Mr Moose June 18th, 2006, 11:44 PM Carpetking
The type 2Bs for floors 2-23 are now 869sqft so there is a difference from floors 24-30.
We bought in January and our contract still shows the old floorplan but also shows the new sqft value.
The maintenance charges are showing in our contract as 869.40*8 = AED6955
carpetking June 19th, 2006, 06:34 AM Mr.Moose
I bougt my 2B typ last year August.My contract shows the old floorplan and
the lower maintenance charge as 776,10*8 =6208,80 AED.
carpetking June 19th, 2006, 11:10 AM ..found in web...i think typ 2C...
http://www.timeplacedubaimarina.com/facilities.htm
onetickin_onetickout June 20th, 2006, 09:25 AM ..found in web...i think typ 2C...
http://www.timeplacedubaimarina.com/facilities.htm
I think that is 2A - similar to my purchase. Check out Gowealty site, they have floor plans.
http://www.gowealthy.com/realestate/uae/dubai/timeplace/plans.asp
onetickin_onetickout June 20th, 2006, 09:27 AM Isn't it a bit early to start advertising for rental anyway?
mission June 20th, 2006, 11:51 AM totally agree its way to early
Any updates anyone i reckon 3 to 4th floor now
Jacko June 20th, 2006, 12:27 PM I know this is'nt the place to discuss this but I cannot find an investor section on site!
Does anyone know of an agent they would recomend for selling a type 4. Thanks
mission June 20th, 2006, 12:32 PM Jacko
I have always been told by agents to keep properties till they are complete then they will be worth more
Jacko June 20th, 2006, 12:36 PM If you look on Dubai marina thread, there is a picture from Dubai Freak taken 16th June which just catches TP on right- Still on second floor.
carpetking June 20th, 2006, 01:30 PM Jacko
Ask ali from ABRAJ for a type 4
gmalhot June 21st, 2006, 07:35 AM Dear All,
All of us have invested in this property in the marina timeplace, I believe that we should do away with the negetivity regarding our building and the marina area.
Well, I have purchased the place to live in and yes even if it is a few months late I dont care as long as the work is good. I believe that the marina area will be always in demand no matter what, those expcting 30% returns in a year should forget about it as those days are gone, I believe that I will be happy with 5-10% appreciation on my apartment year on year and I plan to sell in 5 years time..
Overall I believe in the Dubai story and do believe that it is the place to be even with all its downside. I believe that most of us here are expats and we all have purchased this place based on what we have heard regarding dubai and its property market.
As for the marina area, if you have tracked similar areas all over the world in big cities you will see that even with the property markets going down the marina areas have always mantained their popularity among investors...I understand that there are a few infrastructure problems on that side but if you see all around, all these luxury apartments are coming up, people have spent millions of dollars on these buildings. I do not think that these builders and investors have done so without taking all the parameters into account.
well, sorry for ranting but sometimes I get depressed reading the thread and wanted to speak my mind.
Gaurav
Jacko June 21st, 2006, 10:08 AM Why are you suddenly saying all this! It is not related to any of the recent discussions and who is knocking TP?
gmalhot June 21st, 2006, 02:29 PM well,
I just saw this discussion and read like the last 100 posts and this was just a general posting of my thoughts.
was not meant agaist anyone in particular. It was a summary of how I felt after reading so many posts of the last few months together.
Cheers
gaurav
Krazy June 21st, 2006, 02:47 PM thanks for your views. Which similar areas in big cities around the world have you tracked?
carpetking June 22nd, 2006, 01:15 PM no new updates ???
http://i5.tinypic.com/157lo5v.jpg
HAAN June 26th, 2006, 11:18 AM "Today, the core building is at level 5, we have completed all cement work in relation to basements, parking and Ground floor. Next week we are starting pouring level one. The work will be quicker once we finish level one since from level 2 onwards we are in typical floors and work moves smoother and faster"
The above was received form Abraj on 13th June. Has there been any further progress. Are they on floor 3 or ?
carpetking June 27th, 2006, 12:04 PM Progress.....
I ask Bijay today for new pictures (updates)
and i awaiting an email from him.
HAAN June 28th, 2006, 12:45 PM Update received from Abraj
"We have completed the first floor pouring and will be starting on the second floor pouring this week.
I have already spoken to the Engineer at the site and he would be sending me the updated pictures. As soon as I receive them, I will forward it to you."
carpetking June 28th, 2006, 01:29 PM Haan
Thank you for the bad news.If i receive the pictures fro Abraj i will post
them too.
see u in Timeplace 2008 ????????
AltinD June 28th, 2006, 07:11 PM ^^ BAD news??? :weird:
carpetking June 28th, 2006, 07:47 PM look this picture AltinD taken between 23.-24th June
http://i3.tinypic.com/160ssgm.jpg
is this progessing ???
dubaiflo June 28th, 2006, 09:14 PM u can't really see anything from those pictures, and it always takes long to come out of ground and above the basement, ground and M levels to the regular floors.
carpetking June 28th, 2006, 09:24 PM Hi flo,
i wait for new pictures from Abraj and i hope they send it me tomorrow
gmalhot June 29th, 2006, 09:36 AM Just some information, spoke to an agent who sold type 2c 850 sq feet, 2nd floor for 700,000 dhs
Well, I purchased mine on the 29th floor for 884,000, feel I paid too much premium for the upper floor even though I purchased from the developer.
Any thoughts all you people...
carpetking June 29th, 2006, 10:12 AM gmalhot...
I bought an 2B type on 29th floor last year and i paid 822,000 dhs for
870sqft.You paid a little more but I think your price is ok.
Enjoy the view from 29th floor !!!!!!
I bought from www.gowealthy.com
gmalhot June 29th, 2006, 10:20 AM hey carpetking,
Thanks for the quick input.
Well, that makes sense that you purchased it last year. I purchased it a month and a half ago so I guess it was ok taking the time gap into account.
Well are you looking to sell or live in it and what kind of premium do you expect in the next couple of years if you do decide to sell.
