View Full Version : #UNDER C-BCD: "Grand Hyatt Beirut" | 18F Hotel


nareg
June 25th, 2006, 09:03 AM
Grand Hyatt Beirut

Beirut Central District (BCD) - Beirut, Lebanon



http://img469.imageshack.us/img469/5359/hyattmain3xg.gif


$121 million Five Star Hotel
354 Rooms, 18 Floors



Owner: Societe Mediterraneenne des Grands Hotels

Project Controller: Davis Langdon Lebanon

Engineer: Dar-al-Handasah

Enabling Works Contractor: Bauer Lebanon

Technical Controller: Bureaux Veritas

Completion Date: Late 2008

Status: Foundation Works


http://img232.imageshack.us/img232/9330/4573828qz.jpg



Location
http://img133.imageshack.us/img133/1020/grandhyattloc6ea.jpg
Mina El Hosn Area, on Adnan El Hakim Street

nareg
June 25th, 2006, 09:04 AM
http://img214.imageshack.us/img214/5761/dscn07634de.jpg

http://img98.imageshack.us/img98/1361/dscn07642kc.jpg

http://img238.imageshack.us/img238/3305/dscn07614ko.jpg

http://img48.imageshack.us/img48/4388/dscn09273nq.jpg

Jayme
June 25th, 2006, 02:15 PM
Has this project been delayed ? I thougt they acutally started building it

Hassoun
June 25th, 2006, 06:43 PM
WOW.thanx nareg. this is really gr8 job :) well done :)
I like the design so much,the best design of a hotel in beirut i guess.

Lebanese Cedar
June 25th, 2006, 07:21 PM
has this project been delayed ? i thougt they acutally started building it

They are currently doing the enabling works. Once that's done, they will start construction of the building itself.

Beiruti
June 25th, 2006, 07:48 PM
The more I look at this rending the more I like this design. It has a more classic look and it is something different for the area. I'm also sure it will look much nicer in reality once completed.

Beiruti
October 30th, 2006, 09:23 AM
Its almost November, has this building begun rising above ground?

nareg
November 3rd, 2006, 06:30 PM
UPDATE: Sorry, I didn't take any pics. Works continue but nothing appears from outside. It seems foundation works haven't completed yet.

ChaoticTranquility
November 19th, 2006, 03:27 AM
hey hey.

just wondering, has construction progressed on the Grand Hyatt at all?

i was surfing the Net and i found out the place will be designed by the famous designer Pierre-Yves Rochon. this means that the hotel will have this classically contemporary feel; no doubt it'll be amazing. i'm sure it will make quite the impact on the Beirut hotel scene.

kuwaiti_patriot

Nadini
November 19th, 2006, 04:29 AM
it will be completed in Mid 2009 according to the hotel's website so i think it will take some time before it will be completed

Hassoun
May 7th, 2007, 01:38 AM
^^ Yes,Yesterday on Almustaqbal news paper,they mentioned openeng date Mid 2009.So,What's new?

Rabih
March 2nd, 2008, 11:29 AM
http://img525.imageshack.us/img525/7372/DSC04940.jpg
By rabih_alt (http://profile.imageshack.us/user/rabih_alt) at 2008-03-02

Beiruti
March 3rd, 2008, 04:08 AM
^^ I dont see much progress in construction from the pics Nareg posted in summer 2006!

... is there any evidence of active construction on the site?

LeB.Fr
March 3rd, 2008, 12:13 PM
Yea, is there any activity INSIDE the wall?

rezam
March 3rd, 2008, 09:57 PM
i have pics, takes ages to download, sorry cant be bothered, peace!

Hassoun
June 7th, 2008, 07:53 PM
Good News :)

06/06/2008 Matta have just signed the contract of “Grand Hyatt Hotel - Structural Works” in Beirut Central district (BCD) . The contract is worth over $30 million.

The Scope of works encompasses all Structural and Steel Works for the construction of a 450 bay , five stars, Hotel “Grand Hyatt Beirut” that will be built on a 4805 m2 lot at the Beirut Central District (BCD) , Solidere area.

The project includes 6 basements , basement one mezzanine , 3.5 levels of podium (ground , ground floor mezzanine , 1st , technical and second floor) and 14 typical floors.

