Aquarius October 16th, 2005, 09:23 PM http://www.teafortwo.net/img/logos/logo_apb.jpg
Two years ago
http://img.photobucket.com/albums/v484/aquariusbcn/Infraestructura/popup_port_5.jpg
Works of expansion
http://img.photobucket.com/albums/v484/aquariusbcn/Infraestructura/expansion.jpg
The port today, you can to see the inflammable wharf finished
http://www.apb.es/wps/wcm/connect/b61bca0049296f1d8ecfbe73eb65d2bd/dades.tec01.jpg?MOD=AJPERES
Aquarius October 16th, 2005, 09:23 PM The Expansion Works
The Port of Barcelona is guaranteeing its future with expansion work which will enable it to maintain its traffic growth
http://img.photobucket.com/albums/v484/aquariusbcn/Infraestructura/expansion2.jpg
South Breakwater Sections 1 & 2
Budget estimate: 194.05 million euros
Duration: 69 months (completion forecast for 2008)
Description: Section 1 (2,000 metres): Mound breakwater with a main mantle formed out of parallelopedic blocks of concrete of up to 60 metric tonnes. Section 2 (1,700m): Vertical breakwater with 47 prefabricated concrete box blocks.
http://www.apb.es/wps/wcm/connect/3e9e688049296f268efbbe73eb65d2bd/02-trams1_2-01.jpg?MOD=AJPERES
South Breakwater Section 3
Budget estimate: 109.99 million euros
Duration: 82 months (completion forecast for 2008)
Description: 1,100 metre long mound breakwater. The main mantle is formed out of 40 metric tonne parallelopedic blocks of concrete in the base. The mound is finished with 2 prefabricated reinforced concrete box blocks
http://www.apb.es/wps/wcm/connect/f766a68049296f2a8f0abf73eb65d2bd/03-trams3-01.jpg?MOD=AJPERES
East Breakwater
Budget estimate: 197,28 million euros
Duration: 82 months (completion forecast for 2008)
Description: 2.000 metre long mound breakwater. The main mantle is formed out of 50 metric tonne parallelopedic blocks of concrete in the base and 80 tonne blocks in the mound. The breakwater and graded aggregate loader is located in the Port of Vallarca.
http://www.apb.es/wps/wcm/connect/f6ce100049296f2a8f0bbf73eb65d2bd/03-trams3-02.jpg?MOD=AJPERES
Corrective measures on the coast
Budget estimate: 21 million euros (in various phases)
Duration: 6+12+9+3 months (completion forecast for 2005)
Description: Creation of the beach located to the south of the new estuary of the river Llobregat. The measures also include the construction of side support jetties and the preparation of the new areas
http://www.apb.es/wps/wcm/connect/9c7b820049296f1f8ed6be73eb65d2bd/04-est-01.jpg?MOD=AJPERES
Aquarius October 16th, 2005, 09:45 PM PORT VELL
In 1988, the Port of Barcelona plans its definitive opening-up to the sea. It will be carried out in the Port Vell (Old Port).
http://www.apb.es/wps/wcm/connect/154b488049297256993db973eb65d2bd/03.portvell.01.jpg?MOD=AJPERES
The Port Vell, which was turned into an obsolete port area for the traditional uses, is turned in 1995 into a space of 55.6 hectares unique in Europe, a port integrated into the heart of Barcelona.
The Port Vell represents an unique attraction for the city, the citizens and the enterprises. Every year is visited by more than 16 million and the success of any event held in this place is guaranteed
Moll de Bosch i Alsina (Bosch i Alsina wharf)
It is one of the largest spaces of the Port Vell. It’s an ideal place for acts of great magnitude, with great infrastructures and capacity for a large number of people.
http://www.apb.es/wps/wcm/connect/eaaebf0049297258994cb973eb65d2bd/01.portvell.01.jpg?MOD=AJPERES
Rambla de Mar
It’s the most emblematic image of the Port Vell. The architecture and the urban furniture turn this Rambla into a singular walk by the sea. It is the natural continuation of the Rambles de Barcelona. Tourists, citizens of Barcelona, and the companies that film movies or advertisements, all of them benefit from this space.
