There is concrete casting in Wind II now.
You can watch it live:
http://www.farayand.org/camera2/
Internet Explorer Compatible





Wind I has finished the concrete casting for level B1 to GF.
The following is a video of the event.
Q16owJhBx0w

Wind Spokesperson
June 3rd, 2008, 12:52 PM
There concrete casting for Wind Tower II substation has been completed this morning.

gLnsjqqHm48

Wind Spokesperson
June 3rd, 2008, 02:59 PM
Picture Update From Wind Towers



Last Night

http://www.farayand.ae/Wind%20Photo/080609_1.JPG


This Morning

http://www.farayand.ae/Wind%20Photo/080609_2.JPG

http://www.farayand.ae/Wind%20Photo/080609_3.JPG

http://www.farayand.ae/Wind%20Photo/080609_4.JPG

http://www.farayand.ae/Wind%20Photo/080609_5.JPG

http://www.farayand.ae/Wind%20Photo/080609_6.JPG

Wind Spokesperson
June 9th, 2008, 01:22 PM
The dewatering is over.

lB-fOgMVXHI


Looking forward to reading your comments.

abf
June 9th, 2008, 05:10 PM
Good to see steady progress WSP. Thanks for the updates

jba
June 9th, 2008, 05:13 PM
Thanks WSP, for the updates. It was good today the way the webcams were repositioned so you can see both sites from a distance.
WSP, have you access to any computer images of how the foyers will look and the pool areas? You posted some I while back of the bar in Wind 1 so anything simuliar with the foyers/ reception areas and pools?

jba
June 10th, 2008, 11:42 AM
WSP, will you guys be using the new shuttering that was tested a while ago? and if so will this increase the speed of construction?
Also what is the plan when the working law kicks in (no work between 12-15.00) will you guys lose 3 hours a day or restructure the working hours to suit?

Cheers.
p.s any news on the images of the pools, reception areas etc...?

Wind Spokesperson
June 11th, 2008, 11:20 AM
We will answers your questions soon.

Meanwhile, we have some picture updates from Wind Towers:

http://www.farayand.ae/Wind%20Photo/080610_1.JPG

http://www.farayand.ae/Wind%20Photo/080610_2.jpg

http://www.farayand.ae/Wind%20Photo/080610_3.JPG

Wind Spokesperson
June 11th, 2008, 09:02 PM
Wind Tower I - Steel fixing & last ramp Casting - Level +8.55

Wind Towr II - Steel Fixing - Level +8.55

You can see live casting

http://www.farayand.ae/Wind%20Photo/080611-01.JPG

http://www.farayand.ae/Wind%20Photo/080611-02.JPG

http://www.farayand.ae/Wind%20Photo/080611-03.JPG

http://www.farayand.ae/Wind%20Photo/080611-04.JPG

jba
June 11th, 2008, 09:38 PM
8.55 I guess thats the height of the first floor ceiling??

WSP could you clarifiy? please.

Wind Spokesperson
June 12th, 2008, 02:58 PM
yes +8.55 and some parts +9.40

Wind Spokesperson
June 14th, 2008, 02:21 PM
Wind I & II - 12 June 2008

http://www.farayand.ae/Wind%20Photo/080614-02.JPG

http://www.farayand.ae/Wind%20Photo/080614-03.JPG

http://www.farayand.ae/Wind%20Photo/080614-04.JPG

http://www.farayand.ae/Wind%20Photo/080614-05.JPG

http://www.farayand.ae/Wind%20Photo/080614-06.JPG

Wind Spokesperson
June 14th, 2008, 02:25 PM
Wind I Section
http://www.farayand.ae/Wind%20Photo/080614-01.JPG

jba
June 14th, 2008, 03:23 PM
Thanks for the updates and the visual explanation.

Any news on the other questions asked?

Cheers joe.

Wind Spokesperson
June 14th, 2008, 09:05 PM
Wind I & II - 14 June 2008

http://www.farayand.ae/Wind%20Photo/080614-08.JPG


http://www.farayand.ae/Wind%20Photo/080614-10.JPG

Wind Spokesperson
June 15th, 2008, 08:52 AM
IN 2 DAYS WE ARE GOINT TO THE FIRST FLOORS IN WIND 1 AND 2

Wind Spokesperson
June 15th, 2008, 04:04 PM
not yet we have to install the climber sistem for core in this level .... we have the last ramp casting and some walls and the stairs in wind one now .. check the cameras .... http://www.farayand.org/camera

Wind Spokesperson
June 15th, 2008, 08:06 PM
WIND 1

Wind Spokesperson
June 15th, 2008, 08:16 PM
http://www.farayand.ae/Wind%20Photo/502.JPG

Wind Spokesperson
June 15th, 2008, 08:16 PM
CONCRET

Wind Spokesperson
June 15th, 2008, 08:19 PM
http://www.farayand.ae/Wind%20Photo/504.JPG

Wind Spokesperson
June 15th, 2008, 08:22 PM
http://www.farayand.ae/Wind%20Photo/505.JPG

Wind Spokesperson
June 15th, 2008, 08:24 PM
http://www.farayand.ae/Wind%20Photo/506.JPG

Wind Spokesperson
June 15th, 2008, 08:25 PM
http://www.farayand.ae/Wind%20Photo/507.JPG

Morrismarina
June 15th, 2008, 08:37 PM
Really good of Wind to install the webcam.............just been taking a look and it's a great feature. :applause:


(Unlike my developer Select Property who promised a webcam for the Torch and then didn't have the balls to do it !!! ) :ohno:

scoot68
June 16th, 2008, 08:14 AM
http://i31.tinypic.com/j8ofev.jpg

Wind Spokesperson
June 16th, 2008, 06:46 PM
lol scoot68

Wind Spokesperson
June 17th, 2008, 12:12 PM
next day we are going to cast wind towers slabs / ground floors .

jba
June 19th, 2008, 06:35 PM
WSP,
Did you guys cast the ground floors yet?

The web cam for Wind 2 is out of action.

jba
June 21st, 2008, 06:41 PM
Take a look at http://uk.youtube.com/user/WindSpokesperson on it there are many new videos from the last couple of days plus interviews with engineers (most not in English) but it shows how much progress is taking shape and gives a really good insight to how things are looking on site.
I am going to Dubai next week so I will be able to describe how things are first hand.

WSP, and all the Wind team thanks for the updates plus the youtube videos they are very informative.

bongo2202
June 21st, 2008, 06:52 PM
Have a good time mate, are you going over to sort out the Liverpool deal then:lol:

jba
June 22nd, 2008, 04:05 PM
Have a good time mate, are you going over to sort out the Liverpool deal then:lol:

:lol: I Think thats dead in the water?

My be tesco will by us and have two football clubs, a no frills one (everton) and a finest one (Liverpool) :cheers:

Wind Spokesperson
June 23rd, 2008, 10:55 AM
we have casted the wind 2 ground floor last night and tonight we have the wind 1 ground floor slab .. last night pictures .....
http://www.farayand.ae/Wind%20Photo/601.JPG

http://www.farayand.ae/Wind%20Photo/602.JPG

http://www.farayand.ae/Wind%20Photo/603.JPG

http://www.farayand.ae/Wind%20Photo/604.JPG

scoot68
June 25th, 2008, 02:59 PM
http://i27.tinypic.com/2q3442g.jpg

jba
June 25th, 2008, 06:54 PM
Thet have built the nightclub already! That was quick.

jba
June 25th, 2008, 06:54 PM
Thet have built the nightclub already! That was quick.

first timer
June 25th, 2008, 07:48 PM
...

bongo2202
June 25th, 2008, 09:01 PM
Thet have built the nightclub already! That was quick.


It looks like the ravers of the late 80's :banana:

haslok2000
June 30th, 2008, 09:25 PM
They look more like a Village People :) great club !

Wind Spokesperson
July 1st, 2008, 05:22 AM
http://www.farayand.ae/Wind%20Photo/080625-01.JPG

http://www.farayand.ae/Wind%20Photo/080625-02.JPG

http://www.farayand.ae/Wind%20Photo/080625-03.JPG

http://www.farayand.ae/Wind%20Photo/080625-04.JPG

http://www.farayand.ae/Wind%20Photo/080625-05.JPG

http://www.farayand.ae/Wind%20Photo/080625-06.JPG

Wind Spokesperson
July 1st, 2008, 05:32 AM
http://www.farayand.ae/Wind%20Photo/080629-01.JPG

http://www.farayand.ae/Wind%20Photo/080629-02.JPG

http://www.farayand.ae/Wind%20Photo/080629-03.JPG

http://www.farayand.ae/Wind%20Photo/080629-04.JPG

Wind Spokesperson
July 7th, 2008, 06:41 AM
http://www.farayand.ae//Wind%20Photo/080701-01.JPG

http://www.farayand.ae//Wind%20Photo/080701-02.JPG

http://www.farayand.ae//Wind%20Photo/080701-03.JPG

http://www.farayand.ae//Wind%20Photo/080701-04.JPG

http://www.farayand.ae//Wind%20Photo/080703-01.JPG

http://www.farayand.ae//Wind%20Photo/080703-02.JPG

http://www.farayand.ae//Wind%20Photo/080704-01.JPG

http://www.farayand.ae//Wind%20Photo/080704-02.JPG

bongo2202
July 7th, 2008, 07:56 PM
Hi WSP (or JBA) do you have the contact details please for the contact at Wind as I know Ms Askari has left but I want to make sure an e-mail I need to send gets to the correct person...thanks.

jba
July 14th, 2008, 11:18 AM
Hi All,

I have just returned from Dubai during which I visted Wind at their two offices and the site.
On my visit to the site I was shown around both sites by Dr Azizis sister (sorry I can't remember your name!) who even though she was extremly busy took time out to show me around. During my time on the site the next tower crane was being installed on the Wind 1 site and the crane on Wind 2 had been delivered. It was apparent that the site was very active with engineers and workers. It was pointed out to me that daily targets are set and these have to be met to keep the work on track.
The status of both towers seems to be they are around the ground floor level, however the ground floor is level with the top of the parking ramp so from the ground it looks like a couple of storeys are built.
I also visited around 20.00 and the site was active and also on a Friday but unfortunatly on this occassion there was no work on the towers happening but I must say the whole of JLT was silent with no work going on.
I then visited the office of the Chairman Dr Azizi, who I have met on two previous occasions. Once again he was extremly welcoming as were his staff and invited me into his office to speak to him. He is a very busy man and this was very apparent as I sat there watching a film of all the latest projects Wind is currently carrying out including airport designs, dam reconstruction, projects in Qatar, ajman and Iran whilst he talked with his achitechs and engineers.
He then spent time with me to talk about the Wind tower project informing me that despite the rising construction costs the project was still profitable due to the fact that Wind own a large portion of the towers still. He also pointed out that the pace of construction will increase as the towers rise as there are no retaining walls to worry about and the extra cranes will speed things up also. I was then shown some interior designs of the towers which I must say looked excellent they were very modern and to a very high quality.

