View Full Version : [AL/RKS] Lajme nga Energjitika | Energy News
olsib May 10th, 2008, 03:29 AM Albania, Energy News
Please post here news related to the energy sector in Albania!
Data:
Since classical times, people have exploited the fossil-fuel and mineral deposits present in the lands that now constitute Albania. Petroleum, natural gas, coal, and asphalt lie in the sedimentary rock formations of the country's southwestern regions.
With its significant petroleum and natural-gas reserves, coal deposits, and hydroelectric-power capacity, Albania has the potential to produce enough energy for domestic consumption and export fuels and electric power.
In the 1980s, the petroleum and bitumen enterprises employed 10 percent of Albania's industrial work force, controlled 25 percent of the country's industrial capital, and received almost 33 percent of its industrial investment funds.
Petroleum was the first industry to attract direct foreign investment after the communist economic system broke down. In 1990 and 1991, the Albanian Petroleum and Gas Directorate entered into negotiations with foreign drilling and exploration firms for onshore and offshore prospecting.
Albania's known natural-gas reserves have been estimated at 22,400 million cubic meters and lie mainly in the Kuēovė and Patos areas.
Albania's unprofitable coal mines produced about 2.1 million tons in 1987.
About 80 percent of Albania's electric power came from a system of hydroelectric dams built after 1947 and driven by several rivers that normally carried abundant rainfall. Electric- power output was estimated by Albanian officials at 3,984,000 megawatt hours in 1988.
Droughts in the late 1980s and in 1990 brought an energy crisis and a sharp drop in earnings from electric-power exports. In 1991 heavy rainfall allowed Albania to resume electric-power exports to Yugoslavia and Greece. In the early 1990s, labor strikes and transformer burnouts caused by the overloading of circuits when many Albanians turned to electricity to heat apartments after other fuel supplies ran out regularly resulted in blackouts in towns across the country, and even sections of Tiranė, producing disruption months at a time.
Albania's mineral resources are located primarily in the mountainous northern half of the country. Albanian miners extract mainly chromium ore, ferronickel, copper, bitumen, and salt.
Some production estimates placed Albania just behind South Africa and the former Soviet Union in the output of chromite, or chromium ore, which is vital to the production of stainless steel.
Albania's high-grade chromite reserves had been largely exhausted by the 1990. The poor quality of the remaining ore accounted for the country's worsening position in world markets. Impurities present in Albania's highest-grade chrome were largely the by-product of poor mining and smelting techniques and the use of antiquated Chinese equipment. The country's chromium industry also suffered because of inadequate transportation facilities.
Albania also produced copper, iron, and nickel. The main copper deposits, estimated at about 5 million tons, were located near the northern towns of Pukė, Kukės, and Shkodėr.
Albanian bitumen and asphalt deposits were located near the town of Selenicė and in the Vjosė River valley. Bitumen and asphalt production rose significantly after World War II, and most of the output was used for paving and waterproofing materials and in the manufacturing of insulators and roofing shingles. Miners had worked the Selenicė deposits continuously for centuries before a lack of soap, boots, and basic equipment forced operations to cease when the centrally planned economy stalled.
Source (http://countrystudies.us/albania/96.htm)
olsib May 10th, 2008, 03:30 AM Shqipėria shpėton pėrfundimisht nga kriza energjetike
Shqipėria kapėrcen pėrfundimisht krizėn energjetike. Duke filluar nga vit, vendi ka tė gjitha mundėsitė qė tė furnizohet 24 orė me energji elektrike. Kėtė fakt e ka pohuar vetė drejtori i pėrgjithshėm i Korporatės Elektroenergjetike Shqiptare, Gjergj Bojaxhi. Sipas tij, kėtė vit kėrkesat e vendit pėr drita po plotėsohen nga importi, kombinuar me prodhimin vendas nė nivele tė konsiderueshme, i favorizuar nga kushtet e mira atmosferike. Ndėrsa gjatė vitit tė ardhshėm e nė vijim, do tė vihen nė funksionim burimet e reja energjetike, qė janė termocentrali i Vlorės dhe linja e interkonjeksionit me Malin e Zi. Rregullimi i sektorit energjetik do tė na ndihmojė qė tė kemi 24 orė drita. Duke filluar nga ky vit, nuk kemi arsye qė tė kemi kufizime. Strategjia qė kemi ndjekur ka qenė e tillė, qė gjatė muajve tė parė tė vitit janė siguruar importe tė larta, duke siguruar rezervė pėr muajt nė vijim. Vitin tjetėr do tė fusim prodhimin nga TEC-i i Vlorės dhe linjėn e tensionit tė lartė me Malin e Zi. Kjo do tė thotė, qė edhe sikur tė mos kemi mot me rreshje, do tė kemi dy elementė qė do tė balancojnė kėtė gjendje dhe nuk do tė kemi probleme nė furnizimin e qytetarėve me energji elektrike, ka deklaruar Bojaxhi. Por kreu i KESH-it, ka shtuar se pavarėsisht kėtyre dy veprave energjetike, investimet nė kėtė sektor duhet tė vazhdojnė, pasi nė tė ardhmen do tė rritet konsumi i energjisė dhe kjo do tė kėrkojė burime tė reja prodhuese. Pas TEC-it tė Vlorės dhe linjės me Malin e Zi ne nuk duhet tė rrimė duarkryq pėr dhjetė vjetė tė tjera dhe tė presim. Por duhet tė investojmė nė vepra tė tjera prodhuese. Njė prej tyre mund tė jetė edhe njė termocentral nė Kosovė, ēka mund tė arrihet nėpėrmjet njė bashkėpunim mes tė dyja vendeve, ka deklaruar drejtori i korporatės, Gjergj Bojaxhi.
Ēmimi i energjisė elektrike
Drejtori i pėrgjithshėm i KESH-it ka insistuar nė rritjen e mėtejshme tė ēmimit tė energjisė elektrike. Sipas tij, energjia elektrike po shitet aktualisht nėn kosto dhe kjo i shkakton humbje finaciare korporatės. Nė kėto kushte, KESH-i nuk ka para pėr tė kryer investimet e nevojshme, nėpėrmjet sė cilave do tė garantohet furnizimi pa ndėrprerje me energji elektrike pėr njė periudhė afatgjatė. Struktura e ēmimeve tė energjisė ėshtė e pabalancuar. Ky ėshtė njė element qė do tė krijojė deformime nė funksionimin e kompanisė. Pasi kostoja e prodhimit tė energjisė ėshtė mė e lartė se ajo me tė cilėn shitet energjia. Pėr kėtė arsye, korporata ndodhet nė vėshtirėsi tė madhe financiare. Vjet KESH-i doli me humbje. Por edhe kėtė vit, me strukturėn e re tė ēmimeve, nuk do tė dalim me fitim. Korporata ka nevojė qė tė bėjė investime qė nuk do tė vijnė nga qielli, por nga funksioniomi normal i saj. Ne po furnizojmė aktualisht pa ndėrprerje me energji qytetarėt, por po shtyjmė investimet e nevojshme, ka deklaruar Bojaxhi.
Privatizimi i KESH-it, nė gusht shpallet investitori strategjik
Pėrzgjedhja dhe shpallja e investitorit strategjik qė do tė blejė Operatorin e Sistemit tė Shpėrndarjes do tė bėhet deri nė fund tė muajit gusht. Drejtori i pėrgjithshėm i Korporatės Elektroenergjteike Shqiptare, Gjergj Bojaxhi ka deklaruar se deri nė qershor do tė priten ofertat nga kompanitė e interesuara dhe gjatė verės do tė shpallet oferta mė e mirė. Deri tani kanė shprehur interes pėr privatizimin e OSSH-sė 6 deri nė 8 kompani. Deri nė qershor do tė shohim, se cilat nga kėto kompani kanė shprehur interes tė pėrgjithshėm dhe cilat janė ato qė vėrtet janė tė interesuara. Nė kėtė mėnyrė do ti futemi seriozisht procesit tė tenderimit dhe tė zgjedhim njė kompani qė ka eksperiencė nė fushėn energjetike, qė ka njė numėr tė caktuar konsumatorėsh dhe qė mund tė jetė partner pėr popullin shqiptar, ka deklaruar Bojaxhi. Sipas tij, deri nė fund tė kėtij muaji, do tė bėhet shpallja e hapjes sė procesit tė privatizimit nė mediat ndėrkombėtare, mė pas pėr njė periudhė 1-mujore do tė priten ofertat nga kompanitė dhe pas pėrzgjdhjes sė investitorit, do tė duhen disa javė pėr tė bėrė saktėsimin e kontratės, procedurat ligjore, kalimin nė parlament tė projektligjit tė provatizimit tė OSSH-sė etj. Kėto procedura kėrkojnė kohėn e tyre, por unė mendoj qė deri nė fund tė gushtit tė kemi njė fitues tė tenderit, ėshtė shprehur kreu i korporatės, Gjergj Bojaxhi.
E Premte, 09 Maj 2008
Source (http://gazeta-agon.com/mat.php?idm=1978&l=a)
Pirro May 17th, 2008, 07:40 PM Naftesjellesi AMBO drejte deshtimit....!
http://gazeta-shqip.com/artikull.php?id=42394
Pirro May 17th, 2008, 07:45 PM Centrali atomik... ja ca thote Berisha..
http://gazeta-shqip.com/artikull.php?id=42395
daalbo May 17th, 2008, 08:15 PM Shqipėria shpėton pėrfundimisht nga kriza energjetike
Who wants to call BS first
Naftesjellesi AMBO drejte deshtimit....!
No surprise there. That pipeline was never going to get build the way things were going and I don't think it was Albania's fault or anything like that. I can't remember for how long this project has been in the plans and work hasn't still started. The alternative Bourgas-Alexandropolous was the final nail in the coffin of AMBO.
iLiR May 19th, 2008, 04:56 AM Premier Says Albania Interested in Building Nuclear Power Station
Posted on: Saturday, 17 May 2008, 18:00 CDT
Tirana, 16 May (ATA) -- Prime Minister Sali Berisha confirmed Friday [16 May] that "development of energetic sector remains a priority of government in place which is interested in construction of nuclear power stations."
Calling development of energetic sector a very important issue, PM said "government is working hard to increase power generation through construction of new thermo and hydro-power stations."
"A thermo-power station is under construction in Vlora and a hydro-power station in Kalivac. In addition, great efforts are being made to develop our energy sources. Some 26 companies have been contracted for different-sized hydro-power stations just as there are other projects under discussion or bidding process," PM Berisha said during the Crans Montana Economic Forum taking place in the premises of Hotel Tirana.
Saying that work is under way to exploit the country's hydrological sources, PM said "together with Kosovo government we are working to build in Kosovo a medium-sized thermo-power station."
Stressing the interest of foreign companies in building high - technology thermo-power stations, PM Berisha said "Government is willing to rely on nuclear power stations as well."
"We are seeing the opportunity and want to cooperate with Vienna- based International Atomic Energy Agency. Once the legal framework be ready, we will start negotiations with neighbouring counties, Macedonia, Kosovo and Montenegro to draft a joint project since it would be a sustainable energy source," PM Berisha said.
Originally published by ATA, Tirana, in English 1226 16 May 08.
(c) 2008 BBC Monitoring European. Provided by ProQuest Information and Learning. All rights Reserved.
Source: BBC Monitoring European
http://www.redorbit.com/news/business/1390598/premier_says_albania_interested_in_building_nuclear_power_station/
iLiR May 19th, 2008, 11:49 PM Albania asks Kosovo to agree on pipeline
Published: May 19, 2008 at 4:36 PM
TIRANA , Albania, May 19 (UPI) -- Albania is readying plans for an interconnection line with Kosovo.
Production of energy from Albania's hydropower stations would be well balanced with the production from Kosovo's power stations, said Albania's Economy and Trade Minister Genc Ruli, the Shekulli newspaper reported.
"Minister Ruli and Shiroka, his counterpart, stressed the cooperation in the field of energy. The two ministers noted that the Albanian and Kosovo electricity systems complement each other very well," Albanian officials said in a statement.
Analysts said, however, that while cooperation could be profitable, the two countries' financial capabilities are still far from strong enough.
Albania potentially could increase its energy production by 60 percent if it finds a reliable energy source, like the coal power stations in Kosovo. Currently, however, both nations are net importers of energy.
According to Kosovo Energy Corp. analyses, the country needs about $3 billion in investments to keep its current energy system afloat.
According to Albanian specialists, the construction of the thermoelectric cooler power stations and the interconnection lines and the construction of the pipelines supplying gas would help the situation on both sides.
Source (http://www.upi.com/International_Security/Energy/Briefing/2008/05/19/albania_asks_kosovo_to_agree_on_pipeline/3346/)
olsib May 22nd, 2008, 12:32 AM U.S. investors win control of Albania's only oil refiner
http://farm1.static.flickr.com/26/61738402_f9a4659664.jpg
Patos Oil Field
TIRANA (Thomson Financial) - A U.S. consortium has won control of Albania's only oil refinery with a bid of 125 million euros ($197 million), the government announced on Wednesday.
The Refinery Associates of Texas and Antika Enterprises Consortium USA and Switzerland will own 85 percent of the state-controlled ARMO company, the economy ministry said in a statement.
'The offer by the American company was considerably better than the three others selected to bid out of 25 who had expressed an interest in buying ARMO,' the statement said.
'The price was the most important thing,' said Deputy Economy Minister Neritan Alibali.
Sources had said the bids for ARMO were to be judged 75 percent on the price offered and 25 percent on the prospective buyer's business and development plan.
Albania's Minister of Economy Genz Ruli had earlier said that AMRO generated profit of 1.7 billion Albanian lek (13.6 million euros) in 2006, compared to 365 million lek in 2004.
The Albanian government plans a series of privatisations this year with the sale of the last remaining large companies still controlled by the state.
(Forbes.com) (http://www.forbes.com/afxnewslimited/feeds/afx/2008/05/21/afx5035622.html)
SADOSI May 22nd, 2008, 12:38 AM Thats was a high bid, glad to see the Russians didnt get it. Hopefully we hear about the new owners plans for the development of ARMO.
iLiR May 22nd, 2008, 12:51 AM High Bid? Albania's only oil refinery for 125 million euros is pathetic. It only seems high because of the other low ridiculous bids by other companies.
TIAL May 22nd, 2008, 01:14 AM Albania's Minister of Economy Genz Ruli had earlier said that AMRO generated profit of 1.7 billion Albanian lek (13.6 million euros) in 2006, compared to 365 million lek in 2004.
Is it just me or is this stupid? Why would they sell something that can make a profit much more than the selling price for only 10 years (or even less)? This is a freaking joke. That said, I'm glad the Americans got it.
vari k. May 22nd, 2008, 01:29 AM Well when they sell it what do they get? The Americans will own 85% of it, where will the rest go? And don't taxes go to the Albanian government too?
SADOSI May 22nd, 2008, 01:29 AM Because even though it will make a profit, the gov doesnt have the funds to invest in it and modernise. Who knows what shape ARMO is in. Also, with it out of government hands people wont be able to fill their pockets from the profit ARMO made, i bet it really made a lot more than 13 mil. It's absurd that profit rose 5times in 2 years, who ever was the director of ARMO up until 2004 is one rich dirtbag. Corruption/Lack of investment is the problem, that is why they have to get rid of all state owned enterprise, next stop KESH.
I guess that they are going to invest 240mil euro and the other offers were jokes compared to it:)
http://pages.albaniaonline.net/rd/
Kapedani May 22nd, 2008, 06:00 AM t's absurd that profit rose 5times in 2 years,
Edhe Enver Hoxha e tejkalonte planin 5-vjecar kooperativist cdo vit me nga 700-800%.
Po lexove RD-en ashtu del gjithmon.
bgrs May 22nd, 2008, 09:04 AM http://farm1.static.flickr.com/26/61738402_f9a4659664.jpg
Is that a photo of the refinery indeed? If it's so then EUR 125 million is quite a good offer.
olsib May 22nd, 2008, 10:34 AM Yes it is. Do you have any knowledge in this field?
Pirro May 22nd, 2008, 12:23 PM http://farm1.static.flickr.com/26/61738402_f9a4659664.jpg
Is that a photo of the refinery indeed? If it's so then EUR 125 million is quite a good offer.
no i don't think soo... i belive this are only oil-wells.. or a part of the refinery.. for more foto here...
http://www.armo.al/Galeria.15.0.html
the last 4 are of the refinery, i think..
olsib May 22nd, 2008, 12:25 PM ^^ You are probably right!
Kapedani May 22nd, 2008, 02:44 PM The refinary in Ballsh is relativly small by contemporary standarts...not to mention obsolete by now. Its capacity is only about 20,000 barrels a day (max capacity based on AMBO saying 1 million tons a year)...and the one in Fier has a capacity of only 10,000 barrels a day. These are only max values...I doubt they ever reach that high.
Relativly speaking these are very small refinaries. And the majority of their product isn't refined oil but other byproducts like bitum.
So a price of 128 million Euros...PLUS 240 million Euros investiment...is an exceptionally HIGH bid. Its very high in fact. The price isn't only for the refinaries howerver...its for 85% of AMBO's holdings...which I assume inlcude other assets as well.
Does AMBO own the oil wells?? Some of them are privatised as far as I know?
Either way...I think this seems a very good deal...especially the investment. Without the investment the whole operation would have been imposible to maintain. Half the stuff barely worked probably by now.
Forgetting about corruption or this or that for a moment...on paper so far it seems good. But we need more details to see where and how the investments will be done.
gjergjkastrioti May 22nd, 2008, 02:56 PM me sa di une ska perfunduar akoma asgje por oferta amerikane eshte me e larta.
Pirro May 22nd, 2008, 02:58 PM To kapedani
^^ AMBO are youn talking about ARMO...
puset jane dhene me qera... asnje nuk eshte i shitur.. toka dhe puset jane ne pronesi te shtetit...
Kapedani May 22nd, 2008, 03:25 PM Na u be mendja lemsh...AMBO ARMO...
DanMs May 23rd, 2008, 07:28 AM It is an exceptional deal, especially since they are investing a ton in modernizing it to European standards. ARMO, under gov't control was pathetic and it is also a very shitty refinery, whose technology dates back during communist times with China. First off, I believe that when the audit was done on ARMO it was valued at around 10-15 million therefore the others did not bid low, they bid normal compared to the value of ARMO.
The only reason that I can think off that the Texas based company would offer so much would be in order to try and sieze the Albanian market share that would come with majority ownership of ARMO, at least for the time being.
I believe the last 15% is still publicly owned.
gjergjkastrioti May 29th, 2008, 09:30 AM Berisha: siamo pronti a costruire
le centrali nucleari per l’Italia
Intervista ne Corriere della Sera http://www.corriere.it/cronache/08_maggio_29/berisha_centrali_nucleari_albania_7af52254-2d3f-11dd-913b-00144f02aabc.shtml
AltinD May 29th, 2008, 01:13 PM ... po, po ja se tani do i bejme.
Pirro May 29th, 2008, 02:58 PM ^^ u tha u be...! pse ca kujto ti...!!!!!? :hilarious
http://www.balkanweb.com/sitev4/index.php?id=21456
SADOSI May 29th, 2008, 03:06 PM Ministria e Ekonomisė, Tregtisė dhe Energjetikės ka hapur tenderin pėr privatizimin e Kompanisė sė Shpėrndarjes sė KESH-it pėrmes publikimit tė Ftesės pėr Aplikim nė Parakualifikim nė gazetėn Financial Times. Korporata Financiare Ndėrkombėtare IFC, pjesė e Grupit tė Bankės Botėrore, po ndihmon Ministrinė e Ekonomisė, Tregtisė dhe Energjisė nė procesin e privatizimit bazuar nė marrėveshjen qė ajo ka me tė. IFC-ja ėshtė angazhuar pėr tė kėshilluar METE-n nė ndarjen e aseteve te Kompanisė sė Shpėrndarjes nga aktivitetet e tjera tė KESH-it. IFC-ja gjithashtu do tė ndihmojė pėr tė strukturuar transaksionin dhe bėrė atė sa mė tėrheqės pėr sektorin privat. Kjo do tė realizonte njė proces konkurrues tė hapur dhe transparent nė mėnyrė qė tė ofrohet njė partner strategjik privat optimal, i cili do tė punojė dhe do ta zhvillojė mė tej kompaninė. Shumė investitorė ndėrkombėtarė potencialė qe morėn pjesė nė Konferencėn e Investitorėve tė KESH-it, mbajtur nė Tiranė nė 8 prill, shprehėn interesin pėr privatizimin e Kompanisė sė Shpėrndarjes. Nėpėrmjet njė tenderi tė hapur ndėrkombėtar, qeveria shqiptare planifikon tė shesė 51 pėr qind deri 76 pėr qind tė Kompanisė sė Shpėrndarjes tek njė investitor strategjik. Privatizimi ėshtė njė hap i nevojshėm pėr tė ulur humbjet nė shpėrndarjen e energjisė elektrike, tė cilat po vazhdojnė tė dėmtojnė rėndė vendin. Sipas Entit Rregullator tė Energjisė Elektrike, ERE: Kėto humbje janė rreth 2 miliardė kilovat-orė nė vit, nga tė cilat, 1 miliard kilovat-orė janė humbje joteknike dhe qė shkaktojnė njė dėm shumė tė madh ekonomik. Pėr kėtė arsye pritet qė privatizimi tė ketė njė ndikim thelbėsor pozitiv nė ekonominė shqiptare. Banka Botėrore dhe USAID-i kanė marrė pjesė dhe kanė mbėshtetur kėtė proces si donatorė. Privatizimi i Kompanisė sė Shpėrndarjes sė KESH-it ėshtė mė i madhi dhe mė kompleksi nė sektorin e energjisė nė Shqipėri.
29 Maj 2008 Gazeta Albania
:cheers: Finally! This is where they steal all the money from, as if they lose that much electricity from customers that don't pay, people pay and they pocket the money and say that people dont pay..
Pirro June 6th, 2008, 03:16 PM Lajmet qe vine nga qeveria kroate besoj se jane me te besueshme..
http://www.balkanweb.com/sitev4/index.php?id=21881
Taulant June 7th, 2008, 12:15 PM Is it correct, when I say that the state companies don't produce oil anymore? Is it all in the hands of the greeks, Manas Petrolium, BP...?
Just don't tell me that's the truth, it would be a shame.
SADOSI June 9th, 2008, 10:53 AM Ndėrtimi i linjės sė energjisė elektrike tė tensionit tė lartė 400 kilovolt Tiranė-Podgoricė ka hyrė nė fazėn e parė tė punimeve. Linja e interkonjeksionit shtrihet nga Tirana e pėrfundon nė Podgoricė tė Malit tė Zi, me njė gjatėsi prej 55.6 kilometrash, nė trasenė e sė cilės do tė vendosen 120 shtylla tė tensionit tė lartė. Projekti ka vlerėn e 42 milionė eurove dhe financohet nga qeveria gjermane, me njė kredi tė dhėnė pėr qeverinė shqiptare. Bazuar nė punėn qė po bėn kompania kroate, fituese e projektit, pritet qė nė mes tė vitit 2009 linja tė jetė ndėrtuar plotėsisht. Burime zyrtare tė OST-sė, bėnė tė ditur se me ndėrtimin e kėsaj linje bėhet e mundur shkėmbimi i energjisė elektrike me fqinjėt nė njė masė shumė tė madhe, ēka do tė thotė se Shqipėria nė ēdo kohė mund tė plotėsojė kėrkesat e saj pėr energji elektrike nėpėrmjet importit, pavarėsisht se si do tė jenė situatat hidroenergjetike nė vend.
7 Qershor 2008 Gazetta Albania
Pirro June 9th, 2008, 11:20 AM lajme i ri nga tenderi i armos..
http://69.89.27.249/~panoram4/index.php?id=15370
gjergjkastrioti June 9th, 2008, 02:02 PM fitoi kompania amerikane sipas top-channel
7t June 9th, 2008, 02:38 PM Yep, Refinery Associates from Texas won the ARMO Tender according to Top Channel.
A wise move for once by this impotent government of ours.
Pirro June 9th, 2008, 02:58 PM ^^ Yep..... S'merren vesh gazetat ca thot njera s'thot tjetra...
http://www.balkanweb.com/sitev4/index.php?id=22028
Albaniaaan June 25th, 2008, 08:31 AM Enel invests in Albania coal plant, maybe nuclear
--------------------------------------------------------------------------------
ROME, June 24 (Reuters) - Italian power utility Enel (ENEI.MI: Quote, Profile, Research) is planning to build a coal-fired power station in Albania and is looking into nuclear opportunities there and in Italy, its chief executive said on Tuesday.
"We are working with the Albanian government for the construction of a coal plant," Fulvio Conti told Italian state radio RAI1.
"We think we have all the necessary guarantees to be able to increase our presence in that market, also through nuclear investments, but in the very long term. Nothing is planned at the moment," he added.
Conti also reiterated Enel's ambition to restart nuclear power generation in Italy where it was halted by a referendum in the 1980s, an aim shared by Silvio Berlusconi's conservative government.
"We want to push for nuclear," Conti said, pointing out that Italy imports some 20 percent of its electricity from France which is largely produced by nuclear energy. "I believe it is right that we in Italy also return to that sort of energy." (Reporting by Giuseppe Fonte, writing by Robin Pomeroy; editing by Sue Thomas)
http://uk.reuters.com/article/oilRpt...14928620080624
vari k. June 26th, 2008, 07:15 AM why coal when we have so much water and sun...we can take care of the whole country and another 3 in the balkans with what nature alone offers us.
Kapedani June 26th, 2008, 07:59 AM why coal when we have so much water and sun...we can take care of the whole country and another 3 in the balkans with what nature alone offers us.
__________________
The sun don't shine nowhere else?? Water?? Ne s'kemi uje per te la bythet jo mo per energji. Qymyr kemi sa te dush ama...
daalbo June 26th, 2008, 04:02 PM People stop pretending that we have something other countries don't have. Even our largest river depends on whether or not Macedonia decides to let the water through. But yeah we will become the first country in the world with 100% renewable energy.:nuts:
The sun don't shine nowhere else??
Nope. Albania has a special sun.
TIAL June 26th, 2008, 05:43 PM Lexova ca kohe me pare qe ne Izrael do hapej nje "solar power plant" me 500 megavat qe do mbulonte nevojat energjitike te 5% to vendit. Nje tjeter po hapet ne Florida me 110 megavat edhe ne Japoni pak me te vogla. Tani qe cmimi i naftes po shkon ne "tsomes" me duket se kjo do ishte ide e mire (edhe pse pak e shtrenjte) per Shqiperine se djellin nuk varet te Maqedonia. Pastaj edhe "wind turbines" jane ide e mire, sidomos ne zona fushore. Plus edhe qymyri ide e mire eshte po leshon gati 2 here me shume dioksid karboni sesa benzina (se mos po pyt njeri per dioksid karboni ne Shqiperi?)
Albaniaaan June 26th, 2008, 09:18 PM People stop pretending that we have something other countries don't have. Even our largest river depends on whether or not Macedonia decides to let the water through. But yeah we will become the first country in the world with 100% renewable energy.:nuts:
Nope. Albania has a special sun.
And you know this ?? may i ask you first how do you know this ?? pff i bet you live in an foreign country while you think you know how everything is in Albania common Macedonia you got 2 be kidding lol i think your the one who is :nuts::nuts:
Kapedani June 26th, 2008, 10:50 PM ^^:nuts: You should consult a map sometime...see where the Drini comes from.
Panelet djellore dhe turbinat me ere kushtojne jashtzakonisht shume per nivelin e Shqiperise...do kushtonin shume me teper se nje TEC per te njejtin nivel prodhimi.
Tani per tani as teknollogjia nuk eshte aq e avancuar ne ato fusha. Ja vlen per konsumim personal...ti vesh ne catite dhe tarracat e shtepive per te ngrohur ujin etj.
Dikoksidi i carbonit nuk eshte gaz ndohtes...te pakten nuk kualifikohet si i tille. Eshte vetem "global warming gas" dhe kontributi i ndonje TEC-i Shqiptar eshte teper i parperfillshem. TEC-et me qymyr sot jane "te pastra"...ose te pakten brenda normave te pranuara ne Evrope. Gazrat qe kane me teper rendesi jane NOx, SOx dhe CO...dhe niveli i ktyre gazrave mbetet perseri teper i ulet...mbetet i paperfillshem per nivelin ekzistues ne Vlore pershembull.
Per mua alarmimi qe kane ata "ambientalistat" dhe grupe te tjera budallenjsh neper Shqiperi per TEC-in e Vlores etj...jane reaksion injorance dhe budalleku. Cdo qytet i madh Evropain apo kudo ne bote ka TEC-e ne afersi te tij...disa edhe brenda ne qytet. Ne NYC jane nja 3 me duket qe jane brenda ne qytet...pervec te tjerve qe mund te ket perreth. Me sisteme filtrimi moderne etj...niveli i ndotjes eshte teper i ulet...sidomos kur e krahason me ndotjen qe shkaktojne makinat e vjetra dhe karburantet nen-nivel qe ka ne Shqiperi.
Hik se jam lodh tu diskutu kte teme...ka shume budallenj Shqiperia dhe do e le me kaq :) Na ngrohin me pordhat qe leshojne...s'kemi nevoje per TEC-e
iLiR July 10th, 2008, 10:37 PM Albania's Berisha supports nuclear-energy plans
July 10, 2008
AL
TIRANA, Albania -- Albania is close to building its first nuclear power station. At a cabinet meeting on Wednesday (July 9th), Prime Minister Sali Berisha asked Finance Minister Ridvan Bode to follow the procedures that would enable the country to use nuclear energy. "The [G-8] discussed the issue, and there is no reason why Albania cannot build one of the planned 1,000 plants," Berisha said.
Source: SETimes
daalbo July 28th, 2008, 07:48 PM Paskemi aq energji sa po ja shesim dhe Greqise:
http://macedoniaonline.eu/content/view/2544/2/
:nuts:
Tartanzan August 21st, 2008, 03:24 PM Fillon Gara per ndertimin e Centraleve hidrike
Hermes News (http://www.hermesnews.org/articoli/8354---.asp)
liburni September 29th, 2008, 11:03 PM TIRANA, Sept 29 (Reuters) - The Czech power utility CEZ CEZsp.PR offered
102 million euros on Monday to win a 76 percent stake in Albania's power distributor DSO after Albania found Italy's ENEL (ENEI.MI: Quote, Profile, Research, Stock Buzz) technical bid insufficient.
"The financial offer from CEZ is 102 million euros," Fatjon Tugu, a member of the government commission told the audience.
The commission's chairman Neritan Alibali said ENEL's technical bid was "not compatible with the criteria" imposed by Albania while CEZ's bid "fully met" the conditions.
