malec
March 18th, 2006, 01:15 AM
Again same as usual. This one looks OK though:

http://www.dubaiwaterfronts.com/ct2pic.JPG

http://www.dubaiwaterfronts.com/champions_tower_2.htm

Dubai-Lover
March 18th, 2006, 01:24 PM
much much better
i wonder why the heck this company gets all the new towers for sale before they are launced?!?!? :wtf:

none of those towers which are for presale were in the news or had ads!

dubaiflo
March 18th, 2006, 01:35 PM
it looks in fact way better than everything in DSC.
nice tower.

malec
March 18th, 2006, 01:54 PM
better than the cube?

BinDubai
March 21st, 2006, 02:29 PM
this tower must lose some weight

dubaiflo
March 21st, 2006, 06:20 PM
^^ yeah it's faaaat.

not better than the cube of course malec, the cube is not part of the 'everything' i referred to, it is special :D:D

malec
July 13th, 2006, 11:27 PM
Memon Group announces new project at Sports City

Staff Report


Dubai: Memon Real Estate unveiled its latest project at a function held to celebrate the developer's 28 years in operation.

Champions Tower II, a Dh110 million residential tower, will be situated in the Dubai Sports City, part of the Dubailand mega-project.

The launch comes on the heels of Memon's successful sales campaign for its 125-unit Champions Tower I at Sports City, which sold out in five months.

Abu Shaikhani, Memon Group chairman, said it will be the only tower with wide-open gardens around it with views to the canal and golf course. "It will be a tower with appealing looks, modern concept and functional in design," he said.

Designed by architect Adnan Saffarini, the 12-storey building will offer 174 units with an option to choose from studio, one- and two-bedroom apartments.

The tower will include a spacious lobby area in marble with three high-speed elevators, 24-hour security, in-house maintenance team and the option of choosing from basement parking or covered parking on the ground floor.

The tower will be situated next door to David Lloyd Tennis Academy, Butch Harmon Golf Academy, Manchester United Academy and the ICC Cricket Academy.

In addition it will be surrounded by a sports mall spread across 1.5 million square feet, more than seven international schools, 14 sports academies, besides other modern facilities including swimming pools, spa, sauna, jacuzzi, fully-equipped gymnasium, indoor games room and others.

The apartments will be sold for Dh280,000 and above, while the annual maintenance fee has been fixed at Dh6 per square foot.

Dubai-Lover
July 14th, 2006, 02:12 PM
added to emporis

Dubai-Lover
November 29th, 2006, 09:22 AM
AED 85 million Champions Tower II completely sold out

Memon Group of Companies, a leading business conglomerate with interests in real estate development, trading, manufacturing and IT, has announced that Champions Tower II, an AED 85 million residential tower strategically situated within the enclaves of the Dubai Sports City, is completely sold out.
United Arab Emirates: 1 hour, 9 minutes ago PRESS RELEASE

http://www.ameinfo.com/images/news/4/32694-cham.jpg
Champions Tower II.

The tower, due to be ready for delivery in 2008, has been sold following a surge of interest from international and local investors.

Champions Tower II, rising on 218,000 sq. ft. of built-up area, is a 13-storey tower and will offer a total of 174 apartments with the choice of 72 studios, 74 one bedroom and 28 two bedroom apartments, each with its own magnificent views and fine architecture. The tower is located in close proximity to an 18-hole golf course, a cricket stadium and academy, rugby & football pitches and a track & field stadium and offers an unparalleled range of activities for the family by benefiting from the secure and gated community of Dubai Sports City.


'The Middle East property market is witnessing a high growth with quality real estate projects. Envisioned and master planned by the company in Dubai's real estate growth corridor, Champions Tower II will offer residents with a distinctive and unique living environment that will cater to virtually all their needs. The success of Champions Tower II goes on to prove that customers continue to put a high value on quality real-estate development, especially as they typically put their lifetime savings behind such an investment,'



said Ahmed Shaikhani, Managing Director of the Memon Group.

'We, at the Memon Group, are extremely conscious of the trust that our customers have reposed in us and consider it our responsibility to provide them with their dream homes that represent true value for money. We have worked very hard to ensure that Champions Tower II will meet the highest international standards and the rapid sale of this project is testimony to the success of the team,' he added.

Located in the multibillion dollar Dubai Sports City, Champions Tower II offers exceptional views to the front and rear. The tower is the height of luxury with attention given to detail and five star amenities. Residents can hobnob with sporting celebrities at the year-round events in Dubai Sports City, while enjoying the comfort and luxury of their exclusive Studios, One, Two and Three bedroom apartments. The Tower's north end adjoins the new Emirates Road, thereby providing excellent accessibility to key locations.

'The Memon Group has built its reputation on a firm commitment to deliver on its promises to the customer, and we are focused on ensuring that Champions Towers II is completed within schedule. We realize that timely handover of projects has become as much an investor concern as construction quality and the facilities offered, and we are committed to allow our investors to take ownership of their properties without the least delay,' concluded Shaikhani.

The Memon Group of Companies, a $5 billion business group from Pakistan, is primed for further expansion in regional markets, and is expected to announce further projects in the near future. The Group had entered the real estate market in UAE with projects under the Champions branding. Champions Tower I, an AED 75 million tower, also located within Dubai Sports City, was released last year and sold out within a few months of its launch. The Group prides itself with an experience of over 28 years in real estate development across the world having delivered 30000 units, and has presence in 35 countries, apart from its trading, IT and manufacturing interests.

malec
November 29th, 2006, 10:46 AM
Have any towers actually started construction in sports city?

Krazy
November 29th, 2006, 05:48 PM
^^ none I think

Qatar Son 333
November 30th, 2006, 04:48 PM
yup non of them are uc

Krazy
December 1st, 2006, 12:11 AM
Champions Tower II completely sold out

Dubai: Memon Group of Companies, a leading business conglomerate with interests in real estate development, trading, manufacturing and IT, has announced that Champions Tower II, a Dh85 million residential tower situated within the enclaves of the Dubai Sports City, is completely sold out.

The tower, due to be ready for delivery in 2008, has been sold following a surge of interest from investors.

Champions Tower II, rising on 218,000 square feet of built-up area, is a 13-storey tower and will offer a total of 174 apartments with the choice of 72 studios, 74 one bedroom and 28 two bedroom apartments.

The tower is located in close proximity to an 18-hole golf course, a cricket stadium and academy, rugby and football grounds and a track and field stadium and offers a range of activities for the family by benefiting from the secure and gated community of Dubai Sports City. "The Middle East property market is witnessing a high growth. Champions Tower II will offer residents a distinctive and unique living environment that will cater to virtually all their needs," said Ahmad Shaikhani, Managing Director of the Memon Group.

Vikas
February 19th, 2007, 07:58 AM
Hi I did a picture of this tower. What do you think.
http://www.bncnetwork.net/linx/imgs/content/projpics/PRJAE0617514.jpg (http://www.bncnetwork.net)

Vikas
www.bncnetwork.net

Imre
October 25th, 2007, 06:07 AM
Press Release

Memon Investments breaks ground on AED 85 million Champions Tower II at Dubai Sports City

http://img100.imageshack.us/img100/9894/memoninvestmentsctiigrogr9.jpg (http://imageshack.us)
Don Leask, Project Development Manager, Dubai Sports City (second from left) and Ahmed Shaikhani, Managing Director, Memon Investments (center) along with senior officials from Memon Investments at the groundbreaking ceremony of Champions Tower II at Dubai Sports City.


Shoring and excavation contract awarded to piling specialist Stromek Emirates Foundation

October 24, 2007

Memon Investments, a leading Dubai-based property developer and part of the international business conglomerate, the Memon Group of Companies, recently held a groundbreaking ceremony to commence the construction work on the AED 85 million Champions Tower II in Dubai Sports City (DSC). Present at the ceremony were top company officials, including Ahmed Shaikhani, Managing Director, Memon Investments; Don Leask, Project Development Manager, Dubai Sports City; Ahmed Sattar, Executive Director, Memon Investments; and Younan Youssef, Manager - Projects, Memon Investments.

The groundbreaking followed Memon Investments’ recent awarding of shoring and excavation contract for Champions Tower II to Stromek Emirates Foundation (SEF), a subsidiary of M`sharie, the private equity arm of Dubai Investments. The piling company will be in charge of the important first phase of construction, which includes excavation, shoring and foundation work. SEF has committed to complete the first phase in record time as the contract for the construction of the tower is currently under tender. Champions Tower II’s shoring and excavation project will be SEF’s second venture with Memon Investments, as the company is also handling the foundation work on Champions Tower III.
Ahmed Shaikhani, Managing Director, Memon Investments, said: “The expertise that Stromek Emirates Foundation has exhibited across all their completed projects has caught our attention, which is why we felt no hesitation in giving them this project. We are positive that they will adhere to the same standard we uphold in all our previous developments, as their dedication and top-notch work is truly remarkable.”

Champions Tower II is a 13-storey tower with a total built-up area of 218,000 square feet, and offers a total of 174 apartments comprising 72 studios, 74 one-bedroom and 28 two-bedroom apartments, each with its own magnificent view of the lush greenery exuding a relaxing ambiance. The tower provides easy access to an 18-hole golf course, a cricket stadium and various sport-oriented academies, rugby and football pitches and a track and field stadium.

Since its establishment in Dubai in July 1994, SEF has been known in the industry to utilize breakthrough systems in piling, shoring and anchoring works such as Bentonite slurry suspended method, CFA method, steel soldier piles, sheet piles, contiguous piles and secant piles. Currently, SEF has more than 550 projects in its portfolio, including the Shore Line Apartment on the Palm Jumeirah in Dubai, Palace Tower and Donna Towers in Dubai Silicon Oasis and Al Faqeet in Fujairah.

Eng Ahmed Al Adl, General Manager, Stromek Emirates Foundation, said: “As a company that places high premium on quality workmanship and has immense respect for deadlines, we are proud to become a part of a prestigious project such as Champions Tower II. By utilizing our top-of-the-line methods, we are optimistic that we will deliver beyond expectation results, thereby matching Memon Investments’ standard of excellence, which they maintain across all their projects. We are grateful to have been given an opportunity to work with the best in the industry and continue to expand our high profile portfolio.”

Champions Tower II is a culmination of the sophisticated combination of luxury and high technology living set amidst a sports-oriented environment, with a handful of other modern facilities including swimming pools, spa and sauna, Jacuzzi, fully-equipped gymnasium and an indoor games room. In addition, Dubai Sports City houses a sports mall spread across 1.5 million square feet, more than seven international schools and boasts of first-class amenities such as jogging/bicycle tracks, restaurants, cafes, cinemas, retail outlets and medical centers.


About Memon Investments LLC:
Memon Investments LLC is a leading Dubai-based property developer offering a whole gamut of property-related services to the Middle East market and the world. The company has attained ISO 9001:2000 certification, an internationally accepted quality management certification system, following a rigorous assessment by IMS Certification Plc. It is poised to become a leading property player by focusing on its core competencies on acquisition, design and development, consultancy, leasing and management of properties to bring a diversified portfolio of premium property projects. Memon Investments, the property development arm of the international business conglomerate, the Memon Group of Companies, leverages the over 28 years of real estate development experience of the group, having delivered over 30,000 units across the globe with a presence in 90 countries spread across Asia, Africa, Middle East and Europe. The UAE portfolio includes prestigious residential projects namely, Champions Tower I, II and III located in Dubai Sports City and its inaugural commercial venture, Cambridge Business Centre located in Dubai Silicon Oasis.

InterViagra
January 5th, 2008, 11:27 PM
Hi Everyone.

I've just joined and am purchasing a Studio Apartment on the 7th Floor of CT2. Is there anyone else out there buying in the same development?
I'm concerned at the lack of progress and the fact that the Memon Website is still 'under development' Any info or links to other sites where I can contact other purchasers will be most welcome.
Thanks. :ohno:

MikeMuz
January 8th, 2008, 07:21 PM
Yeah we bought an appartment on floor 8 a year ago..!! Progress is slow and forthcoming info from memon also slow. However they reckon its going to be built by oct 08 so i spose we'll just have to be patient..! I found out that they have in fact had the ground breaking ceremony last october, so the building work should have started by now:)

MikeMuz
January 8th, 2008, 07:22 PM
Yeah we bought an appartment on floor 8 a year ago..!! Progress is slow and forthcoming info from memon also slow. However they reckon its going to be built by oct 08 so i spose we'll just have to be patient..! I found out that they have in fact had the ground breaking ceremony last october, so the building work should have started by now:)

MikeMuz
January 13th, 2008, 04:02 PM
Hi Imre,
I wonder if it would be possible for you to post some pictures of the sports city project..??
I am mainly interested in Champions tower 2.:banana:
Is there anything happening there yet?????:ohno:

InterViagra
January 25th, 2008, 03:15 PM
Hi Mike,

As far as I can tell Champions Tower 2 is just a figment of the developers imagination at the moment! Although the launch ceremony was held in October nothing has been done yet. The long promised website doesn't exist either.
I am considering withholding further payments until we know exactly what's going on although,having read the Purchase Agreement,also have my doubts as to where our existing payments have gone.
What % have you paid so far? I wonder how many CT2 3 and 4 'worried' Investors there are out there.
:ohno:

MikeMuz
January 27th, 2008, 02:06 PM
Hi inter
Well we've paid about 75% now and we have receipts for all the payments so far. However after contacting the developers they told me the website should have been up and running last week but its not..!!:ohno: Gunna keep pestering them till I get some answers tho:bash: :nuts: If I stop paying now I lose my early payments bonus. I paid Memon a visit last time I was in Dubai and everything seemed kosher so I might pay them an unexpected visit shortly..!!^^:cheers:

ameelioo
January 27th, 2008, 02:29 PM
Hi MikeMuz,

What do you mean by early payment bonus?