So thanks to everybody at Wind for once again taking time out to meet with me.
On the subject of end date as I know that is a big subject on here, Dr Azizi mentioned that the company was reluctent to issue a new date due to the negativity that this may reignite but the feeling I got was that 2009 was the target, however looking at other towers in Dubai each year I have been, this date seems a little optamistic.

mouss28
July 14th, 2008, 05:57 PM
Dear all,

Wants to sale my studio in wind towers1
detail: 475sqft, sea and landscape view, parking included, furnished, 14 th floor .
original price: 291,487 aed
paid: 150,000
630 00 aed ferm
ps: only serious buyer

contact at : mbenia@dubaifrance.com

abf
July 15th, 2008, 02:55 PM
Hi WSP (or JBA) do you have the contact details please for the contact at Wind as I know Ms Askari has left but I want to make sure an e-mail I need to send gets to the correct person...thanks.

Is that the reason there has been little input from Windspokesperson ie that she was the spokesperson?

nexlite
July 15th, 2008, 05:12 PM
If anyone wants one bed apartment in Dubai Lagoon ,pls PM or write to ibkiss@lycos.co.uk .
663 sq ft & car park included in phase 1 .

bongo2202
July 15th, 2008, 09:54 PM
Is that the reason there has been little input from Windspokesperson ie that she was the spokesperson?

To be fair I'm not sure they were the same person, I think Ms Askari used to provide some info to be posted but not sure she posted though

Property Queen
July 19th, 2008, 03:32 PM
I was in Dubai during the end of June and visited an ex-university friend who lives in the Springs. The progress of Wind is very promising. If they were working at this pace two years ago then everybody would have been happy.

Any how, if they continue at this pace they should be ready in 18 months time for handover. Therefore, the first quarter of 2010 is a realistic date for moving in

My only concern is that there is a clause which states that if the project is not completed by the end of 2008 Wind can give you your original money back and cancel your apartment. Have you all received firm reassurances that in 6 months time this will not happen? I hope they will not but unless it is in writing then a contract is a contract.

Wind Spokesperson
July 19th, 2008, 04:55 PM
wind I

http://www.farayand.ae/Wind%20Photo/080710-w1-1.JPG

http://www.farayand.ae/Wind%20Photo/080709-w1-2.JPG

http://www.farayand.ae/Wind%20Photo/080710-w1-1.JPG

Wind II

http://www.farayand.ae/Wind%20Photo/080707-w2-1.JPG

http://www.farayand.ae/Wind%20Photo/080707-w2-2.JPG

http://www.farayand.ae/Wind%20Photo/080709-w2-1.JPG

http://www.farayand.ae/Wind%20Photo/080713-w2-1.JPG

http://www.farayand.ae/Wind%20Photo/080715-w2-1.JPG

Wind Spokesperson
July 19th, 2008, 04:59 PM
Wind 1

http://www.farayand.ae/Wind%20Photo/080715-w1-1.JPG

http://www.farayand.ae/Wind%20Photo/080719-w1-1.JPG

Wind 2

http://www.farayand.ae/Wind%20Photo/080715-w2-2.JPG

http://www.farayand.ae/Wind%20Photo/080716-w2-2.JPG

bongo2202
July 19th, 2008, 06:35 PM
Is it possible to try and get some long view shots of the actual site please as so we can see the progress and if possible respond to Propert Queens note above (or send me an e-mail) thanks

jba
July 19th, 2008, 08:48 PM
WSP, thanks for the updates.

When will the next slab casting be on Wind 1 and 2?

Also could you inform us if there is a problem with the web cams?

Cheers .

PQ could you please inform us were this new clause came from?

Morrismarina
July 19th, 2008, 09:17 PM
I was in Dubai during the end of June and visited an ex-university friend who lives in the Springs. The progress of Wind is very promising. If they were working at this pace two years ago then everybody would have been happy.

Any how, if they continue at this pace they should be ready in 18 months time for handover. Therefore, the first quarter of 2010 is a realistic date for moving in

My only concern is that there is a clause which states that if the project is not completed by the end of 2008 Wind can give you your original money back and cancel your apartment. Have you all received firm reassurances that in 6 months time this will not happen? I hope they will not but unless it is in writing then a contract is a contract.

There are a lot of contracts with this type of clause in them. My contracts with Select Property (Torch and Bay Central) have the same. It's more to protect the developer but as you say a contract is a contract. I doubt very much any developer would try to enforce this clause unless they had very good reason and simply trying to cancel apartments and sell them at a much higher price would not be one of them. RERA would certainly prevent this happening. There really is nothing at all to worry about here. :cheers:

BTW how are Wind prices doing ?? I would expect them to have increased substantially since this good pace of contruction started.

first timer
July 19th, 2008, 11:44 PM
I was in Dubai during the end of June and visited an ex-university friend who lives in the Springs. The progress of Wind is very promising. If they were working at this pace two years ago then everybody would have been happy.

Any how, if they continue at this pace they should be ready in 18 months time for handover. Therefore, the first quarter of 2010 is a realistic date for moving in

My only concern is that there is a clause which states that if the project is not completed by the end of 2008 Wind can give you your original money back and cancel your apartment. Have you all received firm reassurances that in 6 months time this will not happen? I hope they will not but unless it is in writing then a contract is a contract.


Thanks PQ for your first ever positive post, I trust you still have your apartment within Wind?

I have spoken to the DMCC and also a solicitor in Dubai who both confirm the law and times have changed since the original contracts where written and I was assured that this wont be a concern.

The clause is more in the event that the site could not be started for some reasons.
RERA would not allow this type of behaviour these days, Dubai at last is starting to get the legal system into some type of order and give buyers the reassurances that one would exspect from a modern country.

Lets not go back to being negative and move forward on positive matters.
:banana:

jba
July 21st, 2008, 07:17 AM
There has been new videos posted by the WSP on you tube (thanks WSP). In one of them an engineer talks about the core rising and the different techniques they will now carry out for renforcment and slab casting.
WSP, could you give us any more info on the next stages please?

Cheers.

Wind Spokesperson
July 21st, 2008, 09:06 AM
Wind 2 20080720

http://www.farayand.ae/Wind%20Photo/080720-w2-01.JPG

http://www.farayand.ae/Wind%20Photo/080720-w2-02.JPG

http://www.farayand.ae/Wind%20Photo/080720-w2-03.JPG

http://www.farayand.ae/Wind%20Photo/080720-w2-04.JPG

jba
July 24th, 2008, 11:38 AM
WSP, whats up with the webcams??????

Also any idea when the next castings will be? its been a while now?

Wind Spokesperson
July 24th, 2008, 02:25 PM
Wind Tower 1

http://www.farayand.ae/Wind%20Photo/080723-w1-01.JPG

http://www.farayand.ae/Wind%20Photo/080723-w1-02.JPG

Wind Tower 2

http://www.farayand.ae/Wind%20Photo/080722-W2-01.JPG

http://www.farayand.ae/Wind%20Photo/080722-w2-02.JPG

http://www.farayand.ae/Wind%20Photo/080722-w2-03.JPG

http://www.farayand.ae/Wind%20Photo/080722-w2-04.JPG

http://www.farayand.ae/Wind%20Photo/080722-W2-05.JPG

jba
July 26th, 2008, 11:12 AM
WSP, any chance of informing us what the problem is with the web cams that haven't worked for a long time now?

Wind Spokesperson
July 26th, 2008, 11:16 AM
Wind 1

http://www.farayand.ae/Wind%20Photo/080724-w1-01.JPG

http://www.farayand.ae/Wind%20Photo/080724-w1-02.JPG

http://www.farayand.ae/Wind%20Photo/080726-w1-01.JPG

Wind 2

http://www.farayand.ae/Wind%20Photo/080726-w2-01.JPG

Wind Spokesperson
July 26th, 2008, 01:14 PM
Wind 2

http://www.farayand.ae/Wind%20Photo/080726-w2-02.JPG

http://www.farayand.ae/Wind%20Photo/080726-w2-03.JPG

http://www.farayand.ae/Wind%20Photo/080726-w2-04.JPG

jba
July 26th, 2008, 04:08 PM
Could you please give a breif explanation of the works that is going on at the moment?
It looks like they are building the cores up. How long till the next slab castings?
and one more time, any news on the webcams???

Cheers.

malec
July 28th, 2008, 11:51 AM
Guys no adverts please. For that use www.totallyproperty.com, or private messaging.
They have a good dubai section for investors.

GOL2007
July 29th, 2008, 12:44 PM
http://www.farayand.ae/Wind%20Photo/080722-W2-05.JPG

Hey WSP, you should tell your workers they can't pour the concrete like this. When it falls more than 1 meter it unmixes itself! ;)

Wind Spokesperson
July 29th, 2008, 04:07 PM
Wind Tower I
http://farayand.ae/Wind Photo/080724-w1-1.JPG

http://farayand.ae/Wind Photo/080724-w1-2.JPG

http://farayand.ae/Wind Photo/080727-w1-1.JPG

http://farayand.ae/Wind Photo/080728-w1-1.JPG

Wind Tower II

http://farayand.ae/Wind Photo/080724-w2-1.JPG

http://farayand.ae/Wind Photo/080724-w2-2.JPG

http://farayand.ae/Wind Photo/080726-w2-1.JPG

http://farayand.ae/Wind Photo/080726-w2-2.JPG

http://farayand.ae/Wind Photo/080726-w2-3.JPG

http://farayand.ae/Wind Photo/080726-w2-4.JPG

Corewall Casting - Level 1st to 2nd

http://farayand.ae/Wind Photo/080726-w2-5.JPG

http://farayand.ae/Wind Photo/080726-w2-6.JPG

Wind Spokesperson
July 29th, 2008, 04:36 PM
Regarding the webcam disconnections,
We are setting up a new connection system for the webcams at the Wind Towers site. This new connections will greatly reduce the interruptions during the video feed.
We had problems with the metro system blocking our WAN signals.


Hey WSP, you should tell your workers they can't pour the concrete like this. When it falls more than 1 meter it unmixes itself! ;)


Thank you for your observation. You are correct.
We had some difficulties reaching that part of the site with the pump for concrete casting.
During the casting, we had several vibrator machines, and level compacting systems to deal with the mentioned problem.
We are currently working on new central concrete casting pumps that will be fixed on the third floor, and can greatly help us deal with the distance difficulties during future concrete castings.

jba
July 29th, 2008, 09:24 PM
Thanks WSP for the updates and the explanation about the web cams.
Its good to hear about the concrete pumps. When do you think the next slabs will be poured?