Total built area : 67230 m2.

Total Quantity of Concrete to be poured : 49000 m3

AmeriLEB
June 8th, 2008, 01:18 AM
Great news!

john2890
June 8th, 2008, 02:30 AM
anyone knows what the orange facade is made from? stone? brick? steel? its a weird color, i cant think of what material its made of :s

houssam
June 8th, 2008, 10:27 AM
^^ maybe it's just for the rendering and not real ..but there's that brick color building next to it so i think it's not that hard .. maybe paint :dunno:

Nadini
June 8th, 2008, 02:47 PM
it looks like Red Stucco or just normal red bricks, like houssam said it might be the same material on the building next to it

LeB.Fr
July 18th, 2008, 06:47 PM
Taken a couple of weeks ago...

http://farm4.static.flickr.com/3023/2680356766_aeb59a73ef_o.jpg

Hassoun
July 19th, 2008, 12:02 AM
^^ How did u manage to get through???or is it an open area??

AmeriLEB
July 19th, 2008, 05:43 AM
Looks like they need to restart ..i hope people will see we will bounce back

houssam
July 19th, 2008, 08:18 PM
was there any activity on the site BG?

Hassoun
July 20th, 2008, 01:28 AM
^^ Actually they started pouring cement :)

AmeriLEB
July 20th, 2008, 02:21 AM
good news

Lebanese Cedar
September 16th, 2008, 09:26 PM
Supposed to open 2nd quarter of 2010 with 348 rooms.

Dual Engine
October 24th, 2008, 09:23 AM
taken: 23/10/2008


http://i406.photobucket.com/albums/pp145/DualEngine/7.jpg

AmeriLEB
October 25th, 2008, 06:40 AM
Is it at ground level?

Rabih
October 25th, 2008, 08:53 AM
I'm really excited about the Grand Hyatt..
Imagine Beirut will have a four seasons, grand hyatt, intercontenintal & ramada all just a couple of blocks away.

Also Le Gray a few blocks away ...

Hassoun
October 25th, 2008, 03:33 PM
^^ don't forget the Hilton :)

Rabih
October 25th, 2008, 04:04 PM
of course :) :) :)

AmeriLEB
October 29th, 2008, 06:37 AM
Grand Hyatt Hotel is under construction- solidere quarterly

Hassoun
November 9th, 2008, 04:10 PM
From Matta contracting website

27/10/2008 On October 23rd, 2008, Matta complete the casting of 60% of Raft Foundation in “Grand Hyatt Hotel“ Project located in Beirut Central District.

Total quantity of concrete poured = 5525 m3 covering an area of 2150 m2.

http://img143.imageshack.us/img143/7968/gh1nm7.gif
Zone R'1 casted on 16/09/2008

http://img519.imageshack.us/img519/1967/gh2uc2.gif
Zone R1 casted on 20/09/2008

http://img185.imageshack.us/img185/6453/gh3ff1.gif
Zone R2 casted on 26/09/2008

http://img526.imageshack.us/img526/8713/gh4nj2.gif
Zone R3 casted on 11/10/2008

http://img362.imageshack.us/img362/3135/gh5cx4.gif

Zone R4 casted on 23/10/2008

Hassoun
January 16th, 2009, 09:43 PM
courtesy of carreracaballo

http://farm4.static.flickr.com/3519/3201014095_ef84ec9556_b.jpg

houssam
January 16th, 2009, 10:27 PM
is it me or this is advancing very very slow, if even?

Joseph D
January 17th, 2009, 10:25 AM
is it me or this is advancing very very slow, if even?

Have you seen the basement? It looks about 3 stories deep.

There is a lot more involved in constructing a building like this than you think. Also, with concrete, you have to wait for it to cure and gain sufficient strength before you can start working on the next floor. Depending on the concrete, this can take weeks.

Hassoun
January 17th, 2009, 10:56 AM
^^ Agree , and once it reaches the 1st floor,it will rise so fast.

houssam
January 18th, 2009, 09:17 PM
i m not an expert but i still think it's going slow, i v seen other very big buildings reaching 1st flour in few months.... but again im not an expert :dunno:

Nadini
February 4th, 2009, 02:46 AM
courtesy of gas
http://i386.photobucket.com/albums/oo305/Nadini23/wee.jpg

Halawala
February 4th, 2009, 04:39 AM
Have you seen the basement? It looks about 3 stories deep.