Cheers
minime June 29th, 2006, 10:22 AM Just some information, spoke to an agent who sold type 2c 850 sq feet, 2nd floor for 700,000 dhs
Well, I purchased mine on the 29th floor for 884,000, feel I paid too much premium for the upper floor even though I purchased from the developer.
Any thoughts all you people...
If you wait until construction has started, prices do go up yes. I have seen the same with Marina Diamond that even though they where developer direct. The last ones are sold at a premium. :)
Jacko June 30th, 2006, 02:57 PM According to an agent in Dubai, Abraj have told them they are running 2 months behind. So I see that as May 07.
mission June 30th, 2006, 11:29 PM hi all
I have purchased on the 10th floor.
Abraj are running 10 months late. I think it will be ready by Christmas 2008
I have a 1 bedroom for sale if anyone is interested
Krazy July 1st, 2006, 03:32 AM Project: Time Place
Type: Residential
Floors: 35
Height: 158m + 40m Sundail
Construction Start: 2005
Construction End: Early 2008
Part 1 (http://www.skyscrapercity.com/showthread.php?t=138739&page=1&pp=20)
www.timeplacedubai.com
Features: World's largest and highest sundial
http://www.skyscrapercity.com/photopost/data/503/11020Time_Place.jpg
http://www.gowealthy.com/realestate/dubai/timeplace/images/timeplace_night_gross_big.jpg
http://www.timeplacedubai.com/content/timeplace/sundial/sundial01_klein.jpg
http://www.gowealthy.com/realestate/uae/dubai/timeplace/images/timeplace_marina.jpg
carpetking July 1st, 2006, 11:09 AM mission
what type you have bought....and how much is it ??
AltinD July 1st, 2006, 12:51 PM ^^ Up to a good start, arent we ... :sleepy:
carpetking July 1st, 2006, 01:11 PM lets start !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
http://i3.tinypic.com/16azbig.jpg
Kevan July 1st, 2006, 02:21 PM Received a letter from Abraj today confirming the size increase in apt. from 1,131.30 sq. ft to 1,314.3 sq. ft and outlining that although this is at no extra cost to the 1.01m AED that I paid, the service charge will be AED 8 x the new apartment area. Fair enough !!!
Just get it completed!!!
New thread! Started to loose the plot on the last one toward the end.
carpetking July 1st, 2006, 10:31 PM just received from ABRAJ .....thanks Bijay
http://i4.tinypic.com/16bx79s.jpg
http://i5.tinypic.com/16bx7x0.jpg
http://i3.tinypic.com/16bx9w1.jpg
http://i5.tinypic.com/16bxaj7.jpg
mission July 1st, 2006, 10:58 PM mission
what type you have bought....and how much is it ??
I have brought a 1 bedroom with rd view, its one of the smaller apartments on the 10th floor,
Whats with the new thread, they are taking ages to get off the grd
carpetking July 1st, 2006, 11:15 PM mission
Is yours a 1A or 1B type ???
and what is the price ???
Krazy July 1st, 2006, 11:23 PM Please get back to the construction of the tower itself.... let's not turn this into an investor's chat thread and turn off other forumers... PLEASE
HAAN July 2nd, 2006, 12:40 AM I today (Sat 1st) received the same letter as Kevan.
Also received same pictures as CarpetKing.
Now need Abraj to move on and complete.
mission July 2nd, 2006, 09:51 PM guys what does the letter say, i am on holiday in Barcelona at the moment
Carpetking
If u r interested mail me privatly
Krazy sorry mate
Jacko July 4th, 2006, 04:13 PM timeplaceview
carpetking July 4th, 2006, 04:39 PM Jacko
do you have new pictures ??
Jacko July 4th, 2006, 04:49 PM carpetking
Hi, I've had a few sent from Dubai but they do not seem that new. There is one giving the potential view but not sure how to upload .
carpetking July 4th, 2006, 05:31 PM Jacko
Ask Dubaiflo how to post pictures.He had help me too.
Kevan July 4th, 2006, 05:38 PM #92 on the last thread:
upload the pic on www.tinypic.com
-you get an url there (for example www.tinypic.com/uhhsiaojf34.jpg) or whatever.
-click on post reply here over at SSC, click this : button, and copy and -paste the link address given at tinypic.
-press ok, submit reply, that's it.
__________________
Should do it
Jacko July 4th, 2006, 06:12 PM Thanks Kevan, I shall have a go shortly. You will probably think they're not worth your effort! :cheers:
carpetking July 4th, 2006, 06:49 PM Jacko
comon i can't wait for news from T I M E P L C E......................
Jacko July 4th, 2006, 09:18 PM http://i6.tinypic.com/16m55cm.jpg
Jacko July 4th, 2006, 09:33 PM http://i6.tinypic.com/16m60yc.jpg
Jacko July 4th, 2006, 09:34 PM view from tphttp://i6.tinypic.com/16m67eq.jpg
carpetking July 4th, 2006, 09:35 PM thanks Jacko
is this the new board from Timeplace in the front ?
mission July 4th, 2006, 09:37 PM cool
Thanks for the update
So what does the letter from Abraj say
Jacko July 4th, 2006, 10:02 PM http://i6.tinypic.com/16m7ebo.jpg http://i6.tinypic.com/16m7ebo.jpg
Mission, the letter confirms the fees will remain at 8AED sq ft but on the new increased floor sizes which seems fair enough. I understand that is one of the cheapest in the Marina
Jacko July 4th, 2006, 10:06 PM http://i6.tinypic.com/16m7kfk.jpg
carpetking July 4th, 2006, 10:13 PM more more please.....
nice updates
i wanna see rising the tower....
raig July 5th, 2006, 09:58 AM Hi all
I have a 1 bed appt in timeplace - looking at pictures from march to June there looks like no progress to me. I am a bit worried it will not be completed until 08.
What do everyone think?
I am thinking of selling my apartment on the 11th Floor. Should i sell while I still can - before the bubble bursts
carpetking July 5th, 2006, 12:29 PM Hi mission
today i received the letter from ABRAJ:
Subject:TimePlace Tower -Unit No......"the Property"
Dear Mr.&Ms........