MikeMuz
January 28th, 2008, 08:58 PM
Hi Ameelioo,
If I make all payments before the deadlines then I save 1% of the actual value.:):cheers:

ameelioo
January 29th, 2008, 08:55 PM
Thanks

InterViagra
January 30th, 2008, 12:43 PM
Hi Everybody,

I've been badgering the Agents and they tell me the excavations have started and will take approximately 3.5 months to complete. The revised completion date is March/April 2009 and,if you believe Derby County will win the Premiership this year,then you might believe that as well.:nuts:
Strangely enough CT1 is scheduled for completion in June? Re CT3 and 4 God knows.
I will be contacting Memon to ask for further payments to be postponed until they produce evidence that the development is well under way. I'll post the response when I receive it.
:bash:

MikeMuz
January 30th, 2008, 07:37 PM
If Derby don't win the premiership then i'm moving to Manchester..!!:lol::banana:
Keep us posted buddy..!!!!:)

ameelioo
January 31st, 2008, 06:42 PM
Champion Towers 1 is due to finish in June 2008 or 2009 ?

ameelioo
February 20th, 2008, 01:51 AM
Contract follows completion of shoring and excavation work on project at Dubai Sports City
Memon Investments, a leading Dubai-based property developer and part of the international business conglomerate, the Memon Group of Companies, has awarded an AED 55.5 million contract for the construction of Champions Tower II to Al Sarh Contracting. The announcement follows the completion of the shoring, initial excavation and foundation work on the AED 110 million tower by Stromek Emirates Foundation (SEF), a subsidiary of M`sharie, the private equity arm of Dubai Investments. Present at the signing ceremony was Rizwan Shaikhani, Joint Managing Director, Memon Investments and Eng. Emad Eddin Al Khalil, Executive Manager, Al Sarh Contracting.


Al Sarh Contracting has outlined a comprehensive schedule to ensure that the project is completed within only 18 months from the commencement of groundwork construction in March. Al Sarh has also allocated a total of 100 staff including engineers, project managers, site supervisors and construction workers to ensure the timely delivery of the tower in accordance with the contract. Eng. Adnan Saffarini Office, the architect of the tower, is expected to play an important role as primary project consultant.


Rizwan Shaikhani, Joint Managing Director, Memon Investments, said, "We were attracted to Al Sarh Contracting's broad industry expertise, solid reputation, and history of timely project delivery, all key factors to the successful implementation of this development. We are confident that Al Sarh will meet our expectations and eventually help us meet the 2010 deadline for the Tower's completion."


Champions Tower II is a 13-storey tower with a total built-up area of 218,000 square feet, and offers a total of 174 apartments comprising 72 studios, 74 one-bedroom and 28 two-bedroom apartments, each with its own magnificent view of the lush greenery exuding a relaxing ambience. The tower provides easy access to an 18-hole golf course, a cricket stadium and various sport-oriented academies, rugby and football pitches and a track and field stadium. As the culmination of the sophisticated combination of luxury and high technology living set amidst a sports-oriented environment, the tower also offers a handful of modern facilities including a communal swimming pool, spa and sauna, jacuzzi, fully-equipped gymnasium and an indoor games room.


Dubai-based Al Sarh Contracting has more than 13 years of experience in the UAE's contracting sector, and currently employs more than 700 industry experts, from labourers and site supervisors to engineers and project managers. Al Sarh has completed more than 200 projects in Dubai and throughout the UAE, with its completed and ongoing project portfolio tallied at around AED 451 million.


Eng. Emad Eddin Al Khalil, Executive Manager, Al Sarh Contracting, concluded: "We are proud to be a part of a prestigious project such as Champions Tower II and we will make sure that our resources are optimized to meet the high quality of work embodied by all of Memon Investment's projects. We will build on our reputation as a company that emphasizes quality workmanship and on-time delivery to satisfy high-profile clients such as Memon."

http://www.zawya.com/Story.cfm/sidZAWYA20080218071951/secIndustries/pagConstruction

InterViagra
March 20th, 2008, 06:09 PM
Champion Towers 1 is due to finish in June 2008 or 2009 ?

CT 1 is 2009. I am going to Dubai in a couple of weeks time for 4 nights and will be taking a look around. Will report back on progress or lack of it.

:)

bizzybonita
April 25th, 2008, 11:49 AM
http://www.safahomes.com/project/Champions%20Tower%20II/championtower.jpg

majnoundubai
May 4th, 2008, 08:10 PM
i have a studio in Champion tower II , i just get the e-mail from memon and wanna to share it with you:

* Champions Tower 2 construction commenced on the 9th of October 2007 and the progress is on
* Currently the basement work is in progress and the ground work will commence soon, photographs for the same will be mailed to you as soon as I receive the same from the project department.
* Completion date for Champions Tower 2 is in the years 2009.

regards

Rob Timpie
May 7th, 2008, 04:10 PM
Majnoundubai,

Hope you receive the pictures before the website is finished...

Rob Timpie
May 8th, 2008, 02:42 PM
http://www.mre.ae/champions2.htm

Seems like the tower wasn't sold out...

Rob Timpie
May 8th, 2008, 05:29 PM
http://i30.************/juzotj.jpg

Recently taken (end of March) in Sports City.

Rob Timpie
May 10th, 2008, 12:20 PM
Majnoundubai,

Did you receive the photographs of the basement works yet???

ml7127
May 10th, 2008, 06:40 PM
Dont suppose anyone has any news on the progress of Champions Tower 1? Its like trying to get blood out of a stone getting information from Memon

majnoundubai
May 10th, 2008, 07:11 PM
Majnoundubai,

Did you receive the photographs of the basement works yet???

not yet, don't worry i ll put them the same day i ll receive them

MikeMuz
May 10th, 2008, 08:11 PM
Nice picture.!!
would have expected these kind of pictures on the Memon website, but looks like we'll have to take our own.!!:ohno:
I'm going over to Dubai^^ in August for 8 days, gunna take a trip 2 sports city and take a look and some piccy's of my own..!! Will post them when I get back. Also gunna pay Memon a visit 2:bash:

Rob Timpie
May 14th, 2008, 09:12 PM
http://myousufviceroy.point2agent.com/

Website Memon Real Estate??????????

MikeMuz
May 16th, 2008, 07:44 PM
Yeah Memon real estates website..!!!!
WHY..??:nuts:

Rob Timpie
May 16th, 2008, 10:38 PM
i have a studio in Champion tower II , i just get the e-mail from memon and wanna to share it with you:

* Champions Tower 2 construction commenced on the 9th of October 2007 and the progress is on
* Currently the basement work is in progress and the ground work will commence soon, photographs for the same will be mailed to you as soon as I receive the same from the project department.
* Completion date for Champions Tower 2 is in the years 2009.

regards

Also heard they started with groundworks.
Did you already receive any pictures???:cheer::cheer::cheer:

amplesou
May 17th, 2008, 10:44 AM
Also heard they started with groundworks.
Did you already receive any pictures???:cheer::cheer::cheer:
Rob why don,t post the pics on here!

Rob Timpie
May 17th, 2008, 07:40 PM
I don 't have pics.
Majnoundubai was to receive them from Memon project department... (it was his quote)

Rob Timpie
May 23rd, 2008, 02:33 PM
Did anyone receive any pictures of CT2 ???

I received these pictures from ml7127 (Math). He got the pictures from Memon... It's the building of Champions Tower 1.
:cheers1: :cheer::cheer:

http://i30.************/ngecjl.jpg

http://i26.************/30sbwa9.jpg

http://i27.************/28hfmet.jpg

http://i31.************/qpmlnt.jpg

Rob Timpie
May 28th, 2008, 01:01 PM
i have a studio in Champion tower II , i just get the e-mail from memon and wanna to share it with you:

* Champions Tower 2 construction commenced on the 9th of October 2007 and the progress is on
* Currently the basement work is in progress and the ground work will commence soon, photographs for the same will be mailed to you as soon as I receive the same from the project department.
* Completion date for Champions Tower 2 is in the years 2009.

regards


Majnoundubai,

Still received no pictures of the groundworks Champions Tower II? :ohno:
I know Memon has the escrow accounts for most of their projects in place now (also for Champions Towers I, II and III).
I received the numbers from Memon and checked them with RERA. :banana:
But we all want to see that the works progresses...

InterViagra
May 29th, 2008, 02:48 PM
This is the latest update from Viceroy on CT2. My best guess would be early 2010!

Cheers. :ohno:

I am writing to update you on the progress of the Champions Tower II development in Dubai.

In February, we reported that excavation work had started and that it was expected to be completed by March 2008. The excavation, shoring and piling work has taken longer than first anticipated and is ongoing.

This will cause a slight delay in the completion of the development. We understand that the anticipated completion date will now be September 2009. The developers assure us that they are making every effort to complete the project without any further delays.

I will update you again on the progress of Champions Tower II in August/September, when I hope to include some photographs of the build.

If you have any further questions please do no hesitate to contact me.

Kind regards

Kirsten Wilson
Customer Care
Viceroy Invest Ltd

T. 0121 609 7095
F. 0121 609 7094
E. Kirsten@viceroyinvest.co.uk
W. www.viceroyinvest.com

john11
June 1st, 2008, 10:41 PM
Guys this company is one of the worst in Dubai, do not buy from them. I bought a unit in their project in Dubai Silicon Oasis and was unwilling to make payments after I had paid 25% because of the lack of work. They then started 'ground work' which is technically just digging a whole in November last year which is when the escrow laws came into place. I then asked for the escrow account which was given to me in April, while arranging a payment they then cancelled my unit. They now refuse to respond to my emails and telephone calls. I am taking them to court and if anyone else has had problems please send me a message

Rob Timpie
June 2nd, 2008, 12:06 AM
:banana: Sssst don't tell anyone... the website is almost finished

http://tcbcworldwide.com/memon/

Rob Timpie
June 7th, 2008, 11:24 PM
i have a studio in Champion tower II , i just get the e-mail from memon and wanna to share it with you:

* Champions Tower 2 construction commenced on the 9th of October 2007 and the progress is on
* Currently the basement work is in progress and the ground work will commence soon, photographs for the same will be mailed to you as soon as I receive the same from the project department.
* Completion date for Champions Tower 2 is in the years 2009.

regards

Hello Majnoundubai

Still no pictures from Memon??? :ohno:

What's your opinion of the website (under construction...)???
http://tcbcworldwide.com/memon/

MikeMuz
June 8th, 2008, 11:44 AM
Hi Rob,
I'm going over in August to see Memon and will ask some questions bout the website and lack of info and pictures.!! Gunna take a look and some pics of my own and hopefully post them when I return..!!:cheers:

majnoundubai
June 8th, 2008, 09:59 PM
Hello Majnoundubai

Still no pictures from Memon??? :ohno:

What's your opinion of the website (under construction...)???
http://tcbcworldwide.com/memon/

sorry Rob, still no picture, :ohno:

Rob Timpie
June 12th, 2008, 11:46 PM
sorry Rob, still no picture, :ohno:

Anybody any news from Memon????
Believe they're taking a holiday or so... :nuts:

MikeMuz
June 14th, 2008, 11:44 PM
Hey Rob,
where did you find this info on Memon holiday..?

Rob Timpie
June 16th, 2008, 07:59 PM
Hello Mike,

Check this one out: http://tcbcworldwide.com/memon/

They are working on the website, slow, slow ,slow.... zzzzzzzz

:clown: :soon:

Rob Timpie
July 28th, 2008, 11:51 AM
Oke there,

there is a website now and updates of the digged hole...

http://memon.ae/gallery.php?gal=Construction%20Updates&dir=Construction%20Updates/Champions%20Tower%20II

Well, it's not even a hole yet... :|

MikeMuz
July 28th, 2008, 08:56 PM
Yeah looks rather a small digged hole too.!!