There is a lot more involved in constructing a building like this than you think. Also, with concrete, you have to wait for it to cure and gain sufficient strength before you can start working on the next floor. Depending on the concrete, this can take weeks.

Wow, r u a civil enginner man??

Nadini's pic is amazing!

Lebanese Cedar
March 7th, 2009, 09:32 PM
This hotel is not listed on the Hyatt website anymore. I wonder if it's been rebranded or put on hold?

AmeriLEB
March 8th, 2009, 07:06 AM
Recent Solidere quarterlies and Matta construction are all still referring to it as "Grand Hyatt" look at the link below and notice the 2009 date..

http://www.dargroup.com/pdf/projects/GrandHyatt.pdf

Lebanese Cedar
March 8th, 2009, 08:42 AM
^^That Dar al-Handasah PDF is old. It says the project supervision is from 2006 to 2009, but there is no way this project will finish this year. So clearly that PDF is outdated.

I do hope it is still a Grand Hyatt. The Hyatt future hotels page doesn't list hotels opening beyond 2010, so that might be why they took it off the page for the time being, since it probably won't be ready before 2011/2012.

Hassoun
March 8th, 2009, 12:38 PM
^^ the banners on the construction site say it clear that it's going to be a Grand Hyatt .

Beiruti
March 8th, 2009, 05:12 PM
^^ Yes, but that can always change.

AmeriLEB
March 8th, 2009, 07:29 PM
If it changes they will take the signs off

Lebanese Cedar
March 8th, 2009, 09:49 PM
^^Are you in Beirut right now AmeriLEB? I assume you've recently seen the signs still there.

AmeriLEB
March 9th, 2009, 07:00 AM
No but post 40 is from february and still has the signs

Abu 3Leish
March 9th, 2009, 01:48 PM
^^ i was in downtown yesterday they HAVE NOT changed the signs ...so this means its still a Grand Hyatt...right?

AmeriLEB
March 9th, 2009, 05:00 PM
yes...Abu- what did you see construction wise? Are they reaching street level yet?

Hassoun
March 9th, 2009, 05:02 PM
Once it reaches the street level , it will rise so fast.

Lebanese Cedar
March 9th, 2009, 07:49 PM
This is reassuring then.

I think it's not listed on the Hyatt website anymore because its opening is planned for beyond 2010. I noticed they are only listing openings for 2009 and 2010.

Abu 3Leish
March 10th, 2009, 01:13 AM
yes...Abu- what did you see construction wise? Are they reaching street level yet?

construction has reached the floor below street level the next floor to be poured in will be the ground floor ..and call me ali for future reference :cheers:

AmeriLEB
April 19th, 2009, 06:50 PM
Is it now above ground? ..anyone..ali?

Abu 3Leish
April 19th, 2009, 07:46 PM
^^ the ground floor concrete pillars are being poured in now

flying-j
April 30th, 2009, 08:48 PM
I dont like it, I think Beirut deserves a 'grander' Grand Hyatt, plus the architecture is not all that at all, it kinda looks like some of the 90s glass buildings on the Dbayeh Highway.......
i know the market and location is different but u cant compare that to the Grand Hyatt , or even the older Hyatt Regency in Dubai or even Amman....

rezam
May 1st, 2009, 11:43 AM
i agree, the architecture is very dull, dont know why theyre doing this, especially in downtown!

Rabih
May 2nd, 2009, 03:58 PM
my 1st impression was similar to yours guys..
but then i thought, we're only basing our opinions on one render!
And as you said, this is the Grand Hyatt, so I'm optimistic that upon completion it's gonna be a surprise to all!

Beiruti
May 2nd, 2009, 08:55 PM
^^At least it doesnt look like any buildings around it.

Hassoun
May 2nd, 2009, 09:02 PM
^^ Agree, and i think it looks dull because the renderings are just cheap , it's going to look Fab. when it's Done !!! Trust me guys.