http://www.apb.es/wps/wcm/connect/eedadc8049297258994db973eb65d2bd/01.portvell.02.jpg?MOD=AJPERES
Moll d’Espanya
It is at the heart of the Port Vell. This area has very diverse spaces: the Plaça de l’Odissea, the Plaça d’Itaca and the Mirador del Port Vell. These spaces are ideal for product launchs, shows or spectacular parades over the sea. Among other things there have been temporal activities as the Mostra de Vins i Caves de Catalunya (Wine and cava exhibition), the presentation of the Circuit de Montmeló Catalunya, the Port Vell artists, the Port de Nassos, the Squash National Trophy… It has many cultural and leisure posibilities as the Maremagnum, the Imax Port Vell and the Aquarium. The car park offers almost a thousand of parking spaces.
http://www.apb.es/wps/wcm/connect/f1d5cd00492972589950b973eb65d2bd/01.portvell.05.jpg?MOD=AJPERES
L’Aquàrium de Barcelona
It is the biggest aquarium in Europe on the subject matter of the Mediterranean
Maremagnum
Ludic and commercial centre that offers restaurants, shops, multiscreen cinemas and bars.
Imax Port Vell
A spectacular cinema. The first cinema in the world which has integrated and developed the technology for the adaptation of the three systems in the same cinema: Imax, Omnimax y 3Dimension
Museu Marítim de Barcelona
Located in the historical building of the Drassanes Reials of Barcelona, it is the best preserved civilian Gothic construction in the world
Museu d’Història de Catalunya
Located in a typical building of the port architecture of the 19th century, it is an old warehouse today turned into a modern museum which offers a journey through our country in an interactive experience through the time
Reial Club Nàutic de Barcelona
This is a private and centenarian club. It’s located in the Moll d’Espanya and organizes many internationally famous activities: the Regata Conde de Godó and the Regata Ermenegildo Zegna are two examples.
Moll de Barcelona
It’s the headquarters of the World Trade Center of Barcelona. It houses economic activities of business centre, maritime terminals, a luxury hotel and product launchs. It has been the last to be inaugurated and it’s ideal for actions which require to capture the attention of the public as well as for demanding companies. Audi has been one of the best examples lately. It has a car park for 750 vehicles.
http://www.apb.es/wps/wcm/connect/f306fa00492972589951b973eb65d2bd/01.portvell.06.jpg?MOD=AJPERES
World Trade Center: Located in the Moll de Barcelona, it is the last installation added to the Port Vell since the inauguration of the Grand Marina Hotel – a five stars luxury hotel-. The WTCB has a wide range of services which make this complex a big space equipped with great services and infrastructures.
Aquarius October 16th, 2005, 10:12 PM Goods
The Port of Barcelona has at its disposal specialized terminals for all kinds of products, as well as polyvalent terminals which meet different kinds of goods.
Containers and Multipurpose
http://www.apb.es/rsc/images/contents/Mercaderies.es.PORT.Mercancias/Mercaderies.es.PORT.Mercancias-3.jpg
1.- Terminal de Contenidors de Barcelona, SL
http://www.apb.es/wps/wcm/connect/af64af80492971c89732bf73eb65d2bd/01-tcb.jpg?MOD=AJPERES
Characteristics
Area: 46 ha
Line metres: 1,362 m
Draught: up to 16 m
Container cranes: 9 (5 Superpost-panamax)
Straddle-carriers: 30 (3 heights) and 25 (4 heights)
Railway terminal: 5 ha
Maritime Customs and Frontier Check Point PIF: integrated in the terminal
Refrigerated connections: 350
Container freight station: 13,800 m2
Covered warehouses: 14,400 m2
2.- Terminal Catalunya, SA
http://www.apb.es/wps/wcm/connect/b095dc80492971c89733bf73eb65d2bd/02-tercat.jpg?MOD=AJPERES
Characteristics
Area: 35.1 ha
Line metres: 1,653 m
Draught: 8.70 / 14 m
Ro-Ro ramps: 1
Cranes: 8 (7 Post-panamax)
Equipment: RTG: 8; Reach Stacker: 21; tractors: 24
Container freight station: 3,607 m2
Covered warehouses: 26,145 m2
3.-Terminal Port Nou, SA
http://www.apb.es/wps/wcm/connect/b55a9080492971c89735bf73eb65d2bd/04-portnou.jpg?MOD=AJPERES
Characteristics
Area: 6.56 ha
Line metres: 860 m
Draught: 12 m
Ro-Ro ramps: 5
Cranes: 10 (1 container crane, 9 gantry cranes)
Equipment: RTG: 2; Reach Stacker: 5; tractors: 4
Covered warehouses: 19,000 m2
4.- Unió Terminals Estibadors Llevant, SL
http://www.apb.es/wps/wcm/connect/b1c70980492971c89734bf73eb65d2bd/03-estibadora.jpg?MOD=AJPERES
Characteristics
Area: 9.77 ha
Line metres: 450 m
Draught: 16 m
Cranes: 3
Equipment: Straddle-carrier: 4; Reach Stacker: 4;; tractors: 5
Cars
1.-Autoterminal, SA
http://www.apb.es/wps/wcm/connect/c8686300492971be9705bf73eb65d2bd/01-autoterminal.jpg?MOD=AJPERES
Characteristics
Area total: 770.000 m2 (310.000 m2 covered)
Line metres: 1,210 m
Draught: up to 12 m
4 train terminals
4 ro-ro ramp
Capacity: 42,000 vehicles (18,000 covered).