Going over there this sunday, hopefully it will look a bit bigger in the flesh.:lol:
My camera battery is on charge as we speak so all being well i can post some piccies when we return:banana:

Rob Timpie
August 14th, 2008, 12:22 AM
Can't wait seeing your updates, Mike...

234sale
August 14th, 2008, 03:14 PM
plot number please????

bizzybonita
August 16th, 2008, 03:18 PM
^^

http://i33.************/15ousdg.jpg

MikeMuz
August 18th, 2008, 08:22 PM
Can't wait seeing your updates, Mike...

Updates not really as good as I had wanted.! Could not get through security.!
http://s516.photobucket.com/albums/u321/mikelegobbychap/

Rob Timpie
August 18th, 2008, 10:51 PM
Updates not really as good as I had wanted.! Could not get through security.!
http://s516.photobucket.com/albums/u321/mikelegobbychap/

Nice tried Mike,

It's pretty quiet out there again...
Since they 'launched' their website I haven't seen or heard anything about the constructions from Memon. I like to have some updates.
I'm going in October to Dubai and nobody's gonna keep me from entering DSC. :bash:
But that's another 2 months... :ohno:

amplesou
August 19th, 2008, 12:35 AM
It's pretty quiet out there again...
Since they 'launched' their website I haven't seen or heard anything about the constructions from Memon. I like to have some updates.
I'm going in October to Dubai and nobody's gonna keep me from entering DSC. :bash:
But that's another 2 months... :ohno:[/QUOTE]
i will be there last week in october ( atlantis, palm) i will get pictures as i have in the past !what dates are u there rob ?

MikeMuz
August 19th, 2008, 08:37 PM
Hey guys good luck.!!
Wished I'd had the forethought to get in contact with Memon before I went.! I would have been able to enter with a letter or something from the developer.!! Maybe you guys will have better luck!!!!!:cheers:

Rob Timpie
August 20th, 2008, 03:37 PM
Amplesou,

I will be in Dubai from the 13th to the 17th of October.

amplesou
August 20th, 2008, 09:20 PM
sorry i am there from the 23rd i think !

bizzybonita
August 22nd, 2008, 06:08 PM
Memon awards Dh1.96m deal

Elevators firm ETA Melco has secured a Dh1.96 million contract for two Memon Investments apartments in Dubai Sports City.

The deal will see ETA Melco install six high-speed Mitsubishi elevators within the 13-storey Champions Tower II and the 16-storey Champions Tower III over 16 weeks.

Upon completion, the lifts will include technology to reduce power costs by up to 50 per cent compared with conventional drive technology. ETA Melco will also provide free routine maintenance and emergency breakdown support for two years.

Rizwan Shaikhani, Joint Managing Director at Memon Investments, said: "We have identified our new partner's competence and professionalism, which was reflected by the comprehensive bid they have submitted that covered all aspects of the installation and post-delivery services.

"We were also thoroughly impressed by the excellent quality of the brand they carry, which coincides with our ideals in terms of delivering convenience, security, advanced features and overall safety to our clients," he added.

ETA Melco is the Middle East's leading firm to offer design, marketing, supply, installation and maintenance of elevators and escalators from Mitsubishi.



The number

50%: The reduction in power usage by the lifts installed at Champions' towers.

majnoundubai
September 14th, 2008, 06:56 AM
HI FOR ALL,
THIS IS WHAT I GOT FROM MEMON ON 21 JULY 2008;
----------------------------------------------------------
Dear Customer,



We are please to inform you that the construction of Champions Tower 2 is progressing as planned and anticipate completion in the year 2009. We at Memon strive to enhance our customers experience and hence anticipate sending you quarterly construction updates of your property.

For your viewing we have attached a few pictures of the construction and its progress. Incase you require any further queries please feel free to contact us on the details given below.



We thank you for your trust and cooperation with Memon Investment LLC.



Thanking you



Santy



Ms. Santy Mendes
Manager –Client Relations
Memon Investments LLC
(A member of Memon Group of Companies)
5E, Hamarain Centre, P.O. Box 41950 , Dubai , U. A. E
T: + 971 4 268 8111, M: + 971 50 651 7466, F: + 971 4 262 6455
Email: santy@memon.ae, www.memon.ae

http://nl.************/view.php?pic=2rh0e3d&s=4
http://nl.************/view.php?pic=2nhp35t&s=4
http://nl.************/view.php?pic=2f0f2g0&s=4

shiraj_hoque
September 14th, 2008, 04:10 PM
is this the waterproofing?????

majnoundubai
September 14th, 2008, 06:25 PM
no idea:ohno:

MikeMuz
October 20th, 2008, 08:17 PM
Just had word from Memon that the revised completion date is September 2009. They sent me some update pics
http://s516.photobucket.com/albums/u321/mikelegobbychap/?action=view&current=64e9edcc.pbw

Rob Timpie
October 21st, 2008, 11:17 PM
Wauw Mike, that looks good. At least something is happening.

InterViagra
November 18th, 2008, 09:49 PM
Has anyone who is buying from Memon had the contract checked by by an independant Solicitor?

I have been quoted £1000 by the International Property Law Centre for a contract review but don't want to shell out if I don't need to.

Cheers,

IV:)

amplesou
November 18th, 2008, 10:28 PM
Construction site with half the crane hidden behind the bridge so construction should be on its way ! i would say all of the towers near the hub are at advanced stage of footing/engineering/ground works etc! ?
Sports city has tons of construction going on at the moment !


http://img113.imageshack.us/img113/9825/dsc02442az2.jpg (http://imageshack.us)

worried1
November 19th, 2008, 09:29 AM
Construction site with half the crane hidden behind the bridge so construction should be on its way ! i would say all of the towers near the hub are at advanced stage of footing/engineering/ground works etc! ?
Sports city has tons of construction going on at the moment !


http://img113.imageshack.us/img113/9825/dsc02442az2.jpg (http://imageshack.us)

Amplesou, were you able to get anything on Kensington Royale:cheers:

MikeMuz
November 19th, 2008, 07:04 PM
Nice piccy amplesou.
did ya see the link on my previous post of memon update pics..?
:banana:

amplesou
November 19th, 2008, 07:58 PM
Nice piccy amplesou.
did ya see the link on my previous post of memon update pics..?
:banana:
nice find !:cheers:

InterViagra
December 6th, 2008, 12:47 AM
Now scheduled for completion in Jan 2010 apparently.

I have a picture but can't see how to attach it here?

:)

MikeMuz
December 7th, 2008, 05:26 AM
Now scheduled for completion in Jan 2010 apparently.

I have a picture but can't see how to attach it here?

:)

You need to sign up to photobucket or similar its easy..! just go to website and follow instructions..!!!!!!!!!!!!!!!:banana:http://photobucket

shiraj_hoque
January 13th, 2009, 01:59 PM
Memon Investments appoints HI-TECH to install YORK air-conditioners within 4 of its towers





Company to deliver 890 air-conditioning units within developer’s projects





January 13, 2009





Memon Investments, a leading Dubai-based property developer and part of the international business conglomerate, the Memon Group of Companies, announced that it has appointed Umm Al Quwain-based HI-TECH Electro Mechanical Contracting Est. to install YORK air-conditioners within four of its towers - ‘Champions Tower I, II and IV’ and ‘Cambridge Business Centre’, which are collectively valued at 715 million. The developer revealed that it has awarded an AED 13.6 million contract for 890 air-conditioning units, which will be exclusively supplied by Gulf Sail Gen. Trdg Group, the authorised distributor of YORK products in the UAE. This is in line with Memon Investments’ aims to provide state-of-the-art residential spaces for global and regional investors and end-users.





Under the terms of the contract, HI-TECH E.M.C will supply and install its ‘Affinity Series Air Conditioners’ - an internationally reputed range of air-conditioning solutions, which are engineered to meet the exceptionally high standards for long-life, quiet operation, cost-effectiveness and energy efficiency. Featuring an industry-leading two-stage scroll compressor design, the ‘Affinity’ models can operate at a partial capacity when the ambient conditions are mild, and can automatically shift into full capacity when required. Memon Investments has also identified with the product’s energy-saving features in line with the developer’s commitment to green building codes, which it will be implementing within the 5 new projects it has planned within Jumeirah Village South (JVS).





“Our unwavering commitment to quality has led to partnerships with the region’s largest and most credible suppliers to provide us with the best products to complement the high standards, which we have set for our projects,” said Rizwan Shaikhani, Joint Managing Director, Memon Investments. “HI-TECH Electro Mechanical Contracting has been a leading establishment who widely promoted YORK brand in the region and possesses an extensive experience in large-scale implementations, which we require among all our partner suppliers.”





As part of the Al Faisal Group of Companies based in Umm Al Quwain, one of the leading and reputed business organizations in the UAE, HI-TECH Electro Mechanical Contracting has supplied high-quality products to over 50 high profile projects across the country. Driven by its commitment to deliver quality products to landmark projects, the company has grown significantly and now comprises of expert teams that employ highly trained B. Tech and mechanical engineers, Diploma holders foremen and supervisors, as well as qualified erection teams, expert ducting teams and a maintenance team that operates its own work shop and provides warranty services.





“As part of our agreement, we are also going to deliver Preventive maintenance and spare parts, which are essential for the smooth and trouble free operation of YORK equipments. We are thrilled to partner with a reputable company such as Memon Investments and we hope that this is the start of a long-term relationship with them. We are fully committed along with our parent supplier, Gulf Sail to the completion of all work in order to ensure that the towers can be delivered within its schedule of completion,” concluded Rudolf Valerian D’Souza, Manager, HI-TECH Electro Mechanical Contracting EST.





The contract with HI-TECH is part of Memon Investments’ strategy to construct and deliver its projects, which are located in Dubai Sports City, Dubai Silicon Oasis and Jumeirah Village South. With construction progressing on its projects, the developer has recently awarded MEP and Elevator contracts for several of its developments. At present, Memon Investments has a portfolio valued at close to AED 1.34 billion and has identified major master developments in Dubai, including Jumeirah Village South, Dubai Sports City and MIZIN as locations for its new projects, which will include luxury residential, commercial and mixed-use developments.

Rob Timpie
January 14th, 2009, 12:45 AM
Well, for CT 4 at least we have an air conditioner, but still nobody to build the building to hang them in...

shiraj_hoque
January 18th, 2009, 11:07 AM
check out the lastest pics on Memons website

MikeMuz
January 18th, 2009, 11:49 AM
check out the lastest pics on Memons website

Hey fantastic..!! Got excited at the December files till I realised they were taken from the crane.!!!:nuts:
Hope its gunna take less than 6 months per floor from now on..!:bash:
Still at least they make faster progress than the website updates:lol:
NICE Find Shiraj:cheers:

MikeMuz
February 5th, 2009, 09:22 PM
Hey just found an update ont Memon website with a couple more pics........
http://s516.photobucket.com/albums/u321/mikelegobbychap/?action=view&current=Jan2009update2.jpg
http://s516.photobucket.com/albums/u321/mikelegobbychap/?action=view&current=January2009update.jpg
This is without me pestering them to update more:banana:

Rob Timpie
February 8th, 2009, 10:54 AM
http://i43.************/35a6jdg.jpg

shiraj_hoque
March 15th, 2009, 04:43 PM
I'm sure all of you have heard whats going on with BMG and the CUBE. Just wonder if we can pressure Memon to pass over savings to Investors like some other developers.

I got an email from Memon stating that they dont cancel projects or delay them to save on construction costs so we will have to keep an eye on this.

MikeMuz
March 17th, 2009, 08:41 PM
Just had an email from Memon.:banana:
Dear Valued Customer,


Please find attached is the media monitoring report for your kind perusal, for more updates kindly visit our website www.memon.ae, further to this we will provide you regular updates on the project.



In case you have any further clarification please feel free to contact Ms. Santy Mendes at santy@memon.ae .



Best regards,





Asim Suleman



Dear Customer!


Hope this letter finds you in good cheer!

We are pleased to update you on the development progress on Dubai Sport City and the progress of your project, which is as follows.

Infrastructure Work Progress:

The actual Overall progress of the infrastructure work is 90.5% against 100% planned based on old program revision.

Anew revised program has been submitted Clause 14.2 Rev 3 which incorporates all remaining works to June 2009 incl. Landscaping & MV, LV work are expected to be competed June 2009.

DSC Contractors have substantially completed all of there works for where DM East Parallel Road, however not critical. Road works is project to be complete by the 1st week of June 2009.

11 KV substations are in progress, 78 out of 90 substations have been structurally completed up to roof slabs, 18 substations are complete up to block work and 4
Complete with the internals, services.