On August 25. 2005 you executed the apartment sale agreement"the Agreement"
with Abraj FZCo to purchase the property in the Timeplace Tower to be constructed
at Dubai Marina,the details are as follows:
Unit No:......
Total sq.ft.:776,10
Price:AED 822,666
It is our pleasure to inform you that due to some changes in the layout an latest methods of areas calculation,your apartment size was increased from (776,10 sq.ft.)to
(878,00 sq.ft.) and without any additional cost.
Your obligation under the agreement will accordingly change and increase with the
increase in the size of the unit,in relation but not limited to (for example) the
maintenance fees (clause No.8.3-f)
On the other hand,and despite the fact that the maintenance fees have been recently increased by serval developers,we are glad to inform you that we are maintaining the same maintenace fee (AED 8 ).Therefore and in accordance with your apartment sale agreement (clause 7-schedule A)
the maintenance fee shall remain as it is (AED 8 x the new apartment area as highlitedt above)
W e look forward to receiving you in the new premises
Yours truly
ABRAJ FZCo
mission July 5th, 2006, 01:43 PM Hi Carpetking
Cool. I think there will be some progress now but i do feel this will not be completed till the q3 of next year. Krazy i think you were right.
I am going to Dubai at the end of next month and i will take some picutres and hopefully the showroom will be ready.
I am really getting impatient as i brought my apartment in September 2004 and it wont be ready for another 16 months.
I do feel that it will be well worth the wait.
carpetking July 5th, 2006, 06:26 PM mission
Abraj have no showroom at the moment.Ali from Abraj told me
they would have a show apartment in timeplace tower
sept./okt. this year.(i think spring 2007) !!!!
If the show-apartment is ready you can see it
fully furnished.
The new Abraj office is in SPECTRUM BUILDING
2nd floor Oud Metha.
This is near Mövenpick Hotel.I was there at eastern this year.
mission July 5th, 2006, 10:33 PM is this near the marina, Where is this new office
Cmon boys get the floors moving and it defently wont be ready till 3rd q of 2007
Jacko July 5th, 2006, 10:43 PM This might sound a dum question but why can't Abraj simply employ more workers as the more behind schedule it goes, the extra wages bill adds up anyway thus reducing their profit. Last time I visited the site, it seemed as though there were less workers here on TP than the neighbouring builds. If they are trying to build on budget by reducing staff, it will certainly result in a hefty overspend later on.
On a lighter note, is the core where the lifts go and if not, what is their purpose.
carpetking July 6th, 2006, 06:39 AM mission
The new Abraj office is not near the Marina.It is near the Deira Citycenter
(5 min ) by taxi.
thedubailife July 6th, 2006, 11:50 AM ^^ 5 mins from marina to Deria City Center ......what you doing flying hope it's not 5 mins in rush hour too :D
carpetking July 6th, 2006, 12:03 PM 5 min. from Deira City Center to Spectrum Building
Abraj office !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
FriendlyFoe July 7th, 2006, 04:22 PM I realise this might be a bit of a dim question, But ABRAJ i thought were meant to be working nearly 24 hours a day, Why in any of the photos does thier seem to be no one on site doing any work? Can anyone confirm if any constuction has actually taken place as from various photos from may to current ones i can see no progress?
Any one shed any usefull info on contruction progress? What happended to the 1 floor a week promise! I reakon the Burj with its 160 floors will be built before timeplace and its 35.
Kevan July 7th, 2006, 05:57 PM I was on site in May, see my posts on archived thread, the last posts show what appears tp be a large expanse of concrete on the left, facing the Marina, on the second floor. None of that was there, as they were just completing the basements.
The first three levels above groung contain the pool etc and villas. I would expect those to take the time. However, they are obviosly behind schedule and I agree, there does not appear to be a lot of activity.
We need someone local to get a few more posts of pictures. Anyone out there living in MD1 overlooking the site?
carpetking July 7th, 2006, 06:59 PM I ask my friend in Dubai to post new update pictures from T I M E P L A C E.
mission July 7th, 2006, 09:22 PM the MD told me once they have completed the first two floors then its a floor a week
Dont worry
Stephan23 July 8th, 2006, 03:41 PM THX for info :okay:
mission July 8th, 2006, 09:17 PM Also guys remember there will not be a lot of work done in July and August due to the employment law.
Imre July 9th, 2006, 10:38 AM this is a Timeplace?
http://dubaionline.mconet.biz/images/pictures_galery/2006799487399/729_20060709100016_2.jpg
http://dubaionline.mconet.biz/images/pictures_galery/2006799487399/192_20060709100018_134.jpg
carpetking July 9th, 2006, 10:40 AM Thank you very much Imre.
Yes i think in 12 month it is a realy Timeplace
Thanks for the update pictures.
Imre July 9th, 2006, 10:42 AM ok, no problem, I like this tower.
Stephan23 July 9th, 2006, 02:33 PM So slow!!! :bash:
mission July 9th, 2006, 05:58 PM imre
thanks alot you are a top man
AltinD July 9th, 2006, 06:34 PM 08/07/2006
http://i6.tinypic.com/1zexvh2.jpg
carpetking July 9th, 2006, 07:33 PM Thanks AltinD for this beautiful picture.Is this made from Bayside Residence ?
AltinD July 9th, 2006, 09:37 PM ^^ No, from the road.
Jacko July 10th, 2006, 11:01 AM I think it is at last starting to get on with things and rising high!! You can see a lot of work has gone into the villa area and first floor which is probably the most complicated areas and hopefully they can now put all their efforts into reaching for the sky :)
I get totally depressed when I look at the Marina view thread and their progress which seems months ahead of TP considering they were at the same stage at the beginning of this year.
Onwards and Upwards
Jacko July 11th, 2006, 02:09 PM Abraj have new pictures on their site under 'monthly updates' :)
carpetking July 11th, 2006, 03:24 PM Yes, Jacko see post No.6
DUBAI-Boomtown July 11th, 2006, 10:22 PM Great buliding!
grow,grow,grow Time Place!
carpetking July 12th, 2006, 03:23 PM is this work ?
http://i6.tinypic.com/1zpof82.jpg
BankerMan July 12th, 2006, 04:33 PM Hi all
I have a 1 bed appt in timeplace - looking at pictures from march to June there looks like no progress to me. I am a bit worried it will not be completed until 08.