AmeriLEB
August 10th, 2009, 07:38 PM
Completion end 2011..info differs from first post but its at 443 rooms

Lebneni
August 12th, 2009, 12:35 AM
http://img512.imageshack.us/img512/5277/213s.jpg

Jayme
August 14th, 2009, 08:21 AM
This is like the slowest project ever... its been like 2 or more years.

Tabouleh
August 15th, 2009, 06:16 AM
they had stopped everything for a while I think or at least slowed downs the work pace to the maximum until they knew what would happen in Lebanon.

Hassoun
September 5th, 2009, 04:19 AM
Update:

31/08/2009 The Ballroom floor at the ground level of Grand Hyatt Hotel Project in BCD area - a post tension slab of 1050 m2 (39m x 27m) - is poured .
Concrete Volume poured = 250 m3. (55Mpa strength)

The structural system adopted is post tension beams + hollow core slabs th=33cm , system which was shifted from the initially designed steel structure slab. The beams with the same sections of initial designed beams (1.33m x 1.40m) , are casted and stressed.

MARTYR
October 7th, 2009, 04:37 PM
i passed by the project yesterday !!!
it was like a bee hive
tons of workers everywhere.....construction noise blaring all through out the neighborhood !!!!!!:cheers:
u can clearly see 2 floors above ground now

all projects usually take alot of time to finish the underground levels, but as soon as they reach the ground level the tower sprints up in no time
so i hope the same happens here ;)

jader3283
October 7th, 2009, 04:51 PM
:banana::banana::cheers::cheers:

Akheeran!!!!!! 4 years to complete the underground!!

MARTYR
October 9th, 2009, 09:16 PM
courtesy of me , 6/10/2009

http://i720.photobucket.com/albums/ww207/MARTYR_92/NewImage.jpg

Nadini
November 11th, 2009, 03:42 AM
courtesy of pawel
http://i656.photobucket.com/albums/uu287/Nadini234/pawel.jpg

Halawala
November 17th, 2009, 06:20 PM
Guys, this building is now on its 2nd floor or 3rd I think! It has an excellent location--somewhere between the Intercon and Solidere.

jader3283
November 18th, 2009, 03:38 PM
3 floors in one month, that means it should be topped out in June!!

Beirut1986
November 29th, 2009, 01:38 PM
http://img40.imageshack.us/img40/8867/dsc00561ug.jpg

AmeriLEB
November 29th, 2009, 06:13 PM
Finally..this was announced before Platinum and 4 seasons were even built. :) Looks really big

Beiruti
November 29th, 2009, 10:44 PM
I hope the facade looks like the model. I am pretty sure the model was made after the renderings came out so it's possible...

Nadini
December 11th, 2009, 07:17 AM
courtesy of cedarrick
http://i1000.photobucket.com/albums/af121/Nadini2345/cedarrick.jpg

Nadini
January 23rd, 2010, 09:02 PM
courtesy of surfer joe
http://i1000.photobucket.com/albums/af121/Nadini2345/grandhyattjoe.jpg

Beiruti
February 14th, 2010, 06:40 AM
http://i1000.photobucket.com/albums/af121/Nadini2345/moly.jpg
courtesy of molymh

Abdallah K.
March 29th, 2010, 11:43 PM
Courtesy of P Donovan

http://i562.photobucket.com/albums/ss61/budkheir/B3-1.jpg

Nadini
March 30th, 2010, 02:09 AM
quite a significant update, it coming along nicely :)
courtesy of emil
http://i838.photobucket.com/albums/zz301/Nadini23456/grandhyattemil.jpg

Hassoun
March 31st, 2010, 01:15 AM
is it just me or the progress is really slow here?

Nadini
March 31st, 2010, 04:15 AM
its just you, its a significant progress since august (when the foundation was completed), It's quite a large building

Abdallah K.
May 9th, 2010, 01:29 AM
Courtesy of mikemuch1 (Apr 2010)

http://i44.tinypic.com/117eptt.jpg

Hassoun
May 16th, 2010, 11:09 PM
Courtesy of Beirutnightlife

April 2010

Nice progress.

http://www.beirutnightlife.com/wp-content/gallery/discoverlebanon/ByNight/BeirutFrom27/Beirut_sky_view07.jpg

MARTYR
May 17th, 2010, 06:53 PM
^^ amazing progress, how many more floors till it gets topped out ??? 8 ????

Hassoun
June 13th, 2010, 01:16 PM
I believe it's the one rising in the background

http://www.beirutnightlife.com/wp-content/gallery/restaurants/Dinnerinthesky/Opening20100611/Dinner_in_the_sky_alf_events_opening40.jpg

LeB.Fr
June 27th, 2010, 10:20 PM
I took this today:
http://img682.imageshack.us/img682/4781/img7360y.jpg (http://img682.imageshack.us/i/img7360y.jpg/)

Josiane
June 30th, 2010, 08:55 AM
anyone knows what the orange facade is made from? stone? brick? steel? its a weird color, i cant think of what material its made of :s

The facade is made from terracotta tiles

MARTYR
June 30th, 2010, 08:17 PM
courtesy of me
http://img689.imageshack.us/img689/2768/image000wo.jpg (http://img689.imageshack.us/i/image000wo.jpg/)

Abdallah K.
July 14th, 2010, 01:11 PM
Courtesy of Me
July 10

http://i32.tinypic.com/2mc7t03.jpg

Joe.KL
July 15th, 2010, 06:41 PM
Courtesy of Me
July 8, 2010

http://farm5.static.flickr.com/4117/4796839286_49be6a6437_z.jpg

Abdallah K.
July 28th, 2010, 10:34 PM
Courtesy of Me
Taken Today

http://i26.tinypic.com/2zi9bmp.jpg

http://i29.tinypic.com/2epjyv7.jpg

Nadini
August 1st, 2010, 06:01 AM
courtesy of Brandon
http://i950.photobucket.com/albums/ad345/Nadini1/brandon.jpg

courtesy of javier
http://i950.photobucket.com/albums/ad345/Nadini1/javier.jpg

Nadini
September 3rd, 2010, 05:02 AM
courtesy of solidere
http://i950.photobucket.com/albums/ad345/Nadini1/13.jpg

Hassoun
September 16th, 2010, 02:37 PM
Sept. 12

Courtesy of robertschrader


http://farm5.static.flickr.com/4108/4993760028_a964bee12a_b.jpg

MarcLeb
September 20th, 2010, 07:23 PM
By schreibtnix
September 2

http://img580.imageshack.us/img580/1588/5006809203015035d67fb.jpg (http://img580.imageshack.us/i/5006809203015035d67fb.jpg/)

boudi
September 25th, 2010, 09:19 AM
One more floor and it will be topped out
http://i889.photobucket.com/albums/ac95/boudi_70/111-Mina-El-Hosn.jpg

Elie plus
September 25th, 2010, 06:27 PM
fugly!

MARTYR
September 25th, 2010, 07:10 PM
the render may look fugly... but i believe it will look really stunning once completed !!!

Jayme
September 27th, 2010, 03:13 AM
The progress is so slow! its taken over 4 years.

MarcLeb
October 6th, 2010, 02:58 PM
by K-Camp, flickr
september 16

http://img201.imageshack.us/img201/4644/50555579366ce91ba64bz.jpg (http://img201.imageshack.us/i/50555579366ce91ba64bz.jpg/)

Nadini
October 25th, 2010, 03:52 AM
courtesy of james
http://i1085.photobucket.com/albums/j423/NadiniSC/IMG_5150.jpg

Hassoun
October 25th, 2010, 11:34 AM
^^ Yaaaaaaay :banana: topped out :)

Hassoun
November 2nd, 2010, 05:37 PM
Courtesy of رويال العرب

October 21

http://travel.maktoob.com/vb/picture.php?albumid=3064&pictureid=85866

Nadini
November 3rd, 2010, 03:56 AM
courtesy of johanness
http://i1085.photobucket.com/albums/j423/NadiniSC/IMG_0282_DxO.jpg

Hassoun
November 8th, 2010, 01:04 AM
http://favicon.daylife.com/imageserve/06T8a8lavf8sc/favicon.png AP Photo

http://cache.daylife.com/imageserve/0ca04HF229fpm/x610.jpg

Lebanese and foreign runners, run at the 10 kilometers Fun Run of Beirut Marathon, in downtown Beirut, Lebanon, on Sunday, Nov. 7, 2010. Thousands of Lebanese and other nationalities participate in the Beirut Marathon which takes place every year in Beirut.