Thanks again.

Wind Spokesperson
July 30th, 2008, 07:50 AM
We are working 24 hours daily non-stop, in order to finish the concrete casting of Wind II for the first floor. The core wall has already been completed.

We had some delays in Wind Tower I, since our Spanish team responsible for the interior design of the tower requested some changes. They wanted a new set of stairs so that the restaurant doesn't share an entrance with the lobby. They also requested some changes in the openings of the elevator. Concrete casting started right after the confirmation by JAFZA, the core wall is now finished.
From the second floor, we will use the 'DOKA' system. This will greatly increase our construction speed.

Wind Spokesperson
July 30th, 2008, 08:21 AM
http://ftp.farayand

Wind Spokesperson
July 30th, 2008, 05:03 PM
Wind Tower I

http://farayand.ae/Wind%20Photo/080730-W1-1.JPG

Wind Tower II

http://farayand.ae/Wind%20Photo/080730-W2-1.JPG

Wind Spokesperson
August 1st, 2008, 12:19 AM
Video Report From Wind Towers - 2008-07-26

fB9JG_ZQK4k

Wind Spokesperson
August 3rd, 2008, 09:01 AM
QqU60sx4Ukk

Wind Spokesperson
August 3rd, 2008, 12:10 PM
2nd August 2008

LKx-Gwh7vFc

Wind Spokesperson
August 4th, 2008, 08:42 AM
http://farayand.ae/Wind%20Photo/080802-W%20I-I.JPG

http://farayand.ae/Wind%20Photo/080802-W%20I-2.JPG

Wind Spokesperson
August 4th, 2008, 05:12 PM
Wind Tower I
http://farayand.ae/Wind Photo/080802-W1-2.JPG

http://farayand.ae/Wind Photo/080802-W1-1.JPG

Wind Tower II
http://farayand.ae/Wind Photo/080802-W2-1.JPG

http://farayand.ae/Wind Photo/080802-W2-2.JPG

jba
August 4th, 2008, 05:54 PM
Hi WSP, Thanks for all the updates when is the slab for first floor Wind 2 due to be poured?

Cheers.

first timer
August 4th, 2008, 07:27 PM
Steady progress being shown

I assume that the crane will now help speed up construction now your starting to build floors?

Thank you Wind for the numerous photos and updates, it is appreciated.

Wind Spokesperson
August 5th, 2008, 01:54 PM
Wind Tower II
A new tower crane is being assembled and prepared to help out with the construction.

gzmBhAmSTV0&hl

Wind Spokesperson
August 5th, 2008, 03:30 PM
Hi WSP, Thanks for all the updates when is the slab for first floor Wind 2 due to be poured?

Cheers.

The concrete casting for slab of Wind Tower II has already started.

Wind Spokesperson
August 5th, 2008, 03:36 PM
The slab of First Floor in Wind Tower II was completed last night.

Wind Spokesperson
August 5th, 2008, 04:15 PM
Wind Tower I

http://farayand.ae/Wind%20Photo/080805-w1-1.JPG

Wind Tower II
First level slab casting

http://farayand.ae/Wind%20Photo/080805-w2-1.JPG

jba
August 5th, 2008, 06:39 PM
The slab of First Floor in Wind Tower II was completed last night.

Cheers, I also noticed on the web cam this morning:cheers:

scoot68
August 6th, 2008, 01:02 PM
:applause:

Wind Spokesperson
August 7th, 2008, 09:18 AM
Wind II

http://farayand.ae/Wind%20Photo/080806-W2-3.JPG

http://farayand.ae/Wind%20Photo/080805-W2-2.JPG

jba
August 7th, 2008, 09:37 PM
Both web cams are working at the moment. It looks like they have moved the web cam on wind 1 to the new crane. The sites are taking shape as you can see from the pictures the WSP has posted. The Wind website also has a new feature with a diagram of the buildings showing progress which is a very good idea. It also has updates and explanations which is good.

Wind Spokesperson
August 8th, 2008, 02:38 PM
We are still working on the new pages in the website. They are to be completed soon.
We will be able to bring you up to date news and also panoramic pictures of the buildings.

Wind Spokesperson
August 9th, 2008, 11:11 AM
Wind I

http://farayand.ae/Wind%20Photo/080809-W1-1.JPG

Wind II

http://farayand.ae/Wind%20Photo/080809-W2-1.JPG

jba
August 9th, 2008, 04:23 PM
Thanks WSP for the updates. The level of communication from Wind is excellent. :cheers:

Both Webcams are now working also.:banana:

Wind Spokesperson
August 9th, 2008, 08:41 PM
Wind

Wind Spokesperson
August 10th, 2008, 05:41 PM
Wind II

http://www.farayand.ae/Wind%20Photo/080809-w2-2.JPG

http://www.farayand.ae/Wind%20Photo/080809-w2-1.JPG

Wind I

http://www.farayand.ae/Wind%20Photo/080809-w1-1.JPG

jba
August 13th, 2008, 02:46 PM
On Wind 2 the slab for the first floor was cast in the first week of August and then the walls were cast a couple of days later, now looking at the web cam it seems the steel work for the second floor is in progress.
My point being this is a significant increase in construction speed as previously it was around 1 month from floor to floor.
WSP, when will the DOKA system start being used on Wind 1 & 2? also when is the concrete pump be placed in the core?

Then what kind of timescale will it be from floor to floor?

Cheers.

p.s the new addition to the web site is very helpful. Thanks.

Wind Spokesperson
August 13th, 2008, 03:49 PM
The DOKA system is planned to be used from the second floor.
The concrete pump is planned to be fixed from the third floor.

Our plans are to have a maximum time limit of 10 days per floor.
This means that we can hopefully be expecting some changes in the construction speed within 30 days.

Progress of Wind I is behind Wind II since we had some changes in the design and an addition of new stairs for the restaurant.


TleNPyBcFDI

Wind Spokesperson
August 13th, 2008, 05:12 PM
In our website, you might sometimes see that the pictures are not updated.
Try a full refresh once in a while, there have been times when the internet browser uses the computer's previous data to bring up the webpage.
We are currently trying to find a way to fix this problem.

Wind Spokesperson
August 14th, 2008, 07:47 AM
Wind Tower II

http://www.farayand.ae/Wind Photo/080813-W2-4 (1).JPG

Wind Spokesperson
August 14th, 2008, 03:44 PM
Wind Tower I:

We are currently waiting for JAFZA to make an inspection of the slab of the first floor. In case of approval and concrete availability, we will be able to do the concrete casting for slab of first floor tonight. We are currently doing the plasterwork and blockwork in the basements. The staircase system for the basement is under construction; each part is either at steelwork, formwork or casting stage.



Wind Tower II:

Formwork and steel fixing is in progress for slab of First Floor. Plasterwork and Blockwork is in progress for basements B2 & B3. Stair cases for basement levels are in progress; each part is either at the Steelwork, formwork or casting stage.

jba
August 14th, 2008, 04:59 PM
Wind Tower I:

We are currently waiting for JAFZA to make an inspection of the slab of the first floor. In case of approval and concrete availability, we will be able to do the concrete casting for slab of first floor tonight. We are currently doing the plasterwork and blockwork in the basements. The staircase system for the basement is under construction; each part is either at steelwork, formwork or casting stage.



Wind Tower II:

Formwork and steel fixing is in progress for slab of First Floor. Plasterwork and Blockwork is in progress for basements B2 & B3. Stair cases for basement levels are in progress; each part is either at the Steelwork, formwork or casting stage.

Thanks for the information. On Wind 2 I thought that the first floor was on level with the top of the parking ramp and was complete, thinking we were on the second floor, it looks like that on the pictures? or was I mistaken ?:nuts:

Wind Spokesperson
August 17th, 2008, 07:32 AM
The floor that is on the same level as the top parking is the ground floor. The floor above that is the first floor.

Wind Spokesperson
August 17th, 2008, 09:30 AM
Wind Tower I

17th of August 2008
Slab of first floor is awaiting JAFZA approval. The corewall and vertical elements from the first floor to second floor are in progress.




Wind Tower II

17th of August 2008
The new concrete pump has been installed. The steelwork for slab of second floor is in progress. The basements are in blockwork and plasterwork stages.

GOL2007
August 17th, 2008, 10:09 AM
WSP,
thanx for your regular updates, keep them coming.

I have a question... why do you need JAFZA approval of the first floor slab? Didn't you hand in a final design and got a building permit? What are they going to approve now?
What's the procedure at Jumeirah Lake Towers anyway... I always get confused with the procedures in the different free zones and their authorities... JAFZA is Final Design approval only, right? You don't need a Preliminary Design approval like at DSOA?

Eh, sorry this was more than one question... :D

Wind Spokesperson
August 17th, 2008, 11:50 AM
Let me make it short for you, we need JAFZA approval to build and to move up floors.

Here is the process in short:
We make a final design and hand it to JAFZA, they approve it, then we build it, then JAFZA inspectors have to be called. JAFZA inspectors arrive and check what we build and compare it to the final design that we submitted before construction, if everything is ok, we move on. If inspectors see any difference between design and construction, they disapprove and the construction has to be corrected and JAFZA called again.

This is how things are going in that area with our towers.

first timer
August 17th, 2008, 02:19 PM
It appears that the above process as stated by WSP is simular to the UK.
First the you obtain building regulations approval which states how and what materials are to be used and then a building inspector has to visit throughout the build to ensure you are building as per the building regulations.

Once the build is finished and has been build as per the building regulations then a final building regulation completion certificate is issued signing off the build.

This is the best route and it ensures that developers do not take short cuts in the construction which would be hidden if not checked at regular interviews.

GOL2007
August 17th, 2008, 04:18 PM
It's no surprise that building regulations are like in the UK. Most of the consultants are british and a lot of regulatory guidelines were taken from UK also.

But most of the Authorities in Dubai are a pain the ass, I guess WSP can tell you a thing or two about it... :lol:

first timer
August 17th, 2008, 04:38 PM
It's no surprise that building regulations are like in the UK. Most of the consultants are british and a lot of regulatory guidelines were taken from UK also.

But most of the Authorities in Dubai are a pain the ass, I guess WSP can tell you a thing or two about it... :lol:


I develop property in the UK and the building inspectors here im sure are even more of a pain in the ass.

They approve plans and then change their minds half way into a scheme, introduce sprinker systems and extra safety nonsense,
You do your development budgets and then they mean nothing due to a prissy inspector.