Albania hopes the sale of DSO, which is the distributing arm of cash-strapped state-owned power utility KESH, will gradually reduce chronic power shortages that have hurt the quality of life and growth for a decade in one of Europe's poorest states. (Reporting by Benet Koleka)
DanMs September 30th, 2008, 08:38 AM TIRANA, Sept 29 (Reuters) - The Czech power utility CEZ CEZsp.PR offered
102 million euros on Monday to win a 76 percent stake in Albania's power distributor DSO after Albania found Italy's ENEL (ENEI.MI: Quote, Profile, Research, Stock Buzz) technical bid insufficient.
"The financial offer from CEZ is 102 million euros," Fatjon Tugu, a member of the government commission told the audience.
The commission's chairman Neritan Alibali said ENEL's technical bid was "not compatible with the criteria" imposed by Albania while CEZ's bid "fully met" the conditions.
Albania hopes the sale of DSO, which is the distributing arm of cash-strapped state-owned power utility KESH, will gradually reduce chronic power shortages that have hurt the quality of life and growth for a decade in one of Europe's poorest states. (Reporting by Benet Koleka)
Such bad marketing of our country when the media adds the last line even though it is totally irrelevant to the subject. They do it everytime in every kinds of news, you name it, tourism, art, culture.
Why not say this?
"KESH, will gradually reduce chronic power shortages that have hurt the quality of life and growth for a decade in Albania.
GreenAlbanian September 30th, 2008, 08:46 AM because they wanna stress the bad situation of our (if I may say so) country...looks totally logical to me! btw the author of the text is albanian.
AltinD September 30th, 2008, 10:32 AM ^^ The news comes from Reuters. The Albanian guy might have provided the writing, but are the editors who edit it and make the final version.
That is indeed a cliché phrase and certainly the writer has nothing to do with it.
SADOSI September 30th, 2008, 06:31 PM TIRANA, Sept 30 (Reuters) - Austria's Verbund (VERB.VI: Quote, Profile, Research, Stock Buzz) on Tuesday signed a deal to build a 160 million euro ($229.6 million) hydropower plant on northern Albania's Drin River, the fourth plant on the river but the first there for 30 years.
"We plan to be in operation in 40 months," Christian Kern, a member of Verbund's managing board told Reuters after signing with Albania's Energy Minister Genc Ruli.
"For us it is important to be here because we have a strong presence in Central Europe, Italy and Turkey. Therefore it made sense to expand in the Balkans. If you look at the fundamentals, there will be a significant demand here that will outperform the rest of Europe," Kern added.
He said Verbund, Austria's leading power producer, plans to invest over four billion euros in Turkey in hydropower and gas-fired plants. Verbund has bought a power distribution company near Ankara that had three million clients, Kern added.
To win the Albanian concession for the Ashta hydropower plant in July Verbund beat a rival bid from a joint venture linking Compagnie Nationale du Rhone (CNR) and Electrabel, both controlled by French utility company Suez (LYOE.PA: Quote, Profile, Research, Stock Buzz).
Verbund said it will build the hydropower plant at Ashta, which would have a capacity of 48 MW and an annual production capacity of 230 GWH, in a joint venture with Austria's EVN (EVNV.VI: Quote, Profile, Research, Stock Buzz).
EVN withdraw from a tender on Monday to buy 76 percent of Albania's power distributor. The Czech power utility CEZ CEZsp.PR won the deal on Monday with a 102 million euro bid.
EVN is also negotiating an approximately one billion euro project to build hydropower plants on the Devoll River in Abania's east.
"I hope EVN will also make the necessary concessions in the project of the Devoll River (to conclude the deal)," Prime Minister Sali Berisha told the audience of businessmen and reporters attending the signing of the deal.
Berisha saw Verbund's Ashta hydropwer plant as the continuation of the hydropower plants on the Drin River that were built by the communist regime -- the "Light of the Party" at Fierze, a second at Koman and a third named after China's communist leader "Mao Tse Tung" at Vau i Dejes.
He also added the initial plan was to build a hydropower plant at Bushat, but it was moved to Ashta for environmental reasons.
Albanians have been plagued for decades by lengthy and frequent power cuts caused by drought, the dilapidation of the communist-era grid and a failure to build new hydro and thermal plants.
The government hopes to improve the power supply by selling the power distributor to CEZ, building new sources of power like Verbund's Ashta plant as well as thermal plants and by connecting its network to Montenegro and Italy.
www.reuters.com
SADOSI September 30th, 2008, 06:32 PM TIRANA, Sept 30 (Reuters) - Austria's Verbund (VERB.VI: Quote, Profile, Research, Stock Buzz) on Tuesday signed a deal to build a 160 million euro ($229.6 million) hydropower plant on northern Albania's Drin River, the fourth plant on the river but the first there for 30 years.
"We plan to be in operation in 40 months," Christian Kern, a member of Verbund's managing board told Reuters after signing with Albania's Energy Minister Genc Ruli.
"For us it is important to be here because we have a strong presence in Central Europe, Italy and Turkey. Therefore it made sense to expand in the Balkans. If you look at the fundamentals, there will be a significant demand here that will outperform the rest of Europe," Kern added.
He said Verbund, Austria's leading power producer, plans to invest over four billion euros in Turkey in hydropower and gas-fired plants. Verbund has bought a power distribution company near Ankara that had three million clients, Kern added.
To win the Albanian concession for the Ashta hydropower plant in July Verbund beat a rival bid from a joint venture linking Compagnie Nationale du Rhone (CNR) and Electrabel, both controlled by French utility company Suez (LYOE.PA: Quote, Profile, Research, Stock Buzz).
Verbund said it will build the hydropower plant at Ashta, which would have a capacity of 48 MW and an annual production capacity of 230 GWH, in a joint venture with Austria's EVN (EVNV.VI: Quote, Profile, Research, Stock Buzz).
EVN withdraw from a tender on Monday to buy 76 percent of Albania's power distributor. The Czech power utility CEZ CEZsp.PR won the deal on Monday with a 102 million euro bid.
EVN is also negotiating an approximately one billion euro project to build hydropower plants on the Devoll River in Abania's east.
"I hope EVN will also make the necessary concessions in the project of the Devoll River (to conclude the deal)," Prime Minister Sali Berisha told the audience of businessmen and reporters attending the signing of the deal.
Berisha saw Verbund's Ashta hydropwer plant as the continuation of the hydropower plants on the Drin River that were built by the communist regime -- the "Light of the Party" at Fierze, a second at Koman and a third named after China's communist leader "Mao Tse Tung" at Vau i Dejes.
He also added the initial plan was to build a hydropower plant at Bushat, but it was moved to Ashta for environmental reasons.
Albanians have been plagued for decades by lengthy and frequent power cuts caused by drought, the dilapidation of the communist-era grid and a failure to build new hydro and thermal plants.
The government hopes to improve the power supply by selling the power distributor to CEZ, building new sources of power like Verbund's Ashta plant as well as thermal plants and by connecting its network to Montenegro and Italy.
www.reuters.com
40 months seems like such a long time..:bash:
Buddy Holly September 30th, 2008, 09:44 PM 40 months is not a long time. a lot of the equipment needs to be manufactured after the order comes in, and it takes a long time to do that. 3 years is not a bad timeframe.
GreenAlbanian September 30th, 2008, 10:06 PM si do te ndertohet ky hidrocentral, me koncesion apo do jete prone e perjetshme e investuesit?!!!
shpresoj te kete sa me teper perdorim te ujit dhe eres ne menyre qe te ruajme ambientin dhe te shfrytezojme pasurite u ujit qe jane, mos te harrojme qe shqiperia, kroacia dhe mal i zi jane tre shtete me pasurit me te medha ujore ne europe!!!
SADOSI October 1st, 2008, 01:00 AM 40 months is not a long time. a lot of the equipment needs to be manufactured after the order comes in, and it takes a long time to do that. 3 years is not a bad timeframe.
In comparison the Hoover Dam was built back in 1935 and it took 5 years to complete.
Buddy Holly October 1st, 2008, 02:48 AM In comparison the Hoover Dam was built back in 1935 and it took 5 years to complete.
which doesn't say much because Hoover Dam was financed with government money while this is financed by private firms. They'll take their sweet time to gather the money and logistics and 3 years is not a very long time anymore. For comparison, Kosova C will take at least 4 years to build.
Tartanzan October 22nd, 2008, 11:06 AM Sektori minerar, italianet kerkojne burime te reja
E Merkure, 22 Tetor 2008
Investimi ne sektorin minerar ka terhequr vemendjen e investitoreve italiane, te cilet ne bashkepunim dhe me biznesin vendas kerkojne te perfshihen ne zonat qe jane ende te pazbuluara. Dje, Instituti Italian per Tregtine, ICE ne kuader te Festivalit te pare Italian ne Shqiperi, organizoi nje takim me biznesmene italiane e shqiptare nga sektore te ndryshem te ekonomise, ne qender te se cilit ishin mundesine e njohjes se zonave shqiptare qe jepen me koncesion per investime prodhuese me qellim, shfrytezimin e pasurive te rendesishme te nentokes shqiptare. Francesco Vitulli, Drejtor i ICE-s, duke vleresuar organizimin e ketij aktiviteti, u shpreh se permes tij, synohet sensibilizimi i investitoreve dhe biznesit italian per te financuar ne Shqiperi me qellim, rritjen e bashkepunimit ekonomik me dy vendeve. "Italia, theksoi Vitulli, eshte shume e angazhuar ne zhvillimin e ekonomise shqiptare permes bashkepunimit per terheqjen e investimeve italiane si dhe zhvillimin e aktiviteteve dhe konsolidimin e shkembimeve tregtare". Gjate takimit, ku merrnin pjese dhe perfaqesues nga ministria e Ekonomise, Tregtise dhe Industrise, u vu theksi ne zhvillimin e sektorit te nentokes, i cili po behet gjithmone e me shume terheqes per investime te reja, pasi zona te ndryshme mineralmbajtese, jane ende te pazbuluara dhe te pa kerkuara, pasi vlerat financiare te kerkimit, zbulimit dhe nxjerrjes, jane te larta.
Studimi
Ne baze te nje studimi te "Albinvest", perpunimi i thelle i mineraleve ne vend perben nje nga fushat me interes, per thithjen e investimeve te huaja, krahas rezervave ende te pazbuluara, vecanerisht te depozitave te mineraleve fosfatike dhe boksiteve.
Source: http://kohajone.com/html/artikull_32397.html
Scanderbeg December 7th, 2008, 12:12 PM Gjiri i Vlores, 250 kulla nga 12 metra te larta
E Shtune, 06 Dhjetor 2008
Denisa Xhoga
Gjiri i Vlores, nga Karaburuni, Orikumi, Dukati, parku i Llogarase, Rradhima do te rrethohet nga 250 kulla. Projekti i kompanise "Monkada" parashikon nje investim prej nje miliarde euro. Kjo eshte nje nga pikat e marreveshjes se nenshkruar prej kryeministrit italian Silvo Berluskoni dhe kryeministrit shqiptar Sali Berisha, disa dite me pare ne vendin tone. Marreveshja eshte koncensionare. Ndertimi i ketij impianti nuk u jep zgjidhje problemeve imediate te energjise, por eshte nje investim afatgjate.
Koncesioni
Keshilltarja e kryeministrit per ekonomine Suzana Guxolli, shpjegon se linja e kabullit i eshte dhene me koncesion kompanise italiane per 20 vjet, ndersa impianti i mullinjve me ere per 30 vjet. "Pas 30 viteve impianti i kthehet si prone qeverise shqiptare, pra OSSH-se, Operatorit te Sistemit Shperndares te Energjise elektrike", thote Guxolli, Sipas saj, investimet e para per kete impiant pritet te nisin ne pranvere te vitit te ardhshem.
Dy mundesi
Gjithe projekti shtrihet ne nje siperfaqe prej 5 mije kilometra katror, prone e banoreve te ketyre zonave. "Banoreve ju jane dhene vetem dy alternative. Dhenie me qera te tokes per kompanine dhe shitje te saj ne ato pjese ku do te ngrohen kullat", deklaron Guxolli. Nje pjese e ketyre pronareve e kane token te perfituar nga ndarja per fryme me ligjin 7 5001 dhe nje pjese tjeter te trasheguar.
Shitje e lire
Sipas saj, Italia eshte nje treg shume i uritur per energji elektrike, nderkohe qe eshte pasuruar me prodhues, nuk ka me vende prodhuese. Sa per vendet te cilave do t'ju shitjet kjo energji e prodhuar, ajo shprehet se i gjithe tregu ne Evrope ka nevoje per energji, duke nenkuptuar dhe Shqiperine. "Shitjen e kryhen vete kompania Monkada", deklaron Guxolli.
Si do te ngrihet impianti
Ne vetvete projekti perfshin hapje rrugesh te reja deri 70 kilometra. Do te kryhen shume punime, pasi duhet te krijohet nje link nenujor, qe perfundon ne stacionin e fshatit Babice. Konkretisht kemi te bejme me 250 kulla nga 120 metra te larta, qe do te rrethojne gjirin e Vlores. Secila kulle do te jete 78 metra e larte, ndersa krahet e helikes do te kete nje diameter prej 80 metra. I gjithe impianti lidhet nepermjet nje linku qe shkon nga nje nenstacion ne stacionin tjeter elektrik, ate te plazhit te vjeter ne Vlore dhe qe andej nepermjet nje linku nenujor kthehet ne bregun tjeter te Adriatikut ne Itali. Sipas projekti fuqia e nje kulle eshte 2 mije kilovat, ndersa e gjithe impiantit te instaluar eshte 500 mije kilovat.
Energjia e prodhuar prej eres, me e pastra
Pavaresisht nga gjithe retorikat, energjia qe prodhohet me ere konsiderohet si me e pastra per sa i perket demit ekologjik, ajo nuk krahasohet as me demin qe krijon energjia e prodhuar me qymyr guri, nafta, apo nga uji. I vetmi dem qe shkaktohet ne mjedis eshte ajo e krijuar nga fuqia e rrotullimit te helikave te mullinjve, pasi shkaterrohet flora, mungojne zogjte dhe insektet, qe duhet te kishte ne nje gjendje normale mjedisi perreth. Nderkohe dhe nje peizazh i mbushur me kulla perreth, nuk eshte i mire per syrin e nje turisti. Rrjedhimisht pritet qe turizmi te mos kete nje zhvillim normal ne keto zona.
http://www.kohajone.com/html/artikull_34528.html
Obelixx December 13th, 2008, 11:23 PM Are there powerline interconections from Albania to other countries?
Buddy Holly December 13th, 2008, 11:50 PM Are there powerline interconections from Albania to other countries?
Obviously, otherwise Albania wouldn't be able to import or export energy. A new 400kV interconnection is U/C to connect Albania and Kosova to aide with the distribution of electricity and import/export.
Tartanzan December 17th, 2008, 04:55 PM Enel to Transfer its Investments in Albania
Tirana, Dec. 17, 2008 (AENews) - Italian energy giant Enel intends to cancel its projected investments in Italy and to transfer them to Albania, in order to bypass environmental costs, newsitaliapress.it reported on Tuesday.
Local politician from the Veneto region in Italian north-east, Renzo Marangon, said in a press release that he was informed about the possible abandon of a 2 billion Euro worth project in Porto Tolle in North-East of Italy, after that a court ordered Enel to improve its technology and to reduce pollution, something that would rise the cost of investment.
I have been informed that Enel CEO, Fulvio Conti, have communicated with Italian Prime Minister Silvio Berlusconi and Albanian Sali Berisha, about the possibility to transfer in Albania this investment, Renzo Marangon said in a press release. Mr. Marangon is concerned about the loose of business and jobs for his region.
On December 3 2007, Enels CEO Fulvio Conti and the Albanian Minister of Economy, Trade and Energy Genc Ruli signed a memorandum of understanding for the development of the Albanian energy sector. Under the agreement the company committed to the development of a 1,300 MW coal-fired plant and the construction of a power interconnection line with Italy.
However, environmental groups charge that Albania does need such large power plants and they are being built without informing the public fairly on their environmental impact.
At one meeting that Enel held with local villagers to discuss the environmental impact, they spoke in English, Xhemal Mato, head of Albanias Environmental League told Balkan Insight.
According to Mato, with the plants Albania will move from having 98 percent of its power generation carbon emission free, to roughly 40 per cent.
The only reason Enel is coming to Albania is that they cannot pollute at home, he added.
According to the regional environmental organization South East Europe Development Watch, SEEDW, ENEL its relying on Albanias developing country status under the Kyoto Protocol, to promote a series of carbon-heavy power generation facilities.
: The chequered history of the Durres coal-fired thermo-power plant, instigated by the Albanian Ministry of Economy, Trade and Energy and eyed by the Italian energy company Enel, illustrates how a country in transition has chosen to deal with the legacy of an obsolete energy strategy, a chaotic political culture and dominant foreign investors, notes SEEDW.
Over the past two years, Albania has been hit by an acute energy crisis, with regular power cuts throughout the country, including the capital Tirana.
Almost all of Albanias domestically-produced electricity is generated by hydro-power plants, which are badly affected by droughts, but even when rain is plentiful, the obsolete distribution grid causes major problems.
International organisations that monitor the Albanian economy, including the International Monetary Fund and the World Bank, have expressed concern that the energy crisis could have an adverse effect on the countrys robust economic growth, which has been averaging close to 6 percent per annum since 2006.
Source: Albanian Economy News (http://www.albanianeconomy.com/news/2008/12/17/enel-to-transfer-its-investments-in-albania/)
Tartanzan December 17th, 2008, 04:57 PM Albania opens bid for key hydro power plant
Tirana, Dec. 16, 2008 (AENews) Albanian Ministry of Economy, opened a bid for Skavica Hydro Power Plant on upper edge of Drini river, considered the most important energetic project in the country.
Interested companies can submit their projects till December 17. The Skavica Hydro Power Plant is on offer under Build-Own-Transfer concessionary term, - the ministry said.
Skavica was projected first back in 80′ with an installed capacity of 250 MW and a yearly production of 1.3 TW.
Back on 2004, Government of Albania signed a concessionary agreement to build Skavica plant with a group of Italian companies. TGK Skavica Srl, changed the design of the hydro power plant and proposed a new design that will increase the installed capacity to 500 MW. Total investment is expected to Euro 600 million.
Previously, Ministry of Economy, had declared that he intended to conclude negotiations with TGK Skavica Srl, the original Italian consortium, but by law, the concession should be signed after a formal bid.
Source: Albanian Economy News (http://www.albanianeconomy.com/news/2008/12/16/albania-opens-bid-for-key-hydro-power-plant/)
Tartanzan December 17th, 2008, 04:58 PM Verbund Signs Ashta Power Plant Contract with Albanian Government
Tirana, Dec. 13, 2008 (AENews) - The concession agreement for the Ashta power plant on the river Drin was signed on September 30 in the presence of Albanian Prime Minister, Sali Berisha. The run-of-river plant will be erected south of Shkoder, the fourth largest town in Albania. Industrially managed by Verbund, the project will be constructed jointly with EVN.
Both companies will have a 50 % shareholding in the project company. The project, which has a planned investment volume of Euro 160 million, involves the construction and operation of a run-of-river plant with an installed capacity of 48 MW and a forecasted annual generation amount of 230 GWh (this corresponds to approximately one quarter of the Freudenau power plant on the river Danube in Austria). Commissioning is scheduled for 2012.
Power plant information
Ashta is the final power plant step in a chain of three existing power plants and utilizes the head between the Spathara reservoir, which is fed by the river Drin, and the Drin estuary in the Buna.
A so-called Straflo Matrix will be installed in the Ashta run-of-river plant. Instead of one large turbine, this new technology employs several small ones. As a result, it will be possible to utilize even low current speeds and thereby increase efficiency. An additional benefit is the shortened construction period.
Electricity for Albania
Over a 15-year-term, 100 % of the electricity generated in Ashta will be collected by Korporata Elektroenergjetike Shqiptare (KESH), the state-run Albanian energy provider. After that, the term can either be extended or the electricity can be sold on the open market.
Ashta is the first international joint venture by Verbund and EVN. The project is also the Albanias first large hydropower plant concession contract to be signed with an international partner. The concession is granted for 35 years, including construction period.
Verbund as best bidder
The Albanian government launched the call of tenders on 15 January 2008. In an international bidding process, Verbund asserted itself against international competition and was selected by the Albanian government in July 2008 as the best bidder for the project in northern Albania.
This is a press release from Verbund company
Source: Albanian Economy News (http://www.albanianeconomy.com/news/2008/12/13/verbund-signs-ashta-power-plant-contract-with-albanian-government/)
Shqiptario December 17th, 2008, 11:58 PM Energjia, Enel gati tė transferojė 2 mld euro investime nė Shqipėri
Gjigandi italian i energjisė, Enel pritet tė braktisė njė projekt prej 2 mld eurosh nė Porto Tolle tė Venetos nė Itali, pasi gjykata ka urdhėruar qė tė pėrmirėsojė teknologjinė dhe tė ul ndotjen. Me njė marrėveshje me qeverinė shqiptare investimi i Enel pritet tė bėhet nė Shqipėri, ku kompania planifikon ndėrtimin e njė TEC-i me qymyr si dhe ndėrtimin e njė linje interkonjeksioni me Italinė pėr transferimin e energjisė.
VENETO- Gjiganti italian i prodhimit tė energjisė, planifikon tė ndėrpresė projektet e investimit nė Itali dhe ti transferojė ato nė Shqipėri.
Njė zyrtarė lokal nga rajoni i Venetos nė Italinė e verilindjes, Renzo Marangon tha nė njė deklaratė shtypi se Enel pritet tė braktisė njė projekt prej 2 miliardė eurosh nė Porto Tolle, pasi gjykata ka urdhėruar qė kompania tė pėrmirėsojė teknologjinė dhe tė reduktojė ndotjen e ambientit, gjė e cila rrit edhe koston e investimit.
Jam informuar se shefi i Enel, Fulvio Conti ka komunikuar me Kryeministrin Silvio Berluskoni dhe Sali Berishėn, rreth mundėsisė pėr transferimin e investimit nė Shqipėri tha Renzo Marangon. Ai njėkohėsisht ka ngritur edhe shqetėsimin pėr humbjen e vendeve tė punės nė kėtė rajon.
Nė datėn 3 dhjetor 2007, shefi i Enel, Fulvio Conti dhe ministri i Ekonomisė dhe Energjetikės, Genc Ruli nėnshkruan njė memorandum mirėkuptimi pėr zhvillimin e sektorit tė energjisė. Sipas kėsaj marrėvesje kompania ra dakord tė zhvillojė njė tec me qymyr me kapacitet 1300 megavat, dhe ndėrtimin e njė linje transmetimi tė energjisė pėr nė Itali.
Gjatė dy viteve tė fundit, Shqipėria ėshtė goditur nga njė krizė e rėndė energjetike, me ndėrprerje tė vazhdueshme tė energjisė nė tė gjithė vendin.
Pothuaj e gjithė energjia nė Shqipėri prodhohet nga hidrocentralet dhe nė mungesė tė rreshjeve mungesa e energjisė bėhet njė problem i madh.
Organizatat ndėrkombėtare qė kanė monitoruar ekonominė shqiptare, pėrfshirė FMN-nė dhe Bankėn Botėrore , kanė shfaqur shqetėsimin se kriza energjetike mund tė ketė njė efekt tė madh nė reduktimin e rritjes ekonomike, e cila ka qenė afėr nivelit 6% qė prej vitit 2006.
http://www.balkanweb.com/sitev4/index.php?id=31115
Ermir December 19th, 2008, 03:58 PM * EVN says Devoll is Europe's biggest power project
* Stakraft gets foothold in one of fastest growing markets
By Benet Koleka
TIRANA, Dec 19 (Reuters) - Austria's EVN (EVNV.VI: Quote, Profile, Research) and Norway's Statkraft [STATKF.UL] signed a 950 million euro ($1.37 billion) deal with Albania on Friday to build three hydroelectric power plants in the Devoll river valley.
EVN and Statkraft, which each have a 50 percent share in the venture, will build three peak-load hydropower power plants over eight years, in a project they called the biggest hydro power project in Europe. The plants will have a total capacity of around 340 MW that will generate around 1,000 GWh annually.
"The unique size and complexity of the Devoll hydropower project, the biggest ever investment in Albania and currently the biggest hydro power project in Europe, justified our enormous efforts," EVN's Chief Executive Officer Burkhard Hofer said just before the deal was signed.
"We are going ahead with these projects despite the current financial crisis and to do this now is also a very strong expression of confidence in Albania."
The companies have been negotiating a contract with Albania since January, when they won a build-operate-transfer concession for 35 years, or until the project reaches 59 TWh -- or 59,000 GWh -- to exploit the whole potential of the Devoll river valley.
Ragnvald Naero, Statkraft's executive vice president, said the project could increase the hydropower production of Albania by 20 percent, and would create jobs and stimulate the economy.
"Devoll gives Statkraft a foothold in one of the fastest growing markets for hydropower in Europe, a market that is increasingly interlinked with the rest of the European energy market and the European Union, supported by the European Energy Treaty," Naero said.
He added that Albania, Austria and Norway were all hydropower nations. The Devoll hydropower project is the second to start here this year, 30 years after the last hydropower station was built in Albania under communism, which was toppled in 1990.
One of the three plants in the project is a partially constructed hydropower station in Banja, which was abandoned at the end of the communist regime.
Another plant will be built at Lozhane-Grabove and the third one at Skanderbegas.
Currently, three hydropower stations on the Drini River supply 95 percent of Albania's power, with an installed capacity of 1,450 MGh.
However, they have not been able to meet the growth in demand since the end of communism, resulting in power shortages. (Editing by Karen Foster)
http://uk.reuters.com/article/oilRpt/idUKLJ27130320081219?sp=true
Kapedani December 19th, 2008, 10:45 PM with an installed capacity of 1,450 MGh.
WTF is a "MGh"?? :) Gazetar Shqiptar thuaj...
Artikulli mund te thot "me i madhi ne Evrope" etj etj...me 340MW..eshte nje projekt mesatar. Plus...35 vjet koncesion ose deri sa te arrij 59 TWh prodhim...i shkojne kompanise private...jo KESH-it. Nejse...
Tartanzan December 21st, 2008, 01:15 PM WTF is a "MGh"?? :) Gazetar Shqiptar thuaj...
Artikulli mund te thot "me i madhi ne Evrope" etj etj...me 340MW..eshte nje projekt mesatar. Plus...35 vjet koncesion ose deri sa te arrij 59 TWh prodhim...i shkojne kompanise private...jo KESH-it. Nejse...
Meqe do privatizohet edhe KESH-i (sektori i prodhimit te energjise) me vone, ne fund te fundit nuk do luaj me rol, se kush e shet energjine. Por per momentin ke shume te drejte me ate qe thua.
Huti December 21st, 2008, 01:53 PM Are there any project in this area(energy) that would be totally in ,,our hands,,(no foreign investors)?
AltinD December 21st, 2008, 02:31 PM ^^ Do we have anough money to finance any of them?
Answer that and you'll have also the answer to your own question on the post above.
Tartanzan December 21st, 2008, 02:33 PM Are there any project in this area(energy) that would be totally in ,,our hands,,(no foreign investors)?
Nope. The bottom line it plays no rolle who produces the energy, as long as the energy is purchasable...
Huti December 21st, 2008, 05:02 PM Po, por me ter milionera qe i kena all over the world,....
Tartanzan December 25th, 2008, 02:26 PM KESH dhe OSSH 30 milione dollare kredi
Ne kete akt normativ vendoset dhenia e 30 milione eurove kredi kompanive shteterore qe tashme kane nje histori te vazhdueshme borxhesh. Ne liste jane KESH he kompania e tij bije OSSH. Krahas ardhjes ne ndihme ndaj KESH-it dhe OSSH-se, ministri i Financave, beri te ditur edhe nje sere sektoresh te tjere te cilet gjithashtu do te perfshihen ne listen e perfituesve nga rialokimi i buxhetit te ketij viti. Duke analizuar gjendjen e financiare te KESH-it, ministri i Financave deklaroi se eshte parashikuar qe kesaj kompanie t'i ofrohen 2.6 miliarde leke ne forme kredie me interes zero.
Burimi: Koha Jone (http://kohajone.com/html/artikull_35397.html)
Taulant December 26th, 2008, 04:40 PM What does OSSH mean?
Shqiptario February 25th, 2009, 12:22 AM What does OSSH mean?
OSSH-Operatori i Sistemit te Shperndarjes
Shqiptario February 25th, 2009, 12:24 AM Tec-i ne Durres, perfundon studimi
http://www.top-channel.tv/new/foto/lajme/energjia-stacion.jpg
Konsorciumi Greko-Gjerman mes PPC dhe REE, njoftoi se shume shpejt do ti parashtroje Ministrise shqiptare te Energjitikes oferten per ndertimin e nje termocentrali me qymyr duke zbuluar per here te pare edhe vendin se ku do te ndertohet kjo veper.
Gazeta greke Imerisia ben te ditur se oferta eshte miratuar nje dite me pare nga bordi i drejtoreve te kompanise greke dhe ajo parashikon ndertimin e nje termocentrali me qymyr ne Porto Romano te Durresit.
Termocentrali do te ndertohet ne nje siperfaqe prej 33 hektaresh dhe do te kete nje fuqi prej 770 deri ne 800 megavat, gati 8 here me i madh nga tec-i i Vlores.
Sipas planit, te bere nga konsorciumi, parashikohet qe ndertimi i termocentralit qe do te punoje me qymyr importi, do te filloje ne fund te vitit te ardhshem dhe do te zgjase 6 vjet.
Gjermanet zoterojne 51 per qind te aksioneve, kompania publike greke 39 per qind dhe kompania tjeter greke Titan, 10 per qind. Gazeta ben te ditur se oferta do te mberrije ne Ministrine shqiptare te Energjitikes brenda ketij muaji dhe ne te parashikohet qe nje pjese e energjise, sasia e te ciles ende nuk behet e ditur do te importohet per nevojat e Greqise.
http://www.top-channel.tv/new/artikull.php?id=144039
BledarDurrsaku February 25th, 2009, 01:30 AM Now they are presenting a new project. They said that the environment of Porto Romano is already "heavy" and dirty with chemicals that were spread around from the chemical factory. The Italian project for construction of two TEC-s was rejected for this reason. What is the difference between the ENEL project with this new one? Is this going to be any cleaner!!!
Is this new project going to be more profitable?
Or is this going to be more attractive and lovely? :lol:
Kapedani February 25th, 2009, 01:43 AM ENELs TEC was not rejected because "the area is already dirty". In fact I'm not sure it was "rejected"...other than the mayor of Durres saying he didn't aprove of it (but no one gives a crap if he does...its not even in his territory).