Hassoun
November 9th, 2010, 11:25 PM
November 3

Courtesy of hillsidaz

http://img574.imageshack.us/img574/110/5161967778ce9cd8d38ab.jpg

Nadini
December 24th, 2010, 10:32 PM
courtesy of joel
http://i1085.photobucket.com/albums/j423/NadiniSC/joel.jpg

Abdallah K.
January 3rd, 2011, 02:16 AM
Courtesy of Karim Saad
Taken December 27

http://i52.tinypic.com/33nzqmq.jpg

Nadini
January 31st, 2011, 01:38 AM
courtesy of corentin
http://i1085.photobucket.com/albums/j423/NadiniSC/IMG_0174.jpg

Nadini
March 13th, 2011, 04:27 PM
Courtesy of valerie calvet
http://i1085.photobucket.com/albums/j423/NadiniSC/valeriecalvet.jpg

Beirut1986
April 16th, 2011, 10:26 PM
16/04/2011
http://img810.imageshack.us/img810/1528/dsc03969al.jpg

GAJ1992
April 18th, 2011, 08:43 PM
bldg on left looks secy ^^^^^^^

MarcLeb
May 28th, 2011, 06:00 PM
Courtesy of www.Beirutnightlife.com
May 28, 2011

http://img862.imageshack.us/img862/6886/beirutskylineview42.jpg (http://imageshack.us/photo/my-images/862/beirutskylineview42.jpg/)

Hassoun
May 30th, 2011, 12:51 PM
Close up crown pic

Hope it comes up though

http://www.beirutnightlife.com/wp-content/gallery/discoverlebanon/ByDay/BeirutSkylineView/Beirut_Skyline_View38.jpg

Nadini
June 10th, 2011, 05:14 AM
courtesy of gottfried
http://i1085.photobucket.com/albums/j423/NadiniSC/P1000300_panorama.jpg

-Zippo-
June 14th, 2011, 03:41 AM
Taken today

http://i1005.photobucket.com/albums/af175/_Zippo_/SSC%20Projects%20Pictures/Grand%20Hyatt/13-6-2011.jpg

Rabih
July 12th, 2011, 09:40 PM
Taken by me last month

http://img17.imageshack.us/img17/4384/img2859w.jpg

Abdallah K.
July 15th, 2011, 10:42 PM
Courtesy of Me, Taken Yesterday

http://i51.tinypic.com/1fwbo7.jpg

tangolima
September 16th, 2011, 03:01 AM
Taken by me

http://img843.imageshack.us/img843/4107/dsc00330n.jpg
By tangolima (http://profile.imageshack.us/user/tangolima) at 2011-09-15

http://img831.imageshack.us/img831/3849/dsc00327b.jpg
By tangolima (http://profile.imageshack.us/user/tangolima) at 2011-09-15

Rabih
September 18th, 2011, 08:21 AM
ouff it's looked unchanged.. Shouldn't they have started cladding work by now

Rabih
November 17th, 2011, 11:05 PM
Nov 2011 - By me (too slow)

http://img834.imageshack.us/img834/8956/hyatt.jpg

http://img163.imageshack.us/img163/7108/hyatt2u.jpg

http://img838.imageshack.us/img838/1651/hyatt3.jpg

Jayme
November 20th, 2011, 06:48 AM
5 years.... and still not even near completed.

Abdallah K.
November 25th, 2011, 08:59 AM
Courtesy of Trebor In Oak (http://www.flickr.com/photos/treborsf/)
Nov 23

http://i39.tinypic.com/e0pi5g.jpg

jader3283
November 25th, 2011, 05:29 PM
Haha the reason why it hasn't progressed is because since the Egyptian Rev. the project has halted. The plot is for Mubarak's son. :p

B-Patriot
November 26th, 2011, 12:35 PM
Haha the reason why it hasn't progressed is because since the Egyptian Rev. the project has halted. The plot is for Mubarak's son. :p

Really? Hmm..