u gradu svakim danom povećava broj prometnih vozila, a na prometnoj signalizaciji se nije radilo još od prije rata kada smo imali manji broj vozila i kada je postojeća signalizacija zadovoljavala standarde", istaknuo je Vrljić dodavši da će se prometna mreža u gradu vratiti na prijašnje stanje kada se napravi južna obilaznica.
Link: http://www.dnevni-list.ba/?mdls=1&mdls_tip=2&nid=7113
LordMarshall October 31st, 2006, 02:00 AM Mercator Centar Mostar
http://www.mal.ba/images/400x300_mercatormo_002.jpg
http://www.mal.ba/images/400x300_mercatormo_003.jpg
http://www.mal.ba/images/400x300_mercatormo_004.jpg
LordMarshall October 31st, 2006, 02:14 AM MOSTAR : DRUGA FAZA GRADNJE NASELJA "DOLINA SUNCA"
Stambeno-poslovno naselje Dolina sunca u Mostaru nakon prve faze izgradnje kreće u drugu, nekomercijalnu fazu, u kojoj bi se trebale graditi još tri zgrade, osnovna škola, zatvoreni bazen i sportska dvorana, što je predviđeno urbanističkim planom», rekao je Goran Kapetanović,...
... direktor Mid-American Groupa, kompanije u čijem je vlasništvu Dolina sunca. Prema riječima Gorana Kapetanovića, u tijeku su pregovori s Gradskom upravom o realizaciji i pripremi za sljedeću fazu, za koju je Mid-American Group osigurao nova financijska sredstva. Izgradnja Doline sunca jedna je od najvećih poslijeratnih investicija u našem gradu koja bi iznosila deset milijuna eura. Kapetanović je istaknuo da bi se u drugoj fazi napravila jedna vrsta socijalnog modela kojim bi se umirovljenicima, invalidima i svim drugim kategorijama stanovništva omogućila kupnja stanova. «Najprije bismo utvrdili kriterije za dobivanje stanova nakon čega bi se vršio otkup tih stanova. Cijene bi se kretale tako da bi ih potencijalni kupci, koji bi dobili te stanove, financijski mogli izdržati s obzirom na svoja primanja. Stanovi u Dolini sunca građeni su prema američkom modelu stanovanja, vrlo su ugodni, imaju klimu u svakoj sobi te osigurano parkiralište u podzemnoj garaži», rekao je Kapetanović. Podsjetimo, prva zgrada koja je izgrađena nije u potpunosti useljena zbog slabe kupovne moći stanovništva, ali i zbog početne cijene od 1.500 maraka po metru četvornom. «Do sada smo prodali oko 50 posto stanova i to uglavnom obiteljima koje žive izvan Bosne i Hercegovine. Cijena kvadrata trenutačno iznosi 1.300 maraka. Namjera nam je da to bude multietničko naselje, a ne naselje jedne etničke skupine. Sigurno ćemo i dalje nastaviti s gradnjom preostalih sadržaja, samo nam predstoji daljnje utvrđivanje uvjeta za izgradnju» , zaključio je Goran Kapetanović.
Link: http://www.biznis.ba/index.php?option=com_content&task=view&id=1779&Itemid=2
BL October 31st, 2006, 11:36 AM Proračun u idućoj godini oko 38,5 milijuna maraka
Link: http://www.dnevni-list.ba/?mdls=1&mdls_tip=2&nid=7223
djeluje malo?! ne?
Pavle4488 October 31st, 2006, 11:42 AM Definitivno malo.
Bar ako se uporedi sa Banjalukom.
long foot October 31st, 2006, 04:00 PM pa mostar je i manji od banjaluke. ima samo oko 100.000 stanovnika koliko ja znam
BL October 31st, 2006, 05:13 PM ima vise od 100,000, a i da je duplo manji od BL, a nije ima i dalje skoro 4x manji budzet.
LordMarshall October 31st, 2006, 07:21 PM Mostar: Otvoren novi proizvodni pogon Adonis-a
U Mostaru je u ponedjeljak otvoren novi proizvodni pogon sa izložbenim prostorom, pod nazivom "Adonis export-import Mostar".
Direktor i vlasnik preduzeća Sead Šejtanić izjavio je da će više od 90 posto izvoza iz pogona Adonis-a biti plasirano na tržišta skanidinavskih zemalja, a prije svega u Norvešku, s obzirom na to da ova firma već ima svoje pogone u ovoj zemlji.
Prema riječima Šejtanića, novi mostarski pogon ovog preduzeća zaposliće 18 radnika, a u narednim mjesecima planirano je upošljavanje još oko 15 radnika.
On je naglasio da je vrijednost ove investicije oko 1,2 miliona KM. Svečanom otvorenju novog pogona Adonis-a, između ostalih, prisustvovali su norveški ambasador u BiH Jan Bratu (Braathu), te gradonačelnik Mostara Ljubo Bešlić, koji su naglasili značaj ovog projekta s aspekta otvaranja novih radnih mjesta u BiH.
SA-R October 31st, 2006, 10:53 PM Definitivno malo.
Bar ako se uporedi sa Banjalukom.Moguce, a kakav je odnos recimo banjalucki izvoz vs. mostarski, ili zarada prosjecnog banjalucanina (ako takvi tamo stanuju) vs. prosjecnog mostarca, banjalucka privreda vs. mostarske itd?
Kako ja znam najbolji razvoj nekog grada se ne odvija putem budzeta nego privatnih investicija.
LordMarshall October 31st, 2006, 11:55 PM Rondo
http://www.baumit.com/imperia/md/images/baumitba/references/25_a.jpg
Nedim November 1st, 2006, 12:08 AM Definitivno malo.
Bar ako se uporedi sa Banjalukom.
Ne mozes porediti Mostar sa Banja Lukom na taj nacin..Prihodi na lokalnom nivou u RS se slijevaju direktno u budzet opstina/gradova dok se u Federaciji veci dio tih prihoda slijeva u kantonalne budzete koji imaju i najvecu odgovornost za ulaganja.
Ne znam kakav je slucaj sa Hercegovacko neretvanskim kantonom ali npr sarajevski je ove godine imao budzet od oko 750 miliona KM a budzeti opstina u kantonu su bili samo od 5 do 15 miliona
BL November 1st, 2006, 10:26 AM Moguce, a kakav je odnos recimo banjalucki izvoz vs. mostarski, ili zarada prosjecnog banjalucanina (ako takvi tamo stanuju) vs. prosjecnog mostarca, banjalucka privreda vs. mostarske itd?
Kako ja znam najbolji razvoj nekog grada se ne odvija putem budzeta nego privatnih investicija.
ne znam sta zelis reci s ovim ako takvi tamo stanuju.. ali jako glupavo zvuci...
sto se tice izvoza banjalucka regija ima najveci izvoz u BiH, izvor zavod za statistiku BiH ili kako se vec tacno zove. A budzet nekog grada je najbitnija stvar u funkcionisanju tog istog grada.
sto se tice zarada to ne znam, jer kod nas se ne mjere zarade na gradskom nivou.
a Banjaluci se uzasno malo procenat od onog sto prikupi vraca, BL, Gradiska i Laktasi skupe oko 2/3 svih poreza u RS.
SA-R November 1st, 2006, 10:35 AM ne znam sta zelis reci s ovim ako takvi tamo stanuju.. ali jako glupavo zvuci...
sto se tice izvoza banjalucka regija ima najveci izvoz u BiH, izvor zavod za statistiku BiH ili kako se vec tacno zove. A budzet nekog grada je najbitnija stvar u funkcionisanju tog istog grada.
sto se tice zarada to ne znam, jer kod nas se ne mjere zarade na gradskom nivou.
a Banjaluci se uzasno malo procenat od onog sto prikupi vraca, BL, Gradiska i Laktasi skupe oko 2/3 svih poreza u RS.Pa zelim reci da li Banjalucana (onih koji su tamo rodjeni) u opste i ima s obziorm na promjenu stanovnistva u tom gradu u zadnjim godinama. Uglavnom zaboravi nije to tema ovog topika.
Imas li kakve podatke o "najvecem izvozu banjalucke regije" pogotovo kad se uzme u obzir da medju prvi deset kompanija izvoznica u BiH ni jedna nije iz banjalucke regije i cini mi se da je jedna samo iz RS i to ako me pamcenje dobro sluzi radilo se o Biracu iz Zvornika koji se nalazio negdje u sredini? Zadnji put kad sam o tome citao najveci izvoznik iz BiH je bio Aluminijum Mostar, slijede ga EP BiH Sarajevo (veliki porast), VW Sarajevo (umjeren porast), Mittal Steel Zenica (veliki porast) itd.
Jesi siguran da samo izvoz Aluminijuma iz Mostara nije veci od cjelokupnog izvoza banjalucke regije?
BL November 1st, 2006, 12:46 PM pa vjerovao ili ne ima 90% srba je ostalo u tom gradu a po popisu stanovnista iz 91. srba je bilo oko 70%, dankel imas njajmanje 70% "starog" stanovnistva u tom gradu. sto se nppr. za tvoje sarajevo ne bi moglo reci. ali kao sto ti kazes nije ovo tema topika.
jesam siguran sam, a pokusaj naci to na sajtu statistickog zavoda.
LordMarshall November 1st, 2006, 06:02 PM you two are going off topic
zip it
BL November 1st, 2006, 07:59 PM LM savjest foruma... pa ne idemo off topic, jer je topic koliko znam mostar, a budzet mostara i izvoz je dio teme
LordMarshall November 2nd, 2006, 10:55 PM budzet ok
etnicki sastav grada nije ok
Pavle4488 November 3rd, 2006, 12:31 PM Postaješ naporan.
biloko November 3rd, 2006, 03:12 PM Jesi siguran da samo izvoz Aluminijuma iz Mostara nije veci od cjelokupnog izvoza banjalucke regije?
Ok, vrijeme je da se rijesis mitova. Vjerovao ili ne ljudi u banjaluckoj regiji ne zive samo od vazduha. Istina je da su medju najvecim izvoznicima kompanije iz FBIH
Lista najve}ih 10 izvoznika u 2005:
1. „ALUMINIJ“ Mostar (obrada metala) još uvijek nije privatizovan;
2. „VOLKSWAGEN“ Sarajevo (mašine, uređaji, transportna oprema) DSU Njemačke;
4. „BALKAL“ Zvornik (obrada glinice i metala) DSU iz Litvanije;
5. „BHSC“ Zenica (obrada metala - čelik) DSU iz Holandskih Antila;
7. „GLOBAL ISPAAT“(koksara u Lukavcu) DSU Velike Britanije;
8. ˝Novi Rudnici Ljubija˝ (rudnici željeza) DSU- Holandski Antili;
9. ˝ TMD Gradačac˝ (dijelovi za motorna vozila) DSU iz Slovenije;
11. ˝ELEKTROPRIVREDA RS˝ (električna energija) u državnom vlasništvu;
12. ˝BORAC˝ export-import (tekstilna kompanija-Travnik) vlasništvo radnika i menadžmenta;
13. ˝ELEKTROPRIVREDA BIH˝ kompanija u državnom vlasništvu (električna energija).
Izvor: Vanjskotrgovinska komora BiH
,ali je takodje i cinjenica da su strana ulaganja prosle godine najvise isla u:
U 2005. godini, među investicijama koje premašuju 10 miliona KM, osam najvećih pojedinačnih investicijskih
projekata predstavljaju jednu polovinu registrovanog priliva DSU u ekonomiju Bosne i Hercegovine.
To su bili:
JELŠINGRAD a.d. Banja Luka (livnica čelika) – 90 miliona KM;
Hypo Alpe-Adria-Bank AD Banja Luka – 70,5 miliona KM;
INTEROIL Srebrenik (nafta) – 33,4 miliona KM;
MERCATOR BH Sarajevo (veleprodaja i maloprodaja) – 31 miliona KM;
EFT GROUP Stanari Doboj (rudnik lignita) – 22,6 miliona KM;
Holiday Inn Sarajevo (hotel) – 16,3 miliona KM
NATRON-HAYAT d.o.o Maglaj (proizvodi od papira i pulpe) – 14 miliona KM;
Intereuropa RTC Sarajevo (špediterske usluge) – 13,9 miliona KM
A ako odes na
www.eppu.ba/pdf/epru_april_latinica_web.pdf primjetices da i ostale grane industrije, posebno preradjivacka biljeze veliki rast u BL regiji. U svakom slucaju progooglaj malo oci, nadji cinjenice a onda razbacuj znanje.
Pozdrav
SA-R November 3rd, 2006, 11:02 PM Ok, vrijeme je da se rijesis mitova. Vjerovao ili ne ljudi u banjaluckoj regiji ne zive samo od vazduha. Istina je da su medju najvecim izvoznicima kompanije iz FBIH
PozdravNije nam dovoljan samo kopiran tekst nego i puni link ka tekstu. Inace mi malo smrdi taj podatak da je EP BIH 13 po izvozu u BiH? Sto se tice Rudnika Ljubije racunas li to prodaju u Federaciju BiH kao izvoz, zbog toga sto oni rade samo za Mital Steel iz Zenice?
Budi ljubazan pa nam ga proslijedi. Dok nam nedas te linkove evo ti malo materijala za zagrijavu iz hrvatskog Vecernjeg Lista.
Evo ovako se to radi. prvo tekst, pa ispod link na tekst da niko nema sumnje da je tekst prepravljan.
Neravnomjeran gospodarski razvitak u BiH sve izraženiji
Sarajevo i Hercegovina - najbogatija područja u zemlji
http://www.vecernji-list.hr/system/galleries/pics/061102/bih-2-txt.jpg
SARAJEVO - Najbogatija područja u Bosni i Hercegovini su Sarajevski kanton i Hercegovačko-neretvanska županija te banjolučka regija. Podaci o visini plaća, vrijednosti izvoza i zaposlenim građanima jasno pokazuju da ta područja odskaču od ostatka zemlje. Prosječne su plaće u Sarajevu i Mostaru dostigle 758 KM, odnosno 662 KM, a svi ostali imaju prosječne plaće ispod 600 maraka.
Takve razlike u plaćama rezultat su toga da su u Mostaru, a posebno u Sarajevu, smještene brojne državne i entitetske institucije te strana predstavništva. Svi imaju relativno visoke i redovite plaće.
Ipak, visina plaća u Sarajevu i Mostaru uvelike je povezana i s dostignutim stupnjem razvitka industrije i trgovine u tim gradovima i njihovu okruženju. Trgovački lanci, veliki industrijski proizvođači, i javna poduzeća prilično su zaslužna za brži gospodarski oporavak tih dijelova u odnosu na ostala područja u zemlji. Iako Tuzlanski kanton bilježi veću vrijednost izvoza, Sarajevski kanton s godišnjim izvozom od 526 milijuna i Hercegovačko-neretvanska županija s 485 milijuna maraka kotače su gospodarskog razvitka FBiH.
Omjer zaposlenih i nezaposlenih znatno je bolji nego u ostalima. Sarajevo i Mostar imaju trećinu više zaposlenih nego nezaposlenih, za razliku od ostalih. Najbogatija područja u FBiH donekle uspijevaju pratiti Hercegbosanska, Zapadnohercegovačka i Posavska županija te Tuzlanski kanton.
Najmanja primanja, ali i skromnu proizvodnu i ekonomsku aktivnost imaju Zeničko-dobojski i Srednjobosanski kanton. Prosječne su plaće oko 500 maraka, a nezaposlenih je više od onih koji rade. Stanje u Zenici, ali i susjednim općinama Središnje Bosne moglo bi se promijeniti ako se ostvare najave o pokretanju integralne proizvodnje u zeničkoj željezari. Dok se to ne dogodi, Zenica i Središnja Bosna bit će, uz Bosansko-podrinjski kanton, najsiromašnija područja u FBiH.
http://www.vecernji-list.hr/newsroom/news/bih/666737/index.do
Sto se tice "stranih ulaganja" ja tu jedino priznajem greenfield strana ulaganja, ostatak je rasprodaja. Ne treba biti pametan pa znati da banka maltene mora donjeti profit, ne treba biti pametan pa znati da telekom mora donositi profit, prodavati njih je glupost i strogo sam protiv toga. Tako da taj spisak skratis poprilicno.
BL November 3rd, 2006, 11:09 PM ^^ ovo su ti podaci koji se odnose samo na federaciju, ne zna se prosjecna plata u banjaluckoj regiji, jer nema takvih informacija, ne vodi se ta statistika.
A ljubija izvozi vecinu i o tome ti je bilo milion tekstova na webu, mora da si propustio.
a covjek ti je dao link, ja sam danas uzeo sebi pola sata i procitao skoro svih 80str tog izvjestaja.
Banjalucka regija ima najveci izvoz i najmanju nezaposlenost.
SA-R November 4th, 2006, 12:04 AM ^^ ovo su ti podaci koji se odnose samo na federaciju, ne zna se prosjecna plata u banjaluckoj regiji, jer nema takvih informacija, ne vodi se ta statistika.
A ljubija izvozi vecinu i o tome ti je bilo milion tekstova na webu, mora da si propustio.
a covjek ti je dao link, ja sam danas uzeo sebi pola sata i procitao skoro svih 80str tog izvjestaja.
Banjalucka regija ima najveci izvoz i najmanju nezaposlenost.Procitaj jos jednom tekst V.L. pa nam se onda javi.
Najbogatija područja u Bosni i Hercegovini su Sarajevski kanton i Hercegovačko-neretvanska županija te banjolučka regija. Podaci o visini plaća, vrijednosti izvoza i zaposlenim građanima jasno pokazuju da ta područja odskaču od ostatka zemlje. Prosječne su plaće u Sarajevu i Mostaru dostigle 758 KM, odnosno 662 KM, a svi ostali imaju prosječne plaće ispod 600 maraka.Znaci Banjalucka regija nema prosjecnu placu ni 600 maraka vs. Sarajevskog kantona koji ima prosjek od 758 KM ili HN zupanije od 662 KM? Meni je clanak vrlo jasan i ovdje se radi o BiH nivou ne Federalnom.
Na kojoj stranici je izvjestaj o izvozu po regijama? Ja sam ga trazio, trazio i mora da mi je "izmakeo"? Budi ljubazan pa nam napisi broj stranice gdje to pise?
Sto se tice nezaposlenosti i to navodno najmanjoj u Bluckoj regiji negdje u tom linku je posebno napisano da je RS presla na nove kalkulacije u racunanju nezaposlenosti (citaj manipulacije), stara fora nezaposleni se mora prijaviti svakog mjeseca, ako to ne urade ispadaju sa spiska nezaposlenih i tako zvanicne cifre budu puno manje od stvarnih, ali i dalje broj nezaposlenih rapidno raste? Nisam vidio te podatke, medjutim garant da je Blucka regija jedina iz RS koja nesto vrijedi. Ostatak je vjerovatno medju najzaostalijim regijama u BIH. Ipak stvar u Federaciji je ujednacenija. Podatci za RS jesu neuporedivo bolji nego prijasnjih godina (koje sam gledao) i drago mi je da RS vise nije slijepo crijevo BIH sto se tice ekonomije istovremeno se nadajuci da nisu frizirali podatke, sto je vrlo lako moguce da upravo iz tog razloga nedaju podatke.
Takodjer u pdf dosijeu je vise puta napomenuto da je Aluminijum daleko najveci izvoznik u BiH, a da je VW drugi.
Inace gdje su u tim podatcima o stranim investicijam za proslu godinu recimo Terme Ilidza od 36 miliona EUR, sta je sa Holiday Inn investicijom? Nije li ta investicija bila 42 miliona KM, ne 16?
Pavle4488 November 4th, 2006, 12:37 AM ...i drago mi je da RS vise nije slijepo crijevo BIH sto se tice ekonomije...
Što volim ovakve pilote! :laugh:
Eto, nama je žao što kočimo razvoj tzv. Bosne i Hercegovine, i kao svoj doprinos toj međunarodnoj sili nudimo da se samoizdvojimo, da bi ta međunarodna sila mogla brže napredovati ka EU gdje je svi željno isčekuju. :poke:
Nedim November 4th, 2006, 12:56 AM Federacija BiH uplacuje oko 72% PDV, Distrikt Brcko oko 3% i ostalo je RS.To su podaci UIO za 2005 godinu. I prema tome se mogu procijeniti privredna kretanja u BIH. ipak treba uzeti u obzir da federacija ima oko 2,3 miliona a RS oko 1,5 mil stanovnika
sale November 4th, 2006, 06:29 AM Sto se tice "stranih ulaganja" ja tu jedino priznajem greenfield strana ulaganja, ostatak je rasprodaja. Ne treba biti pametan pa znati da banka maltene mora donjeti profit, ne treba biti pametan pa znati da telekom mora donositi profit, prodavati njih je glupost i strogo sam protiv toga. Tako da taj spisak skratis poprilicno.
banks should make a profit. so why werent they making a profit 5 years ago before the privatisatiopn took place? because they were run by a bunch or morons who knew nothing about banks. this is what usaully happend when governments own banks.
BH telecom seems to have improved under goverment ownership in the last years BUT when it becomes privatised it will earn twice as much, calls will be cheaper and things will be instaleld and fixed many times faster.
look at america, arguably the richest country (or one of) the government NEVER owned a telecom company. and they are the doing well. their telecoms are provideing free wireless internet to whole cities! (YES FREE)
also you can buy pretty much any american company, from bank to power plant, to telecom and foreigners do all the time. and america isnt doing os badly is it?
BL November 4th, 2006, 11:03 AM Procitaj jos jednom tekst V.L. pa nam se onda javi.
Znaci Banjalucka regija nema prosjecnu placu ni 600 maraka vs. Sarajevskog kantona koji ima prosjek od 758 KM ili HN zupanije od 662 KM? Meni je clanak vrlo jasan i ovdje se radi o BiH nivou ne Federalnom.
Na kojoj stranici je izvjestaj o izvozu po regijama? Ja sam ga trazio, trazio i mora da mi je "izmakeo"? Budi ljubazan pa nam napisi broj stranice gdje to pise?
Sto se tice nezaposlenosti i to navodno najmanjoj u Bluckoj regiji negdje u tom linku je posebno napisano da je RS presla na nove kalkulacije u racunanju nezaposlenosti (citaj manipulacije), stara fora nezaposleni se mora prijaviti svakog mjeseca, ako to ne urade ispadaju sa spiska nezaposlenih i tako zvanicne cifre budu puno manje od stvarnih, ali i dalje broj nezaposlenih rapidno raste? Nisam vidio te podatke, medjutim garant da je Blucka regija jedina iz RS koja nesto vrijedi. Ostatak je vjerovatno medju najzaostalijim regijama u BIH. Ipak stvar u Federaciji je ujednacenija. Podatci za RS jesu neuporedivo bolji nego prijasnjih godina (koje sam gledao) i drago mi je da RS vise nije slijepo crijevo BIH sto se tice ekonomije istovremeno se nadajuci da nisu frizirali podatke, sto je vrlo lako moguce da upravo iz tog razloga nedaju podatke.
Takodjer u pdf dosijeu je vise puta napomenuto da je Aluminijum daleko najveci izvoznik u BiH, a da je VW drugi.
Inace gdje su u tim podatcima o stranim investicijam za proslu godinu recimo Terme Ilidza od 36 miliona EUR, sta je sa Holiday Inn investicijom? Nije li ta investicija bila 42 miliona KM, ne 16?
Ja cu ti ponovo reci da se ne vodi evidencija koliko je pojedinacno plata u kojoj regiji RS, tako da to sto je vecernji napisao su cista nagadjanja, a blucku regiju je ubacio cisto da ne bi bilo da nemaju podatke uza RS... citaj ciste pretpostavke. i stvarno ovakve novinare bi trebalo sto prije istrijebiti.
sto se tice nezaposlenosti podatak je tacan, broj nezaposlenih se konstantno smanjuje, a ovo znam, jer pratim ta desavanja vec duze vremena, a to da ako se neko ne javi na biro brise se nije tacno. procitaj tekst ponovo. i prije prelaska na novu metodologiju RS je imala za 8% manju nezaposlenost nego federacija. a razlog je jednostavan u federaciji se nalazi vecina velikih sistema koji su imali mnogo radnika, pa se sad rade restruktuiranja i mnogo je nezaposlenih. struktura privrede je drugacija, a osim toga u RS su svi ti veliki sistemi odavno "ocisceni" od viska radnika, federacija to tek sad radi.
sto se tice toga da banjalucka regija jedina nesto vrijedi, opet nije tacno, bijeljinska regija je jako uspjesna, pored nje i posavina isto, a i trebinjska regija je sve bolja i bolja, sada je trenutno na 2. mjestu, pretekla je bijeljinsku. u svakom slucaju sve ove regije su sigurno bolje nego kanton 10, sansko-unski kanton, ze-do kanton i bosansko-podrinjski kanton. tako da ti tvoji mitovi o nerazvijenoj RS i razvijenoj federaciji ne vrijede uopste.
RS je prolazila kroz krizu od 1999g. jer nije imala nikakvih ulaganja, a privreda je pala zbog nato bombardovanja u srbiji, zna se da je velik0om vecinom sve u to doba bilo izvozeno u srbiju. zbog toga je u tom periodu RS bila gora od Federacije, ali vremena se mijenjaju. RS jako dobro napreduje i to vec 4 godinu zaredom. Znam to jer pratim tu tematiku.
Sto se tice friziranja podataka, to mi je zaista smijesno replicirati... sta to kao RS frizira podatke, a federacija sve tacno, jedni lopovi drugi posteni i sl. smijesno i zalosno... zasljepljeno....
u svakom slucaju dosta podataka dolazi i od CBBiH....
sto se tice uplacivanja u budzet RS sada trenutno uplacuje oko 32%, a to opet moze da zavara, jer ne treba zaboraviti da je vecina uvoznika u Sarajevu. Tako da se sve to evidentira za SA kanton.
SA-R November 4th, 2006, 01:50 PM banks should make a profit. so why werent they making a profit 5 years ago before the privatisatiopn took place? because they were run by a bunch or morons who knew nothing about banks. this is what usaully happend when governments own banks. Of course that banks must made profits, just Bosnian banks, not foreign. Ownership is not main thing to have a good enterprise. Why state cannot give percent to good manager and have good enterprise? It is also not hard today to pay one good manager by percent of the profit to make bank very profitable. So why we need after all the biggest five banks in Bosnia with headquerters and profits outside of the Bosnia? Do you have idea that foreign banks from Bosnia delivered trucks of the money from Bosnia in theirs HQ in Wienna, Berlin, Brussels, Ljubljana or where ever, and than they borowed money for credits in Bosnia with five times higher rents? Do you have a idea that Ljubljanska Banka with new name Nova Ljubljanska Banka operate fully in Bosnia even they stolen houndreds of the milions EUR from citiezens of the BiH? This is not way how things must be done.