:nuts:

Wind Spokesperson
August 18th, 2008, 12:29 PM
http://www.farayand.ae/Wind Photo/080816-W2-2.JPG

http://www.farayand.ae/Wind Photo/080817-W2-1.JPG

Wind Spokesperson
August 19th, 2008, 03:30 PM
New Video Reports From Wind Towers I & II

V9glI3SEHIs

KYI1foky9rE

Wind Spokesperson
August 19th, 2008, 05:43 PM
Wind Tower I,
Slab of level 13.25DMD is approved by JAFZA. Concrete casting is planned for tonight at 10PM UAE Time(GMT+4). You can watch it on our webcam.
A total of 15,000(estimate) cubic meters of concrete has been used for Wind I since Parking level B6.
Core Vertical elements steel fixing from 17.21DMD to 20.17DMD is in progress.
Core Vertical Elements concrete casting from 13.25DMD to 17.21DMD is completed.

Wind II,
Formwork for slab of 16.89DMD is completed. Vertical elements 16.89DMD to 20.40DMD is completed.
Concrete casting of 16.89DMD is planned for Wednesday 20th of August.

jba
August 19th, 2008, 07:22 PM
Thanks WSP for the updates and the info. If the slab casting on wind 2 takes place tomorrow then there is a significant increase in speed between floors as the last slab was poured 2 weeks ago.
So things are speeding up. :banana:

Wind Spokesperson
August 20th, 2008, 10:01 AM
Wind I,
The concrete casting for Slab of level 13.25DMD was delayed last night, we have reserved the concrete for today 20th of August, 6 PM UAE Time. Hopefully we would be able to finish the slab.

jba
August 20th, 2008, 04:36 PM
Wind I,
The concrete casting for Slab of level 13.25DMD was delayed last night, we have reserved the concrete for today 20th of August, 6 PM UAE Time. Hopefully we would be able to finish the slab.

Will Wind 2 be cast today?

Wind Spokesperson
August 20th, 2008, 04:52 PM
http://www.farayand.ae/Wind Photo/080820_1_1.JPG

http://www.farayand.ae/Wind Photo/080820_2_1.JPG

http://www.farayand.ae/Wind Photo/080820_2_2.JPG

http://www.farayand.ae/Wind Photo/080820_2_3.JPG

Wind Spokesperson
August 20th, 2008, 04:56 PM
Will Wind 2 be cast today?

Concrete casting is planned at around 8 PM UAE time, today 20th of August.

jba
August 20th, 2008, 04:57 PM
Concrete casting is planned at around 8 PM UAE time, today 20th of August.

Cheers :cheers:

Wind Spokesperson
August 21st, 2008, 12:46 PM
Wind I,
Casting of 13.25DMD was completed today 8:00 AM. Formwork of vertical elements will start tonight, as planned.

Wind II,
Slab of 16.89DMD is awaiting JAFZA approval. When approved, we will have a concrete casting tonight.

Wind Spokesperson
August 24th, 2008, 08:25 AM
Concrete Casting of Wind II on 21st of August

http://www.farayand.ae/Wind%20Photo/080821_W2_01.JPG

http://www.farayand.ae/Wind%20Photo/080821_W2_02.JPG

http://www.farayand.ae/Wind%20Photo/080821_W2_03.JPG

http://www.farayand.ae/Wind%20Photo/080821_W2_04.JPG

http://www.farayand.ae/Wind%20Photo/080821_W2_05.JPG

http://www.farayand.ae/Wind%20Photo/080821_W2_06.JPG

http://www.farayand.ae/Wind%20Photo/080821_W2_07.JPG

http://www.farayand.ae/Wind%20Photo/080821_W2_08.JPG

http://www.farayand.ae/Wind%20Photo/080821_W2_09.JPG

http://www.farayand.ae/Wind%20Photo/080821_W2_10.JPG

After the Casting

http://www.farayand.ae/Wind%20Photo/080821_W2_11.JPG

jba
August 24th, 2008, 11:14 AM
Thanks for the updates. Will they be using the ne system (DOKA) from here on????

Wind Spokesperson
August 25th, 2008, 02:04 PM
We have already made the purchase orders for the DOKA system.
Hopefully, the materials and the equipment will arrive on Wind Tower II by next week.

Imre
August 26th, 2008, 06:28 AM
We have already made the purchase orders for the DOKA system.
Hopefully, the materials and the equipment will arrive on Wind Tower II by next week.

How many workers at the Wind 1 and 2 site now?

What is the expected handover date?

Wind Spokesperson
August 26th, 2008, 09:55 AM
We have approximately a total of 300 labourers working on Wind Towers at all times.

Imre
August 30th, 2008, 12:46 PM
29/Aug/2008

Wind Tower 1-2

http://img294.imageshack.us/img294/5419/imresolt212ka1.jpg (http://imageshack.us)

http://img165.imageshack.us/img165/241/imresolt216yr3.jpg (http://imageshack.us)

Wind Spokesperson
August 31st, 2008, 07:35 AM
30th of August 2008

http://www.farayand.ae/Wind%20Photo/080830_2_1.JPG

http://www.farayand.ae/Wind%20Photo/080830_2_2.JPG

Wind Spokesperson
September 2nd, 2008, 07:18 AM
Wind I
http://www.farayand.ae/Wind%20Photo/080831-W2-1.JPG

Wind II
http://www.farayand.ae/Wind%20Photo/080901-W1-1.JPG

http://www.farayand.ae/Wind%20Photo/080901-W1-2.JPG

VineLLo
September 2nd, 2008, 09:13 PM
Needs at least 2 years for the completion...I guess!

Wind Spokesperson
September 3rd, 2008, 08:23 AM
The DOKA system, equipment and materials have arrived on the Wind Tower II site.

http://www.farayand.ae/Wind%20Photo/080902_Doka_WindII.jpg



Wind Tower II

http://www.farayand.ae/Wind%20Photo/080902_2_1.JPG

http://www.farayand.ae/Wind%20Photo/080902_2_2.JPG

http://www.farayand.ae/Wind%20Photo/080902_2_3.JPG

http://www.farayand.ae/Wind%20Photo/080902_2_4.JPG

http://www.farayand.ae/Wind%20Photo/080902_2_5.JPG

http://www.farayand.ae/Wind%20Photo/080902_2_6.JPG

http://www.farayand.ae/Wind%20Photo/080902_2_7.JPG

http://www.farayand.ae/Wind%20Photo/080902_2_8.JPG



Wind Tower I

http://www.farayand.ae/Wind%20Photo/080902_1_1.jpg

http://www.farayand.ae/Wind%20Photo/080902_1_2.jpg

http://www.farayand.ae/Wind%20Photo/080902_1_3.jpg

http://www.farayand.ae/Wind%20Photo/080902_1_4.jpg

bongo2202
September 3rd, 2008, 01:56 PM
Okay I will ask the stupid question, what is the Doka system and what benefits does it bring to the project, thanks.

Wind Spokesperson
September 3rd, 2008, 09:58 PM
You can see the explanations we already gave on the posts below, and hopefully more explanations that we will give in the future, to get more information on the DOKA formwork system.

jba
September 3rd, 2008, 10:03 PM
you can take out the time for the core wall from the slabs . min 5 days

So with this new system, how long do you expect it to take from floor to floor?

Wind Spokesperson
September 4th, 2008, 07:57 AM
The DOKA system is a slab formwork system.
This will replace the traditional formwork for each slab.

The DOKA equipment and materials have arrived on site for Wind Tower II, they are currently being used for slab of level 20.40 DMD.
According to our engineers at Wind Tower II, the formwork of slab 20.40 will be finished by approximately Tuesday 9th of September.

After using the DOKA formwork for the first time, the progress for the following slabs will speed up. This is because the first time this system is being used, certain parts have to be built.

We will hopefully see an increase in progress speed of Wind Tower II in the following weeks.

Tow
September 4th, 2008, 11:02 AM
Is Wind 1 getting the same system and if so when will it be arriving?

Wind Spokesperson
September 4th, 2008, 02:25 PM
Wind Tower I


http://www.farayand.ae/Wind%20Photo/080904_1_1.JPG

http://www.farayand.ae/Wind%20Photo/080904_1_2.JPG

http://www.farayand.ae/Wind%20Photo/080904_1_3.JPG

http://www.farayand.ae/Wind%20Photo/080904_1_4.JPG


Wind Tower II


http://www.farayand.ae/Wind%20Photo/080904_2_1.JPG

http://www.farayand.ae/Wind%20Photo/080904_2_2.JPG

http://www.farayand.ae/Wind%20Photo/080904_2_3.JPG

http://www.farayand.ae/Wind%20Photo/080904_2_4.JPG

Wind Spokesperson
September 4th, 2008, 04:03 PM
Is Wind 1 getting the same system and if so when will it be arriving?

Wind 1 is planned to have the same system as well. We are waiting for the current slab to be completed before bringing the equipment and materials to site. Hopefully, everything would be set up by the next few days for the new system.

jba
September 4th, 2008, 05:20 PM
Thanks for the info :)

If you look at the last picture posted you can clearly see how close the metro station is to the Wind buildings :cheers:

no denying the location is spot on!

Wind Spokesperson
September 4th, 2008, 05:33 PM
For our basement floors, where there was some steepness for the parkings, we used the caplock system.
The flatbed system is a system used for normal slabs. They require multiple parts to be fixed together in order to finish each slab. It was the traditional way of using beams and fixing the pieces together. It took about 2 to 3 weeks for each slab to be completed.

Our company decided to invest in the new DOKA formwork system to increase the speed of construction.
The DOKA system is a reusable plate by plate system. We build the formwork once, after the casting we can remove and move the formwork to higher levels to be re-used with little inconvenience. No time-consuming disassembly and re-assembly is required for the main formwork.

Wind Spokesperson
September 7th, 2008, 05:20 PM
Wind Tower I

http://www.farayand.ae/Wind%20Photo/080907_1_1.JPG

http://www.farayand.ae/Wind%20Photo/080907_1_2.JPG

http://www.farayand.ae/Wind%20Photo/080907_1_3.jpg

http://www.farayand.ae/Wind%20Photo/080907_1_4.jpg

http://www.farayand.ae/Wind%20Photo/080907_1_5.jpg

http://www.farayand.ae/Wind%20Photo/080907_1_6.jpg



Wind Tower II

http://www.farayand.ae/Wind%20Photo/080907_2_1.JPG

http://www.farayand.ae/Wind%20Photo/080907_2_2.JPG

http://www.farayand.ae/Wind%20Photo/080907_2_3.JPG

http://www.farayand.ae/Wind%20Photo/080907_2_4.JPG

http://www.farayand.ae/Wind%20Photo/080907_2_5.JPG

http://www.farayand.ae/Wind%20Photo/080907_2_6.JPG

Wind Spokesperson
September 9th, 2008, 11:36 PM
Latest Pictures From Wind Towers

http://www.farayand.ae/Wind%20Photo/080909_1.JPG

http://www.farayand.ae/Wind%20Photo/080909_2.JPG

http://www.farayand.ae/Wind%20Photo/080909_3.JPG

http://www.farayand.ae/Wind%20Photo/080909_4.JPG

http://www.farayand.ae/Wind%20Photo/080909_5.JPG

http://www.farayand.ae/Wind%20Photo/080909_6.jpg

jba
September 10th, 2008, 02:07 AM
Thanks for the update. How is the DOKA system going?