What do everyone think?
I am thinking of selling my apartment on the 11th Floor. Should i sell while I still can - before the bubble bursts
Raig....
It has been over a week since you put up this post and no one has replied. Are you surprised? You should not be, since you committed the following two grave mistakes in putting up this post: (1) You asked an investment question which is a no-no on this thread; and (2) you wrote these four horrendous words which is an absolute taboo in this thread....."before the bubble bursts".
Anyways, to answer your question I can send you a PM if you wish and give you my opinion on what you should do.....an opinion, may I add, that is based on having lived and worked in Dubai as a banker for over 20 years.
Please let me know if you wish me to PM you.
mission July 12th, 2006, 04:36 PM Carpetking
Where is TIMEPLACE
maltster July 12th, 2006, 04:53 PM Raig....
It has been over a week since you put up this post and no one has replied. Are you surprised? You should not be, since you committed the following two grave mistakes in putting up this post: (1) You asked an investment question which is a no-no on this thread; and (2) you wrote these four horrendous words which is an absolute taboo in this thread....."before the bubble bursts".
Anyways, to answer your question I can send you a PM if you wish and give you my opinion on what you should do.....an opinion, may I add, that is based on having lived and worked in Dubai as a banker for over 20 years.
Please let me know if you wish me to PM you.
Bankerman , if you dont mind me asking, what property did you buy in Dubai and when did you sell it?
carpetking July 12th, 2006, 05:26 PM Hi mission,
This picture is from Okt. last year.I get no reaction from my friend in Dubai.
mission July 13th, 2006, 08:07 PM I am glad its going off the grd now so hopefully it will now be a floor a week
carpetking July 13th, 2006, 09:13 PM look on Abraj website.Their second project China Town (international city)
is finished.
carpetking July 14th, 2006, 01:29 PM Yes,one floor per week...
http://i1.tinypic.com/1zxw3dz.jpg
Thank you Abraj
mission July 14th, 2006, 01:45 PM I think now they have finished international city they are pulling there resource onto this project
Jacko July 14th, 2006, 02:21 PM Thanks for the picture Carpet King. I think you could be right mission about puling resources. It would make sence :)
carpetking July 14th, 2006, 07:29 PM I received this pictures from Abraj
http://i2.tinypic.com/1zydapi.jpg
http://i1.tinypic.com/1zyddad.jpg
http://i1.tinypic.com/1zyden7.jpg
http://i1.tinypic.com/1zydhdt.jpg
http://i2.tinypic.com/1zydjyq.jpg
mission July 14th, 2006, 07:46 PM HOW COMES YOU ALWAYS GET THE PICTURES AND I NEVER GET ANY WHEN I ASK.
carpetking July 14th, 2006, 07:55 PM mission
I have made the fifth payment...and you only the fourth.
No i don't know.It's true i have payed the 5th payment.
mission July 14th, 2006, 07:56 PM I have paid the whole balance apart from the final payment over 12 months ago as the Dirham was so week to the pound i got 7.12.
So i do not think its that
carpetking July 14th, 2006, 08:00 PM I don't know why i have got the pictures.Ask Mr. Bijay from Abraj
b.rama@timeplace.com
cheers
carpetking July 14th, 2006, 08:04 PM If the timeplace is finished,i dink a coffee with Bijay on my balkony.
You can come too.
Kevan July 14th, 2006, 08:39 PM I don't care who gets them or how they get them, just keep posting the progress. As for the coffee, hope it's a big balcony as a few of us will be there.
So good to see a bit of progress and hear some optimism ...
Nice update.
carpetking July 14th, 2006, 08:44 PM Kevan...
I have a very big balkony.
see you
mission July 15th, 2006, 07:15 AM Is it me or does the floor area look very small?
carpetking July 15th, 2006, 07:20 AM I think it is too dark inside the building.If its finished and furnished
it looks large.Belive me.
mission July 15th, 2006, 08:01 AM No i mean the current core building it looks really small. There are a lot of apartments on each floor.
Kevan
When you visted Dubai and got shown around the site did you just ask the foreman?
mission July 15th, 2006, 08:34 AM is the rear of the building which is currently on level 1 is that for apartments 1a and 1b?
carpetking July 15th, 2006, 08:39 AM Yes i thing the appartments in the backside (roadview) are 1a and 1 b
but the better side is 1b.You can see the marina from your bedroom window.
mission July 15th, 2006, 08:41 AM I have no balcony :(
carpetking July 15th, 2006, 08:43 AM no problem we have a nice park on marina level.And i think if we have outside temperatures from 43 degrees,we will sit on the sofa inside.
Kevan July 15th, 2006, 08:51 AM I was shown what the floor area of of the two bed was and it's approximate location. If they stick to their agreed areas,120 odd sq. mts is a big piece of property. I do not think there is a lot of apts. the three bed take up one side of the Marina facing, the two bed type 4 take up the other side, so two apts for the whole of the front, a two on the bridge side... not a lot.
Then go look at apts for sale in your native country and ask the floor area.
Concrete is very deceptive, white walls and glass open it out. It's plenty big.
As CK states, we'll all be on his balcony anyway.....
mission July 15th, 2006, 08:53 AM What floor is everyone on i am on the 10th ?
carpetking July 15th, 2006, 09:12 AM I am on 29th.floor with big b a l k o n y.I would open a restaurant
his name : MARINA-VIEW-RESTAURANT:yes:
mission July 15th, 2006, 09:24 AM WOW 29th floor
Is 1b better then do u think i might have a view from my window. I might build a little balcony myself and hang my washing outside.