If ENEL pulls out...it will be because ITALY wants to have it in its own territory now...rather than Albania.
This Greek-German project is the replacement...for ENEL-s project. Only one will be build...if ENEL pulls out...this will be build.
Saying the area is already dirty...isn't a reason for not building it but actually is the reason for building it THERE. Its useless land...
And as far as pollution...once more...these modern power plants produce far less pollution than the cars in Durres produce. WHY is it so hard to understand?? Its not very hard...
PS: BTW did you figure out yet how many power plants there are around Worcester yet?? ;)
BledarDurrsaku February 25th, 2009, 05:18 AM I wouldn't say "useless land". That is not piece of desert or useless land. I have lived in Durres and I know the area of Porto Romano. I have also been in the beach area which is behind the polluted area where the chemical factory used to be. Have you been in the beach area? It is has a decent beach, with smooth hills covered with trees all along the coastline which goes up to the cape. There are also archeological remains dating from Illyrian and later from Roman era. Also a fortress which I believe dates to a later time, during the "Scanderbeg era".
Maybe you should refer to Porto Romano as a strategic area, but not as a useless land. It is strategic because it has a small port that will be used to unload the coal, it has the sea where the water will be dumped, and the area will be also connected with a railroad line.
My point is simple. Can the coal plant and the environment get along with each other? In our previous discussion you said that in Boston, there is TEC, but the impact on the environment is not harmful. So, Boston is not only an industrial area, it is also an attractive tourist area.
If a Tec is going to be built there (and if it is as you say
.that the modern technology limits the pollution in the environment), they should find a solution in order to use the land not only as an industrial zone but as a tourist zone (as Boston for example). I think that the TEC and the environment should go hand in hand.
Lets not talk about the environment for a moment and focus on the TEC. Why not building only one Tec, the energy of which to be used only in Albania.
A TEC with 100 MW capacity which can be used only for Albania will require less land (compared with two gigantic Tec of 800 MW). The cost of a small Tec will be affordable for our government with the use of international bank loans. It will pollute 16 times less. It will still leave space that can be used for tourism, for archeological purposes, or maybe a fishing or yaht boat area.
If you built two Tec of 800 MW, the whole area will be occupied. It will require more ships of coal, it will create more pollution, and more dirty waters to dump. And by the way, the profit will be the same considering that maybe 95% of the electricity will be sent overseas. Basically, these two tec-s will not belong to us for at least 35 years.
My judgment refers not only to the environment impact, but to the economical profit not only of electricity but the use of land. As I said, the area can be used for different purposes at the same time.
thebackdoorman February 25th, 2009, 07:09 AM Though I am suspicious of such projects, porto romano cannot become a tourist or yacht zone. Even without the TEC it has been a polluted industrial area, becoming more so even after communism. My problem with the italian approach was political, that it sounded too much along the lines of Daewoo's move in another region of the world. But when you have too little, there is even less you can expect.
Kapedani February 25th, 2009, 09:14 AM I wouldn't say "useless land". That is not piece of desert or useless land. I have lived in Durres and I know the area of Porto Romano. I have also been in the beach area which is behind the polluted area where the chemical factory used to be. Have you been in the beach area? It is has a decent beach, with smooth hills covered with trees all along the coastline which goes up to the cape. There are also archeological remains dating from Illyrian and later from Roman era. Also a fortress which I believe dates to a later time, during the "Scanderbeg era".
My dear it is clear that you have never been there. You are talking about Kepi i Rodonit...which is located a good 10-15 miles to the north.
Porto Romano...is a pathetic sight. It is farmland, it is polluted chemical area, it is a naval base, it is now also a fuel terminal with fuel and gas tanks.
The coast at Porto Romano has not a single tree in it nor a single piece of sand worthy for a tourist from Skrapar...let alone a foreigner.
You are mistaken. The area there IS the perfect place for any industrial project...because it is useless for anything else other than industry.
My point is simple. Can the coal plant and the environment get along with each other?
I don't know ;) Ask the Americans and the 56 new coal plants they are building this year...or the Germans and the 25 they are building....or the Italians and the 3 new ones they'r building.
Don't ask questions to which you can't UNDERSTAND the answer.
In our previous discussion you said that in Boston, there is TEC, but the impact on the environment is not harmful. So, Boston is not only an industrial area, it is also an attractive tourist area.
There's about 8 powerplants in the Boston area :)
So you answered your own question.
they should find a solution in order to use the land not only as an industrial zone but as a tourist zone (as Boston for example).
Comparing Boston to Katundi i Ri...is like comparing Boston to Katundi i Ri :)
Albania needs energy...it needs jobs...then worry about the torusit prospects of...Katundi i Ri :)
Why not building only one Tec, the energy of which to be used only in Albania.
A TEC with 100 MW capacity which can be used only for Albania will require less land (compared with two gigantic Tec of 800 MW). The cost of a small Tec will be affordable for our government with the use of international bank loans. It will pollute 16 times less. It will still leave space that can be used for tourism, for archeological purposes, or maybe a fishing or yaht boat area.
:ohno::ohno::ohno::ohno::ohno:
Where to begin :( First of all forget about torusim and yachts...touring Porto Romano is like touring the remains of Chernobyl. Porto Romano is the worst polluted piece of land in the entire territory of Albania.
Secondly...the problems of a powerplant are not the area they cover :) They'r quite small and compact.
Third...because the Albanian government is ALREADY building a TEC of 100MW in Vlore for our own needs. But thats all we can afford.
Fourth...and most importantly...because Albania needs a LOOOT more than 100MW TEC to meet its energy demands...today and tomorrow.
You WILL be looking at something in excess of 700-800MW installed capacity ONLY for Albania's needs. This will include the TEC in Vlore, in Fier, the new one in Lezha, possibly a second one in Fier...plus the one in Porto Romano. They have to be BIGGER (and 800MW...is by far not a "big" one...1600MW is a large one)...because the INVESTOR will also want to make a profit on it (duh!!) and thus keep or sell a portion of the energy produced somewhere else (a perfectly common practice in the world). So when they build a TEC of 1600MW for exmple...it means that Albania gets the equivalnet of a 300MW TEC for its own uses. The rest goes for export. Perfectly normal. And NO we couldn't afford to build a 300MW one on our own...and we wouldn't WANT to build one...if some Itlalian or German or Greek company...is willing to build it for FREE.
Fifth...because if we build it ourselves...we will build it like we'v build everything else...like a piece of crap. We DON'T HAVE the technical base for it. But most importantly...because this TEC will HAVE to be with coal. And there's a simple reason why it will HAVE to be with coal. Because it will be the main BASE load power plant in the country...and as such it will have to be of a type that will be running for prolonged periods of time. A gas or oil power plant...is prohibitive because of the price of gas and oil. Coal is the easiest way to do this...plus by far the cheapest. And if we'r going to build a cleaner coal plant..we can't use OUR coal because it won't do...it will have to be imported. And at what cost and what logistics? And we can't build one with the latest modern technology either.
So either way someone else will have to build it and operate it...until we learn. And if someone is willing to do wit for FREE...then of course we want it.
If you built two Tec of 800 MW, the whole area will be occupied.
Do you have any idea how big these things are?? ;) When they say "two 800MW"...it doesn't mean two separate powerplants...it means two boilers of 800MW capacity each...
You'r talking an area smaller than 100 x 100m
And by the way, the profit will be the same considering that maybe 95% of the electricity will be sent overseas. Basically, these two tec-s will not belong to us for at least 35 years.
It was already explained that from ENEL-s project Albania gets 2TWh of energy per year...which represents no less than 50% of the energy Albania produces today (meaning an increase of 50%!!).
And thats not 5% of the plants production ;)...nor is 2TWh small in any means...it is a HUGE deal.
Its like this. It costs you NOTHING to build it. It costs you NOTHING to maintain it, operate it or fuel it. And in return you get to incrase your energy production by 50%...at production costs (meaning you pay for it as much as it costs to produce it...which is less than MARKET VALUE).
And in return?? a 200m plot of land in a CRAP hole like Porto Romano...and an increased air pollution in the surrounding area representative of about 10% of the cars in the surrounding area.
I tell you thats a good deal.
As I said, the area can be used for different purposes at the same time.
Yep :) It can be used for an industrial park. it can be used for a petro-chemical storage area...etc.
----------------------------------------------
BledarDurrsaku February 25th, 2009, 06:10 PM My mistake. The fortress is in Rodon Cape. At "Bishti palles" cape there is a naval or military base. Anyway, I have been in the beach area a couple of times which is actually right beside the hills. The polluted area is further inside the land, behind the hills, and it is near by the road. Further up north there is also a farm area with vineyards. Also, during spring time you can see a lot of blooming trees (Therefore, it is not a bare land) :)
In the last years, many people (mainly from northern Albania) have built their homes very close to the polluted area. Now this is a paradox!!!:ohno:
Several projects have been presented for the Porto Romano area, besides projects from ENEl or other energetic companies. There was a plan for building a port for fishing and yacht boats. (by the way it is not a bad idea to move those shipping boats away from the port of Durres, because they are getting crammed or they sink after a wind storm). There was another plan for a fishing factory.
Another project was presented by a German company, to build a pharmaceutical enterprise. (This is very good for employment, and usually pharmaceutical companies pay very good money). Another project foresees the construction of a cement and brick factory, nearby the TEC. There are also projects in infrastructure. They plan to build a road that goes from Currila, along the coast to Porto Romano and up north to Bishti Palles and along Lalzi bay. Also there is a plan for a railroad to link Sukth with Porto Romano.
By the way, there is no need to compare Boston with Katundi i Ri. :) I used Boston as an example, to mention the integration of the industrial zone with the tourist area. The problem is not only the integration, or the environmental impact. In the last decades it has been a very common phenomena the construction of projects without future prospects. Buildings have been build in the wrong place, roads have been constructed without an urban plan. And I am skeptic and suspicious. I hope they will make the right choice. And hopefully the younger generation will not look at this TEC or other constructions, as a mistake that has been made in the past. The same way we look now at the old chemical factory.
We have different opinions on this matter. You think that the TEC is a very good deal. I doubt that in the future this TEC might look out of place.
Black_Seagull February 27th, 2009, 06:43 PM Une jam me BledarDurrsakun per sa i perket ndertimit te Tecit. Shqiperia nuk ka nevoje per tece qe jane super te medhenj, dhe qe do te furnizojne Italine apo Greqine. Ky kapedani nuk llogarit fare problemet e mjedisit qe shkaktojne tecet.
daalbo February 27th, 2009, 08:05 PM Jo, por ai llogarit problemet e te mos pasurit drita dhe te tharit dhembet ne dimer.
Kapedani February 27th, 2009, 08:59 PM Ky kapedani nuk llogarit fare problemet e mjedisit qe shkaktojne tecet.
Shiko jane gjera teknike kto o zotri...dhe s'besoj se je ne gjendje ti kuptosh...lere mo pastaj ti gjykosh.
Black_Seagull February 27th, 2009, 11:01 PM Per cfare gjerash tekinke? Kjo eshte matematike e thjeshte.
Nje tec rreth 150 Megavat por vetem nevojat tona. Ndotja do te jete shume e vogel.
Dy tece 1600 Megavat - pjesa me e madhe shkon jashte, por e gjithe ndotja ngelet ne Shqiperi.
Llogarit ketu edhe tecet e tjera qe jane ne projekt ose qe po ndertohen. Ai i Fierit do ta shtoj kapacitetin dyfish pasi po i shtojne nje pjese tjeter. Ai i vlores po mbaron. Do te ndertohet edhe nje ne Lezhe. Epo tani Shqiperine s'do ta mbushim gjithe tece. Ne duam tece sa per nevojat tona dhe jo per te tjeret.
Black_Seagull February 28th, 2009, 01:50 AM Projekti i ENEL ishte shume i paqarte dhe in ndikuar politikisht. Lexoni ketu qe te kuptoni se cfare loje luhet:
http://www.gazetalibertas.com/2009/01/16/porto-romano-investim-shantazh-apo-nje-skandal/
Ne porto romano kane gjetur mbetje arkeologjike shume te rendesishme:
http://www.icaa.org.al/Albanian_html/dcp.html
Keto gjera jane te thella ose shume "teknike" sic thote ky zoteria qe flet si ekspert.
AltinD February 28th, 2009, 10:29 PM Une jam me BledarDurrsakun per sa i perket ndertimit te Tecit.
Natyrisht qe do jesh me BledarDurrsakun...
Shqiptario March 1st, 2009, 05:26 PM HEC-i i Kalivaēit ėshtė nė pėrfundim
Njė ndėr veprat mė tė mėdha energjetike qė po ndėrtohet nė vendin tonė, hidrocentrali i Kalivaēit do tė jetė gati nė vitin 2011. Deri tani ka pėrfunduar pjesa dėrrmuese e punimeve, ndėrkohė qė sė shpejti do tė nisė edhe ndėrtimi i digės. Njė investim qė do tė garantojė, pėr herė tė parė gjatė 18 viteve tė fundit, furnizimin pa ndrėprerje me energji elektrike tė Jugut tė vendit. "Tashmė ka pėrfunduar 80 pėr qind e ndėrtimit tė hidrocentralit dhe shumė shpejt pritet tė fillojnė faza e fundit e veprės, qė ėshtė ngritja nė kėmbė e digės, rreth 115 metra e lartė, 87 metra e gjatė dhe 60 metra gjerėsi"- shprehen drejutesit e kantierit. Sipas tyre, lumi Vjosė ka njė prurje prej 235 metra kub nė sekondė, e mjaftueshme pėr tė furnizuar tė gjithė jugun e vendit me perspektivė 100 vjeēare. Drejtuesit e kantierit bėjnė tė ditur gjithashtu, se hidrocentrali i Kalivaēit do tė vihet nė funksion
tė plotė nė vitin 2011.
HEC-i i Kalivaēit, vepra e parė energjetike pas Komanit
Hidrocentrali i Kalivaēit ėshtė vepra e parė energjetike pas viteve ’90, qė pason atė tė hidrocentralit tė Komanit. HEC-i i Kalivaēit konsiderohet njė burim shumė i rėndėsishėm energjetik pėr vendin, pasi do tė ndikojė nė pėrballimin e kėrkesave nė rritje tė vendit pėr energji, si dhe nė uljen e varėsisė sė sistemit tonė energjetik nga importi. Punimet nė kėtė hidrocentral po kryhen nga njė bashkėpunim i kompanisė italiane “Beggetti” me bankėn gjermane, “Doice Bank”. Ecuria e deritanishme e punimeve ėshtė vlerėsuar vazhdimisht nga ministri i Ekonomisė, Tregtisė dhe Energjetikės, Genc Ruli dhe kryeministri Berisha. “Ne kemi konstatuar se firma zbatuese e projektit ka avancuar mjaft mirė nė ndėrtimin e hidrocentralit tė Kalivaēit. Punimet e kėsaj vepre tė madhe do tė pėrfundojnė brenda afateve tė pėrcaktuara nė kontratė”, ka deklaruar pak kohė mė parė ministri Ruli. Sipas
parashikimeve, hidrocentrali i Kalivaēit pritet tė vihet nė punė nė vitin 2011.
HEC-i i Kalivaēit, mbi 150 milionė euro investim
Investimet nė energjetikė konsiderohen aktualisht si shumė tė rėndėsishme pėr vendin, nisur nga fakti se energjia ėshtė shndėruar nė njė problem pėr tė gjithė rajonin e Ballkanit. Ndėrtimi i burimeve tė reja prodhuese po shihet si mėnyra mė e mirė pėr tė pėrballuar kėrkesat nė rritje. Nė kėtė drejtim, hidrocentrali i Kalivaēit dhe termocentrali i Vlorės konsiderohen nga qeveria shqiptare si dy veprat energjetike qė do tė nxjerrin pėrfundimisht nga kriza sektorin e energjisė nė vend dhe do ta zgjidhin kėtė problem nė afatgjatė. Njė dekaratė tė tillė e ka bėrė kryeministri i vendit, Sali Berisha gjatė forumit ekonomik tė “Crans Montanės”, i cili i vlerėsoi HEC-in e Kalivaēit dhe TEC-in e Vlorės si shumė tė rėndėsishėm pėr vendin. “Energjia ėshtė njė ēėshtje serioze pėr Shqipėrinė. Ne po punojmė nė shumė drejtime, duke synuar rritjen e prodhimit. Njė termocentral i ri po ndėrtohet
nė Vlorė, paralelisht po ndėrtohet hidrocentrali i Kalivaēit. Kėto janė pėrpjekje tė mėdha, qė do ta fuqizojnė ndjeshėm sistemin energjetik”, ka deklaruar Berisha.
Punimet nė kėtė hidrocentral e kalojnė vlerėn e 150 milionė eurove, njė investim kolosal, mė i madhi i bėrė nė 18 vitet e fundit nė vendin tonė. HEC-i i Kalivaēit do tė ketė njė fuqi tė instaluar prej 96 megavat orė energji dhe prodhimi vjetor do tė kapė nivelin e 400 milionė kilovat orėve. Ky hidrocentral do tė bėhet pjesė e sistemit energjetik vendas dhe do tė shėrbejė pėr njė plotėsuar njė pjesė tė mirė tė kėrkesave tė zonės pėr energji.
http://gazeta-agon.com/mat.php?idm=6284&l=a
Shqiptario March 1st, 2009, 05:36 PM Vjen ne Shqiperi, gjiganti austriak i energjise
Nje kompani, kryesuese e energjise elektrike ne Austri dhe nder ofruesit me te mire te sherbimeve te elektricitetit ne Evrope, ka shpallur ne Tirane, themelimin e projekt kompanise "Energji Ashta shpk". Verbund, ka pergjegjesi per planifikimin, ndertimin dhe drejtimin e hidrocentralit (HEC-it) te Ashtes ne afersi te Shkodres. Ne shtator 2008 Verbund fitoi koncesionin per ndertim dhe udheheqjen e funksionimit ne 35 vjet te hidrocentralit qe do te ndertohet ne Ashte. Ky projekt do te kete ndikim te ndjeshem ne gjendjen energjetike ne Shqiperi. Gjate venies ne pune, HEC-i i Ashtes do te furnizoje me energji elektrike me shume se 100 mije ekonomi shtepiake shqiptare. HEC-i i Ashtes eshte i fundit ne ujevaren e lumit Drin dhe eshte i vendosur nen rrjedhen ujore te stacionit grumbullues te energjise elektrike te Vaut te Dejes. Aktualisht, pjesa me e madhe e ujerave rrjedhese mbi Spathara-n ekzistuese, kthehen serish ne lumin Drin, pa e shfrytezuar energjine e tyre. HEC-i i Ashtes do ta shnderroje kete force te pashfrytezuar ne energji elektrike miqesore ndaj mjedisit, duke perdorur teknologjine me te re dhe te sofistikuar, StrafloMatrix TM me dy seri nga 45 njesi turbina. Kapaciteti vjetor do te jete 230 GW/ore. Duke krijuar vende te reja pune, HEC-i Ashta pritet te sjelle gjithashtu nje nxitje pozitive per zonen dhe vendin ne teresi, dhe ne te njejten kohe do te permiresoje situaten e furnizimit energjik ne vend duke reduktuar varesine e importeve te energjise nga jashte - te gjitha keto me ndikim minimal ne mjedis. Ne perfundim te periudhes koncesionare, HEC-i do t'i dorezohet Republikes se Shqiperise.
Shtrirje e gjere
Kompania kryesuese e energjise elektrike ne Austri eshte perfshire ne menyre aktive ne prodhimin dhe tregtimin e energjise ne me shume se 20 vende, dhe po shtrin akoma me tej rolin e saj si kompani nderkombetare sidomos ne Turqi dhe zonat e Evropes qendrore dhe lindore, por gjithashtu ne Itali dhe France qe cilesohen si tregje strategjike. Ne 2007-en Verbund mbylli nje xhiro vjetore me me shume se 3 miliard euro dhe 2,500 punonjes.
http://www.kohajone.com/html/artikull_38205.html
AltinD March 1st, 2009, 07:00 PM HEC-i i Kalivaēit ėshtė nė pėrfundim
... Deri tani ka pėrfunduar pjesa dėrrmuese e punimeve, ndėrkohė qė sė shpejti do tė nisė edhe ndėrtimi i digės...
http://gazeta-agon.com/mat.php?idm=6284&l=a
MORONIC IDIOTS!!!
Black_Seagull March 1st, 2009, 07:54 PM :lol: It's really funny.
Diga eshte pjesa me e rendesishme e Hidrocentralit, kurse ky gazetari thote qe puna per ndertimin e diges do te filloje se shpejti. Por ka perfunduar pjesa derrmuese e punimeve. :nuts:
Ndoshta e ka fjalen per punimet qe mund te jene kryer per devijimin e lumit ne menyre qe te fillojne punimet per ndertimin e diges.
It's really funny. Our reporters are not professional.
artantirana March 1st, 2009, 08:35 PM Gazetare skandaloze. As abc e gazetarise nuk dine. Po nuk kane faj as ata. Pronaret nuk i paguajne as sigurimer shoqerore. ku ta kene me pare mendjen ata: tek pensioni i se ardhmes qe nuk do ta kene apo tek viti 2009 e viti 2011????
DanMs March 1st, 2009, 08:56 PM Kaq shume budallenj ka ne Shqiperi? Ne rime mundohemi ta pasqyrojme Shqiperine ne menyre positive ne SSC dhe te huajve, kurse ata ne Shqiperi s'duan te rregullojne vendin ku jetojne. Vetem paprofesionalizma te tilla degjojme neper gazetA, grindje, sherre, injorance, disorganizim, pluhur, hale, korrupsion, pacivilizum.... njerez te etur per materializme afat-shkurtra si makina lluksoze, jo te punojne per ardhmne, familje dhe shtepi.
Si su be njehere normal ky vend.
:bash:
daalbo March 2nd, 2009, 05:11 AM MORONIC IDIOTS!!!
:lol: That's exactly what I thought when I read the article. And if you keep reading you will see that "80%" of the construction is finished. And it would be ok if the errors in that article ended there, but it's riddled with idiotic comments like "do tė nxjerrin pėrfundimisht nga kriza sektorin e energjisė nė vend dhe do ta zgjidhin kėtė problem nė afatgjatė".
Further proof that Albanian journalists (and their equally stupid editors) are the most incompetent ever. Freedom of press in Albania has turned into a complete mockery. I have more respect for the journalists in Hoxha's time than these clowns today. At least those during Hoxha's time were way more qualified and responsible and were forced to write a certain way. But wait, Shqiptario will post an article from Shekulli or Wikipedia and call it treason when I question the source.:lol:
Kapedani March 2nd, 2009, 06:56 AM Per cfare gjerash tekinke? Kjo eshte matematike e thjeshte.
Nje tec rreth 150 Megavat por vetem nevojat tona. Ndotja do te jete shume e vogel.
Dy tece 1600 Megavat - pjesa me e madhe shkon jashte, por e gjithe ndotja ngelet ne Shqiperi.
Llogarit ketu edhe tecet e tjera qe jane ne projekt ose qe po ndertohen. Ai i Fierit do ta shtoj kapacitetin dyfish pasi po i shtojne nje pjese tjeter. Ai i vlores po mbaron. Do te ndertohet edhe nje ne Lezhe. Epo tani Shqiperine s'do ta mbushim gjithe tece. Ne duam tece sa per nevojat tona dhe jo per te tjeret.
Kur te them une qe eshte shume e komplikuar dhe teknike per ty kjo pune...nuk tallem :)
Sipas strategjise te KESH-it...Shqiperia duhet te prodhoj 60% te energjise nga TEC-e ne vitin 2020 ne menyre qe te jet i mjaftueshme prodhimi.
Sot prodhimi nga TEC-e eshte 2%.
E kupton kaq..."matematike te thjeshte"?? :)
Po e kupton gjithashtu qe sipas strategjise se KESH-it deri nga vitin 2013 shqiperise do ti duhen 1065MW prodhimtari nga TEC-e?? Dhe nga viti 2020 parashikimi eshte per 3650MW nga TEC-e??
Si te del llogaria e thjeshte ty...me kto 150MW qe shpikni nje e dy??
Lexon nga nje artikull idiot si ai i mepsipermi...ku del ndonje PSIKOPAT si Klosi apo ndonje tjeter si puna e ati...qe thone 'Shqiperisa me 100MW shpeton...c'na duhen kto te tjerat!!"...dhe ju i besoni dhe i perserisni si PAPAGAJ?? Po e merrni vesh ju...VERTET...se sa jane kerkesat dhe nevojat e Shqiperise...se sa do jene...dhe se sa dhe cfar lloj prodhimi do i duhet ne te arrdhme per ta perballuar??
Une po te jpa vetem ca informacione fillestare...qe ta kuptosh se sa gabim qe jeni...dhe sa qesharak qe beheni...sidomos kur filloni e kendoni per "NDOTJE" etj...
Black_Seagull March 2nd, 2009, 02:54 PM Nuk mund te rritet prodhimtaria duke i varur shpresat tek kompanite e huaja qe pjesen me te madhe do ta shfrytezojne per vendet e tyre, kurse Shqiperia do te perfitoje vetem "pakez drite, qe naten ta beje drite".
Shqiperise nuk i duhen zgjidhje afatshkurter. Ate perqindje te energjise qe do te perfitojme tani, (dhe qe na duket e mjaftueshme ) do te jete e pamjafueshme ne te ardhmen.
Teci i Porto romanos ishte i paqarte. Lexo pak more zoteri ate artikullin e mesiperm qe te kesh nje ide. Lexo edhe per sa i perket vlerave arkeologjike te Porto romanos. Shqiperia ka nevoje per kontrata serioze, dhe jo kontrata te paqarta dhe te ndikuar politikisht.
daalbo March 2nd, 2009, 05:21 PM Meqe ajo qe do marrim nga keto tecet do jete e pamjaftueshme ne te ardhmen atehere sipas teje do ishte me mire qe te mos ndertonim asnje. Sepse Shqiperia vete s'ka bythe te ndertoje gje.
Dhe cilat kontrata jane te paqarta dhe te ndikuara politikisht? Mos degjo se cfare thone socialistet tani ose cfare thonin demokratet para se te vinin ne pushtet. Ne Shqiperi nuk shahet nje projekt prej mangesive, por shahet per arsye politike. Nqs socialistet vijne ne pushtet ne qershor, te gjithe keto projekte qe po sulmohen tani do fillojne te lavderohen atehere.
DanMs March 2nd, 2009, 05:23 PM LOL. Shqiperine te huajt dhe diaspora e mbajne. Kur ata ndertojne ndonje projekt ne Shqiperi, patjeter qe do fitojne kot spo investojne dhe me e mira qe "qeveria" mund te perfitojne eshte ndonje taks per te vjelur qe do shkoje ne duart e hajduteve.
Ku ka kompani vendase te marri persiper ndertime energjitike. Boll na bot per te qeshur se lat nom.
Kapedani March 2nd, 2009, 08:57 PM Nuk mund te rritet prodhimtaria duke i varur shpresat tek kompanite e huaja qe pjesen me te madhe do ta shfrytezojne per vendet e tyre, kurse Shqiperia do te perfitoje vetem "pakez drite, qe naten ta beje drite".
Ke alternative tjeter me te mire ti?? :) Jo?? Atehere rri rehat
Shqiperise nuk i duhen zgjidhje afatshkurter.
Vetem zgjidhje afatshkurter nuk jane :)
Ate perqindje te energjise qe do te perfitojme tani, (dhe qe na duket e mjaftueshme ) do te jete e pamjafueshme ne te ardhmen.
?? Pra ti thua qe qenka ne DJENI se sa eshte parashikimi i kerkeses per energji ne vitin...2020 pershembull?? shume mire...kjo domethen qe paske lexuar strategjine kombetare te KESH-it dhe parashikimet e ekspertve per kerkesen ne te ardhme. (nuk besoj...po po tallem) Bravo...atehere besoj se do jesh ne gjendje te na japesh nje zgjidhje se si do perballohet rritja e kerkeses ne te ardhme...PA TEC-e :)
Teci i Porto romanos ishte i paqarte. Lexo pak more zoteri ate artikullin e mesiperm qe te kesh nje ide
Projekti i TEC-it te Porto Romano eshte shume i qart...teknollogjia eshte shume e qarte...po ashtu edhe 2TWh qe perfiton Shqiperia.
Lexo edhe per sa i perket vlerave arkeologjike te Porto romanos.
Boll folet budalleqe...ju lutem.
Shqiperia ka nevoje per kontrata serioze,
Po ju nuk jeni ne gjendje te percaktoni cfar eshte serioze dhe cfar nuk eshte.
Kshuqe nuk ja vlen te diskutohet kot se koti neper forume me njerez si ty apo Bledari
Black_Seagull March 3rd, 2009, 12:07 AM Ke alternative tjeter me te mire ti?? Jo?? Atehere rri rehat
Po zoteri. Ka alternativa te tjera. Burimet energjetike nuk jane vetem Tecat. Tecet shkaktojne jo vetem ndotje, por edhe Global Warming.
Vetem zgjidhje afatshkurter nuk jane
Po ke te drejte, pasi 35 vjet me tym qymyri nuk jane pak....
?? Pra ti thua qe qenka ne DJENI se sa eshte parashikimi i kerkeses per energji ne vitin...2020 pershembull?? shume mire...kjo domethen qe paske lexuar strategjine kombetare te KESH-it dhe parashikimet e ekspertve per kerkesen ne te ardhme. (nuk besoj...po po tallem) Bravo...atehere besoj se do jesh ne gjendje te na japesh nje zgjidhje se si do perballohet rritja e kerkeses ne te ardhme...PA TEC-e
Po, por ne fakt une nuk tallem. Jam ne dijeni edhe te masave qe KESH po merr per strategjine kombetare.
Projekti i TEC-it te Porto Romano eshte shume i qart...teknollogjia eshte shume e qarte...po ashtu edhe 2TWh qe perfiton Shqiperia.
Sigurisht, po ti paraqitet fshatareve te Spitalles, i qarte do te jete.
Boll folet budalleqe...ju lutem.
Me vjen per te qeshur. Po me kujton nje batute te filmi Balle per Balle. Sa turp i tha arkeologu Zheleznovit. Perserite edhe nje here. - Sa turp.
Po te degjonte arkeologu i filmit, do te vinte duart ne fyt. (edhe une po tallem tani)
Po ju nuk jeni ne gjendje te percaktoni cfar eshte serioze dhe cfar nuk eshte.
Pak qesharak ky lloj aresyetimi. Po vetem ju zoteri jeni ne gjendje te percaktoni cfare eshte serioze, kurse te tjeret jo?