Wind Spokesperson
September 10th, 2008, 09:40 AM
Thanks for the update. How is the DOKA system going?

In Wind II, the DOKA system has already been set up for level 20.40 DMD. The parts are being put together as well for level 23.41 DMD.
We make the parts ready for 2 slabs, from there on, we will use the parts already made for other slabs.

In Wind I, the engineers are still finishing up the required works before starting with the DOKA system, they will be using it very soon.

Wind Spokesperson
September 11th, 2008, 08:19 AM
Wind Towers I and II Through Panoramic Pictures

jrUSLrEO5Gw



Wind Towers I and II Through Panoramic Pictures

jrUSLrEO5Gw

MT1bKvJtBpk

jba
September 13th, 2008, 11:38 AM
Any news on when the slab will be cast for Wind 2?

jba
September 15th, 2008, 07:09 AM
When will the next floor be cast at Wind 2? Will still seem a long way from one floor per week?

first timer
September 15th, 2008, 11:05 PM
error

abf
September 18th, 2008, 01:17 PM
Hi everyone on the forum
It has been good to see photos and updates etc but there is a request for WSP:
a person like me in not very technical. All I want to see from time to time is the progress and in terms of photos it would be far more helpful if the pictures are panoramic/long shots so that the progress can be visible to non technical people. This is without any prejudice to friends on the forum who have the technical knowledge and want to know about the engineering aspects
Thanks

aidy
September 18th, 2008, 04:11 PM
^^ Have a look at the thread for New Dubai Gate 2, posts 64/65 nice long shots of wind towers, mostly shows tower 2

Wind Spokesperson
September 20th, 2008, 07:25 PM
Hi everyone on the forum
It has been good to see photos and updates etc but there is a request for WSP:
a person like me in not very technical. All I want to see from time to time is the progress and in terms of photos it would be far more helpful if the pictures are panoramic/long shots so that the progress can be visible to non technical people. This is without any prejudice to friends on the forum who have the technical knowledge and want to know about the engineering aspects
Thanks


Dear Sir/Madam,
You can visit our website where we keep a gallery of pictures and videos regarding our progress.

I hope that our website will provide you with a solution.

http://www.windtowers.net/windTowerI_home.htm

http://www.windtowers.net/windTowerII_home.htm

jba
September 20th, 2008, 08:08 PM
The website has good panoramic pictures on. Also there is many new videos on you tube which is very good!

WSP, when will the next slab be cast on Wind 2 ? Also are you guys finding it slower due to ramadan? Getting the site inspected and passed so you can proceed?

rudeboy
September 20th, 2008, 09:43 PM
The website has good panoramic pictures on. Also there is many new videos on you tube which is very good!

WSP, when will the next slab be cast on Wind 2 ? Also are you guys finding it slower due to ramadan? Getting the site inspected and passed so you can proceed?


who inspects the site? how does it work?

first timer
September 20th, 2008, 10:02 PM
Thank you for your continued updates, pictures and communications, a great deal of progress has been made other the last six months

HOWEVER

1) Do you think it is fair to now confirm that completion is impossible for December 2008?
2) What are the proposals in relation to completion and the DMCC contract obligations?

I think these are valid questions and I think it is reasonable for you to be open and honest in relation to this situation.

Wind certainly will not be the only Tower not to have made this completion date, indeed DMCC will be delayed also and there are several developments behind Wind.

Your answer and confirmation would be appreciated

Thank You

Wind Spokesperson
September 21st, 2008, 02:59 PM
who inspects the site? how does it work?

JAFZA inspects the site.
First, we send them our plans for them to approve, after approval we are authorized to build it.
When we are done it, JAFZA sends an inspector to inspect each floor. When the inspector approves our construction, we will be able to move on to the next floor.


To:
First timer,
We will try to answer your questions as soon as possible.

SUR
September 21st, 2008, 05:26 PM
It seems some of the purchasers of Goldcrest Views are taking legal action for compensation because their development was a mere 14 months late. With Wind now estimated to be around 32 months late I think if a group of us got together there is a very high chance of success for getting compensation. See this link:

http://www.dubaipropertyclaims.com/goldcrest-views-late-delivery-t10.html

jba
September 21st, 2008, 07:04 PM
Bloody Hell! Blast from the past!^^

jba
September 22nd, 2008, 09:40 AM
WSP,

Any news on slab casting?

At the moment it is approx 1 month per floor, when do you think this will speed up? Will it be possible to hit 1 floor per week?

Thanks.

nas001
September 22nd, 2008, 10:04 AM
It seems some of the purchasers of Goldcrest Views are taking legal action for compensation because their development was a mere 14 months late. With Wind now estimated to be around 32 months late I think if a group of us got together there is a very high chance of success for getting compensation. See this link:

http://www.dubaipropertyclaims.com/goldcrest-views-late-delivery-t10.html


I am also taking legal action against DAMAC for late delivery of Lake View at JLT which is almost 2 years late (maybe more). If there are any other people in my situation, I would be happy to hear from them.

Wind Spokesperson
September 23rd, 2008, 12:42 PM
We were unable to post comments on the current issues due to connection problems with the SkyScraperCity website.

According to the official letter from DMCC, the completion date set for JLT, including the lake, is year 2010. A number of towers in JLT have a completion date set for year 2011.
There are a number of developers that are further behind their construction than Wind.

Any one of our customers, whose unit handover date has not been met according to their contract, may claim a full refund for their unit/s.

Our engineers at the Wind Towers site are currently working around the clock to make sure the towers are finished as soon as possible.

Crazy_Horse
September 23rd, 2008, 01:29 PM
We were unable to post comments on the current issues due to connection problems with the SkyScraperCity website.

According to the official letter from DMCC, the completion date set for JLT, including the lake, is year 2010. A number of towers in JLT have a completion date set for year 2011.
There are a large number of developers that are further behind their construction than Wind.

Any one of our customers, whose unit handover date has not been met according to their contract, may claim a full refund for their unit/s.

Our engineers at the Wind Towers site are currently working around the clock to make sure the towers are finished as soon as possible.

Oh well.... looks like we are on the same money trail again!!!

You guys can get down on your knees and beg for a completion date but you wont get one... if you do, it will be a joke! EVERYONE so far has been.

There we go again with the old chesnut "... may clim full refund for there units". WTF, you guys have to be kidding. This is what Wind really want! Which self respecting developers would ever say that to there investors who have finanaced the build??

Keep in mind the date which keeps getting mentioned .... "2010".

Name the "LARGE" number of developers further behing than Wind??? Please tell us so we can take solace in numbers.

Crazy_Horse
September 23rd, 2008, 01:30 PM
WSP,

Any news on slab casting?

At the moment it is approx 1 month per floor, when do you think this will speed up? Will it be possible to hit 1 floor per week?

Thanks.

1 floor a month!!?? Where did thatcome from? Its one floor every 4 years...

Crazy_Horse
September 23rd, 2008, 01:39 PM
Thank you for your continued updates, pictures and communications, a great deal of progress has been made other the last six months

HOWEVER

1) Do you think it is fair to now confirm that completion is impossible for December 2008?
2) What are the proposals in relation to completion and the DMCC contract obligations?

I think these are valid questions and I think it is reasonable for you to be open and honest in relation to this situation.

Wind certainly will not be the only Tower not to have made this completion date, indeed DMCC will be delayed also and there are several developments behind Wind.

Your answer and confirmation would be appreciated

Thank You

OK, i have handed this post over to a random 4 year old and here is the answer to your first question because you will NOT get an answer to this from WSP!

Unless Superman appears hand in hand with Wonder Woman and helps build the towers with the Wind guys, there is no chance of a December 2008 completion.

jba
September 23rd, 2008, 09:34 PM
He's back!

I thought he was dead!

jba
September 23rd, 2008, 09:40 PM
They seem to be pouring concrete on Wind 2 now, not sure if it's the slab?

They don't seem to be using the main pump, WSP is it broke?

SUR
September 24th, 2008, 01:41 PM
Any one of our customers, whose unit handover date has not been met according to their contract, may claim a full refund for their unit/s.

Stop being thick, I'm talking about compensation for the never-ending delay in completion NOT refund of units! If I wasn't soo busy I would begin the campaign to seek such compensation. If anyone else has time on their hands to coordinate such a campaign then I would be happy to pay my share of the costs towards any legal action.

It seems that the Iranian gangsters with Dr Azizi at the helm are back to playing their usual cat and mouse game hoping that everyone will believe them.

jba
September 24th, 2008, 02:14 PM
^^ Here we go again!

Wind Spokesperson
September 24th, 2008, 02:35 PM
They seem to be pouring concrete on Wind 2 now, not sure if it's the slab?

They don't seem to be using the main pump, WSP is it broke?


We were actually using the main pump, it is fully functional and working.
We are not able to use normal pumping vehicles at that level.

Wind Spokesperson
September 25th, 2008, 02:20 PM
Stop being thick, I'm talking about compensation for the never-ending delay in completion NOT refund of units! If I wasn't soo busy I would begin the campaign to seek such compensation. If anyone else has time on their hands to coordinate such a campaign then I would be happy to pay my share of the costs towards any legal action.

It seems that the Iranian gangsters with Dr Azizi at the helm are back to playing their usual cat and mouse game hoping that everyone will believe them.

We are happy to see you back on the forum.
Recently, due to rising costs of construction, about 150 projects have been canceled. Some other developers have requested assistance from their current investors to help them with the rising costs.
We invested in many projects ourselves, such as Palm Deira and Al Salam City, all we were told was to get a refund.
With the current prices, no developer would have been able to continue with the project.
All of our delays were justified, mostly they were due to change of regulations by JAFZA. Our first set of plans were disapproved due to changes in earthquake laws in JLT, and after we started construction JAFZA spent over 6 months inspecting our foundation. We are working in 3 shifts, day and night, while also buying the highest quality supplies, no matter the costs, in order to be able to finish these projects as soon as possible.

There is an Article in the Dubai laws and regulations, that gives the right to the developers to terminate their projects and give back their customers' money, if they have not finished their projects by the middle of 2009.

We have had customers calling us to see whether we are going to use the article or not!

Rest assured that we will never use that article, and we are trying to finish the towers by the middle of 2009.

