February 27th, 2012, 03:14 PM
I will make a photo at weekend. There is a lot of workers there and they have a problem with fence because of sand storms.
|
View Full Version : #UNDER C: AL SAQRAN TOWER, 37F Res+Com, 130m, Plot R3 mikel1982 February 27th, 2012, 03:14 PM I will make a photo at weekend. There is a lot of workers there and they have a problem with fence because of sand storms. skkappi February 28th, 2012, 09:35 PM new photos from almasahint.com http://imageshack.us/f/856/img5556medium.jpg/ http://imageshack.us/f/546/img5552medium.jpg/ http://imageshack.us/f/716/img5542medium.jpg/ http://imageshack.us/f/827/img5539medium.jpg/ http://imageshack.us/photo/my-images/716/img5542medium.jpg/ http://imageshack.us/f/716/img5542medium.jpg/ auzdafluff March 11th, 2012, 07:40 PM I see some genius at DMCC has granted Almasah permission to close off half of the top level parking on cluster R, despite it being the podium that suffers the worst from overcrowding down this end of JLT. F**king idiots. AltinD March 14th, 2012, 03:50 PM ^^ Saw that last night, WTF! mikel1982 March 15th, 2012, 07:59 PM Maybe its a security reason ? After last sand storm i was afraid for walking next to this building... mikel1982 March 25th, 2012, 07:21 PM 11-th floor in progress http://img96.imageshack.us/img96/28/img6714a.jpg (http://imageshack.us/photo/my-images/96/img6714a.jpg/) Imre March 30th, 2012, 10:39 AM 30/March/2012 Al Saqran Tower http://i42.tinypic.com/swco4x.jpg auzdafluff March 30th, 2012, 08:38 PM Does anyone have any idea what all the fire engines, police, and ambulances were at Al Sarqan for before. FromWarsaw March 31st, 2012, 07:53 PM Thanks Imre, what you think about the progress? Imre April 1st, 2012, 06:00 AM Thanks Imre, what you think about the progress? Welcome, progress is not too bad , still slow but at least workers there! Now we can guess which will be ready first , Dubai Star or Al Saqran ?:) larikov April 3rd, 2012, 02:54 PM Does anyone have any idea what all the fire engines, police, and ambulances were at Al Sarqan for before.It was a little fire on the top floor. But nothing serious https://p.twimg.com/ApOOsCdCEAADlkF.jpg:large anacreon April 3rd, 2012, 08:20 PM I passed by there today. Didn't seem to be anyone working. auzdafluff April 3rd, 2012, 09:39 PM I passed by there today. Didn't seem to be anyone working. Nope. But I see they've brought in extra security for the podium and the towers. I heard that there was a pretty bad bust up between some residents and visitors over the lack of parking which almost came to blows. I've also heard a couple of people parking in the drop off only bays and telling the guards "they can f*** off if they think they can close off half the car park and then fine people for parking in the bays when there's no parking left". Wac April 9th, 2012, 03:31 PM I am not in town. Is there any update on the owners NOT being on Al Masah's list? Are they still asking for additional money to transfer the ownership from PIM's list to their list? skkappi April 15th, 2012, 03:21 AM Almasah restored website new photo http://worldwidepm.com/ww45/site-110412.html Mazda April 15th, 2012, 08:48 AM It seems, that the 12 floor is already finish, and there is many workers, on the site. skkappi April 26th, 2012, 01:21 AM new pic http://worldwidepm.com/ww45/site-250412.html 06/05/12 http://worldwidepm.com/ww45/site-060512.html 16.05.12 http://worldwidepm.com/ww45/site-160512.html 24.05 http://worldwidepm.com/ww45/site-240512.html Wac May 22nd, 2012, 06:37 PM anyone having problem in transfering the contract form PMI to AlMasah. As I heard they are creating problems for owners. Thanks. mikel1982 May 22nd, 2012, 06:43 PM Small progress in this tower, they are fighting with 12 floor for 2 months .. Wac May 22nd, 2012, 06:57 PM mikel 1982: did you get your new contract or not yet. auzdafluff May 22nd, 2012, 08:37 PM Small progress in this tower, they are fighting with 12 floor for 2 months .. Probably because they keep having to fight off the residents of Mag 214 and Al Waleed Paradise for blocking off half the available overflow parking. :lol: auzdafluff May 30th, 2012, 02:00 PM http://img51.imageshack.us/img51/1309/alsaqran.jpg (http://imageshack.us/photo/my-images/51/alsaqran.jpg/) skkappi May 31st, 2012, 09:07 PM http://img51.imageshack.us/img51/1309/alsaqran.jpg (http://imageshack.us/photo/my-images/51/alsaqran.jpg/) thank you! Very nice photo Mazda June 3rd, 2012, 01:22 PM Thank You, very nice photo, but it seem that there is no workers on the site. They are Still working? auzdafluff June 3rd, 2012, 02:09 PM Thank You, very nice photo, but it seem that there is no workers on the site. They are Still working? Yeah, they are. I took that when I was besides the pool on one of my days off. I think it was around 5pm, so most of them had already gone home for the day. Mazda June 3rd, 2012, 04:48 PM Thank You, for your information. skkappi June 11th, 2012, 02:06 PM new photo http://worldwidepm.com/ww45/site-070612.html