View Full Version : ISLAMABAD | The Centaurus | Mixed Use | 41 + 32 + 32 + 32 Flrs| ~200m | ~650ft | U/C


Pages : 1 2 3 4 5 6 7 8 [9] 10 11 12 13 14 15

Ahmad Rashid Ahmad
December 23rd, 2009, 06:20 PM
Nice pics.......

_BPS_
December 24th, 2009, 03:32 AM
http://farm3.static.flickr.com/2667/4209104926_2938bfb92f_o.jpg

The far-right crane must be for the hotel construction, I assume.

mrfix
December 24th, 2009, 03:52 AM
floor numbering!!

http://img38.imageshack.us/img38/8437/missingfloor.jpg

_BPS_
December 24th, 2009, 04:03 AM
Floor 7 seems to be have an elevated ceiling, thus counts as only 1 floor.

mrfix
December 24th, 2009, 04:22 AM
Floor 7 seems to be have an elevated ceiling, thus counts as only 1 floor.

right! this is how they should have been numbered :)

http://img694.imageshack.us/img694/8104/groupw.jpg

James-Bond
December 24th, 2009, 07:11 AM
5 more floors to goo! :happy:

ABBASIA
December 24th, 2009, 11:18 AM
5 more floors to goo! :happy:

come on, dont get it started again, the lower 5 floors are part of shopping mall.Excluding the lower 5 portion the tower will be 21 floors, so in total 21+5 = 26 floors.

KB
December 24th, 2009, 12:29 PM
come on, dont get it started again, the lower 5 floors are part of shopping mall.Excluding the lower 5 portion the tower will be 21 floors, so in total 21+5 = 26 floors.

or so we hope.

Btw, its 22 not 21 floors. At the speed they are working, we will find out pretty soon.

oogabooga
December 24th, 2009, 01:37 PM
or so we hope.

Btw, its 22 not 21 floors. At the speed they are working, we will find out pretty soon.

God willing.

malpensa
December 24th, 2009, 10:08 PM
the 4th crane is for?????????????:)

KB
December 24th, 2009, 10:11 PM
the 4th crane is for?????????????:)

the lulz

oogabooga
December 25th, 2009, 12:03 AM
the lulz

Say what now? :sly:

brightside.
December 25th, 2009, 12:19 AM
the lulz

:rofl:

Say what now?

http://www.urbandictionary.com/define.php?term=lulz

oogabooga
December 25th, 2009, 12:23 AM
It stilld doesnt make any sense.......:?


And damn brightness! You really are a nocturnal creature aren't you? Its 3:30AM FFS!

brightside.
December 25th, 2009, 12:26 AM
You just aren't into the skybar thread "those funny captioned pictures" to understand.

And yes, what self respecting young person sleeps so early? :tongue2:

oogabooga
December 25th, 2009, 12:27 AM
You just aren't into the skybar thread "those funny captioned pictures" to understand.

And yes, what self respecting young person sleeps so early? :tongue2:

:laugh:


I bump into my neighbor at 8AM the other day, this nice old Uncle, and I say to him "Uncle! What are you doing up at this ungodly hour?" :laugh:

He's like =|

Abid Siddiqui
December 30th, 2009, 06:03 AM
looking very good

_BPS_
December 31st, 2009, 08:14 AM
right! this is how they should have been numbered :)

http://img694.imageshack.us/img694/8104/groupw.jpg

thanks for the fix

Ahmad Rashid Ahmad
January 2nd, 2010, 03:16 PM
the lulz

:lol:......Plz wait, u will know what it will be for....

Ahmad Rashid Ahmad
January 6th, 2010, 06:34 PM
http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_97512060020x20399.jpg

http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_97502039920x20600.jpg

http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_97492039920x20600.jpg

http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_97462060020x20399.jpg

Ahmad Rashid Ahmad
January 6th, 2010, 06:35 PM
http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_97362060020x20399.jpg

http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_93632060020x20399.jpg

http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_93562060020x20399.jpg

http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_93512060020x20399.jpg

Ahmad Rashid Ahmad
January 6th, 2010, 06:44 PM
Looks so,

LEFT BUILDING - 18th floor (9 floors to go)
MIDDLE BUILDING - 13th floor (14 floors to go)
RIGHT BUILDING - 12th floor (15 floors to go)

Indus
January 6th, 2010, 07:35 PM
It looks like that work on the hotel has started.

Strong Hearted
January 6th, 2010, 09:37 PM
^^ from which pic u concluded that ?

ABBASIA
January 6th, 2010, 10:02 PM
It looks like that work on the hotel has started.

How do u say that.No clues of that to me.

brightside.
January 6th, 2010, 11:22 PM
Isn't the 4th crane a good clue?

PAkIst4(\)I
January 7th, 2010, 08:31 AM
^^ from which pic u concluded that ?


http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_93632060020x20399.jpg


^^
This image,

PakiDoperz
January 7th, 2010, 09:58 AM
no this is not hotel section, this is the front part of the mall which is next to the road which is getting constructed...

Strong Hearted
January 7th, 2010, 10:16 AM
^^ :yes:

Ahmad Rashid Ahmad
January 7th, 2010, 12:52 PM
Isn't the 4th crane a good clue?

It has been there from 6 months......

_BPS_
January 7th, 2010, 03:00 PM
It has been there from 6 months......

What has it been doing for 6 months? Surely, it cannot be just left idle.

KB
January 7th, 2010, 05:43 PM
What has it been doing for 6 months? Surely, it cannot be just left idle.

told you already

the lulz

Ahmad Rashid Ahmad
January 7th, 2010, 06:25 PM
told you already

:lol:......Hotel gonna be completed at the end of 2012.......So chill

Mercenary
January 7th, 2010, 10:44 PM
nice progress....its gonna be sick when I visit Islamabad...

I think i will get married in this hotel :)

_BPS_
January 7th, 2010, 10:46 PM
nice progress....its gonna be sick when I visit Islamabad...

I think i will get married in this hotel :)

That'll be some sight; first zionist wedding in Pakistan.

oogabooga
January 8th, 2010, 02:06 AM
That'll be some sight; first zionist wedding in Pakistan.

What! Where? >(


*loads 50 caliber*





:laugh:

Ahmad Rashid Ahmad
January 11th, 2010, 10:34 PM
President PakGulf Sardar Tanveer Ilyas Khan has said that Pakistan is fast emerging as a destination of multiple investments in almost all sectors particularly in the real estate, says a press release.

Talking to Saudi and Pakistani business community in Saudi Arabia, President PakGulf Sardar Tanveer Ilyas Khan said there are number of business opportunities for the investor in Pakistan. He said Pakistan and Saudis have strong religious, cultural and emotional ties. The business cooperation is on the rise between the two countries. That is way Pakistan prefers its business relation with Saudis.

He said, “We are much thankful to King Abdullah Bin Abdul Aziz, the custodian of the two Holy Mosques, for being so helpful to Pakistan in every testing time.” The purpose of these meeting is to motivate both Saudi and Pakistani business community to invest in Pakistan, he said adding the mega complex Centaurus in the heart of Islamabad is speedily underway and the structure of this mega complex in now visible.

_BPS_
January 12th, 2010, 04:19 PM
What! Where? >(


*loads 50 caliber*





:laugh:

Right there!


*points there*

Ahmad Rashid Ahmad
January 20th, 2010, 03:21 PM
Centaurus website hasn't upload pictures from 14 days........

Koi Isloo wala hi update kar dey ya hum bus website key saharay hi hain.......:lol:

ABBASIA
January 21st, 2010, 06:59 AM
Centaurus website hasn't upload pictures from 14 days........

