View Full Version : Lahore Rapid Mass Transit System


cntower
September 10th, 2006, 10:51 AM
Lahore Rapid Mass Transit System
http://lahore.metblogs.com/archives/images/2006/03/20060314_02.jpg
Above is the proposed Green Line of the LRMTS

LAHORE, Punjab: MVA Asia, a Hong Kong-based engineering company, has proposed constructing three more lines for the Lahore Rapid Mass Transit System (LRMTS) because of the constantly increasing traffic in the city, senior Punjab government sources told Daily Times on Monday.

Initially, MVA Asia was given the contract to prepare the technical feasibility of the transit system's Green Line whose construction cost was estimated at about $2 billion, sources said, adding that MVA Asia had planned to design the Green Line covering an area of 27 kilometres from Shahdara to Kahna.

The four lines that LRMTS planned were based on an elevated and underground system, which would connect all areas of the city, sources said.

The elevated portion of the Green Line would start from Shahdara, will pass through Ravi Road, Data Gunj Buksh shrine, Lower Mall, The Mall, Queens Road and Ferozepur Road near Kalma Chowk, sources said, adding that the underground portion would begin from Kalama Chowk, pass through Model Town I and II, General Hospital and end at Kahna.

Green Line's proposed design included 19 stops including Shahdara, Timber Market, Bhaati Gate, Lahore Museum, Regal Chowk, Ganga Ram Hospital, Mozang Chungi, Ichhra, Wahdat Road, Gaddafi Stadium, Kalma Chowk, Model Town I and II and Kahna, sources added.

Train stations on the elevated route would be designed like overhead bridges while train stations on the underground route would have two entranceways and two exits, sources said, adding that MVA Asia was studying the London and New Delhi underground systems.

They also said the engineering company had designed the other three proposed lines. According to the design, a second line would start from Thokar Niaz Baig and would end at Daroghanwala, covering about 22 kilometres, sources said.

From Thokar, the proposed line would be elevated and would pass through Mansoora, Multan Road, Lake Road, Lakshmi Chowk and Railway Station from where the line's underground portion would begin, passing through Tezab Ahatha, Bhagwanpura, University of Engineering and Technology, Shalimar Gardens and Daroghanwala, sources added.

The third line would start from Chauburji and end at College Road, sources said, adding that from Chauburji the line would pass through Mozang Chungi, Shadman Chowk, Jail Road, Mian Boulevard Gulberg, Mian Boulevard Garden Town, Faisal Town and end at College Road, sources said.

The fourth line would start from Bhaati Chowk and end at Allama Iqbal International Airport. The line would pass through Bhaati Chowk, Brandreth Road, Railway Station, Allama Iqbal Road, Dharampura, Ghazi Road and end at Allama Iqbal International Airport, sources added. The Green Line would facilitate about 350,000 people, sources said, adding that the project's technical study would be completed by the end of May 2006. They said that to facilitate Lahoris the Punjab government had also started the Ring Road project.

The Punjab Transport Department is supervising the project while NESPAK is providing technical help on the Ring Road project. The Punjab Communications and Works Department is managing the Ring Road project.

Sources said that to avoid technical differences between both projects Punjab Chief Minister Pervaiz Elahi had asked the Punjab Planning and Development Department to coordinate between the C&W and Transport Departments.

A mass transit system for Lahore has been the focus of discussion in government circles for many years. The feasibility of a light rail transit system was made by Japanese development organisation JICA in 1991 during Nawaz Sharif's term as prime minister. It had proposed a 13-kilometre-long system. The study was reviewed and updated as part of the World Bank funded "Lahore traffic and transport studies" in 1993.

The system's cost was estimated at about $400 million, but with better network coverage. In 1995 Japan proposed financing the original scheme with grants and loans of about $495 million, but the project could not be implemented due to many reasons.

http://www.dailytimes.com.pk/default.asp?page=2006\03\14\story_14-3-2006_pg7_20

cntower
September 10th, 2006, 10:59 AM
Italics for elevated portion

Green Line
The green line will the the first phase of the LRMTS and will run along the North-South Arteries of the cities.

Green Line will pass:
Ravi Road
Data Gunj Buksh
Lower Mall Road
Mall Road
Queens Road
Ferozepur Road
Kalma Chowk

Green Line Stations:
Shahdara
Timber Market
Bhaati Gate
Lahore Museum
Regal Chowk
Ganga Ram Hospital
Mozang Chungi
Ichhra
Wahdat Road
Gaddafi Stadium
Kalma Chowk
Model Town I
Model Town II
Kahna

cntower
September 10th, 2006, 11:07 AM
Second Line
This will be the second line built, although this to is still in its planning stages. It will roughly be appox. 22 km in length and start from Thokar Niaz Baig and would end at Daroghanwala. The line will begin in West Lahore and will run northwards.

The 2nd line will pass:
Thokar Niaz Biag
Mansoora
Multan Road
Lake Road
Lakshmi Chowk
Lahore Station
Tezab Ahatha
Bhagwanpura
University of Engineering and Technology (UET)
Shalimar Gardens
Daroghanwala

cntower
September 10th, 2006, 11:13 AM
Third Line
Is the third part of the project. It will start from Chauburji and end at College Road

The 3rd line passes:
Mozang Chungi
Shadman Chowk
Jail Road
Mian Boulevard Gulberg
Mian Boulevard Garden Town
Faisal Town
College Road

Fourth Line
Fourth part of the project. It will start from Bhaati Chowk and end at Allama Iqbal International Airport.

The 4th line passes:
Bhaati Chowk
Brandreth Road
Lahore Station
Allama Iqbal Road
Dhurampura
Ghazi Road
Allama Iqbal International Airport