View Full Version : #ON HOLD: VISTA DE LAGO, 41F ?, Plot K1 (JLT)


AltinD
November 11th, 2005, 10:52 PM
Name: Vasta De Large
Plot: K1
No. Floors:
Height:
Use:
Status:

According to the map below, from Property Weekly

http://i7.photobucket.com/albums/y264/altin/Image076.jpg

Dubai-Lover
November 12th, 2005, 12:04 AM
isn't it delargo?

excited to see the remaining towers
not too much happened in jlt in the last few months comparing to the first months, where 1 tower was launched every week!

AltinD
November 12th, 2005, 12:28 AM
^ Please edit the thread name. It should be Vista de Largo or Vista Delargo ;)

malec
November 12th, 2005, 12:41 AM
I hope we get renderings for these soon. I'll google for some now.

Stephan23
December 20th, 2005, 03:16 PM
Next One: Floors??? Height??

Nothing in 5 weeks or so?

Krazy
January 15th, 2006, 10:52 PM
it's been over two months.... surely we can get more info on this one now

Stephan23
January 16th, 2006, 11:35 AM
From where??

AltinD
January 16th, 2006, 07:01 PM
Both names: Vista De Lago (not Largo) for the K1 tower and Vue De Lac for the K3 one, mean "Lake View", respectively in Spanish and French so I wouldn't be surprised if they are from the same developer or even if they have an identical or very similar design.

Dubai-Lover
January 16th, 2006, 10:09 PM
would be al attar properties then
quite likely
two towers with the same name in one cluster
there's something fishy about it

daveyg
May 3rd, 2006, 02:30 PM
I have have bought an apartment in Vue Du Lac we now know about Vista De Largo but does anyone know whats on the last plot?? and is there anyone one out there that has also bought in Jumeriah Lake Towers ???? :cheers:

Krazy
May 3rd, 2006, 03:36 PM
We almost bought in V3 but didnt... we don't know what could be on the third plot but you might wanna see our JLT plot map

http://www.skyscrapercity.com/showthread.php?t=133481

We have quite a few towers whose locations we dont know yet so it could very well be one of them.

BTW.. Congrats on your purchase, did you buy during ATM?

AltinD
October 6th, 2006, 01:25 PM
http://www.immobilien.dubai-city.de/vista_del_lago/vista_del_lago_dubai_01.jpg

http://www.immobilien.dubai-city.de/vista_del_lago/vista_del_lago_dubai_03.jpg

http://www.immobilien.dubai-city.de/vista_del_lago/vista_del_lago_dubai_02.jpg

Krazy
October 6th, 2006, 09:16 PM
they all look like vue du lac...

dubaiflo
October 6th, 2006, 09:59 PM
altin mentioned that before, they are, no doubt, from the same developer, alone the name suggests that, now design confirms it ...

Imre
October 13th, 2006, 09:17 PM
13/10/2006

http://img224.imageshack.us/img224/1839/dsc0083fo3.jpg (http://imageshack.us)

dubaiflo
October 14th, 2006, 08:51 PM
So three towers for Al Attar here, all with the lake view theme.

spoiled-dezigner
October 16th, 2006, 08:40 AM
wow this is amazing tower:0

Skoulikimou
October 16th, 2006, 11:01 PM
love the swimming pool on the roof what a sensational feeling :D

Escoto_Dubai2008
October 17th, 2006, 07:40 PM
:eek2: Thsi is a great project I hope they build soon this amazing project.

Imre
May 24th, 2007, 07:39 PM
24/May/2007

JLT K plot from Almas Tower

http://i18.tinypic.com/4yjafdi.jpg

http://i14.tinypic.com/6cdno6h.jpg

Imre
November 13th, 2007, 07:15 PM
completion: Feb 2008:)

Gulfnews, today

http://img252.imageshack.us/img252/60/save0016ow3.jpg (http://imageshack.us)

Stephan23
November 13th, 2007, 08:58 PM
wtf :lol:

:D:D:D:D:D:D


But the towers looking damn good!!!

malec
November 13th, 2007, 11:32 PM
Avoid at all costs???

marina2010
November 22nd, 2007, 02:16 PM
Avoid at all costs???

why???:nuts:

ardi
November 22nd, 2007, 02:18 PM
even shoring will not finish by Feb 2008:lol:

marina2010
November 22nd, 2007, 02:40 PM
even shoring will not finish by Feb 2008:lol:

thanks guys .Will definitely avoid this one.:)