Koi Isloo wala hi update kar dey ya hum bus website key saharay hi hain.......:lol:

21st January Updates



http://www.thecentaurus.com/images/construction/latest/january/DSC_0026%20(600%20x%20399).jpg

ABBASIA
January 21st, 2010, 06:59 AM
http://www.thecentaurus.com/images/construction/latest/january/DSC_8395%20(600%20x%20399).jpg

ABBASIA
January 21st, 2010, 07:00 AM
http://www.thecentaurus.com/images/construction/latest/january/DSC_8397%20(600%20x%20399).jpg

ABBASIA
January 21st, 2010, 07:00 AM
http://www.thecentaurus.com/images/construction/latest/january/DSC_9928%20(600%20x%20399).jpg

ABBASIA
January 21st, 2010, 07:01 AM
http://www.thecentaurus.com/images/construction/latest/january/DSC_9921%20(600%20x%20399).jpg

ABBASIA
January 21st, 2010, 07:02 AM
http://www.thecentaurus.com/images/construction/latest/january/DSC_9918%20(600%20x%20399).jpg

Strong Hearted
January 21st, 2010, 10:24 AM
is this only me who cant see the pics???:dunno:

shahmeer
January 21st, 2010, 11:47 AM
soon we r gonna find out if it would be 21 floors with the mall or not.
if it is wht the mall it would be quit small then it would be only 3 floors to go

Ahmad Rashid Ahmad
January 21st, 2010, 12:54 PM
^^Nice pics but plz post pics in one post.........

It is confirmed that mall is of 5 floors & the three towers are 22 floors each......

brightside.
January 21st, 2010, 07:35 PM
^^Nice pics but plz post pics in one post.........

No, it's actually better to have 1 pic per post, since that means a max of 15 or so pictures per page, which makes it easier to browse. If there's dozens of pictures on a page, it makes it harder to scroll.

waqas03
January 22nd, 2010, 06:48 AM
No, it's actually better to have 1 pic per post, since that means a max of 15 or so pictures per page, which makes it easier to browse. If there's dozens of pictures on a page, it makes it harder to scroll.

very appropriate

Ahmad Rashid Ahmad
January 23rd, 2010, 07:17 PM
No, it's actually better to have 1 pic per post, since that means a max of 15 or so pictures per page, which makes it easier to browse. If there's dozens of pictures on a page, it makes it harder to scroll.

yup........Valid point

thedonation
January 30th, 2010, 08:28 PM
is there anyone can tell me some technical information abt the centaurus

1 - what is total floors area ? for all 4 towers

2 - what is floor area ratio ?

3 - what is size of foot print of the ground floor ?



thankx in advance :)

KB
January 30th, 2010, 08:50 PM
is there anyone can tell me some technical information abt the centaurus

1 - what is total floors area ? for all 4 towers

2 - what is floor area ratio ?

3 - what is size of foot print of the ground floor ?



thankx in advance :)

The best information you can find is on the website : http://thecentaurus.com/catalog.asp

For any further information, you will have to contact them.

James-Bond
January 31st, 2010, 12:01 AM
http://www.thecentaurus.com/images/construction/latest/january/DSC_9921%20(600%20x%20399).jpg

there is a new crane standing! I think they are starting on the 37 floor tower!

thedonation
January 31st, 2010, 01:10 PM
why the work has not yet start on free flowing curve , the main aesthetical element of the project ?

http://www5.speedyshare.com/files/20665228/download/curve%20%282%29.jpg

Ahmad Rashid Ahmad
January 31st, 2010, 02:53 PM
there is a new crane standing! I think they are starting on the 37 floor tower!

It has been there from 6-8 months.........

KB
January 31st, 2010, 03:30 PM
why the work has not yet start on free flowing curve , the main aesthetical element of the project ?



They asked me if they could start on that curve but I told them

" NO! Finish the towers and other works before embarking on that"

That's why.

thedonation
January 31st, 2010, 03:56 PM
They asked me if they could start on that curve but I told them

" NO! Finish the towers and other works before embarking on that"

That's why.

so the delay in construction of the curve is due to the process they follow and not any structural issue ?

oogabooga
January 31st, 2010, 04:43 PM
Kilobyte has robbed us of something yet again! >(

HOW LONG WILL WE HAVE TO BEAR THIS INJUSTICE! >(

Off with his balls!




:laugh:

Ahmad Rashid Ahmad
February 5th, 2010, 05:53 PM
http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_00492060020x20399.jpg

http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_00552060020x20399.jpg

http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_00592060020x20399.jpg

Ahmad Rashid Ahmad
February 5th, 2010, 05:54 PM
http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_00922060020x20399.jpg

http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_01142060020x20399.jpg

http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_01172060020x20399.jpg

Ahmad Rashid Ahmad
February 5th, 2010, 05:55 PM
http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_01982060020x20399.jpg

http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_02172039920x20600.jpg

http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_02182060020x20399.jpg

shahmeer
February 6th, 2010, 04:57 PM
nice pic

looks quit high now if u look down from top

J_Sultan
February 7th, 2010, 10:52 AM
looks amazing...

Ahmad Rashid Ahmad
February 7th, 2010, 04:26 PM
nice pic

looks quit high now if u look down from top

:yes:

thedonation
February 9th, 2010, 03:20 AM
PROJECT COMPONENTS:

5* DELUXE HOTEL 3,50,000 sq ft
SHOPPING MALL 2,87,560 sq ft
APARTMENTS 7,08,142 sq ft
OFFICES 2,65,893 sq ft – total – <<<<<<1611595 sft>>>>> widout basements
Source - http://www.rightmove.co.uk/overseas-property/property-21991379.html
--

anyone can verify this information ? because on so many pleaces they are telling
3 million square feet
Source 1 – 3 million square feet
http://www.arabnews.com/?page=6&section=0&article=90446&d=28&m=12&y=2006
--

Source – 2 Concept proposals for a 3 million sq ft
http://dreamsmania.com/hotels-famous-or-strange-architecture/islamabad-the-centaurus-seven-star-hotel/

source 3 page no 2 – The Centaurus covers 3 million square feet.
http://www.scribd.com/doc/18765725/The-Centaurus

so anyone plz verify that where is the remaining area consumption as above area calculation said
1611595 sft which is said to be 3 million sft. If we add area for 3 basements that will be around 2 or 2.5 lakh sft .

NorthWestern
February 9th, 2010, 04:31 AM
1611595 Sqft. means 1.61195 million Sqft.
and if you double the area inculding basement according to you then double the numbers give above which works out pretty much close to their numbers figured out

thedonation
February 9th, 2010, 04:07 PM
if we add basement then it will be around 1.8 or 1.85 million sft

Ahmad Rashid Ahmad
February 10th, 2010, 10:09 PM
The hotel is a 7 star hotel NOT 5 star deluxe.........:yes:

zocker000
February 12th, 2010, 06:52 PM
wikipedia :

the $350 million complex is planned to have a 37-story, 7 star deluxe hotel, with two 21-story residential towers, a 25-story corporate office tower, and a 5-story shopping mall, which will cover an area of 300,000 Sq ft, the mall will have a twin screen cinema and a food court.[1] The complex will have a parking lot to accommodate over 2,000 vehicles. It is designed to withstand up to 9.5 magnitude earthquakes and is scheduled to be completed in 2010

Ahmad Rashid Ahmad
February 12th, 2010, 06:55 PM
Chairman Board of Investment (BOI), Saleem H. Mandviwalla extended his full support and cooperation to investors in completion of mega projects like ‘The Centaurus’ for fast economic growth in the country.

BOI chairman on Thursday visited The Centaurus project, which involves investment of billions of rupees. Upon his arrival, Project Director Pak Gulf Brigadier (r) Humayun briefed him about the progress of the project. He was reinsured that The Centaurus will be completed on time despite the global recession and domestic unrest.

The BOI chairman appreciated the pace and quality of work being carried out at the site and acknowledged that the mega project would be an icon of the capital and would set an example for future investors and international developers. He said that BOI would continue to support such projects in future as well to pave the way for faster growth of the country. Pak-Gulf President Sardar Tanveer Ilyas Khan updated the chairman on the short-term and long-term goals of The Centaurus.