Porcello
September 26th, 2008, 04:01 PM
At least, please stop insulting your customers. There's no way these towers can be completed in 9 months.
Can you please tell us exactly the number of the law that you are mentioning?

maltster
September 26th, 2008, 04:12 PM
OK, i have handed this post over to a random 4 year old and here is the answer to your first question because you will NOT get an answer to this from WSP!

Unless Superman appears hand in hand with Wonder Woman and helps build the towers with the Wind guys, there is no chance of a December 2008 completion.

:lol::hahaha:

SUR
September 26th, 2008, 07:22 PM
WSP: "All of our delays were justified, mostly they were due to change of regulations by JAFZA. Our first set of plans were disapproved due to changes in earthquake laws in JLT, and after we started construction JAFZA spent over 6 months inspecting our foundation. We are working in 3 shifts, day and night, while also buying the highest quality supplies, no matter the costs, in order to be able to finish these projects as soon as possible."

These images tell the lies that Wind are telling. None of their delays are justified. It's merely an attempt by Dr Azizi to keep this going on for as long as possible.
Seef tower is on Plot U i think.

http://img522.imageshack.us/img522/7533/iranianpromisesia1.gif (http://imageshack.us)

first timer
September 27th, 2008, 11:10 AM
I have just returned from Dubai and visited the site several times both during the day and night.

I spoke to numerous people both informally and formally at Wind.

I also spoke with officials who clarified JLT position on an informal basis.


Should investors like to enquire about my findings at Wind then I would welcome them to send me a PM for dialog.

Thanks

Wind Spokesperson
September 27th, 2008, 07:01 PM
Wind Tower I

http://www.farayand.ae/Wind%20Photo/080927-W1-2.jpg

http://www.farayand.ae/Wind%20Photo/080927-W1-1.jpg

http://www.farayand.ae/Wind%20Photo/080927-W1-3.jpg


Wind Tower II

http://www.farayand.ae/Wind%20Photo/080927-W2-3.jpg

http://www.farayand.ae/Wind%20Photo/080927-W2-1.jpg

http://www.farayand.ae/Wind%20Photo/080927-W2-2.jpg

Porcello
September 27th, 2008, 08:34 PM
Dear Wind Spokesperson, Can you please tell us exactly the number of the law in which there is the article that you were mentioning? Or shall I just assume that what you were saying was just a lie?

Thanks

Wind Spokesperson
September 28th, 2008, 05:25 PM
Those are very good pictures. We have already mentioned our reasons for delay multiple times, but it seems we need to revise the facts regarding our delays.
1. Our project is a multipurpose project, and it took us much longer than usual to be able to get a permit for the Towers.
2. We have loft floors in both towers, we had to get a permit for that too, and we had to wait for a year for loft permits while our site was ready to start work; every month that we waited we had to pay the contractors for water, electricity, mobilization of tower crane and construction machinery, and human resources including the engineering team, all while we were waiting for a permit.
3. We had to wait for another 6 months so that JAFZA and DMCC would accept our foundation.
4. In every stage that we had a permit, we did not hesitate to move on with the construction. And if there were any losses, it was to the developer.
The prices have been tripled since. Each Sq.Ft. of Wind Towers is now worth at about AED 1400, which means that anyone that has bought a unit from us, if willing to sell their units, will receive a high profit.
We were looking to increase the construction speed; therefore we paid extra money to the contractors to adapt new methods of formwork for slab. We also paid overtime to the contractors so that they would work 3 shifts a day, 24 hours non-stop. During the summer, we paid three times the original price of building materials so that we wouldn’t have to wait in a queue for steel and concrete. We paid the price of labor camps that have also tripled during the summer.
In general, those who are sitting on a branch during a storm and want to cut the branch they are sitting on, will fall before they do any damage to the trunk.
Since December, we have casted over 200,000 Sq.Ft. of slab in both Wind Towers.
Dozens of developers were rejected by Dubai Land Department during investigations and they were not allowed to open Escrow Accounts. We were audited by assigned auditors and it was proven that not even one dirham of any of our investors was in our own accounts.
I would like to bring a fact to the attention of our friends, that some people have been quite paranoid and delusional lately, while also being rude and offensive. Even though, we respond with patience and inform you of all the latest news and answer your inquiries. We are seriously glad to see users such as Sur have returned to the forum. Their responses and inquiries are some one the things that makes us happy.
We hope, that with the current investments made in formwork and work hours, and also purchase of new labor camps in order to be able to accommodate more workers for the site, we can be able to finish the project in year 2009. This is what we want and deeply wish to achieve.

Wind Spokesperson
September 28th, 2008, 05:28 PM
Dear Wind Spokesperson, Can you please tell us exactly the number of the law in which there is the article that you were mentioning? Or shall I just assume that what you were saying was just a lie?

Thanks

According to our contracts with our customers, that are agreed and also signed by Nakheel, there are two articles regarding the termination of the project and cancellation of units.

Article 14 of the contract

"
Default by the seller in delivery (other than Force Majeure)

Except for any delay caused by a Force Majeure event, if the Buyer has fulfilled all of the Buyer's obligations hereunder (including without limitation, the Buyer's obligations of payment hereunder) and the Completion Date does not occur by December 31, 2008, the Buyer may by a written notice to the Seller, terminate this Agreement. In such event, the Seller shall return the Previous Payments made by the Buyer within sixty (60) calendar days from the effective date of such termination with applicable Interest and any interest that has been paid by the Buyer and recieved by the Seller for late Total Price installment patments pursuant to the terms of this Agreement.

The Buyer agrees that such return of payments and Interest constitutes the Buyer's sole remedy in such circumstances and the Buyer forgoes any and all of the Buyer's rights to claim against the Seller for (and releases and discharges the Seller with respect to) any specific performance and any losses, damages, costs, taxes, levies, expenses or liabilities whatsoever.

"

Article 17 of the contract

"
Force Majeure

If the completion of the Project and/ or the Unit is delayed due to an event of Force Majeure, the Seller shall notify the Buyer of such delay as soon as practicable. The Buyer's payment obligations coming due during the event of Force Majeure and the Buyer's rights hereunder as well as the obligations of the Seller under his Agreement shall be suspended and postponed until the date the event of Force Majeure no longer exists as notified in writing by the Seller to the Buyer, at which time such obligations shall resume taking into account the Force Majeure delay.

If an event of Force Majeure delays the Completion Date beyond August 31, 2009, as determined by the Seller in its sole discretion, the Seller may terminate this Agreement by written notice to the Buyer. In the event of such termination of the Agreement, the Seller shall return all Previous Payments made by the Buyer on the effective date of termination without Interest and excluding any interest paid by the Buyer, and the Buyer agrees that it releases and discharges the Seller against any and all claims, losses, costs, taxrs, levies, expenses, damages and/or liabilities incurred, suffered ir that may be incurred or suffered by the Buyer as a result of such termination.
"


Please don't promote the idea that we are lying to you.
We are only responding to your inquiries and keeping you up to date as an act of kindness. We will not appreciate rudeness of some members.
Staff that are assigned to be WSP are the ones in training.
It trains us to be patient against rudeness, insults and offensive behavior.

Wind Spokesperson
September 28th, 2008, 05:31 PM
Wind Tower I

http://www.farayand.ae/Wind%20Photo/080928_1_1.JPG

http://www.farayand.ae/Wind%20Photo/080928_1_2.JPG

http://www.farayand.ae/Wind%20Photo/080928_1_3.JPG

http://www.farayand.ae/Wind%20Photo/080928_1_4.JPG


Wind Tower II

http://www.farayand.ae/Wind%20Photo/080928_2_1.JPG

http://www.farayand.ae/Wind%20Photo/080928_2_2.JPG

Wind Spokesperson
September 28th, 2008, 05:33 PM
We have concrete casting in both Wind I and Wind II.
Since webcam of Wind I is not working, you can watch the concrete casting of Wind I through Wind II webcam. We will move and zoom the camera on Wind Tower I.
Wind Tower II will have a casting of vertical elements.
Wind Tower I will have a casting of new slab.

SUR
September 28th, 2008, 05:42 PM
According to our contracts with our customers, that are agreed and also signed by Nakheel, there are two articles regarding the termination of the project and cancellation of units.

Article 14 of the contract
....
Article 17 of the contract
...


So basically there is NO law but something that exists only in the REVISED contracts which you are trying to force current owners to accept. What does that say about your company?

234sale
September 28th, 2008, 06:08 PM
Wind spokes person is doing a good job,, The project has come along way,, it also has a long way to go.

Keep the updates coming.

Porcello
September 28th, 2008, 09:47 PM
Dear Wind Spokesperson,

you said "There is an Article in the Dubai laws and regulations, that gives the right to the developers to terminate their projects and give back their customers' money, if they have not finished their projects by the middle of 2009."

According to your later post, the article you mentioned is not in the Dubai laws and regulations, but only in your contract.

Furthermore is obvious that the article applies only in case of force majeure, which must be notified as soon as practicable to all investors and ceases when the developer notifies in writing again all the investors. If you fail to do so while the conditions of force majeure exist, then you cannot use the same reasons later to call force majeure. So basically, you cannot enforce the article even in mid 2009 as the situation stands right now.

I don't see how I have been rude, since I was not accusing you to be a liar but I was giving you time to reply and justify your assertion which, at the end, proved to be incorrect, as a minimum. I hope in your good faith, of course.

Please don't spread rumors of false laws; what you said has been already seen into other threads worrying investors of JLT.

abf
September 28th, 2008, 11:20 PM
Out of interest has there been any instances where the developers have used similar clauses to cancel and if so what is the reaction from Dubai Govt?
WSP has been keeping good communication - the discussion on the forum should be constructive including criticism.
WSP what is the schedule and breakup of targets from here on?
Thanks

first timer
September 28th, 2008, 11:25 PM
Thank you WSP for your regular updates, the majority of investors appreciate your input so please do not take too much notice of the minority.

Everyone else
There is no way that Force Majeure could be applied to the delays at the site, there has been no act of god ect.
People could terminate their contracts if they choose within the contracts but Wind have offered you all this already without waiting till August 2009.

The UK group has taken legal advise and talked to the land department on these matters and welcome new members. The Dubai laws are changing monthly and offer better protection to investors than ever before so dont get paranoid with this issue.

My advise is you should not get drawn into these silly discussions that the likes of Sur, Crazy Horse, Property Queen and Malster try to create.
These silly people have been offered refunds and they still stay with their investments, so what does that tell you.

Wind Spokesperson
September 29th, 2008, 07:09 AM
So basically there is NO law but something that exists only in the REVISED contracts which you are trying to force current owners to accept. What does that say about your company?

This is not something we invented or made up, or try to enforce.
This has been in all the contracts that were signed with customers of Wind Towers.
We are not trying to enforce this onto anyone.
If it's not in your contract, it doesn't apply to you. But I was assured by the contracts department that this article is in all the contracts since the beginning.