Kshuqe nuk ja vlen te diskutohet kot se koti neper forume me njerez si ty apo Bledari
Kshuqe!!!!! Jo po ashuqe. Mos shkruaj si fshatar tani.
Secili eshte i lire te jape mendimin e vet ne kete forum. Me duket se nuk ka ndonje kufizim ku te thuhet. Vetem ata qe jane pro Kapedanit jane te mirepritur ne kete forum. Its a free country after all.
Kapedani March 3rd, 2009, 12:58 AM Secili eshte i lire te jape mendimin e vet ne kete forum.
Padyshiiimmm!! Por duhet te jesh i vetdijshem gjithashtu....qe mendimeve te tua (ose te dikujt tjetri) nuk i ve shume peshe njeri.
Pra te grishe sallate me nje kalama ne forum rreth nje ceshtje komplet teknike...eshte dicka me shume pak rendesi.
Duhet te jesh i vetdijshem gjithashtu qe ka dhe njerez ne kte bote qe edhe dine me teper se ty...dhe qe nganjehere "mendimet" e tua do ti gjejne qesharake...dhe do tallin bythen me ty ;)
Kto jane fakte te jetes...
Po zoteri. Ka alternativa te tjera.
Si per shembull?? :)
Po ke te drejte, pasi 35 vjet me tym qymyri nuk jane pak....
Hahaha...lexo me siper.
Po, por ne fakt une nuk tallem. Jam ne dijeni edhe te masave qe KESH po merr per strategjine kombetare.
Qe s'je ne djeni..s'je :) Se po te ishe...do ishe ne djeni qe strategjia kombetare parashikon qe 60% e prodhimit te energjise ne vitin 2020 do jet nepermjet TEC-eve :) Dhe ka aresye te forta teknike dhe ekonomike per kte...aresye qe ti s'ke se si ti kuptosh kshuqe nuk do harxhoj kohe ti shpjegoj.
Sigurisht, po ti paraqitet fshatareve te Spitalles, i qarte do te jete.
Po...katnaret bashk me IDIOTET e MJAFT-it dhe shoket/shoqet e tyre...ate donin...qe te dilte inxhinjieri i ENEL-it e tu shpjegonte katnarve me 4-klasa shkolle....se cfar eshte ky TEC-i, dhe si funksionon. :) Kshu sic po me kerkoni mua te bej me juve ;)
Kur jemi idiot ne Shqipot nuk e ka fajin Taljoni.
Me vjen per te qeshur. Po me kujton nje batute te filmi Balle per Balle. Sa turp i tha arkeologu Zheleznovit. Perserite edhe nje here. - Sa turp.
Po te degjonte arkeologu i filmit, do te vinte duart ne fyt. (edhe une po tallem tani)
Do e perseris dhe njehere...boll folet idiotizma...ju lutem.
Kuptohet qe s'jeni ne djeni as se cfar territori mund te zere ky TEC-i, as se cfar ndikimi mund te ket ndaj nje "zbulimi arkeologjik"...e lere mo pastaj te kuptoni se ku jane kto "zbulime arkeologjike" e KU i bie te jet TEC-i...e CFAR ka ne ate zone sot...neser apo pasneser.
Si me then...gjeta nje monedhe antike une...kshuqe mos ndertoni shtepi 10km rreth ksaj monedhe.
Po vetem ju zoteri jeni ne gjendje te percaktoni cfare eshte serioze, kurse te tjeret jo?
Jo absolutisht jo qe vetem une. Po TI jo... :) Dhe e them kte me gjith respekt se s'besoj se je me shume se 18 vjec dhe s'ke bere me teper se 2 klasa fizike te shkolles se mesme...kshuqe mos e merr per keq.
Dhe kjo dallohet shume qart kur na fillon e flet per "tymra" :) E kam vertetuar qe sado qe mund te mundohem te shpjegoj...eshte kohe e harxhuar.
After all...Bledari kujtonte se ne Mass nuk kishte asnje TEC...prandaj ishte ajri kaq i paster :)
Black_Seagull March 3rd, 2009, 01:38 PM Ekspertet e vertete ne fushen e energjetikes nuk e humbasin kohen neper forume...
ketu jane te gjithe amatore duke perfshire edhe veten tende.... "kshuqe" as ti nuk ke aq njohuri sa te flasesh si ekspert.
Kapedani March 3rd, 2009, 10:51 PM Une nuk them qe jam ekspert i energjitikes...po inxhinier jam te pakten dhe kam nje njohuri te pergjithshme rreth TEC-eve. Une po te them ato qe thone ekspertet e KESH-it...sipas parashikimeve te tyre dhe sipas modeleve bashkohore Evropiane.
Ndersa ju qe i kundershtoni jo vetem qe i beni per aresye komplet qesharake...por s'keni as mundesine ti kuptoni me mire. Kush i kundershton kto?? Ca kalamaj idiot te MJAFT-it....ca psikopat te rrjedhur nga trute si Klosi me shoke...
Vendi nuk zhvillohet me budallenj dhe injorant te ktyre tipave
Black_Seagull March 4th, 2009, 12:51 AM Inxhinier!! Ha ha . Me duket pak qesharake te thuash qe jam inxhinier apo profesor neper forume. Ne pergjithesi ato qe kane nje aresim te larte, nuk flasin gjuhe jo letrare me kshuqe dhe ashuqe. Ndoshta mund te jesh edhe inxhinier, por ka edhe nga ata qe i marin diplomat duke fjetur gjume ne klase, dhe qe ne pergjithesi ngelen injorant dhe fshatar nga mentaliteti. "Vendi nuk zhvillohet me budallenj dhe injorant te ketyre tipave".
Une nuk i njoh keto aktivista, apo levizjen Mjaft, pasi kam kohe qe kam ikur nga Shqiperia.
Kapedani March 4th, 2009, 01:27 AM Une nuk i njoh keto aktivista, apo levizjen Mjaft, pasi kam kohe qe kam ikur nga Shqiperia.
Ka budallenj te shumellojshem ne kte bote...jo vetem mjaft-ist apo Klos-ist.
Black_Seagull March 4th, 2009, 02:36 AM Ka pseudo-inxhinier qe as Shqip nuk dine te shkruajne
AltinD March 4th, 2009, 04:52 PM Mjaft o pulbardha zeze se te gjitha 9 komementet deri tani konfrontime i ke pasur. Mos me bej te bllokoj dhe ty dhe binjak durrsakun nga forumi.
Buddy Holly March 4th, 2009, 04:57 PM Mjaft o pulbardha zeze se te gjitha 9 komementet deri tani konfrontime i ke pasur. Mos me bej te bllokoj dhe ty dhe binjak durrsakun nga forumi.
Interesant se gjithmone po e bllokon vetem njeren pale nga forumi, thua ti se pala tjeter nuk ekziston.
Black_Seagull March 4th, 2009, 05:41 PM Mjaft o pulbardha zeze se te gjitha 9 komementet deri tani konfrontime i ke pasur. Mos me bej te bllokoj dhe ty dhe binjak durrsakun nga forumi.
Me fal zoti polic!!! Nuk e dija qe ky forum qenka prone e nipit te "dulles". As me prish shume pune ne se me bllokon apo jo... Mbaj ne forum vetem ato tipa qe te vijne mas avazit...
Beji te fala anetareve te byrose ....
daalbo March 5th, 2009, 05:29 AM Ndoshta mund te jesh edhe inxhinier, por ka edhe nga ata qe i marin diplomat duke fjetur gjume ne klase, dhe qe ne pergjithesi ngelen injorant dhe fshatar nga mentaliteti. "Vendi nuk zhvillohet me budallenj dhe injorant te ketyre tipave".
Ke shume te drejte. Ai vetem ne diplome e ka inxhinjer se ne te vertete shkoi ne nje lice artesh dhe e kalonte kohen duke bere skulptura akulli dhe duke gjuajtur goca fshati andej nga malesia ku e kishte shkollen.
Kapedani March 5th, 2009, 06:02 AM Ke shume te drejte. Ai vetem ne diplome e ka inxhinjer se ne te vertete shkoi ne nje lice artesh dhe e kalonte kohen duke bere skulptura akulli dhe duke gjuajtur goca fshati andej nga malesia ku e kishte shkollen.
Mos ja fut kot...atje vetem male s'kishe :)
AltinD March 5th, 2009, 09:46 PM ^^ Termocentrale?
AltinD March 5th, 2009, 09:57 PM Interesant se gjithmone po e bllokon vetem njeren pale nga forumi, thua ti se pala tjeter nuk ekziston.
Ai postimi im kishte dy pjese. Ti preferove te injoroje te paren dhe natyrisht nuk kishe si ta kuptoje te dyten sepse i ishte drejtuar vetem personit ne fjale.
Black_Seagull March 5th, 2009, 11:19 PM Ke shume te drejte. Ai vetem ne diplome e ka inxhinjer se ne te vertete shkoi ne nje lice artesh dhe e kalonte kohen duke bere skulptura akulli dhe duke gjuajtur goca fshati andej nga malesia ku e kishte shkollen.
No, ha finito i studi di architettura a Milano, imbecille. Ora sta seguendo i studi di Master a New York.
AltinD + Daalbo! Siete davvero dei imbecilli.
Te pakten Kapedani ka nje njohuri per Tecet dhe ai mund te flase me "kompetence" per kete pune. Ai nuk ka nevoje per ndihmen tuaj ne nje debat forumi (tani nuk tallem). Kurse ju te dy, si njerez pa karakter jeni kthyer ne vasal (puthni kembet e te tjereve), dhe s'e keni haberin e tecave por vetem sa llapni kot, dhe hudhni kunja.
Ky Altin fyelli, ben edhe kercenime idiotike dhe qesharake, se do te me bllokoje. Hajde fyell hajde. (Chi se ne frega!!!)
Juve se keni fare haberin as te Teceve as te vlerave kulturale dhe arkitekturore. "Kshuqe" shikoni njehere se si punon bota e jashtme...Se si punon "Taljoni".
P.S.
Aman ore se mos te me bllokosh, aman. Idiot sferik.
daalbo March 5th, 2009, 11:52 PM E qanke fare italishten. Shume paster e fliske (e shkruajtke). Me behet qejfi kur shoh shqiptare qe zoterojne gjuhet e tuaja. Thoni po deshet qe s'jemi komb i zgjuar.
Tani nje pyetje kisha, mos jane gje kopshtet ne Itali me pushime se shume vocerrake po vijne ketu?
Kapedani March 6th, 2009, 12:27 AM Bo bo...c'fare beni??
Termocentrale?
Per cfar e kishe fjalen?
BledarDurrsaku March 6th, 2009, 12:46 AM Mos me bej te bllokoj dhe ty dhe binjak durrsakun nga forumi.
Me leje!!!!:)
Kete teme une e kam mbyllur me kohe.:wtf:
Black_Seagull March 6th, 2009, 05:03 AM E qanke fare italishten. Shume paster e fliske (e shkruajtke). Me behet qejfi kur shoh shqiptare qe zoterojne gjuhet e tuaja. Thoni po deshet qe s'jemi komb i zgjuar.
Kurse ti e "qanke" e "fliske" e "shkruajtke" fare Shqipen. (dialektin e jugut).
Tani nje pyetje kisha, mos jane gje kopshtet ne Itali me pushime se shume vocerrake po vijne ketu?
daalbo!! Mos u bej karagjoz fare. Per sa i perket Teceve dhe Energjetikes e shoh qe s'ke njohuri fare, vetem sa i llustron kepucet Kapedanit.
Po shiko se ka nje forum tjeter me emrin "Kulla me e larte ne Shqiperi".
They might need your wise opinion and your "sense of humor" over there.
Ose shiko se mos jep opinionin tend per organizatat fetare. You are welcomed there as well.
AltinD March 6th, 2009, 12:06 PM No, ha finito i studi di architettura a Milano, imbecille. Ora sta seguendo i studi di Master a New York.
AltinD + Daalbo! Siete davvero dei imbecilli.
Te pakten Kapedani ka nje njohuri per Tecet dhe ai mund te flase me "kompetence" per kete pune. Ai nuk ka nevoje per ndihmen tuaj ne nje debat forumi (tani nuk tallem). Kurse ju te dy, si njerez pa karakter jeni kthyer ne vasal (puthni kembet e te tjereve), dhe s'e keni haberin e tecave por vetem sa llapni kot, dhe hudhni kunja.
Ky Altin fyelli, ben edhe kercenime idiotike dhe qesharake, se do te me bllokoje. Hajde fyell hajde. (Chi se ne frega!!!)
Juve se keni fare haberin as te Teceve as te vlerave kulturale dhe arkitekturore. "Kshuqe" shikoni njehere se si punon bota e jashtme...Se si punon "Taljoni".
P.S.
Aman ore se mos te me bllokosh, aman. Idiot sferik.
As you wish ....
Me leje!!!!:)
Kete teme une e kam mbyllur me kohe.:wtf:
Shiko PM
EDIT: Jo jo mos e shiko fare PM ... po na luake Dr Jekyll and Mr. Hyde ti ketu.
:banned: & :banned:
AltinD March 6th, 2009, 12:17 PM Meqe tha pulbardha qe s'e kemi haberin, desha te specifikoj se une jam diplomuar ne Inxhinjeri Elektrike, per sistemet e prodhimit dhe shperndarjes se energjise. :lol:
Pirro March 6th, 2009, 03:55 PM ndersa kapedani qe i duket si ekspert... ve bast qe do jete ndonje inxhinier informatike...:lol:
AltinD March 6th, 2009, 07:45 PM Per cfar e kishe fjalen?
Ti the qe aty vetem male nuk kishte, dhe une pyeta: Po Termocentrale? :D
Kapedani March 7th, 2009, 12:44 AM Ti the qe aty vetem male nuk kishte, dhe une pyeta: Po Termocentrale?
Ishe nje central nuklear nja 20 milie nga ku jetoja :)
Shqiptario March 9th, 2009, 05:52 PM ENEL: Marrėveshje Skajola-Ruli pėr TEC-in me qymyr
Ministri italian i Ekonomisė, mė 10 mars nė Tiranė pėr firmosjen e kontratės
Ndėrtimi i termocentralit 800 MW me qymyr nė afėrsi tė Durrėsit pritet tė bėhet realitet kėtė javė, kur dy ministrat pėrgjegjės pėr Ekonominė, Klaudio Skajola dhe Genc Ruli do tė firmosin marrėveshjen mė 10 mars. Lajmin e konfirmon zyra e shtypit pranė ENEL-it, sipas sė cilės, mė 27 shkurt ka pėrfunduar i gjithė projekti pėr ndėrtimin e TEC-it dhe i ėshtė dorėzuar pėr miratim Ministrisė sė Ekonomisė, Tregtisė dhe Energjetikės. Italianėt shikojnė si problem hezitimin e Ministrisė sė Mjedisit, e cila nuk e ka dhėnė ende miratimin, edhe pse janė marrė tė gjitha masat qė impakti nė mjedis tė jetė minimal. Mėsohet gjithashtu se dy ministrat do tė firmosin njė marrėveshje tė pėrbashkėt zhvillimi energjetik, duke i hapur rrugė fillimit tė punimeve pėr TEC-in 800 MW, si dhe ndėrtimit tė linjės nėnujore 500 MW, e cila do tė shėrbejė pėr kalimin e energjisė elektrike nga Shqipėria drejt Italisė. Sipas njoftimit tė ENEL, marrėveshja pėr TEC-in do tė krijojė stabilitet tė qėndrueshėm pėr Shqipėrinė, duke i dhėnė mundėsi tė rrisė eksportin e energjisė elektrike. Ardhja e Skajolės nė Shqipėri i dedikohet marrėveshjes sė firmosur nė dhjetor tė vitit 2007 mes ministrit Ruli dhe ENEL, ku deri mė sot, ėshtė ecur me hapa konkretė drejt realizimit tė projektit.
Drejtuesit e kompanisė italiane janė shprehur kohė mė parė se nga e gjithė energjia qė do tė prodhojė termocentrali, 40 pėr qind e saj do ti shitet Shqipėrisė me ēmimin e kostos, kurse pjesa tjetėr do tė shkojė nė Itali pėr konsum. Vlera e investimit llogaritet deri nė 2 miliardė euro dhe konsiderohet si njė ndėr projektet mė tė mėdha nė Ballkan, aq sa njė pjesė e politikės italiane ėshtė shprehur kundėr kėtij financimi kaq tė madh jashtė territorit tė tyre. Megjithatė, TEC-i me qymyr qė do tė ndėrtohet pranė Porto Romanos, ka hasur nė kundėrshtitė e grupeve ambientaliste, tė cilat kanė kėrkuar zhvillimin e njė referendumi nė qytetin e Durrėsit. Sipas tij, lėnda e parė, qymyri, do tė japė impakt tė lartė negativ pėr ambientin, por ENEL garanton njė pastėrti nė masėn 98 pėr qind.
http://gazeta-shqip.com/artikull.php?id=60334
Kapedani March 9th, 2009, 08:36 PM si dhe ndėrtimit tė linjės nėnujore 500 MW,
Nje fitore e re per gazetarine shqiptare ;)
Pra ENEL-i nuk paska hequr dore...
Buddy Holly March 9th, 2009, 08:38 PM Sigurisht mendojne 400kV :D
Kapedani March 9th, 2009, 11:02 PM Pra TEC-i mbetet realitet :) Tja dergoj njehere CV-en time ENEL-it se ku i dihet :)
AltinD March 9th, 2009, 11:04 PM ^^ Coja, coja se do te japin extra dhe pozicionin a PR qe te merresh me MJAFT dhe shoke ... aq me teper qe ja ke marre doren. :laugh:
Shqiptario March 15th, 2009, 01:08 AM Ministri i Ekonomisė: Do tė ndėrtojmė centralin bėrthamor
Shqipėria do tė ketė centralin e saj bėrthamor. Ministri i Ekonomisė, Genc Ruli, dhe homologu i tij italian, Klaudio Skajola, nėnshkruan dje njė marrėveshje pėr integrimin e sistemeve energjetike dhe atyre tė gazit. Pas takimit drejtuesit e dikastereve tė ekonomisė deklaruan hapat konkrete qė po merren nė kėtė drejtim. Sipas ministrit Genc Ruli, asnjė prej projekteve tė prezantuara deri tani nė sektorin energjetik nuk do tė kthehet pas. Ndėrsa, sipas ministrit italian Skajola, vendi ynė duhet tė shfrytėzojė tė gjitha burimet energjetike, pavarėsisht kostove. Shkėlqyeshėm ne kapėrcejmė kėtė fazė tė asistencės teknike dhe financiare dhe me njė partneritet dhe sinkronizim tė strategjive tona tė zhvillimit, - theksoi ministri Genc Ruli. Njė vėmendje tė veēantė iu kushtua projekteve italiane nė energjetikė, pa pėrjashtuar energjinė bėrthamore. Jam shumė i inkurajuar qė ministri italian, ndoshta ėshtė i pari pas 20 vjetėve qė duhet tė parashikojė me strategjitė e saj tė zhvillimit tė sektorit tė energjisė, energjinė atomike. Duke thyer njė tabu, ne qė shyqyr perėndisė nuk i kemi kėto tabu, jemi prononcuar qė para dy vjetėve politikisht se ne e shohim tė mundshėm, e shohim njė objektiv tonin qė nė gjithė strategjinė e zhvillimit tė sektorit energjetik, tė jetė dhe komponenti nuklear, - tha Genc Ruli. Ministri italian tha se Italia dhe Shqipėria kanė interesa tė pėrbashkėta, ndaj dhe bashkėpunojnė nė energjetikė. Me kėtė marrėveshje po i pėrgjigjemi interesit tė investitorėve, tė cilėt kėrkojnė njė kuadėr ligjor. Duke parashikuar lidhjen e sistemeve tona energjetike ne krijojmė njė lidhje tė sistemeve energjetike mes Ballkanit dhe tregut evropian, - tha Skajola. Nė vijim takimet kanė qenė mė tė zgjeruara me ekspertė tė energjetikės.
http://www.gazetametropol.com/tekst.php?idt=57815
Shqiptario March 15th, 2009, 01:08 AM :ohno:
Kapedani March 15th, 2009, 02:37 AM Shume mire ne fakt!
SADOSI March 15th, 2009, 06:01 AM The energy link is really good, atm i think all energy to the south balkans goes through Serbia, which makes a lot of money in transport fees..
DanMs March 31st, 2009, 04:51 AM zMxROUAYpwY
DanMs March 31st, 2009, 04:57 AM ZTw6J9emBcA
Buddy Holly March 31st, 2009, 05:20 AM 135,000 lek seems like a huge amount. It's like 1,350 euros using Yahoo Currency Exchange. Is that correct or are they referring to the old denomination?
TIAL March 31st, 2009, 06:03 AM 135,000 lek seems like a huge amount. It's like 1,350 euros using Yahoo Currency Exchange. Is that correct or are they referring to the old denomination?
Kur thone 135,000 lek dmth me "te vjetra" qe i bie 13,500 lek "te reja" reth 130 euro. Prap shume jane per ne Shqiperi.
Buddy Holly March 31st, 2009, 07:01 AM Kur thone 135,000 lek dmth me "te vjetra" qe i bie 13,500 lek "te reja" reth 130 euro. Prap shume jane per ne Shqiperi.
Shit, shume jane per ne Amerike :D Une ketu paguaj rryme rreth $30-40 ne muaj edhepse e perdori shume.
Pirro April 1st, 2009, 03:47 PM Ministri i Ekonomisė: Do tė ndėrtojmė centralin bėrthamor
Shqipėria do tė ketė centralin e saj bėrthamor. Ministri i Ekonomisė, Genc Ruli, dhe homologu i tij italian, Klaudio Skajola, nėnshkruan dje njė marrėveshje pėr integrimin e sistemeve energjetike dhe atyre tė gazit. Pas takimit drejtuesit e dikastereve tė ekonomisė deklaruan hapat konkrete qė po merren nė kėtė drejtim. Sipas ministrit Genc Ruli, asnjė prej projekteve tė prezantuara deri tani nė sektorin energjetik nuk do tė kthehet pas. Ndėrsa, sipas ministrit italian Skajola, vendi ynė duhet tė shfrytėzojė tė gjitha burimet energjetike, pavarėsisht kostove. “Shkėlqyeshėm ne kapėrcejmė kėtė fazė tė asistencės teknike dhe financiare dhe me njė partneritet dhe sinkronizim tė strategjive tona tė zhvillimit”, - theksoi ministri Genc Ruli. Njė vėmendje tė veēantė iu kushtua projekteve italiane nė energjetikė, pa pėrjashtuar energjinė bėrthamore. “Jam shumė i inkurajuar qė ministri italian, ndoshta ėshtė i pari pas 20 vjetėve qė duhet tė parashikojė me strategjitė e saj tė zhvillimit tė sektorit tė energjisė, energjinė atomike. Duke thyer njė tabu, ne qė shyqyr perėndisė nuk i kemi kėto tabu, jemi prononcuar qė para dy vjetėve politikisht se ne e shohim tė mundshėm, e shohim njė objektiv tonin qė nė gjithė strategjinė e zhvillimit tė sektorit energjetik, tė jetė dhe komponenti nuklear”, - tha Genc Ruli. Ministri italian tha se Italia dhe Shqipėria kanė interesa tė pėrbashkėta, ndaj dhe bashkėpunojnė nė energjetikė. “Me kėtė marrėveshje po i pėrgjigjemi interesit tė investitorėve, tė cilėt kėrkojnė njė kuadėr ligjor. Duke parashikuar lidhjen e sistemeve tona energjetike ne krijojmė njė lidhje tė sistemeve energjetike mes Ballkanit dhe tregut evropian”, - tha Skajola. Nė vijim takimet kanė qenė mė tė zgjeruara me ekspertė tė energjetikės.
http://www.gazetametropol.com/tekst.php?idt=57815
nje kerkim nga media italiane mbi centralet berthamor....
http://www.rai.tv/dl/RaiTV/programmi/media/ContentItem-17f2ebfb-98a5-428f-8df2-d1634b60decc.html?p=0
SADOSI April 2nd, 2009, 01:39 PM Eltion Hoxha | 27/03/2009
Humbjet vazhdojnė tė jenė nė nivele alarmante. Pėr 2008-ėn, mbi 30% e energjisė, humbi nė rrjet.
Bilanci i vitit 2008 ėshtė pozitiv pėr prodhimin e energjisė elektrike. Familjarėt konsumuan 55% tė totalit
Reshjet kanė nderuar bilancin e energjisė elektrike nė vend. Rreth 60% e energjisė, vitin e kaluar, ėshtė siguruar nga prodhimi i brendshėm dhe, mė saktėsisht, vetėm nga hidrocentralet, pasi, edhe pse nė sasi modeste nė tė shkuarėn, termocentralet gjatė vitit 2008, nuk kanė prodhuar energji.
Pėr vitin 2008, sasia e energjisė sė prodhuar dhe importuar, arriti nė 6.6 GWh, nga 5.8 qė arriti njė vit mė parė, ose 12.4% mė shumė. Gjatė vitit tė kaluar, ėshtė prodhuar nė vend 3.8 GWh, ose 34.3% mė shumė se nė 2007-ėn. Situata e mirė e prodhimit ka sjellė njė rėnie tė lehtė me 6% tė importeve, ku nė sasi, pėr vitin e kaluar, kemi importuar rreth 2.5 GWh energji elektrike.
Koncesionarėt, megjithėse zunė njė pjesė modeste prej 1.6% tė totalit tė prodhimit tė energjisė, krahasuar me vitin 2007, shėnuan njė rritje prej rreth 13% mė shumė.
Kontrastin mė tė madh e zunė eksportet sė bashku me shkėmbimet, tė cilat arritėn nė 294 mijė MWh, ose 175% mė shumė se njė vit mė parė. Por, kjo sasi e destinuar pėr shkėmbime, ka zėnė vetėm 4.4% tė totalit tė disponuar pėr pėrdorimin gjithsej.
Humbjet
Ndėrkohė, humbjet nė rrjet vazhdojnė tė jenė nė nivele tė larta. Sipas bilancit energjetik pėr vitin 2008, tė publikuar nga INSTAT-i, rreth 32.4% e sasisė sė disponueshme tė energjisė elektrike, humbet nė rrjet.
Pėr vitin e kaluar, humbjet arritėn nė rreth 2.2 GWh, ose 2.6% mė shumė se nė vitin 2007. "Humbjet nė shpėrndarje janė rritur 2.9 pėr qind. Ato vazhdojnė tė zėnė pjesėn mė tė rėndėsishme tė humbjeve nė rrjet, me 90 pėrqind",- citohet nė raport. Rreth 63% e totalit tė disponueshėm tė energjisė pėr pėrdorim, shkon pėr konsum final.
Pėrdorimi i energjisė nga konsumatorėt, arriti nė 4.2 GWh, ose 14.1% mė shumė se nė 2007-ėn. Energjia e konsumuar nga familjet zuri, pėr vitin 2008, 55% tė totalit tė disponueshėm pėr pėrdorim final. Familjarėt rritėn me 10% konsumin e energjisė gjatė kėtij viti, krahasuar me 2007-ėn.
Edhe gjatė vitit 2009, situata e mirė hidrike ka bėrė qė KESH-i tė eksportojė energji drejt Greqisė, kur pėr njė muaj ka shitur rreth 5 milionė euro energji nė vendin fqinj.
http://www.shekulli.com.al/2009/03/27/reshjet-rrisin-me-30-energjine.html
AltinD April 2nd, 2009, 08:34 PM ZTw6J9emBcA
LOL, Shpendi i tremi fare ata te shperndarjes: O hajdut, o hajdut ... :rofl:
AlbSidro April 12th, 2009, 04:04 PM iCFUuvNsZ1w
Shqiptario April 18th, 2009, 01:36 PM Perfundon TEC i Vlores, ne test prove
ermocentrali i Vlores, vepra e pare e energjetikes qe prej me shume se 25 vjetesh, eshte futur ne test prove. TEC-i, ndertimi i te cilit perfundon ne muajin qershor te ketij viti i eshte nenshtruar ditet e fundit testeve te kontrollit per te pare kapacitetin e plote te tij. Burime zyrtare nga Korporata Elektroenergjetike Shqiptare, bene dje se, aktualisht po kryhen testet dhe kontrollet e te gjitha pajisjeve te ketij TEC-i". Punimet per ndertimin e TEC-it te Vlores kane nisur ne 1 shtator 2007 duke perfshire nenstacionin e ri te Babices dhe disa objekte te tjera, si linjen per daljen e tensionit te larte 220 KV ne nenstacionin e Fierit, linjen e tensionit te larte 220 KV me dy qarqe Fier-Babice, fuqizimi i nenstacioni i Babices me dy autotransformatore, linjat 110/ 35 KV me rajonin, nenstacioni Vlora 2 me dy transformatore, me fuqi prej 35 MVA secili. Per ndertimin e TEC-it te Vlores po financohet shuma prej rreth 92 milione euro, nga Banka Boterore dhe BERZH. Pjesa me e madhe e punimeve kane perfunduar plotesisht. Sasia e energjise qe do t'i shtohet rrjetit te transmetimit dhe shperndarjes me venien ne pune te TEC-it te ri te Vlores, llogaritet ne 98 ME. TEC-i i Vlores perben investimin me te madh publik si veper energjetike, pasi prej 27 vitesh nuk eshte ndertuar asnje objekt i ri prodhues i energjise. Termocentrali do te punoje me nafte te distiluar me vlere 112 milione dollaresh ne nje zone prej 6 hektaresh rreth 6 km ne veri te Vlores. Zona ku do te ndertohet eshte perdorur per shume vite si nje terminal nafte. Projekti mbeshtetet nga nje kredi e bute prej 25 milione dollaresh nga IDA (Shoqata Nderkombetare per Zhvillim) e Bankes Boterore, 37.5 milione dollare nga Banka Evropiane per Rindertim dhe Zhvillim (EBRD), 37.5 milione dollare nga Banka Evropiane e investimeve dhe 12.6 milione dollare nga KESH (Korporata Elektroenergjetike Shqiptare). Ndersa qeveria shqiptare ka futur tashme ne proces edhe ndertimin e termocentrale te reja duke perfshire edhe ato nukleare. Behet fjale per nje TEC me qymyr qe pritet te ndertohet ne zonen e Porto Romanos dhe gjithashtu nje TEC nuklear ne grykederdhjen e Bunes ne Shkoder.