bayern3999 June 13th, 2012, 02:02 PM wow.....at least 13 floors are ready....lets keep our fingers crossed skkappi June 13th, 2012, 08:51 PM http://worldwidepm.com/ww45/site-130612.html very slowly http://worldwidepm.com/ww45/site-040712.html http://worldwidepm.com/ww45/site-110712.html mashraf42 July 13th, 2012, 09:42 AM Hi how much did the apartments in al saqaran sell for originally? SPEPTUZKA July 17th, 2012, 09:25 AM Hello Guys, I'm also one of the owners in this doomed tower... Can please somebody give me contacts ( telephone nuber will be great)of the new developer? Currently I'm not in Dubai and I don't have no updates what so ever. Is it Almasah the new developer? And also who is the person ''taking care '' of Saqran development. Thanks in advance ! auzdafluff July 17th, 2012, 10:14 AM Hello Guys, I'm also one of the owners in this doomed tower... Can please somebody give me contacts ( telephone nuber will be great)of the new developer? Currently I'm not in Dubai and I don't have no updates what so ever. Is it Almasah the new developer? And also who is the person ''taking care '' of Saqran development. Thanks in advance ! I live across the cluster. I'll see if I can get a phone number off the board for you. Wac July 18th, 2012, 01:33 AM Hello Guys, I'm also one of the owners in this doomed tower... Can please somebody give me contacts ( telephone nuber will be great)of the new developer? Currently I'm not in Dubai and I don't have no updates what so ever. Is it Almasah the new developer? And also who is the person ''taking care '' of Saqran development. Thanks in advance ! http://almasahint.com Tel: +971 4 422 4200 http://worldwidepm.com/ww45/index.html SPEPTUZKA July 25th, 2012, 01:13 PM Thank you guys :) I'm currently in contact with Sharofat Kubranova, she send me over the current stage of the construction, and is quitte helpfull so far in terms of explanations and requirements. mikel1982 July 26th, 2012, 06:23 PM Anybody knows why is no progress ? (Its not because of Ramadan, since no visible progress from looong time). auzdafluff July 26th, 2012, 07:50 PM Anybody knows why is no progress ? (Its not because of Ramadan, since no visible progress from looong time). Because they like hogging half the car park and causing untold annoyance to Al Waleed and MAG 214 residents? :p Honestly, I have no idea. Mazda July 26th, 2012, 10:12 PM But at least there are workers, on the site, or they stop again? mikel1982 July 27th, 2012, 07:22 PM I didnt see any workers from long time. auzdafluff July 28th, 2012, 06:31 PM They're pouring concrete at the moment. mashraf42 July 29th, 2012, 02:12 AM Have they started on the fourteenth floor yet? mikel1982 July 29th, 2012, 06:04 AM I saw some workers yestarday in the evening and today in the morning. But progress is extremely slow. mashraf42 July 29th, 2012, 09:05 AM At least they are working. thanks for the update. FromWarsaw July 29th, 2012, 06:29 PM At least they are working. thanks for the update. They are casting concrete on the 16th floor. Slowly but surely going up, I certainly hope the progress will continue. mashraf42 July 30th, 2012, 06:03 PM They are casting concrete on the 16th floor. Slowly but surely going up, I certainly hope the progress will continue. i saw them at thirteenth floor a few weeks ago so they have made good progress. Mazda August 3rd, 2012, 07:53 PM It can be good, if we can see the last photos, Thank You auzdafluff August 3rd, 2012, 11:48 PM It can be good, if we can see the last photos, Thank You I'll try and get onto the roof of Al Waleed tomorrow and get a pic from above. There's not much difference from the ground. FromWarsaw August 5th, 2012, 09:47 AM Please try to take pictures of the floor count signs, because i thought they were casting concrete on 16, but judging from the pictures on their website it is still floor 15. Thanks. skkappi August 5th, 2012, 09:52 PM new pic (01/08) http://worldwidepm.com/ww45/site-010812.html mashraf42 August 6th, 2012, 02:24 AM new pic (01/08) http://worldwidepm.com/ww45/site-010812.html fantastic pictures. there is obviously progress. Many thanks Skkappi. bayern3999 August 6th, 2012, 07:59 PM Many thanks Skappi...nice pictures and it is evident that some progress has been registered...hope they will keep up the momentum Mazda August 6th, 2012, 08:00 PM Very nice photos, but if am not mistaken, they finish the 15th floor? Many Thanks. mikel1982 August 8th, 2012, 09:18 PM No they didnt. mashraf42 August 9th, 2012, 08:44 AM No they didnt. I am confused. Has level 15 been finished or not? could someone please clarify. noir-dresses August 9th, 2012, 09:25 AM I am confused. Has level 15 been finished or not? could someone please clarify. Zoom in on the latest pics, and count, that easy. :) mashraf42 August 9th, 2012, 04:46 PM Zoom in on the latest pics, and count, that easy. :) I tried that but I keep on counting 14 floors. I was hoping that I was wrong and they have actually completed up