RTA contractor is progressing with the works on the East Parallel Road. They are expected to be completed by Aug. 2009

Updates on Dubai Sports city:

The 25,000- seat stadium will have state-of-the-art facilities for players, match officials, VIP’s spectators and the media. It will be one of the most advanced of its kind in the world.

The 2009 Asia Cup hockey tournament, to be held at Dubai Sports city, the Asia Cup is a qualifying event for the 2010 World Cup. The UAE may also host the Asian Championship Trophy for both men and women. Once the hockey stadium is complete,

Academics Campus: Dubai Sports City Swimming Academy, World Hockey Academy, ICC Global Cricket Academy, Butch Harmon School of Golf, Dubai Sports City football Academy, David Lloyds Tennis Academy

Ernie Els Club: Individuals, Families and corporations are invited to join the golf clubs membership programme.

The worlds second largest retailer, has announced that it will develop a 136,000 sqft hypermarket in Dubai Sports City. “Carrefour”




Project Work Progress Champions Tower II.


1)Logistics, site management plan and draft illustration are completed
2)Soil test report has been submitted to the Dubai Municipality Authority.
3)Adnan Saffarini Consultant has completed on engineering and architectural blueprint development.
4)Shoring Convention has been allocated to Stromek Piling and Shoring Consultant,
5)Contractor for tower 3 has been awarded to Al Sarah
6)Sub contractor of the AC has been awarded to HI-Tech.
7)Sub Contractor of MEP has been awarded to Anwar Al Aqsa.
8)Excavation and Shoring Work is completed.
9)Water proofing has been completed and basement Completed
10)Currently Level one is in progress.
11)Plot number: R9-1 682-1377


Update pictures and all over progress of the project will be available on our website www.memon.ae

Kindly note the anticipated completion date of your above mentioned property is still the same and work is under progress as scheduled.

Please do not hesitate to contact us should you require further assistance.

Best regards,




LOOKS LIKE THEY GUNNA HAVE TO GET THEIR FINGER OUT THEN.!!:bash:

majnoundubai
April 5th, 2009, 05:39 PM
new photos update for the month of march at memon.ae , it seems like those of january !!!!!:nuts:

MikeMuz
April 5th, 2009, 08:15 PM
new photos update for the month of march at memon.ae , it seems like those of january !!!!!:nuts:

May be Memon should re-name it the LACK of progress updates.:bash:
Must be very soft sand their building on looks like the second floor could actually now be the basement..!!!:lol:

shiraj_hoque
April 6th, 2009, 01:43 PM
i am going to Dubai for the cricket on the 2nd of March. I will be visiting Memon HQ. Does anyone want me to get info on anything??

jimbo5
April 6th, 2009, 03:00 PM
i am going to Dubai for the cricket on the 2nd of March. I will be visiting Memon HQ. Does anyone want me to get info on anything??

I hope you mean 2nd May ?

shiraj_hoque
April 6th, 2009, 04:11 PM
Yeah sure. 2nd March... That's my birthday!!!

MikeMuz
April 6th, 2009, 09:23 PM
i am going to Dubai for the cricket on the 2nd of March. I will be visiting Memon HQ. Does anyone want me to get info on anything??

Any information would be highly appreciated..!!!

I'm out there on the 23rd of May, Thought I would pay Memon a visit and pick up a visitor pass for DSC.

If your still out there , maybe we should go mob handed and try and get some proper updates and completion news..???:cheers:

shiraj_hoque
April 6th, 2009, 11:26 PM
Wish I had the funds and time to stay for 23 days!!! When is completion date for Tower 2?

Rob Timpie
May 4th, 2009, 12:31 PM
Leading contractor to manage electrical, plumbing, fire fighting works within two projects in Dubai Sports City

May 04, 2009

http://i41.************/vmvm7s.jpg

Memon Investments, a leading Dubai-based property developer and part of the international business conglomerate, the Memon Group of Companies, announced that it has awarded an AED 19.5 million MEP contract to Anwar Al Aqsa, a leading UAE-based company. The leading MEP contractor will manage the electrical, fire alarm, plumbing, and fire fighting works within Memon Investments’ ‘Champions Tower II’ and ‘Champions Tower III’ projects, located in Dubai Sports City. With construction progressing on the two towers, which are collectively valued at AED 255 million, the developer most recently awarded an AED 1.96 million elevator contract to ETA MELCO for the installation of six high-speed, state-of-the-art Mitsubishi elevators within the 14-storey Champions Tower II and the 16-storey Champions Tower III.

Memon Investments has revealed that its decision to award the contract to Anwar Al Aqsa was based on the company’s experience within the engineering, owner, vendor and trade contractor communities, which has enriched its capacity to provide the greatest value to a project. Specifically, the company will be utilising its expertise in HVAC systems installation, building electrical works, generator installation, interior and exterior plumbing, fire protection systems installation and exterior lighting for Memon Investments’ luxury residential developments. The contract with Anwar Al Aqsa follows previous deals with other top companies, including an AED 55.5 million deal with Al Sarh Contracting and an AED 82 million agreement with Cairo Contracting Company for the construction of Champions Tower II and Champions Tower III respectively.

“Our reputation within the UAE’s thriving property development sector has been built on the quality of our projects, which is the result of our close collaboration with leading companies that possess the necessary industry expertise and know-how of the latest industry technologies,” said Rizwan Shaikhani, Joint Managing Director, Memon Investments. “This strategy has enabled us to provide the highest level of convenience and state-of-the-art facilities to our clients. We have high confidence in the work Anwar Al Aqsa will be doing for Champions Towers II and III, which will play an integral role in the anticipated success of these two projects.”

Having worked with a wide variety of projects across the UAE - from villas to mid-rise buildings to high-rise towers, Anwar Al Aqsa has developed a distinctive quality in its workmanship and has impressed various local authorities, including the UAE Ministry of Electricity and Water, as well as a number of high profile developers. With offices in Dubai, Sharjah and Ajman, the company comprises of qualified electricians, plumbers and technicians who leverage its good infrastructure, material resources and equipment to execute major projects. Anwar Al Aqsa’s extensive expertise across various levels of MEP engineering, in addition to its operations involving the design, manufacturing and assembly of distribution boards were key factors that helped the contractor clinch the deal.

“Memon Investments has a reputation for high quality developments, and we are proud to have been awarded this contract to work on two of their iconic projects. Ever since we commenced operations, we have been winning several high profile contracts, which underline our expertise and the superior quality of our services. With this latest contract from Memon Investments, we look forward to complementing their vision for excellence by adding value at every stage of our involvement,” concluded Eng. Isam Abdullah Edyak, Managing Director, Anwar Al Aqsa.

Memon Investments currently has a portfolio of projects valued at AED 1.34 billion, which includes the high profile residential 'Champions Towers' series, the luxurious ‘'Gardenia I & II’, ‘Frankfurt Sports Tower I’ and 'Cambridge Business Centre'. The Escrow accounts for all the projects are already in place with the Commercial Bank of Dubai, in compliance with the requirements of the Real Estate Regulatory Agency (RERA) and Dubai Land Department (DLD). Each of the towers will also combine sophisticated design and advantageous positioning, thereby underlining Memon Investments’ unwavering focus on delivering high ROI projects to regional and global investors.

MikeMuz
May 10th, 2009, 12:01 PM
Couple of update pics..!!:banana:

http://i516.photobucket.com/albums/u321/mikelegobbychap/May%202009%20update/PIC_0021.jpg
http://i516.photobucket.com/albums/u321/mikelegobbychap/May%202009%20update/PIC_0020.jpg

:cheers:

amplesou
May 10th, 2009, 01:15 PM
Couple of update pics..!!:banana:

http://i516.photobucket.com/albums/u321/mikelegobbychap/May%202009%20update/PIC_0021.jpg
http://i516.photobucket.com/albums/u321/mikelegobbychap/May%202009%20update/PIC_0020.jpg

:cheers:

these pics look like canal residence west to me because the pics show the sports academy final building roof now on ! over to you ^^ soorry

MikeMuz
May 10th, 2009, 05:12 PM
these pics look like canal residence west to me because the pics show the sports academy final building roof now on ! over to you ^^ soorry

Yeah I know wat ya mean.!!!

These pics were sent to me by Memon so I think I'll go along with it 4 now.!!

Unless somebody can prove otherwise:bash:

Going over there in two weeks so I'll try and get a better look then:cheers:

Rob Timpie
May 10th, 2009, 08:49 PM
No no Amplesou, I beleive MikeMuz is right.
Look at this picture of CT2 in March (look at the background...).
So I guess it's really CT2 :banana:

http://i43.************/24bw03n.jpg

majnoundubai
May 11th, 2009, 04:00 PM
these pics look like canal residence west to me because the pics show the sports academy final building roof now on ! over to you ^^ soorry

yes its CT2, me too i received these updates pic today:banana:

amplesou
May 11th, 2009, 09:08 PM
Yeah I know wat ya mean.!!!

These pics were sent to me by Memon so I think I'll go along with it 4 now.!!

Unless somebody can prove otherwise:bash:

Going over there in two weeks so I'll try and get a better look then:cheers:
looks like i got it wrong !

MikeMuz
May 11th, 2009, 09:16 PM
Only thing is 1 floor in 2 months me thinks its not gunna be ready this year:ohno:

But I spose we should be greatfull their still building at all..!

Any body got any advice on how to get into sports city in May.?

Memon arn't so up front with any kind of pass:ohno:

:cheers:

FARIBA
May 12th, 2009, 08:41 AM
:):):)Only thing is 1 floor in 2 months me thinks its not gunna be ready this year:ohno:

But I spose we should be greatfull their still building at all..!

Any body got any advice on how to get into sports city in May.?

Memon arn't so up front with any kind of pass:ohno:

:cheers:

FARIBA
May 12th, 2009, 08:48 AM
Is there anyone knows what's happening about ct4? i'm going crazy with memon and just found out they have no contracters for this building yet.can u believe it?:ohno:

MikeMuz
June 1st, 2009, 03:12 PM
Is there anyone knows what's happening about ct4? i'm going crazy with memon and just found out they have no contracters for this building yet.can u believe it?:ohno:

Things have slowed right down on every project.
CT 4 is one of the latest projects launched so won't be as up to speed as early projects yet..!!
We bought in CT 2 in 2006..!! LONG LONG Time ago..!

Think you just got to be patient.

CT 4 SITE

http://i516.photobucket.com/albums/u321/mikelegobbychap/Sports%20city%20May%202009/Dubai2009CT2075.jpg

CT 2

http://i516.photobucket.com/albums/u321/mikelegobbychap/Sports%20city%20May%202009/Dubai2009CT2078.jpg
http://i516.photobucket.com/albums/u321/mikelegobbychap/Sports%20city%20May%202009/Dubai2009CT2081.jpg

Got loads more pics will update shortly..!!

MikeMuz
June 1st, 2009, 06:45 PM
http://i516.photobucket.com/albums/u321/mikelegobbychap/Sports%20city%20May%202009/Dubai2009CT2119.jpg
http://i516.photobucket.com/albums/u321/mikelegobbychap/Sports%20city%20May%202009/Dubai2009CT2079.jpg
http://i516.photobucket.com/albums/u321/mikelegobbychap/Sports%20city%20May%202009/Dubai2009CT2080.jpg
http://i516.photobucket.com/albums/u321/mikelegobbychap/Sports%20city%20May%202009/Dubai2009CT2082.jpg
http://i516.photobucket.com/albums/u321/mikelegobbychap/Sports%20city%20May%202009/Dubai2009CT2083.jpg
http://i516.photobucket.com/albums/u321/mikelegobbychap/Sports%20city%20May%202009/Dubai2009CT2084.jpg
http://i516.photobucket.com/albums/u321/mikelegobbychap/Sports%20city%20May%202009/Dubai2009CT2085.jpg
http://i516.photobucket.com/albums/u321/mikelegobbychap/Sports%20city%20May%202009/Dubai2009CT2086.jpg
http://i516.photobucket.com/albums/u321/mikelegobbychap/Sports%20city%20May%202009/Dubai2009CT2089.jpg
http://i516.photobucket.com/albums/u321/mikelegobbychap/Sports%20city%20May%202009/Dubai2009CT2090.jpg
http://i516.photobucket.com/albums/u321/mikelegobbychap/Sports%20city%20May%202009/Dubai2009CT2092.jpg
http://i516.photobucket.com/albums/u321/mikelegobbychap/Sports%20city%20May%202009/Dubai2009CT2094.jpg
http://i516.photobucket.com/albums/u321/mikelegobbychap/Sports%20city%20May%202009/Dubai2009CT2101.jpg

FARIBA
June 2nd, 2009, 07:43 AM
Thanks for the info and the pictures when i bought from ct4 i was told this buildilng will be ready by dec 2009 later they said may 2010 now is changed to 2011 you are right i have no choise but to be patient as long as they start building it i'll be happy

FARIBA
June 2nd, 2009, 07:44 AM
:nuts::bash::bash:Thanks for the info and the pictures when i bought from ct4 i was told this buildilng will be ready by dec 2009 later they said may 2010 now is changed to 2011 you are right i have no choise but to be patient as long as they start building it i'll be happy

Rob Timpie
July 24th, 2009, 12:33 AM
Took these on 20th of July 2009

http://i30.************/241qivm.jpg

http://i25.************/2ztj4tw.jpg

MikeMuz
July 25th, 2009, 12:39 PM
Hey Rob,

Great progress..!!!!!!!!