BH telecom seems to have improved under goverment ownership in the last years BUT when it becomes privatised it will earn twice as much, calls will be cheaper and things will be instaleld and fixed many times faster.
look at america, arguably the richest country (or one of) the government NEVER owned a telecom company. and they are the doing well. their telecoms are provideing free wireless internet to whole cities! (YES FREE)
also you can buy pretty much any american company, from bank to power plant, to telecom and foreigners do all the time. and america isnt doing os badly is it?Of course it will earn twice becouase owners will not invest profit for construc. of the highways but will send houndreds millions of the EUR every year of the profits outside of the Bosnia. Just idiots or corupted politicans are able to say that privatisation of the Telecoms is positive thing for country. It is robbery on big skale. Why Deutsche Telecom is not privatised, why Austrian Telecom is in hands of the Austrian government and etc ...? Also after privatisation service will stay on same or higher level of the prices, so don't expect anything positive from that.
You cannot compare US with Bosnia in that. US is huge country compared to Bosnia, it is the most powerfull country in many things and among that in economy, the biggest investors are from US, so if you take that formula and put everything on sale in Bosnia, than foreigners will own everything and domicile will own nothing. How can domicile compare with foreigners in fair fight about ownerships of the Bosnian companies when they faced war just few years ago? No, opening must happiend for 40 or something years of the peace, for example in 2050 we are able to liberate some sectors of our economy. If we do that early, than foreigners will own us not just political, but also economical. Telecom, banking, electro sectors must be under strong control of the state. It is not too hurd for those sectors under state ownership to be profitable. Tell me one reason why we need those sectors in hands of the foreigners? Becouase of the lower prices? Don't you dare to expect something like that after changing ownership from state owned to foreign companies owned. Prices will be the same or higher.
bosnia1990 November 4th, 2006, 02:57 PM 2.650 maraka za popravku sata
Sat na Španjolskom trgu koji je razbijen još 13. lipnja u incidentu koji se dogodio nakon utakmice Hrvatska - Brazil, ovih dana bi se trebao napokon popraviti. Podsjetimo, sat je gradu donirala Međunarodna ...
http://www.bljesak.info/slike/sat-spanjolski-trg.jpg
... organizacija Lions Club. Kako Dnevni list doznaje od nadležnih u gradskoj administraciji, pitanje dana je kada bi se sat trebao popraviti.
Prema riječima Marice Raspudić, stručne savjetnice za urbani mobiliar i dekoraciju u Odjelu za gospodarstvo, sigurnost i okoliš Gradske uprave Mostara, sve je dogovoreno s tvrtkom Vrijeme iz Ljubuškog koja će popraviti sat.
''Trošak popravka sata će iznositi 2.650 maraka, a s popravkom će se krenuti čim ugovor dođe s protokola, odnosno čim ga gradonačelnik potpiše. Mislim da je to samo pitanje dana'', istaknula je Marica Raspudić.
sale November 4th, 2006, 06:50 PM wow SA-R, you are so far removed from good economic policy it is scary! and bosnia is very lucky not to have you running the economy.
Why state cannot give percent to good manager and have good enterprise?
because its been tried. and it doesnt work. its called communism and state protectionism. the main problem is a lack of competition. if state owns somehtign they say, OK lets get rid of competition and we will make more money. WRONG... they might make more money in short term but they are less cometitive and that mekes them incompetant and more expensive.. and arrogant.
Do you have idea that foreign banks from Bosnia delivered trucks of the money from Bosnia in theirs HQ in Wienna, Berlin, Brussels, Ljubljana or where ever, and than they borowed money for credits in Bosnia with five times higher rents?
this is reidiculous!!! who told you this. how old are you? did anyone actually see trucks carrying money? do you know hwo the banking sector works? do you know what money supply is?
Do you have a idea that Ljubljanska Banka with new name Nova Ljubljanska Banka operate fully in Bosnia even they stolen houndreds of the milions EUR from citiezens of the BiH?
they will have to give it back sooner or later with interest if they did indeed steal it. dont worry about that! only worry if they go bankrupt. then you wont see it again.
Of course it will earn twice becouase owners will not invest profit for construc. of the highways but will send houndreds millions of the EUR every year of the profits outside of the Bosnia.
money from bank profits MUST NOT to got building roads. the profits will be reinvested into the bosnian telecommunications sector.. if it isnt........ then new competition will come and take away their customers adn then their whole investment is ruined.
Why Deutsche Telecom is not privatised
it IS privatised. the governemtn owns about 15% of the comapany. if you have some spare cash.. we can go to franfurt and you can buy 85% of deutche telecom on the stock exchange and we can send all the profits to bosnia.
US, so if you take that formula and put everything on sale in Bosnia, than foreigners will own everything and domicile will own nothing.
beleive it or not.. this is a good thing. it would actually make bosnians richer.
but in relaity it would never happen.
No, opening must happiend for 40 or something years of the peace, for example in 2050 we are able to liberate some sectors of our economy
if bosnia did this... there would be a famine in bosnia!!!..... america would have to send money and food so the poeple dont starve.... it would be a bit like north korea.
Tell me one reason why we need those sectors in hands of the foreigners? Becouase of the lower prices? Don't you dare to expect something like that after changing ownership from state owned to foreign companies owned. Prices will be the same or higher.
because it will make the sectors more productive, businesses mroe efficient and higher employment in the medium & long run. and goevrnemtn would get more tax revenues.
if what you say is true... then amreica would be on her knees begging for food because EVERYTHING is privatised. and north korea & former USSR would be a bastion of prosperity.
what you are basically advocating is soemthign between mercantilism and socialism. but you will note that out of these only capitalism is prospering. i read a report that in america out of all the poeple BELOW POVERTY LINE.... 95% of them have coloutr tv's and 70% of them have a car.
PM me i would love to show you some reports on the benefit of free trade and capitalism.
SA-R November 4th, 2006, 08:46 PM wow SA-R, you are so far removed from good economic policy it is scary! and bosnia is very lucky not to have you running the economy.
because its been tried. and it doesnt work. its called communism and state protectionism. the main problem is a lack of competition. if state owns somehtign they say, OK lets get rid of competition and we will make more money. WRONG... they might make more money in short term but they are less cometitive and that mekes them incompetant and more expensive.. and arrogant.
this is reidiculous!!! who told you this. how old are you? did anyone actually see trucks carrying money? do you know hwo the banking sector works? do you know what money supply is?
they will have to give it back sooner or later with interest if they did indeed steal it. dont worry about that! only worry if they go bankrupt. then you wont see it again.
money from bank profits MUST NOT to got building roads. the profits will be reinvested into the bosnian telecommunications sector.. if it isnt........ then new competition will come and take away their customers adn then their whole investment is ruined.
it IS privatised. the governemtn owns about 15% of the comapany. if you have some spare cash.. we can go to franfurt and you can buy 85% of deutche telecom on the stock exchange and we can send all the profits to bosnia.
beleive it or not.. this is a good thing. it would actually make bosnians richer.
but in relaity it would never happen.
if bosnia did this... there would be a famine in bosnia!!!..... america would have to send money and food so the poeple dont starve.... it would be a bit like north korea.
because it will make the sectors more productive, businesses mroe efficient and higher employment in the medium & long run. and goevrnemtn would get more tax revenues.
if what you say is true... then amreica would be on her knees begging for food because EVERYTHING is privatised. and north korea & former USSR would be a bastion of prosperity.
what you are basically advocating is soemthign between mercantilism and socialism. but you will note that out of these only capitalism is prospering. i read a report that in america out of all the poeple BELOW POVERTY LINE.... 95% of them have coloutr tv's and 70% of them have a car.
PM me i would love to show you some reports on the benefit of free trade and capitalism.No it is not. All what you said in your last post is BS.
If state pay one good, excellent manager in percents of the profit, than this is not communism. I think that you are not child to don't understand that?
What you try to said, that foreign banks keeps theirs profits what they earn in Bosnia in Bosnia? You are so naive and you don't know anything about economy. Foreign banks keeps in Bosnia just how much they are obligated by national bank minimum deposit. Everything else they send in HQ outside of the Bosnia. When they need money to give some credits for Bosnian enterprises or citizens they borow money from theirs HQ but with much higher rent.
I don't have a time to answer on rest of the your post about telekoms in foreign hands, nice example for us is Croatia, where nothing is changed after they sold theirs Telekom and "libarised" market for foreign companies with which the richest Croatian don't have a chance to compete. how can you compete with one DT which was state owned company from government in country which have 80 million population?
I don't know for any developed country in world that opened fully theirs market for bigger countries? For example EU and US for products of the China?
So you theory is bullshit. Today Bosnian market is opened more to foreigners houndred times than in oposite direction and that was main reason why Bosnia have so big trade deficit mainly with countries from EU and region and that is main reason why Bosnian economy is not 50% of the pre war economy. Only blind people don't see that.
sale November 5th, 2006, 06:56 AM how can you compete with one DT which was state owned company from government in country which have 80 million population?
again... its not a state owned company anymore. you can compete with it by offereing better prices and better service. there are 7 phone opeators in australia tat i know. they all make a good profit.
Foreign banks keeps in Bosnia just how much they are obligated by national bank minimum deposit. Everything else they send in HQ outside of the Bosnia. When they need money to give some credits for Bosnian enterprises or citizens they borow money from theirs HQ but with much higher rent.
you dont have to go to them. go to BBI. thats an islamic bank and wont charge you ANY interest! you get a loan and a ticket to paradise! this was only possible because of banking de-regulation. you see... even g*d favours capitalism.
I don't know for any developed country in world that opened fully theirs market for bigger countries? For example EU and US for products of the China?
I DO! australia & usa .......... canada & usa ....... singapore & australia ..... china & australia (in 1 years time) ......... israel & usa .... israel & canada ....... sinagapore & usa .......... singapore & south korea....... spain & germany ......... france & germany.... austria & germany i owuld write abotu 3 pages of such agreements.
Today Bosnian market is opened more to foreigners houndred times than in oposite direction and that was main reason why Bosnia have so big trade deficit mainly with countries from EU and region and that is main reason why Bosnian economy is not 50% of the pre war economy.
the reaosn for this is that bosnia doesnt have much to sell that is very good. and if they do they havent worked out a way to get it to the market. if bosnain products were so good why are bosnians not buying it? bosnian goods are often expensive and of a low quality. with greater competition the ineffcient products will disappear and go out of business and will be forced to make something they are good at. finally creating a prosperous country.
i reccomend reading a book by adam smith "wealth of nations" it will be a good start.
beause if you are right then coutnries involeved in free trade would be dirt poor. look at EU in 1960 and EU now that free trade is in place. everyone is much wealthier now in real terms. in 1960 in current prices a berlin to london flight was about $3,000 now its about $20. (the price of 2 large pizzas)... all because of free trade.
sarajevo to frankfurt flight now is about 800KM... after free trade i will be about 50KM... ist that better?
Mimar November 6th, 2006, 06:58 PM Sveučilište u Mostaru: Do 2011. novi campus i zgrade za 360 milijuna kuna
Sveučilište u Mostaru u sljedećih će pet godina promijeniti izgled do neprepoznatljivosti zahvaljujući kreditu Hrvatske banke za obnovu i razvitak koji će Hrvatska vlada vraćati do 2017., uplaćajući obroke umjesto godišnje pomoći Sveučilištu. Radovi su podijeljeni u nekoliko faza, a između ostalog uključuju nove zgrade Građevinskog, Filozofskog, novi campus, sveučilišna knjižnica, športska dvorana, treće krilo studentskog doma, podzemnu garažu i niz drugih projekata.
"Radovi bi trebali biti gotovi do 2011., dokad moramo prihvatiti i bolonjska pravila i norme studiranja", izjavio je prof. dr. Ivo Čolak, dekan Građevinskoga fakulteta.
http://bljesak.info/modules.php?name=News&file=article&sid=37773
LordMarshall November 6th, 2006, 07:06 PM Iduća sezona bez zbunjenih turista
MOSTAR - Turistička signalizacija koja ima zadatak turistima koji se po prvi put nalaze u Mostaru pomoći u dolasku do najzanimljivijih objekata i lokacija do sada je postavljena na ulazima u grad i široj okolici, međutim, trebala bi se naći i u samom gradu, kuda najčešće i "tumaraju" izgubljeni turisti.
Projekt otpočeo prije godinu
Baš zbog tog problema Turistička zajednica HNŽ-a pokrenula je prije godinu dana projekt za postavljanje turističke signalizacije na području cijele županije, s posebnim osvrtom na Mostar i njegovu okolicu. Ovaj projekt je, kako su naglasili iz Turističke zajednice, u završnoj fazi, a čeka se odobrenje Gradske uprave. "Sredstva za projekt turističke signalizacije su osigurana, izvođač je odabran, samo nam treba urbanistička suglasnost Grada. Očekujemo skoru realizaciju ovog projekta", rekao je Andrija Krešić, direktor Turističke zajednice HNŽ-a. Grad na Neretvi, jedan je od najvećih bisera bosanskohercegovačkog turizma, zanimljiv je kako stranim, tako i domaćim turistima. Mnoge su ljepote i znamenitosti koje ovaj grad čine jedinstvenim. Međutim, nekada i oni koji namjenski dođu u Mostar vidjeti sve ljepote koje ga krase odu iz njega, a da nisu "okusili" niti trećinu hercegovačkih čari.
Gradske vlasti podupiru projekt
Da je ovaj projekt potreban gradu, prepoznale su i gradske vlasti, pa je tako gradonačelnik Ljubo Bešlić, objašnjavajući kako se Mostar treba okrenuti turizmu, obećao da će najveći biser Hercegovine u idućoj godini imati potpuno novu i moderniju turističku signalizaciju. "Što se tiče projekta turističke signalizacije, potrebni su nam urbanistički uvjeti i mjesta na kojima će se postaviti signalizacija. Tako ćemo iduću turističku sezonu dočekati s posve novom turističkom signalizacijom", rekao je gradonačelnik Bešlić.
Link: http://dnevni-list.ba/?mdls=1&mdls_tip=2&nid=7419
LordMarshall November 6th, 2006, 07:08 PM Počele pripreme za plesni festival
MOSTAR - Iako se tradicionalni festival “Pod Starim mostom” iduće godine održava od 22. do 25. lipnja, pripreme u organizaciji su već odavno počele. Naime, festival “Pod Starim mostom” ove je godine dobio naziv Međunarodni kup, što predstavlja najjaču kategorizaciju svjetske IDSF asocijacije te bi sljedeći festival trebao biti mnogo kvalitetniji od ovogodišnjeg. Prema riječima predsjednika Plesnog kluba Rondo Emira Tojage, sljedeći festival “Pod Starim mostom” bi trebao ugostiti mnogo više plesnih parova iz svih europskih zemalja.
Još se ne zna mjesto održavanja
“Pripreme su krenule odmah po završetku ovogodišnjeg festivala, sada trenutačno idemo malo konkretnije. Razdoblje je dugo, a istodobno jako kratko, s obzirom da je vrlo teško iznaći osnovna financijska sredstva potrebna za organizaciju jednog tako iznimno velikog projekta koji je ove godine okupio više od 1.000 plesača iz dvanaest europskih zemalja”, kazao je Tojaga. Također je dodao kako će se idući plesni festival “Pod Starim mostom” održavati tri dana te će se u sklopu njega u Mostaru održati pripreme reprezentacije BiH u plesu. Još uvijek nije iskristalizirano gdje će se ovaj plesni festival održati, ali se zasigurno zna da će se jedan dio festivala održati na pozornici ispod Starog mosta po kojoj je ovaj festival i dobio ime. Tojaga je naglasio kako za održavanja protekla tri festivala nisu uspjeli zainteresirati gradonačelnika grada Mostara da pozdravi svjetske plesače te da se iskreno nada da će na sljedećem festivalu goste plesače pozdraviti netko iz Gradske uprave grada Mostara.
Upis u plesnu školu
Osim angažmana oko plesnog festivala, Plesni klub Rondo ovih dana vrši upis djece, ali i ostalih zainteresiranih, u školu plesa. “Upis novih članova u plesnu školu održat će se 5. studenoga u Staroj gimnaziji u Mostaru. Ovo nije klasična škola plesa jer ovdje dječaci i djevojčice imaju mogućnost zabaviti se i družiti kroz pjesmu i ples, a škola je otvorena i za sve ostale građane bez obzira kojoj dobnoj skupini pripadali”, istaknuo je Tojaga dodavši da će djeca imati mogućnost sudjelovati na natjecanjima i turnirima koji se održavaju po cijeloj BiH i susjednim zemljama. “Nama je cilj zadržati tradiciju plesa u ovom gradu. Gimnazija nam je širom otvorila vrata i ustupila svoju dvoranu. Ovom prilikom zahvaljujem ravnateljici Stare gimnazije i njezinu zamjeniku i profesorima koji nas podržavaju te unatoč svojim problemima uvijek nađu načina pomoći nam”, zaključio je Tojaga.
Link: http://dnevni-list.ba/?mdls=1&mdls_tip=2&nid=7386
long foot November 6th, 2006, 08:19 PM Nije nam dovoljan samo kopiran tekst nego i puni link ka tekstu. Inace mi malo smrdi taj podatak da je EP BIH 13 po izvozu u BiH? Sto se tice Rudnika Ljubije racunas li to prodaju u Federaciju BiH kao izvoz, zbog toga sto oni rade samo za Mital Steel iz Zenice?
Budi ljubazan pa nam ga proslijedi. Dok nam nedas te linkove evo ti malo materijala za zagrijavu iz hrvatskog Vecernjeg Lista.
Evo ovako se to radi. prvo tekst, pa ispod link na tekst da niko nema sumnje da je tekst prepravljan.
Sto se tice "stranih ulaganja" ja tu jedino priznajem greenfield strana ulaganja, ostatak je rasprodaja. Ne treba biti pametan pa znati da banka maltene mora donjeti profit, ne treba biti pametan pa znati da telekom mora donositi profit, prodavati njih je glupost i strogo sam protiv toga. Tako da taj spisak skratis poprilicno.
Podaci iz Večernjeg lista? Pa zar mi ti nisi prije koji dan dijelio lekcije o bijedi hrvatskih medija na primjeru Večernjeg lista, a sad ga odjednom citiraš kao vjerodostojan izvor? :ohno:
BL November 7th, 2006, 02:08 AM ^^ kako kome kad treba tako to funkcionise na balkanu
SA-R November 7th, 2006, 12:57 PM Podaci iz Večernjeg lista? Pa zar mi ti nisi prije koji dan dijelio lekcije o bijedi hrvatskih medija na primjeru Večernjeg lista, a sad ga odjednom citiraš kao vjerodostojan izvor? :ohno:LF nije topik za takvo sto. sta bi bilo da ja dodjem na zg thread i krenem pisati desete stvari. prestani s tim vise. sto se tice V.L. ne moras odgovarati ili otvori novi topik. radi se o podatcima koji su vjerovatno citirani iz bih statistike i valjda nisu toliko drski da i to slazu. o lazima vecernjeg lista ne pisem samo ja. cini mi se da je tome feral tribune posvetio cijelu stranicu. takodjer mogao si procitati dosta puta da se i drugi bune ili skrecu paznju na lazi vecernjeg lista.
long foot November 7th, 2006, 01:25 PM LF nije topik za takvo sto.
Cijela ova priča je of topic, a ne samo moj post. :ohno:
sta bi bilo da ja dodjem na zg thread i krenem pisati desete stvari.
Po čemu to ti imaš više prava da postaš u ovaj thread od mene?
prestani s tim vise. sto se tice V.L. ne moras odgovarati ili otvori novi topik.
S čim da prestanem? Ne sjećam se da sam počeo nešto.
radi se o podatcima koji su vjerovatno citirani iz bih statistike i valjda nisu toliko drski da i to slazu. o lazima vecernjeg lista ne pisem samo ja. cini mi se da je tome feral tribune posvetio cijelu stranicu. takodjer mogao si procitati dosta puta da se i drugi bune ili skrecu paznju na lazi vecernjeg lista.
Nisi dosljedan, čovječe. Večernji je smeće, ali ga ti svejedno citiraš da dokažeš neke svoje tvrdnje. Ako su uzeli podatke iz BiH statistike, onda lijepo odeš na stranice zavoda za statistiku, nađeš te podatke i ne treba ti smeće od Večernjeg.
BL November 7th, 2006, 01:30 PM ^^ pa ne moze otici jer u BiH tj. bar za RS ne postoje podaci koliko su u kojem gradu plate, to se vodi samo na republickom nivou
LordMarshall November 8th, 2006, 10:38 PM GRADONAČELNIK MOSTARA PRIMIO KINESKOG VELEPOSLANIKA U BIH
MOSTAR, 8. studenoga (FENA) - Gradonačelnik Mostara Ljubo Bešlić primio je danas u mostarskoj Gradskoj upravi veleposlanika Narodne Republike Kine u BiH Li Shuyuana.
Bešlić je kazao kako je ovo oproštajni posjet Shuyuana, koji ovog mjeseca napušta BiH, te dodao kako se tokom susreta razgovaralo o trenutnoj situaciji u gradu Mostaru i o svim onim projektima koji su započeti u prethodnom razdoblju.
"Razgovarali smo i o mogućnosti da kineska vlada financira izgradnju jedne osnovne škole u Mostaru. Takav projekt postoji za grad Sarajevo, pa pokušavamo da se on provede i u Mostaru. Oni imaju određene uvjete za to o kojima sad ne mogu govoriti", kazao je Bešlić te dodao da je pitanje zakonodavstva hoće li dopustiti takav angažman ili ne, istakavši da je to tema za neke od narednih sastanaka.
Veleposlanik Shuyuan zahvalio je građanima Mostara i novinarima, mostarskom Gradskom vijeću i gradonačelniku na dosadašnjoj suradnji i izrazio nadu da će ta suradnja biti nastavljena i u budućnosti.
Link: http://www.fena.ba/public2/Category.aspx?news_id=FMO407727
LordMarshall November 10th, 2006, 08:59 PM Safet Oručević gradi kino?
MOSTAR – Iako je već nekoliko godino najavljivano da će Art Company iz Kiseljaka graditi multipleks kino u Mostaru na mjestu kina Partizan, izgleda da od toga nema ništa i da će izgradnju kina preuzeti austrijsko-bosanska kompanija PID. Ovo su nam potvrdili i u Mostar filmu koji je do privatizacije bio vlasnik mostarskih kinodvorana Partizan i Zvijezda. Treba spomenuti da iza kompanije PID stoji nekadašnji mostarski gradonačelnik Safet Oručević. Kompanija PID, odnosno gradonačelnik Safet Oručević, u prošloj godini izgradila je poslovni centar “Neretva” na mjestu nekadašnje Titove vile, a iza njih je još nekoliko uspješnih projekata. Tako bi Mostar, sada kada je vlasništvo nad kinom preuzela Oručevićeva kompanija, možda uskoro mogao dobiti i kinodvoranu.
Brojni problemi
Kompanija iz Kiseljaka, kako doznajemo, odustala je zbog mnogobrojnih prepreka koje su im bile na putu. U planu su imali već odavno završiti mostarsko kino, ali problemi su se javili počevši od potrebnih dozvola do ugovora s Mostar filmom.
“Kada će kino početi s radom, ne znamo, ali će se sasvim sigurno početi graditi”, naglasila je Selma Redžović, direktorica Mostar filma. “Dok smo mi rješavali probleme papirologije, oni su uradili samo jednu veću investiciju, a to je rekonstrukcija krova na zgradi kina, i ništa više. U jednom trenutku su nas obavijestili kako nisu u mogućnosti nastaviti izgradnju zbog financijskih problema”, kazala je Redžović. Trenutačno je Mostar film u dogovorima sa svojim većinskim vlasnikom, austrijsko-bosanskom kompanijom PID, koja bi trebala nastaviti projekt investiranja i izgradnje kina.
Uskoro kino
“Budući da imamo svu potrebnu papirologiju, čak i građevinsku dozvolu, nadamo se da će se pitanje kina ubrzo riješiti”, rekla je Redžović. Kako je rekao Emir Balić, nekadašnji direktor Mostar filma, on je optimist i misli da će se to vrlo brzo riješiti. “Sada su to preuzeli dioničari iz Austrije i vjerujem da će oni to ozbiljno shvatiti i nadam se što prije riješiti, te će tako Mostar napokon dobiti kino, što uistinu i zaslužuje”, istaknuo je Emir Balić.
Povremene projekcije
Mostarci s vremena na vrijeme mogu pogledati film i to u Narodnom pozorištu ili na nekom drugom mjestu, koje ni u kojemu slučaju ne služi toj namjeni. Osuđeni možda i “doživotnom” činjenicom da u svome gradu neće imati kino, Mostarci su u velikome broju odlazili na te povremene filmske projekcije. Jedini koji se trude Mostarcima ponekad osigurati nova svjetska filmska ostvarenja su ljudi iz OKC-a “Abrašević”. Prema riječima Huseina Oručevića, urednika Media centra OKC “Abršević”, trude se popuniti sve rupe koje nastaju zbog nepostojanja kulturne strategije. “Grad Mostar nema nikakve kulturne strategije te smo se mi Gradu u nekoliko navrata obraćali zbog toga, organizirajući razne okrugle stolove, bez nekog konkretnog učinka”, naglasio je Oručević dodavši da su ih do jučer uvjeravali kako se uskoro u kinu Partizan treba izgraditi multipleks kino, ali izgleda da od toga neće biti ništa.
Link: http://www.dnevni-list.ba/?mdls=1&mdls_tip=2&nid=7545
LordMarshall November 10th, 2006, 09:00 PM Radovi napokon počinju
MOSTAR - U Mostaru je održan još jedan sastanak između predstavnika Saveza za izbjegle i raseljene osobe grada Mostara, predstavnika OHR-a i Gradske uprave te stanara Šantićeve ulice i središnje zone grada Mostara na kojem se razgovaralo o trenutačnom stanju obnove kolektivnih stambenih objekata.