I will be parking my sofa outside and look up to all you rich boys in your balcony apartments sipping cocktails with all the hot woman.
carpetking July 15th, 2006, 10:49 AM mission here is a furniture example for 1 Bedroom app.
http://i1.tinypic.com/20035uh.jpg
mission July 15th, 2006, 11:11 AM Cool
What apartment would that be for, I think my bedroom in my apartment is going to be large. When i spoke to the MD he advised the bedroom size has increased.
Dear David,
Please find attached the floor plan of type 1B.
If compared to the previous one you will find that you have gained more
space in the bedroom due to revisions incorporated in the shafts thus giving
more space and larger area.
Best regards
So does this mean my bedroom size has increased by 113sq
carpetking July 15th, 2006, 11:27 AM cool mission.
My pictures shows a Suite from ocean-liner "Color-Fantasy"
I mean very luxury.
Ali fro Abraj sad,they would show us in her show appartment in Timeplace
furnitures who we can buy direkt.
mission July 15th, 2006, 11:35 AM Cool
I cant wait for this to be finished i do think June/July next year
carpetking July 15th, 2006, 12:08 PM no,the information from Abraj is this sept.-okt.
The show appartment will be in one of the first floors.
dubaiflo July 15th, 2006, 12:23 PM ^^ u really think it will be done by mid 2007 ? :weird:
mission July 15th, 2006, 12:25 PM I wonder how much the furniture packages are going to be
carpetking July 15th, 2006, 02:53 PM http://www.ikaar.com/almoosa/furniture/home-default.asp
http://www.homecentre.net/homecentre/products/living/living1.htm
If you look for furnitures............
mission July 16th, 2006, 06:57 AM ^^ u really think it will be done by mid 2007 ? :weird:
Flo keep the faith
Did you buy in the end when you went in April? :)
gmalhot July 16th, 2006, 07:19 AM I have also a type 2c on the 29th floor partial marina facing.
Well, I am looking at at least a 3-4 month delay hopeflly not more than that as rents in dubai would kill me just renting out month on month as my current rent contract expires in April 07.
Well, anyway we should all plan a get together once the place is done...
Gaurav
Krazy July 16th, 2006, 07:22 AM Time Place will not be completed anytime before first quarter of 2008... I dont know how you guys have your hopes up so high
mission July 16th, 2006, 08:06 AM Any excuse for a party.
Krazy me old boy it will be done in 2007
Krazy July 16th, 2006, 08:11 AM :ohno:
carpetking July 16th, 2006, 08:18 AM Krazy
On first april 2007 i sit on my balkony and dink a coffee !!!!!!!!!!!!!!!!!!!!!!
Krazy July 16th, 2006, 08:21 AM u can have it during the "tea break" with the workers having their tea on a few floors about u still under construction :lol:
carpetking July 16th, 2006, 08:23 AM :?
Krazy July 16th, 2006, 08:24 AM Each one of you TP owners owe the SSC forumers a house warming party if it's completed in 2007
carpetking July 16th, 2006, 08:30 AM Yes you are right.lets go :okay:
mission July 16th, 2006, 08:36 AM We are planning a get together anyway when its finished.
We are having it at carpetking as he has the biggest and most the highest apartment.
carpetking July 16th, 2006, 09:14 AM Better idea,
we make a party in the lobby with all owners and the property-manager :cheers:
dubaiflo July 16th, 2006, 11:33 AM :rofl:
u guys are crazy, this will never be done by apri, not even by 2007... ;)
Flo keep the faith
Did you buy in the end when you went in April? :)
yeah but not in time place, no more marina view apts.
i could have gotten a 34th floor studio, but road facing, no thanks.
mission July 16th, 2006, 11:37 AM :rofl:
u guys are crazy, this will never be done by apri, not even by 2007... ;)
yeah but not in time place, no more marina view apts.
i could have gotten a 34th floor studio, but road facing, no thanks.
Where did you buy in the end.
Flo it will be 2007 :cheers:
carpetking July 16th, 2006, 11:40 AM Flo do you talk about this appartment ?
http://i2.tinypic.com/205usm0.jpg
mission July 16th, 2006, 11:48 AM Is 703 sq for a 1bed small?
dubaiflo July 16th, 2006, 11:50 AM nope it was the studio in 34th floor.
Where did you buy in the end.
Flo it will be 2007 :cheers:
In Dubai Silicon Oasis.
Don't believe everything the Palm Pirates tell u :rofl:
carpetking July 16th, 2006, 11:53 AM No mission
703 sqft. is very good for a 1 Bed and marina view from bedroom window is ok
u have no balkony but your kitchen area is bigger as upper floors
mission July 16th, 2006, 11:55 AM Do you reckon marina view from my bedroom?
carpetking July 16th, 2006, 11:58 AM mission what do you mean ?
mission July 16th, 2006, 12:02 PM Do u think i will have a marina view from my bedroom?
I reckon i might have a slight view as long as they dont build anything to close.
Is the back on tp going to be concrete
carpetking July 16th, 2006, 12:06 PM TI think you have a good marina view.Next to TP is bayside residence.You look
left on marina bay.In front of your bedroom window is a small park area.
mission July 16th, 2006, 12:07 PM I am going to build my own balcony on my bedroom
carpetking July 16th, 2006, 12:08 PM no better you switch the bedroom and the livingroom.
carpetking July 16th, 2006, 12:11 PM sorry i mean you change the bedr..........
sorry for my bad english
mission July 16th, 2006, 12:13 PM Well its better than my german mines stretches to "Hallo"
So does your contract say anything about compensation if tp is late , have u asked this question ?
I am annoyed with Bijay as he confirmed to me when i was in Dubai that the maintenance fee would be based on the orginal apartment size
carpetking July 16th, 2006, 12:17 PM Yes mission he told me the same.Last week i received a letter from ABRAJ.
mission July 16th, 2006, 12:18 PM What about your contract regarding late delivery?
carpetking July 16th, 2006, 12:20 PM I dont know i must read it.
mission July 16th, 2006, 12:23 PM I am going to e-mail them and see if i get a response
dubaiflo July 16th, 2006, 01:08 PM ^^ sorry... but can't u do this with PMs?
no other forumers are interested in these kinda things...
mission July 16th, 2006, 02:09 PM ^^ sorry... but can't u do this with PMs?
no other forumers are interested in these kinda things...