Ahmad Rashid Ahmad
February 12th, 2010, 07:48 PM
wikipedia :

the $350 million complex is planned to have a 37-story, 7 star deluxe hotel, with two 21-story residential towers, a 25-story corporate office tower, and a 5-story shopping mall, which will cover an area of 300,000 Sq ft, the mall will have a twin screen cinema and a food court.[1] The complex will have a parking lot to accommodate over 2,000 vehicles. It is designed to withstand up to 9.5 magnitude earthquakes and is scheduled to be completed in 2010

Couple of things changed now:

1). Corporate tower is also of 21 floors.
2). 3 towers will complete in 2010.
3). Hotel tower will complete in 2012.

Ahmad Rashid Ahmad
February 12th, 2010, 08:08 PM
http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_00612060020x20399.jpg

http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_00622060020x20399.jpg

http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_00632060020x20399.jpg

Ahmad Rashid Ahmad
February 12th, 2010, 08:09 PM
http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_00642060020x20399.jpg

http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_00652060020x20399.jpg

http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_00662039920x20600.jpg

Ahmad Rashid Ahmad
February 12th, 2010, 08:10 PM
http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_00682039920x20600.jpg

http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_00712060020x20399.jpg

http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_00732060020x20399.jpg

Ahmad Rashid Ahmad
February 12th, 2010, 08:11 PM
http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_00742060020x20399.jpg

http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_00802060020x20399.jpg

http://i999.photobucket.com/albums/af117/Ahmadrashid/DSC_00822060020x20399.jpg

Ahmad Rashid Ahmad
February 12th, 2010, 08:17 PM
Progress on floors:

LEFT Tower = 21st floor U/C (6 floors to go)
MIDDLE Tower = 17th floor U/C (10 floors to go)
RIGHT Tower = 14th floor U/C (13 floors to go)

malikkhalid7
February 12th, 2010, 09:22 PM
Progress on floors:

LEFT Tower = 21st floor U/C (6 floors to go)
MIDDLE Tower = 17th floor U/C (10 floors to go)
RIGHT Tower = 14th floor U/C (13 floors to go)

One tower will be 25 stories, two others will be 22 stories each, so
Left tower 4 floors to go, middle 5 floors and right tower 8 to go.

konichiwa
February 13th, 2010, 03:13 AM
Islamabad—Minister of State and Chairman BOI, Saleem H. Mandviwalla extended his full support and cooperation to President, Pak-Gulf, Sardar Tanveer Ilyas Khan for The Centaurus project during his visit to The CENTAURUS site. On his arrival, the chairman was briefed about the progress of the project by Project Director Pak Gulf Brig. (Rtd) Humayun. The Chairman was reinsured that The Centaurus will be completed on time despite the global recession and domestic unrest.

The Chairman BOI appreciated the speed and quality of work being carried out at the site and acknowledged that the mega project would be an icon of the Capital and would set an example for future investors and international developers. He said that BOI will continue to support such projects in future as well to pave the way for faster growth of the country.

The President, Pak-Gulf, Sardar Tanveer Ilyas Khan updated the Chairman on the short-term and long-term goals of The Centaurus. He stated that the immediate goal was to complete the Mega Shopping Mall, Residential Towers, Corporate Tower for which the construction work is being done around-the-clock and the ground work of the 7 star hotel is also in progress. He further ensured the Chairman of strict adherence to international standards of construction and was extremely confident that the mega project will be completed on time.

brightside.
February 13th, 2010, 11:21 AM
It's confirmed! Ground work of the hotel in progress! :happy:

Ahmad Rashid Ahmad
February 13th, 2010, 11:52 AM
^^Nice news.........:banana:

Ahmad Rashid Ahmad
February 13th, 2010, 11:56 AM
One tower will be 25 stories, two others will be 22 stories each, so
Left tower 4 floors to go, middle 5 floors and right tower 8 to go.

nope, you are wrong........

All are the three towers are of 22 floors excluding the 5 floors for mall.......We have discussed that a dozen times here. So,

LEFT TOWER - 6 floors to go
MIDDLE TOWER - 10 floors to go
RIGHT TOWER - 13 floors to go

KB
February 13th, 2010, 02:07 PM
@Taseer

All these pics have been posted on the previous page. Atleast take a look before you start posting (again)

taseer121
February 13th, 2010, 02:10 PM
@Taseer

All these pics have been posted on the previous page. Atleast take a look before you start posting (again)

I wasn't aware of it as i thought no body had posted them before.......
I will double check next time......

Menec3
February 15th, 2010, 12:50 AM
It's confirmed! Ground work of the hotel in progress! :happy:

If you look to the right you can see that the hotel has begun construction

shahmeer
February 15th, 2010, 12:39 PM
UPDATE 15 feb 2010

belive it or not i spend lot of time on for u pleople :)
because mashallah this buildings pogress is quit fast so i will inshallah update on this diagram regular.

http://farm5.static.flickr.com/4039/4359130182_a6745409e9_b.jpg

Strong Hearted
February 15th, 2010, 12:50 PM
Good work done by u Shahmeer :applause:

waqas03
February 15th, 2010, 02:02 PM
shahmeer, thanks.:)

Strong Hearted
February 15th, 2010, 02:08 PM
just updated the Islamabad thread on City Metro Compilations (http://www.skyscrapercity.com/forumdisplay.php?f=905) ..plz guyz post ur comments on this page, we need to grow these threads!

shahmeer
February 15th, 2010, 03:23 PM
just updated the Islamabad thread on City Metro Compilations (http://www.skyscrapercity.com/forumdisplay.php?f=905) ..plz guyz post ur comments on this page, we need to grow these threads!

thank you both of u:)

Ahmad Rashid Ahmad
February 15th, 2010, 08:30 PM
Nice work Shahmeer........:applause:

ychaman
February 15th, 2010, 10:45 PM
What software did you use for this image? I usually use photo shop for some of my work and I can say that if I was to do this render it would easily take 4-6 hours. So thank you for your hard work and dedication.

RANA AAA
February 16th, 2010, 05:41 AM
Nysh Shahmeer khan :okay:

thedonation
February 17th, 2010, 03:53 PM
shameer khan nice work
it will be more helpfull if u add some dimmensions on section

HUNNIE
February 24th, 2010, 01:45 AM
UPDATES 24th FEBRUARY


http://www.thecentaurus.net/construction/images/DSC_0020%20%28600%20x%20399%29.jpg

http://www.thecentaurus.net/construction/images/DSC_0022%20%28600%20x%20399%29.jpg

http://www.thecentaurus.net/construction/images/DSC_0023%20%28600%20x%20399%29.jpg

http://www.thecentaurus.net/construction/images/DSC_0024%20%28600%20x%20399%29.jpg

http://www.thecentaurus.net/construction/images/DSC_0027%20%28600%20x%20399%29.jpg

http://www.thecentaurus.net/construction/images/DSC_0028%20%28600%20x%20399%29.jpg

http://www.thecentaurus.net/construction/images/DSC_0029%20%28399%20x%20600%29.jpg

http://www.thecentaurus.net/construction/images/DSC_0030%20%28399%20x%20600%29.jpg

http://www.thecentaurus.net/construction/images/DSC_0032%20%28600%20x%20399%29.jpg

http://www.thecentaurus.net/construction/images/DSC_0033%20%28600%20x%20399%29.jpg

Ahmad Rashid Ahmad
February 24th, 2010, 09:37 PM
Great going......:applause:

shahmeer
February 24th, 2010, 11:01 PM
wow mashallah they added 1 floor in each tower.

and thanx for the update

taseer121
February 25th, 2010, 01:43 AM
great going...... Inshallah the whole project will be done in time..

Strong Hearted
February 25th, 2010, 04:07 PM
http://i49.tinypic.com/2sbr049.jpg

http://i50.tinypic.com/znloqa.jpg

http://i50.tinypic.com/11qmvi8.jpg

Aadil.Aijaz
February 25th, 2010, 07:12 PM
Great angle dude! Thanks for sharing.