Osigurana sredstva za rekonstrukciju
Prema riječima Mirhunise Zukić, predsjednice Saveza udruženja i udruga izbjeglica i raseljenih osoba u BiH, predstavnici tog saveza svakih su petnaest dana u Mostaru. Jedan od ciljeva sastanka bio je informirati sve izbjeglice i raseljene osobe iz Mostara da postoje nove informacije iz Gradske uprave o samoj rekonstrukciji stambenih objekata koje bi se uskoro trebale početi obnavljati, a riječ je o deset zgrada na području Mostara. Sastanku su nazočili i donatori koji su predstavili svoje probleme i strategiju kada je u pitanju Mostar. “U idućem razdoblju želimo sudjelovati u radu Komisije za odabir korisnika u Gradskom vijeću tako što bi sudjelovali u glasovanju o racionalnom korištenju sredstava Ministarstva za ljudska prava, entitetskih ministarstava i naravno Europske unije, koja je neizostavni donator u ovakvim projektima”, rekla je Mirhunisa Zukić naglasivši da su sredstva za rekonstrukciju osigurana i da sada samo treba početi s radom.
Zakašnjeli početak radova
Iako su sva sredstva za rekonstrukciju osigurana, još se ne počinje s radom, a prikupljena sredstva će se najvjerojatnije prenijeti i na sljedeću godinu. Prema riječima Mirhunise Zukić, glavni problem zbog kojeg kasni početak obnove objekata jest što Gradska uprava iznimno sporo radi na odabiru korisnika stambenih objekata. Veliki problem predstavlja i to što je komisija za odabir tek oformljena, a prema uputama državnog ministarstva, trebala je biti oformljena mnogo ranije. “Također, suočeni smo s problemima procedura u natječajima koje su jako spore”, kazala je Mirhunisa Zukić dodavši da postoji i procedura koja omogućava da se pri odabiru korisnika izaberu oni ljudi koji su najprioritetniji. U tu skupinu spadaju osobe koji se nalaze u alternativnim smještajima i kolektivnim centrima, a kriterije zadovoljavaju i svi raseljeni u gradu Mostaru. S druge strane, to su ljudi koji se zaista vraćaju, a ne oni koji će prodati svoje stanove i ostaviti stambene jedinice. U rujnu ove godine trebala je u dogovoru s ministrom Mirsadom Kebom biti organizirana i donatorska večera na kojoj su se trebala prikupljati sredstva za izgradnju objekata u Šantićevoj ulici. Međutim, ta večera nije održana. “Tu donatorsku večeru dogovorili smo s ministrom Kebom kojem je mandat već pri kraju, ali ipak nećemo odustati od toga i nadamo se da će novi ministar to i organizirati, a večera će se vjerojatno održati najkasnije krajem veljače”, zaključila je Mirhunisa Zukić.
Link: http://www.dnevni-list.ba/?mdls=1&mdls_tip=2&nid=7543
LordMarshall November 12th, 2006, 02:46 AM Prijem u svjetsku i europsku elitu
MOSTAR - U organizaciji Udruženja neurologa BiH, Klinike za neurologiju Kliničke bolnice Mostar te Medicinskog fakulteta Sveučilišta u Mostaru, naš grad je ovih dana domaćin II. kongresa neurologa BiH s međunarodnim sudjelovanjem. Kongres je u četvrtak i službeno otvoren, a na samom otvaranju je bilo prisutno više od 300 osoba, među kojima je bio i veliki broj stručnjaka neurologije iz cijeloga svijeta. Kongres je svečano otvorio Osman Sinanović, predsjednik Udruženja neurologa BiH. Prilikom otvaranja Sinanović je istaknuo kako će nakon ovog izvanredno organiziranog kongresa mostarska neurologija dobiti novi zamah. «Normalno da će kongres donijeti zamaha i u ostalim gradovima u BiH, te pri tome poboljšati znanja iz oblasti neurologije. Prvi kongres neurologa je održan u Tuzli prije četiri godine, a sljedeći bi se trebao održati u Banjoj Luci», istaknuo je Sinanović najavivši nakon toga skoro učlanjenje Udruženja neurologa BiH u europsku i svjetsku asocijaciju. Helena Škobić, predsjednica Organizacijskog odbora tog kongresa, rekla je da će teme kongresa biti prezentirane u osam sesija, i to urgentna neurologija, epilepsija, neuromišićne bolesti, multipla skleroza, neurokirurgija i neurorehabilitacija, poremećaji pokreta, cerebrovaskularne bolesti i opće teme (iz psihijatrije, bazičnih znanosti i psihologije). «Očekujemo da će ovaj kongres potaknuti i intenzivirati stručni i zdravstveni rad, te napraviti jedan uspon u neurologiji i njezinim srodnim disciplinama», naglasila je Škobić prilikom otvaranja kongresa. Samome otvaranju nazočio je i mostarski gradonačelnik Ljubo Bešlić, a osim njega tu su još bili ministar za civilne poslove u Vijeću ministara Safet Halilović te federalni ministar zdravstva dr. Vjekoslav Mandić.
Link: http://dnevni-list.ba/?mdls=1&mdls_tip=2&nid=7569
mirza-sm November 12th, 2006, 03:30 PM gr8 news :okay:
LordMarshall November 12th, 2006, 11:46 PM Budućnost naše zemlje je u zdravoj hrani
MOSTAR - Nevladina Ekološka mreža za suradnju EKON svojim projektom "Kreiranje radnog mjesta u organskoj poljoprivredi" pokazala je da uz malo truda i mnogo ljubavi rezultati mogu biti ogromni. Naime, ovaj projekt provodi se u Mostaru, na području Srebrenice, Bratunca i Goražda, a u mostarskim Carskim vinogradima ovaj projekt traje već od 2004. i okuplja oko 60 kooperanata. "Cilj te farme je proizvodnja organski certificirane hrane, ali i otvorenje proizvodno edukativnog centra. Također, cilj je okupiti proizvođače organske hrane koji će radom, praktičnom obukom i edukacijom steći znanje u ovoj oblasti, a onda otići kući i pokrenuti proizvodnju na vlastitim imanjima. Kooperanti iz Mostara s pomoću našeg projekta dobili su plastenike i obuku te su oni sad naši proizvođači organske hrane", rekla je magistra poljoprivrede Eldina Muftić, koja je ujedno i EKON-ova projekt-menadžerica.
Sve pogodnosti za proizvodnju
Ekološka mreža za suradnju otkupljuje organsku hranu od proizvođača po dvadeset posto većoj cijeni u odnosu na tržišnu. "Organska poljoprivreda je novi način bavljenja poljoprivredom jer se čovjek mora istinski unijeti u taj posao i shvatiti da radi zajedno s prirodom, bez primjene bilo kakvih kemijskih zaštitnih sredstava", pojasnila je Eldina Muftić. Uporabljuju se zaštita prirodnog podrijetla, stajsko gnojivo te razne pripreme na bazi biljaka, jer proizvod je organski samo kada ima certifikat. "U usporedbi sa zemljama Europske unije mi smo u prednosti jer su te zemlje zatrovale svoje tlo i vode. Prednost naše zemlje je upravo u tome što skoro nikada nismo koristili toliko kemije i još imamo uvijek čistu vodu. Mnoge obradive površine tijekom rata nisu se obrađivale tako da je to zemljište odmoreno i očišćeno te idealno za organsku poljoprivredu", poručila je Eldina Muftić naglasivši da se lako može doći do certifikata upravo zbog toga što naša zemlja nije zagađena kao druge. Također je istaknula da proizvođači organske hrane nemaju problema s tržištem, ali se u posljednje vrijeme javlja problem s kontinuiranom proizvodnjom.
Potrebno još proizvođača
"Ekološka mreža za suradnju je prije pet godina shvatila da se ne možemo utrkivati s Europskom unijom i njezinom unaprijeđenom poljoprivredom. Shvatili smo da je naša prednost proizvodnja na organski način. To je specifičan proizvod ovoga područja koji je interesantan europskom tržištu. Ovo je jedini oblik gdje ćemo uložiti u razvoj prije nego što uđemo u Europsku uniju", rekla je Eldina Muftić. Zanimljivo je da je u ovoj godini napravljen ugovor sa supermarketima na našem tržištu, a jedan od prvih koji je uveo taj trend je bosanskohercegovački Mercator. "Treba nam proizvodnja iz različitih krajeva zemlje kako bismo tijekom cijele godine imali ponudu na tržištu. Nastojimo mikrokreditima pomoći našim proizvođačima kako bi se što veći broj njih uključio te kako bismo imali što veći broj proizvoda. Cilj nam je razviti lokalno tržište, ali i educirati osobe koje će proizvoditi i kupovati tu hranu. Proizvodimo certificiranu hranu i posjedujemo međunarodni certifikat tako da ovdje proizvedenu hranu možemo izvoziti u bilo koju članicu Europske unije, dok drugi ne mogu", poručili su iz EKON-a.
Link: http://dnevni-list.ba/?mdls=1&mdls_tip=2&nid=7604
Bih06 November 21st, 2006, 08:28 AM http://uwc-ibo.org/news/
:)
MIMICA November 21st, 2006, 10:12 PM http://uwc-ibo.org/news/
:)
I remember seeing that building during my last visit in Mostar.
bosnia1990 December 2nd, 2006, 12:48 PM igh Mostar underconstruction.
http://igh-mostar.ba/slike/velike/novo01.jpg
http://igh-mostar.ba/slike/velike/novo04.jpg
http://igh-mostar.ba/slike/velike/novo03.jpg
bosnia1990 December 2nd, 2006, 12:50 PM part of the hospital in Mostar still under construction.
http://igh-mostar.ba/slike/velike/Medicinski_FakultetMO6.jpg
AstroBoy December 7th, 2006, 12:03 PM Brodomerkur gradi sveučilišni kompleks u Mostaru
http://www.poslovni.hr/img/ArticleImages/23744.jpg
Izgradnja objekata sveučilišnog kompleksa mostarskog Sveučilišta vrijedna je 51,13 milijuna eura
Splitski Brodomerkur u većinskom vlasništvu širokobriješkog poslovnog čovjeka Mirka Grbešića dobio je posao izgradnje objekata sveučilišnog kompleksa mostarskog Sveučilišta u vrijednosti 51,13 milijuna eura, tvrde pojedini BiH mediji. Novac će osigurati Vlada Republike Hrvatske iz proračuna. Brodomerkur će raditi projektnu dokumentaciju i biti glavni izvođač radova. Radovi bi trebali biti završeni za tri godine.
Prema planu, gradit će se dvije nove zgrade za fakultete mostarskog Sveučilišta, zgrada za administraciju, zgrada za sjedište rektorata, knjižnica, sportska dvorana i drugo. Za prvu fazu gradnje Vlada Republike Hrvatske odobrila je 35,56 milijuna eura. Bosanskohercegovački mediji navode kako je Grbešić susjed rektora Sveučilišta u Mostaru Franje Ljubića.
U komisiji koja je odlučivala o izvođaču radova, kako tvrde mediji u BiH, bili su širokobriježani Šimun Musa koji je prorektor Sveučilišta u Mostaru, tajnik rektorata Marinko Jurilj te Ivan Čolak. Grbešić je vlasnik trgovačkog poduzeća Mepas iz Širokog Brijega te manje građevinske tvrtke Metalac. U Hrvatskoj je većinski vlasnik Saponije, Koestlina i Brodomerkura. U Brodomerkuru Grbešić posjeduje 92.418 posto vlasništva od listopada 2004. godine nakon što je kupio dionice od malih dioničara i paket dionica Nove banke od 26 posto vlasništva.
Pomoć iz Zagreba
U prvih devet mjeseci ove godine prihod Brodomerkura iznosio je 1119 milijardi kuna ili za 10 posto više nego u istom razdoblju prošle godine. Bruto dobit veća je za 4,8 posto i iznosi 19,7 milijuna kuna, a u prvih devet mjeseci ove godine u Brodomerkuru je investirano u objekte i opremu 24 milijuna kuna. Na popisu 400 najvećih tvrtki u Republici Hrvatskoj po prihodu Brodomerkur se 2005. godine nalazio na 35. mjestu što je niže osam mjesta nego što je bio 2004. godine.
Prema agencijskim vijestima, početkom ove godine Vlada u Zagrebu je iskazala spremnost financiranja mostarskog Sveučilišta, odnosno za izgradnju sveučilišnih objekata s 20 milijuna kuna što je članovima rektorata mostarskog Sveučilišta priopćio ministar obrazovanja Dragan Primorac. Novac bi trebao biti doznačen preko Hrvatske banke za obnovu i razvoj i namijenjen je uspostavi nastavnih i znanstvenih standarda Bolonjske deklaracije na mostarskim visokoškolskim institucijama. Prema drugoj agencijskoj informaciji Vlada Republike Hrvatske odlučila je mostarsko Sveučilište financirati s 361 milijun kuna, a novac bi se uplaćivao do 2017. godine.
Novac je namijenjen, kako je rekao rektor Franjo Ljubić, za izgradnju nove zgrade Građevinskog fakulteta, zgrade Filozofskog fakulteta, sveučilišne knjižnice, sportske dvorane trećeg zgrade studentskog doma te niza drugih objekata. Prvi dio radova trebao bi biti okončan do kraja 2008. godine. Predviđena je obnova zgrade Likovne akademije koja se nalazi u Širokom Brijegu. Vrijednost radova u prvoj fazi je 189 milijuna kuna.
Gradska uprava
Vrijednost radova u drugoj fazi je 172 milijuna kuna. Medicinski fakultet smješten je u krugu Kliničke bolnice u mostarskom naselju Bijeli Brijeg za čiji dovreštak gradnje Hrvatska već godinama iz proračuna izdvaja milijunske iznose. Gradska uprava Mostara od Sveučilišta za svaki četvorni metar obnovljenog prostora ili gradnju novog traži 30 eura poreza pa bi prema tome Vlada Republike Hrvatske znatan novac izdvojila za financiranje mostarske administracije.
http://www.poslovni.hr/28495.aspx
mirza-sm December 7th, 2006, 01:47 PM Gheez super vijest!! :okay:
Holy crap Mepas drži Saponiju,Koestlin i Brodomerkur? :uh: nisam to znao :happy:
LordMarshall December 7th, 2006, 07:58 PM Mostar – najljepši grad s mostom
MOSTAR - U cjelodnevnom posjetu gradu Mostaru jučer je bilo izaslanstvo Grupe prijateljstva Francuske, točnije izaslanstvo nacionalne skupštine Republike Francuske i čelnici francuskoga grada Millaua. Prilikom posjeta Mostaru francuski izaslanici upoznali su se s ljepotama grada na Neretvi, obišli mnoge kulturne i povijesne spomenike, ali i mnoge gradske institucije. Gradonačelnik Mostara Ljubo Bešlić prilikom posjeta francuskog izaslanstva Gradskoj upravi podsjetio je na brojne probleme koji muče ovaj grad, ali i državu. "Nadam se da će nam naši gosti pomoći na putu k europskim integracijama te da ćemo zajedničkim iskustvima brže napredovati u integrativnim procesima, prvenstveno k bržem razvoju i izjednačavanju životnog standarda u cijeloj Europi, a na zadovoljstvo svih njezinih građana", naglasio je gradonačelnik Bešlić.
Prijateljski sporazum dvaju gradova
U povodu današnjeg posjeta Mostaru izaslanstvo francuskog grada Milloua u Mostaru je prezentiralo i izložbu fotografija vijadukta u Millaou, koja je upriličena u mostarskom Centru za kulturu. Prvenstveni cilj ovog posjeta jest svečano potpisivanje obveza o suradnji i prijateljstvu između Mostara i Milloua. "Mostar je sasvim sigurno glavni kulturni grad svih gradova koji imaju mostove u svijetu. Mi imamo najveći vijadukt u svijetu i u tom smislu s Mostarom ćemo pokazati da smo gradovi koji su simboli, i to mostova koji zbližavaju ljude", naglasio je Jacques Godfrain, gradonačelnik Milloua, naglasivši da će se raditi u pravcu zbližavanja ljudi i gradova. Također je na sastanku u Gradskoj upravi najavljeno da će izložba fotografija Staroga mosta uskoro biti predstavljena i u tom francuskom gradu.
Aluminij izvrstan promotor države
Poslije Gradske uprave, francusko izaslanstvo se uputilo u obilazak grada i Francuskog kulturnog centra u Mostaru, gdje su se upoznali s radom te institucije i njezinim daljnjim planovima. Također su nazočili i svečanom ručku u vrtu mostarskog Aluminija, gdje ih je generalni direktor Aluminija mr. Mijo Brajković informirao o razvoju Aluminija od porušene tvornice do najvećeg bh. izvoznika. "Ova zemlja mora biti ponosna na ovakvu tvornicu jer je Aluminij izvrstan promotor BiH", poručili su francuski parlamentarci. Na samom kraju to izaslanstvo je posjetilo i francusko zapovjedništvo u sektoru Mostara te razgovaralo i s generalom Daehnom.
Link: http://dnevni-list.ba/?mdls=1&mdls_tip=2&nid=8139
LordMarshall December 7th, 2006, 07:59 PM Pripreme za blagdane idu punom parom
MOSTAR - Približavanjem predstojećih božićnih i novogodišnjih blagdana naš grad, iz dana u dan, poprima ljepši izgled. Tako je jučer na Španjolskom trgu postavljen novogodišnji bor, koji svojom visinom od 12 metara i 60 centimetara plijeni pozornost prolaznika.
Po uzoru na europske i svjetske gradove
U sljedećih nekoliko dana bor bi se trebao okititi, čime će sasvim sigurno dobiti jedinstveni izgled te uljepšati izgled grada za predstojeće blagdane. Na samom svečanom podizanju ovoga prelijepog bora bio je i gradonačelnik Mostara Ljubo Bešlić. Prema njegovim riječima, grad Mostar u svom urbanom mobilijaru osmišljava kako predstojeće blagdane obilježiti na što ljepši način. “U ovo predblagdansko vrijeme odlučili smo se, po uzoru na svjetske i europske gradove, za postavljanje bora. Odlučili smo se postaviti ga na Španjolskom trgu, mjestu na kojem će se održati organizirani doček Nove godine. Želimo ukrasiti sve dijelove grada Mostara kako bi što više nalikovao na jedan pravi europski grad”, naglasio je Bešlić dodavši kako vjeruje da će Mostar u dogledno vrijeme biti jedna prepoznatljiva sredina koja zavrjeđuje pozornost, ne samo građana Mostara, nego i cijele Europe.
Jaslice plijene pozornost najmlađih
Kako je krenulo, naš grad će u prosincu, mjesecu darivanja, sasvim sigurno prelijepo izgledati, te će mu na tome pozavidjeti mnogi dugi gradovi. U prilog tome ide ukrašavanje ulica u gradu koje u svom novom zdanju prelijepo izgledaju. Osim toga, na Rondou su ponovno postavljene jaslice, koje kao i proteklih godina plijene pozornost naših najmlađih.
Link: http://dnevni-list.ba/?mdls=1&mdls_tip=2&nid=8108
LordMarshall December 7th, 2006, 10:53 PM Ogroman turistički projekat
MOSTAR - Internet stranicu i brošuru projekta "Vinska cesta Hercegovine" predstavili su jučer u Mostaru djelatnici Turističke zajednice Hercegovačko-neretvanske županije i Udruge vinara i vinogradara Hercegovine.
Riječ je o projektu čiji je cilj promoviranje autohtone hercegovačke sorte vina, žilavke i blatine, ali i kompletne turističke ponude vinske regije, koja se prostire od Ljubuškog do Trebinja. Semir Temim, zamjenik direktora Turističke zajednice HNŽ i menadžer ovog projekta, kazao je kako je ovo najveći turistički projekat koji je do sada urađen u BiH.
"Cilj projekta je predstaviti autohtone hercegovačke sorte vina, a to si žilavka i blatina. Kroz žilavku i blatinu mi nastojimo prikazati Hercegovinu kao turističku regiju. Želimo pokazati da Hercegovina nije destinacija kroz koju se samo prolazi, nego da se ovdje može boraviti više dana. Već za sljedeću turističku sezonu imat ćemo spreman novi turistički proizvod. Nadamo se većem broju gostiju i želimo privući što veći broj turista koji posjećuju južnu Dalmaciju i zadržati ih u Hercegovini više od jednog dana. Želimo turistima ponuditi cjelokupan aranžman. Isto tako želimo stvoriti i brend - "Hercegovina: Turistička regija'", rekao je Temim.
Na web stranici www.vinskacesta.ba mogu se naći informacije o 22 vinska podruma, te podaci o kulturno-povijesnim spomenicima, turističkim atrakcijama, restoranima, hotelima i drugim ugostiteljskim objektima ovoga kraja.
Temim je najavio da će u veljači sljedeće godine uz hercegovačke prometnice biti postavljeni putokazi, koji će turiste voditi do vinskih podruma. Tada će biti održana i završna prezentacija projekta, a uslijedit će i jaka promidžbena kampanja, čime će projekat "Vinska cesta Hercegovine" biti završen. Inače, projekat je vrijedan 225.000 eura, a poduprla ga je i Europska unija koja je osigurala 90 odsto financijskih sredstava.
Link: http://www.nezavisne.com/vijesti.php?vijest=3141&meni=5
bosnia1990 December 8th, 2006, 02:06 PM DM za cijelu obitelj
MOSTAR - Od jučer i u Mostaru može se sve naći na jednome mjestu za ljepotu, zdravlje, bebe, djecu i kućanstvo. Naime, jučer otvoreni market DM u prodajnom centru Rondo nudi sve artikle za kućanstvo, asortimane za njegu kose, njegu tijela, kućne potrepštine, hranu za kućne ljubimce, širok asortiman parfema, hrane za bebe i djecu, dječje igračke, dekorativne ukrase te mnoge druge potrepštine koje zadovoljavaju cijelu obitelj. Osim toga što se na jednome mjestu mogu pronaći sve potrebne namirnice za kućanstvo, u DM su istaknuli da su cijene prilagođene standardu te da su market s najjeftinijom i najkvalitetnijom robom.
"Moja marka" i u Mostaru
"DM je prepoznatljiva marka, a ono što je naš zaštitni znak su artikli 'moja marka' koji se u našim marketima mogu prepoznati jer su na policama označeni s plavom etiketom 'moja marka'. To su artikli koji su povoljni cijenom i dobri kvalitetom. Mogu konkurirati ostalim skupim proizvodima, a kupovati se mogu samo u DM-u", naglasila je regionalna menadžerica Karolina Marić. Marketi DM zastupljeni su diljem Europe, a kao vodeća i prepoznatljiva marka su u Njemačkoj, Austriji, Slovačkoj, Češkoj, Mađarskoj, Sloveniji, Srbiji i Hrvatskoj. Prema riječima menadžerice Marić, marketi DM planiraju proširiti se na jedanaest prodajnih mjesta u našoj zemlji do kraja iduće godine.
Širok asortiman darova za blagdane
Budući da su u tijeku božićni i novogodišnji blagdani i vrijeme darivanja, DM marketi su za tu prigodu spremili širok asortiman poklon paketa i ukrasa za Božić. Nagradna igra za sve posjetitelje marketa u Sarajevu, Tuzli i Mostaru počela je od jučer i trajat će do 15. prosinca. Nagradna igra će se izvlačiti 20. prosinca u Sarajevu, a prva nagrada je stroj za pranje rublja marke Gorenje, druga nagrada je digitalni fotoaparat marke Olympus i mnoge druge vrijedne nagrade. Također, u idućih tjedan dana DM market će svim svojim kupcima ponuditi bonus nagrade tijekom kupnje određenih artikala. Jedno je sigurno, DM market je mjesto na kojem svatko može pronaći nešto za sebe.
Bogata nagradna igra
Na dan otvaranja DM market je svojim kupcima priredio bogatu nagradnu igru, pa su tako svi oni koji su jučer kupili namirnice u iznosu od petnaest maraka mogli sudjelovati u nagradnoj igri i okrenuti svoje kolo sreće na kojem su bili vrijedni pokloni poznatih svjetskih i domaćih marki.
mirza-sm December 9th, 2006, 10:54 PM Dva milijuna za Međunarodnu zračnu luku Mostar
Vlada Federacije BiH u četvrtak je usvojila izvještaj komisije koju je, za utvrđivanje utroška novca namijenjenog za rekonstrukciju i investiciono održavanje i opremanje Međunarodne zračne luke Mostar formirao federalni ministar prometa i komunikacija.
Ovaj se projekt financira iz proračuna FBiH s dva milijuna KM koja su, odlukom Vlade, prebačena Međunarodnoj zračnoj luci Mostar s utvrđenim programom njihovog utroška, priopćeno je iz Ureda za informiranje Vlade FBiH.
Vlada je podržala provođenje dosadašnjih i pripremu predstojećih projekata na provedbu odobrenih iznosa i zadužila Federalno ministarstvo prometa i komunikacija da pripremi informaciju o stanju infrastrukture na svim aerodromima u FBiH s konceptom njihovog daljnjeg razvoja.
LordMarshall December 11th, 2006, 11:22 PM Mostar: U četvrtak otvaranje tvornice aluminija FE-AL
Otvorenje tvornice za preradu aluminija FE-AL d.o.o. Mostar, vlasništvo širokobriješkog FEAL-a i mostarskog Aluminija bit će upriličeno u četvrtak, 14. prosinca
Nova tvornica, čija je izgradnja započela 23. siječnja ove godine, izgrađena je u krugu tvornice "Aluminij" d.d. Mostar pokraj srušene tvornice glinice. Ta lokacija je izabrana zbog postojeće infrastrukture, opskrbe primarnim aluminijem, kvalitetnog priključka na energetske izvore te blizine glavnih prometnih koridora i Mostara.
U novoj tvornici će se proizvoditi aluminijski profili i tlačno-ljevački proizvodi, a riječ je o najsuvremenijoj tehnologiji koja se trenutačno koristi u aluminijskoj industriji.
Pokretač tog projekta, generalni direktor Aluminija d.d. Mostar Mijo Brajković kazao je kako se otvaranjem FE-AL-a ostvaruje njegova zamisao o Hercegovini kao aluminijskoj regiji.
"Na osnovi nove tvornice diljem regije mogu se otvoriti na desetine manjih radionica koje bi mogle prerađivati proizvode iz mostarskog FE-AL-a. Zbog toga stalno ističem da nam trebaju mala i srednja poduzeća, ali i velike tvornice na koje bi se moglo oslanjati malo i srednje poduzetništvo", kazao je Brajković.
Nova tvornica ima osigurano tržište u Njemačkoj, Belgiji, Austriji, Nizozemskoj i Švicarskoj, a dio proizvoda ostat će na bosanskohercegovačkom tržištu.
Vlasnik širokobriješkog FEAL-a Jozo Bogdan smatra kako su takve tvornice budućnost bosanskohercegovačkog gospodarstva.
"Ovim projektom na dobitku su svi od radnika koji su dobili posao, proračuna županija, entiteta i države te cijelo bh. gospodarstvo zbog smanjivanja deficita kada je riječ o našem izvozu", kazao je Bogdan.