TEC-i i ri shmanget varesia nga hidrocentralet
Kriza energjetike e viteve te fundit ne Shqiperi ka qene rezultat i faktit qe vendi siguron 98 per qind te energjise nga hidrocentralet, e cila pakesohet ne vite me thatesire, kur prurjet e ujit pakesohen dhe turbinat s'mund te prodhojne sasine e duhur te energjise. Para vitit 1997, Shqiperia prodhonte mjaftueshem energji per te plotesuar nevojat e brendshme si dhe te eksportonte ne vendet fqinje. Por kerkesa per energji elektrike eshte rritur kater here krahasuar me fillimin e viteve '90, ndersa mirembajtja e keqe e pajisjeve dhe shirat e paket e kane pergjysmuar sasine qe prodhohet, sipas edhe te nje konstatimi qe ka bere Banka Boterore. Keshtu qe hidrocentralet jane te ndjeshme ndaj ndryshimeve te motit dhe cikleve te thatesires. Per shkak te kesaj situate Shqiperia ka vendosur te diversifikoje burimet e prodhimit te energjise, duke ndertuar termocentralet do te ndihmonin ne furnizimin e qendrueshem me energji elektrike qe do te permiresonte kerkesen ne rritje per energji ne Shqiperi. Megjithate, edhe kur termocentrali i Vlores nise nga ai do te plotesonte vetem 30 per qind te nevojave te paplotesuara te kerkesave per elektricitet ne Shqiperi. Sasia vjetore e energjise qe Shqiperia mund te prodhoje aktualisht 4,000 GW/h ndersa kerkesa eshte 6,800 GW/h. Kjo diference duhet te permbushet ne nje fare menyre, qofte duke importuar, qofte duke prodhuar ne vend.
http://www.kohajone.com/html/artikull_40973.html
Huti April 19th, 2009, 02:19 PM cool, good news!
AlbSidro April 19th, 2009, 07:13 PM Centrali atomik ne Shkoder, reagon Kroacia
Qeveria kroate ka mohuar zyrtarisht zerat se do te nenshkruaje ne fund te ketij muaji me qeverine shqiptare nje marreveshje per ndertimin e nje centrali berthamor ne rrethin e Shkodres.
Ne nje deklarate zyrtare te Ministrise kroate te Ekonomise, qe eshte publikuar nga mediat kroate thuhet se ministria dhe qeveria kroate nuk kane leshuar kurre ndonje informacion se po planifikojne qe ne fund te muajit te nenshkruajne marreveshje per ndertimin e nje centrali berthamor.
Ministria thote se ekspertet mund te konfirmojne se nenshkrimi i nje marreveshjeje te tille eshte i pamundur pasi projekte te ketij lloji kerkojne vite te tera negociatash dhe planifikimesh paraprake.
Njoftimi zyrtar mohon edhe shifren e publikuar ne disa media kroate se centrali do te kushtoje 4 miliarde euro duke e konsideruar ate si nje spekullim mediatik qe nuk mund te mbeshtetet nga asnje njoftim zyrtar.
Por pavaresisht pergenjeshtrimeve zyrtare, duket se ne plan afatgjate Tirana dhe Zagrebi po shikojne mundesine e realizimit te nje projekti te tille, cka pranohet edhe nga vete Ministria kroate e Ekonomise.
Zyra e shtypit e kesaj ministrie deklaroi se mundesia e ndertimit te nje centrali atomik ne partneritet me Shqiperine eshte disktuar ne fund te muajit mars, gjate nje vizite zyrtare ne Tirane te zevendeskryeministrit polak, Damir Polancec.
Gjate kesaj vizite - thote ministria - Shqiperia dhe Kroacia rane dakord qe ne fund te prillit te nenshkruajne nje memorandum mirekuptimi dhe te ngrene nje grup pune te perbashket ne nivel ekspertesh, per te prodhuar analiza dhe studime qe do te sherbejne si baze per vendimet e ardhshme ne lidhje me kete projekt".
Edhe pse centrali berthamor eshte ende nje ide e pa hedhur ne leter, ne Shkoder komuniteti eshte ngritur kunder ketij projekti duke e cilesuar nje kercenim serioz, jo vetem per Shkodren, por per te gjithe rajonin.
http://www.top-channel.tv/new/artikull.php?id=149175
Ermir April 25th, 2009, 02:16 AM Albania parliament OKs sale of power firm to CEZ
TIRANA, April 24 (Reuters) - Albania's parliament has approved the sale of 76 percent of power distributor DSO to Czech power company CEZ, deputy energy minister Enno Bozdo said on Friday.
Bozdo told reporters parliament approved the contract on Thursday and expects CEZ to invest at least 200 million euros to reduce thefts and losses from the grid.
CEZ offered 102 million euros ($129.4 million) for its DSO stake in March after Albania agreed to write off some 60 million euros of its debts, ending lengthy and difficult negotiations.
Bozdo said CEZ's investment would be needed to meet its pledge to reduce thefts and losses of power to 17 percent of current levels within five years and lift revenues by one percent annually.
Albania suffers power shortages because of rising demand, an ailing grid and theft. The World Bank said that as recently as last year less than 50 percent of electricity was paid for.
Bozdo reiterated that there will be no electricity price rise in 2009. Albania holds general elections on June 28 pitting the ruling Democratic Party government against the main opposition Socialist Party.
Gradual rises are expected in the coming years.
CEZ is expected to take over DSO, which supplies 5.3 terawatt hours of power annually, around mid-May or later.
http://www.forbes.com/feeds/afx/2009/04/24/afx6335047.html
AlbSidro May 14th, 2009, 09:40 PM Parku energjitik ne Lezhe
KxDmkA3rvb4
AlbSidro May 14th, 2009, 10:05 PM Energjitika, Norvegjia: Shqiperia partnere strategjike
QbHoSFwxUlQ
Kryeparlamentari: 915 milione euro investim
Grupi_Armiqsor May 15th, 2009, 12:39 AM Hajd i gezofshim TEC-et e reja :)
daalbo May 15th, 2009, 04:16 AM Nqs behet keto qe thote ky norvegjezi, StatoilHydro do jete kompania energjitike me serioze dhe me e madhe deri tani ne Shqiperi.
Nderkohe Sala ne ate videon perpara i referohet projekteve (hidrocentralet mbi Devoll) te nje tjeter kompanie serioze norvegjeze, Statkraft.
Interesante qe dhe ky te kjo intervista, dhe ne website e Statkraft, permenden atmosfera ligjore e favorshme per investime. Sala kari ka bere ca gjera tamam te pakten.
Pirro May 15th, 2009, 01:58 PM Kryeparlamentari: 915 milione euro investim
u tha u be...!
S'arrij dot ta shof filmimin...?? Per sa tece behet fjale dhe me cfar do funksionojne...?
daalbo May 15th, 2009, 05:51 PM Behet fjale per rreth 50-60 tece gjithsej. I pari do ndertohet ne Tirane buze liqenit artificial, sepse do e kete te lehte te marri uje. I dyti po ashtu do ndertohet ne Tirane, buze Lanes, afer unazes se re. Te tjeret s'jane vendosur akoma s'e ku do ndertohen, por do jene ose ne bregdet ose prane qyteteve te medha, sepse atje jane dhe kerkesat per energji. Gjithashtu nqs ndertohen te gjithe keto tece, Shqiperia do prodhoje me shume energji elektrike per banor se cdo shtet tjeter ne bote. Nga ato qe u thane ne video, do perdorin qymyr per keto tecet, sepse ka koston me te lire dhe Shqiperia nuk eshte akoma ne BE, keshtu qe nuk eshte e detyruar te ndjeki ligjet europiane per ambientin. Te pakten e dime qe keto tece do ndertohen shume shpejt, brenda nje afati 3-4 vjecar, sepse duhen mbaruar para se Shqiperia te hyje ne BE.
Grupi_Armiqsor May 15th, 2009, 08:22 PM Dhe nje TEC eksperimental qe do punoj me pordha Shqiptaresh...teknollogji e re Norvegjeze.
olsib May 15th, 2009, 09:43 PM ^^ Lende te pare ka sa te duash! Problemi eshte se si mund te mblidhet?
olsib May 15th, 2009, 09:45 PM ... ato qe u thane ne video, do perdorin qymyr per keto tecet, sepse ka koston me te lire dhe Shqiperia nuk eshte akoma ne BE, keshtu qe nuk eshte e detyruar te ndjeki ligjet europiane per ambientin. Te pakten e dime qe keto tece do ndertohen shume shpejt, brenda nje afati 3-4 vjecar, sepse duhen mbaruar para se Shqiperia te hyje ne BE.
Me sa kam degjuar une, behet fjale per "kuota ndotjeje (CO2) qe natyrisht me industrializimin e lehte qe ka Shqiperia, nuk i ka shfrytezuar. Nderkohe qe vendet e tjera si Italia etj, i kane konsumuar ne maksimum. Pra edhe po te hynim ne BE do te funksiononin deri ne nje fare piku te caktuar.
daalbo May 15th, 2009, 10:05 PM Une po beja shaka aty. Desha te shikoja si do reagonte Pirro.
Grupi_Armiqsor May 15th, 2009, 10:36 PM Problemi eshte se si mund te mblidhet?
Une kam bere pak research per kte pune ne shkolle...Metoda ime ishte per mbledhje te pordhave ne stalle...po ngaqe ne Arnautet...ndryshe nga lopet...jemi specie kafeneje...pra e ajrit te paster...ka edhe nje metode tjeter:
http://earthfirst.com/wp-content/uploads/2008/07/cow-farts.jpg
Ermir May 15th, 2009, 11:04 PM Hehe ngjan me lopen e nje ish brigadieri qe u vinte lopeve te stalles emrat e puntoreve, Mrika, Zana, Sanije lol
olsib May 16th, 2009, 12:27 AM ne Arnautet...ndryshe nga lopet...jemi specie kafeneje...
http://farm1.static.flickr.com/79/247812836_00a681cae8.jpg
la civilitą del caffč - by em_diesus (http://www.flickr.com/photos/50461467@N00/247812836/in/set-72157594291571929/)
Fantastike! Gjetem nje "pattern". Mund te instalohet nje mekanizem i ngjashem (si ne shembullin e lopes) poshte karrigeve dhe kolltuqeve te bareve te Tiranes dhe te mbare Shqiperise dhe sa here qe personi ulet, tubi i dale i mekanizmit te mesiperm, auto-instalohet. Energji-prodhuesi (apo donatori), gjate fazes se gjate te qendrimit ne bar do te prodhoje sasira gazi te konsiderueshme te cilat me nje sistem te posacem tubash do te transportohen ne nje serbator lagjeje e prej andej drejt e ne TEC-in me te afert.
Sigurisht qe lenda e pare mund edhe te konservohet apo pse jo, edhe te eksportohet ne mbare boten.
Eshte me te vertete nje ide gjeniale qe jo vetem do te ktheje ne energji te shfrytezueshme qendrimin parazitar neper bare te shqiptareve, bisedat e kota qe e shoqerojne dhe pordhet e medhaja keshtu ne pergjithesi, por do ta transformoje Shqiperine ne eksportuesin numer 1 te "green energy" aq shume te deshiruar nga i gjithe populli.
Hej! Le te vrapojme ta patentojme sistemin para se te na vjedhin idene!
:lol:
Pirro May 18th, 2009, 03:24 PM Behet fjale per rreth 50-60 tece gjithsej. I pari do ndertohet ne Tirane buze liqenit artificial, sepse do e kete te lehte te marri uje. I dyti po ashtu do ndertohet ne Tirane, buze Lanes, afer unazes se re. Te tjeret s'jane vendosur akoma s'e ku do ndertohen, por do jene ose ne bregdet ose prane qyteteve te medha, sepse atje jane dhe kerkesat per energji. Gjithashtu nqs ndertohen te gjithe keto tece, Shqiperia do prodhoje me shume energji elektrike per banor se cdo shtet tjeter ne bote. Nga ato qe u thane ne video, do perdorin qymyr per keto tecet, sepse ka koston me te lire dhe Shqiperia nuk eshte akoma ne BE, keshtu qe nuk eshte e detyruar te ndjeki ligjet europiane per ambientin. Te pakten e dime qe keto tece do ndertohen shume shpejt, brenda nje afati 3-4 vjecar, sepse duhen mbaruar para se Shqiperia te hyje ne BE.
O Sulo c'eshte kjo ironi katunaresh...!!!?
Nota___3/10. Heres tjeter perpiqu me shume...!:)
Pirro May 18th, 2009, 03:29 PM Dhe nje TEC eksperimental qe do punoj me pordha Shqiptaresh...teknollogji e re Norvegjeze
Sikur te kishim vetem nje, te personalizuar per ty, e zgjidhim perfundimishte krizen.. biles behemi edhe eksportuesit e pare ne evrope...:)
Grupi_Armiqsor May 18th, 2009, 11:41 PM Ndersa me ty do benim energji valesh...se je TRAP :) (get it...ehh...you don't get it :( )
Ermir May 18th, 2009, 11:54 PM Stop flirting you two
truly from the new trap generation :)
http://www.trapmad.it/
AlbSidro May 26th, 2009, 04:11 PM FE5E_nDayeQ
Justme78783 May 26th, 2009, 04:37 PM ^^ NICE VERY NICE .. 160 million euros ... that will end in the the hand of the population of shkodra ( thus albania) directly or indrirectly , plus the workforce that will be included and and the gdp rise that will come as a result of the energy production , i just hope to see many more investments like these , cause that would be a key factor to the further economic progress of albania ... !
And there are many more benefits ... smart moove !
The_Ambitious_Dream May 26th, 2009, 05:43 PM FE5E_nDayeQ
How many people will work there?
Ermir May 27th, 2009, 12:22 AM By Benet Koleka TIRANA, May 26 (Reuters) -
Austria's Verbund plans to start generating power by 2011 at its hydro plant at Ashta on Albania's Drin River, a company official said.
Christian Kern, a member of Verbund's executive board, said the plant, with capacity of 50 MW and worth 160 million euro ($229.6 million) will use new hydro matrix turbines to slash costs and protect the environment.
"What we hope, due to the fact that there are going to be two dams, most likely the first power could be generated even in the year 2011. This would be little bit faster than what we had initially expected," Kern told Reuters on Tuesday.
He said the faster speed had been achieved by adopting a slightly different layout of the plant and was also due to Albanian government support of the project.
"We received a lot of support from the authorities," he said. "We received all the permits needed to start construction in six months, which is really a rare exception compared to the rest of Europe."
The hydro plant at Ashta will be the fourth on the River Drin, but the first to be built there in 30 years and will help, along with other projects, satisfy the country's need for power.
Albanians have been plagued for decades by lengthy and frequent power cuts caused by drought, the dilapidation of the communist-era grid and a failure to build new plants.
Hailing Ashta as "the first project in Europe contructed on a broad use of this hydro matrix turbine", Kern said Verbund would use 90 of these smaller turbines to reach 50 MW capacity.
"So, the construction is becoming significantly cheaper and more environmentally friendly than using conventional turbines. The power will be sold on a 15-year contract basis to (state power utility) KESH and after the 15 years we are free to sell it on the free market."
Kern said Verbund, which owns 110 hydropower plants and has 25 other projects underway, has invited Austria's EVN to become partners in the Ashta project, which Verbund owns.
"It is in the final stages of negotiations," Kern said.
"In the end, it looks like we are doing it 50-50, that's what we have offered EVN, but the deal is contingent upon the permission of the Ministry of Economic Affairs."
LACK OF CAPACITIES
Kern said Verbund saw Ashta as a way into the Albanian market and it was examining other projects in the Western Balkans because it felt there was a lack of capacity.
After 2009 "the European economy will come on track again, and we will see significantly increasing power prices all over Europe," he said.
"This will of course affect the Balkans and Albania especially, because you see big constraints in power supply as you do not have efficient and enough capacities to fuel GDP growth, which we expect over the next years."
Positive political changes in the Western Balkans and the prospect of European Union accession that has helped countries implement energy policies had made Verbund "feel that things are becoming much more interesting for Western investors".
But he cited more expensive financing and pressure from rating agencies wary of investment in the Western Balkans.
"They have really expressed their opinion that if companies increase their exposure in these countries they would be on a watch list and feel much more pressure concerning their rating," Kern said. "That's a very uncomfortable situation".
"On the one hand projects are becoming more expensive, on other hand due to the pressure of rating agencies financing costs are also starting to increase, which is kind of an offset due to positive political developments which we see now."
He said his company would not embark on new projects in the region until there were clear signs of economic recovery and confidence in the development of the region's markets.
"What I can say is that in the next six months we are not going to take a major step. Absolutely not, we need light at the end of the tunnel."
http://www.guardian.co.uk/business/feedarticle/8526352
shqipo_ May 30th, 2009, 04:18 AM Vihet nė punė nėnstacioni i tunelit tė Kalimashit
Vihet nė punė nėnstacioni i ri 110 kilovolt i Tunelit tė Kalimashit. Ndėrtimi tij nisi rreth dy muaj mė parė pėr njė furnizim tė sigurt dhe permanent me energji elektrike tė tunelit me dy galeri si pjesė e autostradės Durrės-Kukės-Prishtinė. Pėr ndėrtimin e nėnstacionit janė investuar nga buxheti i shtetit rreth 50 milionė lekė, qė kanė pėrdorur pėr godinėn dhe infrastrukturėn e brendshme, si dhe ndėrtimin e linjės elektrike me njė gjatėsi 8 km. Linja e tensionit tė lartė, e cila ka kushtuar rreth 500 mijė dollarė ėshtė marrė nga nėnstacioni aktual i Kalimashit, ku janė ndėrtuar 27 shtylla metalike rreth 30 m tė larta me bazament betonarme.
Me instalimin e linjės elektrike tė nėnstacionit tė tunelit gjithēka ėshtė gati tashmė pėr ditėn e diel kur nė Kalimash do tė udhėtojnė dy kryeministrat shqiptarė, pėrkatėsisht Thaēi nga porta veriore dhe Berisha nga porta jugore pėr tu takuar nė mesin e tunelit ku do tė improvizohet rėnia e "murit" ndarės.
:cheers::cheers::cheers::banana::banana::banana:
Albaniaaan June 6th, 2009, 02:40 PM Edit..........
Shqiptario June 6th, 2009, 04:42 PM Vihet nė punė nėnstacioni i tunelit tė Kalimashit
Vihet nė punė nėnstacioni i ri 110 kilovolt i Tunelit tė Kalimashit. Ndėrtimi tij nisi rreth dy muaj mė parė pėr njė furnizim tė sigurt dhe permanent me energji elektrike tė tunelit me dy galeri si pjesė e autostradės Durrės-Kukės-Prishtinė. Pėr ndėrtimin e nėnstacionit janė investuar nga buxheti i shtetit rreth 50 milionė lekė, qė kanė pėrdorur pėr godinėn dhe infrastrukturėn e brendshme, si dhe ndėrtimin e linjės elektrike me njė gjatėsi 8 km. Linja e tensionit tė lartė, e cila ka kushtuar rreth 500 mijė dollarė ėshtė marrė nga nėnstacioni aktual i Kalimashit, ku janė ndėrtuar 27 shtylla metalike rreth 30 m tė larta me bazament betonarme.
Me instalimin e linjės elektrike tė nėnstacionit tė tunelit gjithēka ėshtė gati tashmė pėr ditėn e diel kur nė Kalimash do tė udhėtojnė dy kryeministrat shqiptarė, pėrkatėsisht Thaēi nga porta veriore dhe Berisha nga porta jugore pėr tu takuar nė mesin e tunelit ku do tė improvizohet rėnia e "murit" ndarės.
:cheers::cheers::cheers::banana::banana::banana:
:applause:
Shqiptario June 9th, 2009, 08:36 PM rWe33aOjvSw&feature=channel_page
kosovania June 9th, 2009, 10:19 PM KOSOVA | Meeting future energy needs
Any information would be greatly appreciated!
Buddy Holly June 9th, 2009, 10:22 PM Kosovania, with all due respect for your work and contributions, perhaps we should consolidate some of these new topics? We usually post in the "economy news" topic about issues related to energy and other topics. Maybe we should not spread our wings too much as there aren't many members to begin with and some topics may die out.
shpirtkosova June 9th, 2009, 10:40 PM There is quite a long report on Kosova C which is against it.. It can be found on google which I thought was quite interesting.
Albaniaaan June 23rd, 2009, 03:46 PM Albania Approves Controversial Wind Farm
Tirana | 23 June 2009 |
The Karaburun peninsulaA few weeks ahead of crucial elections in Albania, the government has quietly approved the construction of Europe's potentially biggest onshore wind-farm, a project that environmentalist warn could wreak havoc on the unspoiled coastline and others say could be a breach of law.
The government has transferred more than 97 hectares of land to Italy’s Moncada Energy Group including a one kilometre buffer zone through which its Albanian subsidiary, Enpower Albania, aims to build a 500-megawatt wind farm in the country's south.
A BIRN investigation in December 2008 showed that the project risked wrecking one of Europe’s last unspoiled environments by allowing the construction of a wind farm on a coastal nature reserve and on national park territory.
The decision to grant the land and the subsequent environmental permit were considered illegal under Albanian laws aimed at protecting natural reserves.
Environmental groups are outraged over the Environment Ministry's decision to issue a permit for the wind farm on the Karaburun peninsula – the site of the nature reserve park – as this is one of the most pristine sites in the Mediterranean.
The project will include the construction of a transmission line running from the port of Vlora in Albania to the Italian port of Brindisi. A 400kV power cable, stretching 145km under the Adriatic at a depth of over 900 metres, will allow electricity to be transmitted in either direction. The interconnection line and the wind farm have an estimated cost of 1.25 billion euros. Construction is expected to start in 2010.
Experts consider the Karaburun peninsula, which covers 62 square kilometres close to the city of Vlora, alongside the adjunct Llogara national park, one of the most important natural sites in the Mediterranean.
While presently designated a managed nature reserve, a series of studies has proposed upgrading the whole area into a national park. These include the MedWetCoast project of 2006, the Biodiversity-Strategic Action Plan of 2002, the Coastal Zone Action Plan for the Albanian coast of 1996, and the report on the activity of “Special Protected Areas and Implantation of SPA Protocol” for Albania of 1996.
Genuario Belmonte, professor of Marine Biology at the University of Salento in southern Italy, describes Karaburun as an unspoiled paradise. “Karaburun is a mythical place, a postcard of what the Mediterranean used to be,” Belmonte tells Balkan Insight. “The peninsula is the best asset for the region as a way to attract tourists from the European Union.”
daalbo June 23rd, 2009, 05:16 PM Nqs eshte e vertete qe qeveria e ka miratuar lajm shume i mire. Keto morracaket e dreqit plasen duke i dale kunder cdo projekti. Dhe pastaj hipokritet (si shume prej atyre qe shkruajne ketu) ankohen per vende pune dhe qe s'ka drita. Teci te ndot, energjia berthamore te vret, parku me ere te vret syte. Se cfare duan keta nje mut e di.
Albaniaaan June 23rd, 2009, 08:30 PM Albania invites bids for USD52mn power substations upgrade
Balkans.com Correspondent - 23.06.2009
Albania's state-run Power Corporation (KESH) has invited bids for equipment upgrades at six transmission substations that are crucial to the operation of the country's network and its participation in the regional energy market.
The USD52-milllion project financed by a loan from the European Bank for Reconstruction and Development is due for completion by September 30, 2011.
It will assist Albania in achieving greater integration with the European Union as planned under a treaty leading to a single electricity market.
The project's components are as follows:
* Equipment for 220 kV Elbasan 1, Fier, Tirana 1 substations and control, monitoring and protection (CMP) system for Fier substation.
* Equipment for 220 kV Fierza HPP substation and CMP system for Fierza, Komani and Vau Dejes HPP substations.
* Equipment and CMP system for 220 kV Burreli substation and 400 kV Elbasan 2 substations.
Tendering for the last two parts of the project is expected in the third quarter of 2009.
SADOSI June 24th, 2009, 12:54 AM Albania Approves Controversial Wind Farm
Tirana | 23 June 2009 |
The Karaburun peninsulaA few weeks ahead of crucial elections in Albania, the government has quietly approved the construction of Europe's potentially biggest onshore wind-farm, a project that environmentalist warn could wreak havoc on the unspoiled coastline and others say could be a breach of law.
The government has transferred more than 97 hectares of land to Italys Moncada Energy Group including a one kilometre buffer zone through which its Albanian subsidiary, Enpower Albania, aims to build a 500-megawatt wind farm in the country's south.
A BIRN investigation in December 2008 showed that the project risked wrecking one of Europes last unspoiled environments by allowing the construction of a wind farm on a coastal nature reserve and on national park territory.
The decision to grant the land and the subsequent environmental permit were considered illegal under Albanian laws aimed at protecting natural reserves.
Environmental groups are outraged over the Environment Ministry's decision to issue a permit for the wind farm on the Karaburun peninsula the site of the nature reserve park as this is one of the most pristine sites in the Mediterranean.
The project will include the construction of a transmission line running from the port of Vlora in Albania to the Italian port of Brindisi. A 400kV power cable, stretching 145km under the Adriatic at a depth of over 900 metres, will allow electricity to be transmitted in either direction. The interconnection line and the wind farm have an estimated cost of 1.25 billion euros. Construction is expected to start in 2010.
Experts consider the Karaburun peninsula, which covers 62 square kilometres close to the city of Vlora, alongside the adjunct Llogara national park, one of the most important natural sites in the Mediterranean.
While presently designated a managed nature reserve, a series of studies has proposed upgrading the whole area into a national park. These include the MedWetCoast project of 2006, the Biodiversity-Strategic Action Plan of 2002, the Coastal Zone Action Plan for the Albanian coast of 1996, and the report on the activity of Special Protected Areas and Implantation of SPA Protocol for Albania of 1996.
Genuario Belmonte, professor of Marine Biology at the University of Salento in southern Italy, describes Karaburun as an unspoiled paradise. Karaburun is a mythical place, a postcard of what the Mediterranean used to be, Belmonte tells Balkan Insight. The peninsula is the best asset for the region as a way to attract tourists from the European Union.
Since they want to build this so close to the shore, it must mean that all the enrgy produced will go to Italy. My opinion is that its a disaster, im sure there are plenty of other sites with just as much wind potential in Albania.
Albaniaaan July 8th, 2009, 09:08 PM Edit....
AltinD July 8th, 2009, 09:54 PM Edit....
Cfare i ben Edit? (... pervec shkaterrimit te shpresave per tu bere i pari vendit)
olsib July 17th, 2009, 07:07 PM Kosovo OKs new power plant
The new power station, expected to produce 2000MW of electricity, is one of the biggest investments the country has seen since its independence.
http://www.setimes.com/cocoon/setimes/images/2009/07/17/BESAphoto.jpg
The Kosovo government on Wednesday (July 15th) approved a decision to move forward with construction of the Kosova C, or Kosova e Re, coal-based power station -- the biggest investment in Kosovo in decades.
The announcement came a day after German energy company RWE AG withdrew its 3 billion-euro bid to build the plant. The company said it was dropping out of the tender due to "issues of complexity and the level of maturity of the project".
RWE AG was one of four international companies expected to bid on building the plant, rehabilitate an old plant and open a new lignite mine.
The three remaining shortlisted companies are Czech and US consortium CEZ/AES, a consortium of Italy's Enel and the Greek-American Sencap.
The project is expected to add 2,000MW to the country's power capacities and hopes to attract 3.5 billion euros in foreign investments.
"The power plant will secure enough and stable energy for the local consumers and the international export. Kosova e Re will be built using the newest technology .... it will meet the European standards, environmental and social, and it will establish a new technological standard in our region," Prime Minister Hashim Thaci said.
The new power station will start with an output of 1,000MW in the first phase, and will be built near the existing Kosova B power station.
The Kosova B power plant will be renovated and prepared for production. The other existing power plant, Kosova A, will be closed by the end of 2015, its energy production replaced by output from the Kosova e Re plant.
The government will also continue with the reconstruction and privatisation of the Kosovo Power Company, KEK, as well as with other investments to produce alternative energy.
According to a study of Kosovo's mines and minerals done by Italian company Osservatorio Balcani, the country has an estimated 11,500 to 14,000 million tonnes of lignite coal.
A donor's conference will be scheduled for the fall -- dedicated to raising money to support the country's energy sector -- with the support of USAID, the World Bank and the European Commission.
"The reformation of the energy sector will promote the rapid economic growth and will accelarate the membership of Kosovo into the EU," Thaci told reporters in Pristina after the government announced its new plans.
The idea has been met by some with resistance. Forumi 2015, an NGO, has raised a number of environmental issues. "Bearing in mind the toll that existing power plants have taken on the environment, the planned installation of new capacity must go hand-in-hand with efforts to improve the current environmental situation," it said in a statement.
"The exploitation of lignite is a capital-intensive undertaking, and -- beyond its environmental impact -- exacts a heavy price in terms of land use, demographic movements, settlement relocation, water consumption, and damage to agricultural sector."
However, the NGO acknowledges Kosovo "cannot build a bright future without developing its energy sector. As Kosovo is rich in lignite, it is only natural that the country relies on this resource for its future development."
http://www.setimes.com/cocoon/setimes/xhtml/en_GB/features/setimes/features/2009/07/17/feature-01
Grupi_Armiqsor July 17th, 2009, 07:43 PM Kur eshte protesta? Dhe me me rendesi...a do ti shembet tyneli ne koke autobuzit te BOLL-it gjat rruges per ne Kosove per protesten??
olsib July 17th, 2009, 08:46 PM Kur eshte protesta? Dhe me me rendesi...a do ti shembet tyneli ne koke autobuzit te BOLL-it gjat rruges per ne Kosove per protesten??
Cfare do ti proteste?!
Tani per tani ke vetem kete artikullin ketu:
http://www.peshkupauje.com/2009/07/kosova-c-e-re-dhe-efektet-e-saj
Grupi_Armiqsor July 17th, 2009, 08:50 PM Tani per tani ke vetem kete artikullin ketu:
http://www.peshkupauje.com/2009/07/k...-efektet-e-saj
http://www.babble.com/CS/blogs/strollerderby/fart.jpg
olsib July 17th, 2009, 08:56 PM Te mbeti mendja tek e energjia e rinovueshme!
E kemi patentuar ate sistem. Tani duhet vetem te kerkojme investitorin. :lol:
Shqiptario August 3rd, 2009, 11:23 PM G-_zsEKD9yw&feature=channel_page
DanMs August 18th, 2009, 09:38 AM ^ good news
AlbSidro September 17th, 2009, 04:18 PM INSTAT: Gjatė kėtij viti ėshtė rritur prodhimi i energjisė
(Dėrguar mė: 16/09/09) Tė dhėnat e fundit tė Institutit tė Statistikave konfirmojnė se gjatė periudhės janar-qershor 2009, prodhimi i energjisė nga hidrocentralet u rrit me 50.5%, kryesisht nga vėnia nė punė e impianteve private.