Sander-
November 23rd, 2007, 11:11 PM
Anyone know how these have come along since may? :)

Imre
December 14th, 2007, 05:11 PM
so Feb 2008 still realistic ?:)

14/December/2007

JLT , K plot

K1 - Vista Del Largo

http://img249.imageshack.us/img249/6050/imresolt45vp7.jpg (http://imageshack.us)


K2

http://img252.imageshack.us/img252/5486/imresolt44ln8.jpg (http://imageshack.us)


K3-- Vue De Lac

http://img222.imageshack.us/img222/4825/imresolt34wv2.jpg (http://imageshack.us)

http://img215.imageshack.us/img215/7844/imresolt35tr9.jpg (http://imageshack.us)

ardi
December 24th, 2007, 12:40 PM
the worker is playing with his balls, thats routine in with al attar projects

Imre
March 5th, 2008, 05:07 PM
05/March/2008


JLT, K plot

http://img525.imageshack.us/img525/4467/imresolt17fd6.jpg (http://imageshack.us)

http://img100.imageshack.us/img100/4991/imresolt18ym8.jpg (http://imageshack.us)

Tony 90
March 17th, 2008, 12:16 AM
http://img254.imageshack.us/img254/1883/282ty6.jpg (http://img254.imageshack.us/my.php?image=282ty6.jpg)

http://img254.imageshack.us/img254/4425/283du4.jpg (http://img254.imageshack.us/my.php?image=283du4.jpg)

http://img254.imageshack.us/img254/3128/284kw5.jpg (http://img254.imageshack.us/my.php?image=284kw5.jpg)

Tony 90
March 31st, 2008, 10:19 AM
http://img246.imageshack.us/img246/4157/307ps9.jpg (http://img246.imageshack.us/my.php?image=307ps9.jpg)

http://img179.imageshack.us/img179/3499/306ah0.jpg (http://img179.imageshack.us/my.php?image=306ah0.jpg)

http://img179.imageshack.us/img179/8062/308hf4.jpg (http://img179.imageshack.us/my.php?image=308hf4.jpg)

http://img179.imageshack.us/img179/5372/309oe6.jpg (http://img179.imageshack.us/my.php?image=309oe6.jpg)

bizzybonita
March 31st, 2008, 10:54 AM
GOOD PROGRESS DOWN THERE :)

Tony 90
June 18th, 2008, 01:03 AM
http://img155.imageshack.us/img155/5837/vistakp9.jpg (http://img155.imageshack.us/my.php?image=vistakp9.jpg)

cugeneva
June 19th, 2008, 05:41 PM
If they continue in that speed.... completion by 2015 (optimistic) :bash:

bizzybonita
August 22nd, 2008, 05:19 PM
any recent pictures Imre ??? Title to Ground Work please .

Imre
August 30th, 2008, 01:05 PM
still hole

29/Aug/2008

Vista del Lago, K1

http://img165.imageshack.us/img165/1497/imresolt157rv8.jpg (http://imageshack.us)

http://img151.imageshack.us/img151/5540/imresolt112vu5.jpg (http://imageshack.us)

Stephan23
August 30th, 2008, 05:07 PM
Thx for board picture !! Edit title with 40 floors in height !! Thx

muffassa
September 16th, 2008, 12:54 PM
guys need help does any one here have any updates about the construction when will it start ?
due to escrow account in place does that mean the payment plan for this tower has to be delayed ?
i need your opinion on investment in this tower

ardi
September 16th, 2008, 02:26 PM
Escrow account is not link to the payment plan and payment plan for this project is also not linked to the construction stages.

Try to find a source inside one of the contractors or subcontractors meniotned in the project board and get some reliable info, Al Attar people are only talk shit.

Imre
November 29th, 2008, 08:47 AM
same hole as before, I would put on the ON HOLD section..

Imre
December 1st, 2008, 07:51 PM
28/November/2008

K1,K2,K3

http://img179.imageshack.us/img179/8940/imresolt207xn1.jpg (http://imageshack.us)

http://img509.imageshack.us/img509/1410/imresolt213ve3.jpg (http://imageshack.us)

http://img179.imageshack.us/img179/4427/imresolt226kd1.jpg (http://imageshack.us)

mome
December 15th, 2008, 10:08 AM
We hwve seen ur report that this tower is on hold.