Direktor mostarskog FE-AL-a Ante Musa istaknuo je kako su svi radovi tekli prema planu i da nije bilo zastoja te dodao da se pri izgradnji tvornice posebna briga vodila o zaštiti okoliša.
"I tu je instalirana najnovija tehnologija koja odgovara standardima Europske unije", kazao je Musa.
U tvornici će se proizvodnja odvijati u dvije smjene, a godišnje bi se trebalo proizvoditi od 12 000 tona aluminijskih profila. Na početku će u tvornici biti uposleno 30 djelatnika, a proširivanjem kapaciteta u dvije faze namjerava se uposliti još pedeset novih djelatnika.
Link: http://www.pincom.biz/vjesnik/opsirnije.asp?id=12507&rub=vjesnik
LordMarshall December 12th, 2006, 08:37 PM Blagaj uskoro zaštićeni spomenik
MOSTAR - Prirodne ljepote koje okružuju grad na Neretvi iz godine u godinu privlače sve više turista iz raznih krajeva svijeta. Jedno od najprivlačnijih i turistima najzanimljivijih odredišta je svakako Derviška tekija, Stara kula - Stjepan grad, Velagića kompleks, ali i cijeli ambijent Blagaja koji odiše netaknutom prirodom. Unatoč velikoj posjećenosti, stanovnici Blagaja nisu imali neku veliku korist od turističkih sezona jer su turisti tu uglavnom dolazili na odmore ili kraće izlete te bi tek rijetki ostavili nešto novca prilikom kupnje suvenira.
Španjolci prepoznali ljepotu
Međutim, izgleda da bi od ove godine Blagaj mogao turistima ponuditi još ljepši i prirodniji ambijent. Naime, prije nekoliko dana španjolski veleposlanik u našoj zemlji Jose Maria Castroviejo y Bolivar i članica Komisije za očuvanje nacionalnih spomenika u Bosni i Hercegovini Amra Hadžimuhamedović potpisali su u Sarajevu sporazum o donaciji španjolske vlade za realizaciju projekta "Potpora turističkom razvoju Blagaja kroz održivo upravljanje prirodnim, povijesnim i kulturnim naslijeđem". Ovo je prvi projekt takve vrste u našoj zemlji koji financira španjolska vlada. Ovom prilikom veleposlanik Castroviejo y Bolivar kazao je da je motiv toj donaciji bila zaštita povijesnog naslijeđa BiH, jer je to duša jednog naroda. "Na području Blagaja nalazi se pravo kulturno bogatstvo, katolički spomenici, kao i pravoslavni i muslimanski, ali i arheološko nalazište koje treba istražiti", istaknuo je španjolski veleposlanik. Na ovaj način španjolska vlada osigurala je uvjete za početak zaštite jednog od najvećih dragulja BiH - povijesne jezgre Blagaja, međutim, za uspjeh projekta potrebno je osigurati suradnju svih razina vlasti.
Promotivnim spotom privući turiste
"Donacija će se iskoristiti da kulturno-povijesno naslijeđe postane čimbenik održiva razvoja Mostara i da svaki građanin BiH bude ponosan na naslijeđe Blagaja", kazala je Amra Hadžimuhamedović. Iako turisti ističu kako ih upravo netaknuta priroda u Blagaju najviše oduševljava i privlači, mnogobrojni projekti koje najavljuju domaći poduzetnici mogli bi znatno uništiti dosadašnji izgled ovog sve popularnijeg turističkog odredišta. Semir Milavić, voditelj Turist info centra u Blagaju, naglasio je da bi iduća sezona mogla biti znatno bolja od ovogodišnje jer, osim donacija iz stranih zemalja, očekuju veću potporu federalne i županijske Vlade. "Za iduću godinu planira se i promotivni spot koji bi trebao poboljšati turizam u Bosni i Hercegovini. Cilj samoga spota je poboljšati informacije vezane uz regiju te ih učiniti dostupnima u svim stranim zemljama, a trebao bi se plasirati preko Interneta i ostalih medija", naglasio je Milavić.
Link: http://www.dnevni-list.ba/?mdls=1&mdls_tip=2&nid=8272
LordMarshall December 12th, 2006, 08:38 PM Značajna pomoć egipatske vlade
MOSTAR - Mohamed Nasrat, veleposlanik Arapske Republike Egipat, posjetio je jučer Rektorat Univerziteta Džemala Bijedića te tom prigodom uručio vrijednu donaciju Centru za arapske jezike pri Fakultetu humanističkih znanosti. Naime, riječ je o donaciji tehničkih pomagala vrijednoj pet tisuća dolara.
Egipatska vlada će i dalje pomagati Centar za arapske jezike
Egipatska vlada donirala je vrijednu opremu, a Veleposlanik Arapske Republike Egipat Mohamed Nasrat je prilikom uručivanja te donacije istaknuo da je to poklon egipatske vlade Centru za arapski jezik, koji je osnovan prije dvije godine. "Ovo je samo dio kulturne suradnje između Egipta i BiH. Naša vlada i Veleposlanstvo će i dalje davati potporu Centru za arapski jezik kako bi omogućili njegovo kvalitetnije razvijanje. Suradnja će biti još bolja zahvaljujući sporazumu koji je potpisan između Univerziteta 'Džemal Bijedić' i sveučilišta u Aleksandriji", naglasio je Nasrat prilikom jučerašnjeg posjeta. On je izrazio zadovoljstvo zbog vijesti da će Univerzitet Džemala Bijedića ugostiti palestinske studente.
Donacija od značajne pomoći
Dekanica Fakulteta humanističkih znanosti Elbisa Ustamujić zahvalila je na donaciji te istaknula kako će tehnička pomagala biti od velike pomoći u odvijanju nastave Centra za arapski jezik. "Ova pomoć je jedna od brojnih suradnji veleposlanika Nasrata s našim centrom. Naime, veleposlanik je prije dvije godine zajedno s nama osmislio taj centar te u više navrata značajno pomogao, kako ovaj centar, tako i njegove studente", rekla nam je dekanica Ustamujić.
Link: http://www.dnevni-list.ba/?mdls=1&mdls_tip=2&nid=8292
bosnia1990 December 13th, 2006, 03:39 PM Hercegovina postaje aluminijska regija: Sve spremno za otvaranje FE AL-a
Otvorenje tvornice za preradu aluminija FE-AL d.o.o. Mostar, vlasništvo širokobriješkog FEAL-a i mostarskog Aluminija bit će upriličeno u četvrtak, 14. prosinca u 12 sati, u prostorijama novoizgrađene tvornice, u krugu Aluminija.
http://www.pincom.info/net/Prikazi_Sliku.aspx?ID=34777
Novoizgrađena tvornica FE AL sutra će biti svečano otvorena
MOSTAR - Otvorenje tvornice za preradu aluminija FE-AL d.o.o. Mostar, vlasništvo širokobriješkog FEAL-a i mostarskog Aluminija bit će upriličeno u četvrtak, 14. prosinca u 12 sati, u prostorijama novoizgrađene tvornice, u krugu Aluminija.
Nova tvornica, čija je izgradnja započela 23. siječnja ove godine, izgrađena je u krugu tvornice "Aluminij" d.d. Mostar pokraj srušene tvornice glinice. Ta lokacija je izabrana zbog postojeće infrastrukture, opskrbe primarnim aluminijem, kvalitetnog priključka na energetske izvore te blizine glavnih prometnih koridora i Mostara.
U novoj tvornici će se proizvoditi aluminijski profili i tlačno-ljevački proizvodi, a riječ je o najsuvremenijoj tehnologiji koja se trenutačno koristi u aluminijskoj industriji.
Pokretač tog projekta, generalni direktor Aluminija d.d. Mostar Mijo Brajković kazao je kako se otvaranjem FE-AL-a ostvaruje njegova zamisao o Hercegovini kao aluminijskoj regiji.
"Na osnovi nove tvornice diljem regije mogu se otvoriti na desetine manjih radionica koje bi mogle prerađivati proizvode iz mostarskog FE-AL-a. Zbog toga stalno ističem da nam trebaju mala i srednja poduzeća, ali i velike tvornice na koje bi se moglo oslanjati malo i srednje poduzetništvo", kazao je Brajković.
Novoizgrađena tvornica FE AL sutra će biti svečano otvorena. Foto: Pincom.info
Nova tvornica ima osigurano tržište u Njemačkoj, Belgiji, Austriji, Nizozemskoj i Švicarskoj, a dio proizvoda ostat će na bosanskohercegovačkom tržištu.
Vlasnik širokobriješkog FEAL-a Jozo Bogdan smatra kako su takve tvornice budućnost bosanskohercegovačkog gospodarstva.
"Ovim projektom na dobitku su svi od radnika koji su dobili posao, proračuna županija, entiteta i države te cijelo bh. gospodarstvo zbog smanjivanja deficita kada je riječ o našem izvozu", kazao je Bogdan.
Direktor mostarskog FE-AL-a Ante Musa istaknuo je kako su svi radovi tekli prema planu i da nije bilo zastoja te dodao da se pri izgradnji tvornice posebna briga vodila o zaštiti okoliša.
"I tu je instalirana najnovija tehnologija koja odgovara standardima Europske unije", kazao je Musa.
U tvornici će se proizvodnja odvijati u dvije smjene, a godišnje bi se trebalo proizvoditi od 12 000 tona aluminijskih profila. Na početku će u tvornici biti uposleno 30 djelatnika, a proširivanjem kapaciteta u dvije faze namjerava se uposliti još pedeset novih djelatnika.
11.12.2006.
bosnia1990 December 13th, 2006, 03:41 PM Dogovoreno: Hotel Ruža bit će niži za 10 metara
http://www.pincom.info/net/Prikazi_Sliku.aspx?ID=34784
MOSTAR - Problem vezan uz sporni objekt na mjestu nekadašnjeg hotela Ruža, koji prijeti skidanju Mostara s UNESCO-ve liste zaštićene baštine, riješit će se za sedam dana. Na jučerašnjem sastanku povjerenstva stručnjaka koje sačinjavaju arhitekti ispred Federacije, Grada Mostara i investitora usuglašeno je da investitor u roku od sedam dana donese konkretan nacrt objekta koji se gradi na mjestu nekadašnjeg hotela Ruža, a sve radi izrade alternativnih riješena za ambijentalno uklapanje toga objekta u povijesnu jezgru Mostara, zaključeno je na jučerašnjem sastanku u Sarajevu.
Naime, kako je Dnevnom listu rekao član stručnog tima koji je postavljen ispred federalne Vlade dr. Amir Pašić, dogovor je bio izvjestan još prije sedam mjeseci, kada su gradonačelnik Mostara Ljubo Bešlić i investitor hotela Ruža dogovorili da se taj problem mora riješiti na zadovoljstvo svih strana. Na mnogim segmentima dogovor je postignut, a zaključak je da investitor na osnovi ranijih dogovora pripremi svoje prijedloge kako vidi tu konstrukciju nakon smanjenja dimenzije objekta.
Kakoje pojasnio Pašić, članovi UNESCO-a u posljednjem pismu gradonačelniku nisu tražili nikakvo rušenje četvrtog kata, nego samo smanjenje dimenzije hotela, koja bi se slagala s prijeratnim planom hotela. "Investitori su od prvog dana za to da se nađe rješenje te izvrše tehničke korekcije koje bi smanjile dimenzije hotela. Glavni zadatak je smanjiti visinu hotela, na nekim mjestima deset metara, a na drugim sedam i tri metra", naglasio je Pašić napomenuvši da objekt treba sagledati sa svih aspekata i tek onda odlučivati o daljnjim planovima. "
Krajnji rok za ispunjenja obveza sadržanih u preporukama Odbora za svjetsku kulturnu baštinu je 31. siječnja 2007., kada se prijedlog rješenja mora dostaviti UNESCO-vu Centru za svjetsko naslijeđe.
13.12.2006.
Mimar December 13th, 2006, 06:08 PM ^^ hvala bogu sto ce ovo ruglo smanjiti :)
bosnia1990 December 13th, 2006, 06:39 PM mimar nije to ruglo to je hotel koji se od nedavno gradi ali je moro od unesco da se smanji posto napase u stari dio grada :D
Mimar December 13th, 2006, 06:47 PM mimar nije to ruglo to je hotel koji se od nedavno gradi ali je moro od unesco da se smanji posto napase u stari dio grada :D
Znam da je hotel ali trenutno izgleda ruzno jer je nedovrsen i veci od ostalih objekata u starom gradu i nadam se da ce se i fasada uklapati s okruzenjem
mirza-sm December 13th, 2006, 07:04 PM taj hotel jest ruglo jer takav stoji već X godina :ohno:
LordMarshall December 13th, 2006, 07:22 PM Uskoro početak izgradnje kampusa Sveučilišta u Mostaru
Rektor Sveučilišta u Mostaru Frano Ljubić najavio je da bi u roku petnaestak dana trebali započeti radovi na izgradnji kampusa Sveučilišta, za što će hrvatska Vlada izdvojiti oko 100 milijuna konvertibilnih maraka.
"Radovi na prvoj fazi bi već započeli, ali zbog žalbe hrvatske tvrtke 'Konstruktor' za izbor izvođača radova, odgođeno je svečano polaganje kamena temeljca", kazao je Ljubić na današnjoj konferenciji za novinare, dodavši da će nadležno povjerenstvo uskoro riješiti žalbu.
Napomenuo je da je izbor izvođača radova izvršen transparentno i u skladu sa zakonom te da je hrvatski konzorcij "Brodomerkur" imao najbolju ponudu, u tehničkom i financijskom smislu.
Dekan Građevinskog fakulteta i predsjednik povjerenstva za izbor izvođača radova Ivo Čolak predočio je podatke te pojasnio kriterije po kojima je izabran izvođač radova.
"Što se tiče dostavljanja potrebne dokumentacije, ovo je bio najlakši javni natječaj. Jednostavno smo na osnovu dostavljenih podataka matematički došli do najboljeg ponuđača, a to je bio Brodomerkur", kazao je Čolak, navodeći da je financijska ponuda tog konzorcija bila za pola milijuna maraka jeftinija od ostale dvije tvrtke.
Rektor Ljubić je pojasnio da su na natječaju bile sve tvrtke iz Hrvatske, jer je to bio jedan od uvjeta za financiranje od strane hrvatske Vlade. Dodao je da su zbog toga tražili suglasnost mjerodavne državne agencija, koja je taj uvjet i odobrila.
Ljubić je napomenuo da će prva faza izgradnje kampusa Sveučilišta biti gotova do 30. lipnja 2008. godine, a cijeli projekt će se dovršiti do 2010. godine.
"Izgradnjom kampusa, naše će sveučilište biti na razini najboljih europskih sveučilišta", ustvrdio je Ljubić.
On je na današnjoj konferenciji kazao da su danas na Sveučilištu u doktora znanosti promovirani Zdenko Klepić i Milenko Bevanda. Prvi je promovira u doktora ekonomskih znanosti, a drugi u doktora medicinskih znanosti.
Ljubić je također kazao da su danas profesoru Ljubi Šimiću i profesoru Đuri Maričiću dodijeljena počasna zvanja "professor emeritus".
Link: http://sarajevo-x.com/clanak/061213033
LordMarshall December 13th, 2006, 07:54 PM INICIJATIVA : ALUMINIJSKA DOLINA - OD TLM-a DO MOSTARA
Inicijativa : Aluminij Mostar, s godišnjim izvozom od 240 milijuna eura, šibenski TLM, sa svojim kapacitetima, Feal i Luka Ploče zajedno bi mogli činiti veliku aluminijsku dolinu. Mijo Brajković, dugogodišnji uspješni direktor mostarskog Aluminija, zagovara osnivanje konzorcija na području Dalmacije i Hercegovine koji bi bio vrlo kvalitetno rješenje kako za njegovu tvrtku, tako i za šibenski TLM.
Šibenčani u posjetu
LUKA U PLOČAMA
Osim njih, konzorcij bi trebali činiti Luka Ploče, širokobriješki Feal i druge tvrtke povezane s aluminijskom industrijom. Velika je šansa da taj prostor postane prepoznatljiva aluminijska dolina, kaže Brajković i dodaje:
— Aluminij Mostar, s godišnjim izvozom od 240 milijuna eura, šibenski TLM sa svojim prerađivačkim kapacitetima, koji će uz dodatna ulaganja još rasti, i Luka Ploče, koja već sada 60 posto prometa obavlja za Aluminij, golemi su gospodarski potencijal. Brajković je to kazao i šibenskoj gradonačelnici Nedi Klarić, koja je na čelu izaslanstva Grada Šibenika prvi put posjetila mostarsku aluminijsku industriju. Cijena električne energije, ugovor o dugoročnoj isporuci primarnog aluminija i privatizacija dviju tvrtki, tri su strateške odrednice na kojima će mostarski Aluminij i šibenska Tvornica lakih metala tražiti zajednički interes u sljedećem razdoblju. Brajković je kazao kako najveći problem Aluminija i dalje ostaje cijena električne energije.
Cijena struje
Zdravica u Mostaru - šibenski čelnici nazdravili su mogućem poslu desetljeća— Nedopustivo je, primjerice, da HEP kupuje struju u BiH po jednoj, a onda je nama prodaje po drugoj, znatno višoj cijeni. Cijena električne energije u toni aluminija trenutačno iznosi 28 posto i svako daljnje povećanje izravni je udar na poslovanje, pa čak i na sudbinu Aluminija. Tvornica lakih metala u Šibeniku, kroz godišnju isporuku, ovisna je o primarnom aluminiju proizvedenom u Mostaru i to je interes koji se konačno mora uskladiti — kazao je Brajković.
Svima trebaju mlađi radnici
Glavni je problem TLM-a u tome što sada ima i viška i manjka ljudi. Zbog novih tehnologija i starosti zaposlenika, nužno bi bilo otpustiti najmanje 600 radnika i zaposliti novih 300 mlađih i obrazovanijih. TLM, dakle, mora promijeniti strukturu svojih zaposlenika. Bez pomoći države i politike, to neće moći sam riješiti. Valjaonička postrojenja su vrlo kvalitetna i ona TLM-u jamče sigurnu budućnost. No, potrebna su dodatna ulaganja — kazao je Mijo Brajković.
Nimac: Nismo dogovarali cijenu
Radi mogućih spekulacija, treba kazati da gradonačelnica Klarić i ja, kao članovi NO TLM-a, u Aluminiju Mostar nismo dogovarali ni količinu ni cijenu primarnog aluminija koju će u 2007. dobivati TLM.
Ovo je prije svega bio posjet radi upoznavanja s tvornicom i vodećim ljudima tvrtke koja s TLM-om ostvaruje uspješnu dugogodišnju poslovnu i prijateljsku suradnju — rekao je Vlado Nimac, član Nadzornog odbora TLM-a.
ZAGREB JEDINA PONUDA ZA KUPNJU ŠIBENSKE TVORNICE
Samo Litvanci žele TLM
ZAGREB - U Hrvatskom fondu za privatizaciju u utorak je otvorena jedina ponuda pristigla za kupnju 80,2 posto dionica Tvornice lakih metala Šibenik.
Ponuda je pristigla od UAB Ukio banko investicijske grupe iz Litve koja, kako stoji u ponudi, za dionice TLM-a nudi 49 milijuna kuna, a u iduće tri godine planira uložiti 677 milijuna kuna vlastitih sredstava. Isto tako zatečenih 1400 radnika, od ukupno 1539 trenutačno zaposlenih, UAB se obvezuje, prema odredbama natječaja, zadržati minimalno dvije godine. Eventualni višak radnika, kako je rečeno, kupac je obvezan zbrinuti prema hrvatskim propisima.
U ponudi se navode i posebni uvjeti koje UAB očekuje, poput reprogramiranja dugovanja TLM-a prema državi i ostalim vjerovnicima putem odgode na pet godina, poreznih olakšica za cijelo investicijsko razdoblje, osiguravanje povoljnijih lučkih i željezničkih tarifa i tarifa za električnu energiju, te jamstvo da se neće pokretati stečaj nad TLM-om.
TLM-ova dugovanja krajem lipnja iznosila su, inače, 1,26 milijardi kuna.
Link: http://www.biznis.ba/index.php?option=com_content&task=view&id=8635&Itemid=2
long foot December 13th, 2006, 08:28 PM Uskoro početak izgradnje kampusa Sveučilišta u Mostaru
Link: http://sarajevo-x.com/clanak/061213033
Lijepo je da Hrvatska vlada ulaže tolike pare u izgradnju jedinog hrvatskog sveučilišta u BiH. Čini se da će Mostar dobiti sveučilišni kampus prije Zagreba ;)
mirza-sm December 14th, 2006, 01:14 AM way to go moSTAR :cheer: :D
bosnia1990 December 15th, 2006, 07:20 PM Novi kampus do 2010.
MOSTAR - Mostarsko Sveučilište jučer je, osim Dana Sveučilišta, obilježilo i početak radova na izgradnji sveučilišnog kampusa, a rektor tog sveučilišta dr. sc. Frano Ljubić istaknuo je da je to ujedno kamen temeljac za europsku budućnost Sveučilišta. Prema njegovim riječima, prva faza radova i postavljanje kamena temeljca za izgradnju Građevinskog fakulteta i kampusa mogla je već početi, ali se čeka da prođe žalbeni postupak koji je pokrenula tvrtka Konstruktor. "Proveli smo postupak provjera najpovoljnijeg ponuđača, koji je sada u tijeku. Mislimo da će imenovano povjerenstvo vrlo brzo riješiti prigovor tvrtke koja je uložila žalbu na izbor najpovoljnijeg ponuđača. Nadamo se da će radovi započeti do božićnih blagdana ili, u krajnjem slučaju, odmah početkom iduće godine", naglasio je Ljubić.
Prva faza vrijedna 47 milijuna maraka
Napomenimo, mostarsko Sveučilište za izgradnju kampusa od hrvatske Vlade dobilo je oko stotinu milijuna maraka, a sredstva za prvu fazu projekta u iznosu od 47 milijuna maraka već su raspoloživa. S prvom fazom kreće se početkom iduće godine, a konzorcij Brodomerkur iz Splita je kao najpovoljniji izvođač dobio projektiranje, izgradnju i opremanje prve faze sveučilišnog kampusa. "Ukupno 16 objekata je u natjecateljskom postupku, od toga sedam za izvođenje i devet za projektiranje. Povjerenstvo koje je biralo najpovoljnije ponuđače imalo je lak posao. Tehnički dio tendera nosio je 50 posto, kao i financijski dio. U tehničkom dijelu uvjeti su bili kapital i rezerve tvrtke te ukupan prihod u 2005., ukupna dobit u 2005. i broj zaposlenih. Sve te podatke dostavili su ponuđači, a nakon izračunavanja uvidjeli smo tko je najpovoljniji. Tvrtka koja je imala najviše bodova imala je i financijski najbolju ponudu. Taj konzorcij je u sklopu svoje ponude ponudio i plaćanje pristojbe i rente, tako da je, uključujući tu pristojbu, ova ponuda za pola milijuna bila povoljnija od ostalih", rekao je Ivo Čolak, dekan Građevinskog fakulteta i predsjednik navedenog povjerenstva za izbor najpovoljnijeg ponuđača za projektiranje, građenje i opremanje objekata kampusa Sveučilišta. Osim Čolaka, u tom povjerenstvu bili su Stipe Mamić, pomoćnik ministra znanosti, obrazovanja i sporta RH, Stanislava Rogić, savjetnica u hrvatskoj Vladi, zamjenik rektora Sveučilišta prof. Šimun Musa i glavni tajnik Sveučilišta magistar Marinko Jurilj.
Brodomerkur iz Splita najpovoljniji
Ukupno su bila tri ponuđača iz Hrvatske, i nitko se iz naše zemlje nije mogao ni javiti na tender jer su to bile propozicije za dobivanje kredita. Hrvatska banka za obnovu i razvitak odobrila je kredit uz uvjet da će se u postupku biranja najpovoljnijeg ponuđača odabrati tvrtka iz Hrvatske kako bi se to moglo tretirati kao kreditiranje izvoza. "Konzorcij Brodomerkur je bio najpovoljniji, a prigovor je uložila tvrtka Konstruktor d.d. Zagreb, dok je treća tvrtka bila Tehnika d.d. Zagreb. Konstruktorov prigovor je nerealan i neobjektivan, nitko ne osporava njihovu sposobnost, ali tvrtke koje su dobile projekt su sposobne projektirati, napraviti i opremiti kampus. Pokazalo se da su oba konzorcija kvalitetna, ali Brodomerkur je za 500.000 maraka povoljniji i zbog toga je izabran", naglasio je rektor Ljubić.
Promocije na Dan Sveučilišta
Jučer su na Dan Sveučilišta promovirana dva doktora znanosti. Mr. sc. Zdenko Klepić promoviran je u doktora ekonomskih znanosti, a mr. sc. Milenko Bevanda u doktora medicinskih znanosti. Također, u Amfiteatru Sveučilišta dodijeljeno je počasno zvanje professor emeritus kandidatima prof. dr. sc. Ljubi Šimiću i prof. dr. sc. Đuri Maričiću. Posebno priznanje na Dan Sveučilišta dobila je i djelatnica Sveučilišta Branka Mandić.
bosnia1990 December 15th, 2006, 07:22 PM Turisti i zimi posjećuju Mostar MOSTAR - Unatoč tomu da je turistička sezona mjesecima iza nas, u Starom gradu se ovih dana može vidjeti veliki broj stranih turista, i to u većem broju nego prethodnih godina. Turisti dolazi iz raznih dijelova Europe, a ova godina je karakteristična po dolasku turista iz azijskih zemalja, uglavnom iz Japana i Malezije.
Stari grad ispunjen turistima
Mensud Duraković, voditelj Turističke zajednice Mostar, potvrdio nam je da je pojačan posjet turista u ovo doba. "Za razliku od prethodnih godina, ovaj prosinac je karakterističan po povećanju dolazaka turista iz Europe pa i šire. Potrebno je istaknuti da imamo porast stranih gostiju iz azijskih zemalja", rekao je Duraković. Veće skupine turista posljednjih dana se mogu vidjeti u Starom gradu, a posebice na Starome mostu. Inozemni gosti koji posjećuju naš grad dolaze većinom u organiziranim skupinama, iako ima i veliki broj pojedinačnih dolazaka. "Osim skupnih dolazaka gostiju, koji ostaju u našem gradu više dana, imamo i veliki broj koji dolaze na jednodnevne izlete", kazao je Duraković dodavši da s nestrpljenjem očekuju siječanj za koji već postoje naznake o većim dolascima inozemnih gostiju.