Great pics:):):)

MikeMuz
August 3rd, 2009, 08:13 PM
Can anyone advise me..??

Just had an email from Memon advising me that completion is due for completion June 2010 and they want land registry fee and electricity utility charge @ AED 20/-per sq ft up front..????
Has anyone else had this info and should we pay it..??????:nuts:

Reference :Champions Tower II –802



Memon Investments is pleased to inform you that we have signed the pre-registration agreement with the Dubai Land Department in line with Law No. 13 of 2008. regulating the interim Real Estate Register of Dubai.



As you are aware, the Dubai Government has been taking a series of intensive measures to support investor interests and strengthen the property sector of the emirate.



The advantage of registration is that your unit purchased off-plan is registered with the Government of Dubai, and as soon the project is completed and upon handover, you can transfer the completed unit from the interim Registration to the property title deed under your name.



The pre-registration has begun, and we will undertake the pre-registration process on your behalf with the Dubai Land Department, The cost of pre- registration per unit has been fixed at a total of AED 2000,



In addition to the above the additional electrical utility charges to be paid which has been worked out @AED 20/- per sq ft, totals to AED 10780.00 as per the area of the unit you own.



The total payment AED 12780.00(Additional electrical utility charges + pre-registration AED 2000.00) has been divided in 3 installments for the month on August/ September/October 2009 of AED 4260.00.



The handover of Champions Tower II is scheduled for June 2010. Given below are the bank details to remit above mentioned amount.

majnoundubai
August 3rd, 2009, 08:43 PM
yes i have the same e-mail, we should have more explication from memon about this ELECTRICITY ADDITIONAL CHARGES?

FARIBA
August 3rd, 2009, 08:48 PM
This is crazy was any of these extra expenses mentioned in the contract?

MikeMuz
August 3rd, 2009, 09:01 PM
This is crazy was any of these extra expenses mentioned in the contract?

Well it was that long ago I can't remember, but I have just replied to Memon with the same question and will keep you posted as to reply..!

I have payed for my studio 100% and kept my side of the bargain but they told me originally that it would be completed 2008. Surely they can't expect us to pay these extra charges until completion..??:ohno::bash:

FARIBA
August 3rd, 2009, 09:40 PM
yes,
Is so easy for them to come up with new things and demand for you to pay for it and if you don't they say you loss your apt but they don't care that they have it in writting for this project to be finshed in 2008 in most placese you may have up to 6 months grace period to be late not 2 years or more without them paying us any penalty.

But if we are late we'll pay late fee or we loss the place.This is madness why we shouldn't hold them responsible and they can.

ml7127
August 4th, 2009, 09:24 AM
I had the same email for Champions Tower 1. The response I received from Memon stated:

"We refer to your mail, the pre registration is compulsory for all champions Tower 1 customers, as for the electrical utility charges. This is the cost attached to the mainline connection for the tower.
Please refer clause 9 , 9.1 , 10 mentioned in the SPA."

I have not yet looked at the clauses mentioned, so not sure how valid this is

FARIBA
August 4th, 2009, 04:32 PM
Would you please check and see if there is such a thing mentioned in your contract and let us know?tHANKS

MikeMuz
August 4th, 2009, 08:16 PM
I had the same email for Champions Tower 1. The response I received from Memon stated:

"We refer to your mail, the pre registration is compulsory for all champions Tower 1 customers, as for the electrical utility charges. This is the cost attached to the mainline connection for the tower.
Please refer clause 9 , 9.1 , 10 mentioned in the SPA."

I have not yet looked at the clauses mentioned, so not sure how valid this is

Well I have checked page seven of the SPA and it does not contain these clauses. ( 9.1 10 )

I have asked Memon to check their copy of our agreement and let me know as to any additional info and clauses that may be missing.:ohno:

But it looks like were gunna have to cough up to keep things happening:nuts:

FARIBA
August 5th, 2009, 06:50 PM
mike is your right to know what's in your spa and please don't give up so easiley after all is your money

I asked a friend of mine in dubai regarding electical utillity charge before the building was even built and was told it was unheard of.

again it's up to you bcas memon want's you to say ok at any time for any extra charges without writting it in our contract.

amplesou
August 5th, 2009, 08:15 PM
mike is your right to know what's in your spa and please don't give up so easiley after all is your money

I asked a friend of mine in dubai regarding electical utillity charge before the building was even built and was told it was unheard of.

again it's up to you bcas memon want's you to say ok at any time for any extra charges without writting it in our contract.

Lets get this right they want thousands of durhams per apartment for supplying electricity hook up !
Should be paid for by the electricity company or the builder !
This lot would,nt cheat you i mean just a look at there sweet faces!
http://img219.imageshack.us/img219/2061/image01dddddddddddddddd.jpg (http://img219.imageshack.us/i/image01dddddddddddddddd.jpg/)

Demo Man
August 6th, 2009, 05:16 PM
I seem to be getting nowhere asking Memon for an explanatiuon as to why this electricity utility charge is so very expensive. They just keep refering me to the clauses in the contract.

Will the cost associated with water and any gas supply be so expensive. If so it increases the original purchase price by 10%.

Surely they cannot just charge whatever they want without any justification.

FARIBA
August 6th, 2009, 06:23 PM
I believe they came up with all these stupid cahrges for people bcaus they are thinkin most people have paid either %100 or close to that of their purchase price therefor they have no other choice but to pay

But if you can't find anything in your s.p.a therefor is illigal.

Demo Man
August 10th, 2009, 01:32 PM
Can anybody tell me if they have already arranged payment of this electricity utility charge to Memon, which I consider to be unbelievably expensive.

Also can someone explain why I woud need to sign up for the Home Secure Plan if I intend to purchgase the property outright ie. no mortgage. I am unsure as to what this actually is.

FARIBA
August 10th, 2009, 04:43 PM
Demo Man

I just spoke to memon about the insurance for your payment plan and told them i don't want any insurance for it and when i siad to him this not mandetory he just asked me to reply to his email and say that i don't want it which i did .

maybe you should speak to them.

Just to let every one know about the regestaion fee according to reara theycan charge us when the building is finished not now so they are not very honest with the investors.

As far as the electicity charge they asked for so far no one in Dubai has told me this a normall thing. i belive this charge belongs to memon only they are acting like thieves.

shiraj_hoque
August 11th, 2009, 05:59 PM
I will do some investigation and hopefully we can prevent memon from taking this money from us.

MikeMuz
August 14th, 2009, 08:34 PM
http://i516.photobucket.com/albums/u321/mikelegobbychap/CT2%20AUG%20UPDATE/DSCF0008.jpg

http://i516.photobucket.com/albums/u321/mikelegobbychap/CT2%20AUG%20UPDATE/DSCF0009.jpg

http://i516.photobucket.com/albums/u321/mikelegobbychap/CT2%20AUG%20UPDATE/DSCF0010.jpg

Some updates from Memon :nuts:

amplesou
August 16th, 2009, 06:10 PM
Lets get this right they want thousands of durhams per apartment for supplying electricity hook up !
Should be paid for by the electricity company or the builder !
This lot would,nt cheat you i mean just a look at there sweet faces!
http://img219.imageshack.us/img219/2061/image01dddddddddddddddd.jpg (http://img219.imageshack.us/i/image01dddddddddddddddd.jpg/)
Dear Mr.

Greetings, hope you are doing fine!

We refer to your email and would like to clarify that the Electrical utility charges are for the Mainline Connection and the same can be cleared by checking your SPA page 7 clause 9.1 and 10 or page 5 , 2.4 or 2.5

As for the Pre Registration the same is charged @ 2000 AED as we have to register your unit with the Dubai Land Department.

Please note that these payments are to be made with immediate effect to avoid any disruption in the construction activity as well as the project handover.

Looking forward to your cooperation.

Thanks



Shah Assad
Assistant Manager - Sales
Memon Investments LLC
(A member of Memon Group of Companies)
5E, Hamarain Centre, P.O. Box 41950, Dubai, U. A. E
T: + 971 4 268 8111, M: + 971 50 345 2149, F: + 971 4 262 6455
Email: shah@memon.ae, www.memon.ae

This email communication, together with any attachments, is confidential and is intended only for the use of the addressee(s) and may contain information which may be covered by legal, professional or other privilege. If you are not the intended recipient, any copying, distribution or use of this email or its attachments, or of the information contained herein, is strictly prohibited; please destroy this email and its attachments and notify us immediately. Memon is neither liable for the proper, complete transmission of the information contained in this communication nor any delay in its receipt, unauthorized interception by a third party, any alteration, or corruption during transmission, or for any loss or damage caused by any virus transmitted by this email. Any opinions, express or implied, presented are solely those of the author and do not necessarily represent those of the company.

Dubai - pal
September 7th, 2009, 11:04 AM
Hello to all on this site.
I have just joined up.......:lol:
I wanted to start by asking whether anyone has actually paid the connection charges (main line) and the pre reg fee?

It appears Memon are insisting on the payments as part of the contract and they are threatening late payment fees if not paid by end of Sept.....:ohno:

How do other people feel about this and what are your plans?
Apologies if this seems a bit in your face but I have purchased an aprtment in this investment and I am fnding it very difficult getting any sense out of the developer:bash:

Demo Man
September 9th, 2009, 02:32 PM
I am still getting emails from Memon telling me that the Home Secure Plan Insurance is compulsory. Is this so? They are requesting payment by 16th September.

Surely my arrangements for financing the remainder of the payments to Memon are my own business! Can anyone please advise?

I have not paid the electric connection charge or the pre reg fee (although this fee does sound reasonable).

amplesou
September 9th, 2009, 05:08 PM
I am still getting emails from Memon telling me that the Home Secure Plan Insurance is compulsory. Is this so? They are requesting payment by 16th September.

Surely my arrangements for financing the remainder of the payments to Memon are my own business! Can anyone please advise?

I have not paid the electric connection charge or the pre reg fee (although this fee does sound reasonable).

I would suggest you do not pay anything to these cowboys !!!

sportslover
September 9th, 2009, 05:35 PM
does any one notice about memon web site?
hope every thimg ok with memon
please send them lots of email and ask them to up date there web site....

MikeMuz
September 9th, 2009, 09:59 PM
does any one notice about memon web site?
hope every thimg ok with memon
please send them lots of email and ask them to up date there web site....

They have just updated the construction pics for ct2
don't know bout the others.?

MikeMuz
September 9th, 2009, 10:05 PM
I am still getting emails from Memon telling me that the Home Secure Plan Insurance is compulsory. Is this so? They are requesting payment by 16th September.

Surely my arrangements for financing the remainder of the payments to Memon are my own business! Can anyone please advise?

I have not paid the electric connection charge or the pre reg fee (although this fee does sound reasonable).

The home secure plan is not compulsary, however they still want you to pay for the land registry which is compulsary to register your plot in your name..!!
Fill out the attached form from their email and return it to them with pre reg fee.!!
Your right pre reg fee is reasonable, however hook up fee is excessive..!:bash:

shiraj_hoque
September 10th, 2009, 02:37 PM
Lets Co-ordinate the efforts.

I've set up a new email address for all the investors to send correspondences to

Please take note:-
CTinvestors@yahoo.co.uk


We need a system. I propose:-

1. We need to find out our numbers. Can all CT 1,2,3 and 4 investors email me their name, location, No of units in which building, email and telephone no.
From this, I will create a database.

2. Then let me know if you have or havent paid the Pre-Reg fees

3. Then let me know if you have or havent paid the Utility charges

4. Please also send me any correspondences sent or received from Memon/RERA re these issues

5. Any other suggestions.


Please do not post any of this info onto the forum here, but send to the CT investor email address so I can upload myself in a systematic order.

6. I also propose that we include a 2nd lead-co-ordinator for auditory purposes who will have access to the email address and verify what I do. Do we all agree? Who can we appoint?

Justthink
September 12th, 2009, 02:45 PM
Hi All
I am also investor from Memon, They also email me about Pre reg, Utility charge and Secure Plan insurance. I also chack all other Developer in Dubai. No one charge these from there investor. only reg fee charge from after deliver apartments.
So raise all our voice and contact RERA about there SCAM.