Ahmad Rashid Ahmad
February 25th, 2010, 07:57 PM
Nice pics SH......:applause:

You are glowing in ISB as well........

RANA AAA
February 28th, 2010, 01:46 AM
work on hotel tower started :crazy:

Ahmad Rashid Ahmad
February 28th, 2010, 01:37 PM
work on hotel tower started :crazy:

:rant:

_BPS_
February 28th, 2010, 02:44 PM
Approximately, how many days/weeks is it taking them to add 1 floor to one tower?

shahmeer
February 28th, 2010, 02:59 PM
Approximately, how many days/weeks is it taking them to add 1 floor to one tower?

1 and half week :)

JADI
February 28th, 2010, 03:03 PM
nope, you are wrong........

All are the three towers are of 22 floors excluding the 5 floors for mall.......We have discussed that a dozen times here. So,

LEFT TOWER - 6 floors to go
MIDDLE TOWER - 10 floors to go
RIGHT TOWER - 13 floors to go

I have a little correction. The 2 residential towers will be 21 floors and the corporate tower will be 22 floors.

I received this email a couple of days ago:

THE CENTAURUS





The Centaurus:

Today more than ever, Pakistan is progressing in many fields of development. This is the result of its people thinking ahead of their times. To set their vision in stone, we present The Centaurus, the iconic structure of a progressive Pakistan. The Centaurus is much more than a building; it is a concrete step towards what the future of this country will look like. It is a reflection of individuals like you, who will make this future a reality. Centaurus is the brightest constellation in the southern sky, a collection of the most brilliant stars. We wanted to create a mirror image of that on this planet for people who outshine everyone else. People like you, the brightest stars in their fields. The Centaurus …because there are people who are miles ahead of competition…and then there are those who are light years ahead.



The Developers:

Pak Gulf Construction (Pvt.) Ltd. (PGCL) is a joint venture of Tamimi Global Company Pvt. Ltd. (TAFGA) of Saudi Arabia and Sardar Builders Holdings Dubai. Both, Tamimi & Sardar Groups posses a history of dealing with Mega Landmark Projects in Saudi Arabia, Middle East and Pakistan. Pak Gulf Construction (Pvt.) Ltd. now brings its skills and expertise to Pakistan's capital city, Islamabad in the form of an awe inspiring and highly lucrative mix use project, The Centaurus.



The Location:

The prime land measures 6.6 acres and situated at the confluence of Jinnah and Faisal Avenues in Sector F-8. This happens to be the Commercial Heart of the Capital where daily customer traffic exceeds 150,000 on an average.



The Components:

The Centaurus a spectacular urban structure consists of:



· Mega Shopping Mall ( 5 levels)

· Two Residential Apartment Towers (21 levels each)

· One Corporate Tower ( 22 Levels)

· The First Seven Star Hotel in Pakistan. (37 levels)



The apartments have 14 different layouts ranging from 1, 2, 3 and 4 bed simplex and duplex apartments and penthouses. Exclusive health club levels for the residential towers enhance the residents’ lifestyles.



The world class weather controlled Shopping Mall, comparable to any international branded and segmented Mega Mall, is being developed on the basis of the “One Stop Shop” concept. The Mega Mall spreads over five artistically designed and spacious floors segmented as follows:



- Level 0-3 Retail outlets of highly acclaimed International and National Brands

- Level 4 Food Court, Cineplex’s, Restaurants, Children’s play area, amusement area, etc.



The mall will serve as the primary shopping space catering to the needs of this mini metropolis that is The Centaurus. Not only will it be the preferred shopping destination of the luxury apartment residents and the corporate complex users, but it will also serve the elite clients of the seven star hotel, which has been deliberately left bare of shopping spaces to divert all traffic to the mall. To serve this purpose, the mall has been ingeniously connected to the hotel through an attractive Public Square. All outside traffic by virtue of being in the commercial heart shall be a bonus above this inbuilt traffic generation system.



The state of the art corporate complex will house top notch multi national companies and would be developed as the finest office address with most the modern facilities that the Capital can boast of.



The Hotel Brand:

The Centaurus has added another feather to its cap by attracting CONRAD Hotel, the luxury brand of the Hilton Hotels Corporation for the seven star hotel at The Centaurus.



The Architects:

THE CENTAURUS is designed by the world renowned Architects WS ATKINS of United Kingdom; who are best known for their land mark project like the imposing Burj-Al-Arab, Jumeirah Beach Hotel, World Trade Centre, Bahrain and Twisting Tower of Dubai, UAE etc.



The Main Contractors:

The main contractor for The Centaurus is China State Construction Engineering Corporation (CSCEC) a Fortune Global 500 Company that has successfully completed over 3000 projects in 100 countries. This comes at a time when Excavation and Contiguous Piling are complete and Test Piling for the Main Piling work is under progress.







For more information and project current status please log on to our website which is



www.thecentaurus.com













Thanks with warm regards



Waqas Awan

Sr. Executive Sales & Marketing

0300-5055733

www.thecentaurus.com

Ahmad Rashid Ahmad
February 28th, 2010, 04:10 PM
^^Nice info......
Their website is still saying that the residential towers will be of 22 floors each....:nuts:

Metropole
March 3rd, 2010, 11:09 PM
http://farm5.static.flickr.com/4004/4404936528_8e577d7d6c_o.jpg

http://farm5.static.flickr.com/4049/4404177637_25df4d1925_o.jpg

Metropole
March 3rd, 2010, 11:10 PM
http://farm5.static.flickr.com/4021/4404941760_bdb6d58358_o.jpg

http://farm5.static.flickr.com/4019/4404942694_a1b387fe83_o.jpg

Metropole
March 3rd, 2010, 11:12 PM
http://farm3.static.flickr.com/2744/4404942192_30801b4034_o.jpg

http://farm5.static.flickr.com/4064/4404944094_1e60de61cf_o.jpg

Metropole
March 3rd, 2010, 11:13 PM
http://farm3.static.flickr.com/2798/4404943808_797ef17fff_o.jpg

http://farm3.static.flickr.com/2773/4404180027_06e108058f_o.jpg

Metropole
March 3rd, 2010, 11:15 PM
http://farm5.static.flickr.com/4014/4404944424_cfd811c40e_o.jpg

http://farm3.static.flickr.com/2712/4404945036_44dc86fc04_o.jpg

Metropole
March 3rd, 2010, 11:16 PM
http://farm3.static.flickr.com/2755/4404944720_9d69b705d4_o.jpg

shahmeer
March 3rd, 2010, 11:36 PM
wow so clear pics hats off to us sir

James-Bond
March 4th, 2010, 12:02 AM
^^ Yeaa, Great pics! That look like an amazing camera!

Strong Hearted
March 4th, 2010, 01:27 AM
Yes lovely pictures, i love the quality :applause:

and that guard is watching u :D

KB
March 4th, 2010, 06:10 AM
Awesome pics Metropole :applause:

Metropole
March 4th, 2010, 11:08 AM
wow so clear pics hats off to us sir

^^ Yeaa, Great pics! That look like an amazing camera!

Yes lovely pictures, i love the quality :applause:

and that guard is watching u :D

Thanks. I have a Nikon D200 SLR camera with a 18-200 mm lens. It's quite nice though a newer model (D300) has replaced it.

Most of the pictures I've taken have been from a moving car. But pictures usually turn out even better if I'm stopped while taking the photos.

http://img.alibaba.com/photo/107913372/Nikon_D200_with_18_200mm_lens_camera.jpg

KB
March 4th, 2010, 01:12 PM
Awesome pics Metropole :applause:

Metropole
March 4th, 2010, 01:40 PM
Awesome pics Metropole :applause:

Thanks. I've still got lots and lots of photos to post over the next few weeks.

Aadil.Aijaz
March 4th, 2010, 06:32 PM
Great pics sir!