Povezivanje kulturno-povijesnih nasljeđa
Turistička zajednica ovih dana užurbano radi, jer se trenutačno obavljaju pripreme na organizaciji dočeka Nove godine na otvorenom, koji organiziraju u suradnji s Gradskom upravom. Također, ovih dana su obavljeni i preliminarni razgovori glede jednog projekta u suradnji s UNDP-om. Naime, radi se o projektu povezivanja kulturno-povijesnih naslijeđa Blagaja, Stoca i Trebinja. Za taj projekt vlada velika zainteresiranost, a njegova realizacija ovisit će od iznosa sredstava koje će UNDP izdvojiti.
bosnia1990 December 15th, 2006, 07:23 PM Neizvjestan završetak KB-a Mostar
MOSTAR - Radovi na izgradnji Kliničke bolnice Mostar na Bijelom brijegu su u tijeku, ali kako doznajemo od glasnogovornice KB-a Mostar Andrijane Bošnjak, radovi su kontinuirani s povremenim prekidima zbog financijskih problema. Za dovršetak izgradnje nedostaje oko sedam milijuna maraka, a za opremu se pronašlo nekoliko kreditnih aranžmana od kojih se upravo ovih dana realizirao kredit korejske banke u iznosu od četiri i pol milijuna dolara, a u tijeku su dogovori o saudijskom kreditu koji je u sredini faze i austrijskom, koji je u početnoj fazi.
Vlade RH i Federacije BiH najveći donatori
Najviše sredstava u izgradnju bolnice, koja bi nakon završetka bila jedna od boljih u državi, uložila je Vlada Republike Hrvatske, a zatim i Vlada Federacije BiH. Kako su naglasili iz te zdravstvene ustanove, dio sredstava osiguran je iz donacija kako pojedinih tvrtki, tako i organiziranjem humanitarnih koncerata. Međutim, ono što usporava radove na dovršetku KB-a je administracija koja je u Federaciji BiH poseban problem koji priječi i ulaganja i donacije. "Novac od mnogobrojnih kredita bit će operativan kad se završi administrativni dio, a poznato je kako je administracija u našoj zemlji manje-više dugotrajan proces. Stoga i radimo s kontinuiranim prekidima", naglasila je Andrijana Bošnjak.
Završetak neizvjestan
Klinička bolnica Mostar u samom početku planirana je kao centar za sve građane naše države, no većina pacijenata koji se u njoj liječe su s prostora Hercegovine, objasnili si iz KB-a. Međutim, planovi ljudi koji rade na izgradnji ove bolnice su veliki. Klinička bolnica Mostar, kao ustanova na najvišoj zdravstvenoj razini, osigurava narodu Hercegovine, neretvanske doline, srednje i zapadne Bosne potrebu za sekundarnom, tercijalnom i visoko diferenciranom zdravstvenom zaštitom. Kada će Klinička bolnica Mostar biti dovršena još se ne zna, a glasnogovornica je naglasila da sve ovisi o financijskim mogućnostima; što prije bolnica pribavi novac, prije će se radovi završiti. Podsjetimo da će se u prizemlju glavne zgrade nalaziti hitni medicinski prijam i poliklinike, kao i dvije interventne dvorane, a prvi kat je operacijski blok s deset operacijskih dvorana i jedinicom za intenzivno liječenje. Treći kat je ginekološko-porođajni blok, a sve iznad toga je stacionar. U ovu zgradu će se preseliti sve kirurške grane. Osim centra za onkologiju i središnje službe opskrbe, ostaje još izgradnja upravne zgrade te zgrada za odjel za kožne bolesti, zarazne bolesti i akutnu psihijatriju.
bosnia1990 December 15th, 2006, 07:25 PM Mutne igre oko mostarskog kina MOSTAR - Mostarska javnost sasvim sigurno se s razlogom pita kada će naš grad napokon dobiti kino. No, kako sada stvari stoje, čini se da to neće biti uskoro. Podsjetimo da su još prije nešto više od dvije godine započele pripreme na izgradnji multiplex kinodvorane koja se trebala nalaziti na prostoru bivšeg kina Partizan. Obnovu i rekonstrukciju započela je tvrtka Art Company iz Kiseljaka, ali to multiplex kino nije nikada ugledalo svjetlo dana. Nakon urađenog dijela radova na spomenutom objektu, daljnji radovi su obustavljeni.
PID gradi kino, a Art Company ga uzima u zakup
Nakon obustavljanja radova, u nekoliko navrata kontaktirali smo osobe iz tvrtke Art Company kako bismo doznali iz kojih razloga su prekinuti radovi i što će biti s budućim kinom, čiju su izgradnju Mostarci s nestrpljenjem iščekivali. Iz Art Companyja su kazali da je obnova i rekonstrukcija kinodvorane obustavljena zbog neriješenih imovinskopravnih problema koji su se iznenadno pojavili prilikom izvođenja radova.
Ipak, postoji i druga strana cijele priče. Naime, problemi s papirologijom su uistinu postojali, ali, kako doznajemo, to nije bio glavni razlog obustave radova.
"Dok smo rješavali probleme s papirologijom, oni su nas u jednom trenutku obavijestili kako zbog financijskih problema nisu u stanju nastaviti izgradnju kina", kazala nam je Selma Redžović, direktorica Mostar filma. Prije nekoliko dana ponovno smo kontaktirali Art Company kako bismo doznali jesu li uistinu odustali od izgradnje kinodvorane. Informacije koje smo dobili od njih su sasvim suprotne tome. Naime, oni bi se sljedećeg tjedna trebali sastati s mostarskim gradonačelnikom te dogovoriti detalje o nastavku izgradnje kinodvorane. To su nam potvrdili i u Gradskoj upravi Mostar, pa bi se tijekom sljedećeg tjedna trebala znati budućnost mostarskog kina. Što se tiče Mostar filma, čiji je vlasnik austrijsko-bosanska kompanija PID, oni bi trebali graditi kino. "Naš posljednji dogovor s kiseljačkim Art Companyjem je bio da mi pravimo kino, a oni bi ga zakupili", kazala nam je Selma Redžović dodavši kako se nada da će radovi ubrzo započeti.
Bešlić zainteresiran za izgradnju kina
Kako smo uspjeli doznati, radovi na izgradnji kina u mostarskoj Gradskoj upravi su u posljednje vrijeme mnogo aktualni. Prema informacijama do kojih smo uspjeli doći, gradonačelnik Ljubo Bešlić je jako zainteresiran za izgradnju kina. Ipak, to ne bi bilo ovo kino koje bi se trebalo nalaziti na prostoru kina Partizan. Naime, riječ je o drugom objektu za kojeg se traži prostor na kojemu bi se trebalo nalaziti, a čiji bi vlasnik bio Grad koji bi svojim građanima omogućio da u njemu napokon gledaju nova svjetska filmska izdanja.
bosnia1990 December 16th, 2006, 11:40 AM http://galerija.badboysteam.com/albums/userpics/10001/IMG_4715.jpg
ovo je sportska dvorana u mostaru sto se gradila prija rat sta je sada sa njom meni bas dobro izgledaju tribine ako bi se to zavrsilo
bosnia1990 December 16th, 2006, 11:41 AM http://galerija.badboysteam.com/albums/userpics/10001/IMG_4719.jpg
evo jedne zgrada sto se gradi:D
bosnia1990 December 16th, 2006, 11:42 AM http://galerija.badboysteam.com/albums/userpics/10001/IMG_4709.jpg
da jos obnove te dvije zgrade bio bi ovo mjesto na ljepse u BiH:)
bosnia1990 December 16th, 2006, 11:50 AM http://galerija.bljesak.info/albums/bridge/IMG_4896.jpg
nedavno otvorena diskoteka the bridge Mostar:D
bosnia1990 December 16th, 2006, 11:52 AM http://galerija.bljesak.info/albums/userpics/normal_DSC03291.JPG
vidi cura ja juga BiH
bosnia1990 December 16th, 2006, 12:53 PM Nastavak radova na izgradnji čaršijske džamije
http://www.jablanica.ba/jab/images/stories/dzamija_2_th.jpg
http://www.jablanica.ba/jab/images/stories/dzamija_2_.jpg
http://www.jablanica.ba/jab/images/stories/gradnja_carsijske_dzamije.jpg
http://www.jablanica.ba/jab/images/stories/gradnja_carsijske_dzamije2.jpg
ovo je dzamija sto se gradi u Jablanici ako se zavrsi dzamija ove ce biti tek druga za Jablannici inace gdje se dzamije gradi prija su bile dvije barake napokon da se i on srusile. Ja sam ovde postavio ovaj post zato sto je jablanica blizu mostar-a
mostarac1 December 16th, 2006, 02:30 PM Cuj tek druga, svasta?? Well it looks good :)
LordMarshall December 18th, 2006, 07:23 PM Potpisan ugovor o izgradnji vodovoda
Gradonačelnik Mostara Ljubo Bešlić i predstavnik poduzeća HP Investing d.o.o. Mostar Samir Šoše potpisali su danas u mostarskoj Gradskoj upravi Ugovor o izvođenju radova na izgradnji osnovnih objekata podsustava vodovoda Bijelo Polje za naselja Livač-Kuti-Semetovac-Uborak.
Gradonačelnik Mostara kazao je da je potpisivanje ovog ugovora od velike važnosti, jer će biti rješeno pitanje opskrbe vodom jednog velikog dijela bjelopoljske kotline.
Ovih dana bit će potpisani još neki ugovori, tako da će građani Mostara vidjeti da gradska uprava, unatoč teškoćama s kojima se suočava, radi i obavlja ono što je zacrtano, dodao je gradonačelnik Bešlić.
Predsjednik Gradskog vijeća Mostara Murat Ćorić kazao je kako je ovo važan dan za cjelokupno gradsko područje Sjever jer se radi o završetku treće faze ukupnog projekta vodoopskrbe bjelopoljske kotline iz izvorišta Bošnjaci.
"Ovim se rješava veliki problem, a to je da ljudi u okolici deponije Uborak dobivaju vodu iz zatvorenog sistema, a poboljšava se i snadbjevanje vodom gornjih dijelova Vrapčića", kazao je Ćorić.
Ukupna je vrijednost projekta 1 206 145 maraka, a rok za završetak radova 95 kalendarskih dana od dana uvođenja izvođača u posao.
Link: http://www.ntvhayat.com/home/vijesti/index.php?sta=3&pid=29268
bosnia1990 December 20th, 2006, 05:19 PM Kakva će trava rasti u parku Zrinjevac?!
Gradonačelnik Mostara Ljubo Bešlić primio je danas u Gradskoj upravi dr. Ivana Ostojića, direktora A.C Sjemenarne-Mostar i Antu Bošnjaka, direktora i vlasnika tvrtke Bossin iz Mostara. Na sastanku je bilo riječi ...
... o donaciji za uređenje središnjeg gradskog parka Zrinjevac. Predstavnici ove dvije tvrtke izrazili su svoju spremnost da nakon što predstavnici grada iskažu konkretnu potrebu za zelenilom i betonskom galanterijom istu uruče.
Dr. Ostojić je istaknuo kako u svom asortimanu Sjemenarna ima različite smjese trave kojom bi se ozelenila travnata površina parka.
Glede betonske galanterije kojom će se urediti staze u parku dogovoreno je da se za početak na manjoj površini uradi nekoliko različitih rješenja o kojima bi ne samo struka nego i građani dali svoje mišljenje, a što bi u konačnici bilo presudno pri odabiru konkretnog rješenja.
Gradonačelnik Bešlić zahvalio je dr. Ostojiću i Bošnjaku na potpori ovom projektu koji se uglavnom izuzev 100 tisuća KM iz proračuna radi donatorskim sredstvima te naglasio kako će park kada bude potpuno završen bit jedinstven i na korist svim građanima.
http://www.bljesak.info/slike/park-zrinjevac-tabla2.jpg
bosnia1990 December 20th, 2006, 05:21 PM Potpisan ugovor o izgradnji sportskih tribina
Gradonačelnik Mostar Ljubo Bešlić i Harun Zalihić predstavnik poduzeća ''Harun'' d.o.o Mostar potpisali su u utorak u Gradskoj upravi Mostara Ugovor o izvođenju radova na izgradnji tribina u sportskoj ...
... dvorani u Sjevernom logoru. Vrijednost izvođenja radova je 167 740 KM, a rok za završetak radova je 90 kalendarskih dana od dana uvođenja izvođača u posao, dok je jamstveni rok na izvedene radove tri godine.
Gradonačelnik je Bešlić istaknuo kako ponuda poduzeća Harun bila najbolja na javnom natječaju te da će ovim projektom biti završeno kompletno unutarnje uređenje dvorane, te da još ostaje nabavka sportskih rekvizita i uređenje partera ispred dvorane. Kapacitet tribina kada se izgrade biti će 1000 mjesta za sjedenje, a sredstva za ovaj projekt osigurana su od privatizacije hotela ''Neretva''.
Harun Zalihić zahvalio je na ukazanom povjerenju je po prvi puta rade s gradskom upravom te obećao kako će radovi biti urađeni kvalitetno i u predviđenom roku.
LordMarshall December 21st, 2006, 01:04 AM Obećana pomoć u obnovi Mostara
MOSTAR - Delegacija Evropske komisije u BiH pojačat će suradnju s Mostarom, posebice kada je riječ o obnovi u ratu porušenih objekata, zaključak je jučerašnjeg sastanka mostarskog gradonačelnika Ljube Bešlića sa šefom izaslanstva Europske komisije u BiH Dimitrisom Kurkulasom.
Kako je kazao Bešlić, na sastanku su razgovarali o projektima koji su u Mostaru realizirani kroz suranju EK I grada Mostara.
"Kao gradonačelnik od EK očekujem nastavak onoga što je do sada započeto u suradnji s EK i Mostara. Tražio sam i pomoć od EK da nastavimo rad na onim projektima koji su do sada započeti. U narednom periodu želimo uspostaviti bolju ekonomsku suradnju između grada i EK, prvenstveno putem Regionalne razvojne agencije za Hercegovinu (REDAH). Molio sam ekselenciju da mi pomogne u lobiranju za bržu rekonstrukciju porušenih objekata u Mostaru. Nužna nam je pomoć i EK i ljudi iz Svjetske banke. Očekujemo njihovo razumijevanje i da ćemo uskoro imati sastanak s konkretnim prijedlozima o obnovi grada", rekao je Bešlić.
Kurkulas se složio s gradonačelnikom, poručivši da će se suradnja EK i Mostara dodatno produbiti.
"Siguran sam da će EK i u budućnosti nastaviti suradnju s Mostarom. Štoviše, smatram kako ćemo tu suradnju i intenzivirati. Potpisivanjem Sporazuma o stabilizaciji i pridruživanju EK će se moći i finansijski intenzivnije uključiti u obnovu, kako BiH tako i Mostara. Gradonačelnik me upoznao i s prioritetima u obnovi grada i obećao sam da ću o tome razgovarati sa odgovornim ljudima u EK. U skoroj ćemo budućnosti moći razgovarati o tome na koji način ćemo nastaviti obnovu", rekao je Kurkulas, koji je u okviru svog posjeta Mostaru obišao zgrade koje su obnovljene sredstvima Europske unije, te Stari grad.
Link: http://www.nezavisne.com/vijesti.php?vijest=3619&meni=4
tonycro December 24th, 2006, 04:55 PM Dragi Hercegovci :) Sretan Vam Božić :cheers:
Pavle4488 December 24th, 2006, 04:57 PM Čestit Božić Mostarci!!! :cheers:
antenor December 24th, 2006, 05:09 PM :carrot: :cucumber: :banana: :pepper: Merry X-MASS svima!!:carrot: :cucumber: :banana: :pepper:
mostarac1 December 24th, 2006, 05:14 PM http://www.nelsonideas.com/history-of-christmas/christmas-tree-decorated.jpg
merry christmas to all catholics thruout B&H
bosnia1990 December 24th, 2006, 11:31 PM Ultras: ''Kad će silni prvoligaši dobiti adekvatno mjesto za treniranje?''
Nedavno je potpisan Ugovor o izvođenju radova na izgradnji tribina u sportskoj dvorani u Sjevernom logoru. Tim povodom oglasili su se iz Kluba navijača "Ultras - Zrinjski" Mostar, koji ponovno aktualiziraju ...
... pitanje izgradnje gradske športske dvorane, u kojoj bi, umjesto u školskoj dvorani moglo nastupati čak pet gradskih prvoligaša. U priopćenju između ostalog stoji:
http://www.bljesak.info/slike/_dvorana_c2.jpg
"Ovim ne želimo nikoga omaložavati, ali čudno je da se riješava dvorana u kojoj ne nastupa niti jedan prvoligaš, dok naših 5 prvoligaša grčevito čeka riješavanje pitanja bilo kakve dvorane. Ne treba više pisati o nedostatku prostora za treninge, o talentima koji prestaju trenirati, o Bojanu Bogdanoviću ili Igoru Karačiću." (...)
"Sportski savez Mostara djeluje i financira se iz gradskog proračuna, a taj proračun je opet zaobišao dvoranu. Stoga mislimo da ovaj savez nema legitimitet da predstavlja mostarske sportaše, bar ne iz ovih prethodno spomenutih, prvoligaških sportskih kolektiva.
Evo sada je kraj godine i naravno vrijeme da Sportski savez grada podijeli priznanja za najbolje sportaše grada za proteklu godinu. I taj događaj je samo parada svojstvena samo ovome gradu i kopija onih koji zaista drže do sporta i sportaša. Sjećamo se lanjske farse od izbora kada su se po nacionalnom ključu dijelila priznanja, a jedan Bojan Bogdanović i košarkaški klub Zrinjski MC su izostavljeni sa tog "glamoura", jer eto netko tamo je trebao dobiti priznanje po tom njihovom ključu.
>> Članak možete komentirati na forumu >>
Najbolje bi bilo da naši sportski kolektivi bojkotiraju ovu dodjelu, jer krajnje je vrijeme da se nešto pokrene u vezi dvorane. Našim sportašima ne trebaju jeftini limeni poklali, niti sendviči poslije te farse, već dvorana !
Stoga, molimo i apeliramo na sportske kolektive iz obitelji Zrinjski da se ne odazovu ovogodišnjoj dodjeli priznanja, pa se možda netko iz grada i Sportskog saveza prisjeti i pokrene pitanje izgradnje dvorane. Nažalost, mislimo da to nikoga neće pogoditi , ali ako sportaši sami ne krenu u odlučniju borbu za svoja prava i prostor za treninge, zauvijek ćemo biti "kasaba" u odnosu na ostale gradove čije su vlasti već poodavno riješili pitanje sportskih dvorana.
Unatoč ponekim neslaganjima Ultrasi su uvijek bili uz naše sportaše, pa tako i u ovoj borbi. Krajnje je vrijeme da silni državni prvaci koji se koriste neadekvantnom sportskom dvoranom dobiju pravo mjesto za treniranje i odigravanje utakmica!"
www.bljesak.info
LordMarshall December 26th, 2006, 08:46 PM Nizozemski arhitekti stvaraju novu dvoranu
MOSTAR - Kako sada stvari stoje, tijekom sljedeće godine bi se trebali započeti radovi na dovršetku sportske dvorane na koju Mostarci čekaju već punih dvadeset godina. Kao što je poznato, izgradnja sportske dvorane u Centru 2 je započeta još osamdesetih godina, kada su urađeni početni radovi u kojima je napravljena konstrukcija dvorane. Nažalost, od tog trenutka na dvorani nije urađeno apsolutno ništa te ona godinama u središtu grada stoji prazna i u međuvremenu služi jedino kao okupljalište narkomana, beskućnika i alkoholičara. Na štetu građana Mostara i njegovih sportaša, sportska dvorana je zarasla u korov i kupinu, čineći time pravo ruglo od grada.
Bešlić glavni pobornik
Prema najnovijim informacijama, kako doznajemo iz Gradske uprave, postoje velike naznake o početku radova na konačnom dovršetku radova na dvorani. Najveći pobornik dovršetka sportske dvorane je upravo mostarski gradonačelnik Ljubo Bešlić, koji je i sam bio dugogodišnji sportaš, pa vrlo dobro razumije što bi dvorana značila gradu i njegovim brojnim sportašima. Prilikom potpisivanja ugovora o izvođenju radova na izgradnji tribina sportske dvorane u Sjevernom logoru, koje je održano prije nekoliko dana u Gradskoj upravi, gradonačelnik Bešlić se osvrnuo i na nedovršenu sportsku dvoranu te kazao da će radovi na njoj započeti već sljedeće godine. “Ovo nije kraj priče o gradnji sportskih objekata u gradu i vjerujem da ćemo već u idućoj godini početi s gradnjom sportske dvorane koju smo započeli još davno. Nadam se da će tako građani u iduće tri godine dobiti jedan prekrasan sportski kompleks”, kazao je Bešlić prilikom potpisivanja ugovora. Tom prigodom gradonačelnik je također istaknuo da upravo s nizozemskom tvrtkom 4d Arhitekt rade studiju osuvremenjivanja projekta. “Određene stvari i zahtjevi u arhitekturi su se u međuvremenu promijenili, stoga treba prvo uraditi projekt. Nakon tog usklađivanja, znat će se sve detaljnije, kao i kolika je vrijednost cijeloga projekta. Završetkom projekta će se najprije raspisati javni natječaj, nakon čega će se znati točan početak gradnje, iako sasvim sigurno mogu reći da će to biti tijekom sljedeće godine”, istaknuo je mostarski gradonačelnik.
Dvorana bi ubrzala napredak mostarskog sporta
Napomenimo još jednom da je Mostar jedini grad u Hercegovini, pa i šire, koji nema adekvatnu sportsku dvoranu. Nasuprot tome, sva ostala manja obližnja mjesta imaju sportske dvorane, i to čak sa svim potrebnim uvjetima. Sasvim sigurno bi dovršetak sportske dvorane bio od velikog značaja, kako za građane Mostara, tako i za njegove sportaše. Završetkom dvorane širom bi se otvorila vrata napretka mostarskog sporta te sklonila mladež s ulica. Sportska dvorana bi se trebala koristiti za više sportova i imala bi sve potrebne uvjete i pogodnosti.
Link: http://dnevni-list.ba/?mdls=1&mdls_tip=2&nid=8607
LordMarshall December 27th, 2006, 01:31 AM TURISTIČKA ZAJEDNICA HNK USPJEŠNO IMPLEMENTIRALA PROJEKAT TURISTIČKE SIGNALIZACIJE U MOSTARU
Turistička zajednica Hercegovačko – neretvanskog kantona uspješno je implementirala projekat urbano – turističke signalizacije na području Mostara. "Cilj projekta je podizanje opšteg dojma o gradu Mostaru, kao tuističkoj destinaciji za strane turiste, te podizanje opšte kvalitete života u gradu i svijesti o vlastitim vrijednostima“, rekao je zamjenik direktora TZ HNK-a Semir Temim.
Urbana turistička signalizacija urađena je prema evropskim standardima u plavoj, smeđoj, crnoj, žutoj i bijeloj boji, a obuhvatila je glavne karakteristike Mostara.
"Ova signalizacija upućuje goste na turističke, kulturne i sve druge institucije koje su potrebne svakom turističkom mjestu. Namjenjena je prvenstveno motoriziranim turistima, kako bi ih uputila na odredište i lakše dovela do željenog cilja“ dodao je Temim.
Izrada projekta trajala je skoro dvije godine, a samo postavljanje signalizacije završeno je u posljednjih 15 dana.
Ukupna vrijednost projekta urbano – turističke signalizacije za područje Mostara je 50.000 KM.
Link: http://www.biznis.ba/index.php?option=com_content&task=view&id=8991&Itemid=59
bosnia1990 December 27th, 2006, 12:39 PM jedva cekam da se zavrsi dvorana
bosnia1990 December 27th, 2006, 12:42 PM koliko ce imati mjesta dvorana sigurno ja mislim jedno 3000
bosnia1990 December 29th, 2006, 02:21 PM Turisti od sada lakše do gradskih znamenitosti
MOSTAR - Napokon je završen projekt postavljanja turističke signalizacije u Mostaru, kojom su naš grad i županija postali jedina sredina u državi s ovom signalizacijom, i to ni manje ni više nego urađenu prema svim europskim standardima. Nakon ovog poteza Mostar je sasvim sigurno postao dio Europe, ako ništa, onda bar u turističkom smislu. Navedena signalizacija ima zadatak pomoći turistima koji se po prvi put nađu u Mostaru da jednostavnije dođu do najznačajnijih objekata, prije svega objekata kulturno-povijesne baštine.
Signalizacija urađena po europskim standardima
http://www.dnevni-list.ba/mdls/dnlnws/nwsimg/1167209576.jpg
Sam projekt je urađen još prije dvije godine, nakon čega je Turistička zajednica krenula s postavljanjem signalizacije na području općina HNŽ-a, da bi se potom osvrnula i na grad Mostar i njegovu bližu okolinu. Zamjenik direktora Turističke zajednice HNŽ-a Semir Temim je istaknuo kako ovaj projekt obuhvaća urbano-turističku signalizaciju koja će omogućiti lakše snalaženje stranim turistima. “Nakon postavljanja turističke signalizacije u Mostaru kompletirali smo cijelu županiju, te se možemo pohvaliti da prvi u državi imamo završen ovaj projekt. Signalizacija je urađena po europskim standardima u osnovnim bojama: smeđa, plava, crna, bijela i žuta. Završili smo projekt koji je bio prijeko potreban Mostaru, a nakon ovoga ćemo sasvim sigurno spremno dočekati sljedeću turističku sezonu”, naglasio je Temim dodavši kako naš grad nakon ovoga izgleda europski i uljudno. Ukupna vrijednost cijelog projekta iznosi oko 50 tisuća maraka.
Turistima omogućeno lakše snalaženje
Urbano-turistička signalizacija je obuhvatila sve glavne karakteristike grada, a namjera joj je bila uputiti strane goste na turističke, kulturne i sve ostale institucije, po kojima je prepoznatljivo svako turističko mjesto. Voditelj Turističke zajednice Mostara Mensud Duraković nam je kazao kako je ovime omogućeno lakše snalaženje turistima u našem gradu. “Turističkom signalizacijom je obuhvaćeno sve - od bolnica, hotela, industrijske zone do kulturno-povijesnih spomenika. S te je strane Mostar definitivno zaokružio cjelokupnu turističku strukturu”, rekao nam je Duraković
bosnia1990 December 29th, 2006, 02:22 PM Federalna Vlada rješava slučaj Ruža
MOSTAR - Posljednja sjednica Gradskog vijeća Mostara čelnim ljudima, ali i brojnim turističkim radnicima donijela je još jednu veliku brigu i nadvila nove probleme nad jedini grad koji se nalazi na UNESCO-voj listi zaštićene svjetske baštine. Naime, mostarski gradonačelnik je na sjednici održanoj prošlog tjedna kazao kako stručno povjerenstvo i nakon više mjeseci rada nije uspjelo postići nikakav kompromis u vezi ispunjavanja uvjeta UNESCO-a kada je u pitanju hotel Ruža, što izravno implicira mogućnost skidanja Mostara s liste zaštićenih spomenika.
http://www.dnevni-list.ba/mdls/dnlnws/nwsimg/1167306316.jpg
Informacije proslijeđene Vladi
Kako sada stvari stoje, problem u vezi hotela Ruža nalazi se rukama federalne Vlade koja bi, prema nekim najavama, na današnjoj sjednici trebala raspravljati o tome, a nakon informacija koje su federalnom premijeru Hadžipašiću, zamjenika premijeru Vrankiću i ministru prostornog uređenja Otajagiću prezentirali gradski vijećnici i mostarski gradonačelnik. Od predsjednika Gradskog vijeća Mostara Murata Ćorića i jednog od sudionika tog sastanka doznali smo kako su čelnici Vlade i ministarstava preuzeli dokumentaciju i informacije o hotelu te im tada nisu mogli dati nikakav konkretan odgovor. “Nadam se da će se na sjednici Vlade, koja bi se trebala održati do kraja tjedna, donijeti konkretni zaključci vezani uz rješavanje ovog problema te kako ćemo i mi uskoro imati povratne informacije za daljnje korake”, kazao nam je Ćorić. Nadležni ministar Otajagić do sada nije želio poduzimati nikakve korake kada je hotel Ruža u pitanju, a posebice nije pomišljao na izdavanje rješenja o zabrani gradnje na tom objektu. Zabranom gradnje na spomenutom objektu osiguralo bi se još malo vremena za nalaženje konačnog rješenja za hotel Ruža, ali i za ostanak Mostara u društvu privilegiranih svjetskih gradova.
Gradonačelnik predlagao rješenje
Zbog ovoga je gradonačelnik zatražio poduzimanje koraka na rješavanju tog problema iako to nije u nadležnosti Grada, nego federalnih tijela. “Budući da federalni ministar Otajagić ne želi pokrenuti postupak zabrane gradnje, tražim donošenje odluke prema kojoj bi Grad Mostar, iako za to nije nadležan, donio odluku o zabrani gradnje, čime bismo dobili malo vremena prije nego što budemo skinuti s liste UNESCO-a”, kazao je na prošlotjednoj sjednici vidno rezignirani gradonačelnik Bešlić. U pokušaju da se cijela situacija vrati u zakonske okvire te da se konačno poradi nešto na tome, Vijeće je zaključkom zatražilo sastanak s čelnicima Vlade te nadležnim ministrom, koji je i održan proteklog tjedna. Napomenimo kako informacije o ovom projektu moraju UNESCO-u biti dostavljene do 2. veljače iduće godine, kada će zasjedati Svjetsko povjerenstvo za spomenike i kada će se razmatrati napredak Mostara u oblasti provođenja UNESCO-vih standarda u staroj gradskoj jezgri.
mostarac1 December 31st, 2006, 12:36 AM http://www.panoramio.com/photos/original/259171/bajram.jpg
bosnia1990 January 2nd, 2007, 11:29 PM http://www.sirbegovic.com/slike/2005_04/klas3.jpg
http://www.sirbegovic.com/slike/2005_04/klas4.jpg
http://www.sirbegovic.com/slike/2005_04/klas5.jpg
http://www.sirbegovic.com/slike/2005_04/klas8.jpg
klas centar Mostar otvoren 2005
lkm370 January 3rd, 2007, 03:24 AM very hi tech and modern looking
LordMarshall January 6th, 2007, 08:26 PM Novi kolodvor po uzoru na europske
MOSTAR - Dugo najavljivana izgradnja novog autobusnog kolodvora se ubrzanim tempom privodi kraju. Novi kolodvor se nalazi u Vukovarskoj ulici i već godinu dana na njega pristižu i s njega odlaze brojni autobusi, kako na lokalnim, tako i na međunarodnim linijama. Novi kolodvor je u vlasništvu mostarske tvrtke Autoprijevoz i već duže vrijeme radi punim kapacitetom. Ipak, do kompletnog završetka novog autobusnog kolodvora potrebno je uraditi još dosta pojedinosti.
Za desetak dana gotova prva faza
Prema riječima Ivana Zelenčića, direktora Autoprijevoza, do završetka cjelokupnog projekta potrebno je uraditi još neke pojedinosti koje su oni podijelili u dvije faze. Doduše, završetak tih dviju faza je bio najavljivan još tijekom protekle godine, ali su datumi završetka radova malo kasnili. “Prva faza radova bi, prema našim procjenama, trebala biti gotova za nekih desetak do petnaest dana. Radovi su se na njoj već trebali završiti, ali su nas u tome, nažalost, malo poremetili loše vrijeme i protekli blagdani”, kazao nam je Zelenčić. Ova prva faza uključivat će izgradnju krova, otvaranje čekaonice, blagajne, kafića i uređivanja partera. Preseljenjem na novi kolodvor riješeni su svi problemi vezani uz vodu i infrastrukturu, s kojima su se susretali na bivšem kolodvoru u Radićevoj ulici. Novoizgrađeni kolodvor je u infrastrukturnom smislu puno podesniji za dolazak i odlazak autobusa s perona, te će svojim izgledom i funkcionalnim karakteristikama smanjiti stvaranje gužvi i nepotrebnih zadržavanja u krugu kolodvora.
Kompletan projekt gotov do 1. svibnja
Ipak, za kompletan završetak cjelokupnog projekta potrebno je uraditi i sve prateće sadržaje nakon čega će novi kolodvor poprimiti moderniji izgled. “Završetak druge faze i cjelokupnog kolodvora trebao bi biti gotov do 1. svibnja. Druga faza uključuje sve potrebne prateće sadržaje kao što su javna garaža, turističke agencije, banke, taksi i rent a car službe, slastičarnice, restorane te i veći broj kafića”, kazao je Zelenčić dodavši da će nakon toga ovaj autobusni kolodvor dobiti jedan savršeni izgled po uzoru na europske i svjetske kolodvore.
Link: http://dnevni-list.ba/?mdls=1&mdls_tip=2&nid=8796
bosnia1990 January 6th, 2007, 09:42 PM imali iko foto od autobuske stanice ona stara nije bila lose kod zeljeznicke stanice ja mislim da je zeljeznicka stanica u Mostaru naj ljepsa u BIH samo da se jos malo ofarbe nova stakla i tako:D
Jasoo_ January 16th, 2007, 12:14 AM Novi kolodvor po uzoru na europske
Link: http://dnevni-list.ba/?mdls=1&mdls_tip=2&nid=8796
Ja mislim da smo mi stajali tu prosle godine, s linijom Neum - Mostar. Bas izgleda fino, moderan look i prilicno velika stanica.
mostarac1 January 16th, 2007, 01:48 PM imali iko foto od autobuske stanice ona stara nije bila lose kod zeljeznicke stanice ja mislim da je zeljeznicka stanica u Mostaru naj ljepsa u BIH samo da se jos malo ofarbe nova stakla i tako:D
Evo glavne stanice bus/zeljeznica
http://static.bareka.com/photos/medium/452238/stanica.jpg
mostarac1 January 17th, 2007, 08:13 PM http://www.bljesak.info/slike/mukosa_obnova.jpg
Počela obnova zgrade Mukoša na Bulevaru
Nakon brojnih praznih obećanja donatora, zgrada Mukoša na Bulevaru zahvaljujući nedavno potpisanom Ugovoru između Grada Mostara i federalnog Ministarstva za izbjegle i raseljene osobe, konačno se ...
... počela obnavljati. Nakon provedenog javnog natječaja, kao i ranije provedenog razminiranja ostataka zgrade, na koji se javilo šest građevinskih poduzeća posao rekonstrukcije i nadogradnje Mukoše povjerena je poduzeću MIP Mostar, a vrijednost potpisanog Ugovora je 1 063 817 KM.
Od potrebnog iznosa za obnovu zgrade Federalno resorno ministarstvo izdvojilo je 570 000 KM, a Gradska uprava Mostara 95 000 KM.
Zbog nedostatka sredstava za kompletan završetak objekta Ugovor s je s izvođačem radova potpisan na 665 000 KM, a nakon osiguranja nedostajućih 398 870 KM sačinit će se aneks Ugovora.
Nakon višegodišnje zavrzlame koja je bila za vrijeme postojanja gradskih općina Gradska uprava Mostara osigurala je uvjete i za dovršetak izgradnje nekoliko stambenih zgrada u naselju Podhum.
Ovih dana upravo se izvode radovi na fasadi kao i unutrašnje uređenje stanova. Grad Mostar osigurao je 1 400 000 KM za dovršetak ovog projekta.
Rok za završetak radova za koje je osiguran novac je šest mjeseci, a u Mukoši će biti obnovljeno 19 stanova, koliko ih je bilo i prije, ili ukupne površine 2216 metara četvornih od čega je stambenog prostora 1856, a poslovnog 359 metara četvornih.
Za obnovu preostalih stambenih objekata, a riječ je o 34 stambene zgrade i 381 stranu, prema procjenama koje je radio Odjela za urbanizam i građenje Grada Mostara potrebno izdvojiti oko 20 milijuna KM.
Kako grad kao jedinica lokalne samouprave nije izravno nadležan za obnovu, već resorna ministarstva na federalnoj i državnoj razini, Gradska uprava Mostara nakon brojnih zahtjeva stanara koji desetak godina čekaju na obnovu domova u proračunu je prošle godine izdvojila 250 000 KM za izradu projektne dokumentacije za potencijalne donatore.
Za očekivati je da će vijećnici i u ovoj godini osigurati potporu za taj ili veći iznos kako bi se nastavilo s osiguranjem projektne dokumentacije i za one zgrade za koje to nije učinjeno u 2006. godini.
(Bljesak.info)
Beca January 18th, 2007, 11:17 AM ^^ kako izgleda ta zgrada?
mostarac1 January 18th, 2007, 11:51 PM sorry, evo slike srusenog stanja stanja :)
Pokusat cu ovih dana nabaciti svijziju sliku
http://static.bareka.com/photos/medium/482399/bulevar.jpg
LordMarshall January 19th, 2007, 06:50 PM Hering gradi most vrijedan 1,3 milijuna KM
Projekt izgradnje cestovnog mosta Vojno-Potoci u Mostaru, prema Izvedbenom projektu poduzeća ''ARHITEKT'' d.o.o. Mostar iz 2003. godine predviđa uklanjanje postojećeg mosta i gradnju suvremenog cestovnog mosta.
Most će imati dvije kolničke trake širine po 2,35 m i pješačke staze širine po 1,50 m s obje strane. Ukupni raspon mosta je oko 63 metra, po sustavu prednapregnutih nosača.
'Projekt se financira od sredstava naplaćenih od prodaje GSM licenci za Federaciju BiH, po Odluci Vlade Federacije BiH, a sredstva odobrena za realizaciju projekta iznose 1.300.000 KM. Projekt provodi Grad Mostar, odnosno Odjel za Urbanizam i graditeljstvo putem Služba za građenje infrastrukturnih objekata.
Na javnom natječaju raspisanom za gradnju i nadzor mosta kao najpovoljniji ponuđači odabrani su poduzeće “HERING” d.o.o. Široki Brijeg, kao izvođač radova, s ponuđenim rokom od 90 dana, te tvrtka “IGH-MOSTAR” d.o.o. Mostar , kao nadzorni organ na izgradnji mosta.
Iz Gradske uprave Mostara obznanili su kako se početak izvođenja radova očekuje u idućih tjedan dana, ovisno od dobivene suglasnosti Federalnog ministarstva vodoprivrede, poljoprivrede i šumarstva, na poseban režim regulacije rijeke Neretve. Naime u određenim fazama izgradnje mosta za radove u samom koritu rijeke potrebno je razinu Neretve spustiti ispod kote + 74,00 m.
Link: http://www.pincom.biz/vjesnik/opsirnije.asp?id=12707&rub=vjesnik
Beca January 21st, 2007, 11:03 AM sorry, evo slike srusenog stanja stanja :)
Pokusat cu ovih dana nabaciti svijziju sliku
http://static.bareka.com/photos/medium/482399/bulevar.jpg
djeluje kao da se radilo o jako lijepoj gradjevini...
hercegovac1990 January 26th, 2007, 05:37 PM 1,5 milijuna maraka za sportsku dvoranu u Centru 2
Gradsko vijeće Mostara usvojilo je danas Odluku o privremenom financiranja Grada Mostara za prva tri mjeseca ove godine u iznosu od oko 10 080 569 KM, čime su stvorene pretpostavke za normalno ...
funkcioniranje grada. Razmatran je i Nacrt proračuna za 2007. godinu, koji iznosi 41 993 500 KM i taj planirani iznos za 1, 6 milijuna KM veći će što je ostvareno njegovim rebalansom za prethodnu godinu.
Gradonačelnik je Bešlić kazao kako je očito da nakon javne rasprave i rasprave na vijeću da su želje veće od mogućnosti ali da će se nastojati u proračun staviti sve korisnike bar u minimalnom obliku te da će u skoroj budućnosti trebati raspraviti što je to što i u kojem obimu grad treba financirati.
Prema ovom nacrtu za tekuće grantove predviđeno je 9,15 milijuna KM, što je za oko 700 000 KM manje u odnosu na prethodnu godinu, dok je za kapitalne izdatke predviđeno je 5,7 milijuna KM ili oko 500.000 KM više u odnosu na 2006.
Od kapitalnih izdataka 1,5 milijuna KM predviđena za Jedinicu za implementaciju sportske dvorane u Centru ll, što znači da bi i Mostar uskoro mogao imati sportsku dvoranu.
U proteklom razdoblju vatrogasci su iskazivali nezadovoljstvo visinom izdvajanja za njih tako da će Službi za vatrogastvo civilnu zaštitu sad biti izdvojeno 2,8 milijuna KM, što je za 1,3 milijuna KM više nego za prethodnu godinu.
Gradonačelnik Bešlić vijećnicima je prezentirao i informaciju oko hotela Ruža te sve aktivnosti koje je poduzeo da se taj slučaj riješi. Gradsko vijeće je donijelo više odluka koje su u izravnoj vezi s formiranjem dvaju komunalnih poduzeća u Mostaru, Komunalnog i Uborka, V.d. direktor J.P Komunalno bit će Esad Pobrić.
Vijeće je tako usvojilo zaključak da iz razloga što su BiH i Grad Mostar suočeni s ozbiljnim upozorenjima od strane Odbora za svjetsku baštinu i UNESCO-a da postoji opravdana bojazan da se Stari Most i stara gradska jezgra skinu s popisa zaštićenih spomenika UNESCO-a iz razloga nerješavanja problema izgradnje hotela ''Ruža'' u Mostaru, što bi moglo imati vrlo negativne odjeke i štetne posljedice po turističke, gospodarske i kulturne potencijale Grada Mostara i BiH, kojim poziva na odgovornost Vladu BiH, Vladu F. BiH, te nadležno Federalno ministarstvo prostornog uređenja i zahtjeva da što kraćem roku sukladno članku 10. Zakona o provedbi odluka Povjerenstva za zaštitu nacionalnih spomenika uspostavljenog prema Aneksu 8. Općeg okvirnoga sporazuma za mir u BiH osigura pravne, znanstvene, tehničke, administrativne i financijske mjere za zaštitu, konzervaciju, prezentaciju i rehabilitaciju nacionalnih spomenika.
http://www.bljesak.info/slike/centar2dvorana.jpg
Također je predložilo da se prije 1.2.2007.g. od strane Predsjedništva BiH sazove žuran sastanak svih relevantnih institucija po predmetnom pitanju na kojem bi se zauzelo zajedničko stajalište o rješavanju predmetnoga problema značajnog za BiH.
Gradsko vijeće je pozvalo Federalno ministarstvo prostornog uređenja i gradonačelnika Grada Mostara da sukladno stavu Komisije za očuvanje nacionalnih spomenika BiH pristupi postupku izmjene Odluke o proglašenju historijskog gradskog područja Mostara nacionalnim spomenikom obzirom da se ista otežano sprovodi zbog veličine zaštićenog pojasa
LordMarshall February 3rd, 2007, 07:48 AM Picture by Kondor
http://img160.imageshack.us/img160/3029/mocentarby0.jpg
LordMarshall February 3rd, 2007, 07:52 AM Mostar dobio jedinstvenu deponiju
MOSTAR - Novoformirano Javno poduzeće Uborak koje će upravljati jedinim gradskim odlagalištem otpada od jučer je i službeno otpočelo svoj rad te se uskoro mogu očekivati prvi rezultati u revitalizaciji i unaprjeđenju rada na tom odlagalištu. Rad tog poduzeća je započeo jučerašnjim danom, odnosno uplatom 10.000 maraka iz gradskog proračuna na ime osnivačkih sredstava koje je trebao uplatiti Grad Mostar, a što se nije moglo ranije učiniti zbog neusvajanja proračuna za ovu godinu.
Pismo Svjetskoj banci
Kako smo doznali od Rahmana Bećirevića, direktora JP-a Uborak, jučer je u Gradskoj upravi Mostar održan sastanak s gradonačelnikom Bešlićem i predsjednikom Vijeća Ćorićem na kojem su predstavnici tog poduzeća, ali i JP-a Komos, informirani o budućim akcijama gradskih vlasti kada je u pitanju budućnost JP-a Uborak i samog odlagališta Uborak. “Gradonačelnik Bešlić nam je kazao kako su osnivačka sredstva od 10.000 maraka od jutros operativna te da poduzeće može normalno raditi. Također nas je obavijestio da je 21. siječnja upućeno pismo Svjetskoj banci u kojem je navedeno kako je poduzeće osnovano i da može početi s radom. Nadamo se da će se uskoro održati sastanak s predstavnicima Svjetske banke te da ćemo moći koristiti sredstva koja je ta banka namijenila za gradsko odlagalište”, izjavio je za naš list Bećirević.
Sredstva umanjena zbog kamata
Naime, još prije četiri godine Svjetska banka je za revitalizaciju, odnosno sanaciju i unaprjeđenje rada odlagališta Uborak izdvojila dva milijuna dolara, međutim, zbog već poznatih problema u podjeli JP-a Komos na dva komunalna poduzeća, ta sredstva nisu realizirana do danas. “Prema našim informacijama, Svjetska banka nije odustala od ovog projekta, međutim, zbog poznatih odugovlačenja u ovom procesu formiranja tvrtke došlo je do malih promjena u iznosu aranžmana te banke. Naime, prema neslužbenim informacijama koje imamo u ovom trenutku, ta su sredstva zbog kamata umanjena i nama bi se na raspolaganju trebalo naći oko milijun dolara”, kazao je Bećirević dodavši kako će se više znati nakon sastanka za koji se nadaju da će uslijediti uskoro. Na jučerašnjem sastanku su dogovorene i tehničke pojedinosti oko poslova primopredaje sredstava i opreme te diobene bilance između Uborka i Komosa, a na kojima će raditi predstavnici obaju poduzeća uz pomoć predstavnika gradske administracije. Odjel za ekonomiju, sigurnost i okoliš Gradske uprave Mostara u sljedećem će razdoblju izraditi elaborat o učinkovitom djelovanju JP-a Uborak.
Link: http://dnevni-list.ba/?mdls=1&mdls_tip=2&nid=9573
LordMarshall February 3rd, 2007, 07:54 AM Stanovi useljivi i prije predviđenog roka
MOSTAR - Radovi na obnovi Mukoše, zgrade koja se nalazi na Bulevaru, nakon potpisana ugovora između Grada Mostara i Federalnog ministarstva za izbjegle i raseljene osobe, napreduju ubrzanim tempom kako bi se što prije osigurali stanovi za 19 nositelja stanarskog prava. Trenutačno su u tijeku pripremni radovi nakon kojih će uslijediti podizanje objekta za jednu etažu te izlijevanje deke, a rok za dovršetak radova je šest mjeseci.
Vrijeme potrošeno na razminiranje
Prema riječima Mire Kordića, šefa Službe za građenje i obnovu te koordinatora radova na objektu Mukoša, trenutačno se ruši dio objekta koji, prema projektu, nije bio u redu te se zamjenjuje novim zidom. “Radovi na obnovi Mukoše teku prema dinamici koja je utvrđena projektom. Dosta smo vremena potrošili na razminiranje. Naime, iako smo dobili napismeno da je sve razminirano, pri čišćenju smo pronašli dvije eksplozivne naprave”, kazao je Kordić dodavši da su poduzete i određene mjere za regulaciju prometa. Iako će stanove dobiti svi prijašnji stanari, zgrada će po obnovi imati nešto drukčiji izgled. “Bit će izmjena jer će u prizemlju biti poslovni prostori te se iz tog razloga zgrada diže za jednu etažu, a oni stanari koji su prije imali stanove u prizemlju, sada će im biti dodijeljeni stanovi na trećem katu. Sve je usuglašeno sa stanarima jer smo dobili urbanističku dozvolu koja se ne može izdati bez suglasnosti stanara”, potvrdio je Kordić.
Radovi gotovi prije roka
Iako je rok kada bi se stanari, nakon što su godine proveli kao izbjeglice u svome gradu, vratili u prijeratna prebivališta šest mjeseci, zgrada Mukoša bi, kako sada radovi napreduju, mogla biti gotova i prije predviđenog roka. “Ovih dana će krenuti radovi s izlijevanjem ploče. Mislim da će se s radovima, ako se nastavi ovim tempom, čak završiti i daleko prije predviđenog roka”, naglasio je Kordić. Razlog zbog kojeg bi se rok mogao produžiti može izazvati jedino nedostatak novca. Naime, vrijednost potpisanog ugovora za ovaj projekt je 1,063.817 maraka, a od potrebnog iznosa za obnovu resorno federalno ministarstvo izdvojilo je 570.000 maraka, dok je Gradska uprava Mostara izdvojila 95.000 maraka, a zbog nedostatka sredstava za kompletan završetak objekta ugovor s izvođačem radova potpisan je na 665.000 maraka, zbog čega će se nakon osiguranja nedostajućih sredstava načiniti aneks ugovora. “Ne znam što će biti s ostatkom novca jer je trenutačno napravljen samo dio ugovora, a ostalo će biti riješeno aneksom”, kazao je Kordić. Na pitanje je li upoznat hoće li se po uzoru na Mukošu obnavljati i ostale srušene zgrade na Bulevaru, Kordić je odgovorio da ne zna jer je jedva prikupljen novac i za obnovu ove zgrade.
Link: http://dnevni-list.ba/?mdls=1&mdls_tip=2&nid=9572
Kondor February 3rd, 2007, 07:57 AM Alo bre, zasto mi krades sliku?;)
Zezam se, da sam znao da jos nije vidjena, sam bi je postirao.
LordMarshall February 3rd, 2007, 07:59 AM predobra slika nisam mogo dopustiti da se nevidi na mostarskom thredu...
LordMarshall February 3rd, 2007, 08:04 AM Suncana Dolina is a 30-hectare (about 62 acres) site being developed for war refugees in Mostar, Bosnia and Herzegovina. The new neighborhood will be bounded on the north by civic, residential, and industrial uses; on the east by the city’s bypass highway; on the south by the boundary line of the city and by a NATO camp across the boundary; and on the west by the Neretva River. The undeveloped land across the river is zoned industrial.
The site served as a military camp during the recent war and contains some 1940s military barracks that will be demolished because of their association with World War Two. An existing stone wall runs diagonally across the site for unspecified reasons. There are some trees in the vicinity of the existing buildings. As is the case in the rest of this city built along the river, mountain ranges form the views to the east and west.
Prior to the recent war, the city of Mostar had a population of 140,000. During the war, housing for 80,000 people was completely destroyed or rendered uninhabitable. In addition, many people were displaced because opposition forces occupied their homes. The population that fled the city for the countryside and other countries during the war is now beginning to return, further exacerbating the demand for housing.
The most significant natural feature of Suncana Dolina is the Neretva River, which defines the western boundary of the site. The Riverfront Park runs alongside the river, forming part of the greenway system that defines the edge of the new neighborhood. The western edge of the neighborhood also consists of allotment fields and gardens for agricultural use, a school and play fields, an outdoor amphitheater, a swimming pool, and a boulevard terminating in an existing hospital. The edge is easily a five-minute walk to the center.
The center of the neighborhood contains a square that runs perpendicular to the river and towards a plaza in the physical center of the site. The spatial connection of the river to the center, which provides commercial and civic activities, allows the river to likewise be part of the town’s everyday social life. At the intersection of the park and the existing north-south road is one of three transit stops in the neighborhood, the other two being at the hospital and the school.
http://www.dpz.com/images/popop_page/2022-1%20PLAN21_z.jpg
http://www.dpz.com/images/popop_page/2022-2%20AERIAL21_z.jpg
http://www.dpz.com/images/popop_page/2022-5%20PHASE21_z.jpg
http://www.dpz.com/images/popop_page/2022-3%20Street%20View21_z.jpg
LordMarshall February 3rd, 2007, 08:05 AM ja je jos nisam vidio
MIMICA February 4th, 2007, 01:48 AM http://www.dpz.com/images/popop_page/2022-1%20PLAN21_z.jpg
http://www.dpz.com/images/popop_page/2022-2%20AERIAL21_z.jpg
http://www.dpz.com/images/popop_page/2022-5%20PHASE21_z.jpg
http://www.dpz.com/images/popop_page/2022-3%20Street%20View21_z.jpg
i believe that project completely failed in investment, and only one building stayed.
LordMarshall February 4th, 2007, 03:27 AM well that sucks...
MIMICA February 4th, 2007, 04:30 AM well that sucks...
Inded. :(
mostarac1 February 7th, 2007, 04:36 PM SUPER VIJEST ZA MOSTAR :)
Predstavnici Austrijskog koncerna PORR prezentirali su danas u mostarskoj Gradskoj upravi pet konkretnih projekata koje namjeravaju realizirati u tom gradu. Riječ je o poslovno-stambenom objektu "Zvijezda" ...
u Fejićevoj ulici, poslovno stambenom objektu "Kino Partizan" s multiplex kinom, poslovnim i stambenim sadržajem, zatim poslovno-stambenom objektu u Ulici Moše Pijade, izgradnji porušene Poslovne zgrade na lokalitetu nekadašnje Privredne banke Sarajevo, te izgradnji Gradske garaže sa zatvorenom tržnicom na lokaciji nekadašnje robne kuće "Zema" u Titovoj ulici.