Sorry flo
But this forum is to discuss TIMEPLACE and the progress. Some messages that you post do not interest me however i do not make a comment about it......
mission July 16th, 2006, 02:28 PM Look Flo
Something interesting
Dear Sir,
It is our policy in Abraj to reply to all comments and queries from our dear customers.
The completion was scheduled to be March 2007 but there was a small delay to the new labor law, therefore we rescheduled the completion to May 2007.
As for the compensation, I will get back to you as soon as I receive a reply from our lawyer on this.
If you have any enquiries, please do not hesitate to contact us any time.
dubaiflo July 16th, 2006, 02:30 PM ^^ yes, i agree, this is sth worth to post
but i don't chat with one forumer for 20 posts about stuff which has nothing to do with the general interest in Timeplace.
mission July 16th, 2006, 02:33 PM Flo cmon you do ,,,,
Plus i am discussing progress and my apartment with a fellow intevestor there is nothing wrong with that.
So your saying that your 11.546 post have all been valid posts and interest to everyone and not just one fellow investor.....
gmalhot July 16th, 2006, 02:39 PM Dear All,
I have written to them asking them on the exact date of completion as i will have to vacate my apartment in april 07.
Do they compensate us if it is furthur delayed.
I have asked for definite answers and will post the reply when I have it.
gaurav
mission July 16th, 2006, 02:41 PM Gaurav
I have done the same
carpetking July 16th, 2006, 04:00 PM Live cam jumeirah beach (residence)
click on cam 2
http://www.jbr.ae/highband/sitevision_live/index.htm
carpetking July 16th, 2006, 06:13 PM Sorry i gave your a wrong email adress
b.rama@timeplacedubai.com
Bijay Ramachandran,
Abraj Property Developers,
Office No. 205,
Spectrum Building,
Oud Metha Road,
Dubai, U.A.E
Tel:+971 4 3377977
Fax:+971 4 3377855
Mob:+971 50 5500976
Krazy July 16th, 2006, 06:23 PM The last two pages or so have been of interest to no one but to the ones who have purchased in the TP... please limit this kind of a discussion to PMs. Thanks.
carpetking July 16th, 2006, 07:27 PM Krazy i dont know what you mean........
see your post 93 , 95 , 97 , 99 it is the same :weird:
dubaiflo July 16th, 2006, 07:39 PM but he was giving general opinion and trying to convince you, because u still believe in april 2007.
+ he was not talking to one of you... there is a real difference here.
So your saying that your 11.546 post have all been valid posts and interest to everyone and not just one fellow investor.....
yes.
carpetking July 16th, 2006, 07:48 PM OK flo u r right.:)
mission July 17th, 2006, 07:02 AM The last two pages or so have been of interest to no one but to the ones who have purchased in the TP... please limit this kind of a discussion to PMs. Thanks.
Krazy this is the TP thread so of course the investors are going to discuss general things about the project that maybe other users would not be interested in. If you look at other threads other users also discuss information that is no use to me but i respect that users will discuss non vital information as this builds moral and communication on this site. This is the whole point of a forum.
I have looked at other threads and when other users just waste pages on stupid cartoons and smiley faces or discussing what the resturant is like on the marina walk. Do you think this is any use to anyone. I think not
:bash:
I respect your comments but i think you are wrong...
Now back to what this thread is for (discussing tp).
carpetking July 17th, 2006, 09:39 AM I hope we get new update pictures today.
I have written an email today to Bijay from Abraj.
(one floor per week........! )
Jacko July 17th, 2006, 10:29 AM Sorry guys, your probably going to hate me but I've just caught up with the last 3 pages and Boring, Boring,Boring!! As I have purchased in TP, I am also interested in all it's aspects but a lot of what's been said has already been discussed a hundred times in one form or another, eg funriture packages,views etc So please don't be offended by me asking to use the pm for these areas(or you could phone each other!) :cheers:
carpetking July 17th, 2006, 01:19 PM OK, the next T I M E P L A C E pictures just received from Abraj
http://i2.tinypic.com/207x8uc.jpg
http://i1.tinypic.com/207xa40.jpg
http://i2.tinypic.com/207xbw4.jpg
carpetking July 17th, 2006, 01:27 PM http://i2.tinypic.com/207xeso.jpg
thedubailife July 17th, 2006, 01:28 PM Kool....looks like some progress for all the time place owners. Nice updates too
Jacko July 17th, 2006, 01:47 PM Great pictures CarpetKing, your now the official spokesman at Abraj
mission July 17th, 2006, 01:55 PM carpetking i actually think you work for Abraj
carpetking July 17th, 2006, 01:55 PM http://i2.tinypic.com/207xoqx.jpg
carpetking July 17th, 2006, 01:57 PM no mission i am an private purchaser.
I like Dubai and the marina.
and TIMEPLACE
mission July 17th, 2006, 01:59 PM I was joking
mission July 17th, 2006, 04:34 PM This at the same stage as last week pictures
Kevan July 17th, 2006, 07:28 PM Get a grip Mission, the core is being increased and the floors are progressing.
CK I am impressed wit the updates.
We are now seeing what has been promised - progress
Grow to the sky!!!
Jacko July 18th, 2006, 12:47 PM Well done again Carpet King, these recent pictures seem to have shown really good progress over the recent weeks. Abraj seem to be putting their foot on the gas peddle even with the quite July and August time.
Does anyone fancy a sweepstake to see who is the closest to the official handover. Perhaps a small gathering in CK's executive balcony for the winner.
For the record, I say October 30th 2007. :applause:
carpetking July 19th, 2006, 08:40 PM look on abraj website
just two new update pictures.Same as mine.
thedubailife July 21st, 2006, 11:44 AM Update 21/07/2006 Thanks to IMRE
http://i5.tinypic.com/20k7t3t.jpg
http://i5.tinypic.com/20k7t77.jpg
http://i5.tinypic.com/20k7thd.jpg
carpetking July 21st, 2006, 12:20 PM Yeah,yeah,yeah...........