TIRANE- Pėr herė tė parė gjatė kėtij viti, Shqipėria i ka plotėsuar pjesėn dėrrmuese tė kėrkesave tė saj pėr energji me prodhimin vendas. Tė dhėnat e fundit tė Institutit tė Statistikave konfirmojnė se gjatė periudhės janar-qershor 2009, prodhimi nga hidrocentralet u rrit me 50.5 pėr qind, kryesisht nga vėnia nė punė e impianteve private tė dhėna me koncension gjatė viteve tė fundit. Nėpėrmjet prodhimit vendas janė plotėsuar mbi 61 pėr qind e kėrkesave tė vendit pėr energji, ndėrsa pjesa tjetėr ėshtė realizuar nėpėrmjet importit.
INSTAT konstaton se familjarėt mbetėn konsumatorėt kryesorė tė energjsė elektrike nė vendin tonė. Ndėrkohė qė konsumi i energjisė nga bizneset dhe institucionet ka pėsuar gjatė kėtij viti njė rėnie tė lehtė.
(e.n/News24/BalkanWeb)
Tartanzan September 17th, 2009, 05:52 PM ^^ Por edhe humbjet ne rrjet dhe vjedhjet e energjise jane rritur...
7t September 17th, 2009, 06:09 PM Eshte Gjergj Bojaxhi akoma kreu i KESH-it apo jo?
AlbSidro September 26th, 2009, 01:10 AM Verbund awards large-scale contract for hydropower plant in Albania
Graz, Vienna, 17 September 2009. Verbund, Austria's leading electricity company and TOP-4 hydropower producer in Europe, is building a world novelty in Albania: the largest matrix power plant consisting of small turbines by proven ANDRIZ-HYDROMATRIX® technology. ENERGJI ASHTA Shpk, a Verbund subsidiary, is laying its bets on Austrian products awards the contract for the equipment of the Ashta power plant to technology company ANDRITZ. The contract value is approx. 100 MEUR.
By 1012, SPV Energji Ashta Shpk will have erected Ashta hydropower plant in the north of Albania, near the country's fourth largest town of Shkoder. The process to be implemented for the project on the river Drin is quite an innovative one: The matrix technology allows for a particularly efficient utilization of water. Through Ashta, some 100,000 Albanian households will be able to be supplied with electricity annually.
In this regard, Verbund is counting on Austrian technology: the HYDROMATRIX®-system will be implemented in two stages on the river Drin in the north of Albania by ANDRITZ HYDRO. Each of the two stages will be equipped with 45 steel modules, each including a HYDROMATRIX® turbine generator unit.
The total installed capacity of both systems (Ashta I and Ashta II) is over 50 megawatt; the annual output to be generated is 230 million kilowatt hours. This corresponds to a fourth of the amount supplied by Vienna Danube power plant Freudenau. Construction of the power plant is scheduled to start in 2010: the total volume invested by Verbund is more than 160 million Euro. Electricity will be generated from 2012, which will be fed into the Albanian 110 kV grid.
http://www.verbund.at/cps/rde/xchg/internet/hs.xsl/354_10040.htm
Shqiptario September 29th, 2009, 05:09 PM Vihet nė punė TEC-i i Vlorės
Nė muajin tetor, KESH parashikon tė prodhojė 45 milionė kilovat orė nga kjo vepėr energjetike
Dje ėshtė vėnė nė punė termocentrali i Vlorės, vepra mė e re energjetike nė vend. Lajmi konfirmohet pėr gazetėn “Agon” nga Muharrem Stojku, nėndrejtor i pėrgjithshėm i Korporatės Elektroenergjetike Shqiptare. Sipas tij, TEC-i ndodhet nė fazėn e komisionimit tė energjisė, ndėrkohė qė aparaturat janė vėnė nė punė dhe kjo vepėr energjetike ka nisur funksionimin normalisht. “Tashmė i kemi kryer provat nė termocentralin e Vlorės. Vepra ėshtė vėnė nė punė dhe ndodhemi nė fazėn e komisionimit tė energjisė. Kemi parashikuar qė gjatė muajit tetor tė pėrfitojmė nga TEC-i i Vlorės njė sasi energjie, qė nė total do tė arrijė nė 45 milionė kilovat orė”,- shprehet Stojku. Korporata Elektroenergjetike Shqiptare e ka pėrmbushur kėshtu objektivin e saj pėr vėnien nė punė tė kėtij TEC-i brenda muajit shtator. Ky afat u la nė qershor, kur u kryen edhe provat e para nė kėtė vepėr energjetike, nė prani tė kryeministrit tė vendit, Sali Berisha, dhe ambasadorit italian nė Tiranė, Saba D’Elia.
Pritet rritje e prodhimit vendas tė energjisė
Vėnia nė punė e termocentralit tė Vlorės do tė rrisė ndjeshėm prodhimin vendas tė energjisė. Kjo do tė thotė se KESH-i do ta ketė mė tė lehtė tė plotėsojė kėrkesat e vendit pėr energji, duke ulur sasinė e importit. Funksionimi i TEC-it nė kėtė periudhė do tė ndihmojė korporatėn pėr tė furnizuar mė lehtė qytetarėt me energji gjatė periudhės sė dimrit, kur konsumi rritet ndjeshėm pėr shkak tė vendosjes masivisht nė punė tė pajisjeve ngrohėse. TEC-i i Vlorės ka njė kapacitet prodhues prej 100 megavat, tė cilat duke filluar nga dita e djeshme do t’i shtohen sistemit tonė energjetik.
120 milionė euro investim nė TEC-in e Vlorės
Investimi nė termocentralin e Vlorės ka vlerėn e 120 milionė eurove dhe ėshtė mundėsuar nga Banka Botėrore, Banka Europiane pėr Rindėrtim, dhe Zhvillim dhe Banka Europiane e Investimeve.
Punimet pėr ndėrtimin e termocentralit tė Vlorės kanė nisur mė 1 shtator tė vitit 2007. Ato pėrfshijnė ndėrtimin e nėnstacionit tė ri tė Babicės dhe disa objekte tė tjera, si linjėn pėr daljen e tensionit tė lartė, 220 kilovolt, nė nėnstacionin e Fierit, linjėn e tensionit tė lartė, 220 kilovolt, me dy qarqe Fier-Babicė, fuqizimin e nėnstacionit tė Babicės me dy autotransformatorė 100 megavat, 220/110/35 kilovat secili, linjat 110/ 35 kilovat me rajonin, nėnstacionin Vlora 2 110/20 kilovat me dy transformatorė, me fuqi prej 35 megavat secili. TEC-i i Vlorės ėshtė ndėrtuar pranė Triportit, komuna Qendėr, afėrsisht 6 km nė verilindje tė portit tė Vlorės, nė njė shesh me sipėrfaqe prej 14 hektarė.
INSTAT
Prodhimi i energjisė rritet me 50 pėr qind
Prodhimi vendas i energjisė ka shėnuar rritje gjatė kėtij viti, pėr shkak edhe nė vėnies nė punė tė disa prej HEC-ve tė dhėna me koncesion. Sipas tė dhėnave zyrtare tė Institutit tė Statistikave, gjatė pjesės sė parė tė kėtij viti, prodhimi total i energjisė elektrike nė vend u rrit me 50 pėr qind krahasuar me gjashtėmujorin e parė tė vitit tė kaluar.
Sipas INSTAT-it, prodhimi i hidrocentraleve u rrit me 50.5 pėr qind, duke dhėnė ndikimin kryesor nė rritjen e burimeve tė energjisė elektrike. Ky prodhim, kėtė gjashtėmujor, zuri 98 pėr qind tė prodhimit gjithsej nė vend. Rritje tė ndjeshme, prej 44 pėr qind, ka energjia e prodhuar nga impiantet private e me koncesion krahasuar me tė njėjtėn periudhė tė njė viti mė parė. Ndėrkohė qė TEC-et gjatė pjesės sė parė tė vitit 2009 nuk kanė prodhuar energji elektrike.
http://gazeta-agon.com/mat.php?idm=9820&l=a
AlbSidro September 30th, 2009, 01:20 AM Energjitike, Gjermania 49 milion euro per linjat e jugut
OSSH dhe banka gjermane per zhvillim nenshkruan dy kontrata prej 49 milion eurosh, ne kuader te projektit linja 110 kilovolt, shqiperia e jugut, projekt qe pritet te permiresoje ndjeshem furnizimin me energji elektrike ne pjesen jugore te vendit.
Kemi firmosur me qeverine gjermane dhe me KFW dy kontrata konsulence. Unaza e jugut do te financohet nga qeveria gjermane me 49 milion euro, u shpreh ministri i Ekonomise dhe Energjitikes, Dritan Prifti.
I pranishem ne ceremonine e nenshkrimit ambasadori gjerman ne Shqiperi Barkard deklaroi se ka marre nga qeveria gjermane premtimin se ne vazhdim te ketij bashkepunimit do te investohen dhe 36 milione euro te tjera pjesa me e madhe e te cilave do te shkojne per te financuar projekte energjitike.
Bashkepunimi gjermano-shqiptar ka filluar ne vitin 1998 kohe prej te ciles jane investuar rreth 850 milione euro per projekte te ndryshme investimesh ne vend, nga keto rreth 180 milione euro jane angazhuar per financime ne sektorin e energjitikes.
http://top-channel.tv/artikull.php?id=163470&ref=lajme
DanMs September 30th, 2009, 01:34 AM Lajme te mira keto per energjine. Keto do ta rrisin ndjeshem zhvillimin.
AlbSidro October 1st, 2009, 04:57 AM Manas Petroleum's Albanian Project Moves Forward
Mention Albania to an energy analyst, and you might get a blank stare, despite the countrys many oil fields and a long oil history that goes back to ancient Rome. Albania, now a member of NATO is booming and oil development is moving at full throttle.
The fact of the matter is Europes largest onshore oilfield, the 2-billion barrel Patos Marinzas, is in Albania. But it now appears that countrys potential reserves could be far greater one of the worlds largest onshore light oil fields lies to be announced, right in the heart of Europe. A study by an international engineering firm was released regarding a series of giant light oil-bearing structures north of Patos Marinzas. The engineers say they could contain a spectacular 2.9 billion barrels of light crude great news for a tiny Switzerland-based oil company, Manas Petroleum which is currently U.S.-listed. (OTCBB: MNAP).
Erik Herlyn, CEO of Manas, comments, "Our focus right now is to finalize the financing of our large exploration project in Albania. Management is actively refining negotiations and will decide which arrangement best enhances shareholder value." Manas now controls 100% working interest in six giant exploration blocks near Europe's largest onshore production. Independent reports from Gustavson and Associates (2008) assign (P50) of almost 3 billion barrels in block A, B, D and E (12.3 Billion Oil in Place) which Manas controls. Two of Manas' four blocks are now drill-ready. The council of ministers recently ratified the production-sharing contract on the two former Oxy blocks to DWM Petroleum, a subsidiary of Manas. These blocks are within the area where most of Bankers Petroleum's current shallow oil production derives from. Manas has the rights to explore the deeper targets in block two where Bankers is producing oil, and where in 2001 Occidental made a light oil discovery. A 51-101-compliant estimate is now being prepared. As Manas drills and develops these giant plays, it clearly has the potential to become one of the worlds fastest-growing oil companies.
http://www.prweb.com/releases/2009/09/prweb2958734.htm
http://www.manaspetroleum.com/s/NewsReleases.asp?ReportID=365502&_Type=News-Releases&_Title=Manas-Petroleums-second-shallow-well-in-Kyrgyzstan-confirms-geologic-model-...
Shqiptario October 3rd, 2009, 01:30 PM HEC-i i Ashtės, gati nė vitin 2012
Hidrocentrali i Ashtės, qė konsiderohet si njė ndėr veprat mė tė mėdha nė fushėn e energjisė elektrike, do tė jetė gati nė vitin 2012. Kompania Verbund, e cila po realizon kėtė projekt, bėn tė ditur, nėpėrmjet njė njoftimi pėr shtyp, se punimet po vazhdojnė me ritmin e parashikuar. Sipas saj, duke prodhuar elektricitet nga energji hidrike qė nuk e dėmton ambientin, kompania ka dhėnė njė kontribut tė rėndėsishėm nė ruajtjen e burimeve dhe mbrojtjen e klimės. HEC-i i Ashtės do tė jetė njė ndėr hidrocentralet mė tė mėdhenj matriks nė vendin tonė, i cili do tė jetė i pėrbėrė nga turbina tė vogla. Hidrocentrali, qė do tė ndėrtohet nė afėrsi tė Shkodrės, do tė ketė njė kapacitet prodhues prej 58 megavat.
http://gazeta-agon.com/mat.php?idm=9896&l=a
Shqiptario October 10th, 2009, 11:53 PM yEsBhT5VE60&feature=channel_page
daalbo October 11th, 2009, 01:18 PM Sa idiote jane gazetaret shqiptare.
Pas shperthimit te Gerdecit, eshte rritur frika e sigurise se centralin berthamor. Heren tjeter do thone, pas shperthimit te bombules se gazit ne nje shtepi ne Maliq, eshte rritur frika e centralit berthamor.
Tartanzan October 12th, 2009, 05:00 PM Sa idiote jane gazetaret shqiptare.
Pas shperthimit te Gerdecit, eshte rritur frika e sigurise se centralin berthamor. Heren tjeter do thone, pas shperthimit te bombules se gazit ne nje shtepi ne Maliq, eshte rritur frika e centralit berthamor.
Si gjithmon qesharake ēar argumentesh sjellin kto gazetleshat ton...
Un per vete jom kunder centraleve berthamore,sidomos ne Shqipni,duke par faktin,qe ne Shqipni standardet e sigurise jon si gjithmon mo te uleta,kshuqe ndertimi i nonji centrali berthamor do sillte rreziqe me vete.
Grupi_Armiqsor October 12th, 2009, 05:20 PM Un per vete jom kunder centraleve berthamore,sidomos ne Shqipni,duke par faktin,qe ne Shqipni standardet e sigurise jon si gjithmon mo te uleta,kshuqe ndertimi i nonji centrali berthamor do sillte rreziqe me vete.
Po ti Tarzan je...s'ka cte thush me teper.
Tartanzan October 12th, 2009, 06:38 PM Po ti Tarzan je...s'ka cte thush me teper.
Rrofsh plako! Ta di per nder...
Total October 27th, 2009, 03:00 PM Hello! Can you tell me, which is main electric company in Albania that manages electricity supply on state level? And since i saw some topics about Kosovo here, does Kosovo has one as well?
I am interested in public lighting demands in Albania and Kosovo, maybe you have that data directly?
Thanks in forward!
Edit: after further reading i found that there is:
KESH: http://www.kesh.com.al/v2/index.php
and KEK: http://www.kek-energy.com/index.jsp?cat=160&l=2
But problem remains, KESH web pages seems to have no actual info (transfer period?), and KEK has some but couldn't even find total electricity produced/consumed, let alone specification by consumer type....
Anyone can share more info?
Buddy Holly October 27th, 2009, 05:19 PM KEK has some but couldn't even find total electricity produced/consumed, let alone specification by consumer type....
Anyone can share more info?
Here you can find daily production/consumption and the monthly schedule.
http://www.kek-energy.com/kek-cmnPg.jsp?mID=182&cat=181&l=2
nov1912 February 17th, 2010, 11:51 PM Prifti: Linja e interkonjeksionit Tiranė-Podgoricė, brenda kėtij viti
Linja e interkonjeksionit 400 kilovolt mes Shqipėrisė dhe Malit tė Zi do tė pėrfundojė brenda kėtij viti. Ministri i Energjetikės, Dritan Prifti ėshtė takuar me homologun e tij malazez, Branko Vojovic, me tė cilin ka diskutuar lidhur me projektet e pėrbashkėta nė energjetikė dhe shumė sektorė tė tjerė tė ekonomisė.
ZCguPoi_22Y
AlbSidro March 3rd, 2010, 04:14 PM HEC-i i ri i Ashtes,austriaket nisin punimet
Pas me shume se dy dekadash, nga ndertimi i hidrocentralit te fundit, Shqiperia i rikthehet serish ndertimit te nje vepre te madhe hidro-energjetike. Kompania austriake Verbund ka nisur zyrtarisht punimet ne terren per ndertimin e hidrocentralit me fuqi 50 megavat.
Ne kemi perfunduar tashme te gjithe procesin ligjor te marrjes se lejeve. Kemi marre te gjitha lejet e nevojshme qe nga ato ambientale deri tek lejet e ndertimit dhe tashme kemi filluar punen per ndertimin e hidrocentralit duke qene plotesisht ne linje me afatet e paracaktuara te projektit, u shpreh Christian Kern, anetari i bordit te menaxhimit te Verbund.
Kushtet e veshtira te lumit imponojne perdorimin e teknologjise me bashkekohore, qe sipas drejtuesve te Verbund mundeson shfrytezimin me eficensen me te larte te prurjeve.
Eshte nje hidrocentral i veshtire per t'u ndertuar, per shkak te kushteve te lumit. Por ne kemi gjetur zgjidhjen dhe do te perdorim teknologjine me te avancuar sot ne bote, qe quhet teknologjia Matrix, e cila mundeson shfrytezimin me eficensen me te madhe te prurjeve edhe kur ato jane te pakta. Ne kete menyre ashta eshte nje projekt inovativ sepse eshte projektuar te jete hidrocentrali me i madh ne bote qe perdor kete lloj teknologjie. Ky ishte dhe parakushti per suksesin e kesaj vepre, pasi hidrocentrali i Ashtes nuk mund te ndertohej me teknologjine e zakonshme qe perdoret sot, theksoi Kern.
Ashta rezulton te jete nder koncesionet me te sukseshme energjetike ne Shqiperi, ne morine e koncesioneve te dhena nga qeveria, pjesa derrmuese e te cilave prej kohesh mbeten vetem projekte ne leter.
Hidrocentrali do te prodhoje mesatarisht rreth 242 milione kilovat ore energji ne vit edhe do te furnizoje me shume se 100 mije familje shqiptare. Do te jete e gjitha nje energji e paster, pa efektin me te vogel ndotes ne ambient dhe ky investim i sjell Shqiperise me shume se 300 vende te reja pune gjate periudhes se ndertimit. Ne total projekti shkon 200 milione euro, nga nje pjese e mire do te shkoje per kompanite shqiptare qe punojne si nenkrontraktore me ne. Pra impaktet jane te shumefishta sepse eshte nje investim me te vertete i madh, u shpreh Kern.
Verbund, nje nga kompanite me te medha ne prodhimin e energjise hidrike ne Europe, qe vitin e kaluar realizoi nje xhiro prej 3.5 miliarde euro.
http://top-channel.tv/artikull.php?id=176959&ref=fp
hakz2007 March 9th, 2010, 03:52 PM Four consortiums in race for Kosovo's new power plant (http://www.newkosovareport.com/Business-and-Economy/)
Tuesday, 09 March 2010
http://www.newkosovareport.com/images/stories/energy17100701.jpg
The steering committee for the construction of the new power plant has selected four international consortiums, which have met the criteria to race in the tender.
Initially, 6 international consortiums expressed officially interest to construct the power plant. Two of them did not meet the criteria.
Following consortiums qualified as bidders for the construction of “Kosova e Re” power plant:
- Adani Power Consortium - PT Adani Global from India and Indonesia;
- Consortium AES Electric lid - Demir Export AS from USA and Turkey;
- Park Holding from Turkey;
- Consortium PPC-Contour Global LLP from Greece and Britain
The Kosovar Minister of Energy and Mining, Justina Shiroka Pula, which heads the committee, expressed the satisfaction of the Government with the interest of these companies.
She said that draft tender is expected to be announced by the end of April while the selection of the winner will be completed by July. Construction of "Kosova e Re" is expected to begin in 2011.
The power plant is expected to produce 500 megawatts of energy, with the possibility of additional 500 megawatts. Construction costs are estimated up to one billion Euros, and will be co-financed by the Government of Kosovo and the winning company.
liburni March 9th, 2010, 04:07 PM Hakzzz thank you for showing interest in our country and continously contributing to our threads.
Grupi_Armiqsor March 9th, 2010, 07:58 PM There is quite a long report on Kosova C which is against it.. It can be found on google which I thought was quite interesting.
There's lots of "reports" posted by various groups which may or may not have any sort of credibility or relevance...and most such "reports" have very little economic analysis of anything they talk about...just touchy-feely stuff. There's lots of that stuff in Albanian press too about Albania...written by thoroughly incompetent people.
Don't fall for that crap...
The main reason for the delays in this project, and why several western companies back out of it several years back...has to do with some specific conditions in Kosovo. Primarily, US companies interested in the project found that the quality of the coal in Kosovo wasn't as good as they needed it to be.
Buddy Holly March 9th, 2010, 09:59 PM Actually, the main reason was that the current government sat on the project for almost 2 years before it decided to change the terms, at which point the two main contenders withdrew, and CEZ wanted better terms. After analyzing the new terms, CEZ did not bid for the reconfigured plant. American AES is still in the game, and will probably win the tender.
RolexAL May 2nd, 2010, 08:06 PM Jqf0wjawzks
SADOSI May 17th, 2010, 06:24 PM Nje raport te ri rreth projekte te ndryshme energjetike.
http://www.cmf.ch/events/tirana2010/assets/discours/PRIFTI.pdf
RolexAL May 21st, 2010, 11:06 AM fgq-nHiKVbc
Kulla May 29th, 2010, 11:41 PM Shqiėria, superfuqi energjetike, do ndėrtohen 264 hidrocentrale (NOA) (http://noa.al/index.php/ekonomi/90-ekonomi/23475-shqiperia-superfuqi-energjetike-do-te-ndertohen-264-hidrocentrale-)
hakz2007 June 2nd, 2010, 10:45 AM Energy minister on trip to Albania
31 May 2010
TIRANA -- Serbia's Mining and Energy Minister Petar Škundrić today met with Albanian Economy, Trade and Energy Minister Dritan Prifti in Tirana.
The two discussed improvement of the two countries’ economic cooperation and especially cooperation in the field of energy.
Škundrić and Prifti told a joint news conference after the meeting that today’s visit productive and constructive and that it included friendly talks about the two countries' economic ties.
The two ministers also announced that the Memorandum on Economic Cooperation of Serbia and Albania will be signed within the next few months, during Prifti’s visit to Belgrade, and pointed out that the document would be a basis for further cooperation.
“Although this is our first meeting, we’ve spoken openly, which points to a need for our countries to intensify cooperation in all areas of the economy, and energy has the most important place in this cooperation,” the Serbian minister pointed out.
He emphasized that Serbia and Albania should have a series of joint projects in the field of energy, as well as initiate regional projects, “which are also important for third parties and for Europe as a whole”.
“The potential for economic cooperation are ten times what is currently taking place between Serbia and Albania,” Škundrić said, and added that future economic cooperation should also contribute to better cultural ties, friendlier relations between the two countries.
He told his Albanian counterpart that Serbia was planning on becoming the region's leader in the field of energy in the next five to seven years, and added that Serbia and Albania should participate in joint gas infrastructure projects.
His host said that Škundrić's visit was “historic and productive”.
“We’ve talked about how to build cooperation which both countries will benefit from, and we’ve identified in which fields we want to cooperate in the future, such as energy and road infrastructure,” Prifti explained.
He said that Serbian investment was welcome in all economic sectors in Albania, that his country was interested in “natural gas interconnections” with Serbia, and that it would “consider the offer”.
While in Tirana, Škundrić also met with the country's prime minister, Sali Berisha. A statement after the meeting said that they discussed ways of improving economic cooperation and that the meeting was “constructive, despite the differences the two countries have regarding the important issue of Kosovo”. http://www.b92.net/eng/news/business-article.php?yyyy=2010&mm=05&dd=31&nav_id=67502
RolexAL June 13th, 2010, 05:52 PM 4rA7ezcnNkI
Illyrian_Patriot June 13th, 2010, 10:09 PM glad to see that works started ^^
TIAL June 15th, 2010, 07:47 PM 100 000 familje? Dmth diku rreth 400 000 banore? :nuts:
Grupi_Armiqsor June 15th, 2010, 08:41 PM 100 000 familje? Dmth diku rreth 400 000 banore?
Numer kot. Ashta ka nje kapacitet te instaluar prej 50MW...nje shifer qe eshte relativisht e ulet...TEC-i i Vlores pershembull ka kapacitet 98MW (dhe ky eshte nje TEC realtivisht i vogel)...dhe 1 nga hidrocentralet ne veri ka kapacitet prej 350MW (dhe jane 3 te tille ne veri). Nje hidrocentral zakonisht ka nje faktor rreth 30% (ne Shqiperi)...qe domethen qe gjat vitit prodhon afersisht vetem 30% te energjise maksimale qe mund te prodhonte nese do punonte me 100% kapacitet. Kjo si pasoje e nivelit te ujit, kerkeses etj etj.
Pra kur e perkthen kte 50MW te instaluar per nje hidrocentral...ne energji te prodhuar gjat vitit...del dicka relativisht e vogel edhe per Shqiperine.
Gjithsesi impakti i tij do ndihet ne nivel lokal...ne Jug. Por me teper energjia e tij do perdoret per eksport.
Ky HEC-i (dhe HEC-et e tjera qe planifikohen...qe shumica jane me koncesion qe domethen se Shqiperia do marri vetem nje sasi te caktuar te energjise prej tyre) nuk do zgjidhin problemin e energjise ne Shqiperi.
Vetem 2-3 TEC-e te tjera mund ta zgjidhin kte problem...sidomos ne muajt problematike te veres (kur ka dhe thatsira te medha ne HEC-e).
-------
TEC-i i Durresit do e kishe zgjidhur kte problem...por fatkeqsisht ka mbetur ne vend si pasoje e krizes ekonomike ne bote...dhe ka hikur interesi nga invetitore tani per tani.
soldek June 15th, 2010, 09:30 PM Numer kot. Ashta ka nje kapacitet te instaluar prej 50MW...nje shifer qe eshte relativisht e ulet...TEC-i i Vlores pershembull ka kapacitet 98MW (dhe ky eshte nje TEC realtivisht i vogel)...dhe 1 nga hidrocentralet ne veri ka kapacitet prej 350MW (dhe jane 3 te tille ne veri). Nje hidrocentral zakonisht ka nje faktor rreth 30% (ne Shqiperi)...qe domethen qe gjat vitit prodhon afersisht vetem 30% te energjise maksimale qe mund te prodhonte nese do punonte me 100% kapacitet. Kjo si pasoje e nivelit te ujit, kerkeses etj etj.
Pra kur e perkthen kte 50MW te instaluar per nje hidrocentral...ne energji te prodhuar gjat vitit...del dicka relativisht e vogel edhe per Shqiperine.
Gjithsesi impakti i tij do ndihet ne nivel lokal...ne Jug. Por me teper energjia e tij do perdoret per eksport.
Ky HEC-i (dhe HEC-et e tjera qe planifikohen...qe shumica jane me koncesion qe domethen se Shqiperia do marri vetem nje sasi te caktuar te energjise prej tyre) nuk do zgjidhin problemin e energjise ne Shqiperi.
Vetem 2-3 TEC-e te tjera mund ta zgjidhin kte problem...sidomos ne muajt problematike te veres (kur ka dhe thatsira te medha ne HEC-e).
-------
TEC-i i Durresit do e kishe zgjidhur kte problem...por fatkeqsisht ka mbetur ne vend si pasoje e krizes ekonomike ne bote...dhe ka hikur interesi nga invetitore tani per tani.
Hidricentralet ne veri kane fuqi te instaluar gjithsej 1350 MW.
500 MW Fierza
600 MW Komani
250 MW Vau i dejes
redi21 June 15th, 2010, 11:21 PM Energy minister on trip to Albania
31 May 2010
http://www.b92.net/eng/news/business-article.php?yyyy=2010&mm=05&dd=31&nav_id=67502
Ore po keta shkerdhata qe kemi ne pushtet se sa te forcojne lidhet ekonomike midis shqipetarve ne ballkan bejne pazare me armikun??? Ato motrat mu ne vrim.....
soldek June 15th, 2010, 11:25 PM Ore po keta shkerdhata qe kemi ne pushtet se sa te forcojne lidhet ekonomike midis shqipetarve ne ballkan bejne pazare me armikun??? Ato motrat mu ne vrim.....
Duam sduam bashkepunim me ta ne fushen energjitike do kemi dhe jo vetem ne por i gjithe ballkani. Ne serbi kryqezohen te tera linjat e interkonjeksionit ne ballkan dhe pastaj shperndahen te te tere vendet e rajonit. Keshtu eshte ndertuar qe ne kohen e jugoslavise. Me rrugen durres-kukes qe beme bashkepunim do rritet edhe me tej. Eshte e qarte qe nga durresi e vlora do kalojne pjesa me e madhe e mallrave per ne perendim dhe anasjelltas.
redi21 June 15th, 2010, 11:31 PM Numer kot. Ashta ka nje kapacitet te instaluar prej 50MW...nje shifer qe eshte relativisht e ulet...TEC-i i Vlores pershembull ka kapacitet 98MW (dhe ky eshte nje TEC realtivisht i vogel)...dhe 1 nga hidrocentralet ne veri ka kapacitet prej 350MW (dhe jane 3 te tille ne veri). Nje hidrocentral zakonisht ka nje faktor rreth 30% (ne Shqiperi)...qe domethen qe gjat vitit prodhon afersisht vetem 30% te energjise maksimale qe mund te prodhonte nese do punonte me 100% kapacitet. Kjo si pasoje e nivelit te ujit, kerkeses etj etj.
Pra kur e perkthen kte 50MW te instaluar per nje hidrocentral...ne energji te prodhuar gjat vitit...del dicka relativisht e vogel edhe per Shqiperine.
Gjithsesi impakti i tij do ndihet ne nivel lokal...ne Jug. Por me teper energjia e tij do perdoret per eksport.
Ky HEC-i (dhe HEC-et e tjera qe planifikohen...qe shumica jane me koncesion qe domethen se Shqiperia do marri vetem nje sasi te caktuar te energjise prej tyre) nuk do zgjidhin problemin e energjise ne Shqiperi.
Vetem 2-3 TEC-e te tjera mund ta zgjidhin kte problem...sidomos ne muajt problematike te veres (kur ka dhe thatsira te medha ne HEC-e).
-------
TEC-i i Durresit do e kishe zgjidhur kte problem...por fatkeqsisht ka mbetur ne vend si pasoje e krizes ekonomike ne bote...dhe ka hikur interesi nga invetitore tani per tani.
Edhe me TEC-i in Durresit nuk do zgjidnim problemin se shumica e korentit edhe aty do shkonte ne Itali.
Pastaj mua se sa vetem ndertimi i TEC-eve do me dukesh me i llogjikshem te stimuloje energji te pastra si psh.ajo djellore.