Predstavnici PORR-a Markus Schrentewein, Andreas Neuheimer, te konsultant PORR-a za BiH Safet Oručević upoznali su gradonačelnika Mostara Ljubu Bešlića kako je ova austrijska kompanija spremna investirati više od 30 milijuna eura u rekonstrukciju i izgradnju spomenutih objekata.
Sastanku s gradonačelnikom Bešlićem nazočila je i predstavnica Vanjskotrgovinske komore Austrije Ulrike Straka, koja je istakla podršku veleposlanstva Republike Austrije ovim projektima i naglasila njihov značaj za Mostar i njegove građane.
Gradonačelnik Bešlić je izrazio zadovoljstvo inicijativom PORR-a , rekavši da je svaka investicija u Mostar dobrodošla, te da će gradska administracija u okviru svojih obveza i nadležnosti izaći u susret investitorima.
Konsultant PORR-a za BiH Safet Oručević je kazao kako su danas Gradu Mostaru ponuđene konkretne investicije od kojih je jedna već u tijeku, misleći na Poslovno-stambenu zgradu Zvijezda u Fejićevoj ulici.
Oručević je naglasio da će dinamika realizacije ovih investicija ovisiti isključivo od razumijevanja gradske administracije koja, osim stvaranja ambijenta za investiranje, treba povući i konkretne poteze na smanjenju administrativnih i drugih zapreka koje destimuliraju strane investitore.
Inače, austrijski koncern PORR je druga najveća kompanija u Austriji u oblasti građevinarstva koja upošljava 10.000 radnika i prisutna je u deset europskih zemalja, među kojima je i Bosna i Hercegovina. U našoj zemlji, PORR je putem svoje projektne tvrtke "PID" d.o.o. već realizirao izgradnju Poslovno-trgovačkog centra Vila Neretva u Mostaru.
(Fena)
http://www.pid.co.ba/img/front%20zvijezda.jpg
LordMarshall February 7th, 2007, 06:58 PM odlicne vijesti za Mostar :)
mirza-sm February 8th, 2007, 11:22 PM mostar je BEAuuuuuuuuuuuuuuuuuuuutiful :D
lkm370 February 10th, 2007, 06:03 AM i believe that project completely failed in investment, and only one building stayed.
i bet the government just stole the money
BL February 10th, 2007, 12:37 PM government?
LordMarshall February 10th, 2007, 08:25 PM Bivša Privredna banka postaje poslovni centar
http://dnevni-list.ba/mdls/dnlnws/nwsimg/1171096877.jpg
MOSTAR – Zgrada Privredne banke u strogom središtu Mostara, koja je uništena u ratu, postat će reprezentativan poslovni objekt kakvim se ne mogu pohvaliti ni mnogo veći gradovi.
Ova zgrada, koja se nalazi na Španjolskome trgu, preko puta Gimnazije Mostar i koja je do sada služila kao okupljalište narkomana, postat će moderan poslovni centar za čije će se kvadrate poslovnog prostora boriti vodeće svjetske tvrtke.
Prostorije za Gospodarsku komoru
Naime, Gospodarska komora Federacije kao prijeratni, doduše manjinski vlasnik ove zgrade, po pravu prvenstva otkupila je udjele od ranijih vlasnika – Privredne banke Sarajevo, Sarajevo osiguranja i na taj način postala osamdesetpostotni vlasnik ove zgrade. Preostalih dvadeset posto, odnosno dio kojim je ranije raspolagao komorski sustav i dio koji je bio u vlasništvu Hepoka, dano je na raspolaganje Gospodarskoj komori Hercegovačko-neretvanske županije.
Kako se doznaje iz federalne Gospodarske komore, plan je izgraditi potpuno novi moderni poslovni objekt čiji će jedan dio će koristiti federalna Gospodarska komora i Gospodarska komora HNŽ-a, dok će preostali dio biti prodan ili dan u zakup zainteresiranim tvrtkama.
Austrijanci većinski vlasnici
Trenutačno se odvija aktivnost na uknjižbi zemljišta kako bi se stekli uvjet da GK FBiH s jednom od najvećih građevinskih tvrtki u Austriji – tvrtkom PORR osnuje zajedničko poduzeće koje će graditi ovaj objekt. Budući da će austrijska tvrtka PORR vlastitim sredstvima izgraditi cijeli objekt, bit će i njegov većinski vlasnik, i to u omjeru 52 posto, dok će 30 posto vlasništva zadržati Gospodarska komora FBiH te 18 posto Gospodarska komora HNŽ-a. Ukupna vrijednost investicije iznosi 6,668.881 euro, a završetak radova planiran je polovinom 2009. Glavni motiv ulagača svakako je dobit koja će se ostvariti prodajom i iznajmljivanjem poslovnih prostora, dok je s druge strane interes Gospodarske komore višestruk. Osim dobiti koju će dijeliti sukladno vlasničkim udjelima, na ovaj način trajno će se riješiti problem smještaja županijske Gospodarske komore koja je podstanar, a Mostar će dobiti objekt koji će postaviti nove visoke standarde gradnje u regiji.
Smanjenje gužve u prometu
Iako još uvijek nisu počeli građevinski radovi, veliki broj tvrtki iz Hrvatske, Slovenije, ali i iz BiH pokazao je interes za kupovinu ili zakup poslovnog prostora u zgradi. Iz Gospodarske komore FBiH istaknuli su kako im je cilj ishoditi dozvole gradskih vlasti za izgradnju dodatna dva kata u odnosu na stari objekt, jer bi na taj način visina zgrade bila identična visini zgrade Vlade FBiH i Staklene banke koje se nalaze u blizini. Kako bi se izbjegle gužve u strogom središtu grada, investitori planiraju izgraditi i dovoljan broj parkirališnih mjesta. To će se riješiti izgradnjom tri kata podzemnih garaža te izgradnjom garaža ispod trga koji se nalazi odmah uz objekt. U tom slučaju, ukupan broj parkirališnih mjesta bio bi veći od 250, odnosno bio bi znatno veći od potreba objekta, čime bi se značajno rasteretila jezgra grada.
Realizacija pet projekata
Predstavnici austrijskog koncerna PORR predstavili su Gradskoj upravi Mostara pet projekata koje namjeravaju realizirati. Zainteresirani su za izgradnju dva objekta u istočnom Mostaru - poslovno-stambenog objekta Zvijezda u Fejićevoj ulici i garaže sa zatvorenom tržnicom na lokaciji nekadašnje robne kuće Zema u Titovoj ulici. Također su zainteresirani za tri lokacije u središnjoj gradskoj zoni. Naime, traže izgradnju poslovno-stambenog objekta kino Partizan s multipleks kinom u Ulici Alekse Šantića, poslovno-stambenog objekta starog željezničkog kolodvora u Ulici dr. Ante Starčevića te izgradnju porušene poslovne zgrade nekadašnje Privredne banke Sarajevo na Španjolskome trgu.
Link: http://dnevni-list.ba/?mdls=1&mdls_tip=2&nid=9778
LordMarshall February 10th, 2007, 08:27 PM Više od 600 izlagača iz 35 zemalja
MOSTAR - Ovogodišnji jubilarni 10. međunarodni sajam gospodarstva Mostar 2007. održavat će se od 27. do 31. ožujka na prostoru Slobodne zone Hercegovina u Mostaru, a zemlja partner ovogodišnjeg mostarskog sajma je Republika Austrija.
Na sajmu će se predstaviti gospodarstvenici iz gotovo svih grana industrije, preko bankarskih i osiguravateljskih usluga pa sve do svijeta računala, telekomunikacija, turizma i drugih gospodarskih grana. Opću sajamsku manifestaciju po peti put će pratiti nezaobilazna podsajamska manifestacija vina i vinogradarske opreme, a po treći put Sajam knjige i nakladništva.
Republika Austrija, zemlja partner ovogodišnjeg sajma
Podsjetimo, gospodarski sajam se od 1997. održava u Mostaru, a otada pa do danas postao je najznačajnija i najveća gospodarska manifestacija u državi. Zemlja partner ovogodišnjeg sajma je Republika Austrija, koja otvara goleme mogućnosti na jedinstvenom europskom tržištu.
Austrija je u gospodarstvu BiH uvelike nazočna kroz bankarski sektor, a ove godine će se kroz sajam predstaviti i u drugim gospodarskim granama. Prema riječima Astrid Pummer, trgovinske savjetnice u Veleposlanstvu Republike Austrije u BiH, Austrija je investitor broj jedan u našoj državi, a međutrgovinska suradnja je na visokoj razini. “Kroz ovu manifestaciju želimo još više poboljšati i razviti odnose između naše dvije zemlje. Odlučili smo na ovome sajmu sudjelovati s jednim grupnim štandom, i to s 13 austrijskih tvrtki, od kojih se neke već nalaze ovdje u BiH”, naglasila je Astrid Pummer.
Ove godine se slavi 10. jubilej
Direktorica tvrtke Mostarski sajam d.o.o. Dalfina Bošnjak kazala je da je ovogodišnji sajam jako bitan jer se ove godine slavi i deseti jubilej. “U dosadašnjih devet godina uspjeli smo se nametnuti kao sajam prepoznatljiv ne samo u BiH, nego i u široj regiji, te smo postali i punopravni član Asocijacije sajmova jugoistočne Europe. Svake godine imamo sve veći broj izlagača, kako iz zemlje, tako i iz inozemstva”, kazala je Dalfina Bošnjak dodavši i to da je još rano govoriti o konkretnim brojkama, ali već dosad se prijavilo više od 35 zemalja sudionica koje će predstaviti svoje gospodarske potencijale na mostarskome sajmu.
“Iako je rano govoriti o brojkama, već sada znamo da će na sajmu biti više od 600 izlagača. Sajam će se odvijati u tri cjeline. Prva cjelina je opća i na njoj se predstavljaju sve gospodarske grane. Druga cjelina je Sajam vina i vinogradarske opreme, a treća je manifestacija Sajam knjige i nakladništva”, dodala je Direktorica tvrtke Mostarski sajam d.o.o. Sudeći prema dosadašnjem broju izlagača, sasvim sigurno će ovogodišnji mostarski sajam, koji ove godine slavi jubilej, biti i najbolji do sada.
Link: http://dnevni-list.ba/?mdls=1&mdls_tip=2&nid=9789
SinCity February 12th, 2007, 12:39 AM Porr u Mostaru želi graditi pet poslovno-stambenih objekata
Osim zgrada i energetskih objekata, Porr želi graditi i autoceste kroz BiH
MOSTAR Predstavnici austrijskog koncerna Porr predstavili su Gradskoj upravi Mostara pet projekata u koje žele uložiti 30 milijuna eura. Porr traži dozvolu za gradnju poslovno-stambenog objekta, garaže sa zatvorenom tržnicom, poslovno-stambenog objekta s multipleks kinom, poslovno-stambenog objekta u središtu grada i obnovu zgrade nekadašnje Privredne banke Sarajevo. Ponudu mostarskom gradonačelniku dostavili su menadžeri Porra Markus Schrentewein i Andreas Neuheimer te njihov lobist u BiH, bivši gradonačelnik Mostara Safet Oručević. S predstavnicima Porra kod gradskih čelnika Mostara bila je direktorica ureda Vanjskotrgovinske komore u Sarajevu Urlike Straka. Porr je u Mostaru preko svoje projektantske tvrtke Pid već ulagao u gradnju poslovno-trgovačkog objekta Vila Neretva, a radovi na njihovu novom projektu poslovno-stambenog objekta već su započeli. Inače, Porr je jedna od najvećih graditeljskih tvrtki u Austriji. Od 2005. godine ima predstavništvo u Srbiji, a najavljeno je otvaranje predstavništva i u Sarajevu. Porr je s tvrtkama Warech, Poyry, Alstom, Siemens, Vith, Alpine i Wew formirao konzorcij Austrian Power and Enwiroment Tehnology koji je lani dobio gradnju osam velikih energetskih objekata u F BiH nakon objavljenog međunarodnog natječaja Ministarstva energetike, rudarstva i industrije F BiH. Zbog protivljena u Vladi F BiH upitno je realiziranje tog posla vrijednog oko 3 milijarde eura.
http://www.poslovni.hr/33500.aspx
LordMarshall February 13th, 2007, 02:19 AM Postavljen kamen temeljac za kampus
MOSTAR - Kamen temeljac za izgradnju kampusa Mostarskog univerziteta postavila je juče Jadranka Kosor, potpredsjednik Vlade Republike Hrvatke.
"Ovaj projekt svjedoči kako zajedno možemo puno i kako zajedno možemo naprijed, neka to bude poruka koju možemo ugraditi i u temelje kampusa", kazala je Kosorova.
Franjo Ljubić, rektor Mostarskog univerziteta, rekao je kako se ovaj univerzitet među prvima u BiH opredijelio za sprovođenje bolonjskog procesa, a time je sebi postavio ciljeve da se po kvalitetu obrazovanja izjednači sa univerzitetima u evropskim zemljama.
Dragan Primorac, ministar nauke, obrazovanja i sporta Vlade Republike Hrvatske, istakao je kako je Mostarski univerzitet jedini u BiH gdje se nastava izvodi na hrvatskom jeziku.
"To je ogroman iskorak, što je prepoznala Vlada Republike Hrvatske i krenula s ovom velikom investicijom. Ovo je investicija za Hrvate, ali i za sve one koji će doći studirati, jer hrvatska vlada podržava iznad svega suživot svih ljudi u BiH", kazao je Primorac.
Za izgradnju i obnovu objekata kampusa Univerziteta u Mostaru hrvatska vlada izdvojiće oko 100 miliona KM.
Polaganjem kamena temeljca ujedno je započelo i obilježavanje Dana Univerziteta u Mostaru, koje je nastavljeno svečanom sjednicom Univerzitetskog senata.
Link: http://www.nezavisne.com/vijesti.php?vijest=5739&meni=4
Herceg February 13th, 2007, 07:36 AM ^^ Svaka cast!
LordMarshall February 16th, 2007, 05:31 AM Mostar: Odobreno davanje koncesije za vjetroelektrane
MOSTAR - Vijećnici Gradskog vijeća Mostara na današnjoj su sjednici razmatrali informaciju o prodaji šumskog zemljišta na lokalitetu Pijesci, Gubavica i Kruševo, te su na temelju toga iznijeli zahtjev o hitnom završetku postupka provjere koji vodi tužiteljstvo i OHR.
Na sjednici je usvojen i program poboljšanja rad gradske administracije, odnosno dano je pozitivno mišljenje za pokretanje postupka koncesije na zemljište za izgradnju vjetroelektrana na lokalitetu Podveležje.
Po riječima gradonačelnika Ljube Bešlića, na ovaj način Mostar je poslao pozitivnu sliku za budućnost i brži razvitak grada, posebice za stanovništvo na tom području jer će imati izravne koristi od projekta, odnosno mogućnost zapošljavanja i infrastrukturnih projekata, koje bi novi koncesionar trebao učiniti na tom području.
Vijećnici su obavili i imenovanje nadzornih odbora pet javnih poduzeća kojima je grad Mostar osnivač. Riječ je o poduzećima "Vodovod", "Uborak" "Tržnica-pijaca" i "Komos".
Sjednica Gradskog vijeća Mostara bit će nastavljena u ponedjeljak, 19. veljače.
Link: http://www.pincom.info/bih/opsirnije.asp?ID=45500
LordMarshall March 3rd, 2007, 07:53 PM Izgradnja dvorane iznosit će 17 milijuna maraka
MOSTAR - Arhitekti nizozemskog arhitektonskog ureda 4D Architects predstavili su predstavnicima gradskih vlasti, čelnim ljudima Sportskog saveza grada i sportskih klubova te drugim zainteresiranim građanima idejno rješenje izgradnje sportsko-poslovnog centra koji bi se trebao graditi u mostarskom naselju Centar II.
Taj redizajnirani projekt trebao bi zamijeniti prije desetljeće i pol započetu sportsku dvoranu na toj lokaciji.
Multifunkcionalna dvorana
Taj ambiciozni projekt, koji će sa 17 milijuna maraka financirati Grad Mostar kroz idejno rješenje, zainteresiranim stranama predstavila je dr. Elma Durmišević, voditeljica arhitektonskog tima koji treba Gradu ponuditi rješenje za izgradnju kompleksa.
Prema njezinim riječima, njihov cilj je što bolje se upoznati sa željama i idejama svih zainteresiranih strana kako bi se napravio što uspješniji projekt, koji će biti u funkciji 24 sata tijekom tjedna.
“Ispunjavajući naš osnovni cilj u ovoj fazi projekta, koji se ogleda kroz analizu potencijala ove lokacije, želimo osmisliti i definirati multifunkcionalni koncept koji će oživjeti spomenutu lokaciju te ovom dijelu grada, točnije središtu Mostara, dati novi razvojni i životni impuls”, kazala je dr. Elma Durmišević.
Prvi čovjek Mostara Ljubo Bešlić je tom prilikom kazao kako očekuje da se nakon ispunjavanja svih zakonom propisanih procedura konačno krene u izgradnju kvalitetnog i funkcionalnog objekta koji će zadovoljiti nasušne potrebe mostarskih sportaša.
Od 3.000 do 5.000 sjedećih mjesta
Idejno rješenje, koje je jučer prezentirano, predstavilo je moguće sadržaje objekta koji se ogledaju kroz sportske terene za četiri bazna sporta - rukomet, nogomet, košarku i odbojku te korištenje središnje arene za koncerte i sajamske priredbe, dok bi se uz arenu u vanjskim dijelovima objekta nalazili restoran, dio s poslovnim prostorima koji bi jednim dijelom i financirali dvoranu. Također, planirano je da se ispod arene nalazi i parkirališni prostor za posjetitelje te dvorane. Prema trenutačnim rješenjima, sportska arena bi, ovisno o sportu koji
se odvija, raspolagala s 3.000 do 5.000 mjesta, dok bi tijekom drugih manifestacija raspolagala sa 6.000 sjedećih mjesta. Prema najavama iz gradske administracije, nakon primjedbi i ideja koje su jučer izrečene, konačno rješenje bit će gotovo do kraja travnja, dok bi izgradnja dvorane trebala biti gotova u iduće dvije i pol godine.
Svi zainteresirani građani će od početka idućeg tjedna svoje prijedloge i savjete u vezi s tim projektom gradskim vlastima uputiti preko web stranice Grada Mostara na kojem će također biti dostupno idejno rješenje dvorane.
Arhitektonski ured 4D Architects osnovan 1999.
Arhitektonski ured 4D Architects Amsterdam osnovali su dr. Elma Durmišević uz svesrdnu pomoć prof. Jana Brouwera. Tvrtka je svoj koncept, kako je navedeno na njihovoj stranici, zasnovala na dizajniranju lako transformirajućih građevina koje mogu u isto vrijeme zadovoljiti više namjena i sve želje i prohtjeve korisnika. Osim velikih kompleksa na kojima rade svoje ideje realiziraju i u oblasti stambenih objekata po istom principu multifunkcionalnosti.
Link: http://dnevni-list.ba/?mdls=1&mdls_tip=2&nid=10375
LordMarshall March 3rd, 2007, 07:54 PM Prvi radovi otpočinju u travnju
MOSTAR - Implementacija projekta kopa Vihovići zasada se odvija planiranom dinamikom i, kako stvari stoje, početkom travnja bi trebali započeti i prvi radovi. Naime, implementacija je došla do faze u kojoj je konačno definiran i pravni okvir projekta te su time stvoreni i svi pravni preduvjeti za nesmetano odvijanje radova na samome projektu. To podrazumijeva rješavanje imovinskih odnosa i utvrđivanje granica prostora.
Očekuju isporuku elaborata studije izvodivosti
Prema riječima mr. Andrije Davida Škobića, voditelja projekta sanacije divljeg odlagališta otpada Vihovići, zasada se sve odvija planiranom dinamikom.
“Supčavamo se manjim poteškoćama, ali to je sasvim normalno. Ako nastavimo ovim tempom i učinkovitošću, trebali bismo sve završiti do zadanih rokova”, kazao je Škobić. Također je dodao i to da ovih dana očekuju i isporuku elaborata studije izvodivosti projekta. Sami projekt je podijeljen i na dijelove. Tako prvi dio obuhvaća i rezultate kompletnih istraživanja na ovome prostoru.
“Na temelju rezultata zagađenosti napravljena je i koncepcija sanacije ovoga prostora, a sama sanacija se može podijeliti u dvije zone – crvenu i zelenu”, napomenuo je Škobić.
Radovi podijeljeni na dvije zone
Prva zona nazvana je crvenom jer obuhvaća dio Vihovića u kojemu se nalazi i ugljen koji gori, a nalazi se na dubini od osamdeset do stotinu metara. Druga zona je zelena i puna je otpada koji je potrebno što prije sanirati.
Prva faza radova uključuje i izradu prilaznoga puta koji će ići od Rudnika prema Vihovićima te izradu ograde duge nekoliko kilometara koja će ograditi 76 hektara zemlje. “Radovi na ovoj prvoj fazi bi trebali započeti početkom travnja”, potvrdio je Škobić dodavši kako će druga faza radova uključivati uređenje zelenih zona te početak radova na gašenju ugljena i čišćenju jezera.
Link: http://dnevni-list.ba/?mdls=1&mdls_tip=2&nid=10373
LordMarshall March 3rd, 2007, 07:55 PM Formira se jedinstveni urbanistički zavod
MOSTAR - Nakon tri godine neizvjesnosti i stalnog povlačenja po gradskim institucijama, djelatnici mostarskog URBING-a i Zavoda za urbanizam uskoro bi mogli dobiti pozitivno rješenje svoga problema.
Naime, poznato je da sindikati URBING-a i Zavoda za urbanizam već godinama muku muče s domaćim vlastima, koje ih ignoriraju radeći kako politika želi. Kako nam je potvrdio Dražan Bilić, predsjednik Sindikata URBING-a, u tijeku je formiranje novog, jedinstvenoga zavoda za prostorno planiranje Mostara.
Formirati poduzeće u roku od dva mjeseca
Na ovu odluku čekalo se dugo, a sve zbog neslaganja različitih političkih strana koje su preko Zavoda i URBING-a htjele rješavati politička pitanja.
"Visoki predstavnik je donio odluku po kojoj bi gradske vlasti trebale osnovati zajednički zavod. Nakon niza neuspjelih rasprava u Gradskom vijeću nije postignut dogovor. Gradonačelnik je stvar uzeo u svoje ruke i donio odluku o imenovanju v.d. direktora", rekao nam je Bilić napomenuvši da je v.d. direktora Dino Praše inženjer građevine.
Novi v.d. direktora imat će zadatak napraviti sistematizaciju i izvršiti pripreme za formiranje poduzeća u roku od dva mjeseca. Prema svim dosad donesenim odlukama, kako gradskih vlasti, tako i međunarodne zajednice, novi zavod bi trebao okupljati djelatnike dva poduzeća za urbanizam koja su nastala nakon rata.
Kako je objasnio Dražan Bilić, prema svim odlukama, radnici koji će raditi u jedinstvenome zavodu zapošljavaju se preko internog natječaja, a aplicirati se mogu samo djelatnici ova dva poduzeća.
Zavod bi trebao imati pedesetak djelatnika
"Interni natječaj još nije raspisan, to je proces koji traje i po mjesec dana, sada smo dobili upitnike u kojima nas pitaju želimo li raditi u novom zavodu. Ako sve bude išlo prema opisu poslova koje treba obavljati, novi zavod trebat će nas dosta, ali nitko još ne zna pravu funkciju zavoda", naglasio je Bilić te dodao da bi bilo dobro kada bi se poštivale odluke i kada bi se formirao zavod koji će zapošljavati pedesetak ljudi. Napomenimo i to da sada u URBING-u radno-pravni status ima tridesetak djelatnika, a u Zavodu za urbanizam dvadesetak.
Bilić je također rekao da još nitko od nadležnih tijela nije kontaktirao sindikate ova dva urbanistička poduzeća, ali se nadaju da će moći sudjelovati u razradi sistematizacije. Iz URBING-a su poručili da je stanje, kada je u pitanju urbanizam, kritično i da se što prije mora uvesti neki red, jer svatko tko nađe praznih stotinu metara četvornih počinje graditi bez ikakva plana.
Dok se ne napravi sistematizacija, još se ne zna tko će i koje poslove raditi u novoformiranom zavodu, no jedno je sigurno - sada djelatnici URBING-a, koji su dosad gotovo bili na ulici, imaju nadu da će nekada početi raditi u svojoj struci i na mjestima koja su im zakonski pripadala.
Imovina URBING-a će se rasprodati?!
Kako je već poznato, URBING je u stečajnom postupku, a radnicima se duguje oko milijun i pol maraka za plaće i ostale doprinose, dok ostalih dugovanja ima još oko dva milijuna. Kako nam je rekao Bilić, problem nagomilanih dugova najvjerojatnije će se riješiti rasprodajom imovine ovoga poduzeća.
Link: http://dnevni-list.ba/?mdls=1&mdls_tip=2&nid=10348
LordMarshall March 4th, 2007, 07:49 PM Mjesto u kojem se treba razvijati mostarska kultura
MOSTAR – Zahvaljujući pomoći vlade Savezne Republike Njemačke i njemačkog veleposlanika u našoj zemlji Michaela Georga Schmunka, OKC ''Abrašević'' je dobio novoobnovljenju multifunkcionalnu dvoranu.
Ova dvorana u koju je sredstva za obnovu uložila njemačka vlada jedina je ovakve vrste za sada u našem gradu te će osim brojnih filmskih, glazbenih i teatarskih predstava imati ulogu kultnog mjesta za razvoj avangardne kulture.
Mjesto za razvoj kulture
Prema riječima njemačkog veleposlanika Schmunka, ova dvorana treba biti najbolja dvorana ovakve vrste u našem gradu, dvorana u kojoj će se susretati mladi i stari i u kojoj će nastajati nova umjetnička djela.
''Drago mi je da smo mogli pomoći obnovu ove dvorane koja bi u skladu sa svojim avangardnim izgledom trebala biti i mjesto razvoja avangardne kulture i mjesto na kojem će mladi moći najbolje iskazati svoj umjetnički izraz. Također želim kazati da sam ponosan da je Njemačka u vrijeme svojeg predsjedavanja Europskom unijom i u vrijeme provođenja projekta 'Probosna-protolerancija' uspjela realizirati obnovu ove dvorane kroz koju želimo povećati toleranciju među narodima u Bosni i Hercegovini'', kazao je veleposlanik Schmunk.