Car parks: Three vertical car parks and one under construction with a capacity of 2.700
Mark up services: repair shop, PDI and accesories assembly, protection and paraffin wax removing tunnel, transport coordination, sending vehicles to local stores personalization centre.
2.-Setram, SA
http://www.apb.es/wps/wcm/connect/c9999000492971be9706bf73eb65d2bd/02-setram.jpg?MOD=AJPERES
Characteristics
Area: 150.000 m2 (60.000 m2 covered)
Line metres: 1,210 m
Draught: up to 12 m
Capacity: 10,000 vehicles (6,000 uncovered and 4,000 covered spaces)
Vertical car park: 24.000 m2 plant 4 floors
Road transport: 350 trucks car carrier
Mark up services: storage, painting and plate repair shop, assembly and limited series, washing, waxing, preparing and personal PDI, rent-a-car management, external storage zones, motor shows
Liquid bulk
http://www.apb.es/wps/wcm/connect/20f52b80492971d29747bf73eb65d2bd/07-clh.jpg?MOD=AJPERES
http://www.apb.es/wps/wcm/connect/133fa600492971d29741bf73eb65d2bd/01-enagas.jpg?MOD=AJPERES
Solid bulk
http://www.apb.es/wps/wcm/connect/e323678049b980a69259bbbb98b7056d/04-cargill.jpg?MOD=AJPERES
http://www.apb.es/wps/wcm/connect/cab34d0049b980a69258bbbb98b7056d/03-ergransa.jpg?MOD=AJPERES
Nemo October 19th, 2005, 02:04 PM WOW! Those are huge developments. Thanks for the fine updates... :cheers:
Aquarius October 23rd, 2005, 02:54 PM FERRIES & CRUISES
http://img.photobucket.com/albums/v484/aquariusbcn/Infraestructura/crucerobcn.jpghttp://img.photobucket.com/albums/v484/aquariusbcn/Infraestructura/ferriesbcn.jpg
Cruisers
Barcelona is one of the world's most cosmopolitan cities. Its port is the gateway for over a million cruise passengers every year.The port leader in Europe
The Port of Barcelona has a total of 7 terminals exclusively for use by cruise traffic. Since January 2000, the terminal operator Creuers del Port de Barcelona, S.A. has provided a service to these terminals in co-operation with various departments of the Port of Barcelona involved in the cruise sector.
Terminal plus B+D
http://www.portic.net/creuers/mapas_terminales/plano_general.gif
Terminal A, moll Adossat
It is the first terminal to be built for cruise traffic in the Port of Barcelona. It is considered the second terminal in terms of capacity and operations, as its size allows up to 3,000 passengers to embark and disembark from ships
http://www.apb.es/wps/wcm/connect/01520900492971ba96e7be73eb65d2bd/01-T.A.03.jpg?MOD=AJPERES
Terminal B, moll Adossat
As a response to the increase in passenger traffic, Creuers del Port de Barcelona, SA, the contractor at the terminal, has finished building a new maritime station designed to work with the world's largest ships, of 140,000 tonnes and 3,600 passengers.