Ahmad Rashid Ahmad
March 4th, 2010, 09:09 PM
Awesome pics Sir G.........:okay:


Cha gaye ho......:yes:

taseer121
March 4th, 2010, 09:44 PM
I have never seen pictures of this quality on MP before regarding construction updates....
thanks for using a high resolution camera as it gives greater depth.....

Strong Hearted
March 5th, 2010, 11:54 AM
http://www.thecentaurus.net/construction/images/DSC_0004%20(399%20x%20600).jpg

http://www.thecentaurus.net/construction/images/DSC_0005%20(600%20x%20399).jpg

http://www.thecentaurus.net/construction/images/DSC_0006%20(399%20x%20600).jpg

Strong Hearted
March 5th, 2010, 11:57 AM
http://www.thecentaurus.net/construction/images/DSC_0007%20(600%20x%20399).jpg

http://www.thecentaurus.net/construction/images/DSC_0009%20(399%20x%20600).jpg

http://www.thecentaurus.net/construction/images/DSC_0009%20(399%20x%20600).jpg

Strong Hearted
March 5th, 2010, 11:59 AM
http://www.thecentaurus.net/construction/images/DSC_0011%20(600%20x%20399).jpg

http://www.thecentaurus.net/construction/images/DSC_0013%20(399%20x%20600).jpg

http://www.thecentaurus.net/construction/images/DSC_0022%20(600%20x%20399).jpg

shahmeer
March 5th, 2010, 01:54 PM
nice they started building the 22nd floor after this floor i will update my diagram

Rkhan
March 6th, 2010, 07:51 AM
this masterpiece will only become a masterpiece when they complete the main tower, which is supposed to have a 7 star hotel. hope they make it asap!!!!!

RANA AAA
March 8th, 2010, 06:16 AM
thanks for the updates Metropole and strong hearted :okay:

SeeAndReport.com
March 12th, 2010, 01:24 PM
http://www.lahorerealestate.com/ads/public/img-1268385132.jpg

RANA AAA
March 13th, 2010, 12:30 AM
wow nice ad. centaurus in the da hand :lol:

Ahmad Rashid Ahmad
March 13th, 2010, 12:50 PM
Very nice ad........

danishbhaizindabaad
March 14th, 2010, 06:18 PM
awesome ad . specially the theme in which the whole building in in one hand . impressive

brightside.
March 14th, 2010, 09:32 PM
Am I the only one who can't see the ad in the post itself? I had to quote his post, then copy/paste the link into a tab to see the ad.

Strong Hearted
March 14th, 2010, 10:28 PM
^^Nopes I can see the add, I had to do the same but only with the images that are uploaded via imageshack. dont know WTH is the problem with my net :bash:

Pakia
March 15th, 2010, 01:49 PM
Good pics, Metro & StrongH.

Don't forget to post them on your trip thread too.

techlahore
March 17th, 2010, 04:12 PM
I've been following MP for a long time, but didn't have much to contribute before this. Here are a few pics I took two days ago (3/15/2010). Thank you all for the great updates you keep posting on all the various listed projects... please accept this as my gratitude for your great work.

http://i943.photobucket.com/albums/ad273/techlahore/Islamabad%20Pics/CopyofPicture1141.jpg

http://i943.photobucket.com/albums/ad273/techlahore/Islamabad%20Pics/CopyofPicture112.jpg

http://i943.photobucket.com/albums/ad273/techlahore/Islamabad%20Pics/CopyofPicture109.jpg

http://i943.photobucket.com/albums/ad273/techlahore/Islamabad%20Pics/CopyofPicture106.jpg

http://i943.photobucket.com/albums/ad273/techlahore/Islamabad%20Pics/CopyofPicture113.jpg

http://i943.photobucket.com/albums/ad273/techlahore/Islamabad%20Pics/CopyofPicture094.jpg

--

The TechLahore Blog
http://www.techlahore.com

Dallas1
March 17th, 2010, 05:01 PM
very nice, thank you

Strong Hearted
March 17th, 2010, 06:18 PM
Good work techlahore :applause: thanks for the updates!

PakNorway
March 17th, 2010, 07:36 PM
Another guy who can give us updates :happy:

shahmeer
March 17th, 2010, 09:18 PM
I have also marked the point they were working at last month

from thinking they do 1 floor each 2 weeks they have slowed down little bit but still pogress maschallah.

:)

http://farm3.static.flickr.com/2705/4440767459_1934859f9c_b.jpg

Strong Hearted
March 17th, 2010, 09:26 PM
Thanx for the latest diagram shahmeer ,good work!:applause:

Ahmad Rashid Ahmad
March 17th, 2010, 09:58 PM
Nice pics techlahore......:applause:

taseer121
March 17th, 2010, 11:54 PM
great work...... techlahore........

Aashiq
March 18th, 2010, 01:02 AM
Good to see it being constructed

adil
March 18th, 2010, 05:02 AM
Guys this might be a silly question, but... I have noticed a lot of buildings underconstruction in Downtown Toronto. They tend to start off with a steel frame and then tend to rise fairly quickly.
When I see construction pictures from Pakistan all I see is grey. The buildings are pure concrete. Is that because these building are constructed in an area with active fault lines or is this just because that is the most common technique used or that the builders are not experienced at using the steel frame construction?
I assume that is why constructing a building like this takes so long in Pakistan.

ABBASIA
March 18th, 2010, 06:31 AM
Guys this might be a silly question, but... I have noticed a lot of buildings underconstruction in Downtown Toronto. They tend to start off with a steel frame and then tend to rise fairly quickly.
When I see construction pictures from Pakistan all I see is grey. The buildings are pure concrete. Is that because these building are constructed in an area with active fault lines or is this just because that is the most common technique used or that the builders are not experienced at using the steel frame construction?
I assume that is why constructing a building like this takes so long in Pakistan.

Yes we dont construct steel structure here in Pakistan, all of the buildings are concrete structures.

Strong Hearted
March 22nd, 2010, 03:24 PM
http://www.thecentaurus.net/construction/images/DSC_0001%20%28600%20x%20399%29.jpg

http://www.thecentaurus.net/construction/images/DSC_0002%20%28600%20x%20399%29.jpg

http://www.thecentaurus.net/construction/images/DSC_0003%20%28600%20x%20399%29.jpg

Strong Hearted
March 22nd, 2010, 03:26 PM
http://www.thecentaurus.net/construction/images/DSC_0004%20%28600%20x%20399%29.jpg

http://www.thecentaurus.net/construction/images/DSC_0007%20%28600%20x%20399%29.jpg

http://www.thecentaurus.net/construction/images/DSC_0010%20%28600%20x%20399%29.jpg

Strong Hearted
March 22nd, 2010, 03:27 PM
http://www.thecentaurus.net/construction/images/DSC_0018%20%28399%20x%20600%29.jpg

http://www.thecentaurus.net/construction/images/DSC_0019%20%28399%20x%20600%29.jpg

http://www.thecentaurus.net/construction/images/DSC_0024%20%28600%20x%20399%29.jpg

Strong Hearted
March 22nd, 2010, 03:30 PM
What I can guess is they are working on the structure of 23rd floor (tower 1), 19th floor(tower 2), 18th floor (tower 3).
Am I right?

