View Full Version : FOUR SEASONS PLACE | Kuala Lumpur ( KLCC ) | 65F | Proposed


Pages : 1 2 3 [4]

SHAH FIRDAUS
February 28th, 2010, 10:13 PM
From flickr
by -haf-

still an empty plot of land...Prime land that is...
http://farm5.static.flickr.com/4001/4393644743_8f4e7d9162_b.jpg

World 2 World
March 1st, 2010, 11:43 AM
u can see they put up fence in front of Four Seasons. Is that land part of the project? ^^

Before.

http://farm4.static.flickr.com/3183/2670683145_f1acfbb7d2_b.jpg
from flickr

poltak
March 1st, 2010, 11:59 AM
Are they going to cut all the trees ?

patchay
March 1st, 2010, 03:08 PM
haha there's not enough space for this project so they need to extend into KLCC's land.... marah tau Petronas :bash:

Victor18
March 1st, 2010, 05:08 PM
^^ Damn are they really gonna cut down the trees and take a slight portion of the park infront of it?? :ohno:

James Foong
March 1st, 2010, 05:15 PM
the green patch belongs to klcc. these temporary barriers are meant for an u/c powercable work. no trees will be felled.

Victor18
March 1st, 2010, 05:15 PM
^^ I see,thanks alot James for the info :)

XNeo
March 1st, 2010, 05:17 PM
i dont think they will cut down the trees when they only build one single building.

Victor18
March 1st, 2010, 05:19 PM
I hope so,the plot is pretty small especially for a 65 storey mixed use building,i hope the podium fits in well though...:)

James Foong
March 1st, 2010, 05:31 PM
i d think the plot is sufficient. this is about 3 times larger than lot C.

dengilo
March 2nd, 2010, 09:28 AM
Was there any attempt by them to take over wisma central?

aismanggo
March 2nd, 2010, 09:58 AM
i hope all the taller building like four season build around klcc,not just 100m-200m...so the skyline of kuala lumpur will look stuning n the skyline will more iconic..

nazrey
March 2nd, 2010, 02:00 PM
i hope all the taller building like four season build around klcc,not just 100m-200m...so the skyline of kuala lumpur will look stuning n the skyline will more iconic..

These projects will change KLCC skyline forever >>
- Four Seasons Place (Approved)
- Petronas Carigali (U/C)
- Felda Tower (U/C)
- Naza Tower (U/C)
- Grand Hyatt (U/C)

http://img30.imageshack.us/img30/4991/35157752.jpg

Upcoming projects around there...
- TA3/TA4
- DNP Tower
- The Regent
- Platinum Park residences

nazrey
March 3rd, 2010, 07:51 AM
From flickr
by -haf-

still an empty plot of land...Prime land that is...
http://farm5.static.flickr.com/4001/4393644743_8f4e7d9162_b.jpg


u can see they put up fence in front of Four Seasons. Is that land part of the project? ^^

Before.

http://farm4.static.flickr.com/3183/2670683145_f1acfbb7d2_b.jpg
from flickr

seems like nothing to do with the four seasons...

http://farm5.static.flickr.com/4046/4402534623_42fa764110_b.jpg

http://farm3.static.flickr.com/2721/4403304306_b0f4ac8835_b.jpg

XNeo
March 3rd, 2010, 10:06 AM
^^ construction tu utk showroom 4 season kut.
just guessing.
:)

nazrey
March 3rd, 2010, 10:10 AM
Hmmmm...ada feel...tapi harap bukan carpark extension lah :lol:

Victor18
March 3rd, 2010, 01:15 PM
^^ Nope,mcm underground cable extension je,nothing or doesnt look like a common U/C plot...

a7x
March 3rd, 2010, 07:01 PM
that is KLCC land my friend...work is going on some underground cable if i'm not mistaken.

dengilo
March 4th, 2010, 03:40 PM
I could wronglah at one time DBKL preposed their new HQ on that lotlah.

XNeo
March 5th, 2010, 01:58 AM
that is KLCC land my friend...work is going on some underground cable if i'm not mistaken.

undergound cabling for 4 season kut.

hahaha..still hoping.

dengilo
March 5th, 2010, 04:53 AM
More like for lot c.

SHAH FIRDAUS
March 18th, 2010, 10:48 PM
From flickr
by chipple

great progress at menara carigali but still no sign of activity of the four seasons...i bet that by the time menara carigali reaches the 20th floor,the four seasons would still be an empty plot of land..
http://farm3.static.flickr.com/2455/4443143618_be923d7e2f_b.jpg

patchay
March 19th, 2010, 01:22 AM
four seasons wont start so soooon.....

byong_sun
March 19th, 2010, 02:17 AM
four seasons wont start so soooon.....

is it possible early next year?

XNeo
March 19th, 2010, 02:21 AM
wish 4 season start this year .
kalau lot C siap....klcc skyline nampak tak balance..:colgate:

pedang
March 19th, 2010, 02:26 AM
^^ ehe setuju!
dacing kena sama berat :D

Victor18
March 19th, 2010, 05:55 AM
Was there any attempt by them to take over wisma central?

The previous 4 Seasons design looks like it needs to take over Wisma Central due to its monstrous podium size,but since it got slimmed down,i guess now Wisma Central will just be an eyesore there for a very long time...:ohno:

dengilo
March 19th, 2010, 06:42 AM
Same club as Wilayah,Cambell,Pertama,Ampang Park and Sungei Wang ha.Just that when it comes to wisma central my understanding is that all the lots in it are individually owned so not a simple thing trying to get them to agree to anything!Sad.

aismanggo
March 19th, 2010, 08:47 AM
wish 4 season start this year .
kalau lot C siap....klcc skyline nampak tak balance..:colgate:

..no la..lot c tu mmg kne siap awal..sbb nak bagi balance dgn maxis tower...then bru buat 4season dgn project lain plak berhampiran mandrin oriental with almost same high with 4season..then what i call balance

James Foong
March 20th, 2010, 02:59 PM
The previous 4 Seasons design looks like it needs to take over Wisma Central due to its monstrous podium size,but since it got slimmed down,i guess now Wisma Central will just be an eyesore there for a very long time...:ohno:

the four seasons initial plot does not include the wisma central.

Victor18
March 20th, 2010, 06:35 PM
^^ I see,but James do you think any refurbishment works will be done to older nearby buildings like Wisma Central or Equity?,they dont really match the area's appeal though,as far as i know there is a plan to redevelop Plaza Angkasaraya but till today quiet only. :)

dengilo
March 21st, 2010, 06:45 AM
Not forgetting WISMA STUPID GETAH ASLI!!!Whithin 5km we have wisma getah asli ,RRI close to jelatek and Mardec next to ISKL ampang.

James Foong
March 21st, 2010, 08:15 AM
vic, i dont know any of their plans. getting hundred-owners to agree on one deal is tough to happen. some hardcores want to keep their businesses because it is cheap to operate. if they want to dispose their lots for redeveloping plan, how much can they get when the space they owned is one tiny box?

SHAH FIRDAUS
March 22nd, 2010, 08:02 PM
the infamous neighbour...should be demolished a.s.a.p..and make way for the four seasons or any other super skyscraper...

http://farm3.static.flickr.com/2733/4450455495_be402e6600_b.jpg

nazrey
March 22nd, 2010, 08:08 PM
Selama mana Bangunan Getah Asli dan Wisma Equity tak berubah Wisma Central pun akan jadi macam tu jugak.....!!

byong_sun
March 23rd, 2010, 12:27 AM
the infamous neighbour...should be demolished a.s.a.p..and make way for the four seasons or any other super skyscraper...

SETUJU!!!

SHAH FIRDAUS
March 23rd, 2010, 02:22 AM
Selama mana Bangunan Getah Asli dan Wisma Equity tak berubah Wisma Central pun akan jadi macam tu jugak.....!!

same owners ka these 3 old buildings?..

dengilo
March 23rd, 2010, 06:18 AM
Nope!!As much as we hate seeing this 3 buildings being there ,we must understand that they have been there long before the idea of the twin towers came about!Just that i dont understand these owners not doing anything at all to upgrade or they just waiting for the best offer to sell just like angkasaraya!

patchay
March 23rd, 2010, 04:53 PM
Selama mana Bangunan Getah Asli dan Wisma Equity tak berubah Wisma Central pun akan jadi macam tu jugak.....!!



sebenarnya i sungguh hairan... why?

one of malaysia's top architect firm VERITAS is headquartered in Bangunan Getah Asli... takkan sendiri punya tempat (as a tenant) takder proposal ker? at least change facade lah....

yg Wisma Central tu saya pernah post satu weird rendering... proposed 70+ storeys there... :lol: tapi maklumlah wisma central is controlled by sooo many taukeh-taukeh dat i think DBKL or even Petronas dare not touch....

dengilo
March 23rd, 2010, 05:09 PM
Yalah all those taukehs expecting 1000% if not more returns for their investments.

Cerulean
March 23rd, 2010, 10:37 PM
I actually have an evil plan to settle this Wisma Central issue. I have been secretly hoping that the whole building will caught fire one fine day and burnt to ashes, with no casualty of course LOL.

byong_sun
March 24th, 2010, 12:24 AM
hhahaha..good idea..suruh bebudak extremist bakar^^:lol:
MPO,mungkin as we speak,tengah ada rancangan nak demolish bangunan2 tu semua utk project baru...tak logic kalau tak ada org pikir apa yg kita pikir.

dengilo
March 24th, 2010, 05:40 AM
I actually have an evil plan to settle this Wisma Central issue. I have been secretly hoping that the whole building will caught fire one fine day and burnt to ashes, with no casualty of course LOL.

Sooner or later that will happen !On the ground level the no of coffee shops and makan joint will be the reason!I am amazed how our beloved"BOMBA" allows such thing!What happen to the fire code?:bash:they smell $$$ in the air and i smell poorly ventilated air in that building .Thanks bomba we love u:ohno:

Victor18
March 24th, 2010, 11:13 AM
^^ :hilarious

poltak
April 2nd, 2010, 05:38 AM
bila bangunan nie siap? 2014 ke?

XNeo
April 12th, 2010, 03:53 AM
Maybe our 4 season will look like this :

[QUOTE=Cazale;54911231]Costanera Center - SANTIAGO, CHILE - 300Mts - U/C

http://www.bendinger.com.ar/maquetas/Costanera%20Center_Chile_Alemparte-Barreda%20y%20Asoc_Cesar%20Pelli_12_b_www.jpg

http://img532.imageshack.us/img532/7522/screenshot20100331at163.png

Vrooms
April 23rd, 2010, 12:26 PM
Four Seasons Centre looks nice. Are they building 2 towers or only one?

rizalhakim
April 23rd, 2010, 12:39 PM
proposed 2 but now 1 only....

poltak
April 28th, 2010, 03:29 AM
I DONT THINK THIS BUILDING WILL BE COMPLETED iN 2012. mAY BE IN 2015 .

i.B TOWERS WILL BE COMLPETED FIRST. so slow la this project

chuapk
April 28th, 2010, 03:53 AM
I DONT THINK THIS BUILDING WILL BE COMPLETED iN 2012. mAY BE IN 2015 .

i.B TOWERS WILL BE COMLPETED FIRST. so slow la this project

no funding and want sell at very high price..who wants to buy...better stop this project...

patchay
April 28th, 2010, 04:25 AM
i think dis project is scrapped for time being.....

SHAH FIRDAUS
April 29th, 2010, 12:51 AM
scrapped?..NO!!!!...my hope for another fantastic skyscraper in KL is ruined...

PlanetNova
April 29th, 2010, 04:47 PM
what is it with this project? Really dont understand.

firdaus
April 30th, 2010, 04:45 AM
I watched In Reality @ Astro Awani, the said that the Season Hotel will be build.
Just wait and see.

XNeo
April 30th, 2010, 10:12 AM
hope it is a good news.
but i worried if they reduce number of floors.

patchay
August 8th, 2010, 01:34 PM
anybody got updates for this project? heard its gonna start soon??

nazrey
August 22nd, 2010, 11:53 AM
Syed Yusof buys into Vasseti, which is launching its broadband service today
By B.K. SIDHU Saturday August 21, 2010
http://biz.thestar.com.my/news/story.asp?file=/2010/8/21/business/6896284&sec=business

http://biz.thestar.com.my/archives/2010/8/21/business/b_14YUSOF.jpg

Syed Yusof at Vasseti’s network operations centre in Kuala Lumpur.

KUALA LUMPUR: Businessman Tan Sri Syed Yusof Syed Nasir has bought a 30% stake in Vasseti Bhd, which is expected to launch its 1Gbps (gigabit per second) fixed line broadband service offering for residential users in select areas today.

“Telecommunications is a growing business. It has a lot of potential and I believe it is not too late for me to be part of a growing segment of the market,” Yusof told StarBizWeek in an interview yesterday.

Yusof has various business concerns and is well known for his interests in Hard Rock Cafe and Hotels and the Concorde Hotel chain. He is a partner alongside the Sultan of Selangor and Ipoh-born tycoon Ong Beng Seng in the RM2.5bil Four Seasons Place Kuala Lumpur which is being developed next to the Petronas Twin Towers.

With a paid-up capital of RM15mil, Vasseti has business interests in telecommunications and information technology, plantations, construction, tourism, real estate and human resource outsourcing services. Its other shareholders are Ranjeet Singh Sidhu and Datuk M. Harisharan Pal Singh.

“I came on board early this year,” said Yusof, who is Vasseti chairman.

Vasseti’s journey into telecoms began early this year when it undertook a corporate exercise to buy 80% equity stake in V Telecoms Bhd, which has a paid-up capital of RM502mil. V Telecoms holds network facilities provider and NSP network services provider licences.

Yusof said V Telecoms had thus far invested RM500mil to build a fibre optic network that spanned the length of Peninsular Malaysia. As it does not have enough fibre in the ground, the company also buys capacity from other telecoms providers to cater to the needs of its clients which are mostly multinational corporations and some telcos. “It is a 50:50 combination between our own fibre and what we lease from others now. We need to expand our network and our target is to invest RM1bil by the year-end for this purpose,” Yusof said.

V Telecoms’ investment far had been sourced via private equity and internal funding. The company has also just completed a fund-raising exercise for an additional RM100mil by issuing redeemable convertible cumulative preference shares.

“We will need to raise more funding in the market for our expansion and we intend to source funding via private equity funds and high net worth individuals,” said Yusof.

According to V Telecoms executive director Anthony Suppiah, wholesale makes up 70% of the company’s business and retail the remaining 30%. With the 1Gbps community broadband product, the company expects to reach out to more residential users to grow its retail business.

“With 1Gbps, the network is capable of delivering very high speed broadband and can even cater for video streaming and IPTV (Internet protocol TV) besides voice connectivity. The residential offering will be available in Capital Square in Kuala Lumpur, The Loft in Bangsar and KL Sentral. We are charging RM199 per month for the 1Gpbs,” he said.

Asked how the company could stand alongside bigger players with deep pockets and a much wider reach, Anthony said “we are not in competition with other fibre optic players, we see ourselves as complementing them. Our challenge is how we can brand ourselves to be a provider and expand at the speed the market demands. That, to us, is more crucial.”

azey
August 24th, 2010, 03:27 PM
2.5 billion!!!just a single tower but much more expensive thn ptt??:nuts::nuts:
BUILD THIS PLSS!!!

fritz_kaktus
August 24th, 2010, 03:40 PM
There's a new billboard by Jalan Ampang depicting the one tower etc. So suspect they'll start soon.

patchay
August 24th, 2010, 03:51 PM
There's a new billboard by Jalan Ampang depicting the one tower etc. So suspect they'll start soon.

i tot dat was quite sometime ago... not sure

WhiteChicken
August 27th, 2010, 09:35 PM
i tot dat was quite sometime ago... not sure
Does anybody knows what the latest status is of this amazing project?
please let it be build. Together with the Lot C it will complete the PTT even better.

SHAH FIRDAUS
August 28th, 2010, 05:28 AM
Eyesore at KL tourist spot
By LIM CHIA YING
chiaying@thestar.com.my

FOR regular passers-by and tourists in the KLCC area, it is unlikely that they will miss the Four Seasons Place Kuala Lumpur project.

With the development temporarily stalled, the hoarding surrounding it has been vandalised with graffiti, resulting in an eyesore to the public.

John Anthony, who works at the nearby Petronas Towers, said it is sheer embarrassment as the area is regarded as prestigious and high-end.
Ugly sight: Part of the hoarding with graffiti.

“The hoarding is dirty and ugly,” said Anthony, 39, who is a senior broadcasting engineer.

“I urge the Kuala Lumpur City Hall (DBKL) to ask the developer to give the hoarding a new coat of paint, clean up the area or completely dismantle it.”

It was reported that the project will comprise the six-star Four Seasons Hotel and service apartment with retail shopping area, and Four Seasons Condominium to be built in what is an open air carpark located between Menara Maxis and Wisma Central.

A news article was reported as saying last year that the launch of the RM2.5bil project development has apparently been postponed, but that the piling works were already completed.

The site has been left in its current state for the past one year.

When contacted, a spokesperson of Venus Assets said the company has a contractor on site who periodically cleans the place and pumps out water whenever it rains to prevent Aedes mosquitoes from breeding.

“We are a responsible developer carrying out maintenance at our site with a 24-hour security to guard against vandalism,” said the spokesperson.

He said the company was also getting graphic designers to add images on the extensive hoarding that had been put up.

He said the project’s delay was due to a new design, which took about six months while a new development order had to be submitted.

“The approval process also took some time but we got it late last year. However, by then the economic situation was already not so favourable, which is why the company held back on the project.

“We are waiting for the appropriate time to launch the project and start its construction, which is likely to be this year end. Right now, we are discussing with potential contractors.”

When contacted, DBKL confirmed that approval had been given last year for a 65-storey tower.

patchay
August 28th, 2010, 05:38 AM
“We are waiting for the appropriate time to launch the project and start its construction, which is likely to be this year end. Right now, we are discussing with potential contractors.”

When contacted, DBKL confirmed that approval had been given last year for a 65-storey tower.


talk talk talk another Berjaya The Ritz in the making..... i think they got problem selling the project....

nazrey
August 28th, 2010, 05:51 AM
He said the project’s delay was due to a new design, which took about six months while a new development order had to be submitted.

When contacted, DBKL confirmed that approval had been given last year for a 65-storey tower.

new design is just okey dah...build larrrr!

nazrey
August 29th, 2010, 11:30 PM
SANTIAGO | Costanera Center | 300m | 984ft | U/C
By Fulano o Sutano

http://commondatastorage.googleapis.com/static.panoramio.com/photos/original/39979006.jpg

Regards!


http://i461.photobucket.com/albums/qq338/xcarras/22%20agosto%202010/Torre2sola.jpg

http://i461.photobucket.com/albums/qq338/xcarras/22%20agosto%202010/Contitanium.jpg


Development perspective bagi Four Season KL plak...agak macam ni!

D_Y2k.2^
September 13th, 2010, 10:09 AM
Still a huge padang:
http://i346.photobucket.com/albums/p436/darrenyeo/IMG_0455.jpg

SEED
September 15th, 2010, 02:54 PM
^^ u call that a padang... more like setting of a drugies or gangster movies~

nazrey
October 20th, 2010, 09:12 AM
No progress yet.
Construction Notice Board

http://farm4.static.flickr.com/3464/3867651502_f3b486b39d_b.jpg


Supertall tower projects in KL in line-up!! (tpi semua jauh pada relaiti belaka lagi :lol:)

poltak
October 20th, 2010, 09:29 AM
Supertall tower projects in KL in line-up!! (tpi semua jauh pada relaiti belaka lagi :lol:)




kenapa tak bina lagi.. sebab ada bantahan org chile ke sebab costanera center sama ngan four season punye design..

nazrey
October 20th, 2010, 10:17 AM
http://biz.thestar.com.my/archives/2010/8/21/business/b_14YUSOF.jpg

Syed Yusof at Vasseti’s network operations centre in Kuala Lumpur.


Entah...tanya syed saja...........

cattivo
October 20th, 2010, 11:02 AM
but I hope they could prepare the foundation for the 2nd tower for future development.

Build 1st tower is necessary for now.

rizalhakim
November 25th, 2010, 01:44 PM
sudah bertukar menjadi warna oren...ada vasseti group. So syukry pergila snap pic...www.vasseti.com.my

nazrey
November 25th, 2010, 02:14 PM
rizal pon gi laaar..snap pic!

patchay
November 25th, 2010, 02:22 PM
sudah bertukar menjadi warna oren...ada vasseti group. So syukry pergila snap pic...www.vasseti.com.my

u mean de website or de hoarding/rendering?

dengilo
November 26th, 2010, 02:12 AM
Still a huge padang:
http://i346.photobucket.com/albums/p436/darrenyeo/IMG_0455.jpg

:bash:Damm i could have made some good money there(parking lot) while they make up their mind!!!:lol:

rizalhakim
November 26th, 2010, 02:57 AM
u mean de website or de hoarding/rendering?

the hoarding at dat site..the paint it 2 oren color n got vasseti logo...

patchay
November 26th, 2010, 03:15 AM
OK guys some good news:

The project is expected to start soon.

Vasseti Berhad is helmed by Tan Sri Syed Yusof Tun Syed Nasir.

XNeo
November 26th, 2010, 08:46 AM
^^ Good ! ..at last.

cattivo
November 26th, 2010, 09:46 AM
OK guys some good news:

The project is expected to start soon.

Vasseti Berhad is helmed by Tan Sri Syed Yusof Tun Syed Nasir.

yup, he invest in Vasseti about 3-4 months back, Vasseti also formerly known as Paneagle.

razpatrol99
November 26th, 2010, 11:00 AM
OK guys some good news:

The project is expected to start soon.

Vasseti Berhad is helmed by Tan Sri Syed Yusof Tun Syed Nasir.

Hopefully its not another false alarm.... :lol:

guy4versa4
November 26th, 2010, 12:38 PM
please built it tomorrow...i want to see it rising from the land before i die..!

idiamindada
November 26th, 2010, 02:10 PM
Hopefully its not another false alarm.... :lol:

nope, it's a drill ;)

cattivo
November 28th, 2010, 03:44 PM
Hopefully its not another false alarm.... :lol:

work together with Vasseti Group before, I bet the building will be exclusuve for V-Group to provide few of their services. good showcase for Vasseti.

msyukry08
November 28th, 2010, 05:04 PM
http://farm6.static.flickr.com/5125/5214255557_ea432d62dc_b.jpg
http://farm5.static.flickr.com/4125/5214848480_683cab0378_b.jpg

Victor18
November 28th, 2010, 05:06 PM
^^ Yay new hoardings, hopefully it will commence soon!! :banana:

XNeo
November 29th, 2010, 02:30 AM
wait first.

wait until the big machines come in, after that can :banana: and :carrot:

erwinkarim
November 29th, 2010, 04:01 AM
^^ agreed, i'll start believing when i see heavy machines start shaking the ground....

Greg
November 29th, 2010, 08:27 AM
Wisma Central looks really run down. :ohno:

kl 2020 ideas
November 29th, 2010, 09:05 AM
Please start today and get it over and done with.

Victor18
November 29th, 2010, 09:34 AM
wait first.

wait until the big machines come in, after that can :banana: and :carrot:

Haha yeah, hopefully this year or early next year start la :pepper:

razpatrol99
November 29th, 2010, 03:48 PM
Wisma Central looks really run down. :ohno:

yeah... hope that building will be next

msyukry08
December 20th, 2010, 05:58 PM
http://farm6.static.flickr.com/5049/5277856754_daa09a8b98_b.jpg
http://farm6.static.flickr.com/5046/5277857020_6772cd2b12_b.jpg

Munwon
December 21st, 2010, 01:00 AM
Any machinery over the wall?

Victor18
December 21st, 2010, 04:52 PM
^^ Nope, this won't begin anytime soon though, the earliest would be atleast Q2 2011...

Munwon
December 22nd, 2010, 02:37 AM
I can live with 2Q 2011.

patchay
January 29th, 2011, 04:53 AM
RECAP


Four Seasons KL may rope in MidEast partner
Vasantha Ganesan
Business Times | February 2010

http://www.smecorp.gov.my/node/1300
http://findarticles.com/p/news-articles/new-straits-times/mi_8016/is_20100202/seasons-kl-rope-east-partner/ai_n48859119/

A Middle Eastern consortium may become the partner for the RM2.5 billion Four Seasons Place Kuala Lumpur, which will occupy a site next to the Petronas Twin Towers.

idiamindada
January 29th, 2011, 07:29 AM
damn sh*t lah this project. imagine if this tower started last year, it would compliment KLCC skyline together with Carigali once they are completed together :bash:

patchay
January 29th, 2011, 08:15 AM
tak ader duit ler....

tak ader demand pun.....

unless u nak sponsor 2.5 billion?

razpatrol99
January 29th, 2011, 08:20 AM
hopefully after our PM came back from the GCC we can hear good news about this one..

idiamindada
January 29th, 2011, 08:48 AM
tak ader duit ler....

tak ader demand pun.....

unless u nak sponsor 2.5 billion?

just sell the land to Petronas lor….

erwinkarim
January 29th, 2011, 09:51 AM
just sell the land to Petronas lor….

they busy trying to develop the land next to district cooling (the parking lot and in front of isetan)

so petronas buy tomorrow, it'd be an empty lot for years to come...

josephyap90
March 11th, 2011, 07:23 PM
are u they still gonna build this?

James Foong
June 4th, 2011, 12:07 PM
they busy trying to develop the land next to district cooling (the parking lot and in front of isetan)

so petronas buy tomorrow, it'd be an empty lot for years to come...

strong winds got into my ear that they had a grand plan to bring down the chilled plants underground, n merged with lot K with 3 towers ontop a new 3000+ parking spaces underground.

James Foong
June 4th, 2011, 12:09 PM
are u they still gonna build this?

this one is the biggest letdown of all time.

im not sure if i had missed out the four seasons news but anyhow in recent weeks, active bidding wars for main structure work were high profile projects such as IB tower, st regis, le nouvel and acadia.

aurora, W hotel n klcc lot K are still in sketchy plan but the outlook remains very good in coming months.

patchay
June 26th, 2011, 05:30 PM
James, nothing for Four Seasons?

How come lah! I heard St. Regis attracted some quite good response. I guess Four Seasons can do better, or if not get other hotel chain like Kempinski or Conrad...

aismanggo
June 26th, 2011, 06:00 PM
James, nothing for Four Seasons?

How come lah! I heard St. Regis attracted some quite good response. I guess Four Seasons can do better, or if not get other hotel chain like Kempinski or Conrad...

I want to see banyan tree klcc , waldorf klcc or else park hyatt klcc

daniu79
June 26th, 2011, 06:59 PM
I want to see banyan tree klcc , waldorf klcc or else park hyatt klcc

Banyan Tree will be built opposite Pavilion

Brannix
June 27th, 2011, 06:06 AM
James, nothing for Four Seasons?


investment consideration, but not issue, has been the drags for mroe than 2 years..

what i last heard, they are resubmitting a dummy plan for authority approval to extend the license expiry while finalizing the changes and targeting to see activities at site by Q2 next year :nuts:

dengilo
June 27th, 2011, 11:26 AM
May be it has got to do with the preposed massive Suria KLCC expansion plans.

nazrey
August 21st, 2011, 07:20 AM
ni gambar latest update ..tak de tanda langsung nak bermula...:(
http://farm7.static.flickr.com/6069/6062099020_8280d32a8d_b.jpg
http://www.flickr.com/photos/danielcheong/6062099020/

THT-United
August 22nd, 2011, 07:28 AM
The three Petronas Towers (twins and No. 3) look so impressive in the KLCC + Ampang Road skyline. Too bad there is no Four Seasons coming up as yet, otherwise it will be another great addition to these skyscrapers!

patchay
August 22nd, 2011, 06:26 PM
The three Petronas Towers (twins and No. 3) look so impressive in the KLCC + Ampang Road skyline. Too bad there is no Four Seasons coming up as yet, otherwise it will be another great addition to these skyscrapers!

still waiting for Four Seasons (65) + LotK/181 (77, 50, 35) + IB (58) + Nouvel (49, 43)

dengilo
August 23rd, 2011, 02:03 AM
Whats the hick up with this one?

nazrey
August 23rd, 2011, 02:35 AM
still waiting for Four Seasons (65) + LotK/181 (77, 50, 35) + IB (58) + Nouvel (49, 43)

How can you forgot OSK, The Regent along Jln Ampang although they're just shorter building project :D otherwise ther're still has more projects in the prime land near PTT such as Aurora Tower, W Hotel, TA Towers, Vertices Tower!...(and lot D?)

THT-United
August 23rd, 2011, 10:08 AM
Who would have thought that as recently as 15 years ago, there were only the Petronas Twins and Vista Tower dominating the Ampang Road skyline, with the bulk of the high-rises centered along Sultan Ismail (e.g. StanChart, KH, MAS, UBN).

Fast forward to today, seems like the bulk of KL's tallest skyscrapers are now centered in Ampang Road. In addition to PTT and Vista, so many new 200m-plus buildings have come up, including Petronas 3, Troika, AmGroup, Avenue K, as well as new ones like Felda and the proposed IB Tower, to name a few.

Of course the Four Seasons should be clustered together with these "tallies" but until now, I can only see a Vasetti hoarding on the site. What's the status of this would-be iconic structure today?

dengilo
August 24th, 2011, 06:12 AM
True enough!Jalan Ampang has got a long interesting history even long before.A good majority of the buildings we see is 2nd generation even 3rd.I just want to see wisma getah asli,wisma equaty and wisma central disappear all together:lol:

fritz_kaktus
August 27th, 2011, 04:46 AM
True enough!Jalan Ampang has got a long interesting history even long before.A good majority of the buildings we see is 2nd generation even 3rd.I just want to see wisma getah asli,wisma equaty and wisma central disappear all together:lol:

I don't mind the contrast: Beauty shines more next to ugliness.

daeng_jal
August 28th, 2011, 12:11 AM
^^ thats why cute girl bff is someone ugly

dengilo
August 28th, 2011, 12:59 AM
I don't mind the contrast: Beauty shines more next to ugliness.

:cheers:I never thought of it that way:lol:

Brannix
August 30th, 2011, 04:54 AM
investment consideration, but not issue, has been the drags for mroe than 2 years..

what i last heard, they are resubmitting a dummy plan for authority approval to extend the license expiry while finalizing the changes and targeting to see activities at site by Q2 next year :nuts:

previous md resigned and new md, came from the same contractor they appointed before the project abandoned, just got on board 2 months ago.

dont think we can see anything at site until q2'12

patchay
November 16th, 2011, 01:49 AM
let's continue in this thread....


design which took off - 2 towers
new design after suspension - dropped off the shorter tower
latest design - totally new design (i prefer the original one though) :ohno:


Ong Beng Seng, Malaysian tycoon that is now active in SG.. hold substantial stake in Four Seasons worldwide.. also active in lots of other trades

Four Seasons new design is out.. the project can start anytime soon but can also delay as long as non of us can imagine :ohno:


with the way this project goes, there could be a new design 6 months later.. sorry cant response on this for now

pedang
November 16th, 2011, 03:23 AM
so another kotak ?

patchay
November 17th, 2011, 02:37 PM
i hope they retain the retail podium like this

>>> http://www.pickardchilton.com/mobile/four_seasons_place.html
http://www.pickardchilton.com/mobile/img/PORTFOLIO/Four_Seasons_Place/Four-Seasons-Place-6.jpg

the lobby
http://www.pickardchilton.com/mobile/img/PORTFOLIO/Four_Seasons_Place/Four-Seasons-Place-5.jpg

haikalcool2u
November 17th, 2011, 04:06 PM
i hope they build revolving restaurant at the highest floor

patchay
December 12th, 2011, 04:05 PM
The coolest thing in KL in 2012 will be the start of this project!!!

ZaHiRnYa???
December 12th, 2011, 04:18 PM
confirmed??

The coolest thing in KL in 2012 will be the start of this project!!!

nazrey
December 12th, 2011, 04:20 PM
what!!! Four Seasons got new design!!!!

guy4versa
December 12th, 2011, 04:27 PM
brennix said it going to be a new look,but he still prefer the old one...if this project revive and the keep the height...i swear...it will change kl skyline

nazrey
December 12th, 2011, 04:29 PM
1, 2

http://www.upislam.com/images/27734942159598011350.jpg http://www.upislam.com/images/04075584119816297224.jpg

3 ???

rizalhakim
December 12th, 2011, 04:39 PM
And wat hapen to Regent KL?????? Bye bye????

guy4versa
December 12th, 2011, 04:47 PM
how about build 600m++ tower beside klcc?how it will look? i think it will look super amazing

realitybites-u
December 12th, 2011, 04:52 PM
how about build 600m++ tower beside klcc?how it will look? i think it will look super amazing

not gonna happen.

sepul
December 12th, 2011, 05:08 PM
2nd that.. not gonna happen EVER

azey
December 13th, 2011, 06:22 AM
maybe 15 years later....who knows??
and by tat time kl is world class with matrade and warisan towerdominate the skyline

realitybites-u
December 13th, 2011, 10:44 AM
maybe 15 years later....who knows??
and by tat time kl is world class with matrade and warisan towerdominate the skyline

maybe in the future but not now. and only petronas probably allowed to build tower that is higher than other building in klcc district.

patchay
December 13th, 2011, 11:00 AM
how about build 600m++ tower beside klcc?how it will look? i think it will look super amazing

Petronas will gunned you down. Haha just j/k.

guy4versa
December 13th, 2011, 06:56 PM
Petronas will gunned you down. Haha just j/k.

yeah..i mean look at shanghai,first they build jinmao,then they just finish swfc a year ago..now the built another one beside it (shanghai tower)..it was sooo crazy:nuts:and they still reserve another empty site beside it..maybe 1000m tower in the future?haha

patchay
December 13th, 2011, 07:44 PM
Call up for status of this project:

Venus Assets Sdn Bhd
Developer of Four Seasons KL

5th Flr, Wisma Concorde Penthouse
Jalan Sultan Ismail
03-2026-5085 or 03-2026 5086

tanpadia
December 14th, 2011, 05:22 PM
tgh carik investor kot....

Brannix
December 17th, 2011, 04:07 PM
brennix said it going to be a new look,but he still prefer the old one...if this project revive and the keep the height...i swear...it will change kl skyline
yeah i prefer the old design but they scrapped it :bash:

1, 2

http://www.upislam.com/images/27734942159598011350.jpg http://www.upislam.com/images/04075584119816297224.jpg

3 ???
the third one, if i recall correctly, looks more square.. that's why i dont like.. they change design like celeb change boyfriend.. who knows they come out with something new again :lol:


Call up for status of this project:

Venus Assets Sdn Bhd
Developer of Four Seasons KL

5th Flr, Wisma Concorde Penthouse
Jalan Sultan Ismail
03-2026-5085 or 03-2026 5086

they only got 3 staff there, if u want to know more about the project, talk to the md which previously from capitaland. but i am not sure how much is he willing to reveal.

Brannix
December 17th, 2011, 04:11 PM
oh by the way, one of the director conferred with datukship during Sultan's birthday last week.

patchay
December 17th, 2011, 04:18 PM
yeah i prefer the old design but they scrapped it :bash:

the third one, if i recall correctly, looks more square.. that's why i dont like.. they change design like celeb change boyfriend.. who knows they come out with something new again :lol:

they only got 3 staff there, if u want to know more about the project, talk to the md which previously from capitaland. but i am not sure how much is he willing to reveal.


so when they are gonna start?? I hope they can retain the height...

Brannix
December 17th, 2011, 05:04 PM
so when they are gonna start?? I hope they can retain the height...

unfortunately height reduced

start date.. i lost interest to check.. they change anytime.. but we both know nothing gonna be there H1 2012

guy4versa
December 17th, 2011, 05:05 PM
unfortunately height reduced

start date.. i lost interest to check.. they can anytime.. but we both know nothing gonna be there H1 2012

40 storey?

sepul
December 17th, 2011, 05:14 PM
oh man.. my worst nightmare.. it was 320m before right? now 40+? 50+? Brannix please >.<

this one is off my radar now.. next is Lot K.. hopefully won't disappoint

guy4versa
December 17th, 2011, 05:33 PM
that sad...what ever building next to PTT should be nicely design,because it will appear in most tourist photo and also television,they should think again,atleast 60storey is ok

http://img849.imageshack.us/img849/9752/27734942159598011350.jpg:(:(:(

patchay
December 17th, 2011, 05:34 PM
pls increase the height... we don't mind if they cant see demand, so dont launch now, dont start now.. start later but retain height... pls! LOL

Brannix
December 17th, 2011, 05:40 PM
pls increase the height... we don't mind if they cant see demand, so dont launch now, dont start now.. start later but retain height... pls! LOL

ohhh i agree!

dont do something half cook

guy4versa
December 17th, 2011, 05:41 PM
menyeluk pekasam biar sampai ke pangkal lengan...:)

PlanetNova
December 18th, 2011, 05:22 AM
what a joke if it is not 300m tall!

yeehs18
December 18th, 2011, 06:31 AM
Building anything lower than 60 floor is really a waste of the prime location and land. Not to mention the prestige of the area. Really stupid.

Normally we only see people upgrade design and building. This one is actually downgrade. Malu la.

Brannix could you tell the md and developer to grow some brain? They built it better will allow them to factor in future growth. Once they built with the downgrade design then it is gone. Bodoh.

patchay
December 18th, 2011, 07:02 AM
The MD is from Capitaland?? I hope he knows wat is iconic tall tower in a prestigious heart of downtown area.

XNeo
December 18th, 2011, 12:00 PM
if 40 storey better built 4 seasons at KL sentral or damansara,


building next to PTT shud 60 ++ storey. so KL /KLCC skyline will looks balance . now it is imbalanced..
petronas is too gigantic....need more supertall buildings so KL skyline deserved 10/10...

http://img15.imageshack.us/img15/2319/546222452010ec842dcab.jpg

guy4versa
December 18th, 2011, 12:14 PM
maybe they want to keep PTT "exclusive",anything around it must be half tall and simple..huhuhu..

XNeo
December 18th, 2011, 12:22 PM
maybe they want to keep PTT "exclusive",anything around it must be half tall and simple..huhuhu..

at least 60-70 storey ok what.PTT still looks splendor n grandeur n KL skyline will be amazing.

'they' should see Spore skyline and learn.

guy4versa
December 18th, 2011, 12:32 PM
at least 60-70 storey ok what.PTT still looks splendor n grandeur n KL skyline will be amazing.

'they' should see Spore skyline and learn.

agree 100%,every single building built in marina bay is masterpiece,the sail,bay sand,financial centre,oub plaza,oversea union bank,ocean..

James Foong
December 18th, 2011, 04:40 PM
only petronas probably allowed to build tower that is higher than other building in klcc district.

Four seasons is not in the klcc district. its on a private land and they can build a taller tower. but somehow after Petronas pull out from the project, some idiots in dbkl made a quick call to imposed height restriction around the twins...perhaps some external forces influence the decision? thats made OBS pissed off. luckily, he bought the land so cheap at one Quarter of whats the Sunrise n dijaya paid per sqfoot nearby. So if he want to take it off in fashion, he still can hold it off to another boom cycle.

rizalhakim
December 19th, 2011, 03:37 AM
after looking at the Dijaya & Sunrise projects...im sure 4Seasons developer will surpise us with another cool project hehe....dey surely want something better than the other 2 projects.....

azey
December 19th, 2011, 10:54 AM
whose that idiots???damnnnn

patchay
December 19th, 2011, 05:48 PM
Four seasons is not in the klcc district. its on a private land and they can build a taller tower. but somehow after Petronas pull out from the project, some idiots in dbkl made a quick call to imposed height restriction around the twins...perhaps some external forces influence the decision? thats made OBS pissed off. luckily, he bought the land so cheap at one Quarter of whats the Sunrise n dijaya paid per sqfoot nearby. So if he want to take it off in fashion, he still can hold it off to another boom cycle.

Yes we know that on paper Four Seasons is not part of KLCC, since it is not developed by KLCC Holdings anyway.

But to us, Four Seasons will form the immediate skyline of KLCC, the area that truly represents the face of KL.

We hope that despite Lot 185/167K has been approved, the Four Seasons should not stand inferior of those towers there. It must be given a chance to shine and I hope the retail podium would be seemlessly "integrated" or otherwise somekind of "connected" element must be there.

James Foong
December 20th, 2011, 11:16 AM
Understood, Patchay.

Problem is we r not in the board of approving the project.

If i m the mayor, i have a condition for them. Get Zaha Hadid to design!

Brannix
December 20th, 2011, 12:22 PM
Understood, Patchay.

Problem is we r not in the board of approving the project.

If i m the mayor, i have a condition for them. Get Zaha Hadid to design!

:yes: :yes: :yes: :yes: :yes:

sepul
December 20th, 2011, 12:26 PM
I like Zaha Hadid a lot too lol

patchay
December 20th, 2011, 03:38 PM
Understood, Patchay.

Problem is we r not in the board of approving the project.

If i m the mayor, i have a condition for them. Get Zaha Hadid to design!

Wow then we really need to elect you there. LOL :lol:

guy4versa
December 20th, 2011, 04:23 PM
for culture centre@ low rise architecture i will choose zaha hadid,but highrise i will go for SOM and ceaser pelli

rizalhakim
December 20th, 2011, 04:55 PM
ill choose Atkins.....and SOM.....Zaha Hadid most of their projects x aprv....mostly proposal....

haikalcool2u
December 20th, 2011, 05:39 PM
fosters n partners? kenneth yeang? hijjas kasturi?

tanpadia
December 20th, 2011, 06:02 PM
.. renzo piano .

Brannix
December 20th, 2011, 08:37 PM
fosters n partners? kenneth yeang? hijjas kasturi?

they are in PJ Sentral Garden City

wan11
December 21st, 2011, 01:54 AM
For skyscrapers, Ceaser Peili, Foster and Partners or Hijjas Kasturi will be good. Zaha Hadid is overrated.

dengilo
December 21st, 2011, 02:12 AM
Hijas is caught in a time capsule not seen anything special from him in the last few years!

razpatrol99
December 21st, 2011, 01:34 PM
if they can maintain the old design im more than happy...

rizalhakim
December 21st, 2011, 01:52 PM
^^im with u...

nazrey
April 4th, 2012, 08:13 PM
BREAKING NEWS!!!
Four Seasons Place KL to open in 2015
By Vasantha Ganesan Published: 2012/04/05
http://www.btimes.com.my/Current_News/BTIMES/articles/i4season-2/Article/

http://www.btimes.com.my/articles/i4season-2/pix_topright

NO RUSH: Back to drawing board to ensure a world-class end-product, source says

THE Four Seasons Place in Kuala Lumpur will open in 2015, sources say.

News of a Four Seasons being developed in the capital by two tycoons and a sultan first surfaced in 2005. In 2007, some work even began on the site, but the project has yet to see the light of day.

A source told Business Times that some developments can be anticipated within the next three months with completion expected to be three years thereafter.

The Four Seasons Place is being built by Venus Assets Sdn Bhd, a firm controlled by Ipoh-born tycoon Ong Beng Seng, Tan Sri Syed Yusof Syed Nasir and the Sultan of Selangor.

The delay was attributed to the failure of a proposed deal between Venus Assets and national oil corporation Petronas to go through and the project going back to the drawing board.

"The developer is working to ensure this product is worthy of Malaysia's image as an international tourist destination and is in line with the country's target to be a developed nation," the source said.

"The project is not being rushed, so that the end result will be a first-class product," he said.

Since the plans have gone back to the drawing board, talk is that there may even be a possibility of the Four Seasons reverting to the original plans which included two towers.

In a 2009 interview with Business Times, Syed Yusof said the building will be a single 65-storey tower. It was to include 150,000 sq ft of retail component, 150 hotel rooms and 100 serviced apartments. Another 140 serviced apartments would be for sale.

Venus Assets bought the prime 1.05ha site for RM90 million in 2003 from the estate of the late Khoo Teck Puat, the former major shareholder of Standard Chartered plc.

It was reported then that cost of construction for all the components, including land and interior design, was RM1.4 billion and the estimated gross development value (GDV) of the project was RM2.5 billion.

Should the new project have two towers, it would be safe to assume that the GDV could be well above the initial estimation of RM2.5 billion.

azey
April 4th, 2012, 08:28 PM
I.AM.SO.HAPPY

UjaiDidida
April 4th, 2012, 09:09 PM
great. but single tower of 4 seasons look like a single tower of PTT. hope they build it twin

sepul
April 4th, 2012, 10:09 PM
OMG I didn't expect this when I clicked on the thread!!!!! I'm so surprised!!


but this tower will be hidden behind Lot K right? so pity lah..

archilover
April 5th, 2012, 02:31 AM
What a great news!one of the best news that i get this year.is it still get supertall title??

XNeo
April 5th, 2012, 02:56 AM
unconvincing news...2015? anything can happen :)

until there is some activities at the site then only i can celebrate :banana:

patchay
April 5th, 2012, 03:01 AM
Four Seasons Place Kuala Lumpur to start in 3 months time.

aiman!
April 5th, 2012, 03:05 AM
yes,another high-end mall !!!

XNeo
April 5th, 2012, 03:08 AM
Four Seasons Place Kuala Lumpur to start in 3 months time.

source pls

davidwsk
April 5th, 2012, 03:56 AM
Wow...good news..super dense...

Le NOuvel, Four Seasons, Lot K, Aurora, W Hotel, Lot D1.. Ritz Carlton...Boom !

Anyone can put those towers in 1 picture?

UjaiDidida
April 5th, 2012, 04:33 AM
Anyone can put those towers in 1 picture?

too bad our illustrator Guy4versa has been banned :lol:

newmalayan
April 5th, 2012, 04:51 AM
"The developer is working to ensure this product is worthy of Malaysia's image as an international tourist destination and is in line with the country's target to be a developed nation," the source said.


building a hotel tower next to twin tower would make a nation 'developed'?
:D


:jk:

THT-United
April 5th, 2012, 05:21 AM
Wow, that's good news!

This will mean a massive cluster of super tall towers all close to each other, but too bad Four Seasons guests will not have a view of the famous KLCC Park, since it'll be blocked by Lot K's tower! :(

triple-j
April 5th, 2012, 07:36 AM
too bad our illustrator Guy4versa has been banned :lol:

^^:lol: YEAH! If only he could shut his mouth and keep on illustrating...

Here we have constrcution photographers, development insiders, news-agents ...and readers/observers <<*I'm one of them, guilty as charged:)*

rizalhakim
April 5th, 2012, 07:49 AM
dont xpect too muchlah.....

nazrey
April 5th, 2012, 11:08 AM
Interesting fact that Binaan Menara Telekom (310m) start in 1998 during economic crisis dan siap pada tahun 2001 (PUTRA LRT bermula operate) ...ia makan masa 3 tahun..that means this new 2nd tallest building of Malaysia (320m) can do it if everything is going like clockwork..

Again... Some interesting prediction projects in Greater KL!!
- [2012] MyKomuter, Hangtuah interchange station, New 4-carriage trains KL Monorail, Empire Damansara, The Paradigm, Glomac Damansara
- [2013] Nu Sentral, Promenade @ 8, D'Pulze Cyberjaya, KLIA2, ERL extension
- [2014] Damansara City, Maju Linq, Empire City, MATRADE Centre, LRT extension
- [2015] Four Seasons Place (as media report)
- [2016-2017] MRT, KL Sentral Masterplan
- [2018] River of Life

HAVE FUN!!! :cheers:

Bruno Mars
April 5th, 2012, 11:16 AM
Great news!

razpatrol99
April 5th, 2012, 11:51 AM
Soo many false alarms on this one.... unless there is a crane at site then im not buying anything..

sepul
April 5th, 2012, 11:58 AM
if reverted to earlier design then no longer a supertall rite?

PlanetNova
April 6th, 2012, 05:39 PM
if reverted to earlier design then no longer a supertall rite?

that would be a waste then.

archilover
April 6th, 2012, 05:45 PM
My sweetdream became a nightmare then:(hopefull they stick with the supertall option or else at least twins 250m++ :)

bananapotato
April 6th, 2012, 06:00 PM
i hope they will stick with that height..but new design..people on international forum said we copied Costanera Center

patchay
April 6th, 2012, 08:43 PM
Four Seasons and Lot 185/K will start together... ???

I wonder what Wisma Central owners will say? :lol: :lol: (Despite the many difficulties, Petronas not interested to buy over?)

LeeighIam
April 7th, 2012, 12:39 AM
I'll believe it when I see it...typical, all the hooplah and days n months go by...zilch!

dengilo
April 7th, 2012, 01:31 AM
Four Seasons and Lot 185/K will start together... ???

I wonder what Wisma Central owners will say? :lol: :lol: (Despite the many difficulties, Petronas not interested to buy over?)

Not just Wisma Central how about the few lots next to it towards the temple?:)I sure like to see the cooling plant go underground if possible!

nazrey
April 9th, 2012, 03:55 PM
OMG I didn't expect this when I clicked on the thread!!!!! I'm so surprised!!


but this tower will be hidden behind Lot K right? so pity lah..
From this view...I think it won't hidden lah
http://farm8.staticflickr.com/7071/7060609259_4e12bbaebb_b.jpg (http://www.flickr.com/photos/ahmadsyarafi/7060609259/)
Kuala Lumpur City Centre (http://www.flickr.com/photos/ahmadsyarafi/7060609259/) by ahmadsyarafi (http://www.flickr.com/people/ahmadsyarafi/), on Flickr

rizalhakim
April 10th, 2012, 05:13 AM
i hope da architect can think sumtin out of da box...simple but difnt like dis
Four Seasons Dubai Hotel & Residences
http://www.dubaifestivalcity.com/cntn.aspx?id=37

http://arquitectonica.com/wp-content/blogs.dir/1/files_mf/2.00.498.27.2pil.jpg

azey
April 10th, 2012, 11:41 AM
tht building looks like a joke,funny looking

nazrey
April 10th, 2012, 11:45 AM
I think lokasi condition kt sini tak hebat kalau design ia macam sebegitu coz there's another location yg dah design extraordinary like this ;)

http://i1098.photobucket.com/albums/g371/Afiq_Nadzir/aurora.jpg

http://static.worldarchitecturenews.com/news_images/18001_4_Angkasa4.jpg

http://static.worldarchitecturenews.com/news_images/18001_3_Angkasa3.jpg

PlanetNova
April 10th, 2012, 05:00 PM
great! cant wait for those to complete.

davidwsk
April 12th, 2012, 04:48 PM
http://farm8.staticflickr.com/7241/7025662613_9c58c37dd5_b.jpg

davidwsk
April 12th, 2012, 04:48 PM
http://farm7.staticflickr.com/6095/7025662187_1863825edf_b.jpg