The old terminal (3,000 m2) has been made into one measuring almost 7,000 m2, including the latest security, comfort, operations and image systems, and it is equipped with 2 fingers and 4 luggage conveyor belts.
http://www.apb.es/wps/wcm/connect/01520900492971ba96e8be73eb65d2bd/02-T.B.jpg?MOD=AJPERES
Terminal C, moll Adossat
http://www.apb.es/wps/wcm/connect/02833600492971ba96e9be73eb65d2bd/03-T.C.jpg?MOD=AJPERES
Terminal D, moll Adossat
http://www.apb.es/wps/wcm/connect/03b46300492971ba96eabe73eb65d2bd/04-T.D.jpg?MOD=AJPERES
North and South Terminals, moll Barcelona
These terminals are on the Moll de Barcelona quay, and are part of the World Trade Center, a business centre equipped with all types of services. Their proximity to the city centre enables tourists to walk to the Plaça Colom in just 5 minutes.
As well as the two terminals, which can deal with 2 medium-sized ships each, there is an additional mooring space on the eastern side of the quay that can be used by either the Nord or Sud terminal for their embarking and disembarking procedures
http://www.apb.es/wps/wcm/connect/057e2680492971ba96ecbe73eb65d2bd/06-T.Sud.jpg?MOD=AJPERES
Terminal Port Vell
It is situated in the Maremàgnum complex. It is the smallest terminal and provides a service to ships with smaller capacities and lengths.
Because of the new trend towards building increasingly large ships, this terminal has not been used a great deal in recent years.
http://www.apb.es/wps/wcm/connect/0616bd00492971ba96edbe73eb65d2bd/07-T.PortVell.jpg?MOD=AJPERES
Terminal Sant Bertran
Located on the Moll de Sant Bertran quay, this terminal is basically equipped for ferry reception, and is sometimes used as a terminal for cruise ship passengers. It has all the necessary safety measures and it is equipped with all services.
http://www.apb.es/wps/wcm/connect/0747ea00492971ba96eebe73eb65d2bd/08-T.SantBertra.jpg?MOD=AJPERES
Ferries
The Port of Barcelona has direct connections with Genoa, Rome, Algiers-Oran, Majorca, Ibiza and Minorca.
http://www.simplonpc.co.uk/Balearia/Ramon_Llull_igb-20020407-01.jpghttp://www.atan.org/costas/fast/mileniumdos.jpg
endeve October 23rd, 2005, 03:12 PM wow! great thread ;)
Brice October 25th, 2005, 04:07 AM Which port is the 1st in Spain and in the mediterranean sea?
Saskaton November 9th, 2005, 10:22 PM barcelona or valencia in this last years
SGoico November 13th, 2005, 02:36 PM SUPERB report! Thanks for that Aquarius
-Corey- November 15th, 2005, 04:18 AM wow is too big
ollagrabovi November 15th, 2005, 04:45 AM Excellent report indeed!
Bitxofo November 25th, 2005, 04:16 AM Which port is the 1st in Spain and in the mediterranean sea?
Algeciras is the 1st port in Spain. Then Barcelona & Valencia.
;)
@Aquarius:
Wonderful thread!!
:okay:
Mr Sagrera November 30th, 2005, 12:07 PM One of the best threads I have ever seen, plenty of inetersting details. Thanks.
Well done Aquarius. :applause:
Arpels November 30th, 2005, 12:27 PM excellent job :okay: containers area is big!!
Bitxofo December 28th, 2005, 02:47 AM Record in 2005:
More than 1,200,000 cruise passengers and still increasing!!
1st port of Europe for cruisers.
:happy:
mopc December 28th, 2005, 08:51 PM Fantàstic!
DonQui December 29th, 2005, 07:43 AM IMPRESSIVE!
:eek:
Fabio January 5th, 2006, 02:47 PM :applause:
this is really awesome
belencita January 18th, 2006, 05:10 PM Very good!
:okay:
Kaiser February 3rd, 2006, 03:05 PM awesome, really beautiful
FJP February 7th, 2006, 07:44 PM Great job aquarius!
Harkeb February 10th, 2006, 04:51 AM Beautiful and great happenings there!
pacman_1905 February 24th, 2006, 10:52 AM I have been to Barcelona a few times and each time I go there I always find that something has changed, like most of Spain, there is a lot of construction going on. Its a progressive city and its because of this it attracts a lot of tourism. The port expansion along with the Airport expansion will mean the Barcelona will be very well serviced, attracting a lot of investment and jobs...