Veleposlanik Schmunk je pozvao mostarskog gradonačelnika da da podršku ovom projektu te bude jedan od najvjernijih posjetitelja novoobnovljene dvorane u OKC-u ''Abrašević''.
Zadovoljstvo u ''Abraševiću''
Urednik Media centra OKC-a ''Abrašević'' Husein Oručević je nakon otvaranja dvorane kazao da je zadovoljan i sretan što je nakon petnaest godina konačno došlo do otvaranja ove dvorane koja će služiti svim mladima u Mostaru, ali i našoj zemlji.
Gosti koji su nazočili svečanost otvaranja, njih oko pedeset, ovom su prilikom pogledali i desetominutni film o obnovi i rekonstrukciji koja je provedena u proteklih deset godina u prostorima OKC-a ''Abrašević''.
Link: http://dnevni-list.ba/?mdls=1&mdls_tip=2&nid=10398
LordMarshall March 4th, 2007, 07:50 PM Za obnovu nedostaje oko 400.000 maraka
MOSTAR - Nakon potpisivanja ugovora između Grada Mostara i Federalnog ministarstva za izbjegle i raseljene osobe radovi na obnovi Mukoše odvijaju se prema predviđenoj dinamici, pa bi stanari ove zgrade vrlo brzo mogli useliti u svoje stanove. Trenutačno su u tijeku radovi na izgradnji fasade i takozvanih grubih radova, a prema riječima Mire Kordića, šefa Službe za građenje i obnovu te koordinatora radova na objektu Mukoša, nema nikakvih zastoja u radu i sve ide prema planu.
Radovi teku prema zadanoj dinamici
"Pratimo dinamiku koja je navedena u ugovoru i nema zastoja u radu. Radovi bi se
čak mogli završiti i prije zadanog roka", rekao je Miro Kordić, šef Službe za gradnju i obnovu te koordinator radova na objektu Mukoša. Međutim, naglasio je da su u tijeku radovi koji obuhvaćaju prvi dio ugovora o obnavljanju tog objekta.
Naime, tender, odnosno izgradnja zgrade iznosio je nešto više od milijun maraka, no u trenutku potpisivanja ugovora nije bilo dovoljno novca, pa je potpisan ugovor u vrijednosti oko 660.000 maraka.
"Tim ugovorom predviđeni su grubi građevinski radovi, kompletna fasada, krov i nosivi elementi, a radovi koji su u tijeku odnose se na dio ugovora i bit će završeni u zadanom roku", kazao je Kordić.
Čeka se drugi dio ugovora
Drugi dio ugovora, koji se treba potpisati, iznosi oko 400.000 maraka i odnosi se na unutarnje radove, odnosno radove u stambenim jedinicama.
"Kada će se taj drugi dio ugovora potpisati i hoće li, točno ne znam. Pri potpisivanju prvog ugovora bilo je priče da će i taj ugovor biti ubrzo potpisan, ali evo, još nije potpisan i kojim će tijekom to dalje ići, ne znam", kazao je Kordić.
No, napomenimo da se za potpisivanje drugog dijela ugovora čeka formiranje nove federalne Vlade i usvajanje federalnog proračuna.
Link: http://dnevni-list.ba/?mdls=1&mdls_tip=2&nid=10397
LordMarshall March 10th, 2007, 07:59 PM MOSTAR: POČINJE IZGRADNJA MOSTA VOJNO - POTOCI
Projekt izgradnje cestovnog mosta Vojno - Potoci će početi u ponedjeljak, 12. marta, prema izvedbenom projektu preduzeća "Arhitekt" iz Mostara, javio je dopisnik Agencije “Onasa”. "Ovaj projekt provodi Gradska uprava Mostar, odnosno Odjel za urbanizam i građenje, a finansira se od sredstava naplaćenih od prodaje GMS licence za Federaciju BiH. Sredstva odobrena za realizaciju gradnje mosta iznose 1,300.000 KM", saopćeno je iz Gradske uprave Mostar. Dodaje se da je proveden javni konkurs za izbor najpovoljnijeg izvođača radova, tako da je izvođača izabrana širokobriješka firma "Hering", a za nadzornog organa firma IGH iz Mostara. "Od 11. marta slijedi obustava prometa preko mosta u naselju Vojno - Potoci i trajeće do završetka radova", navodi se u saopćenju.
Link: http://privrednastampa.com/pvijest.aspx?id=3061
Herceg March 18th, 2007, 08:45 AM Zrinjevac: Park u centru Mostara gotov do kraja Travnja
24SI - Radovi na preuređenju mostarskog parka Zrinjevac odvijaju se prema planiranom i park bi uskoro trebao dobiti novi izgled. U parku se juče mogla vidjeti prava radna atmosfera. Ako nas posluži lijepo vrijeme, radovi će posve sigurno biti završeni u predviđenom roku, navode izvođači radova.
Nakon rekonstrukcije parka, predviđena je i svečanost u tom povodu, koja bi se trebala održati 23. aprila na Dan planete Zemlje.
Bageri svakodnevno kopaju
Marica Raspudić, viša savjetnica za urbani mobilijar i dekoraciju, kazala je da se radovi u parku odvijaju prema predviđenom i da je dosad urađeno dosta toga.
“Upravo ovih dana se stavljaju rubnjaci na zelene površine. Tako se u parku mogu vidjeti i bageri koji izvode radove”, kazala je Marica Raspudić.
Jedan od ovih bagera je vlasništvo poduzeća Komos, a drugi Parkova. Komosov bager izvodi radove na ivičnjaku, dok bager Parkova kopa rupe za grmove.
“Osim ovih radova, vrši se i ispitivanje bušotina kako bi se vidjelo postoji li mogućnost da u parku imamo tehničku vodu. Ako je budemo imali, onda nećemo trošiti sanitarnu vodu”, rekla je Marica Raspudić. Do sada je u parku urađeno dosta toga. Naime, urađena je javna rasvjeta, postavljen je sistem za navodnjavanje, osim montiranja prskalica što će biti urađeno naknadno. Takođe su položeni i kablovi za videonadgledanje.
Treba uraditi još puno toga
Iako se sve odvija prema planiranom, do samog završetka rekonstrukcije parka treba uraditi još puno toga.
“Osim završetka uređenja staza i zelenila, potrebno je pustiti sistem za navodnjavanje u pogon te postaviti nove igračke u park i popraviti postojeće”, rekla je Marica Raspudić dodavši da vjeruje kako će sve biti urađeno do Dana planete Zemlje.
(dnevni-list.ba)
http://www.24sata.info/4372
LordMarshall March 19th, 2007, 01:07 AM PRODUŽEN ROK ZA REALIZACIJU KUPOPRODAJNOG UGOVORA HOTELA “RUŽA”
Agencija za privatizaciju Hercegovačko-neretvanskog kantona produžila je za 16 mjeseci rok za realizaciju kupoprodajnog ugovora za hotel "Ruža" u Mostaru, javio je dopisnik Agencije “Onasa”. Mihajlo Butigan, direktor Agencije za privatizaciju HNK, je kazao kako je sporazum o rješavanju problema oko hotela "Ruža" i njegovog uklapanja u ambijent stare gradske jezgre, koji su postigli Ljubo Bešlić gradonačelnik Mostara i investitor izgradnje hotela "Ruža" Emir Kečo, trebao biti realiziran do kraja godine. On je istakao da je Agencije imala razumijevanja prema investitoru i uzela u obzir da je za završetak radova potrebno više vremena, te donijela odluku o produženju roka. "Investitor i Grad su potvrdili da će problem sa UNESCO-om biti riješen do kraja jula ove godine. Agencija je pristala na produženje roka za realizaciju kupoprodajnog ugovora, ali se ogradila da nijednim svojim potezom neće dovesti u pitanje realizaciju ugovora, te da neće snositi eventualne finansijske posljedice", dodao je Butigan.
Link: http://privrednastampa.com/pvijest.aspx?id=3112
LordMarshall March 19th, 2007, 01:09 AM Potpuno novi izgled Blagaja
MOSTAR - Komisija za očuvanje nacionalnih spomenika Bosne i Hercegovine u Blagaju namjerava implementirati projekt "Plan upravljanja povijesnom jezgrom Blagaja u svrhu osiguranja njegova održivog razvoja".
Ovaj projekt, koji je ključ za razvoj Blagaja, financiran će Ministarstvo vanjskih poslova BiH i Kraljevine Španjolske, kroz španjolsku Agenciju za međunarodnu suradnju. Na prvi koordinacijski sastanak u Blagaju u povodu početka realizacije projekta, pozvane su sve institucije koje rade na projektima očuvanja prirodnih i kulturno-povijesnih vrijednosti Blagaja i razvoja njegovih potencijala.
Prezentacija brojnih projekata
Prema riječima Ramiza Bašića, savjetnika Turističke zajednice HNŽ-a, projekt pod nazivom "Plan upravljanja povijesnom jezgrom Blagaja u svrhu osiguranja njegovog održivog razvoja" svojom realizacijom je započeo još prije ožujka ove godine, a rok završetka projekta je dvanaest mjeseci.
"S obzirom da je u tijeku više projekata koji se odnose na integriranje kulturnog i prirodnog nasljeđa Blagaja u planu održivog razvoja i budući da te projekte implementiraju različite organizacije, cilj održanog sastanka je bio uspostaviti koordinaciju između svih implementatora s ciljem osiguranja jednog sinergijskog učinka", kazao je Bašić.
Na sastanku su nazočile sve institucije koje implementiraju različite projekte s ciljem očuvanja Blagaja, održana je i prezentacija svih tih projekata, koji su već provedeni ili se provode. Na održanom sastanku je Turistička zajednica HNŽ-a predstavila svoj projekt kojeg je radila u suradnji s japanskom agencijom za međunarodni razvoj. "Projekt je bio pod nazivom 'Put blagajskog povijesnog nasljeđa', a obuhvaćao je izgradnju kaldrme dužine od 600 metara, zatim postavljanje ploča na kulturno-povijesne spomenike kojih je u Blagaju proglašeno osam, zatim izgradnja turističkog info centra s parkiralištem te obuka vodiča", istaknuo je Bašić.
Radovi neće narušiti sezonu
Organizacija Omladinski val i organizacija Južnjačko plavo nebo iz Trebinja predstavili su na sastanku svoj projekt ponovnog oživljavanja bjeloglavog supa, te su i druge organizacije iznijele neke svoje aktivnosti koje su rađene na području Blagaja. Komisija za očuvanje nacionalnih spomenika predstavila je projekt koji je već počeo.
"Projekt predviđa izradu plana za područje Blagaja, kompletnu analizu trenutačnog stanja kulturnih spomenika da se vidi u kakvu su stanju, predviđeno je čišćenje i rekonstrukcija pojedinih objekata, ali sve u cilju pravljenja plana upravljanja tim područjem", naglasio je Bašić dodavši da bi se plan trebao prezentirati Gradskom vijeću Mostara da ga oni usvoje.
Iako su mještani Blagaja najviše zabrinuti da se radovi i rekonstrukcija pojedinih objekata ne budu odvijali u sezoni, Bašić je kazao da ne vjeruje da bi radovi mogli na bilo koji način narušiti turističku sezonu.
Link: http://dnevni-list.ba/?mdls=1&mdls_tip=2&nid=10797
LordMarshall March 20th, 2007, 08:17 PM Nova zgrada za nove čitatelje
MOSTAR - Mostar je zahvaljujući financijskim sredstvima koje je osigurala Fondacija OdRaz ovih dana dobio vrijedan objekt Gradske biblioteke u mostarskom naselju Luka.
Gradska biblioteka je s radom počela početkom ožujka, a prema riječima Rasima Prgude, ravnatelja mostarske Gradske biblioteke, među građanima postoji velika zainteresiranost za upis u ovu biblioteku.
Opremljen dio čitaonice
Zgrada Gradske biblioteke na Luci će po samom završetku projekta koji uključuje opremanje čitaonica na tri kata zasigurno biti jedan od najopremljenijih i najmodernijih objekata slične svrhe na području Hercegovine, a njezinom obnovom najviše koristi imat će učenici, studenti i građani s cijelog prostora grada. Budući da nije bilo dovoljno novčanih sredstava, trenutačno je u Gradsku biblioteku na Luci prebačen višak knjižnog fonda iz stare Gradske biblioteke.
“Višak knjižnog fonda smo prebacili iz ove biblioteke, i za sad odjeljenje funkcionira s tim knjižnim fondom, a mi trenutačno pripremamo knjižni fond za čitaonicu”, naglasio je Prguda.
On je dodao kako je jedan kat čitaonice već opremljen te da im nedostaju sredstva za još dva kata. Napomenimo, prvobitnim projektom planirano je, osim knjižničarskih prostorija, u ovom objektu uspostaviti i čitaonicu koja bi bila opremljena računalima i drugom opremom te Internet klubom čime bi čitatelji dobili kompletnu uslugu.
Uskoro otvorenje igroteke
U zgradi novoobnovljene Gradske biblioteke bi uskoro trebala biti otvorena igroteka za koju su zaslužni talijanska organizacija “Nehus Emilia Romagna Bologna”, Grad Mostar, udruženja Žene za Europu i Narodna biblioteka.
“Mi smo im dali prostor, a oni će nama za uzvrat dati nešto sredstava da popunimo knjižni fond i kupimo namještaj koji nedostaje”, kazao je Prguda.
Za sada vlada velik interes građana za novootvorenu biblioteku, trenutačno nije velika navala za upis u biblioteku jer je velik broj građana već upisan u neke druge biblioteke, međutim početkom nove godine bi svi građani kojima je bliže trebali biti upisani u novu biblioteku.
“Ima u posljednjih nekoliko dana i određen broj korisnika koji su već počeli iznajmljivati knjige, a posebno će to sve biti zanimljivo kada se otvori čitaonica”, zaključio je Prguda.
Link: http://dnevni-list.ba/?mdls=1&mdls_tip=2&nid=10857
Mimar March 31st, 2007, 06:14 PM Vandali uništili turističku signalizaciju
Huliganstvo u Mostaru, kao i u cijeloj Hercegovini, čini se, ne prestaje. Posljednjih godina bili smo svjedoci stradavanja različitih objekata u gradu i izvan njega, automobila, a nisu bili pošteđeni ni neki vjerski objekti i kulturni spomenici. Iznimka nije ni turistička signalizacija koja je u posljednje vrijeme na meti vandala, ne samo u Mostaru, nego i šire.
Prema riječima Semira Temima, zamjenika direktora Turističke zajednice Hercegovačko-neretvanske županije, problem sa signalizacijom postoji u cijeloj županiji.
"Istina, signalizacija je išarana u gradu, ali moram reći da problem postoji i u Rami i Žitomisliću", rekao je Semir Temim.
Podsjetimo, signalizaciju je postavila Turistička zajednica, a za održavanje se trebao brinuti Grad Mostar.
"Dogovor je bio takav da mi financiramo projekti i izvedemo radove na postavljanju signalizacije, a Grad Mostar je zadužen za osiguravanje iste", kazao je Temim.
Također je dodao da se oni trenutačno spremaju uraditi procjenu stanja te vidjeti što je potrebno uraditi.
Dodatni problem čini i to da se išarane table ne mogu očistiti, nego se uvijek moraju postavljati nove.
"Moram reći da je, nažalost, kod nekih ljudi razina kulture još uvijek ispod svake granice. Neki to očito ne mogu ili ne žele shvatiti pa zbog toga i rade takve stvari", naglasio je Temim.
Turistička signalizacija namijenjena je prvenstveno stranim turistima, a kad oni vide ovakve stvari, nose ružne dojmove iz Mostara, što šteti svim građanima, a naročito ljudima koji žive od turizma.
Kada se signalizacija prvi put postavljala, iz Turističke zajednice su apelirali da se o njoj vodi računa, ali to nažalost nije bio slučaj i sigurno je da ovaj problem valja brzo riješiti.
"Dogovoriti ćemo se s Gradom na koji način riješiti ovaj problem, ali sigurno je da se mora riješiti do početka turističke sezone", zaključio je na kraju razgovora za Dnevni list Temim.
http://www.bljesak.info/modules.php?name=News&file=article&sid=43921
:ohno:
LordMarshall March 31st, 2007, 08:17 PM Uskoro dobivamo kvalitetne programe za zaštitu voda
MOSTAR - Iako Bosna i Hercegovina po vodenim potencijalima spada u red najbogatijih zemalja u Europi, po pitanju njihove zaštite i stanja ekologije je situacija skroz suprotna te se nalazi na samome europskom dnu.
Doduše, na razini Federacije postoji Zakon o vodama, kojim se uređuje način i uvjeti upravljanja vodama, vodoprivrednim objektima i javnim vodnim dobrom radi korištenja voda, zaštite voda od zagađivanja, uređenja voda i vodotoka te zaštite od štetnog djelovanja voda. Ipak, u praksi se malo toga čini na provođenju ovoga zakona.
Grad Mostar je jedan od gradova koji ima vrlo bogate vodene potencijale, koji su nažalost svakim danom sve ugroženiji. Iz toga razloga je Gradsko vijeće donijelo i Odluku o pristupanju izradi elaborata o zonama sanitarne zaštite i zaštitnim mjerama područja na kojima se nalaze izvorišta vode za piće Radobolja, Studenac i Salakovac. Nakon provedene procedure javne nabave, kao najpovoljniji ponuđač za izradu elaborata čija je vrijednost 228.735 maraka izabrano je poduzeće INTEGRA Mostar. U realizaciju projekta uključio se JP Vodno područje slivova Jadranskog mora Mostar koji sudjeluje u izradi elaborata sa 60.000 maraka.
Kako nam je kazano u Odjela za urbanizam i građenje Gradske uprave Mostara, dosad je prikupljana sva postojeća dokumentacija vezana uz prikupljanje i obradu dosad provedenih istraživanja vezanih uz utvrđivanje zaštite podzemnih voda mostarskog vodoopskrbnog sustava. Provedena su geomorfološka istraživanja i izrađene odgovarajuće geomorfološke karte te terenski radovi i detaljna geološka i hidrogeološka obrada zračnih snimaka područja istraživanja. Osim ovi, dosad su prikupljani i podatci utjecaja akumulacije HE Salakovac i HE Mostar na izvorište Studenac.
Link: http://dnevni-list.ba/?mdls=1&mdls_tip=2&nid=11154
snupix April 1st, 2007, 01:17 AM Vandali uništili turističku signalizaciju
:ohno:
Ja ne mogu razumjeti te budale... To treba poslati da jezikom očiste te znakove... Ovdje u ZG mi je pun "kufer" te ekipe koja šara jer ne zna što bi pametnije sa svojim životom... :bash:
Bih06 April 1st, 2007, 03:26 AM Kad nas svi na miruuu ostaveeee.....
6glaCqxTZKc
Svi ovi preijdlozi su super......cevap na zastavu hahaha :cheers:
Europa. April 1st, 2007, 04:14 AM ^^ dobra ta pijesma.. :D
Boycie April 1st, 2007, 06:49 AM Kad nas svi na miruuu ostaveeee.....
6glaCqxTZKc
Svi ovi preijdlozi su super......cevap na zastavu hahaha :cheers:
:) Nice.
:cheers:
edolen1 April 1st, 2007, 06:16 PM I am extremely disappointed in you guys. I can't even leave this forum for 4 days without getting shit. Next time I'll think about banning more than one person.
krzamak April 1st, 2007, 06:17 PM Ovogodišnji sajam gospodarstva u Mostaru posjetilo više od 50.000 posjetitelja
http://i10.tinypic.com/3yo7bep.jpg
Na 10. međunarodnom sajmu gospodarstva Mostar 2007. predstavile su se i turističke zajednice Hercegovine, na inicijativu i uz financijsku podršku USAID-a. Prvi put nastupile su jedinstveno turističke zajednice Zapadnohercegovačke, Hercegbosanske i Hercegovačko-neretvanske županije, kojima su se pridružile turističke zajednice istočne Hercegovine.
Zanimanje za ovu regiju pokazao je veliki broj posjetitelja štanda iz BiH i Europe. Predstavljen je veliki broj vrijednosti i zanimljivosti Hercegovine, a posjetitelji su se posebno zanimali za Mostar, Blagaj, Neum, Boračko jezero i Hutovo blato, na kojem će se uskoro održati međunarodno prvenstvo u sportskom ribolovu, te Neretvu, gdje se priprema prvenstvo BiH u raftingu.
Zamjenik direktora Turističke zajednice HNŽ-a Semir Temim kazao je FENI kako zajednički nastup na mostarskom sajmu pokazuje da turisti vide Hercegovinu kao jedinstvenu turističku regiju, te da njeni turistički potencijali nisu uvezani niti dovoljno predstavljeni i iskorišteni.
To se odnosi na Muzej Humac, Međugorje, Mostar, Mogorjelo, Blidinje, Blagaj, Risovac i druge svjetske kulturno-povijesne i prirodne vrijednosti, izražene posebno u ljepotama rijeka i jezera, starih gradova, nekropola stećaka...
"Već smo pokrenuli inicijativu za izradu zajedničke web-stranice, zajedničkog prospekta i turističke signalizacije, kao i jedinstvenog nastupa na budućim sajmovima", rekao je Temim.
Sumirajući rezultate petodnevnog rada, direktorica Sajma Dalfina Bošnjak kazala je kako je ovaj susret privrednika okupio 600 izlagača iz 36 zemalja, što je najviše do sada.
Prema njenim riječima, sajam je ispunio sva očekivanja izlagača i posjetitelja i opća je ocjena kako je ovo dosad najbolje organizirani sajam.
"Ukupno 30.000 četvornih metara bilo je u funkciji promocije i povezivanja gospodarstva. Sajam je posjetilo više od 50.000 posjetitelja, među kojima ističem kolektivne posjete iz Mostara, Olova, Gornjeg Vakufa i drugih gradova", kazala za FENU Dalfina Bošnjak.
Međunarodni sajam, jedini u Hercegovini, bio je mjesto istinskog druženja, promocija, prezentacija, degustacija, poslovnih razgovora, ugovora i razmjene iskustava, a podijeljena su i priznanja za nastup na sajmu kao i za kvalitetu proizvoda.
Promovirani su gradovi, gospodarstvo, turizam, sektori građevinarstva, autoindustrije, prehrambene, kemijske, drvne, informatike, kozmetike, sporta, grafike, izdavaštva...
Osim prezentacije gospodarstva, sajam je imao i veoma bogat program pratećih manifestacija, kao što su npr. izbor miss sajma, predstavljanje knjiga, izbor najboljih vina, meda, sireva, poslovni forumi i dr.
Zemlja partner ovogodišnjeg 10. međunarodnog sajma gospodarstva bila je Austrija, s desetak svojih firmi, koje je na otvaranju sajma predstavio veleposlanik Republike Austrije u BiH Werner Almhofer.
http://www.bljesak.info/modules.php?name=***s&file=article&sid=43952
krzamak April 1st, 2007, 06:23 PM Foto galerija Mostarski sajam 2007. (http://galerija.bljesak.info/thumbnails.php?album=210)
mostarac1 April 1st, 2007, 08:15 PM I am extremely disappointed in you guys. I can't even leave this forum for 4 days without getting shit. Next time I'll think about banning more than one person.
sorry dude
krzamak April 1st, 2007, 11:18 PM Program manifestacije ''Mostarsko proljeće - Dani Matice hrvatske Mostar 2007.
http://i7.tinypic.com/30t5qno.jpg
Na međunarodnoj kulturnoj manifestaciji "Mostarsko proljeće - Dani Matice hrvatske 2007.", koja se održava od 11. travnja do 23. lipnja bit će predstavljeno oko 40 programa, istaknuli su organizatori na današnjoj konferenciji za novinare. Manifestacija će svečano biti otvorena likovnom izložbom "Stoljeće likovne kulture u Mostaru", u Hrvatskom domu "Herceg Stjepan Kosača", u 18 sati.
U dramskom dijelu programa ljubitelji će, uz ostalo moći vidjeti predstave "Zid od brašna" Lutkarsko kazalište Mostar, "Nova zemlja" Crnogorsko narodno pozorište, NPRS-a Banja Luka predstava "Gospođa ministarka", "Nemreš pobjeć od nedjelje" Atelje 212, "Sluškinje" Narodno pozorište Mostar, te "1001 noć" Zadarska kazališna kuća.
Što se tiče glazbenog dijela, uz ostalo bit će upriličen koncert Olivera Dragovjevića, Gibonnija, koncert "Gospari vam s pjesmom dohode", zatim koncert Tamburaškog orkestra HRT i solisti. Također bit će upriličena i Jazz večer Blackcoffi i Zdenka Kovačiček, te koncert Klapa iz Omiša, kao i koncert gitariste Saše Dejanovića i sopranistice Olge Šober.
U sklopu manifestacije, tradicionalno je tu i međunarodna književna večer gdje se očekuje izniman broj kvalitetnih književnika, a bit će upriličene i opere "Ero s onoga svijeta" i "Nikola Šubić Zrinski".
Također, bit će održan i "Cvitkov dan", dan namijenjen za djecu kada će biti upriličena izložba dječjih crteža, te nastup mladih pjesnika i glazbenika.
U sklopu manifestacije bit će upriliče i filmski program. Posjetitelji će moći vidjeti filmove "Armin", "Put lubenica", "Gospođica", "Sve džaba" i "Grbavica".
Na konferenciji, organizatori su istaknuli kako najavljeni koncert Maksima Mrvice neće biti upriličen, zbog kako su kazali prvenstveno visokih cijena karata na kojima je inzistirao menadžment spomenutog umjetnika.
Manifestacija "Mostarskom proljeće - Dani Matice hrvatske Mostar 2007." održat će se pod visokim pokroviteljstvom Predsjedništva BiH, Predsjedništva Republike Hrvatske, Ministarstva kulture FBiH i Ministarstva kulture RH. Generalni sponzor manifestacije je Hypo Alpe-Adria Group Mostar, a zlatni sponzor Aluminij d.d. Mostar.
http://www.bljesak.info/modules.php?name=News&file=article&sid=43918
edolen1 April 1st, 2007, 11:40 PM ^^Remind me what this has to do with construction
krzamak April 1st, 2007, 11:42 PM ^^Remind me what this has to do with construction
Riječ je o umjetnosti, kulturi, nečem lijepom, konstruktivnom :)
mirza-sm April 1st, 2007, 11:44 PM nemoj se sad izvlačiti Krz :D:D :naughty:
|
|