Aashiq
March 22nd, 2010, 09:49 PM
Yeah they are
I heard it should be completed by december

shahmeer
March 23rd, 2010, 09:50 PM
What I can guess is they are working on the structure of 23rd floor (tower 1), 19th floor(tower 2), 18th floor (tower 3).
Am I right?

i think t3 is 16 :)

and Strong Hearted since u went to kuwait there is no update on the lahore threats:bash:

Strong Hearted
March 23rd, 2010, 10:02 PM
i think t3 is 16 :)

and Strong Hearted since u went to kuwait there is no update on the lahore threats:bash:

Yes its 16th

Lolz dun worry I will be back in action :D Leaving tomorrow for Lahore :banana:

shahmeer
March 23rd, 2010, 10:12 PM
Yes its 16th

Lolz dun worry I will be back in action :D Leaving tomorrow for Lahore :banana:

inshallah:banana:

Ahmad Rashid Ahmad
March 27th, 2010, 09:10 AM
http://i999.photobucket.com/albums/af117/Ahmadrashid/da30bc485dd12dcf70796b380724eaa6.jpg

mynameisdanish
March 28th, 2010, 02:25 PM
nice pic the last one . great angle . nice luck to got this pic

KB
March 28th, 2010, 02:34 PM
by zaki.shaheen (http://www.flickr.com/photos/asturias03/page3/)
http://farm5.static.flickr.com/4062/4440505752_968eba7cb4_b.jpg

abidi2009
March 29th, 2010, 08:34 AM
wow.....its huge!

GoBaby
March 29th, 2010, 10:55 AM
Guys this might be a silly question, but... I have noticed a lot of buildings underconstruction in Downtown Toronto. They tend to start off with a steel frame and then tend to rise fairly quickly.
When I see construction pictures from Pakistan all I see is grey. The buildings are pure concrete. Is that because these building are constructed in an area with active fault lines or is this just because that is the most common technique used or that the builders are not experienced at using the steel frame construction?
I assume that is why constructing a building like this takes so long in Pakistan.

adil, there are two reasons for this.

1. Pakistan doesn't really have the amount of steel(read: capability) required to build a pure steel structure. Importing would be very expensive. You'll see steel high-rises in western countries predominently because they have cheaper steel. Plus the construction time is lower as well, which helps them save considerably on the labour costs.

2. You're right about fault lines thing...Concreate-reinforced structures are much stronger than steel structures. But then again, steel industry counters it with the fact that steel structure can absorb energy by bending...where as concreate doesn't. The other reason is labour being much cheaper in Pakistan so people often go with concrete.

You might have noticed, labour is also the reason houses in US are built from wood - its just to save money on labour costs. Btw, thats what I learned from the intraweb few years ago....as the saying goes...google is your friend :)

Ahmad Rashid Ahmad
March 29th, 2010, 07:42 PM
http://i999.photobucket.com/albums/af117/Ahmadrashid/599ef78b604c9d4de71b7eb0a6fd4a4e.jpg

bablo124
March 30th, 2010, 12:03 AM
Wb main hotel tower. Whn they gonna start?

malpensa
March 30th, 2010, 02:41 AM
Turkish firm to develop interior of The Centaurus
Observer Report


Islamabad—PakGulf has signed an agreement with renowned Turkish firm for designing the interior of The. The Centaurus consists of a shopping mall, two luxurious apartments towers, a corporate tower and a seven star hotel. Interest was shown by many companies for the interior designing. In depth due diligence was carried out canvassing technical capabilities, financial strength and workmanship in similar project and on merit it was decided that the contract be awarded to Odein Architecture & Interior Design.

The agreement was signed by President PGCL Sardar Tanveer Ilyas Khan and Ugur Onur Chairman of Odein. After the signing ceremony khan said the Centaurus will be an icon in Islamabad and will usher a new era in the real estate sector.

PGCL has already engaged the world renowned companies Atkins as project designer, China State Construction Eng. Corp. main contractor for the construction.

Ahmad Rashid Ahmad
April 1st, 2010, 06:47 PM
Turkish President Abdullah Gul Thursday lauded the under-construction mixed-use project of The Centaurus and described it as a milestone towards economic prosperity of brother Islamic country.He expressed these views in a meeting with Sardar Tanvir Ilyas Khan, President Pak-Gulf Construction Limited, a joint venture of Al Tamimi (Saudi Arabia) and Sardar Builders (Pakistan) executing the multi-billion project, who called on the visiting President here, said a press release.
The Turkish President said it was pleasing that such a gigantic project is being executed with full pace in Pakistan and assured for all out cooperation for the interior designing of The Centaurus to be executed by a Turkish firm.
Pak-Gulf had signed an agreement with Turkish firm for interior designing the complex.
Abdullah Gul also offered Pak-Gulf to invest capital in Turkey as well and assured for maximum cooperation in this regard.
President Pak-Gulf thanked Turkish President and said his visit to Pakistan along with his business delegation will strengthen trade ties between two brotherly states.
He said Centaurus will be an icon in Islamabad and will usher a new era in economic sector, adding that the interest shown by Turkish President and business delegation is pleasant gesture for Pakistan’s business community.
The Complex comprises a five-storey shopping mall, two 28-storeys each luxurious apartment towers, a 28-storey corporate tower and a 37-storey seven star hotel.
PGCL has already engaged the world renowned companies Atkins as project designer, China State Construction Eng. Corp. main contractor for the construction. The complex is designed by Atkins, whose portfolio includes the Burj Al Arab and Jumeirah Beach Hotel in Dubai, and the Bahrain World Trade Center in Bahrain.

KB
April 2nd, 2010, 01:31 PM
April 02,2010

http://www.thecentaurus.net/construction/images/DSC_0001%20(600%20x%20399).jpg

http://www.thecentaurus.net/construction/images/DSC_0004%20(600%20x%20399).jpg

http://www.thecentaurus.net/construction/images/DSC_0009%20(600%20x%20399).jpg

KB
April 2nd, 2010, 01:32 PM
April 02,2010

http://www.thecentaurus.net/construction/images/DSC_0025%20(399%20x%20600).jpg

http://www.thecentaurus.net/construction/images/DSC_0030%20(600%20x%20399).jpg

http://www.thecentaurus.net/construction/images/DSC_0033%20(399%20x%20600).jpg

http://www.thecentaurus.net/construction/images/DSC_0037%20(600%20x%20399).jpg

http://www.thecentaurus.net/construction/images/DSC_0040%20(600%20x%20399).jpg

shahmeer
April 2nd, 2010, 04:41 PM
Diagram UPDATE

http://farm5.static.flickr.com/4043/4484376826_29f0e8454e_b.jpg

Strong Hearted
April 2nd, 2010, 05:05 PM
Thanx for the latest diagram Shahmeer :)

Aashiq
April 2nd, 2010, 05:57 PM
I really want to see that seven star hotel after its done.

Ahmad Rashid Ahmad
April 2nd, 2010, 09:53 PM
Nice work Shahmeer......:applause:

taseer121
April 2nd, 2010, 11:30 PM
I think only 4 floors are left and then the first tower will be completed.....

RANA AAA
April 3rd, 2010, 03:03 AM
shahmeer bhai zindabad

shahmeer
April 3rd, 2010, 01:33 PM
THANK YOU ALL OF YOU NICE SERVING U

FAISAL MOIN
April 7th, 2010, 07:50 PM
UPDATE AS ON April 07, 2010
Took these photos from my nokia 5130. So the pic quality not gud with 2MP camera.



http://i1011.photobucket.com/albums/af238/faisalmoin/Image0022.jpg




http://i1011.photobucket.com/albums/af238/faisalmoin/Image0023.jpg




http://i1011.photobucket.com/albums/af238/faisalmoin/Image0024.jpg




http://i1011.photobucket.com/albums/af238/faisalmoin/Image0025.jpg




http://i1011.photobucket.com/albums/af238/faisalmoin/Image0028.jpg




http://i1011.photobucket.com/albums/af238/faisalmoin/Image0027.jpg

FAISAL MOIN
April 7th, 2010, 07:52 PM
http://i1011.photobucket.com/albums/af238/faisalmoin/Image0026.jpg

Aashiq
April 7th, 2010, 09:53 PM
Thanks for the pics,hopefully it will be completed by December but why are the not working on the seven star hotel?

Strong Hearted
April 7th, 2010, 09:57 PM
Superb pics Faisal :applause: all the pics are taken from very good angles!

Ahmad Rashid Ahmad
April 7th, 2010, 11:27 PM
Nice pics.....:applause:


Keep them coming.....