Justthink
September 12th, 2009, 02:48 PM
Lets Co-ordinate the efforts.

I've set up a new email address for all the investors to send correspondences to

Please take note:-
CTinvestors@yahoo.co.uk


We need a system. I propose:-

1. We need to find out our numbers. Can all CT 1,2,3 and 4 investors email me their name, location, No of units in which building, email and telephone no.
From this, I will create a database.

2. Then let me know if you have or havent paid the Pre-Reg fees

3. Then let me know if you have or havent paid the Utility charges

4. Please also send me any correspondences sent or received from Memon/RERA re these issues

5. Any other suggestions.


Please do not post any of this info onto the forum here, but send to the CT investor email address so I can upload myself in a systematic order.

6. I also propose that we include a 2nd lead-co-ordinator for auditory purposes who will have access to the email address and verify what I do. Do we all agree? Who can we appoint?


I am agree with you and stop charge all hiden charge

Justthink
September 12th, 2009, 02:55 PM
I Invested 4 apartments from Memon Investments LLc. I am not paying any Utility, Pre reg and Home Secure Plan. I think every one stoped pay these fee too.

ilunat
September 13th, 2009, 05:28 PM
just seen this thread - I am also an investor at CT2 and what I've read pretty much reflects my experiences with Memon, though they have confirmed that the home insurance is not essential (though they still keep sending me emails asking to me to pay it).

I'm in agreement with a co-ordinated approach as it's something I'd liketo do in terms of seeking compensation off them for the delay. I'll email my details to the CTinvestor email address.

amplesou
September 13th, 2009, 10:02 PM
I think Memon are running out of money !

Is this the reason they are sqeezing investors so much!

They are building very slowly two of there sites are up to 4 floors !

How long has that taken ?

Justthink
September 13th, 2009, 10:10 PM
Hi All
I am also investor from Memon, They also email me about pre reg, Utility charge and Secure Plan insurance. I also chack all other Developer in Dubai. No one charge these from there investor. only reg fee charge from after deliver apartments.
So raise all our voice and contact RERA about there SCAM.

How much now value in CH2 and CBC tower from memon

Justthink
September 13th, 2009, 10:13 PM
Dont pay Utility charge, Home sccure plan and pre reg fee!!!!

Justthink
September 14th, 2009, 02:15 AM
I purchase 10th floor. but not compleated yet 20% work. They email me for Registration fee, utility and home secure. I dont no why they doing this scam for us. Please stop charge

sportslover
September 14th, 2009, 02:58 PM
please send all your detail to siraj haq
also all memon investor requested to forward there detail to via e mail to siraj believe me toghther we can stop this charges
tha

FARIBA
September 15th, 2009, 02:34 PM
I think Memon are running out of money !

Is this the reason they are sqeezing investors so much!

They are building very slowly two of there sites are up to 4 floors !

How long has that taken ?

I agree with you they are working very slow on the buildings the ct1 was going to be done in 2008 then they said for sure in 2009 but is not going to happen for this year.

so what's the garantee they are going to finish the rest if they are out of money.
sending money to memon at this time is with no garantee if or when they are going to finish so they should stop the payments for one year so they atleast give people a brake.

Zac1979
September 22nd, 2009, 12:58 PM
Hi guys,

I have just joined this forum today. I have had similar problems to everyone on here.

Bought my Studio on the 5th floor in Aug 2006. I went on a 5 year payment plan and have been paying on time every month. I started complaining and holding my payments back earlier this year when I realised the construction was more more or less at a stand still.

I contacted RERA at the time who advised not to make further payments. But since then Memon have been buzzing as I think now they have gone to the 5th floor.

My complaints pushed Memon to extend my payment plan free of charge by another 3 years which I am happy with as it reduces my monthly payments.

I was then told about these utility charges and land reg fee (the latter is quite normal to my understading). Furthermore, Memon advised they had to increase the sizes of the studio apartments due to some technical fault so now I have to pay extra for this too.

I dont know if anyone else here has had this yet? So basically according to Memon, Studios and 1 Bed sizes will be increased due to the regulations and investors will have to pay the difference and 2 Bed sizes will be decreased and Investors will be refunded for these.

I hope we dont have to pay for the Utility Charges - I was quoted 11,000 AED.

Has anyone spoken to RERA about this and if so what was there response?

Shiraj - I have sent you an email today.

FARIBA
September 22nd, 2009, 09:13 PM
HI
what size is your studio?and what is the new size going to be?

Zac1979
September 23rd, 2009, 01:43 AM
Original size was 559 sq ft and new size is 635 sq

FARIBA
September 23rd, 2009, 01:54 AM
tha's a good size for studio.what was the price when you bought it in 2006? and do you have any idea what would it be now in this market?

Zac1979
September 23rd, 2009, 09:36 AM
You know I really cant remember - I have to go and check my original contract. I was charged extra for the 5 year payment plan. I think at the time I paid something like 650AED per sq ft and Memon say today its worth like 1200 AED per sq ft even in this recession. I know there prices are over hiped alot but I have not been able to get prices from elsewhere.

But what I am really not too sure about is this Utility Charge. Hence why I ask has anyone checked with RERA about this?

I think they will complete though. They offerred me a price plan a few months back where I can pay only on construction of each floor. So everytime they complete a floor I pay the next installment. For them to offer me this price plan to me shows they are confident they will complete. Dont know about the timescale but I am more worried about the completion and the price I am paying.

amplesou
September 23rd, 2009, 10:58 AM
I want your money !

http://img10.imageshack.us/img10/2704/296itl3.jpg (http://img10.imageshack.us/i/296itl3.jpg/)

waiting4ever
September 23rd, 2009, 12:40 PM
LOL !! Priceless !!!!

FARIBA
September 23rd, 2009, 05:24 PM
LOL !! Priceless !!!!

HI
Thanks for the message.pls check your inbox.

Justthink
September 24th, 2009, 03:19 AM
What the current market price for Champions tower 2.

Dubai - pal
September 25th, 2009, 11:39 AM
Hi all,
Hey Siraj things have gone a bit quiet on the united approach - have you any updates please? :)

Zac1979
September 25th, 2009, 04:36 PM
Memon say they are doing resales for around 1,250 AED per sq ft on CT02.

I thought CT02 is a 12 storey building and not a 15 storey one?

Zac1979
September 25th, 2009, 04:37 PM
Memon say they are doing resales for around 1,250 AED per sq ft on CT02.

I thought CT02 is a 12 storey building and not a 15 storey one?

I forgot to add that price was for the Studio. Not too sure if its the same ration for 1 and 2 beds

Demo Man
October 22nd, 2009, 02:32 PM
I have been overseas for a few weeks and have had no further contact with Memon as yet.

What is the current position regarding electrical connection charges and registration? Has everyone paid? Are people still refusing to pay? Please advise.

Many Thanks

amplesou
October 23rd, 2009, 10:33 AM
I don,t think anybody is falling for there con tricks and are awaiting decisions from rera and legal experts !
But for now i would not pay them a penny!

shiraj_hoque
October 24th, 2009, 11:12 AM
Amplesou, are you an investor in Champions Towers??

amplesou
October 24th, 2009, 05:58 PM
I have had contact with them but only the same letter you guys have recieved!
All the champion towers seem to be going very slow at this point !
I don,t know why at this stage !:ohno:

MikeMuz
October 24th, 2009, 06:01 PM
Amplesou, are you an investor in Champions Towers??

Yeah Ive asked this question before but no answer:ohno::ohno::nuts:
N that pictures getting a bit boring:bash:
I still have not payed until I get a reply off Memon to my questions:ohno:
Looking at the big picture CT2 aint gunna be ready next year :bash:

amplesou
October 25th, 2009, 10:38 AM
Yeah Ive asked this question before but no answer:ohno::ohno::nuts:
N that pictures getting a bit boring:bash:
I still have not payed until I get a reply off Memon to my questions:ohno:
Looking at the big picture CT2 aint gunna be ready next year :bash:
I have edited the pic so its no longer there !
I have entered into the debate over issues here as you all know as i feel strongly about these issues !
Thats all ,i am not directly involved with an investment but i have a friends who are and it is on this basis i have spoken out!
Brilliant where do i get them from !!!!! :nuts:

InterViagra
November 18th, 2009, 02:46 PM
I emailed Memon asking for an update and received a reply stating that CT2 is now up to the 7th floor and requesting the next 'stage' payment.

There were a couple of inconclusive pics attached so I wonder whether anyone is able to confirm whether this is true or not?

Cheers,

Jeff

ilunat
November 20th, 2009, 01:25 AM
just been to Dubai and got back yesterday. Met Santy at Memon offices and had a long meeting and undertook a good long site visit on CT02. Took loads of pictures and will upload them in a couple of days. Santy said still on course for completion for June
2010. Currently on 7th floor but whole of Sports City is still like a building site, though ICC have moved i and cricket and athletics stadiums are completed as well as the golf course.
PM me if you want any further information. Disappointed I've not heard anything from anyone else on this forum for a while, especially the person who rallied everyone together and asked for details to start a pressure group.

InterViagra
November 21st, 2009, 09:13 PM
Cheers for the update. Good to know it's still going up,albeit slowly!

I've sent you a PM.

Jeff

Imre
December 8th, 2009, 03:14 PM
Memon Investments’ AED 255 million ‘Champions Towers II’ and ‘Champions Towers III’ witness continuous construction progress

Leading property developer confident to deliver projects on time

December 8, 2009

Memon Investments, a leading Dubai-based property developer and part of the international business conglomerate, Memon Group of Companies, has reported that construction on its ‘Champions Towers II’ (CT II) and ‘Champions Towers III’ (CT III) projects is witnessing continuous progress. The leading property developer reported that it has already completed 6 out of 14 floors and 5 out of 16 floors for CT II and CT III respectively. The timely pace of the project’s construction and development complements Memon Investment’s assurance of delivering the projects on time.

pics and more text here:

http://imresolt.blogspot.com/2009/12/memon-investments-aed-255-million.html

MikeMuz
December 9th, 2009, 09:31 PM
Thanks Imre,

This is the kind of update we all like to see.!!!
Especially midst the latest news on Dubai World.
Keep up the good work.!!:)

Rob Timpie
December 21st, 2009, 08:40 PM
Latest updates on www.memon.ae

http://i49.************/2evx37a.jpg

MikeMuz
January 11th, 2010, 07:19 PM
Couple of update pics from Memon,

http://i516.photobucket.com/albums/u321/mikelegobbychap/CT%202%20JAN%202010/CT2DSCF0582.jpg

http://i516.photobucket.com/albums/u321/mikelegobbychap/CT%202%20JAN%202010/CT2DSCF0583.jpg

Think I get it now..!!
Everytime they finish a level it must sink into the sand 1 level.:bash:
They tell me June 2010 now.!!:nuts::nuts::ohno:

FARIBA
January 12th, 2010, 01:00 AM
HI MIKEMUZ
This is not possible to finish this one in just 5 or 6 months i don't know why they give us this fake dates do they really think people are stupied?

kevin_1980in
January 12th, 2010, 06:54 AM
Couple of update pics from Memon,

Think I get it now..!!
Everytime they finish a level it must sink into the sand 1 level.:bash:
They tell me June 2010 now.!!:nuts::nuts::ohno:

:lol::lol:

DXBhugefan
January 12th, 2010, 01:20 PM
Has anyone been approached by Memon asking for further payments due to increased unit area sizes?

Demo Man
January 22nd, 2010, 02:18 PM
I have previously made a substantial amount of the purchase price and received a letter from Memon saying that the final payment would now be payable on completion.

They are now requesting that any outstanding monies are paid as soon as possible to ensure the continued building programme.

With the well publicised problems in Dubai and the endless delays I am jittery about sending any more money but at the same time I want to ensure that the building is completed. Any thoughts?

Rob Timpie
January 22nd, 2010, 07:36 PM
I have previously made a substantial amount of the purchase price and received a letter from Memon saying that the final payment would now be payable on completion.

They are now requesting that any outstanding monies are paid as soon as possible to ensure the continued building programme.

With the well publicised problems in Dubai and the endless delays I am jittery about sending any more money but at the same time I want to ensure that the building is completed. Any thoughts?

Well, I think requesting to pay outstanding instalments is pretty normal. Memon is building their projects, but as we know everything in DSC is delayed and delayed... For some reason I still have faith in this company...
Hopefully I'm right. :okay:

smith11
January 23rd, 2010, 12:17 AM
I have previously made a substantial amount of the purchase price and received a letter from Memon saying that the final payment would now be payable on completion.

They are now requesting that any outstanding monies are paid as soon as possible to ensure the continued building programme.

