View Full Version : #The Boulevard - Mixed Use - 6F - Umhlanga


dysan1
February 21st, 2007, 08:20 PM
http://www.keyprojects.co.za/assets/future_projects/pic3.jpg

http://www.keyprojects.co.za/assets/future_projects/pic2.jpg

http://www.keyprojects.co.za/assets/future_projects/pic1.jpg

NAME: The Boulevard
LOCATION: Umhlanga Ridge New Town Centre
STATUS: Approved
FLOORS: 6
HEIGHT: -
USE: Mixed Use (Retail and Office)

10 500m2 of Office Space
3500m2 of Retail space

Developer - Key Projects and Louis International

The Boulevard is a landmark mixed-use development designed as an assemblage of components each displaying an individual architectural character and contextual response. Comprising five distinct elements with Retail at all Ground Level interfaces and Offices above, the building forms an internal courtyard over two levels with sub-tropical landscaping and dramatic water features. Sun screens, colonnades, verandas, frames and elevated decks characterize The Boulevard, and the two corners it forms fronting the surrounding streets are celebrated with visually exciting towers which imbue the development with a powerful urban identity.

romanSA
February 21st, 2007, 11:19 PM
I like it. Where exactly is it?

Durbsboi
February 22nd, 2007, 08:24 AM
I doubt its Palm, coz that boulevard is full up, it does look nice, the windo feature on the corner looks cool, doing away with the standard round corner with crown design that seems to be popular in Durbs.

dysan1
February 22nd, 2007, 01:09 PM
Its in the new section of Parkside, 3 blocks from the palm boulvard (one block from the park heading north). It is to be on the new road parallel to Centenary Boulevard that will connect to the new interchange. It backs onto Madison on Park and Mayfair on Park

dysan1
May 20th, 2007, 05:54 PM
all the major infrastructure work is underway for The Boulevard, Grand Hill, Mayfair, Maddison, Troon, Park Avenue, FNB and the University. The park is also well underway.

This dev should be underway and rising in august

SA BOY
May 21st, 2007, 09:33 AM
pics pics pics we wanna see dirt being moved

Durbsboi
May 21st, 2007, 09:45 AM
^^Its just red sand, well really light brown, at the mo..

dysan1
May 21st, 2007, 01:39 PM
yeah all you can see is the cutting of sites, laying of roads and cables/pipes. its a huge area, and the next phase of the NTC, far bigger than the current (nearly completed) one. but if you want dirt pics, i'll get :)

dysan1
March 1st, 2008, 04:57 PM
well the infrastructure for the new parkside area has been completed, so this dev as well as the mayfair, madison, radisson, grand hill, lincoln on lake, elements and tolman towers are all now fully underway.

the new roads should be opening in the coming month or so and i am sure many other developments we dont know about will be popping up as this area has a strong commercial focus

Deon Hanekom
July 21st, 2009, 02:11 PM
radisson, grand hill

hi, where is Radisson Hotel group going to put up the new one in phase 2?

Grand Hill? Is that a new mixed use?

dysan1
July 21st, 2009, 02:16 PM
Grand hill is mixed use and has its own thread and website. But no work is happening still. This one is now jointly being developed by key developments and growthpoint

Deon Hanekom
July 23rd, 2009, 11:48 AM
Grand hill is mixed use and has its own thread and website. But no work is happening still. This one is now jointly being developed by key developments and growthpoint

On which site is Radisson?

dysan1
July 23rd, 2009, 12:50 PM
Park Avenue, overlooking the park. Work stopped at basement level a few months back. no idea what is happening now