Property Queen
September 29th, 2008, 01:16 PM
If the building process can lead to a floor being completed every TWO WEEKS then we should not complain. A floor a week is a pipe dream as are every completion date that Wind give. Use your commons sense and be realistic.

The progress is slow but is moving forward unlike what had happened in the previous 4 years. We should not panic as resources are being put in to the development and visible progress can be witnessed every month.

A completion date in the middle of 2010 is what should happen...although it could be 2011 before you move into the apartments. I just hope that there are no nasty surprises on the way.

But so far so good. Stay positive and do not be irritated by silly wishful thinking or paranoia.

first timer
September 30th, 2008, 01:11 PM
Eid mubarak

abf
October 1st, 2008, 12:46 AM
Thanks first timer. Happy Eid to you and Evryone

luvableja
October 1st, 2008, 10:24 AM
Thank you and Eid Mubarak to you all too! Hope all of our Muslim brothers and sisters enjoyed it!!! Thank you for your kind wishes First Timer and abf. On another note, Wind are progressing well, so let's not get ourselves into negative mode again, PLEASE!

scoot68
October 2nd, 2008, 08:57 AM
Have these buildings topped out yet?

Mavekris
October 2nd, 2008, 10:32 AM
^^They handed over last month :)

SUR
October 3rd, 2008, 10:29 AM
Have these buildings topped out yet?

No, these towers haven't topped out but several of their investors have topped themselves in the process.

scoot68
October 3rd, 2008, 07:31 PM
:shocked:

Wind Spokesperson
October 5th, 2008, 01:46 PM
Wind Towers on 4th and 5th of October

4th of October

http://www.farayand.ae/Wind%20Photo/081004_1.JPG

http://www.farayand.ae/Wind%20Photo/081004_2.JPG

http://www.farayand.ae/Wind%20Photo/081004_3.JPG

http://www.farayand.ae/Wind%20Photo/081004_4.JPG


5th of October

http://www.farayand.ae/Wind%20Photo/081005_1.JPG

http://www.farayand.ae/Wind%20Photo/081005_2.JPG

http://www.farayand.ae/Wind%20Photo/081005_3.JPG

http://www.farayand.ae/Wind%20Photo/081005_4.JPG

Property Queen
October 5th, 2008, 03:23 PM
Which floor are they working on now?

Wind Spokesperson
October 5th, 2008, 04:01 PM
Wind Tower I
Concrete casting of slab 20.17 was completed last week.
Formwork of vertical elements from level 20.17 to level 23.13 is in near completion. Concrete casting of vertical elements is planned for sometime soon.

Wind Tower II
Concrete casting of slab 20.40 was completed last week.
Concrete casting of vertical elements for level 20.40 to level 23.41 has been completed.
DOKA formwork for level 23.41 is in progress.

Wind Spokesperson
October 5th, 2008, 04:52 PM
You can always check our website on www.windtowers.net
We will try to keep the website as up to date as possible.

abf
October 5th, 2008, 08:01 PM
You can always check our website on www.windtowers.net
We will try to keep the website as up to date as possible.

Hi WSP
It is a bit tedious as one has to load different software for different computers for some websites. It would be extremely helpful if information is posted here ( including long shots) for the forum users especially for ignorant non technical persons like myself as sometimes it is even difficult to set up for web cam
Thanks

Wind Spokesperson
October 6th, 2008, 07:22 AM
Wind Tower I (http://www.windtowers.net/Wind%20I%20Pano.jpg)

Wind Tower II (http://www.windtowers.net/Wind%20II%20Pano.jpg)

Property Queen
October 6th, 2008, 10:43 AM
Which floor are they on now? Is it the 5th floor or 20th floor?

Knowing which floor they are on is useful. Just add a month per floor for the next 5 floors then expect a floor every 2 weeks thereafter. End of 2010 for handover?

Which floor are they on!!!!

abf
October 6th, 2008, 04:09 PM
Wind Tower I (http://www.windtowers.net/Wind%20I%20Pano.jpg)

Wind Tower II (http://www.windtowers.net/Wind%20II%20Pano.jpg)
Thanks for the clear shot WSP.

jba
October 6th, 2008, 06:11 PM
The last post on the Laguna tower thread states they expect the tower to top out in 1 month!

If you go back to May 2007 they were at the slab casting stage and in November 2007 they were around the same stage as Wind now. So it is realistic that Wind could top out in October 2009?

Whats your thoughts on this WSP,am I being realistic?

Property Queen
October 6th, 2008, 06:26 PM
One year from now is pie in the sky.

However, investors have been patient and 18 months from today is still good. A floor every month and then one every 2 weeks is good compared to nothing.

Onwards and upwards, even at Winds very slow pace, is better than nothing and being cheated. You should all get your apartments at the end of 2010 if it is completed middle of 2010. It could be later but the above dates are realistic.

Wind Spokesperson
October 7th, 2008, 01:15 PM
The last post on the Laguna tower thread states they expect the tower to top out in 1 month!

If you go back to May 2007 they were at the slab casting stage and in November 2007 they were around the same stage as Wind now. So it is realistic that Wind could top out in October 2009?

Whats your thoughts on this WSP,am I being realistic?


One year from now is pie in the sky.

However, investors have been patient and 18 months from today is still good. A floor every month and then one every 2 weeks is good compared to nothing.

Onwards and upwards, even at Winds very slow pace, is better than nothing and being cheated. You should all get your apartments at the end of 2010 if it is completed middle of 2010. It could be later but the above dates are realistic.



Our final goal is to increase the speed to one floor per week, and we are concentrating to finish the towers in 2009.
I will talk to the senior engineering team regarding your comments.

jba
October 7th, 2008, 01:57 PM
Our final goal is to increase the speed to one floor per month, and we are concentrating to finish the towers in 2009.
I will talk to the senior engineering team regarding your comments.

One per Month, is not an increase in speed it's that now.

Is this a typing error?

Wind Spokesperson
October 7th, 2008, 02:00 PM
Type error is corrected.

jba
October 7th, 2008, 02:02 PM
[QUOTE=Wind Spokesperson;26270022]Type error is corrected.[/QUOTE

Thanks, nearly had a heart attack then!

Wind Spokesperson
October 7th, 2008, 04:35 PM
7th of October, 2008

http://www.farayand.ae/Wind%20Photo/081007_1.JPG

http://www.farayand.ae/Wind%20Photo/081007_2.JPG

http://www.farayand.ae/Wind%20Photo/081007_3.JPG

Wind Spokesperson
October 7th, 2008, 04:46 PM
During the least few weeks, there was a slow down in the construction process at the Wind Towers.
This was due to the change in construction method to the DOKA flat-bed system. It took us a month to prepare for the new system. We had to get the system ready for 2 floors before continuing with the construction.
Now that the system is ready, there is an increase in the construction for each slab. You should be able to see the boost in a short time.

I would like to repeat that we are trying to use the new method to reach the goal of one floor per week.

jba
October 7th, 2008, 07:00 PM
Thanks WSP for the info and all the updates which are being provided on here and youtube, plus the website is pretty upto date.

I am sure the speed will increase taking into account that ramadan has just passed and the learning curve that the engineers will of overcome with the new system.

If you guys can match the speed of Laguna Tower then this time next year we could be looking forward to the towers topping out.:cheers:

Wind Spokesperson
October 8th, 2008, 05:59 PM
7th of October, 2008

http://www.farayand.ae/Wind%20Photo/081008_1.JPG

http://www.farayand.ae/Wind%20Photo/081008_2.JPG

http://www.farayand.ae/Wind%20Photo/081008_3.JPG

http://www.farayand.ae/Wind%20Photo/081008_4.JPG

http://www.farayand.ae/Wind%20Photo/081008_5.JPG

rexdmx
October 9th, 2008, 02:26 PM
good to see update regularly... bless u all who bought here

Wind Spokesperson
October 9th, 2008, 03:28 PM
http://www.farayand.ae/Wind%20Photo/081008_6.JPG

http://www.farayand.ae/Wind%20Photo/081008_7.JPG

http://www.farayand.ae/Wind%20Photo/081008_8.JPG

http://www.farayand.ae/Wind%20Photo/081008_9.JPG

Crazy_Horse
October 9th, 2008, 05:48 PM
[quote=Wind Spokesperson;26270022]Type error is corrected.[/QUOTE

Thanks, nearly had a heart attack then!

Why does it matter 2008 or 2009? Its going to be when Wind see fit... and at this rate, its no sooner than late 2010 or after..

And by the way, all the people who are quoting prices, etc. You are all talking rubbish because there is without a doubt a property price correction taking place across the globe. For anyone who thinks this does not affect Dubai or the Emirates, you are dreaming.

By the time Wind finish this project, we will probabaly be at the botom of the barrel.

jba
October 9th, 2008, 08:48 PM
[quote=jba;26270098]

Why does it matter 2008 or 2009? Its going to be when Wind see fit... and at this rate, its no sooner than late 2010 or after..

And by the way, all the people who are quoting prices, etc. You are all talking rubbish because there is without a doubt a property price correction taking place across the globe. For anyone who thinks this does not affect Dubai or the Emirates, you are dreaming.

By the time Wind finish this project, we will probabaly be at the botom of the barrel.

Suprised you haven't blamed Wind for the global credit crisis!:bash:

first timer
October 9th, 2008, 11:57 PM
RE: CrazyHorse Post 1453 ^^^

Is this the idiot that suggested people where running to Iran with our money but still remains invested in the site even though offered a full refund?

Everyone this idiot is beyond help so dont even bother wasting your breath on IT

IT will disappear again in due course when no one takes IT seriously like the last few months when progress has been seen.

ITS the witch of doom and gloom, throw a bucket of water over IT and IT may even melt just like in the film.

The only thing this idiot has got right so far is ITS screen name 'CRAZY', I hope they have good medical care establishments in JLT cause this one will be getting platinum membership
:nuts:

Wind Spokesperson
October 11th, 2008, 07:49 PM
Wind Tower I
http://www.farayand.ae/Wind%20Photo/081011-w1-01.JPG

Wind Tower II
http://www.farayand.ae/Wind%20Photo/081011-w2-01.JPG

http://www.farayand.ae/Wind%20Photo/081011-w2-02.JPG

jba
October 13th, 2008, 10:59 AM
Thanks for the pictures.

Wind Spokesperson
October 13th, 2008, 01:15 PM
13th of October 2008

http://www.farayand.ae/Wind%20Photo/081013_1.JPG

http://www.farayand.ae/Wind%20Photo/081013_2.JPG

http://www.farayand.ae/Wind%20Photo/081013_3.JPG

malec
October 13th, 2008, 11:13 PM
I say completion sometime in 2011. :cheers:

first timer
October 13th, 2008, 11:17 PM
I say completion sometime in 2011. :cheers:

Personally, I would say 2012 but for me no rush but fully understand frustrations of others.