to the 16th floor. I was in Dubai at the end of June and they were working on the 13th floor. I thought at this rate they may be finished by the middle of next year. My contract says they should be finished second quarter of 2014. Hopefully that is not being too optimistic. mikel1982 August 10th, 2012, 08:34 AM They are finishing 15-th floor. But looking at their progress it will take much more time. skkappi August 12th, 2012, 11:30 PM new pic http://worldwidepm.com/ww45/site-080812.html FromWarsaw August 13th, 2012, 02:53 PM ^^ Damn, I thought they were working on the 16th floor, but it turns out they are still f...ing around on the lower floors! It will take them ages to finish this one man... I feel sorry for everyone who invested there, including myself...:bash: s.y August 14th, 2012, 01:31 PM Remember, this is a never ending project you have to accept it. The new people just wanted to get more money!!!!!! and none of us can do anything. Investing in a country which no one knows the meaning of people's right. They only understand the language of money and ripping off others skkappi August 19th, 2012, 10:19 PM site(http://worldwidepm.com) dont working FromWarsaw August 20th, 2012, 07:45 PM I spoke to person in charge of my units, they are working at site although very slow. Sam Russell August 22nd, 2012, 06:08 AM its good at least to know they did something in ramadan.. they should complete now at double the rate.. yes ... is worldwidepm down? Sam Russell August 22nd, 2012, 06:10 AM I thought at this rate they may be finished by the middle of next year. My contract says they should be finished second quarter of 2014. Hopefully that is not being too optimistic. the middle of next year is Q2 2013 not 2014..dont get your hopes up too high mashraf42 August 23rd, 2012, 12:27 AM the middle of next year is Q2 2013 not 2014..dont get your hopes up too high I was there at the end of June and they were on the thirteenth floor. When I read that they had got to the sixteenth floor and had completed three floors in a month I thought they were moving very quickly and may finish by the middle of next year. Unfortunately I think we will be lucky to get handover in the middle of 2014. FromWarsaw August 23rd, 2012, 10:21 AM Never could i have imagined that we would reach page 66 on this thread, unfortunately we have and counting. What a regrettable fact it is, ladies and gentlemen! Being patient is probably the only remedy in our situation. Cheers. :cheers: skkappi September 9th, 2012, 11:01 AM new photo 06/09/12 http://worldwidepm.com/ww45/site-060912.html Mazda September 10th, 2012, 04:20 PM Thank You, for the photos, and, from what I see, they finsh the 15 floor? auzdafluff September 10th, 2012, 07:30 PM Thank You, for the photos, and, from what I see, they finsh the 15 floor? Your guess is as good as ours. My tenancy in AWP across the podium is up in just over a month. In that time, they've managed six floors. I wouldn't hold your breath that this will be done any time soon. mikel1982 September 11th, 2012, 07:46 PM 15 or 14 ? skkappi September 13th, 2012, 10:29 PM new photos http://worldwidepm.com/ww45/site-130912.html mikel1982 September 15th, 2012, 03:31 PM If im counting correctly they finished 14-th floor not 15-th. mikel1982 October 5th, 2012, 10:20 AM Photo taken today. They speed it up. Quite good progess on 15-th floor. http://imageshack.us/a/img41/8594/jltk.jpg Pandrangi October 6th, 2012, 05:57 AM Mikel1982, Thanks for the awesome photo...looking good:) Mazda October 6th, 2012, 06:37 PM Thanks, for nice photo, I wish to know, how count floors, in Dubai, because if I am wrght, they make the roof of 16 floors. haseeb_eng October 6th, 2012, 07:31 PM I have read the full thread and found somehow the problem seems to be resolving. I am thinking to buy in this project and went today by myself to have a look at it. Work was going on 16th floor. May i know what was the launching price of this project? faceoffdxb October 10th, 2012, 03:25 PM I currently have 3 units in Sports Business Tower, Sports City Dubai under contract from Axon Development which had ceased construction for over 2 years (which has since restarted) The problem being that the project is now over two and a half years in delay (projected at a further 3 years delay) and the contract with Axon Development FZC which is now in question as the project has been handed over to AlMasah ( Al Masah )International Real Estate Development LLC also owned by Mr Aboutaleb Shokrollah Talebi on investigating through RERA I find the owner Mr Talebi has another company registered with RERA called New World Investment Ltd and has a further 15 projects listed with 10 of them on hold according to RERA. Project Names are as follows: Jouri 3, Cadi 4, Jouri 1, Cadi 5, Cadi 2, Judi Palace, Jouri 6, World Wide Tower, Classic Soccer Tower, Cadi 3, Cadi 1, Jouri 4, Soraya Tower 1, Orchid Residence and Jouri 2. Further to the above Mr Aboutaleb Shokrollah Talebi also owns the following: Chess Tower Ltd, Romeo & Juliet Ltd, Star Developers Ltd, Marina Exclusive Ltd, Marina Breeze Ltd, Bella Vida Ltd and Sahara Living Ltd. With so many companies and projects on hold in today’s economic climate in Dubai I am concerned the developer will run out of money and purchasers will not hand over further monies due to lack of confidence and or progress (10 projects on hold and a starved future cash flow) The developer has breached the contract grossly in terms of delivery dates and progress, so I decided to visit both RERA and Dubai Courts to investigate litigation; after a day knocking on doors it was confirmed by both RERA and Dubai Courts there are numerous cases against Al Masah and the name is well known by Dubai Courts. I am looking for any information anyone can provide over their experiences and in particular a lawyers name and contact details who is familiar with AlMasah and his mass of unfinished developments and claims against them as I am genuinely feel we are heading for a crash. mikel1982 October 10th, 2012, 06:02 PM Thanks, for nice photo, I wish to know, how count floors, in Dubai, because if I am wrght, they make the roof of 16 floors. You can always edit the photo and put there numbers then we will resolve the issue with floor counting :) Mazda October 10th, 2012, 08:56 PM I think more then counting floors, is more serious, what say faceoffdxb, because I see long way to have our apartments in our hands, but at least till now, we are seeing progress. Mazda October 12th, 2012, 01:55 PM I am not sure, but when I have problem with Property Investment Market, some body from that company, tell me that Mr Aboutaleb Talebi, is the owner of Property Investment Market. And this if it is really true, this means, at least how I see it, there is a play, what they do or try to do, at least with me, If He is the owner of almasah, and the owner of Property Investment market, this means this was a play, playing with companys to take more money not because Property Investment Market was gone, if he is the same owner. Also in the new contract Almasah want me, to give them, the power of ATorny, because they want to fight Property Investment Market in Court, to give me back the money that I lost with Property investment market. t If Its true, is the same owner, of this 2 companys, for sure only that they want only to cheat me, because how go fight in court the same owner, I think more want to take my aprtment for free, after I already pay big money on it. When I here this name, that he is the owner of Amasah, I really feel shoked. mikel1982 October 13th, 2012, 06:53 PM I simply dont count ground floor Mazda October 14th, 2012, 02:01 AM Is true, but almasah count ground floors, because when speak with them, they say that is 16 floor, and is true 16 floor with ground floor, but at least with me, they count it. auzdafluff October 14th, 2012, 05:48 AM Is true, but almasah count ground floors, because when speak with them, they say that is 16 floor, and is true 16 floor with ground floor, but at least with me, they count it. Technically the ground floor isn't the ground though. It's podium level. Basement 1 is ground level. skkappi October 14th, 2012, 07:37 PM photo 11/10 http://worldwidepm.com/ww45/site-111012.html skkappi November 16th, 2012, 05:44 AM any news, photos? jane18 November 17th, 2012, 04:28 PM Some one pls help me,, I have flat in Al Saqran which Al Masah is saying that they have sold that flat to some one as we have not agreed on the rates earlier.. Now he is offering me new unit with higher price,, Please guide me,, what shld i do ?? I'm not even sure that they will construct the tower...any body elses has signed the new contract with them..do they have registered that new unit in RERA, taking the amount in excrow account... Pls reply asap...thanks mikel1982 November 23rd, 2012, 04:06 PM It looks like on hold, i didnt notice any workers movement there ... skkappi November 28th, 2012, 07:38 PM new photo http://worldwidepm.com/ww45/site-281112.html noir-dresses November 28th, 2012, 10:07 PM If I counted properly there are seventeen completed floors. mashraf42 December 2nd, 2012, 02:06 AM Hi Looking at the last two photos that skkapi has put up on 11/10/12 and 28/11/12 i cant see any differance. it seems that no new floors have been put up in nearly 6 weeks!!! mashraf42 December 2nd, 2012, 02:07 AM Skkappi Many thanks for the pictures. at least it shows men at work. mikel1982 December 3rd, 2012, 06:05 PM No visible progress ... for me its on hold ... skkappi December 4th, 2012, 09:12 PM for me to.... skkappi December 6th, 2012, 04:45 PM new photo http://worldwidepm.com/ww45/site-061212.html Mazda December 6th, 2012, 06:10 PM Thank You Skkappi, for the photos, but if I see good, there was no progress at all, I see that are still in 16 floor. Dubai SCP December 15th, 2012, 09:30 AM People who want to sell their units and cash out may contact me on adilsait@sandcastlesproperties.com Mazda December 19th, 2012, 06:37 PM Can, some body, can give us idea, if the construction, is going on? Thank You. haseeb_eng December 22nd, 2012, 02:23 PM GOOD NEWS. I was in their office 2 weeks back. Yes, the construction is going on & they still have 1 crane and 1 scaffolding on the building. They said that they are preparing for 17th floor and with in 3 weeks they will increase the man power again to finish the remaining floors ASAP. They also told me that they will start the finishing of the lower floors parallel to the construction of upper level floors because they got now more money pumped up. The expected finishing timeline is in 2014. Let's hope for the best. Mazda December 23rd, 2012, 06:31 PM Thank You, so much. zukihippo December 27th, 2012, 11:29 PM Are you guys still paying the monthly payments?.. I ve just swapped my app from jouri 1 to al saqran because jouri has nt even started building.:ohno: Berliner01 December 28th, 2012, 11:25 AM Well they are at the 16th floor now. Some progress but not really much: http://i49.tinypic.com/315jzg4.jpg Docmo1 December 31st, 2012, 04:47 PM Hi guys After reading thru this thread im alarmed at how lawless such a seemingly developed country can be!! Sorry for your ordeal. Nevertheless i have family in Dubai and plan to move back there some day. Have recently started searching the Dubai market for a little apartment and was hoping to find something affordable (a studio) on a payment plan. Cant seem to find any ready projects that offer properties on installments. If im not mistaking Al Saqran seems to be one the few unfinished projects left in this part of Dubai and therefore one of the few that still has some sort of payment plan. Reading through this post i know that its a big risk, but bearing in mind my economy i guess im willing to take this risk and buy a unit in this building. I'm in no hurry to move to Dubai now. I have found an offer on a unit in this building through a real estate agent but if any one of you is willing to sell their unit (studio that is not yet fully paid for) i'm very interested. Please pm me. Regards Docmo1 Mazda January 1st, 2013, 04:16 PM How much you are willing to pay for a studio aprtment, in Alsaqran Tower? Docmo1 January 2nd, 2013, 11:36 AM Hi Mazda Please check your private messages. Regards Docmo1 Mazda January 2nd, 2013, 11:45 AM Thank You, I will, and I let you know. bayern3999 January 4th, 2013, 11:18 AM anyone interested to buy a studio apartment ? if yes please contact me at bayern3999@yahoo.com FromWarsaw January 5th, 2013, 04:00 PM It appears that people are getting rid of their property in this project. What's the average price for 1 bed in such a project? haseeb_eng January 9th, 2013, 09:26 AM I passed by the site today and found a lot of workers and some work was going on. It seems they are preparing for 17th floor. skkappi January 10th, 2013, 11:55 PM new photo http://worldwidepm.com/ww45/site-100113.html zukihippo January 14th, 2013, 08:00 PM R you guys still paying your monthly payments ? Im on a monthly payment plan but since the improvement is slow, what do you think? haseeb_eng January 15th, 2013, 08:48 PM As per Dubai land department's new rule if any building facing Sheikh Zaid road is stopped for more then 2 months then government will take over the project and will build by themselves. After that land department will handover the project to the investors. On the other hand we have to do the payment on time otherwise developed can complain to dubai land dept. & that means trouble. zukihippo January 16th, 2013, 10:08 PM Hi thanks alot for the reply, i was nt aware of this law, do you have a link by any chance of where i can find these laws please? skkappi January 17th, 2013, 10:00 PM new photo http://worldwidepm.com/ww45/site-150113.html Mazda January 22nd, 2013, 08:22 AM This photos is of the roof of 17 floor? Thank You. skkappi January 23rd, 2013, 08:55 PM new photo http://worldwidepm.com/ww45/site-230113.html skkappi January 23rd, 2013, 08:57 PM This photos is of the roof of 17 floor? Thank You. i think this is roof of 16 floor Mazda January 24th, 2013, 11:22 AM Yes, I think that last photos, you give us, shows thats the roof of 16 floor. Thank You, Skkappy nirajdisha January 24th, 2013, 08:23 PM Guys Please let me know if anybody wants to Sell STUDIO Apartment in Al Saqran Tower in JLT i am interested to Buy a STUDIO in this Project. haseeb_eng January 27th, 2013, 08:30 PM zukihippo, definitely you can check regarding this law with dubai land department. I had asked some real estate companies and developers as well regarding this law and got the same information. chempharm January 28th, 2013, 01:29 PM Does anyone have knowledge about AlSaqran Tower, history seems that a bit of progress going on at the site and floor 16 is constructed so far.... What is guess about future of construction activity, some people say they cannot stop work on Sheikh Road while others have opinion that its just an eye wash and the project is never going to be finished in next 5 years.... Can some insider or the person having Dubai knowledge give his/her expert opinion mashraf42 January 30th, 2013, 01:58 PM HI Just had an email fron Afsanaah to say that the 17th floor will be finished next week and the whole development is going to finish by end of 2014. keep our fingers crossed for that. skkappi January 31st, 2013, 08:38 PM New photo http://worldwidepm.com/ww45/site-310113.html haseeb_eng January 31st, 2013, 09:17 PM chempharm i have properties in this project and other projects in Dubai.I am keeping a close eye on this project and the future looks good. Dubai Land department had make new rules to protect investors, land lords and tenants. Me being Dubai resident is experiencing all these new rules and we can sense that this is betterment for everybody. Moreover if you go to JLT area you will find SAQRAN tower is the only tower under construction on the east side. All the other towers are handed over + it is right infront of metro station. True Blue February 1st, 2013, 02:32 PM Guys Please let me know if anybody wants to Sell STUDIO Apartment in Al Saqran Tower in JLT i am interested to Buy a STUDIO in this Project. You are an IDIOT who thinks people are stupid and don't realise you work for the developer. You are clearly trying to put positive spin on this scam and the other developments buy this crooked developer. nirajdisha February 1st, 2013, 05:55 PM Okay then i am giving an open OFFER of AED 650 IF ANYBODY WANTS TO SELL CONTACT ME... AGAIN I AM REPEATING IT IS OPEN OFFER.......... I need STUDIO ONLY. Morteza.a February 4th, 2013, 04:29 PM Regarding your interest in buying the unit in al saqran tower , I own a unit , which I would like to discuss selling it. Morteza.a February 4th, 2013, 04:32 PM ... Morteza.a February 4th, 2013, 04:39 PM ... Superman_Saqran February 11th, 2013, 10:12 PM Hi, Does anyone knows how much to buy a studio flat at Al Saqran tower ? Is it right the the completion has posponed till 2016? Please advice Thanks nirajdisha February 12th, 2013, 10:03 AM I Have Given Offer for AED650, But it Seems No Body wants to sell at THAT PRICE. People are Expecting AED 850 to AED 900. But AED 650 for UNDERCONSTRUCTION is PERFECT BCoz Ready Units are AVAILABLE AT AED 900 TO AED 1000 auzdafluff February 12th, 2013, 10:59 AM Guys. Seriously. If you don't think people are seeing through your attempt at bullshitting people, you're wrong – especially with a name like Superman_Saqran. And you nirajdisha have already been called out on it. Pack in bullshitting or you'll be reported to the moderators. Superman_Saqran February 12th, 2013, 01:53 PM I understand where you are coming from (auzdafluff) but I'm serious about it. I guess my username reflected my interest in the tower. nirajdisha\ I don't believe you as this is away far from what I have got on the table. nirajdisha February 13th, 2013, 09:50 AM Sir If u see in last 7 to 8 Months Property Market is constanly and slowly moving upwards, WHICH I AM SURE EVERYBODY AGREES, It has risen from 20 % to even 35 % Depending on the Location. Underconstruction Properties are very FEW in the PRIME AREA LIKE- MARINA, DOWN TOWN , JLT, ETC..... Now as u can see the Construction which was stopped COMPLETELY HAS started but with very snail pace, which is very postive sign, There are lot people who have invested in these projects at very high rate during the PEAK and now they are COMPLETELY FRUSTATED AND HAVE LOST PATIENCE ( Which they are right) even we would have been same.. Now the developers have started getting inquiries which was not the case few months back, They have started giving good rates and have started closing the DEALS, So if u see now nobody wants to sell at the bottom price or close to bottom because they do not want to book loss or if the property market goes up they will be the loser, i am being cautiously Optimistic, I AM QUOTING ALL THIS MATTER IN A VERY GENERAL SCENARIO NOT SPECIFIC DEVELOPER... skkappi February 15th, 2013, 09:16 PM new photo http://worldwidepm.com/ww45/site-140213.html Mazda February 16th, 2013, 06:53 AM Thank you skkappi, for the new photos. If I am right, they are going to make the roof of 17 floor? Superman_Saqran February 16th, 2013, 11:42 AM Thank Skkappi, but I can not see any changes since you last published the previous photos on the 31/01, they are on the same floor!!! alam.realty February 17th, 2013, 03:16 PM People I am looking for as many studios and one beds in Al Saqran call me on +971 55 7977438 or email me on taufeeq@sandcastlesproperties.com mansoor.sheikh February 23rd, 2013, 09:31 PM Hello, We have 2 units each 480sqft. in Al Saqran Tower, at 13th floor. We are interested to sale our residantial appartments. If you are interested please contact with us. Best regards Mansoor Sheikh Contact: Mansoor.sheikh@live.com 92-333-2103162 mansoor.sheikh February 23rd, 2013, 11:00 PM We are all hoping that this will complete soon. But finishing take much longer