We are very concerned as to what is means

is this true that it has not been built or is never going to be built

How high is the tower TODAY/

Do you know when can we get occupation .

If it true that the building will be ready in 2015 what can we do to get our money back

How many people are affected by this

Are the developers the gevernment or are they small .

Is our money safe

We are anxious as we have bought many units please let us know if you can post fotos of the exact site and progresss at todays date 15/12/2008

Your fotos are amazing and we thank you for your advice always

MOME

ardi
December 15th, 2008, 04:38 PM
^^ go to land department and officially claim about this project.

Imre
December 15th, 2008, 04:51 PM
^^ go to land department and officially claim about this project.

.. and what are they doing there? nothing ..

mome
December 15th, 2008, 08:05 PM
can you get us the name and number of the land department and tell us the procedure .


According to the ATTAR website the expected date of completion has been vaguely set for 3 rd quarter 2010

check the details at www,alattarproperties.com

tried to call Mr Attar but spoke to a very confused FILIPINO LADY who kept me on hold for 30 minutes left a message and still waiting , waiting , intezaar and sabor seems to be the order of the day

PLEASE HELP

Imre
December 16th, 2008, 07:04 AM
Dont worry about of Al Attar , that is huge local company , they have many towers and properties here.

It will be built , only question when.

ardi
December 16th, 2008, 07:43 AM
Imre land department will give you a form which you can fill, its for the projects which are onhold, You might be able to compensate and developer might return some of amount of the money, I have recently done that. I try to post the form here.

mome
December 18th, 2008, 01:28 PM
Vista Del Lago

Thank you for ur confidence in the AL ATTAR people being a large local group.Just cos im scared I need a re assurance as to

when I can move into my flat and with the current economic climate
NOBODY IS SAFE

CAN U GUARANTEE ME I WONT LOSE MY MONEY COS ON THEIR WEBSITE THE DETAILS ARE VAGUE AND ALSO FRIGHTENING AS THEY HAVE ONE MESSAGE OD

ANTICIPATED DATE OF COMPLETION LATE 2010

THEY ARE ON HOLD
NOT EVEN 1 FLOOR U

IT IS IMPOSSIBLE TO FINISH WITHIN THE NEXT 18 MONTHS

ALSO THAY HAVE THE MONEY WE PAID THEM LOTS OF MONEY

WE SHUD HAVE SOME RECOURSE .

WHAT DO U ADVISE

SHUD WE DEMAND OUR MONEY BACK AS THEY HAVE NOT KEPT THEIR WORD IN RESPECT OF THE SALE AGREEMENT

TELL ME SUM :ONE :

ardi
December 18th, 2008, 04:36 PM
Your money back after 3 years? they will deduct 30%. Try to consult with a law firm over the property law in Dubai, dont panic.

Imre
December 29th, 2008, 02:54 PM
Vue De Lac to begin this week


http://i43.tinypic.com/2ynp276.jpg


on Saturday, 27 December 2008

The K3 tower is one of three in the Vue De Lac development that is yet to begin.Dubai-based Al Attar Properties has confirmed that it could begin foundation work on its Vue De Lac project in Jumeirah Lake Towers as early as this week.

The development includes three towers - K1, K2 and K3. Each was originally scheduled for handover in September 2007, but the project has since been pushed back to the third quarter of 2010.

Speaking to Construction Week, Al Attar projects manager Bipin Pudiyadath said, "We should be able to begin the raft foundation within a week or two maximum, and we should be able to start the entire construction after the raft work."
He also said the company was waiting for Dubai to release its green regulations in January before it begins construction in order to comply with the code.

"Once the regulations come out, we are just waiting for the approval (of the design) which we should get by January," Pudiyadath said.

The declaration follows complaints from investors of the project who said the delay was costing them "thousands of dirhams a year."

An investor in the project, who declined to be named, told Construction Week that the delay was costing around US $4100 (AED15,000) per year.

"We bought this in the hope that our EMI (equated monthly installment) would work up to about 90,000 dirham a year, which is what it would have worked up to if they had delivered on time.

"But we pay 7.5% interest over and above the monthly EMI, so for every year that the developer delays the project, the additional 7.5% works up to about 15,000 dirham annually.

"If the project was up on time, it would have benefited us. Now, our cash is locked in and there is no compensation."

Investors say they should be paid compensation to cover money that has been lost due to the delays.

"The people at Al Attar are always polite, but when your cash is locked in, you want a little more than that," the investor said. "Shouldn't the developer be responsible for something?"

But Pudiyadath said, "We make decisions regarding compensation at the time of handover. As of now, there is nothing. Not just yet."


http://www.arabianbusiness.com/542024-vue-de-lac-to-begin-this-week



:) maybe good news , hopefully this one will start as well.

Imre
January 9th, 2009, 04:24 PM
09/January/2009

K1,K2,K3, JLT

http://img404.imageshack.us/img404/7868/imresolt013zb1.jpg (http://imageshack.us)

http://img176.imageshack.us/img176/4337/imresolt028gr2.jpg (http://imageshack.us)

http://img525.imageshack.us/img525/4473/imresolt029gj2.jpg (http://imageshack.us)

MalcomX
January 14th, 2009, 01:11 PM
i spoke to someone from dmcc and they told that the project is not on hold. they had to revise plans due to parking issues and were or still are waiting for permission to build

Imre
February 14th, 2009, 01:19 PM
same hole..

14/February/2009

K1

Vista De Largo

http://img9.imageshack.us/img9/978/imresolt007qv5.jpg (http://imageshack.us)

muffassa
February 15th, 2009, 06:51 PM
i have been constantly calling the developer to inquire when will the construction start but till now the only answers received are next week this has been going on since 3 months now any one can shed some light so as to what's going on

opening an escrow account does that make the developer responsible to answer the govt about it's progress ?

please can some one inquire and inform

Imre
February 15th, 2009, 08:58 PM
it seems ok.

Vista De Lago

Developer Name : Ahmed Abdul Rahim Alattar Properties
Master Developer : NAKHEEL L.L.C
Trust Acc. Number : 0190070010000P
Bank Name : Amlak

mome
March 10th, 2009, 04:10 PM
Dear ALL


PLEASE HELP

WHEN ARE THESE PEOPLE GOING TO START BUILDING

HEARD THAT AL ATTAR PROPERTIES HAVE NO FUNDS TO CONTINUE

DO U THINK ITS TIME FOR RERA TO HELP US GET OUR MONIES BACK

CAN WE START BY GETTING THE INVESTORS TOGETHER TO START PROCEEDINGS TO GET BACK THE FULL MONIES PLUS INTEREST FROM DATE OF PAYMENTS

PLEASE ALL ADVISE WAY FORWARD


WE GONNA LOSE ALL OUR MONIES IF WE DONT ACT NOW!!!!!!!!!!!!!!!!

malec
March 10th, 2009, 06:06 PM
Who knows, it's al attar so nobody ever knows. :)

Imre
March 11th, 2009, 06:24 AM
Dear ALL


PLEASE HELP

WHEN ARE THESE PEOPLE GOING TO START BUILDING

HEARD THAT AL ATTAR PROPERTIES HAVE NO FUNDS TO CONTINUE

DO U THINK ITS TIME FOR RERA TO HELP US GET OUR MONIES BACK

CAN WE START BY GETTING THE INVESTORS TOGETHER TO START PROCEEDINGS TO GET BACK THE FULL MONIES PLUS INTEREST FROM DATE OF PAYMENTS

PLEASE ALL ADVISE WAY FORWARD


WE GONNA LOSE ALL OUR MONIES IF WE DONT ACT NOW!!!!!!!!!!!!!!!!

they are building just slow , I think first of all they want to finish the Al Attar Tower ,SZR and it seams they dont care about the JLT at the moment.

Dont worry , it will be built just need time, 5-10 years maybe..

malec
March 14th, 2009, 02:54 AM
^^ Well al attar tower on SZR is on hold as well.

cugeneva
April 11th, 2009, 07:45 AM
As always they tell stories that they will start soon as they have renegotiated contracts.
In any case, this time it may be true because they would be faced large penalties if they dont finish construction by end 2010. This will of course not mean that the towers will be finished by that time (just construction) and they will still have to finish the interior. I do not expect the handover before mid to end 2011.
At least they now have a new payment plan which is linked to construction progress and it seems that it has been approved by RERA (if this is true..... we dont know). :ohno::ohno::ohno:

Imre
April 22nd, 2009, 03:06 PM
dead, still nothing here

22/April/2009

JLT, K plot


http://i41.tinypic.com/2599xt0.jpg

Imre
May 15th, 2009, 01:38 PM
15/May/2009

K plots

http://i41.tinypic.com/34t3eir.jpg

http://i44.tinypic.com/10p0etw.jpg

http://i39.tinypic.com/2v1268p.jpg

Imre
May 20th, 2009, 05:28 PM
completion: Feb 2008:)

Gulfnews, today

http://img252.imageshack.us/img252/60/save0016ow3.jpg (http://imageshack.us)

small delays:)

Imre
June 12th, 2009, 01:30 PM
12/June/2009

JLT K plot , still 3 holes but good progress of the parking-podium structure :)

http://i42.tinypic.com/2vmhk0g.jpg

http://i39.tinypic.com/qq7dao.jpg

http://i40.tinypic.com/52cdi8.jpg

http://i44.tinypic.com/2ajdwxt.jpg

http://i42.tinypic.com/vcup28.jpg

http://i43.tinypic.com/2wm2cd1.jpg

Imre
July 22nd, 2009, 11:42 AM
22/July/2009

K plots

http://i27.tinypic.com/qqsmec.jpg

Imre
September 6th, 2009, 07:14 AM
21/August/2009

K1,K2,K3

http://i28.tinypic.com/msds1c.jpg

http://i30.tinypic.com/263wpw4.jpg

http://i27.tinypic.com/5v7g29.jpg

Imre
October 2nd, 2009, 10:40 AM
02/October/2009

JLT, K plots

same as before, nothing..

http://i34.tinypic.com/25qu7v8.jpg

http://i37.tinypic.com/11ru5gn.jpg

http://i37.tinypic.com/fk18wg.jpg

LA76
October 21st, 2009, 02:35 PM
Read this,

http://www.constructionweekonline.co...m-rera-office/

Anyone interested in joining this committee let me know

LA76
October 26th, 2009, 10:02 AM
Article By Arabian Business

Investors file case with RERA over Dubai project delays

A group of around 30 investors has filed an official complaint at the Real Estate Regulatory Agency (Rera) over ongoing delays and specification changes at the Vue de Lac and Vista del Lago developments in Dubai.

Investors on the Al Attar project at Jumeirah Lake Towers accused the developer of unreasonable delays and changes being made to apartments without the consent of owners, Construction Week Online reported.

“We have been promised the project since then end of 2007. It was then pushed to 2008, then the end of 2008, and now he’s saying 2011 – which will never happen, because up to date they’ve only finished the piling,” investor Makram Mohamed told the website.

Many asserted that apartment specifications have changed so drastically that they no longer wish to purchase property in the project and want a full refund.

Investors are unhappy at what was described in a letter from Al Attar as “some small changes”, where two-bedroom apartments have been changed to one-bedroom ones.

Al Attar had revised the prices of the apartments in line with the reduction in apartment size, but investors said that they had bought two-bedroom apartments specifically and a smaller alternative was not acceptable.

“Because of the change of designation and all of this delay, we don’t want this property any more. The majority of people investing were buying to live in this property. Ninety per cent of our group wanted to live in this. Now they’ve changed the designation, we don’t need it. I bought a two-bedroom; you can’t give me a one-bed plus study,” said investor Shailendra Sainani.

“The majority of us need our money refunded and the costs absorbed. [Al Attar] needs to resell the project from the beginning.”

In addition to changes in designation, many investors are also concerned that delays to the project will result in a huge interest bill arising from finance agreements that can only be concluded following apartment handover.

Some investors took out finance agreements in 2006 under the impression that the project would be handed over in 2008. They are now facing the prospect of paying five years’ worth of interest on finance agreements, should the project be delivered according to a new completion date of 2011.

Some investors also query Al Attar’s ability to deliver the project on time.

“Can we still believe Al Attar can deliver in 2011, if they couldn’t even start construction in the last three years?” said one investor.

The group has filed a case with Rera because they say that Al Attar Properties is refusing to communicate with them except through a lawyer.

No-one from Al Attar was able to comment on the case or development.

The case has now been filed with Rera, who said a decision on the steps it would take would be forthcoming in the next few days.

http://www.arabianbusiness.com/57126...project-delays

LA76
October 26th, 2009, 03:29 PM
For all of the investors out there who are in similar position I will appreciate your help by adding your comments on the article in Arabian Business

http://www.arabianbusiness.com/57126...project-delays

This may help our case

Thanks

Imre
November 6th, 2009, 01:15 PM
06/November/2009

JLT, K1-2-3 plots

podium-road structure done but still nothing there.

Good news , I met with an investor there , we had a nice chat :)

The Al Attar told him that the mobilisaton has started behind the plot , next to the Goldcrest Views 2 and the contractor (Goldline) coming soon.

I thought that is the mobilisation of the mosque , we will see soon , its time to start something there. :)

If they start , only the M2 plot left hole (+Anantara , ON HOLD + few at the JLT extension)

http://i33.tinypic.com/9ka6jd.jpg

http://i36.tinypic.com/119tj02.jpg

http://i35.tinypic.com/6jmwjm.jpg

http://i37.tinypic.com/2ywilwg.jpg

http://i35.tinypic.com/jznee.jpg

site mobilisation

http://i38.tinypic.com/ouwt45.jpg

http://i38.tinypic.com/28recti.jpg

http://i34.tinypic.com/10x6p0k.jpg

LA76
November 15th, 2009, 09:04 AM
Check out this site.

The committee is still working hard. The article appeared in the Gulf News weekly Xpress newspaper and in the Gulf news website (check out the below)

http://gulfnews.com/news/gulf/uae/housing-property/jlt-owners-still-waiting-for-homes-promised-in-2007-1.526478

Our sound is becoming higher

Imre
November 29th, 2009, 10:54 PM
29/November/2009

JLT, K plots

http://i49.tinypic.com/123a1yh.jpg

bahman2000
December 28th, 2009, 09:06 PM
i posted this in the vue de lac thread. maybe we should try consolidate the two al attar threads?

we've invested in Vancouver at International City and now Al Attar are proposing we switch to Vue De Lac or Vista Del Lago, as their IC projects are delayed indefinitely.

They're offering mostly 2 bedrooms 1,050-1,131 sqf, 720-907 dhs/sqf progressively as you go up the building.

Most 2 bedroom floor-plans show a single bedroom and a study, though the study, at least on the drawing, is not significantly smaller.

Does anyone know what is the difference between a study and a bedroom in this case?

Is this a good deal? What's a good way to determine an appropriate rate for this sort of property?

bahman2000
December 28th, 2009, 09:32 PM
accidental double post

kevin_1980in
January 8th, 2010, 04:54 PM
Is construction work ongoing?

bahman2000
January 9th, 2010, 01:30 PM
This comes from Al Attar, January 5:

the construction progress as per the project manager still the same as of November 25, 2009:



Study Room is the common term for 1 bed room as per the new plans/ design.





Project: 5B+G+1Mech+39 Floors of Residential Building at Jumeirah Lake Towers, cluster (K)

Location: Vue Du Lac, Plot # JLT-PH1-K3

Sub: Project Progress Report as on November 25, 2009

Dewatering works under process
Mobilization of main contractor under process

Goldline Contracting has started the mobilization on site. Preparation for raft and plastering and waterproofing of retention wall completed. Enabling works has been completed by Middle East Foundation Group. Building has been redesigned as per the green building regulations. Anticipated project completion by end of 2011.





Project: 5B+G+1Mech+39 Floors of Residential Building
Location: Vista Del Lago, Plot No. 981 (JLT-PH1-K1), Jumeirah Lake Towers, cluster (K)


Sub: Project Progress Report as on November 25, 2009

Dewatering works under process
Mobilization of main contractor under process

Goldline Contracting has started the mobilization on site. Preparation for raft and plastering and waterproofing of retention wall completed. Enabling works has been completed by Middle East Foundation Group. Building has been redesigned as per the green building regulations. Anticipated project completion by end of 2011.

bahman2000
January 26th, 2010, 11:19 PM
I was onsite today. Met the Contractor Project Manager. He was kind enough to show me around.

There's active work on lake excavation, lake promenade is complete, auxiliary parking (not under the towers, but on the sides of the drop-off ramp) is complete. Lake will be filled this year, does not affect the K plots.

The K1-K3 sites are still holes in the ground. The contractor is mobilized and ready to work. Awaiting approval from Jafza, hopefully first half of February.

According to the Goldline PM, a tower of this sort would take 3 years to get built, at best. So the Al Attar-proposed completion date of "end of 2011" is not realistic.

K1 will start first, K3 will follow 3-6 months after.

Flintbug
January 27th, 2010, 12:29 PM
There's active work on lake excavation, lake promenade is complete, auxiliary parking (not under the towers, but on the sides of the drop-off ramp) is complete. Lake will be filled this year, does not affect the K plots.


All the above is the responsibility of the master developer and not the K plots developer.

This site has been about to start work "next week" for the last couple of years - I'll believe it when I see it!!!

UAE_AD
January 27th, 2010, 01:19 PM
I was there the other day (saw the plots from Icon Tower II balcony, looked dead)

Imre
January 27th, 2010, 02:00 PM
I saw today, still nothing there just 3 holes without any workers.

The site office seems done ,hopefully they will start soon.

vishalaggarwal
February 15th, 2010, 09:02 AM
Is there any collective action possible against developer to get our money back on VISTA DEL LAGO

Imre
March 5th, 2010, 10:21 AM
05/March/2010

JLT, K1,K2,K3 plots, still nothing here

http://i49.tinypic.com/6gkif9.jpg

http://i46.tinypic.com/2zj9vk6.jpg

http://i46.tinypic.com/2d0ng4z.jpg

Imre
April 20th, 2010, 12:30 PM
20/April/2010

Al Attar K1, K2,K3 , still nothing here

http://i42.tinypic.com/iggkg8.jpg

bahman2000
May 10th, 2010, 07:10 PM
is anyone taking any action on this? trying to get their money out? want to join in a group?

Imre
July 9th, 2010, 02:33 PM
09/July/2010

Al Attar Projects , K1, K2 , K3

http://img138.imageshack.us/img138/9749/dubai91.jpg (http://img138.imageshack.us/i/dubai91.jpg/)

Uploaded with ImageShack.us (http://imageshack.us)

http://img718.imageshack.us/img718/5383/dubai92.jpg (http://img718.imageshack.us/i/dubai92.jpg/)

Uploaded with ImageShack.us (http://imageshack.us)

http://img30.imageshack.us/img30/733/dubai102.jpg (http://img30.imageshack.us/i/dubai102.jpg/)

Uploaded with ImageShack.us (http://imageshack.us)

http://img717.imageshack.us/img717/6864/dubai105.jpg (http://img717.imageshack.us/i/dubai105.jpg/)

Uploaded with ImageShack.us (http://imageshack.us)

http://img441.imageshack.us/img441/6820/dubai107.jpg (http://img441.imageshack.us/i/dubai107.jpg/)

Uploaded with ImageShack.us (http://imageshack.us)

Flintbug
July 9th, 2010, 06:22 PM
This finally looks like someone has tidied at least one hole

bahman2000
July 9th, 2010, 06:37 PM
This finally looks like someone has tidied at least one hole

wishful thinking :ohno:

Imre
July 9th, 2010, 06:42 PM
Main contractor is already there and the holes cleaning have begun, podium closed as well.

They have lot of staff at the JLT store area (DMCC Business Park plot) , scaffoldings, cranes, etc.. so the main construction will start soon.

vishalaggarwal
July 20th, 2010, 08:40 AM
Hi Bahman,

Yes Ive already taken legal action and have sat with my lawyers last week. If you would like to join or anyone else would like to recover there money please PM me.

Can i join you with same lawyer for collective action.
Pls contact me -----

234sale
August 7th, 2010, 09:23 PM
Don't trust PM's from users, my advice

Second advice, don't post private numbers

Imre
February 13th, 2011, 04:17 PM
Site offices , fence etc.. have removed from the plot next to the Goldcrest Views 2 , not a good sign..

Imre
May 27th, 2011, 03:54 PM
27/May/2011

Al Attar projects ...K1 , K2, K3

http://i56.tinypic.com/2ryh7v8.jpg

Imre
September 17th, 2011, 12:55 PM
It seems NEVER BUILT, landscaping done around the plot if they want to build it will be difficult as there is no access road, storage area etc...

17/September/2011

JLT, cluster K

http://i54.tinypic.com/348j6ro.jpg

Imre
January 20th, 2012, 03:19 PM
Some site offices there again after one and half year :)

20/January/2012

Cluster K

http://i41.tinypic.com/2ziaau1.jpg

http://i41.tinypic.com/synjbb.jpg

http://i40.tinypic.com/mtavpz.jpg