Several other sites in JLK behind this one as well!

Property Queen
October 14th, 2008, 11:08 AM
Personally, I would say 2012 but for me no rush but fully understand frustrations of others.

Several other sites in JLK behind this one as well!

I am glad you have joined the real world and lowered your expectations. and realsied that Wind can not be trusted:banana:

Stating a completing in 2006 was a joke, as was the end of 2007. Now they state 2009 you have finally realised they are full of Wind. I predict 2010 for a handover in that year or early 2011.

They hope to get 1 floor a week....they will never achieve this..they are useless bunch of time wastersl. However, if they achieve a floor every 10 day or every 2 weeks then be happy as they will eventually complete it before we all become grandparents. As long as they move upwards month on month rather than stay static then be patient. I love you all.:)

Angela O'Connell
October 14th, 2008, 12:01 PM
can anyone help me im looking for property in JLT either direct from developer or individuals, completed or not, any ideas?

jba
October 14th, 2008, 12:51 PM
WSP, when do you expect the next slab casting on Wind 1 & 2?

Cheers

first timer
October 14th, 2008, 04:21 PM
I am glad you have joined the real world and lowered your expectations. and realsied that Wind can not be trusted:banana:

Stating a completing in 2006 was a joke, as was the end of 2007. Now they state 2009 you have finally realised they are full of Wind. I predict 2010 for a handover in that year or early 2011.

They hope to get 1 floor a week....they will never achieve this..they are useless bunch of time wastersl. However, if they achieve a floor every 10 day or every 2 weeks then be happy as they will eventually complete it before we all become grandparents. As long as they move upwards month on month rather than stay static then be patient. I love you all.:)

I have always stated 2011-2012 check back

For a queen that sold up a year ago its very strange you still study this forum?

Or is it that you never sold and you simply wanted to make a fuss for nothing again?

Property Queen
October 15th, 2008, 10:37 AM
I am just saying that we should be grateful that the towers are actually being built.

We know from past experience that Wind do not keep their promises and do not achieve what they intend to do...so do not listen to them. Just be grateful for the pictures posted.

A floor per month will mean 2011-12. That is pathetic. A floor every couple of weeks is the most we can ask for, and expect from Wind. SUR and Crazy Horse should not complain as it is better than a hole in the ground, which we had to put up with for 3 years.

Undue moaning or undue praising has no benefit. Late 2010 is an undemanding expectation. Any how, I hope it continues to rise, as I hope the interest in purchasing your apartments does: for those who wish to sell. Good luck to all.

Crazy_Horse
October 15th, 2008, 04:56 PM
can anyone help me im looking for property in JLT either direct from developer or individuals, completed or not, any ideas?

What we can tell you is that you need to stay well away from WIND development. I would actually stay away from anything even near this site!!!

Just look back at the posts and you will see what I mean.

Crazy_Horse
October 15th, 2008, 04:59 PM
I have always stated 2011-2012 check back

For a queen that sold up a year ago its very strange you still study this forum?

Or is it that you never sold and you simply wanted to make a fuss for nothing again?

Why does it pain you so much if someone has a view that differs with yours!! Owning a property in this development is not a requirement to post here. Does EVERYONE who posts here have a invested concern? NO!

jba
October 15th, 2008, 08:15 PM
Why does it pain you so much if someone has a view that differs with yours!! Owning a property in this development is not a requirement to post here. Does EVERYONE who posts here have a invested concern? NO!

You do!

Oh sorry forgot you sold up years ago didn't you, you got out when the building was never going to get out of the ground!
Your just posting on this site because you have f-all to do! :nuts:

first timer
October 15th, 2008, 08:37 PM
error

jba
October 16th, 2008, 09:49 AM
WSP, Is the slab ready for casting on Wind 2? and if so when do you plan to do the cast???

Cheers!

maltster
October 16th, 2008, 01:07 PM
You can kind of see Wind rising above ground (albeit very slowly); through the glass of the balcony.

Last time I was on that balcony, or saw any any photo taken from it, all you could see was the podium area covered in that scruffy, torn blue talpaulin, and a couple of idle cranes standing over two big holes in the ground.

Photo taken this morning, btw.

http://i38.tinypic.com/2dvspi.jpg

aidy
October 16th, 2008, 01:43 PM
^^ Thanks for that, when you took the photo could you see any workers, because the pictures from the web cam have shown no activity for days.

maltster
October 16th, 2008, 01:52 PM
^^ Thanks for that, when you took the photo could you see any workers, because the pictures from the web cam have shown no activity for days.

^^No, sorry. I'm in the UK. Someone took it for me. They are popping back in the next few days so I might ask them to take another photo specifically of the Wind site.

aidy
October 16th, 2008, 02:06 PM
^^ That would be great thanks

Wind Spokesperson
October 16th, 2008, 04:21 PM
Our post-tension works is under testing and examination by a third-party.

The formwork for the new slab is completed, we will start the concrete casting as soon as we receive the testing results.

jba
October 16th, 2008, 05:47 PM
Our post-tension works is under testing and examination by a third-party.

The formwork for the new slab is completed, we will start the concrete casting as soon as we receive the testing results.

Thanks for the reply.

Wind Spokesperson
October 18th, 2008, 07:13 PM
Wind Tower II

http://www.farayand.ae/Wind%20Photo/081018-01.JPG

http://www.farayand.ae/Wind%20Photo/081018-02.JPG

http://www.farayand.ae/Wind%20Photo/081018-03.JPG

Wind Spokesperson
October 18th, 2008, 07:15 PM
Wind Towers - Interior

http://www.farayand.ae/Wind%20Photo/081018-04.JPG

http://www.farayand.ae/Wind%20Photo/081018-05.JPG

http://www.farayand.ae/Wind%20Photo/081018-06.JPG

http://www.farayand.ae/Wind%20Photo/081018-07.JPG

http://www.farayand.ae/Wind%20Photo/081018-08.JPG

http://www.farayand.ae/Wind%20Photo/081018-09.JPG

http://www.farayand.ae/Wind%20Photo/081018-10.JPG

http://www.farayand.ae/Wind%20Photo/081018-11.JPG

http://www.farayand.ae/Wind%20Photo/081018-12.JPG

http://www.farayand.ae/Wind%20Photo/081018-13.JPG

http://www.farayand.ae/Wind%20Photo/081018-14.JPG

http://www.farayand.ae/Wind%20Photo/081018-15.JPG

http://www.farayand.ae/Wind%20Photo/081018-16.JPG

http://www.farayand.ae/Wind%20Photo/081018-17.JPG

http://www.farayand.ae/Wind%20Photo/081018-18.JPG

jba
October 18th, 2008, 07:26 PM
Bloody hell! They did the interiors quick:lol:

no Seriously the designs look great! Thanks for posting them.:cheers:

Imre
October 18th, 2008, 08:23 PM
amazing Burj Dubai and SZR view from the pool:)

abf
October 18th, 2008, 11:36 PM
It is lifting to see the interiors - only if Wind Management would kit out the interiors as in the pics as a gesture of goodwill for the all the wait! How about recommending it WSP?

jba
October 19th, 2008, 11:26 AM
Any news on when the next castings will be taking place?

Iknow you guys are waiting for test results and the ok to cast but do you have an idea when this is expected?

first timer
October 19th, 2008, 02:53 PM
It is lifting to see the interiors - only if Wind Management would kit out the interiors as in the pics as a gesture of goodwill for the all the wait! How about recommending it WSP?

Never mind about the interiors

A magonila wall, b & q kitchen and bathroom will bloody do just get the thing built I say
lol

abf
October 19th, 2008, 03:53 PM
Never mind about the interiors

A magonila wall, b & q kitchen and bathroom will bloody do just get the thing built I say
lol

Really then what is the point in displaying brochure pictures?

zrusky
October 20th, 2008, 07:04 AM
amazing Burj Dubai and SZR view from the pool:)

I so funny, the rander shows Burj Dubai as still under construction and Wind completed :lol:

I guess when people would have completed 1 year stay in Burj, Wind will be ready hopefully to occupy.

maltster
October 20th, 2008, 11:03 AM
Taken last wednesday

http://i38.tinypic.com/2j2jmzd.jpg

http://i35.tinypic.com/zlawk3.jpg

SUR
October 20th, 2008, 12:26 PM
It really is a damn shame these towers are taking soo long to rise because the location is prefect. Compared to the marina, JLT looks organised and un-crowded. I suppose anyone taking a chance on these towers is looking at a minimum return of +40% if they top out within a year.

abf
October 20th, 2008, 01:06 PM
Thanks maltster for the shot. if it is not a problem could you tell us which building the view is from?

jba
October 20th, 2008, 07:40 PM
Taken last wednesday

http://i38.tinypic.com/2j2jmzd.jpg

http://i35.tinypic.com/zlawk3.jpg

Thanks for the pictures.

Laguna tower A1 and Lakeside A3 have flown up since I was in Dubai in July. You can see in these pictures the progress made on these two towers.

WSP, when will we see an increase in speed as at the moment again it is still 1 floor per month?

abf
October 21st, 2008, 01:20 PM
can anyone update from the webcam's point of view please

Wind Spokesperson
October 21st, 2008, 05:07 PM
Wind Tower II

http://www.farayand.ae/Wind%20Photo/081021_1.JPG

http://www.farayand.ae/Wind%20Photo/081021_2.JPG

http://www.farayand.ae/Wind%20Photo/081021_3.JPG

http://www.farayand.ae/Wind%20Photo/081021_4.JPG

http://www.farayand.ae/Wind%20Photo/081021_5.JPG

jba
October 21st, 2008, 05:16 PM
Thanks for the update, however when do you expect the next slab to be cast?

bongo2202
October 21st, 2008, 07:32 PM
Thanks for the update, however when do you expect the next slab to be cast?

Ha ha one day you'll get an answer my friend:bash:

first timer
October 21st, 2008, 08:35 PM
Why would you 'ha ha' I cant understand why some people find other peoples mis fortune a happy event?

Strange

bongo2202
October 22nd, 2008, 09:06 PM
Why would you 'ha ha' I cant understand why some people find other peoples mis fortune a happy event?

Strange

Shut up you dickhead, Joe and I have swapped many e-mails/jokes and I'm sure he'll understand my humor, seriously you should think before you type sometimes....and even bloody read the note as it was no way having fun at his misfortune....no wonder people get wound up with you

jba
October 22nd, 2008, 09:49 PM
^^ Alright boys, calm down! calm down! as they apparently say in Liverpool:lol:

We'll all be laughing about this in the bar in 2010 or 2011 or 2012? or when ever they finish.:bash: