systematica
November 1st, 2005, 01:51 AM
http://www.gruhm.org/images2/hull/hull1M.jpg
This 4-lane boulevard through the city centre with three consecutive roundabouts should pose some *interesting* traffic situations. It opens next month, and construction of the connecting highway westbound starts next year. It will form a strange link between a divided highway and a 6-lane urban boulevard which eventually leads to a 2-lane bridge to Ottawa (an old historic rail bridge). Something tells me these roundabouts will be short-lived :bash:
This project replaces the old projected route of Autoroute 50, which now ends perpendicular to this boulevard.
http://www.mtq.gouv.qc.ca/images/regions/outaouais/1plan.jpg
http://www.mtq.gouv.qc.ca/images/regions/outaouais/3croquis.jpg
This 4-lane boulevard through the city centre with three consecutive roundabouts should pose some *interesting* traffic situations. It opens next month, and construction of the connecting highway westbound starts next year. It will form a strange link between a divided highway and a 6-lane urban boulevard which eventually leads to a 2-lane bridge to Ottawa (an old historic rail bridge). Something tells me these roundabouts will be short-lived :bash:
This project replaces the old projected route of Autoroute 50, which now ends perpendicular to this boulevard.
http://www.mtq.gouv.qc.ca/images/regions/outaouais/1plan.jpg
http://www.mtq.gouv.qc.ca/images/regions/outaouais/3croquis.jpg