Thank you for this amazing pic's and don't forget one floor per week:cheers:
mission July 21st, 2006, 01:05 PM That is real good progress. I am very impressed with those pictures.
Cant wait for completion......
carpetking July 21st, 2006, 02:39 PM I see on first pictures on second floor a balkony in front of app. type 1 B
on my floorplan there is no balkony ???
mission July 21st, 2006, 03:33 PM oh yeah maybe they might give us a free balcony for running late
Krazy July 21st, 2006, 03:34 PM ok dont start the balcony/compensation/interiors discussion again. Sorry but just wanna stop it before we start again like a couple of pages back.
mission July 21st, 2006, 04:53 PM ITSA JOKE CRAZY
You have told us off and i promise i will not start again okay dad
carpetking July 21st, 2006, 04:59 PM i agree mission.
Krazy July 21st, 2006, 08:23 PM go back a few pages and then tell me it's a joke. I dont want it to start again and that's why I wanna stop it before it starts again!
Again.. use PM for your investment related discussions.
mission July 22nd, 2006, 06:49 AM :weirdo:
Krazy i give up
mission July 24th, 2006, 07:15 AM I just had a e-mail from Abraj and they advised that by the end of August they will be able to give us a true completion date.
They are saying May 2007 at the moment...
dubaiflo July 24th, 2006, 08:02 AM and they are going to tell u end 2007 in august. if they want to tell the truth.
mission July 24th, 2006, 08:22 AM Flo i agree with you.
I hope Krazy does not see this post......
carpetking July 28th, 2006, 11:59 AM Imre and AltinD guys have your shot new timeplace update pictures ?
I can't wait for new pictures :laugh:
Krazy July 28th, 2006, 01:48 PM Today by Imre
http://i7.tinypic.com/219yvcn.jpg
mission July 28th, 2006, 01:50 PM Its defenlty a floor a week then soooo cool ,
Cheers Imre/Krazy for posting them
thedubailife July 28th, 2006, 02:02 PM Starting to progress now, as usual slow start, but up to full speed now.
Kevan July 29th, 2006, 11:45 AM I note with pleasure and a warm feeling as the curves begin to appear, the balconies to the side, small inlets and a wall on the first floor. I feel almost perverse, but only - almost.
mission July 29th, 2006, 12:20 PM kevan
is that where the show flat is gonna be on the first floor
carpetking July 29th, 2006, 12:51 PM Thanks again Imre/Krazy for this nice photo.
Timeplace is growing fast how they have told us one floor per week.
Thank you very much
Dubai-Lover August 1st, 2006, 07:25 PM july 30
http://i7.tinypic.com/21mxco9.jpg
Krazy August 1st, 2006, 09:38 PM not much to see there from the last update
chippy August 2nd, 2006, 10:13 PM Hi there, im new to this site, i have been reading all the comments, i am really pleased to see the growth of the construction work taking place, i have bought a 2b about half way up, my daughter is over there now hopefully taking loads of snap shots. :
Krazy August 2nd, 2006, 10:19 PM ^^ welcome to the forum.. if u do get pictures of time place from your daughter please post them here and share with us :cheers:
chippy August 3rd, 2006, 09:35 AM cant promise, but will try.
carpetking August 3rd, 2006, 02:59 PM Thanks Dubai Lover for the update picture from 30th july.You can see the first walls inside the building.Great shot from the other side also you can see a part of the lobby and entrance.
And a warm welcome to chippy.
Stephan23 August 4th, 2006, 11:25 AM 04.08.2006 By Imre
http://i3.tinypic.com/23ku7ub.jpg
http://i3.tinypic.com/23ku7w1.jpg
http://i6.tinypic.com/23ku80j.jpg
thedubailife August 4th, 2006, 11:31 AM Do the average of nearly a floor a week, Timeplace owners must be happy to see good progress after the short tea break
carpetking August 4th, 2006, 01:16 PM Thank you Imre you are a good man,what shall we do without you ?:master:
Kevan August 5th, 2006, 02:51 PM They appear to be carrying out block work on the poured floors. I have skipped arround some of the other threads, Marina Views etc and they are not following the same trend. Hope the rate of progress continues. I have a pal at his place at the moment and I have asked for some photographs from the other side. Hope he delivers.
However, these ones from Imre are greatly appreciated - thanks for the updates. Makes my week end.
carpetking August 8th, 2006, 05:31 PM chippy...
has your daughter taken loads of shots from Timeplace ?
and can you post them here ?
gmalhot August 9th, 2006, 03:02 PM Ciao,
am really happy at the progress but if they stick to schedule another 30 floors would mean 30 weeks plus another 15 weeks for the sundial and the decors inside...
I dont think it will be ready before end 2007....
what say people..
gaurav
carpetking August 9th, 2006, 03:06 PM Abraj sad it would be may 2007
i think Timeplace is ready summer 2007
(good quality needs time.........)
thedubailife August 9th, 2006, 03:16 PM We not going around in that circle again read the whole thread, some think mid 2007 and others think end 2007 / start 2008.
Over and out. Now back to something which is more factual.
chippy August 9th, 2006, 08:34 PM chippy...
has your daughter taken loads of shots from Timeplace ?
and can you post them here ?