time then construction. what your ideas guys when will be the completion date ? mashraf42 February 26th, 2013, 04:19 PM Have had an email asking for payment for the 18th floor so there does seem to be some progress. axel_foley February 27th, 2013, 06:25 PM Guys, I live in MAG214, next to Al Saqran and I can confirm no progress whatsoever for some time now s.y February 28th, 2013, 03:01 PM Guys, I live in MAG214, next to Al Saqran and I can confirm no progress whatsoever for some time now So I heard the construcion is on hold and now you confirmed that. haseeb_eng March 3rd, 2013, 12:39 PM Got a call from developer now and they told me that 17th floor is complete and i have to do the next payment of all my units which is bounded with 18th floor. I will visit the site on Thursday to check by myself. mashraf42 March 4th, 2013, 06:34 PM had a conversation with afsaneh this afternoon. the reason for the delay has been flooding in the basement. that has been resolved so hopefully the construction of the floors should be quicker. the finish date i was told is still last quarter of 2014. Hopefully that will be the case. i have also been asked for payment for the 18th floor so I hope we jhave reached that stage. Superman_Saqran March 4th, 2013, 10:43 PM Is this another excuse to justify the delay!! :ohno: Superman_Saqran March 7th, 2013, 08:43 PM Paid for the 18th floor Superman_Saqran March 8th, 2013, 10:04 AM http://www.flickr.com/photos/93930368@N08/ mikel1982 March 9th, 2013, 06:45 PM I can confirm that its not on hold anymore. Today they were working on 18-th floor. haseeb_eng March 11th, 2013, 08:20 AM I went and friday and found that it's true. the 18th floor has been started and i had given them my payments. skkappi March 16th, 2013, 09:43 AM new photos http://worldwidepm.com/ww45/site-140313.html Bashar-Samad March 20th, 2013, 01:02 PM :wave::wave::wave::wave::wave: Hello, I have recently bought an 609 studio apartment in this tower directly from Al Masah for 365,000 AED . Is this a good price? Can anyone tell me please what are the procedures of registrations (oqood...etc)? Anything more I should know? this is the first time I buy in UAE. Thanks for your help in advance. :cheers: s.y March 21st, 2013, 11:19 AM Good luck. This is the only thing you need with this project. haseeb_eng March 21st, 2013, 04:25 PM HI Bashar, That's an extremely good price. You need to tell developer to apply for your oqood Good luck RGDS Haseeb :wave::wave::wave::wave::wave: Hello, I have recently bought an 609 studio apartment in this tower directly from Al Masah for 365,000 AED . Is this a good price? Can anyone tell me please what are the procedures of registrations (oqood...etc)? Anything more I should know? this is the first time I buy in UAE. Thanks for your help in advance. :cheers: Bashar-Samad March 21st, 2013, 05:11 PM Thanks Haseeb :banana: HI Bashar, That's an extremely good price. You need to tell developer to apply for your oqood Good luck RGDS Haseeb fazsnatch March 25th, 2013, 02:09 AM Any latest news. If i was to invest here, is there a risk it never gets built. I dont mind waiting 3 or 4 years nirajdisha March 25th, 2013, 08:00 AM Even i wanted to Invest, Can u give me the details of the concerned person. haseeb_eng March 26th, 2013, 03:32 PM Guys, my advise to you is buy it. I myself have 10 units over there and it's exactly in front of the Metro. It's just the matter of time before the value increases and these days the pricing is also good. Also i had noticed on Saturday that 18th floor slab is about to complete. I had noticed that there are about 40+ labors working on the site. If you want to see by yourself then go at the back side of the tower across the lake(you can park your car at the corner) at 4:30PM because that seems to be their off time & you can see their full labors force waiting for the bus. Personally i would be happy if they are putting up at least 100 labors which will help them to finish off the project quickly. Good Luck Superman_Saqran March 26th, 2013, 10:21 PM Prices wont go significantly high in Dubai anymore. So many units are going to come available in the next few weeks and they are going to sustain the market, perhaps they going to drop the prices a bit don't forget there are so many exciting project are coming soon like Meydan, etc... haseeb_eng March 27th, 2013, 11:44 AM Yes i agree it won't go high quickly like before but the market is behaving other way around. The time a new project is launched by any major developer the prices tend to go bit higher of the existing/under construction properties. But remember Dubai had bid for expo 2020 and the decision is coming somewhere around september. As soon as the decision is taken at that time prices can fluctuate. beer51 April 3rd, 2013, 09:10 AM Hi What is the latest progress on this tower, also do you guys think this will complete in 2yrs time. Thanks auzdafluff April 3rd, 2013, 11:38 AM Hi What is the latest progress on this tower, also do you guys think this will complete in 2yrs time. Thanks Considering they've managed six floors in the last two years, I wouldn't hold your breath. beer51 April 3rd, 2013, 01:24 PM Thanks auzdafluff. I take it in your opinion this is not a good tower to invest in? Thanks Brain storming April 3rd, 2013, 10:58 PM Good morning, what is the price per square feet in this tower currently in the market? auzdafluff April 4th, 2013, 01:13 PM Thanks auzdafluff. I take it in your opinion this is not a good tower to invest in? Thanks I'm not an expert in real estate, so I wouldn't take my advice on that basis. However, I did live across from this tower (in Al Waleed – R3) from October 2011 to October 2012 and had a good view of its construction – or lack there of. Unfortunately I can't find any images of when I first moved in to show you how little has been done in the last 20 odd months. But I personally would be very careful about investing in this tower. beer51 April 4th, 2013, 02:37 PM Thanks for your opinion auzdafluff much appreciate it. cheers Abuturab_zaidi April 6th, 2013, 10:21 PM Hi all , I have been approached by a couple of real estate agents recently , theyve been pitching me studios in this tower, i went to check out the site and seriously was not very impressed with the speed of the construction, though location is excellent and i do see a grey structure upto around 17 or 18 floors , as per what ive understood is that the developer has given 2014 last quarter as the completion date. 1. kindly advise if its worth getting into . 2. kindly advise if however i do decide to enter this project what should be the right price per square ft. 3. what happens in case RERA cancel's the project . would highly appreciate any advise. FromWarsaw April 7th, 2013, 12:24 PM ^^ Just out of curiosity, what price per sqft. you have received from real estate agents? P.S. I really don't think this project will be cancelled by RERA. s.y April 8th, 2013, 01:46 PM Just be aware not to buy an apartment that have already been purchased by another investor it seems Al masah has been selling the apartments that been sold by previous management. mzee78 April 9th, 2013, 07:15 PM How to be sure what we are receiving or buying is genuine ? apradhan April 10th, 2013, 01:47 PM People are creating a bubble in this tower by buying off-plan and the price spiralling upwards. Remember what happen a few years ago when this happened! With the track record of the developer I would not be surprised if the tower takes 3 years to complete. Remember your money will be tied in for 3 years without any return on investment. zukihippo April 15th, 2013, 08:02 PM Just be aware not to buy an apartment that have already been purchased by another investor it seems Al masah has been selling the apartments that been sold by previous management. Dear S.Y. From where did you get this info.. ? I would like to read more about it if you have a link please haseeb_eng April 16th, 2013, 10:08 PM As per my understanding any developer is having the right to cancel the units if he investor doesn't pay the payment on time. I am not sure about the exact law with land department but what i know is that developer can file the case against investor in land department and that's how the registration on the name of old investor gets cancelled due to non-payment. You can contact land department to get more details regarding this. The prices these days seems to be around 750 dirhams per sq. feet depending on the floor level. Good luck. haseeb_eng April 16th, 2013, 10:16 PM Also, as soon as you buy any property anywhere in Dubai make sure that you register with land department OQOOD. You have to inform the developer to immediately apply for your OQOOD with land department which takes couple of days only. This will give you protection as an investor by adding the record with Dubai government and ensures nobody touches your apartment without giving you heads up. So even if something goes wrong in the payment and developer files the case against you, the land department will contact you as well to check what's going on before cancelling the registration from your name. Bashar-Samad April 18th, 2013, 06:22 PM https://www.facebook.com/photo.php?fbid=10152708196930403&set=pcb.10152708197045403&type=1&permPage=1 mashraf42 April 27th, 2013, 08:24 AM cid:A542D299-9973-4493-912B-7587897F3B78 Progress seems to be t Asking place mashraf42 April 27th, 2013, 08:25 AM cid:A542D299-9973-4493-912B-7587897F3B78 Progress seems to be t Asking place Sorry the picture has not gone up but afsaneh has sent me pictures today which show that progress is taking place. haseeb_eng April 28th, 2013, 09:36 AM Got call from developer last week that 19th floor has been completed and construction of 20th floor has been started. I had verified it last saturday. The bird April 28th, 2013, 03:16 PM Hi Is there some one has a studio want to sale it forward in the Al Saqran tower ? Please send me email on dadan@inbox.com |