Excellent Photos.
mic of Orion February 26th, 2006, 05:58 PM cool, :okay: very nice :cheers:
Aquarius April 20th, 2006, 12:29 PM More cruises in Barcelona
Mickey's European cruise
Lake Buena Vista, Florida (AP) -- Mickey Mouse is going on a European vacation in the summer of 2007. Company officials announced Tuesday that Disney Cruise Line will sail to Italy, France and Spain from May to August 2007 as part of a larger strategy to "chart new waters."
The Disney Magic will offer eight alternating 10-night and 11-night Mediterranean cruises, departing from Barcelona, Spain, and stopping in eight European cities.
Company President Tom McAlpin says traveling through Europe can be daunting, especially with small children. He says a Disney cruise takes the guesswork out of what cities to hit, where to eat and what shows to see.
But analysts say the European expansion will have little affect on the cruise industry overall. Carnival and Royal Caribbean Cruises already operate in Europe with cruise lines that cater specifically to European vacationers.
http://www.tampabays10.com/news/news.aspx?storyid=27596
Disney Magic Cruises From Spain Next Year
Disney Cruise Line announced Tuesday that it will offer cruises in Europe in the summer of 2007 on the Disney Magic, which normally is based at Port Canaveral.
The ship will offer cruises from Barcelona, Spain, with stops in Italy and France, home to Disneyland Resort Paris, which is partially owned by The Walt Disney Co., according to Local 6 News partner Florida Today.
In May 2007, the Disney Magic will sail a 14-day trans-Atlantic cruise from Port Canaveral to Barcelona. The Magic then will sail alternating 10- and 11-night cruises to eight ports of call in Italy and France. It will return in August 2007 to Port Canaveral with another trans-Atlantic cruise departing from Barcelona.
http://www.local6.com/news/8165990/detail.html
Bitxofo April 21st, 2006, 02:16 AM ^^Great news!
:okay:
1st port of Mediterranean in cruises.
:happy:
Aquarius May 22nd, 2006, 09:24 PM Voyager of the Seas to Make European Debut
In May 2006, the ship that revolutionized cruising will depart Miami for Barcelona, Spain, marking the 3,114-guest Voyager of the Seas' European debut. From May 27 to July 8, 2006, and again Sept. 9 through Nov. 11, 2006, Voyager of the Seas will offer seven-night Mediterranean sailings roundtrip from Barcelona, calling on Marseille and Villefranche (Nice), France, and Livorno (Florence/Pisa), Civitavecchia (Rome) and Naples, Italy.
Voyager of the Seas also will sail seven-night Mediterranean-Malta sailings July 15 through Sept. 2, 2006, making stops in Villefranche (Nice); Civitavecchia (Rome); Palermo (Sicily), Italy; Valletta, Malta; and Palma De Mallorca, Spain. In addition, guests on either itinerary have the option of extending their vacation with one of two cruisetour packages - a three-night tour to Madrid and Barcelona or a five-night tour to Seville, Madrid and Barcelona.
Voyager of the Seas remains one of the most innovative ships at sea. Introduced in 1999, Voyager was the first cruise ship to feature a rock-climbing wall, an ice-skating rink, an in-line skating track and the Royal Promenade, a horizontal atrium featuring shopping, dining and entertainment venues. Voyager of the Seas offers guests six restaurants and more than a dozen lounges and bars from which to choose, as well as a state-of-the-art theater, the Las Vegas-style Casino Royale, and the outstanding Adventure Ocean youth program.
http://www.royalcaribbean.com/ourCompany/pressCenter/pressReleases/info.do?prDate=07-25-2005&prCode=A
Aquarius January 19th, 2007, 01:20 PM More pics...
General views..
http://www.apb.es/APB/WEBROOT/en/SERVICES/Pictures_Gallery/files/01-Vista.general01.jpg
Adossat Wharf
http://www.apb.es/APB/WEBROOT/en/SERVICES/Pictures_Gallery/files/03-Adossat02.jpg
http://www.apb.es/APB/WEBROOT/en/SERVICES/Pictures_Gallery/files/04-Adossat02.jpg
North Entrance Mouth
http://www.apb.es/APB/WEBROOT/en/SERVICES/Pictures_Gallery/files/05-Bocana03.jpg
Dry Dock and Pescadors Wharf
http://www.apb.es/APB/WEBROOT/en/SERVICES/Pictures_Gallery/files/06-Dics.pescadors02.jpg
South warf..
http://www.apb.es/APB/WEBROOT/en/SERVICES/Pictures_Gallery/files/14-Sud02.jpg
http://www.apb.es/APB/WEBROOT/en/SERVICES/Pictures_Gallery/files/15-Sud02.jpg
Príncep d’Espanya wharf
http://www.apb.es/APB/WEBROOT/en/SERVICES/Pictures_Gallery/files/18-Princep02.jpg
South Basin
http://www.apb.es/APB/WEBROOT/en/SERVICES/Pictures_Gallery/files/20-Darsena02.jpg
Inflamables wharf
http://www.apb.es/APB/WEBROOT/en/SERVICES/Pictures_Gallery/files/22-Inflamables02.jpg
Bitxofo January 24th, 2007, 11:06 PM ^^Thanks Aquarius!
:okay:
Great photos!!
:happy:
Barcelona Port is becoming huge, it wants to be the 1st of the Mediterranean. :yes:
:eek2:
Aquarius January 27th, 2007, 08:55 PM New cruiser`s terminals, under construction october 2006, pics SEIM
Unas fotos de las obras de una de las terminales de cruceros en el muelle adosado del puerto de BCN.
http://img476.imageshack.us/img476/8319/terminalcruceros6vh4.jpg
http://img476.imageshack.us/img476/42/terminalcruceros5dr4.jpg
http://img367.imageshack.us/img367/7089/terminalcruceros2kq9.jpg
http://img367.imageshack.us/img367/8706/terminalcruceros1gj8.jpg
gincan July 4th, 2007, 03:55 AM I read somewhere that Southampton will overtake Barcelona as the nr 1 cruise port in europe this year, however the article said that Southampton were aiming for 1 million passengers and 300 port calls. Now Barcelona this year will handle somewhere in the region of 1.7 milllion passengers and around 800 port calls. How do they count?
wiki July 4th, 2007, 03:58 AM amazing port, really big.
frozen July 4th, 2007, 12:38 PM great job, Aquarius. Thank you very much!
Aquarius July 28th, 2007, 07:04 PM works of expansion
Aquí tenéis unas fotos de la ampliación del puerto tomadas esta tarde, en un vuelo de vuelta de NY ,vía Londres:
http://img502.imageshack.us/img502/5757/dsc01507mk7.jpg
http://img252.imageshack.us/img252/3922/dsc01508if2.jpg
http://img110.imageshack.us/img110/5986/dsc01509cp4.jpg
Se aprecian muy bien los daños producidos hace algún tiempo.
Saludos.
Bitxofo July 30th, 2007, 11:27 PM I read somewhere that Southampton will overtake Barcelona as the nr 1 cruise port in europe this year, however the article said that Southampton were aiming for 1 million passengers and 300 port calls. Now Barcelona this year will handle somewhere in the region of 1.7 milllion passengers and around 800 port calls. How do they count?
I wonder how do they count in Southampton...
:sly:
DiggerD21 July 31st, 2007, 03:33 AM Any more info on the port expansion? What will be the capacity after completion?
Bitxofo August 2nd, 2007, 01:14 PM ^^This year cruiser passengers has increased in 34% and freight in 12%.
:eek:
New images, by SEiM:
Plano oficial del puerto de BCN
http://img524.imageshack.us/img524/4787/imagen1hh9.png
Imagen aérea del puerto con la zona en obras.
http://img180.imageshack.us/img180/2434/imagen2us4.png
Sale la ampliación de la plataforma del muelle de Costa para nueva terminal contenedores en la dársena del Morrot
http://img186.imageshack.us/img186/5360/imagen3cn2.png
A10
:wink2:
Artanis August 2nd, 2007, 06:44 PM Which contractor is awarded with the expansion works? I see a CSD working in one of the last pictures.
gincan August 6th, 2007, 10:50 PM Any more info on the port expansion? What will be the capacity after completion?
There are no capacity figures released but they anticipate some 4 million TEUs by 2015, however if the current growth rate is sustained it will probably be more like 5-6 million. Considering the current port handle some 2,5 million TEUs and only operate att haft capacity, I think that when the port expansion is finished it could probably handle somewhere between 10 and 15 million TEUs.
The main cruise qay is also being expanded to accommodate up to 5 Gensis class cruisers at once (the largest that currently exists).