Pastaj jane edhe dy rruge te tjera qe duhen ndjekur por qe nuk merren parasysh :
1 energjia duhet edhe kursyer
2 duhen rinovuar edhe linjat e shperndarjes qe zakonisht kane mbi 30 vjet.
daalbo June 16th, 2010, 12:03 AM Gjithsesi impakti i tij do ndihet ne nivel lokal...ne Jug.
Ashta eshte Shkoder. Mos e ngaterron me Kalivacin, sepse dhe aty kane filluar punimet.
Por me teper energjia e tij do perdoret per eksport.
Ky HEC-i (dhe HEC-et e tjera qe planifikohen...qe shumica jane me koncesion qe domethen se Shqiperia do marri vetem nje sasi te caktuar te energjise prej tyre) nuk do zgjidhin problemin e energjise ne Shqiperi.
Varet. Ky i Ashtes eshte vetem 50MW, Kalivaci me duket se eshte rreth 80, ato te tre qe priten te fillojne punimet ne Devoll kane nje kapacitet te perbashket rreth 300. Pastaj nqs e merr njeri persiper, Skavica do jete akoma me i madh. Kuptohet qe problemi i hidrocentraleve eshte thatesira. Mund te kesh 10 vjet rreshje te mjaftueshme dhe vetem nje vit pa shi te le pa drita. Plus qe Shqiperia ka fatin e keq qe nuk e kontrollon burimin e Drinit. Kuptohet ne kohe te mira Maqedonia e leshon ujin pa problem, por ne kohe thatesire gjerat ndryshojne. S'ka asnje lloj problemi qe te ndertojme sa me shume hidrocentrale qe te jete e mundur. Ne fund te fundit, energjia qe ata prodhojne eshte me e lire se ajo e TECeve, por sic e the edhe ti duhen edhe burime energjie qe nuk varen nga moti.
Grupi_Armiqsor June 16th, 2010, 08:39 AM Edhe me TEC-i in Durresit nuk do zgjidnim problemin se shumica e korentit edhe aty do shkonte ne Itali.
E zgjidhte problemin dhe e tejkalonte. Sipas nje llogarie qe kam bere njehere Shqiperise per 10 vitet e ardhsme do i duhen aferisht 650MW kapacitet te instaluar me TEC-e per te perballuar nivelin e kerkeses te parashikuar. 98MW TEC-i i Vlores, aferishsit 150MW ai i Fierit qe ekziston sot (dhe po modernizohet dhe zgjerohet), 140MW TEC-i i parashikuar ne Lezhe...mbeten vetem 260MW mangut.
Dhe kur merr parasysh se TEC-i i Vlores do jet TEC per peak load me nje faktor mbase jo me teper se 0.3...po ashtu dhe TEC-i i Fierit...ndersa TEC-i i Lezhes mund te mendojme se do jet rreth 0.7...i bie qe te mbeten mangut edhe me shume.
Kutpohet ky numer s'eshte aspak i sakte...por ne perafersi...sipas disa shifrave qe kam lexuar nga KESH-i per parashikimin e kerkesave ne vitin 2020. Dhe kto shifra ishin per rastin me te mire.
TEC-i i Durresit parashikon 20% te energjise te prodhuar per perdorim ne Shqiperi me cmim kostoje. Nese marrim parasysh nje TEC 1600MW...dhe duke qen me qymyr le te marrim faktorin e kapacitet prej 0.8 (duke qen se do jet TEC modern)...i bie dicka e krahasueshme 1.28 TWh ne vit. Ky eshte vetem 20% i prodhimit te kti TEC-i...
Kjo do ishte nje shifer mese e mjaftueshme per nevojat e Shqiperise ne vitet e ardhshme.
--------------------------
Pastaj mua se sa vetem ndertimi i TEC-eve do me dukesh me i llogjikshem te stimuloje energji te pastra si psh.ajo djellore.
S'do ishte aspak e llogjikshme nje gje e tille pasi tregu Shqiptar nuk do ti perballonte kurre kostot e ksaj lloj energjie.
Koncepti i "energjise se paster" eshte koncept i vlefshem vetem per eko-pordhacet ne perendim qe mund ti perballojne kostot...por jo per nje vend si Shqiperia. Pastaj...Shqiperia eshte vendi me energjise ME te paster ne Evrope...97% te paster :) (se eshte 97% me HEC).
Ne kontekstin e Shqiperise...eshte ide kot fare (sepse s'ka asnje lloj velere). Jo vetem qe do ket nje kosto te paperballueshme per tregun Shqiptar...por ne asnje menyre nuk do shtonte ate qe i mungon me teper Shqiperise...KAPACITET.
Energjite eko-pordhace nuk shtojne...kapacitet...ne rrjet. Pra djellore dhe me ere. Rrjeti i energjise ne Shqiperi ka nevoje pikerisht per kapacitet...jo me shume.
Ne vendet ku kto lloj teknollogjira implementohen (zakonisht vetem nepermjet zubvencionimve te qeverive te atyre vendeve)...ato ndertohen atje ku rrjeti mund ti mbeshtesi me kapacitet (pra nese nderton 300MW energji me ere...rrujeti duhet te ket 300MW kapacitet me teper per te perballuar kerkesen ne ate 70% te kohes kur kto mullinj me ere nuk prodhojne energji...pra zakonisht ndertohen TEC-e dhe gjenerator ekstra...qe te mbeshtesin mullinjte me ere)
Thjesht ndertimi ka nje kosto astronimike per nivelin e energjise qe prodhon...komplet pa leverdi (vetem nese te paguan qeveria per ta bere)
Thjesht muhabeti...jane kot per Shqiperine.
Energjia djellore ka shume vlere ne Shqiperi vetem nese perdoret per perdorim personal...pra panelse djellore per ngrofje uji ne cati...sic ka ne Greqi ose Israel. Po ky eshte nje muhabet shume ndryshe nga kapaciteti qe i duhet nje rrjeti.
---------------------------
1 energjia duhet edhe kursyer
Eh po...patjeter :|
Sipas parashikimit te KESh-it ne 10 vitet e ardhsme...ne rastin me te mire...kerkesa do rritet me 160%
duhen rinovuar edhe linjat e shperndarjes qe zakonisht kane mbi 30 vjet.
Rinovoj sa te duash...nuk do ket me teper se 5% permirsim
------------------------------
Ashta eshte Shkoder. Mos e ngaterron me Kalivacin,
Ok...atehere do jet 100% per eksport ;)
Varet. Ky i Ashtes eshte vetem 50MW, Kalivaci me duket se eshte rreth 80, ato te tre qe priten te fillojne punimet ne Devoll kane nje kapacitet te perbashket rreth 300. Pastaj nqs e merr njeri persiper, Skavica do jete akoma me i madh. Kuptohet qe problemi i hidrocentraleve eshte thatesira. Mund te kesh 10 vjet rreshje te mjaftueshme dhe vetem nje vit pa shi te le pa drita. Plus qe Shqiperia ka fatin e keq qe nuk e kontrollon burimin e Drinit. Kuptohet ne kohe te mira Maqedonia e leshon ujin pa problem, por ne kohe thatesire gjerat ndryshojne. S'ka asnje lloj problemi qe te ndertojme sa me shume hidrocentrale qe te jete e mundur. Ne fund te fundit, energjia qe ata prodhojne eshte me e lire se ajo e TECeve, por sic e the edhe ti duhen edhe burime energjie qe nuk varen nga moti.
Jo kaq e thjeshte.
Shumica e HEC-eve qe do ndertohen...jane me koncesion.
Vetem njeri nga kto HEC-e (me sa mbaj mend une ose ky i Ashtes ose Kalivaci) do ndertohet me paret e KESH-it dhe per perdorim te Shqiperise.
Te tjeret do ndertohen me koncesion per perdorim nga kompani te huaja...dhe me kontrate per nje % te caktuar te energjise per Shqiperine...zakonisht 10-20% te energjise te prodhuar.
Kutpohet Shqiperia perfiton shume edhe nga kto concesione...por kur merr parasysh nje HEC 300MW (le ta zeme ne rastin me te mire te ndonje HEC-i te ardhshem)...me 10-20% kontrate...me nje HEC qe ne Shqiperi mund te ket nje faktor prodhimi jo me shume se 0.3 (megjithse Shqiperija gjasme reklamon se HEC-et mund te kene faktor prodhimi deri ne 0.4...po ato jane llafe koti)...ne fund te dites i bie nje sasi relativisht e vogel qe i mbetet Shqiperise.
Shqiperia perfiton edhe nga taksat e paguara kutpohet...kshuqe kto s'po i them per te treguar se jane investime te keqia per Shqiperine.
Po ne fund te dites...asnje nga kto HEC-e nuk do sjelli ndonje lloj zgjidhje per problemet energjitike te Shqiperise.
Shqiperise i mungojne 2 gjera. Se pari kapacitet ne sezonet kur HEC-et nuk e perballojne dot as kerkesen baze te energjise.
Pra...absolutisht...nje TEC me qymyr (ose te pakten 2 TEC-e combined cycle me gaz)
Dhe se dyti...kapacitet per peak load
Pra...absolutisht...2-3 TEC-e me gaz si ai i Vlores ose i Fierit.
-------------
Te tjerat pastaj...si HEC-et e shumta...behen per te rritur balancen e eksportit te energjise per te bere tregti me vendet e tjera. Problemi eshte nese kerkesa e rrajonit eshte aq e larte...dhe sa te deshperuar mund te jemi ne ne sezonet e thatesise per eneregji importi.
Ka me teper kuptim ekonomik ta prodhosh kte energji ne Shqiperi nepermjet ktyre TEC-eve...se ta importosh nga jasht. Aq me teper kur te gjitha kto TEC-e do ndertohen nga kompani te huaja me paret e tyre (pra me nje kosto ZERO per Shqiperine).
Kurse sot Shqiperia ka nje bilanc 300-400 milion dollare negativ ne vit per energji.
Disa HEC-e mikroskopike nuk do ta permirsojne kte situate shume ne te ardhme...dhe aq me teper kur parashikimi per 2020 eshte 160% me i lart se kerkesa e sotme.
---------------------
Plus vertet qe energjia kushton me pak me nje HEC se nje TEC...por nje HEC punon vetem 30% te kohes ne vit...kurse nje TEC mund te punoj 80% te kohes.
Plus kostoja up-front per ndertimin e nje TEC-i mund te jet 20-30% e nje HEC-i me te njetin kapacitet...dhe i sjell prodhuesit nje fleksibilitet shume here me te madh per te maksimizuar fitimin nga ky burim. Pershembull...nje HEC te lejon te prodhosh energji ne shumice vetem ne ate sezon kur ke uje...jo kur te duash ti. Dhe ne ate kohe cmimi i kerkeses se enegjise per eksport mund te jet i ulet...por prodhuesi s'ka alternative.
Kurse me nje TEC e prodhon kur te duash...dhe e prodhon per eksport pikerisht ne ate kohe dhe orar kur te maksimizon fitimin ne tregun e eksportit (vecse Shqiperia nuk do ti operoj kto TEC-e...kshuqe s'ka shume rendesi)
Buddy Holly June 16th, 2010, 08:41 AM Duam sduam bashkepunim me ta ne fushen energjitike do kemi dhe jo vetem ne por i gjithe ballkani. Ne serbi kryqezohen te tera linjat e interkonjeksionit ne ballkan dhe pastaj shperndahen te te tere vendet e rajonit. Keshtu eshte ndertuar qe ne kohen e jugoslavise. Me rrugen durres-kukes qe beme bashkepunim do rritet edhe me tej. Eshte e qarte qe nga durresi e vlora do kalojne pjesa me e madhe e mallrave per ne perendim dhe anasjelltas.
Po harron se mes Shqiperise e Serbise eshte nje shtet tjeter, e ky rrjet do te duhej te kalonte edhe andej. Per kete ky serbi erdh ne Shqiperi; te kerkonte nga Shqiperia t'ja mbush mendjen Kosoves qe te lejoje rrjetin e tyre fantom te kaloje neper Kosove. Ne fakt Serbia eshte shume mbrapa sa i perket gazit natyral dhe nuk eshte kurrfare qendre interkonekcioni ne Ballkan.
Noki_pr June 16th, 2010, 09:25 AM TEC-i i Durresit parashikon 20% te energjise te prodhuar per perdorim ne Shqiperi me cmim kostoje. Nese marrim parasysh nje TEC 1600MW...dhe duke qen me qymyr le te marrim faktorin e kapacitet prej 0.8 (duke qen se do jet TEC modern)...i bie dicka e krahasueshme 1.28 TWh ne vit. Ky eshte vetem 20% i prodhimit te kti TEC-i...
Ka rezerva qymyri edhe ne Shqiperi?
daalbo June 16th, 2010, 03:34 PM Kutpohet ky numer s'eshte aspak i sakte...por ne perafersi...sipas disa shifrave qe kam lexuar nga KESH-i per parashikimin e kerkesave ne vitin 2020. Dhe kto shifra ishin per rastin me te mire.
Parashikimet (faqja 11):
http://www.energy-community.org/pls/portal/docs/292180.PDF
Ky eshte nje studim i EVN por kete citon edhe ministria kur flet per parashikime.
TEC-i i Durresit parashikon 20% te energjise te prodhuar per perdorim ne Shqiperi me cmim kostoje. Nese marrim parasysh nje TEC 1600MW...dhe duke qen me qymyr le te marrim faktorin e kapacitet prej 0.8 (duke qen se do jet TEC modern)...i bie dicka e krahasueshme 1.28 TWh ne vit. Ky eshte vetem 20% i prodhimit te kti TEC-i...
1600 eshte kapaciteti qe mund te ndertohej ne te ardhmen. Kapaciteti i tecit te pare do ishte diku rreth 600MW.
S'do ishte aspak e llogjikshme nje gje e tille pasi tregu Shqiptar nuk do ti perballonte kurre kostot e ksaj lloj energjie.
Shume shtepi sot perdorin energjine diellore per ngrohjen e ujit. Dhe gati te gjithe thone qe ia vlen krahasuar me koston e korentit. Kjo tregon pikerisht faktin qe nuk eshte aq e shtrenjte. Plus qe kostoja sa vjen e ulet dhe teknologjia permisohet. Tani do thuash ti qe nqs kjo eshte e vertete, pse nuk vene te gjitha shtepite panele diellore. Kjo ka te beje me koston fillestare dhe me faktin qe njerezit nuk jane largpames. Njerezit i tremben cmimit fillestar megjithese nuk e kuptojne qe shume shpejt do te paguajne me shume vetem per korentin. Gjithsesi, nuk besoj se energjia diellore eshte e mjaftueshme per nevojat e Shqiperise. Si burim shtese po, por jo si burim kryesor.
Ne kontekstin e Shqiperise...eshte ide kot fare (sepse s'ka asnje lloj velere). Jo vetem qe do ket nje kosto te paperballueshme per tregun Shqiptar...por ne asnje menyre nuk do shtonte ate qe i mungon me teper Shqiperise...KAPACITET.
Energjite eko-pordhace nuk shtojne...kapacitet...ne rrjet. Pra djellore dhe me ere. Rrjeti i energjise ne Shqiperi ka nevoje pikerisht per kapacitet...jo me shume.
Ne vendet ku kto lloj teknollogjira implementohen (zakonisht vetem nepermjet zubvencionimve te qeverive te atyre vendeve)...ato ndertohen atje ku rrjeti mund ti mbeshtesi me kapacitet (pra nese nderton 300MW energji me ere...rrujeti duhet te ket 300MW kapacitet me teper per te perballuar kerkesen ne ate 70% te kohes kur kto mullinj me ere nuk prodhojne energji...pra zakonisht ndertohen TEC-e dhe gjenerator ekstra...qe te mbeshtesin mullinjte me ere)
Ketu s'hyn fare kapaciteti se si teci si mullinjte e eres mund te perdorin te njejtin rrjet. Kur ka ere, teci s'punon dhe rrjeti furnizohet nga mullinjte. Kur s'ka ere, punon teci. Shembulli qe jep ti supozon qe teci do punonte me kapacitet te plote gjate gjithe kohes kurse mullinjte vetem kur ka ere, dhe rrjeti i Shqiperise duhet t'i akomodoje te dy. Kurse une them, qe kur ka ere, Shqiperia do e merrte energjine nga era dhe teci s'do prodhonte gje, ose prodhimi do shkonte direkt ne Itali pa u futur fare ne rrjetin shqiptar.
Energjia djellore ka shume vlere ne Shqiperi vetem nese perdoret per perdorim personal...pra panelse djellore per ngrofje uji ne cati...sic ka ne Greqi ose Israel. Po ky eshte nje muhabet shume ndryshe nga kapaciteti qe i duhet nje rrjeti.
Po, por nese te gjithe do e benin kete do ulej kerkesa per korent. Plus nqs do zgjerohej perdorimi i paneleve per te mbuluar te gjithe catine sic e kane ca qe tani ne Shqiperi, atehere mund te kishte energji te mjaftueshme edhe per gjera te tjera si p.sh. per te punuar kondicioneri ne vere kur edhe dielli eshte me i forte. Une s'jam kunder teceve, perkundrazi, por ama s'ka pse te shohim vetem nje burim te vetem si shpetimtarin.
Jo kaq e thjeshte.
Shumica e HEC-eve qe do ndertohen...jane me koncesion.
Vetem njeri nga kto HEC-e (me sa mbaj mend une ose ky i Ashtes ose Kalivaci) do ndertohet me paret e KESH-it dhe per perdorim te Shqiperise.
As njeri as tjetri s'po ndertohet me paret e KESH. Ashta po ndertohet nga Verbund kurse Kalivaci nga Becheti me financim te Deutsche Bank. Per Kalivacin s'ka shume informacion ne internet, keshtu qe nuk i di kushtet e kontrates. Kurse Ashta, duhet t'i shesi Shqiperise te gjithe energjine 15 vitet e para, dhe me pas mund ta shesi ku te doje. Kurse hidrocentralet e Devollit qe do ndertohen nga EVN dhe Statkraft mund ta shesin energjine ku te duan. Kuptohet qe nqs do ia japin Shqiperise, kostoja do jete me e larte se ajo hidrocentraleve ne Drin, por s'do jete me e larte se kostoja e eksportit. Dhe duke pare pengesat me transferimin e energjise, per te njejtin cmim, EVN/Statkraft do preferoje t'ia japi Shqiperise. Plus qe keto hidrocentralet jane dhene ne baze te nje kontrate me kohe te kufizuar. Mbas kesaj kohe, hidrocentralet i kalojne shtetit shqiptar.
Te tjeret do ndertohen me koncesion per perdorim nga kompani te huaja...dhe me kontrate per nje % te caktuar te energjise per Shqiperine...zakonisht 10-20% te energjise te prodhuar.
Pervec Kalivacit (qe nuk ia di kontraten) s'ka limit se sa do qendroje ne Shqiperi dhe sa do shkoje jashte. Por sic e thashe, skenari me i keq do jete qe Shqiperia do e bleje energjine me te njejtin cmim si importi. Por te pakten do e kete ketu dhe s'do lodhet se kerkuari kapacitet neper Evrope per ta transferuar enegjine ne Shqiperi.
Kutpohet Shqiperia perfiton shume edhe nga kto concesione...por kur merr parasysh nje HEC 300MW (le ta zeme ne rastin me te mire te ndonje HEC-i te ardhshem)...me 10-20% kontrate...me nje HEC qe ne Shqiperi mund te ket nje faktor prodhimi jo me shume se 0.3 (megjithse Shqiperija gjasme reklamon se HEC-et mund te kene faktor prodhimi deri ne 0.4...po ato jane llafe koti)...ne fund te dites i bie nje sasi relativisht e vogel qe i mbetet Shqiperise.
Pak si pa lidhje, por keto argumentat me kapacitetin me duken kot mua. Pak rendesi ka kapaciteti. Me shume rendesi ka prodhimi total vjetor. Ndersa Shqiperia nderton me shume linje interkoneksioni me vendet fqinje, do jete gjithnje e me e lehte transferimi i energjise. Kjo ndodh edhe tani qe po flasim. Keshtu qe ne kohe rreshjesh, Shqiperia prodhon me shume se c'ka nevoje dhe ia jep energjine Kosoves p.sh., e cila ia kthen energjine Shqiperise ne vere kur s'ka shi. Prandaj eshte me mire te krahasosh prodhimin total vjetor sesa kapacitetin maksimal.
Po ne fund te dites...asnje nga kto HEC-e nuk do sjelli ndonje lloj zgjidhje per problemet energjitike te Shqiperise.
Perkundrazi. Ato s'mund te perballojne kerkesat ne cdo moment, por ne 90% te kohes do jene te mjaftueshem.
Shqiperise i mungojne 2 gjera. Se pari kapacitet ne sezonet kur HEC-et nuk e perballojne dot as kerkesen baze te energjise.
Sic e kemi pare deri tani, nqs ka rreshje te mjaftueshme ne dimer, ka korent edhe ne vere. Shqiperia thjesht eksporton ne dimer dhe importon ne vere. Net net Shqiperia mund te dale dhe me fitim si vitet e fundit. Problemi qendron ne kohe te zgjatura thatesirash, jo ne harkun kohor te nje viti.
Dhe se dyti...kapacitet per peak load
Hidrocentralet e Devollit (sipas EVN) do kene nje prodhim te kenaqshem ne peak load periods. As e kam idene se cfare menyre prodhimi do perdorin, por keshtu thone.
Pra...absolutisht...2-3 TEC-e me gaz si ai i Vlores ose i Fierit.
As Vlora as Fieri nuk jane me gaz.
Ka me teper kuptim ekonomik ta prodhosh kte energji ne Shqiperi nepermjet ktyre TEC-eve...se ta importosh nga jasht. Aq me teper kur te gjitha kto TEC-e do ndertohen nga kompani te huaja me paret e tyre (pra me nje kosto ZERO per Shqiperine).
I njejti argument jepet edhe per hidrocentralet.
Kurse sot Shqiperia ka nje bilanc 300-400 milion dollare negativ ne vit per energji.
Ne kohe thatesire po. Kurse sot Shqiperia ka nje bilanc pozitiv. Sic e thashe, hidrocentralet hasin probleme vetem kur thatesira kap dimrin.
Disa HEC-e mikroskopike nuk do ta permirsojne kte situate shume ne te ardhme...dhe aq me teper kur parashikimi per 2020 eshte 160% me i lart se kerkesa e sotme.
Sic e thashe, s'ka nevoje vetem per nje burim te vetem shpetimi. Te gjithe ndihmojne nga pak. Sot lexova qe kane filluar procedurat e koncesionit per te hidrocentrale ne lumin Fan. S'ka asnje arsye pse Shqiperia s'duhet te shfrytezoje reservat ujore ne maksimum.
Plus vertet qe energjia kushton me pak me nje HEC se nje TEC...por nje HEC punon vetem 30% te kohes ne vit...kurse nje TEC mund te punoj 80% te kohes.
Dhe kur punon tamam e eksporton energjine dhe me ato pare importon ne vere.
Plus kostoja up-front per ndertimin e nje TEC-i mund te jet 20-30% e nje HEC-i me te njetin kapacitet...
Shume te ekzagjeruar keto numrat qe jep ti. Teci i Vlores dhe Hidrocentrali i Kalivacit kane kapacitet te njejte (rreth 100 MW). Kostoja e Tecit te Vlores eshte $100M kurse e Kalivacit eshte $130M.
Vlora: http://www.energy-community.org/pls/portal/docs/36239.PDF
Kalivac: http://www.cae.al/v3/index.php?option=com_content&task=view&id=57&Itemid=
dhe i sjell prodhuesit nje fleksibilitet shume here me te madh per te maksimizuar fitimin nga ky burim. Pershembull...nje HEC te lejon te prodhosh energji ne shumice vetem ne ate sezon kur ke uje...jo kur te duash ti. Dhe ne ate kohe cmimi i kerkeses se enegjise per eksport mund te jet i ulet...por prodhuesi s'ka alternative.
S'mund te thuash qe nje tec ka me shume fitim se nje hec. Cmimi i energjise mund te jete me i lire ne dimer (qe eshte thjesht nje supozim i yti), por ne te njejten kohe cmimi i naftes eshte me i larte ne vere zakonisht. Dhe megjithese nuk mund ta kontrollosh se kur punon nje tec, ne kohen qe ai punon, energjia qe prodhon eshte gati falas.
(vecse Shqiperia nuk do ti operoj kto TEC-e...kshuqe s'ka shume rendesi)
Pikerisht. Shqiperia s'do operoje as ndertoje as tecet (pervec te Vlores) as hecet e rinj, keshtu qe pak rendesi ka kostoja fillestare dhe e ajo e operimit.
Per te hequr cdo lloj konfuzioni rreth qendrimit tim. Une s'ja kunder teceve. Perkundrazi une perkrah cdo projekt energjitik ne Shqiperi. Dhe jam mese i bindur qe Shqiperia ka nevoje per burime energjitike qe nuk varen nga moti apo fqinjet. Por une s'e shoh zgjidhjen e problemeve vetem tek tecet, por edhe tek hidrocentralet, mullinjte me ere, panelet diellore, centralet atomike, etj.
Grupi_Armiqsor June 16th, 2010, 07:05 PM Parashikimet (faqja 11):
http://www.energy-community.org/pls/...ocs/292180.PDF
Ky eshte nje studim i EVN por kete citon edhe ministria kur flet per parashikime.
Jo jo. KESH-i ka nje studim te gjere rreth parashikimit te energjise ne Shqiperi. Kto jane parashikime te kompanive private...ie...propagande ;)
1600 eshte kapaciteti qe mund te ndertohej ne te ardhmen. Kapaciteti i tecit te pare do ishte diku rreth 600MW.
S'ka rendesi. Do jen 2-3 TEC-e ne kte projekt (po u ndertua ndonjehere)
Shume shtepi sot perdorin energjine diellore per ngrohjen e ujit. Dhe gati te gjithe thone qe ia vlen krahasuar me koston e korentit. Kjo tregon pikerisht faktin qe nuk eshte aq e shtrenjte. Plus qe kostoja sa vjen e ulet dhe teknologjia permisohet. Tani do thuash ti qe nqs kjo eshte e vertete, pse nuk vene te gjitha shtepite panele diellore. Kjo ka te beje me koston fillestare dhe me faktin qe njerezit nuk jane largpames. Njerezit i tremben cmimit fillestar megjithese nuk e kuptojne qe shume shpejt do te paguajne me shume vetem per korentin. Gjithsesi, nuk besoj se energjia diellore eshte e mjaftueshme per nevojat e Shqiperise. Si burim shtese po, por jo si burim kryesor.
Nuk e ke kuptuar cfar thashe...dhe ku qendron ndryshimi midis perdorimit te panelve diellore per perdorim personal...dhe per prodhim energjie per rrjet.
Jane dy gjera shume ndryshe.
Perdorimi personal i paneleve djellore ka kuptim dhe eshte fitimprures. Perdorimi ne rrjet...eshte shume problematik.
Ndryshimi qendron se ne rastin e perdorimit personal...ti thjesht ul kerkesen tende nga rrjeti. Por rrjeti nuk preket nga kjo...thjesht lehtesohet.
Ndersa ne perdorimin e djellores (ose mullinjve me ere gjithashtu)...per prodhim ne rrjet, ka probleme te medha sepse kto nuk shtojne kapacitet, por ne te kundert kerkojne kapacitet.
Kur kto aplikohen ne rrjet...zakonisht jane te shoqueruara me instalimin e nje kapaciteti te barabart TEC-eve...ose me keq gjenerator me nafte. Pra...nese instalon 300MW mullinj me ere (ose djellore)...dhe kto punojne per 30% te kohes, 70% tjeter merret persiper nga nje kapacitet shtese TEC-eve. Por kto s'mund te jene cdo lloj TEC-esh...por duhen te jene tipa qe mund te ndizen dhe fiken menjehere dhe kur te duash...pra ato me gaz ose me nafte (por rralle here me cikel te kombinuar)...ose ne shume raste thjesht gjenerator me nafte. Dhe djegja qe kto lloj burime prodhojne...per aresye te fikje-ndezjes se shpejte...eshte shume me me pak eficence se TEC-et per kapacitet te zakonshem.
Nga pikpamja..."ekologjike"...benefiti eshte jo-ekzisutes ne shumicen e rasteve (pervec ne raste kur kapaciteti mbeshtetes eshte nje HEC...qe mund te behet ne vende ku ka shume burime ujore)
---------
Por gjithsesi...rendesi ka qe te kuptohet se perdorimi PERSONAL i paneleve djellore eshte shume ndryshe nga prodhimi i energjise per RRJET.
-----------------
Ketu s'hyn fare kapaciteti se si teci si mullinjte e eres mund te perdorin te njejtin rrjet. Kur ka ere, teci s'punon dhe rrjeti furnizohet nga mullinjte. Kur s'ka ere, punon teci. Shembulli qe jep ti supozon qe teci do punonte me kapacitet te plote gjate gjithe kohes kurse mullinjte vetem kur ka ere, dhe rrjeti i Shqiperise duhet t'i akomodoje te dy. Kurse une them, qe kur ka ere, Shqiperia do e merrte energjine nga era dhe teci s'do prodhonte gje, ose prodhimi do shkonte direkt ne Itali pa u futur fare ne rrjetin shqiptar.
Nuk funksionojne ashtu.
Nuk funksionojne ashtu sepse tipat e TEC-eve dhe gjeneratorve qe perdoren per te mbeshtetur mullinjte me ere ose panelet djellore...jane ndryshe nga TEC_et qe perdoren per kapacitet te zakonshem ne rrjet.
Jane ndryshe sepse TEC-et e zakonshme...nuk mund te ndizen dhe fiken kur te duash dhe aq me teper nuk punojne ne menyre optimale brenda nje kohe te shkurter. Kurse TEC-et qe perdoren per te mbeshtetur kto burime "ekologjike"...jane TEC-e me nje cikel per shembull...ose ne shume raste thjesht gjenerator me nafte.
Kto duhen shtuar...MBI...kapacitetin ekzistues te nje rrjeti qe funksionon pa mullinj ere ose djellore.
Mullinjte me ere le te ndertohen dhe te le eksportohet energjia ne Itali...s'ka problem. Por rrjeti Shqiptar as nuk i perdor dot kto lloj teknollogjira...dhe aq me teper s'ka nevoje.
----------------------
Po, por nese te gjithe do e benin kete do ulej kerkesa per korent. Plus nqs do zgjerohej perdorimi i paneleve per te mbuluar te gjithe catine sic e kane ca qe tani ne Shqiperi, atehere mund te kishte energji te mjaftueshme edhe per gjera te tjera si p.sh. per te punuar kondicioneri ne vere kur edhe dielli eshte me i forte. Une s'jam kunder teceve, perkundrazi, por ama s'ka pse te shohim vetem nje burim te vetem si shpetimtarin.