PakiDoperz
April 8th, 2010, 02:06 AM
Thanks for the pics,hopefully it will be completed by December but why are the not working on the seven star hotel?

if i am not worng, i read it somewhere in a news paper, the CDA is trying to get approval from the government for this hotel and hayyat hotel. so until they get approval they wont start this

Aashiq
April 8th, 2010, 03:57 PM
if i am not worng, i read it somewhere in a news paper, the CDA is trying to get approval from the government for this hotel and hayyat hotel. so until they get approval they wont start this

wow thats like 5 more years of waiting

mudassar Butt
April 8th, 2010, 06:13 PM
if i am not worng, i read it somewhere in a news paper, the CDA is trying to get approval from the government for this hotel and hayyat hotel. so until they get approval they wont start this


In case of Hotel grand hyat tower was approved by the CDA but later PAF and CAA objected the height of the building. But as the CDA had already given approval mentioning in the approval letter that no other agency, institute or any authority whatever can effect the completion of project by objecting on it.
Therefore BNP (Owners) is putting pressure on CDA and frequent meetings are occuring with CDA, CAA and PAF officials. To date CAA and PAF has agreed on constructing the tower upto a height which becomes about half of the original height of the main tower. (Dont remmember the exact height)

Same kind of restrictions seems to be with Centaurus. Lets see what happen next.

brightside.
April 8th, 2010, 06:35 PM
Why do these retards always restrict building heights?! Singapore is tiny with an airport yet look at their buildings.

Strong Hearted
April 13th, 2010, 05:16 PM
12-04-2010
http://www.thecentaurus.net/construction/images/DSC_0005%20(600%20x%20399).jpg

http://www.thecentaurus.net/construction/images/DSC_0006%20(600%20x%20399).jpg

http://www.thecentaurus.net/construction/images/DSC_0014%20(600%20x%20399).jpg

Strong Hearted
April 13th, 2010, 05:19 PM
http://www.thecentaurus.net/construction/images/DSC_0015%20(600%20x%20399).jpg

http://www.thecentaurus.net/construction/images/DSC_0016%20(600%20x%20399).jpg

http://www.thecentaurus.net/construction/images/DSC_0017%20(600%20x%20399).jpg

Strong Hearted
April 13th, 2010, 05:20 PM
http://www.thecentaurus.net/construction/images/DSC_0019%20(600%20x%20399).jpg

http://www.thecentaurus.net/construction/images/DSC_0020%20(600%20x%20399).jpg

http://www.thecentaurus.net/construction/images/DSC_0021%20(600%20x%20399).jpg

Strong Hearted
April 13th, 2010, 05:22 PM
http://www.thecentaurus.net/construction/images/DSC_0025%20(600%20x%20399).jpg

Ahmad Rashid Ahmad
April 13th, 2010, 06:00 PM
According to me:

LEFT TOWER - 25th floor U/C
MIDDLE TOWER - 21st floor U/C
RIGHT TOWER - 20th floor U/C

James-Bond
April 13th, 2010, 10:15 PM
^^ So one tower is almost topped out! By the way, great update!

Ahmad Rashid Ahmad
April 13th, 2010, 11:07 PM
According to me:

LEFT TOWER - 25th floor U/C (2 floors to go)
MIDDLE TOWER - 21st floor U/C (6 floors to go)
RIGHT TOWER - 19th floor U/C (8 floors to go)

khalid-don
April 14th, 2010, 02:56 AM
According to me:

LEFT TOWER - 25th floor U/C (2 floors to go)
MIDDLE TOWER - 21st floor U/C (6 floors to go)
RIGHT TOWER - 19th floor U/C (8 floors to go)

Looks like all the towers would be 27 floors; if so is it possible for Mods to update the floor numbers in thread title from 22 to 27.

RANA AAA
April 14th, 2010, 07:45 AM
shukar hai hotel tower pe bi kam shuru hoa nai to sab nai saeh tang akr diya tha pouch pouch ka :(

nice Updates MOhsin Bhai :)

sourierservice
April 14th, 2010, 12:11 PM
Looks like all the towers would be 27 floors; if so is it possible for Mods to update the floor numbers in thread title from 22 to 27.

:rant: :doh: plz go through previous pages :tongue3:

shahmeer
April 14th, 2010, 12:54 PM
shukar hai hotel tower pe bi kam shuru hoa nai to sab nai saeh tang akr diya tha pouch pouch ka :(

nice Updates MOhsin Bhai :)

sir how do u know that the work on the hotel has started ? I did no understandt:)

taseer121
April 16th, 2010, 08:40 PM
^^ neither did I......please shed some light on it....

FAISAL MOIN
April 18th, 2010, 05:17 PM
The Work on hotel is not started yet. We have to wait for it.

FAISAL MOIN
April 18th, 2010, 05:18 PM
VIEW OF CENTAURUS FROM E-7

http://i1011.photobucket.com/albums/af238/faisalmoin/Image0104.jpg

KB
April 26th, 2010, 12:49 PM
April 26, 2010

http://www.thecentaurus.net/construction/images/DSC_0109%20(600%20x%20399).jpg

http://www.thecentaurus.net/construction/images/DSC_0142%20(600%20x%20399).jpg

http://www.thecentaurus.net/construction/images/DSC_0147%20(399%20x%20600).jpg

http://www.thecentaurus.net/construction/images/DSC_0151%20(399%20x%20600).jpg

http://www.thecentaurus.net/construction/images/DSC_0035%20(600%20x%20399).jpg

shahmeer
April 26th, 2010, 01:47 PM
http://farm4.static.flickr.com/3568/4554470222_8f624cdafd_b.jpg

when i was making this diagram i noticed that they have slowed down on tower 1 and 2 but going good past on tower 3.:)

Strong Hearted
April 26th, 2010, 09:11 PM
Thanx for the latest diagram shahmeer :)

Aashiq
April 26th, 2010, 10:01 PM
Thanks for the pics and diagram.

So sad no work is going on the 7 star hotel :(

GoBaby
April 28th, 2010, 04:34 AM
Thanks for the pics and diagram.

So sad no work is going on the 7 star hotel :(

yea...and that hotel is the crown of the building...without it the project looks just like any other ordinary building.

and it would have been great if the entire building was made black...looks super sexy that way.

kammak
May 2nd, 2010, 12:05 PM
http://farm3.static.flickr.com/2759/4451582361_7c3feff8bf_o.jpghttp://i292.photobucket.com/albums/mm34/fawadsyed/Islamabad/IMG0026B.jpg

James-Bond
May 2nd, 2010, 06:52 PM
http://farm3.static.flickr.com/2759/4451582361_7c3feff8bf_o.jpg

I'm starting to see a bit of progress in the skyline. Great Pic

FAISAL MOIN
May 3rd, 2010, 07:55 AM
Thx for the update but This is atleast 6-7 week old pic.

compnature
May 4th, 2010, 02:32 AM
nice pic ...

taseer121
May 11th, 2010, 04:17 PM
http://farm2.static.flickr.com/1227/4598119975_97672e2a7a_o.jpg
http://farm5.static.flickr.com/4033/4598737778_11dc91760f_o.jpg
http://farm4.static.flickr.com/3504/4598119649_8b87d10f80_o.jpg

taseer121
May 11th, 2010, 04:19 PM
http://farm5.static.flickr.com/4031/4598119753_182ed91b30_o.jpg

taseer121
May 11th, 2010, 04:21 PM
http://farm4.static.flickr.com/3036/4598119557_4e31353ece_o.jpg
http://farm4.static.flickr.com/3369/4598737314_b4e738c009_o.jpg
http://farm2.static.flickr.com/1052/4598737220_7808233100_o.jpg
http://farm2.static.flickr.com/1338/4598737100_44d977d86a_o.jpg

taseer121
May 11th, 2010, 04:22 PM
http://farm2.static.flickr.com/1145/4598119187_075010a551_o.jpg
http://farm4.static.flickr.com/3466/4598119073_bd33253e6f_o.jpg
http://farm2.static.flickr.com/1049/4598118773_a72e77d254_o.jpg

taseer121
May 11th, 2010, 04:25 PM
http://farm2.static.flickr.com/1369/4598118657_c65cdaebdc_o.jpg
http://farm4.static.flickr.com/3421/4598118549_c37b6ee641_o.jpg
http://farm2.static.flickr.com/1307/4598118447_aa2abf1f96_o.jpg

shahmeer
May 11th, 2010, 04:42 PM
the hight is not changing the have slowed down and have just added 1 floor to the middle tower

oogabooga
May 11th, 2010, 04:52 PM
*waits for some idiot to speculate on their financial condition*

_BPS_
May 12th, 2010, 09:25 AM
may be doing some interior works? pics are not working.