With the well publicised problems in Dubai and the endless delays I am jittery about sending any more money but at the same time I want to ensure that the building is completed. Any thoughts?

Dear we all should pay, by not paying we may ruin our investments.
Yes we can ask for construction base payment plan, and we have no choice even. As far they are constructing is good for us, I am again and again telling that we must realized their intentions, and atleast they are here, those with bad intentions already gone or stucked in between.
Help them atleast by paying which have committed and accordingly they also
must have their commitments against the constructions. so Don't delay payments, and I am sure if we pay on time as our duty, now they also won't delay, as each delay means more cost to them. Rest I leave it to you all.

Zac1979
January 27th, 2010, 01:19 PM
MEMON UNVEILS NEW IDENTITY

Memon Group of Companies - a multibillion dollar international business conglomerate with interest in real estate development, trading, manufacturing and IT - has unveiled its new brand identity, 'Shaikhani Group'

"The move is in line with the group's new strategy for growth in the region, which involves undertaking of new projects and colaboration with leading industry partners. The group aims to acheive a 10 to 15 per cent growth in 2010 and further expand its project portfolio," Chairman Abu Baker Shaikhani said in a statement.

The rebranding is also part of the Group's effort to build a closer association with its founding family - the Shaikhani's, which the company believes will further strengthen its brand identity. All existing business under the Group's former identity, which includes Memon Investments, Memon Real Estate Brokers Dubai, Rubber World Industries, Gulf-O-Flex Trading, Memon Developers UK and Memon Real Estate Pakistan, are also slated to operate under the Shaikhani Group banner. The group is planning to diversfy into the hospitality, medical retail and education sectors in the near future, said the statement.
The Memon Group has delivered more than 30,000 units across the globe, and maintained relevant presence in 90 countries spread across Asia, Africa, Middle East and Europe.

Demo Man
January 27th, 2010, 03:42 PM
Not sure what to make of this!

Zac1979
January 29th, 2010, 03:21 PM
Me neither. I got this email from Memon talking about this merger. I dont know if thats a good thing or bad thing? What happens to our investment? Our contracts are with Memon so are they still valid or do we need new paperwork?

On the question on further payments for increased unit sizes - I was having this dispute with Memon last year when they mentioned I will have to pay extra due to my Studio size increasing by 76ft I think. I asked why this was they replied due to some change in the regulation they have had to increase the sizes of studios and 1 beds and decreased the sizes of 2 beds. So according to them they will be refunding/reducing the prices for the 2 beds and asking for more money for the 1 beds/studios. I have deferred my payments for this extra cost til 2011 for now. But need to probably chase this up with RERA unless someone here knows the facts about this?

amplesou
January 29th, 2010, 06:08 PM
if the developer increases the size of your purchase you do not have to pay extra !
that is the law in dubai !
you need a solicitor for this lot to show you any respect ,then you will find they will not adjust the price !
And should show apologies for trying it on !

katalan
February 17th, 2010, 04:54 PM
HI Guys,
New to this forum, have studio on 10th floor and just received demand for electricity hook-up of 20AED/sqft + 2000AED for Land Registry.
Has anyone paid??

Imre
March 8th, 2010, 01:52 PM
UAE real estate market to witness a demand-supply balance in 2010, says Shaikhani Group

Company asserts commitment to go ahead with construction of all launched projects worth AED 1.34 billion

March 08, 2010

Amidst expectations that the UAE’s economy will rise by 3.2 per cent in 2010, Shaikhani Group, a multibillion dollar international business conglomerate with interests in real estate development, trading, manufacturing and IT, has predicted that the country’s real estate market is poised for demand-supply balance this year. A representative from the company referred to recent data released by Proleads and added that despite the cancellation of 566 projects in the UAE, a total of 806 properties currently under construction are expected to be delivered soon, and this will help attain stability in the property sector. Amidst all this, the Group is assuring its investors of its commitment to go ahead with construction of all its launched projects, which have a collective value of AED 1.34 billion.

With transparency as its utmost priority, Shaikhani Group has reported that construction on its ‘Champions Towers I’ (CTI), ‘Champions Towers II’ (CT II) and ‘Champions Towers III’ (CT III) projects is witnessing continuous progress. The leading property developer reported that it has already 14 levels of CTI, 8 out of 13 floors and 7 out of 15 floors for CT II and CT III respectively. Furthermore, it has also completed nine out of the ten levels within ‘Cambridge Business Centre’ (CBC) project, its inaugural commercial venture located in Dubai Silicon Oasis. The company also previously announced that it is fast-tracking the construction of ‘Gardenia I & II’ and ‘Frankfurt Sports Tower I’, and has awarded various important contracts to a number of top contractors.
More here:

http://imresolt.blogspot.com/2010/03/uae-real-estate-market-to-witness.html

amplesou
March 8th, 2010, 02:52 PM
We have had these press properganda articles from these people on many occasions before when they where know as memon !
These press releases are missleading and raising false hopes for investers !
On skysraper dubai marina tread i think
imre coments regarding apartment buidings in dsc with few workers on each just so they can get the next payment off inversters ( very sad)!
Well this company is one of these !
Cheers imre for the info!

Dubai - pal
March 14th, 2010, 08:21 PM
Has anyone received an email from Memon - re CT2

The new completion date is Dec 2010????

This is despite beng told many times in the past year that the completion was June 2010.

:bash::ohno:

amplesou
March 14th, 2010, 09:13 PM
Has anyone received an email from Memon - re CT2

The new completion date is Dec 2010????

This is despite beng told many times in the past year that the completion was June 2010.

:bash::ohno:

I can,t se any champion towers finishesd this year !
The sites are just not active enough ,some are just 2 days a week or nothing depending on there whim!
Please take no notice of the propergander press releases there pure b---sh-t !
They have done these releases a number of times over recent years but 3 guys working every now and again on these towers means they may well be grinding to a halt unless they can get extra money out of investers by whatever means possible !
I am not an invester in champion towers but i do know what is going on here and i would advise any person involved with these project may the lord have mercy !:)
I would be very suprised if they get finished at all !

tysonM
March 14th, 2010, 11:45 PM
I can,t se any champion towers finishesd this year !
The sites are just not active enough ,some are just 2 days a week or nothing depending on there whim!
Please take no notice of the propergander press releases there pure b---sh-t !
They have done these releases a number of times over recent years but 3 guys working every now and again on these towers means they may well be grinding to a halt unless they can get extra money out of investers by whatever means possible !
I am not an invester in champion towers but i do know what is going on here and i would advise any person involved with these project may the lord have mercy !:)
I would be very suprised if they get finished at all !

How come you are at some many threads. You got nothing to do just to mess around.

Rob Timpie
March 15th, 2010, 10:56 AM
I can,t se any champion towers finishesd this year !
The sites are just not active enough ,some are just 2 days a week or nothing depending on there whim!
Please take no notice of the propergander press releases there pure b---sh-t !
They have done these releases a number of times over recent years but 3 guys working every now and again on these towers means they may well be grinding to a halt unless they can get extra money out of investers by whatever means possible !
I am not an invester in champion towers but i do know what is going on here and i would advise any person involved with these project may the lord have mercy !:)
I would be very suprised if they get finished at all !

If I look at the pictures of DSC a lot of buildings haven't even started yet being build, even de stadiums and infrastructure won't be complete for a long time.
So to say you'd be surprised if the CT's ever get finished is a surprising conclusion. I admit my faith isn't growing as things take so long, but let's keep hoping for the best... :)

amplesou
March 15th, 2010, 11:32 AM
If I look at the pictures of DSC a lot of buildings haven't even started yet being build, even de stadiums and infrastructure won't be complete for a long time.
So to say you'd be surprised if the CT's ever get finished is a surprising conclusion. I admit my faith isn't growing as things take so long, but let's keep hoping for the best... :)

Sorry Rob !
May be i was having a bit of a moment ,i hope for your sake that everything turns out ok :)

InterViagra
April 8th, 2010, 04:44 PM
Greetings from Memon!

We are pleased to inform you that Champions Tower II is progressing well for approximate completion by March 2011. Please find attached is the picture for your kind perusal and also find below the detailed explanation for the attached construction updates.

1. Currently we have completed 9th level.
2. Currently we are working on blockings for 1st to 4th level
3. The next stage will be the 10th level slab; pictures for the same are attached.


No Comment necessary!! :ohno:

majnoundubai
April 9th, 2010, 05:38 PM
has received the same update

it seems like 3 months for each floor since last oct 2009

so i don't think so that's the completion date will be march 2011,,,,,,,,,,,,,,,,may be 2013

FARIBA
April 9th, 2010, 06:11 PM
has received the same update

it seems like 3 months for each floor since last oct 2009

so i don't think so that's the completion date will be march 2011,,,,,,,,,,,,,,,,may be 2013

If they have send you any pic's would you post it here pls ?

Thanks

majnoundubai
April 9th, 2010, 06:21 PM
CTII-UPDATES MARCH2010
http://cf.mg1.mail.yahoo.com/ya/download?fid=Inbox&mid=1_183821_AGnPjkQAAB91S72HNAj98gs3jKE&pid=2&tnef=&YY=1270829885554&newid=1&clean=0&inline=1
http://thumbp2.mail.vip.gq1.yahoo.com/tn?sid=760325831&mid=AGnPjkQAAB91S72HNAj98gs3jKE&midoffset=1_183821&partid=3&f=320&fid=Inbox
http://thumbp2.mail.vip.gq1.yahoo.com/tn?sid=760325831&mid=AGnPjkQAAB91S72HNAj98gs3jKE&midoffset=1_183821&partid=4&f=320&fid=Inbox

amplesou
April 9th, 2010, 06:36 PM
CTII-UPDATES MARCH2010
http://cf.mg1.mail.yahoo.com/ya/download?fid=Inbox&mid=1_183821_AGnPjkQAAB91S72HNAj98gs3jKE&pid=2&tnef=&YY=1270829885554&newid=1&clean=0&inline=1
http://thumbp2.mail.vip.gq1.yahoo.com/tn?sid=760325831&mid=AGnPjkQAAB91S72HNAj98gs3jKE&midoffset=1_183821&partid=3&f=320&fid=Inbox
http://thumbp2.mail.vip.gq1.yahoo.com/tn?sid=760325831&mid=AGnPjkQAAB91S72HNAj98gs3jKE&midoffset=1_183821&partid=4&f=320&fid=Inbox

don,t work?

FARIBA
April 9th, 2010, 06:40 PM
CTII-UPDATES MARCH2010
http://cf.mg1.mail.yahoo.com/ya/download?fid=Inbox&mid=1_183821_AGnPjkQAAB91S72HNAj98gs3jKE&pid=2&tnef=&YY=1270829885554&newid=1&clean=0&inline=1
http://thumbp2.mail.vip.gq1.yahoo.com/tn?sid=760325831&mid=AGnPjkQAAB91S72HNAj98gs3jKE&midoffset=1_183821&partid=3&f=320&fid=Inbox
http://thumbp2.mail.vip.gq1.yahoo.com/tn?sid=760325831&mid=AGnPjkQAAB91S72HNAj98gs3jKE&midoffset=1_183821&partid=4&f=320&fid=Inbox

I CAN'T OPEN ANY OF THESE

majnoundubai
April 9th, 2010, 08:34 PM
C:\Documents and Settings\admin\Bureau

majnoundubai
April 9th, 2010, 08:35 PM
sorry cant link the photos to message wind

majnoundubai
April 9th, 2010, 08:39 PM
http://thumbp2.mail.vip.gq1.yahoo.com/tn?sid=760325831&mid=AGnPjkQAAB91S72HNAj98gs3jKE&midoffset=1_183821&partid=2&f=320&fid=Inbox

majnoundubai
April 9th, 2010, 08:40 PM
http://thumbp2.mail.vip.gq1.yahoo.com/tn?sid=760325831&mid=AGnPjkQAAB91S72HNAj98gs3jKE&midoffset=1_183821&partid=3&f=320&fid=Inbox

majnoundubai
April 9th, 2010, 08:40 PM
http://thumbp2.mail.vip.gq1.yahoo.com/tn?sid=760325831&mid=AGnPjkQAAB91S72HNAj98gs3jKE&midoffset=1_183821&partid=4&f=320&fid=Inbox

amplesou
April 9th, 2010, 09:04 PM
sorry cant link the photos to message wind
wind ! what does this mean!


ah
still can,t see pics :bash:

majnoundubai
April 9th, 2010, 09:51 PM
WINDOW

Rob Timpie
April 9th, 2010, 10:17 PM
WINDOW

If you send the pictures to me, I'll put them on this thread...
rob1.timmermans@planet.nl

tysonM
April 9th, 2010, 11:43 PM
Finally Atin you have deleted Dubaimats post criticising you and your moderating.
As per usual you cover your tracks and delete and post that makes you look bad.
Pathetic.
Truth is out there in the real world you’re nothing but an invisible pen pusher.
A loser with no clout.On here you think you’re the bollocks.A prick on a power
trip abusing and insulting members then banning them when they argue back.
Followed by the deleting of any post that exposes you for the provocateur
that you are.
From someone who comes from the most invisible country in Europe
I can understand that inferiority complex you have.
Get of this site and get your kicks somewhere else you moron.