My daughter is still over there, im sure she has taken pictures ,although she may be using a dvd camcorder, she has a villa on the palm so plenty of snaps of that if she is allowed to get on there. she mailed me today to say she doubts " timeplace" will be ready by end of May 2007 as hoped. we will have to wait and see. but im thinking POSITIVE
carpetking August 9th, 2006, 11:01 PM cool chippy :)
carpetking August 10th, 2006, 11:52 AM there are two new update-pictures on Abraj website
www.abrajdubai.com
Imre August 10th, 2006, 12:53 PM 10/08/2006
Time Place for Carpetking:)
http://i5.tinypic.com/2465f2u.jpg
http://i6.tinypic.com/2465ci1.jpg
http://i2.tinypic.com/2465cue.jpg
http://i3.tinypic.com/2465cll.jpg
carpetking August 10th, 2006, 01:49 PM Thank you very much Imre,
...today is a good day !!!!
mission August 10th, 2006, 03:23 PM Another floor
Cheers for the shots imre
Kevan August 12th, 2006, 12:53 PM Thanks to HAAN some new views showing a little more detail.
http://i8.tinypic.com/24ecavr.jpg
http://i7.tinypic.com/24ecbo2.jpg
http://i8.tinypic.com/24ecc3b.jpg
Kevan August 12th, 2006, 01:01 PM HAAN
http://i8.tinypic.com/24ece4x.jpg
http://i7.tinypic.com/24ecemp.jpg
http://i7.tinypic.com/24eceug.jpg
carpetking August 12th, 2006, 02:29 PM Thank you Kevan/Haan for the pictures.
the front of the tower where you can see the curves looks great. ;)
carpetking August 12th, 2006, 03:18 PM MODELAPARTMENT TIMEPLACE
...just received from Abraj
Dear......
A model apartment would be ready by the end of this month or early September. I will keep you updated. Normally, every Sunday or Monday, we get the updated pictures from the site. I will send them to you as soon as I get them.
Thanks and Regards,
Bijay
mission August 13th, 2006, 06:51 AM Carpetking
Bijay must love you
mission August 13th, 2006, 02:05 PM second picture done by Imre on the 10 August, The numbers on the building are they the 1b Apartments?
carpetking August 13th, 2006, 03:55 PM Yes and the pictures made by Haan the 3th and 4th you can see the 1B apartment
carpetking August 13th, 2006, 06:21 PM Just received from Abraj.....
http://i7.tinypic.com/24gt5q8.jpg
http://i8.tinypic.com/24gt8jp.jpg
http://i8.tinypic.com/24gt9nr.jpg
http://i8.tinypic.com/24gty52.jpg
carpetking August 13th, 2006, 06:35 PM more pics
http://i8.tinypic.com/24guera.jpg
http://i8.tinypic.com/24gugyf.jpg
carpetking August 13th, 2006, 07:20 PM last two...
http://i8.tinypic.com/24gvtzb.jpg
http://i8.tinypic.com/24gvwp2.jpg
mission August 14th, 2006, 07:02 AM Carpetking
Great pictures, They seem to send you the old ones.. But they are really good shots though. Who is going to Dubai next to try and get some interior shots
mission August 14th, 2006, 08:27 AM Dear David,
Sorry for being late in my answer but I was on some emergency leave due to
the sad war and aggression against my country Lebanon.
As explained earlier and due to one force majeure that encountered us so far
(Labor law), the same affected our progress with a 2 months delay i.e.
delivery towards end May 2007.
I hope nothing will face us anymore and we will be in a better position to
give a more accurate date by end September.
You are right and if you frequently visit the website you can clearly notice
the progress and today we have reached the 7th floor.
Hope I answered your queries and feel free to ask at anytime.
Best regards
Saad El Zein
Managing Director
Stephan23 August 14th, 2006, 10:49 AM This one is so slow!!!! :down:
thedubailife August 14th, 2006, 12:12 PM ^^ You feeling ok from last few upadtes by Imre it appears to be going at around 1 floor a week
Imre August 14th, 2006, 08:34 PM 14/08/2006 from La Riviera
http://i7.tinypic.com/24mf39j.jpg
carpetking August 14th, 2006, 09:09 PM Another view on Timeplace :shocked:
Thank you Imre
mission August 15th, 2006, 08:36 AM Yes and the pictures made by Haan the 3th and 4th you can see the 1B apartment
What is the area sticking from the outside. Its not a balcony as 1b do not have them? Any ideas
:cheers:
carpetking August 15th, 2006, 09:24 AM I send you a PM mission ok ?
Norfolk boy August 16th, 2006, 01:22 PM Good day
A new member - brought 2D - one bed - was worried as nothing seemed to be happening but things moving now - I will await their comments end Sept as to when it is finished.
Any recent info/ pictures
carpetking August 16th, 2006, 02:12 PM Welcome Norfolk boy.
We are waiting for new update pictures from Imre "every friday" ;)
Stephan23 August 18th, 2006, 11:37 AM 18.08.2006 By Imre
http://i8.tinypic.com/24x2kjm.jpg
http://i7.tinypic.com/24x2kjq.jpg
http://i7.tinypic.com/24x2mo6.jpg
http://i8.tinypic.com/24x2mpu.jpg
carpetking August 18th, 2006, 12:02 PM Thank you Imre for this great pictures,also from the marina side.Timeplace looks
very good.
What can i say: thank you very much :master::applause::applause::applause:
mission August 18th, 2006, 12:09 PM If i ever go to Dubai can you get on site and be shown around?
Imre August 18th, 2006, 12:34 PM yes , of course Mission :)
mission August 18th, 2006, 12:39 PM Imre you are a legend!!!!!!!!!!!!!!
Norfolk boy August 21st, 2006, 11:05 AM Great pictures - it seems to be coming on now - I cant see it being ready until end of 2007 though - hopefully we will be told soon so we all know what we are doing :bash:
Does anyone have a plan of the marina complex - ie shops/ restaurants, parks etc?
I think the the marina will look great when 'finished.'
Norfolk boy August 23rd, 2006, 01:50 PM I have heard directly today that expected completion date and moving in date is expected to be end of July 2007
I suppose good news....except that Dubai closes down in July and August, so does that mean September?
mission August 23rd, 2006, 02:14 PM Who told you this?
Stephan23 August 23rd, 2006, 02:16 PM ^^very optimistic!!
mission August 23rd, 2006, 02:35 PM To be honest if they top out by end of Jan, i would think that September would be a possiblity
Norfolk boy August 23rd, 2006, 07:43 PM Bijay answered my email to him
someone else try early next week and see what they say - I guess it is still guess work at this stage
mission August 23rd, 2006, 07:52 PM Can you forward the email to me on davedubaidave@yahoo.co.uk
mission August 23rd, 2006, 08:17 PM I have some new pictures from Abraj. I have e-mailed Carpetking to upload as i am unable to do this at work
|
|