FAISAL MOIN
May 12th, 2010, 11:33 AM
Update as on May 11, 2010.


http://i1011.photobucket.com/albums/af238/faisalmoin/DSC_0006.jpg

FAISAL MOIN
May 12th, 2010, 11:34 AM
http://i1011.photobucket.com/albums/af238/faisalmoin/DSC_00061.jpg

FAISAL MOIN
May 12th, 2010, 11:35 AM
http://i1011.photobucket.com/albums/af238/faisalmoin/DSC_000612.jpg

Strong Hearted
May 12th, 2010, 12:25 PM
Wow great shots :okay: from what point u took these shots?

KB
May 12th, 2010, 12:37 PM
^^Daman-e-Koh

Faisal, do you have some Telecom tower pics too?

FAISAL MOIN
May 12th, 2010, 12:59 PM
Thx!
I took these shots from between daman e koh N monal. I had Nikon D90 :-)
Yes I also took Tel tower pics. will post em ASAP.... n some Isloo picz too.

taseer121
May 12th, 2010, 03:03 PM
pictures are working fine.......

Ahmad Rashid Ahmad
May 12th, 2010, 05:38 PM
very nice pics....:applause:

James-Bond
May 12th, 2010, 10:48 PM
It looks SWEEEETTT! :happy:


One project I will always have hope on!

konichiwa
May 21st, 2010, 04:19 PM
Drove past it the other day and they seem to working on the 24th floor of the tallest tower.

hero g
May 21st, 2010, 04:53 PM
http://www.thecentaurus.net/construction/images/DSC_0043%20(600%20x%20399).jpg
as you can see crane is lifting some stuff that'd mean they are working 5 star hotel, now

Aadil.Aijaz
May 21st, 2010, 05:50 PM
^^
Hope what you're saying is true. Thanks for the update!

ABBASIA
May 21st, 2010, 06:22 PM
as you can see crane is lifting some stuff that'd mean they are working 5 star hotel, now

Another novice joiner with little clue about the project giving an expert opinion. :bash:

shahmeer
May 21st, 2010, 07:21 PM
i dont know how people dont understandt simple stuff

The hotel will not begin until the other 3 towers and the mall gets complete and mostly sold out.

taseer121
May 21st, 2010, 09:43 PM
^^aahhhhhhhh

_BPS_
May 22nd, 2010, 01:33 AM
^^ That crane could simply just be aiding the construction of the other towers.

hero g
May 22nd, 2010, 02:27 AM
i dont know how people dont understandt simple stuff

The hotel will not begin until the other 3 towers and the mall gets complete and mostly sold out.

the completion date for 5 star hotel is december 2010 or early 2011, and without the tower project has no meaning. so i bet you'll see the tower rising in few months.:)

Aashiq
May 22nd, 2010, 02:29 AM
Nice pics

But last time I heard was that they are not currently working on the 7 star hotel due to some problems. But I hope what your saying is true.

RANA AAA
May 22nd, 2010, 03:54 AM
http://www.thecentaurus.net/construction/images/DSC_0043%20(600%20x%20399).jpg
as you can see crane is lifting some stuff that'd mean they are working 5 star hotel, now

:doh:

http://i1011.photobucket.com/albums/af238/faisalmoin/DSC_000612.jpg

nice shot :okay:

Ahmad Rashid Ahmad
May 22nd, 2010, 09:50 AM
i dont know how people dont understandt simple stuff

The hotel will not begin until the other 3 towers and the mall gets complete and mostly sold out.

+1

brightside.
May 22nd, 2010, 12:48 PM
I highly doubt that the hotel will not be completed until the three towers are complete. I mean, it will look extremely odd to have 3 fully completed glass cladded towers next to a U/C tower which is supposed to be attached to them. I think the hotel will be constructed before anyone gets to live in or open up stores in the other three towers.

KB
May 22nd, 2010, 02:39 PM
I highly doubt that the hotel will not be completed until the three towers are complete. I mean, it will look extremely odd to have 3 fully completed glass cladded towers next to a U/C tower which is supposed to be attached to them. I think the hotel will be constructed before anyone gets to live in or open up stores in the other three towers.

As opposed to the hotel, there are people waiting to get possession of their penthouses and/or shops. I am pretty sure the two residential towers and mall will be up and running well before the hotel gets completed.

IIRC, the time line for hotel tower is somewhere end of 2012 (possibly Dec 21).

Aashiq
May 22nd, 2010, 05:05 PM
LMAO December 21st 2012 the hotel gets completed.

stevensp
May 22nd, 2010, 05:20 PM
LMAO December 21st 2012 the hotel gets completed.
:banana:

_BPS_
May 25th, 2010, 06:55 AM
LMAO December 21st 2012 the hotel gets completed.

:lol::lol::lol::lol::lol:\

How do you know?

shahmeer
May 25th, 2010, 01:04 PM
[[

shahmeer
May 25th, 2010, 01:07 PM
i have noticed that tower 3 desin is diffrent to t 1 and 2 if u look at the close up pic it has a thin strip in each floor which there two dont have

shahmeer
May 25th, 2010, 01:36 PM
25 may 2010
http://farm5.static.flickr.com/4005/4638803204_6b548b0aff_b.jpg

ABBASIA
May 25th, 2010, 04:02 PM
i have noticed that tower 3 desin is diffrent to t 1 and 2 if u look at the close up pic it has a thin strip in each floor which there two dont have


That is because 3rd tower is corporate tower and will be different as compared to other two towers.It will be 22 floors tall, adding the lower mall, total 22+5=27.

Strong Hearted
May 25th, 2010, 07:17 PM
Good updates Shahmeer :applause:

Ahmad Rashid Ahmad
May 25th, 2010, 09:09 PM
Nice work Taseer & Shahmeer.....

James-Bond
May 25th, 2010, 10:19 PM
Very nice update tasser Jee! :happy:

The progress is just amazing!

khalid-don
May 26th, 2010, 12:58 AM
:rant: :doh: plz go through previous pages :tongue3:

No need to go through previous pages. It has been updated.

thxs Mods

Rkhan
May 27th, 2010, 04:19 PM
i feel that they've slowed down a little now. They should have completed atleast one building by now and working on finishing works or MEP. wonder why..

_BPS_
May 31st, 2010, 05:01 AM
http://www.thecentaurus.net/construction/images/DSC_0091%20(399%20x%20600).jpghttp://www.thecentaurus.net/construction/images/DSC_0086%20(600%20x%20399).jpg

The 40 page Centaurus digital catalogue:
http://amazingcatalog.com/demos/centaurus/digital_catalogue.html

Ahmad Rashid Ahmad
June 1st, 2010, 03:51 PM
i feel that they've slowed down a little now. They should have completed atleast one building by now and working on finishing works or MEP. wonder why..

They are going alright & according to plan they will finish these three towers at the end of this year, what's wrong with that....

FAISAL MOIN
June 2nd, 2010, 06:23 AM
They have completed 27 levels of first tower. but sil construction is going on above this. i think the tower will be of 25 floors + 5 levels of mall...... 27 floors is the total no of floors including 5 storey mall... Am i right?