The quay now, with two of the five new cruise terminals finished, a third will be added by next year.
http://www.apb.es/rsc/areas/WEBMASTER/files/20070510_creuers04.jpg
Bitxofo August 8th, 2007, 07:13 PM ^^Your photo is great:
:eek:
http://i16.tinypic.com/5y9ep2u.jpg
:drool: x 22569874156987013
Bitxofo November 23rd, 2007, 12:29 AM Barcelona port works update:
;)
Dique Sur Tramos 1 y 2
http://www.apb.es/rsc/images/contents/Institucional.es.APB.Obras/Institucional.es.APB.Obras-5.jpg
Presupuesto: 194,05 millones de euros
Plazo: 69 meses (finalización prevista el 2008)
Descripción: Tramo 1 (2.000 metros): Dique en talud con un manto principal formado por bloques paralepipédicos de hormigón de hasta a 60 Tm. Tramo 2 (1.700 m): Dique vertical ejecutado con 47 cajones prefabricados de hormigón.
http://www.apb.es/rsc/images/contents/Institucional.es.APB.Obras/Institucional.es.APB.Obras-7.jpg
http://www.apb.es/rsc/images/contents/Institucional.es.APB.Obras/Institucional.es.APB.Obras-9.jpg
Dique Sur Tramo 3
http://www.apb.es/rsc/images/contents/Institucional.es.APB.Obras/Institucional.es.APB.Obras-13.jpg
Presupuesto: 109,99 millones de euros
Plazo: 82 meses (finalización prevista en 2008)
Descripción: Dique en talud de 1.100 metros de longitud. El manto principal está formado por bloques pararelepipédicos de hormigón de 40 Tm en el tronco. El morro se remata con 2 cajones prefabricados de hormigón armado.
http://www.apb.es/rsc/images/contents/Institucional.es.APB.Obras/Institucional.es.APB.Obras-15.jpg
http://www.apb.es/rsc/images/contents/Institucional.es.APB.Obras/Institucional.es.APB.Obras-17.jpg
Dique Este
http://www.apb.es/rsc/images/contents/Institucional.es.APB.Obras/Institucional.es.APB.Obras-21.jpg
Presupuesto: 197,28 millones de euros
Plazo: 82 meses (finalización prevista el 2008)
Descripción: Dique en talud de 2.000 metros de longitud. El manto principal está formado para bloques paralepipédicos de hormigón de 50 Tm en el tronco y de 80 Tm en el morro. El cargadero de escolleras y todo uno se ubica al Port de Vallcarca.
http://www.apb.es/rsc/images/contents/Institucional.es.APB.Obras/Institucional.es.APB.Obras-23.jpg
http://www.apb.es/rsc/images/contents/Institucional.es.APB.Obras/Institucional.es.APB.Obras-25.jpg
:)
Datos autoactualizados a 30 de Septiembre ;)
^^Updated 30/9/2007.^^
:wink2:
Aquarius April 24th, 2009, 02:57 AM New bridge under construction linking the port and the airport
Se inician las obras del puente que ha de comunicar el puerto y la ZAL con el aeropuerto del Prat cruzando el Llobregat.
La Generalitat comienza el nuevo puente del Llobregat
• El viaducto cruzará en El Prat el cauce abierto tras el desvío de la desembocadura
• La obra estará lista en el verano del 2010 y acercará el puerto y el aeropuerto
http://img24.imageshack.us/img24/3259/imagen8r.png
http://img7.imageshack.us/img7/8691/imagen6nam.png
EJE ESTRATÉGICO
El proyecto de la Generalitat mejorará a corto plazo las conexiones interiores y la fluidez del tráfico en este entorno industrial y logístico. De cara a un futuro más lejano, esta obra inicia el eje estratégico que, desde la autovía de Castelldefels, la C-31, y hasta la Zona de Actividades Logísticas (ZAL), unirá viariamente el puerto y el aeropuerto, junto sus respectivos espacios de influencia. Es decir, por el oeste conectará el sector logístico del polígono Mas Blau y el aeródromo y, por el este, el nuevo muelle Prat y la terminal de contenedores que se ubicará en él, dentro del recinto ampliado del puerto.
ElPeriódico de Cataluña (http://www.elperiodico.com/default.asp?idpublicacio_PK=46&idioma=CAS&idnoticia_PK=601794&idseccio_PK=1022)
A10
|
|