I also really can't understand what these people are upto, but I think you are right specially this person is in inferiority complex.

Rob Timpie
April 10th, 2010, 09:08 PM
With thanks to Majnoundubai :)


http://i43.************/29yqhah.jpg

http://i43.************/70dr7o.jpg

amplesou
April 11th, 2010, 01:59 AM
happy days !
Picture shows workers and cement pouring !
must be tuesday no!
only joking :lol::lol:

MikeMuz
May 29th, 2010, 08:11 PM
http://i516.photobucket.com/albums/u321/mikelegobbychap/de881d6d.jpg

http://i516.photobucket.com/albums/u321/mikelegobbychap/0f0c6944.jpg

update???????

amplesou
May 30th, 2010, 01:42 AM
http://i516.photobucket.com/albums/u321/mikelegobbychap/de881d6d.jpg

http://i516.photobucket.com/albums/u321/mikelegobbychap/0f0c6944.jpg

update???????
welcome back .

where you bin !

oh i know looking after no 2

:lol::lol:

half a floor in 6 weeks

Excellent
:nuts:

MikeMuz
June 16th, 2010, 09:17 PM
http://i516.photobucket.com/albums/u321/mikelegobbychap/278d1ccd.jpg

http://i516.photobucket.com/albums/u321/mikelegobbychap/546fd322.jpg

completion now mid 2011...??????

amplesou
June 16th, 2010, 10:58 PM
http://i516.photobucket.com/albums/u321/mikelegobbychap/278d1ccd.jpg

http://i516.photobucket.com/albums/u321/mikelegobbychap/546fd322.jpg

completion now mid 2011...??????

canal resi looking good in the back ground :lol:

MikeMuz
June 16th, 2010, 11:49 PM
Well if that's lookin good???? Ur easily pleased!!!!!
What curtains did ya decide on??? BEEF??

amplesou
June 17th, 2010, 10:28 AM
Well if that's lookin good???? Ur easily pleased!!!!!
What curtains did ya decide on??? BEEF??

it,s the only update we have at the moment ,can,t seem to get info or pics at the moment maybe i am not trying hard enough !
but at least i know its going to happen right ?
unlike a lot of apartment in dsc!
my curtains issue is really just a sarcastic jibe at investors who go on about investment talk which is against the rules and gets everybody upset ,but actually i don,t think mentioning curtains is off topic !
its also my little joke that i have invested in the right apartments in other words i have,nt f--k-- up !
thank god !
come on crw !!!!!!!!!!
:lol:

lookinflowers
June 18th, 2010, 01:53 AM
wow just amazin!!:cheers:

amplesou
June 18th, 2010, 10:45 AM
wow just amazin!!:cheers:

wow what a sh-- hole :lol:

ilunat
September 3rd, 2010, 01:54 AM
anyone heard of these?

http://www.internationalpropertyresolutions.com/

Zac1979
September 7th, 2010, 03:18 PM
Anyone recieve any updates from memon on CT2? I got pictures showing they have built to 10th floor now. Slowly but surely.

majnoundubai
September 7th, 2010, 07:00 PM
yes, receive the same update, 10th floor
it seems like completion date is 2012 , very very slowwwwwwww

unknownpleasures
September 10th, 2010, 04:29 PM
Eid Mubarak! Everything should go back to "full swing" after this...well one can only hope!

Zac1979
October 7th, 2010, 11:15 AM
New pictures from Memon - on 11th floor now. Looks like a floor a month to me. At this rate I reckon by march/april 2011 they should have the main structure up but still alot of work left to do.

Dont know about everyone else but I am glad they are finally speeding things up a little.

Rob Timpie
November 12th, 2010, 07:34 PM
http://i51.************/24q4774.jpg

http://i51.************/ev5pxi.jpg

unknownpleasures
November 29th, 2010, 04:07 PM
It's been roughly two months now...should be on the 13th....ooooh I think that's not a good place to stop...keep going chaps and quick!

mb1612
November 30th, 2010, 05:09 PM
CT1 has come to a standstill and CT2 is going ahead. Anyone know why??

Zac1979
December 2nd, 2010, 03:06 PM
I have not heard anything from Memon in 2 months in regards to CT2.

Rob - the pictures you posted in November are they from CT1 or CT2?

I generally get a monthly email from Allan in Memon dont know if anyone else on here has recieved anything recently?

amplesou
December 2nd, 2010, 05:50 PM
I have not heard anything from Memon in 2 months in regards to CT2.

Rob - the pictures you posted in November are they from CT1 or CT2?

I generally get a monthly email from Allan in Memon dont know if anyone else on here has recieved anything recently?

November pics above are CT3 !
rob you posted on the wrong thread !
:)

sportslover
December 2nd, 2010, 07:06 PM
i think above pics is for ct3 not ct2....

Zac1979
December 3rd, 2010, 12:20 PM
I was thinking I am sure I counted 11 floors in CT2 from October how did they do an extra 2 floors lol

So no update from CT2 for 2 months now?

unknownpleasures
December 4th, 2010, 10:09 AM
Errrr, anyone for a re-count?

October 11th floor...should be on floor 13 by now or is that asking for too much oh so knowlegable employees?

Looks like no progress for more than 2 months since the last report.

Which project is this anyhow...it's all too confusing... it's Champion 2 isn't it?

Rob Timpie
December 5th, 2010, 02:53 PM
November pics above are CT3 !
rob you posted on the wrong thread !
:)

^^
You are right! I lost it, as they were building sooo fast... :lol:

This one is CT2 I guess...

http://i52.************/2nhqakz.jpg

amplesou
December 5th, 2010, 03:45 PM
Rob Timpie;68377993]^^
You are right! I lost it, as they were building sooo fast... :lol:

This one is CT2 I guess.
:lol:

Zac1979
December 7th, 2010, 12:49 PM
I am just wondering how comes CT2 has progressed quicker than CT1?

And how comes CT3 has progressed quicker than CT2?

I would have thought they would get the older projects completed ahead of the newer ones?

Zac1979
December 14th, 2010, 01:11 PM
I have been advised by Memon that currently CT2 is on the 13th Floor. Waiting for the updated pictures.

majnoundubai
December 14th, 2010, 08:21 PM
I have been advised by Memon that currently CT2 is on the 13th Floor. Waiting for the updated pictures.

any date for the handover Zac1979?

Zac1979
December 16th, 2010, 12:02 PM
Nope I have not been advised of any handover date. Your guess is as good as mine.

unknownpleasures
December 17th, 2010, 01:47 PM
Isn't this one a long way from handover...it's kind of between floors but no one really knows which ones!

I hate to say it but that's reality unfortunately folks!

Credit for patience - something they say is a virtue!

How many unsold in this one? That will kind of let you know why they are so far behind!

Zac1979
February 7th, 2011, 01:03 PM
I got an email from Memon last weekend with pictures showing they are now on 13th floor. I think they may be slowing down a little now. That one floor has taken some time to do.

ilunat
February 9th, 2011, 11:02 PM
Was in Dubai last week and met with Memon. Had a very good meeting and they were very helpful and informative. Also went on site by myself and took loads of pictures of Sports City and CT2. Picture on last post of CT2 is about the latest but DSC has progressed a fair bit since I last went on site in Nov 2009.
It seems Memon are trying and I'm fairly confident that CT2 will complete. They are still saying 1st or 2nd quarter of 2011 but that they will have a better idea of a more realistic completion date after JUne this year. completion dates up to now have been estimates provided by site teams but after June they hope to be working on the internals so will be able to give a more realistic timescale for completion. Apparently they already have a show flat in CT3 but couldn't find it by myself and it was getting dark. They are hoping to have a show flat in CT2 by the end of the year. Anyone want more details of my meeting with Memon please send me a personal email.

Champion3
February 14th, 2011, 10:52 AM
Was in Dubai last week and met with Memon. Had a very good meeting and they were very helpful and informative. Also went on site by myself and took loads of pictures of Sports City and CT2. Picture on last post of CT2 is about the latest but DSC has progressed a fair bit since I last went on site in Nov 2009.
It seems Memon are trying and I'm fairly confident that CT2 will complete. They are still saying 1st or 2nd quarter of 2011 but that they will have a better idea of a more realistic completion date after JUne this year. completion dates up to now have been estimates provided by site teams but after June they hope to be working on the internals so will be able to give a more realistic timescale for completion. Apparently they already have a show flat in CT3 but couldn't find it by myself and it was getting dark. They are hoping to have a show flat in CT2 by the end of the year. Anyone want more details of my meeting with Memon please send me a personal email.

Thats promising news, thanks for your efforts with Memon :)

Jovan01
April 3rd, 2011, 10:35 AM
Anybody seeking to employ the services of Mr Sunil Thacker needs to be a ware that this man was given the sack from the law firm TLG. He was given the sack for ill advising and misleading clients as well as making promises that were not true. This man is a crooked cheat and will seek to take advantage of desperate investors. Everybody needs to be warned.

Towers3
March 7th, 2012, 03:06 PM
We are starting petition to RERA. It is not project specific. Everybody who would like to join us is welcome.

http://www.ipetitions.com/petition/dubai_sport_city/

Please, whe you sign in the comment section include your project and DOC - date of completion according to your contract.
Thank you in advance.

Towers3
March 19th, 2012, 04:46 PM
Can

Towers3
March 19th, 2012, 04:51 PM
Can

sportslover
March 26th, 2012, 09:50 PM
http://www.dubailand.gov.ae/Upload/ProjectIndicatorLarge_58360n.jpg

Datok
March 29th, 2012, 12:47 AM
Can Michael Norman please pm me?


what are you doing in so many blogs. what you are upto.:bash:

kamenoff
March 29th, 2012, 01:54 AM
He is trying to help lost souls in DSC...:)

UAE Investor
March 29th, 2012, 11:25 AM
ct2 is on hold

http://www.dubailand.gov.ae/Upload/ProjectIndicatorLarge_58360n.jpg

oh really ...that is a surprise ..!

Memon told me in the press release .... i read they where going to complete all towers ,was it by next year...

What has gone wrong ?

According to this here it says champion twrs 2/3 4/ are all on hold..!

http://www.skyscraperlist.com/showthread.php?507-A-Z-Sports-City-Quick-Find-Completed-On-Hold
:ohno:

UAE Investor
March 29th, 2012, 11:37 AM
what are you doing in so many blogs. what you are upto.:bash:

I think he wants to see dodgy developers put behind bars... i think..:bash:

sportslover
March 29th, 2012, 10:41 PM
As per rera website ct3 work started again from jan.
Ct2 is officially on hold, any investor from this tower contacted memon regarding this?

Towers3
March 29th, 2012, 11:26 PM
As per rera website ct3 work started again from jan.
Ct2 is officially on hold, any investor from this tower contacted memon regarding this?

We're

UAE Investor
April 3rd, 2012, 10:49 PM
This guy trying to mke sales ...yet on hold soi...

http://www.propertyfinder.ae/en/buy/apartment-for-sale-dubai-dubai-sports-city-202247.html

MikeMuz
April 18th, 2012, 08:47 PM
As per rera website ct3 work started again from jan.
Ct2 is officially on hold, any investor from this tower contacted memon regarding this?

Yeah I contacted them & they told me to F*ck off.?????:nuts::nuts::nuts:
Then they refunded my money in full.!!!!!!!!!!

Not such a bad developer after all^^^^^^^^^^:banana::cheers::cheers::nuts:

michael norman
June 2nd, 2012, 03:59 PM
Datok. Just seen your message to post you. Do you have any news on Champions Tower 2 ? We are seeing messages that construction has stopped and there was a post claiming refunds being given? Have e-mailed and attempted to contact Allan at MEmon to confirm status and possibility of a refund.

michael norman
June 2nd, 2012, 04:02 PM
towers 3. Only just seen your message, do you know the latest situation in regards to CT2. We have chased for confirmation as to whether construction is on hold or if indeed refunds are happening. Any feedback and thoughts gratefully appreciated.

michael norman
June 2nd, 2012, 04:17 PM
MikeMuz. Have sent a message to your inbox and would be grateful if you can tell me best way to get a refund. Do you have name of the person who authorised the repayment at Memon? Did you have to go through a lawyer or did they just refund automatically? Any help and thoughts gratefully appreciated.