:) Po llogarite i ke bere ndonjehere sa kushtojne kto panele djellore...dhe realisht...se SA energji prodhojne dhe sa kontribut do benein ne uljen e kerkeses???
Relativisht...pak.
Dhe realisht...shume pak njerez mund ti blinin kto panele.
Realisht...kto s'jane zgjidhje
-----------------------------------------------
As njeri as tjetri s'po ndertohet me paret e KESH. Ashta po ndertohet nga Verbund kurse Kalivaci nga Becheti me financim te Deutsche Bank. Per Kalivacin s'ka shume informacion ne internet, keshtu qe nuk i di kushtet e kontrates. Kurse Ashta, duhet t'i shesi Shqiperise te gjithe energjine 15 vitet e para, dhe me pas mund ta shesi ku te doje. Kurse hidrocentralet e Devollit qe do ndertohen nga EVN dhe Statkraft mund ta shesin energjine ku te duan. Kuptohet qe nqs do ia japin Shqiperise, kostoja do jete me e larte se ajo hidrocentraleve ne Drin, por s'do jete me e larte se kostoja e eksportit. Dhe duke pare pengesat me transferimin e energjise, per te njejtin cmim, EVN/Statkraft do preferoje t'ia japi Shqiperise. Plus qe keto hidrocentralet jane dhene ne baze te nje kontrate me kohe te kufizuar. Mbas kesaj kohe, hidrocentralet i kalojne shtetit shqiptar.
Njeri nga kto HEC-e eshte per perdorim te Shqiperise...nuk e di cili.
Nejse...the point is...kto nuk jane zgjidhje sepse kontributi total i ktyre HEC-eve nuk do jet aspak i mjaftueshem per te mbuluar kerkesen...aq me pak ne rastet e HEC-eve qe jane me koncesion.
Kto ne shumicen e rasteve do pedoren per kerkesa lokale dhe me teper per te permirsuar balancin e import-eksportit te Shqiperise.
Jo gje e keqe...por ne fund te dites prap jo zgjidhje.
Pervec Kalivacit (qe nuk ia di kontraten) s'ka limit se sa do qendroje ne Shqiperi dhe sa do shkoje jashte.
Me sa di une...ka. Po nejse kjo s'ka rendesi.
Pak si pa lidhje, por keto argumentat me kapacitetin me duken kot mua. Pak rendesi ka kapaciteti. Me shume rendesi ka prodhimi total vjetor. Ndersa Shqiperia nderton me shume linje interkoneksioni me vendet fqinje, do jete gjithnje e me e lehte transferimi i energjise. Kjo ndodh edhe tani qe po flasim. Keshtu qe ne kohe rreshjesh, Shqiperia prodhon me shume se c'ka nevoje dhe ia jep energjine Kosoves p.sh., e cila ia kthen energjine Shqiperise ne vere kur s'ka shi. Prandaj eshte me mire te krahasosh prodhimin total vjetor sesa kapacitetin maksimal.
"Kapaciteti" ne kte rast domethen mundesia per te permbushur nje kerkese ne kohen e duhur. Nuk eshte kapaciteti maksimal ose prodhimi vjetor.
Ky eshte problemi i Shqiperise.
Nese nuk kuptohet kjo...s'kuptohet dot problemi i Shqiperise.
Pra kur them qe energjia djellore ose mullinjte me ere...nuk shtojne kapacitet dhe prandaj jane pa lidhje me problemin e Shqiperise...e kam fjalen per kte.
Kosova nuk e ndihmon dot Shqiperine ne kte rast pasi problemi i Kosoves eshte i njejti me Shqiperine...vetem se ata kan TEC-e me qymyr ne vend te HEC-eve (por TEC-et me qymyr jane TEC-e baze...dhe eshte e veshtire ti perdoresh per te permbushur kerkesen ne peak load...per shembull).
Se dyti te jesh ne meshire te import-eksportit eshte nje zgjidhje shume e shtrenjte...Sepse kur ke ti prodhim ekstra ne kohe rreshjes...po ashtu kan edhe vendet e tjera qe kan HEC-e ;)
Perkundrazi. Ato s'mund te perballojne kerkesat ne cdo moment, por ne 90% te kohes do jene te mjaftueshem.
:| No. Per shume shume aresye.
Sic e kemi pare deri tani, nqs ka rreshje te mjaftueshme ne dimer, ka korent edhe ne vere. Shqiperia thjesht eksporton ne dimer dhe importon ne vere. Net net Shqiperia mund te dale dhe me fitim si vitet e fundit. Problemi qendron ne kohe te zgjatura thatesirash, jo ne harkun kohor te nje viti.
No.
Jo kur kerkesa parashikohet te rritet me 160% ne rastin me te mire brenda 10 viteve.
Hidrocentralet e Devollit (sipas EVN) do kene nje prodhim te kenaqshem ne peak load periods. As e kam idene se cfare menyre prodhimi do perdorin, por keshtu thone.
HEC-et te gjitha mund te perdoren shume mire per peak load...
Por kan nje problem :) Uji mbaron.
As Vlora as Fieri nuk jane me gaz.
Ok...me nafte. S'ka rendesi njesoj jane.
I njejti argument jepet edhe per hidrocentralet.
Nuk po thot njeri ndonje gje kundra HEC-eve.
Thjesht qe kto s'do jene te mjaftueshme per te perballuar kerkesat ne te ardhme. Kaq.
Ti s'ke nevoje te me kundreshtosh gjithnje fjlai per fjali ;)
Ne kohe thatesire po. Kurse sot Shqiperia ka nje bilanc pozitiv. Sic e thashe, hidrocentralet hasin probleme vetem kur thatesira kap dimrin.
Jo. Per shume aresye :)
Sic e thashe, s'ka nevoje vetem per nje burim te vetem shpetimi. Te gjithe ndihmojne nga pak. Sot lexova qe kane filluar procedurat e koncesionit per te hidrocentrale ne lumin Fan. S'ka asnje arsye pse Shqiperia s'duhet te shfrytezoje reservat ujore ne maksimum.
Ok...vazhdo diskuto me veten tende atehere :|
Dhe kur punon tamam e eksporton energjine dhe me ato pare importon ne vere.
Ide gjeniale!! :p
Shume te ekzagjeruar keto numrat qe jep ti. Teci i Vlores dhe Hidrocentrali i Kalivacit kane kapacitet te njejte (rreth 100 MW). Kostoja e Tecit te Vlores eshte $100M kurse e Kalivacit eshte $130M.
Vlora: http://www.energy-community.org/pls/...docs/36239.PDF
Kalivac: http://www.cae.al/v3/index.php?optio...&id=57&Itemid=
:)
Si sasi energjie te prodhuar ne vit...nuk jane njesoj.
S'mund te thuash qe nje tec ka me shume fitim se nje hec
Nuk thash nje gje te tille ;)
Por une s'e shoh zgjidhjen e problemeve vetem tek tecet, por edhe tek hidrocentralet, mullinjte me ere, panelet diellore, centralet atomike, etj.
...harrove energjine e PORDHES
http://media.photobucket.com/image/methane%20energy/like_a_school_kid/cowbackpack123.jpg
:)
Edhe une s'po them asgje kundra asnje lloj projekti :) (pervec djellore dhe me ere...qe jane kot per Shqiperine)
Ate qe po them eshte se...pa TEC-e...nuk mund te ket zgjidhje problemi ne Shqiperi.
Kjo NUK do te thote qe VETEM TEC-e duhen...
Ok??
Shyqyr qe u kuptuam tani :)
daalbo June 17th, 2010, 04:17 AM Jo jo. KESH-i ka nje studim te gjere rreth parashikimit te energjise ne Shqiperi. Kto jane parashikime te kompanive private...ie...propagande ;)
Ministria e Energjitikes perdor numrat e EVNse, plus qe as EVN as KESH s'kane ndonje arsye per te manipuluar shifrat. Gjithsesi kjo pak vlere ka per kete diskutim.
Nuk funksionojne ashtu sepse tipat e TEC-eve dhe gjeneratorve qe perdoren per te mbeshtetur mullinjte me ere ose panelet djellore...jane ndryshe nga TEC_et qe perdoren per kapacitet te zakonshem ne rrjet.
Jane ndryshe sepse TEC-et e zakonshme...nuk mund te ndizen dhe fiken kur te duash dhe aq me teper nuk punojne ne menyre optimale brenda nje kohe te shkurter. Kurse TEC-et qe perdoren per te mbeshtetur kto burime "ekologjike"...jane TEC-e me nje cikel per shembull...ose ne shume raste thjesht gjenerator me nafte.
Nuk eshte se energjia diellore ose ajo e eres eshte komplet e paparishikueshme. Rasti me i keq eshte qe vitet e para nuk do dihet se kur ka ere apo diell, por me vone do kete se s'ben nje grafik te prodhimit te kesaj energjie per periudha te ndryshme te vitit. Dhe ne baze te ketyre parashikimeve mund te vendoset qe perpara se kur do te punoje teci. Nuk eshte aq a paparishkuar sa cfare e ben ti.
:) Po llogarite i ke bere ndonjehere sa kushtojne kto panele djellore...dhe realisht...se SA energji prodhojne dhe sa kontribut do benein ne uljen e kerkeses???
Relativisht...pak.
Dhe realisht...shume pak njerez mund ti blinin kto panele.
Realisht...kto s'jane zgjidhje
Une di qe ata qe kane blere panele diellore, ia kane pare perfitimin. S'ka rendesi sa energji prodhojne. E gjithe energjia qe prodhojne eshte me se e mjaftueshme per te perballuar koston e instalimit krahasuar me perdorimin e energjise elektrike.
Njeri nga kto HEC-e eshte per perdorim te Shqiperise...nuk e di cili.
Sic e thashe, Ashta eshte i gjithi per Shqiperine 15 vitet e para, kurse per Kalivacin s'e di.
Nejse...the point is...kto nuk jane zgjidhje sepse kontributi total i ktyre HEC-eve nuk do jet aspak i mjaftueshem per te mbuluar kerkesen...aq me pak ne rastet e HEC-eve qe jane me koncesion.
S'eshte vetem nje hidrocentral qe po ndertohet. Nje hidrocentral i vetem s'do e zgjidhi krizen. Pese hidrocentrale do jene me afer zgjidhjes. Gjithsesi pak rendesi ka nese hidrocentralet do jene ne gjendje apo jo te perballojne kerkesat e Shqiperise. Cdo MW qe do vije nga hidrocentralet do e uli nevojen per import me nje MW. Keshtu qe nuk eshte qe energjia qe do vije nga hidrocentralet do shkoje kot.
Kto ne shumicen e rasteve do pedoren per kerkesa lokale dhe me teper per te permirsuar balancin e import-eksportit te Shqiperise.
S'ka rendesi nese perdoren per kerkesa lokale apo jo. Nje energji qe shkon per banoret e Shkodres eshte po aq e vlefshme sa nje qe shkon per banoret e Korces. Kjo do uli nevojen per import.
Kosova nuk e ndihmon dot Shqiperine ne kte rast pasi problemi i Kosoves eshte i njejti me Shqiperine...vetem se ata kan TEC-e me qymyr ne vend te HEC-eve (por TEC-et me qymyr jane TEC-e baze...dhe eshte e veshtire ti perdoresh per te permbushur kerkesen ne peak load...per shembull).
Cudi, sepse tani po e permbushin kerkesen pike.
Se dyti te jesh ne meshire te import-eksportit eshte nje zgjidhje shume e shtrenjte...Sepse kur ke ti prodhim ekstra ne kohe rreshjes...po ashtu kan edhe vendet e tjera qe kan HEC-e ;)
Gjithsesi Shqiperia s'ka vuajtur nga mos pasja e kerkesave per eksport. Apo si e quan ti faktin qe kete vit per shembull, Shqiperia ka dale me bilanc pozitiv ne fushen e energjise. Plus qe duke pare normat qe po vendosen per minimumet e energjise se rinovueshme ne vendet e tjera europiane, gjithmone do te kete nje treg fitimprures per energjine hidrike.
:| No. Per shume shume aresye.
Me ver pak ca nga keto arsyet, sepse te gjithe mund te themi jo per shume arsye.
Jo kur kerkesa parashikohet te rritet me 160% ne rastin me te mire brenda 10 viteve.
Mos e nderro muhabetin tani. Ti the qe Shqiperia SOT po del me nje deficit me qindra miliona dollare nga energjia. Kjo eshte komplet genjeshter. Dhe sot, pa u vene ne pune asnje hidrocentral i ri, Shqiperia po del me fitim. Nqs do ndertohen hidrocentrale te rinj, do perballohen edhe kerkesat e se ardhmes shumicen e kohes.
HEC-et te gjitha mund te perdoren shume mire per peak load...
Por kan nje problem :) Uji mbaron.
Sic e thashe, une nuk e di cfare politike prodhimi do perdoret. Gjithashtu as e kam idene fare te prurjeve te Devollit ne periudha te ndryshme te vitit. Une iu referova thjesht asaj qe tha EVN, e theksoi qe prodhimi do jete i kenaqshem ne peak load period.
Jo. Per shume aresye :)
Shume arsye?
Ok...vazhdo diskuto me veten tende atehere :|
Dmth s'ke pergjigje.
Si sasi energjie te prodhuar ne vit...nuk jane njesoj.
Shume dakort, por ti nuk the sasi e prodhuar ne vit, por kapacitet. Mos e nderro muhabetin tani.
Grupi_Armiqsor June 17th, 2010, 08:08 PM Ministria e Energjitikes perdor numrat e EVNse, plus qe as EVN as KESH s'kane ndonje arsye per te manipuluar shifrat. Gjithsesi kjo pak vlere ka per kete diskutim.
Po te them dhe njehre qe jane disa studime...
Nuk eshte se energjia diellore ose ajo e eres eshte komplet e paparishikueshme. Rasti me i keq eshte qe vitet e para nuk do dihet se kur ka ere apo diell, por me vone do kete se s'ben nje grafik te prodhimit te kesaj energjie per periudha te ndryshme te vitit. Dhe ne baze te ketyre parashikimeve mund te vendoset qe perpara se kur do te punoje teci. Nuk eshte aq a paparishkuar sa cfare e ben ti.
Grafiku i eres behet shume shume para se te vendsoet se ku do ndertohen mullinjte me ere...ose panelet djellore. Nuk behen mbas.
Nejse...une po te them se si funksionon ne REALITET kjo pune...
Ti thua jo.
Ok.
Une po te them qe nuk jane te njejtit TEC-e qe mund te perdoren per rrjet...dhe per te mbeshtetur mullinjte me ere ose panelet djellore. Ti thua jo. Ok
Une di qe ata qe kane blere panele diellore, ia kane pare perfitimin. S'ka rendesi sa energji prodhojne. E gjithe energjia qe prodhojne eshte me se e mjaftueshme per te perballuar koston e instalimit krahasuar me perdorimin e energjise elektrike.
:| Edhe njehere...kostoja fillestare e paneleve djellore nuk eshte dicka qe SHUMICA (ose dhe pakica) e konsumatorve Shqiptar mund ta perballojne...
Kshuqe teoria e "sikur te gjithe ta kishin..."...eshte teori koti.
Se dyti...s'ka asnje shans qe ROI per panele djellore per perdorim personal mund te jet me pak se 8 vjet.
S'eshte vetem nje hidrocentral qe po ndertohet. Nje hidrocentral i vetem s'do e zgjidhi krizen. Pese hidrocentrale do jene me afer zgjidhjes. Gjithsesi pak rendesi ka nese hidrocentralet do jene ne gjendje apo jo te perballojne kerkesat e Shqiperise. Cdo MW qe do vije nga hidrocentralet do e uli nevojen per import me nje MW. Keshtu qe nuk eshte qe energjia qe do vije nga hidrocentralet do shkoje kot.
:| No.
Kur nje hidrocentral prodhon energji mbi kerkesen e Shqiperise dhe qe mund te eksportohet...kostoja e shitjes te ksaj energjie mund te jet shume me e ulet...se ne kohen kur kerkesa ne Shqiperi eshte e larte dhe duhet importuar kjo energji.
1MW =\ 1MW...sepse varet se KUR kerkohet ky MW.
S'ka rendesi nese perdoren per kerkesa lokale apo jo. Nje energji qe shkon per banoret e Shkodres eshte po aq e vlefshme sa nje qe shkon per banoret e Korces. Kjo do uli nevojen per import.
:| No.
Edhe njehere...nuk po diskuton njeri nese ul apo jo kerkesen per import.
E ul.
The point is...nuk e zgjidh dot krizen energjitike vetem nepermjet ktyre projekteve...dhe realisht impakti do jet i vogel...sidomos kur merr parasysh rritjen e kerkeses ne te ardhme.
Po diskuton me veten tende...kot.
Cudi, sepse tani po e permbushin kerkesen pike.
E permbushin sic e permbush Shqiperia...import.
Gjithsesi Shqiperia s'ka vuajtur nga mos pasja e kerkesave per eksport. Apo si e quan ti faktin qe kete vit per shembull, Shqiperia ka dale me bilanc pozitiv ne fushen e energjise. Plus qe duke pare normat qe po vendosen per minimumet e energjise se rinovueshme ne vendet e tjera europiane, gjithmone do te kete nje treg fitimprures per energjine hidrike.
:|
E ke idene e ndryshimit te kostos se energjise ne kohe te ndryshme?? Edhe njehere...1MW =\ 1MW
Mire kte vit Shqiperia doli pozitive. Ka 20 vjet qe bilanci i del negativ. I sigurt qe do ti dali pozitiv edhe vitin tjeter?? ;)
Me ver pak ca nga keto arsyet, sepse te gjithe mund te themi jo per shume arsye.
Une s'kam kohe te te shpjegoj detaje me detaje aresyet...po meqe kerkove...e kam shpjeguar me perpara. Nese nje HEC ka nje faktor prodhimi rreth 0.3...sic kane ato ne Shqiperi...kjo do te thote qe ne nje vit mund te prodhojne rreth 30% te energjise qe mund te prodhonin nese do puinonin me kapacitet 100%. Kjo do te thot se...edhe 1001 HEC-e te kishe...s'ke si te permushes 90% te kereses me ato...sepse kur ka thatesire ne Shkoder...ka akoma me teper thatesire ne Korce.
Eksporto sa te duash ti per te balancuar bilancin e energjise...kjo nuk mund te garantoj se cmimi i tregut ne kohen kur ti ke per eksport...do jet i mjaftueshem per te perballuar kerkesat per import ne sezon kur ti ke nevoje (sepse Shqiperia s'eshte i vetmi vend ne rrajon qe ka HEC-e me bollek).
Mos e nderro muhabetin tani. Ti the qe Shqiperia SOT po del me nje deficit me qindra miliona dollare nga energjia. Kjo eshte komplet genjeshter. Dhe sot, pa u vene ne pune asnje hidrocentral i ri, Shqiperia po del me fitim. Nqs do ndertohen hidrocentrale te rinj, do perballohen edhe kerkesat e se ardhmes shumicen e kohes.
Nuk ja paske idene fare se per cfar po flet.
Thjesht puna...pse futesh ne diskutime kot...kur s'e merr vesh se si funksionojne kto gjera?
Shume thjesht...
1. Shiko nje grafik te kerkeses se energjise ne nje vit.
2. Shiko nje grafik te prodhimit te energjise ne nje vit.
3. Shiko nese kto perputhen.
4. Shiko cmimin e energjise ne treg.
5. Shumzo cmimin e terprices se energjise me cmimin e tregut...dhe zbrit deficitin e energjise ne sezonet kur s'ke kapacitet me cmimin e tregut ne ate kohe.
6. Tani zgjate kte per 10 vitet e ardhshme...duke marre parasysh rritjen e kapacitetit prodhues qe krijojne kto HEC-e...me rritjen e kerkeses se tregut Shqiptar.
7....I sigurt qe do dalesh pozitiv ose i balancuar??? ;)
Edhe duke marre parasysh rastin me te mire...duke pare kapacitetin qe kto HEC-e mund te shtojne ne rrjet ne te ardhme...fakti mbetet qe kerkesa do rritet akoma me shume se shtesa e ktyre HEC-eve...
...pra...edhe ne rastin me te mire te imagjunar...ato nuk do perballojne dot kerkesen ne te ardhme.
--------------
Tani e marr vesh qe do vazhdosh diskutimin me veten tende kot...prap. Do thuash "po do uli kerkesen per import ne nje kohe te caktuar, dhe do permirsoj bilancin e import-eksportit".
PO.
Edhe njehere...nuk po e diksuton njeri kte.
Por fakti mbetet qe kto projekte permirsojne gjendjen vetem pak...dhe ajo qe duhet jane disa TEC-e te tjera te tipave te lart-permendur.
--------------------
Sic e thashe, une nuk e di cfare politike prodhimi do perdoret. Gjithashtu as e kam idene fare te prurjeve te Devollit ne periudha te ndryshme te vitit. Une iu referova thjesht asaj qe tha EVN, e theksoi qe prodhimi do jete i kenaqshem ne peak load period.
:) Edhe une po te them qe cdo HEC mund te perdoret per peak load...Bile eshte nje nga burimet me te mira per kte perdorim (sepse reaction time eshte e menjehershme). Por kjo s'do te thot asgje...kur s'ke uje per te perballuar kte peak load ne Korrik :)
Dmth s'ke pergjigje.
:) Pergjigje kam...por 'skam kohe te merrem me cdo cikerrime qe shpik ti se ke qef te diskutosh me veten tende (se me mua s'po diskuton)
S'kam pse ti jap pergjigje nje teorie qe "cdo gje ndihmon, s'ka pse te mos perdorim burimet ujore!!"
:) S'kam pergjigje sepse ne asnje rast nuk ka then asnjeri qe kto jane projekte te keqia ose qe s'duhet te behen :)
Ate qe po them...eshte qe jane gjithsesi te pamjaftueshme.
Ok??? E shikon pse po diskuton me veten tende dhe jo me mua?
daalbo June 17th, 2010, 11:14 PM Me nje fjale :blahblah:
Ti kur s'di c'te thuash me, thua po diskuton me veten. Dhe me e forta eshte se leshon ca genjeshtra kot mbasi kot dhe pastaj kur kapesh ngushte e ndryshon muhabetin si te te vije per mbare. Nejse, nqs ashtu kujton se fiton argumente, ashtu vazhdo.
redi21 June 17th, 2010, 11:31 PM Ate qe po them...eshte qe jane gjithsesi te pamjaftueshme.
Ok??? E shikon pse po diskuton me veten tende dhe jo me mua?
Po se s'ben qe jane te pamjaftueshme , dhe gjithmon do jene sipas llogjikes tende.
Politika per te kufizuar rritjen e konsumit , psh.incentivimin i paisjeve elektroshtepiake ose idustriale me konsum te ulet ose dhe panelet diellor per uje te ngrot,ose dhe vetem llampat per ndriēim,as qe i merren parasysh .
Enegji si ajo djellore dhe e eres , jane te paleverdisshme per privatet ne Shqiperi : e vertet . Mbase jo dhe aq per bizneset (sidomos ajo djellore) qe kane ne dispozicione me shume kapital dhe interes per te investuar....
Thua qe energjia djellore duhet mbeshtetu me gjenerator dhe TEC-e ne perjudhen ku ulet prodhushmeria e tyre. Pse jo me HEC-e? Ne vere kur HEC-et prodhjone pak ka diell me bollek, ne dimer kur ka pak diell ka uje me bollek apo jo ? :)
Edhe keto s'mjaftojne , shume mire , te ndertojme edhe TEC-e por jo 3 , vetem 2 :) . Paneleve djellore i duhen 10-15 vejt per ti amortizuar koston, TEC-eve 30-35.
Kerko ta zgjerosh nje ēik horizontin shoku se kush po diskuton me veten e vet ketu po me dukesh ti. ;)
SADOSI June 24th, 2010, 10:37 AM http://gs-press.com.au/images/news_articles/tap_map_new_route_web.jpg
Trans Adriatic Pipeline route refined
Thu, 24 June 2010
Albanian Ministers and government officials have approved the revised route of the 520 km Trans Adriatic Pipeline (TAP) through Albania.
In June 2009, local and international engineers began refining the pipeline route to avoid impacting the Hotova National Park and other environmentally significant areas and cultural heritage sites.
Six different route options were considered, but the final route was selected as it has minimal impact on forests and avoids all cultural heritage sites. It will also be shorter and easier to construct than the route identified during the basic engineering phase.
Having received government approval, TAP will now meet with 400 local stakeholders and 60 non-government organisations in regional workshops, and begin working on the Environmental and Social Impact Assessment.
The TAP Gas Pipeline will originate near Thessaloniki, Greece, and cross Albania and the Adriatic Sea, before ending near Brindisi, Italy. The pipeline will have an initial capacity of 10 Bcm/a, and is intended to enhance the security of European gas supply.
The project is currently in the front end engineering and design stage. Once this is completed, TAP will invite tenders for pipeline construction.
Image caption: The proposed TAP Pipeline route.
http://pipelinesinternational.com/news/trans_adriatic_pipeline_route_refined/041591/
Kulla July 7th, 2010, 03:41 PM Lanēohet projekti pėr energjnė diellore alternative, 66 panele diellore jetėsojnė nismėn nė dy nga ēerdhet e kryeqytetit
http://www.tirana.gov.al/common/images/IMG_1889_M.jpg
Bashkia e Tiranės i ka hapur rrugė njė ideje dhe projekti ambicioz, i cili ka si qėllim shfrytėzimin e energjisė diellore alternative pėr ngrohjen nė ēerdhet dhe shkollat e kryeqytetit. Projekti i cili synon tė shtrihet nė tė gjitha kėto struktura sociale, u lanēua sot nė dy prej ēerdheve
tė kryeqytetit, Ēerdhja nr.1 dhe Ēerdhja nr.8.
Kjo nismė ka tė bėjė me vendosjen e paneleve diellore pėr ngrohjen e ujit sanitar si dhe tė sistemit ngrohės nė kėto institucione, duke siguruar njė energji tė pandėrprerė dhe pėrfituar nga dielli, pa shpenzuar burimin tjetėr shumė tė ēmuar tė energjisė elektrike.
I pranishėm nė ambientet e Ēerdhes nr.8, nga ku ka nisur dhe zbatimi i kėtij projekti ambicioz, Kryebashkiaku Rama, pas falenderimeve ndaj Ambasadorit dhe qeverisė hollandeze pėr mbėshtetjen e kėtij projekti, vlerėsoi rėndėsinė e qasjes ndaj kėsaj energjie alternative, duke e cilėsuar atė si njė gur themeli dhe njė kontribut tė jashtėzakonshėm, drejt rritjes sė cilėsisė sė jetės dhe nė funksion tė transformimit rrėnjėsor tė kulturės sonė mjedisore.
“Unė i jam shumė mirėnjohės Ambasadorit dhe Qeverisė hollandeze pėr mbėshtetjen e njė ideje tė re, e njė ideje qė sot hap rrugėn e saj tė jetėsimit nė njė ēerdhe tė Tiranės, por qė ėshtė njė rrugė, tė cilėn ne dėshirojmė ta ndjekim deri nė fund, pėr tė tė transformuar burimin e energjisė sė ēerdheve dhe shkollave tė Tiranės, nga energjia elektrike tek energjia diellore, nė kėtė vend tė bekuar nga Zoti, pėr sasinė e jashtėzakonshme tė kėsaj energjie diellore, me tė cilėn nėn shembullin e vendeve mė tė pėrparuara dhe nė funksion tė njė transformimi rrėnjėsor tė kulturės sonė mjedisore, ne mund tė bėjmė me investime tė arsyeshme dhe kosto tė ulura pėr tė ardhmen, njė mrekulli tė vėrtetė, e cila rrit ndjeshėm cilėsinė e jetės dhe njėkohėsisht rrit ndjeshėm edhe cilėsinė e vetė marrėdhėnies tonė me mjedisin, duke bėrė tė mundur qė nė tė gjitha kėto struktura sociale, tė ketė njė energji tė pandėrprerė, duke pėrfituar nga dielli dhe pa shpenzuar burimin tjetėr shumė tė ēmuar tė energjisė elektrike qė vjen nėpėrmjet ujit. Ėshtė shumė e rėndėsishme qė ky projekt tė shkojė pėrpara dhe pėr kėtė arsye, si njė gur themeli nė kėtė rrugė qė ne duam tė ndėrtojmė sėbashku, mbetet pa diskutim njė kontribut i jashtėzakonshėm pėr tė cilėn ne i jemi mirėnjohės Qeverisė dhe Ambasadorit tė Mbretėrisė sė Hollandės. Jam shpresėplotė se nė kėtė mėnyrė, ne do tė lehtėsojmė edhe rrugėn e thithjes sė fondeve dhe tė realizimit tė investimeve tė tjera, pėrmes njė shembulli konkret, funksional, pėrmes njė shembulli qė do tė flasė vetė pėr cilėsinė dhe njėkohėsisht pėr tė gjitha tė mirat qė sjell qasja ndaj kėsaj energjie alternative, qė e pėrsėris, nė vendin tonė ėshtė nė njė sasi tė jashtėzakonshme, nė pjesėn mė tė madhe tė vitit”- u shpreh Kryetari I Bashkisė sė Tiranės Edi Rama.
Projekti, nėn logon “Energjia diellore, alternativė ekonomike dhe pro-mjedisore” u bė i mundur nė sajė tė bashkėpunimit tė Ambasadės sė Mbretėrisė sė Vendeve tė Ulėta nė Tiranė (Ambasada Hollandeze), REC (Qendra Rajonale e mjedisit) dhe Qendrės Mjedisore EDEN dhe synon gjithashtu tė rrisė ndjeshėm cilėsinė e jetės dhe njėkohėsisht dhe cilėsinė e vetė marrėdhėnies tonė me mjedisin.
Rezultatet qė u arritėn nga ky projekt janė :
• Instalimi i i 66 paneleve diellorė pėr ngrohjen e ujit sanitar dhe sistemit ngrohės nė 2 ēerdhe;
• Kursimi i energjisė elektrike tė pėrdorur pėr ngrohjen e ujit sanitar;
• Kursimi i lėndės djegėse, tė pėrdorur pėr sistemin ngrohės;
• Ulja e ndotjes sė shkaktuar nga ngrohja, me lėndė djegėse (naftė);
• Rritja e numrit tė ditėve me ngrohje nė ēerdhe;
Promovimi i energjisė diellore dhe rezultatit tė projektit
Bashkia e Tiranės ka prioritet promovimin e standarteve tė mbrojtjes sė mjedisit dhe zbatimin e parimeve tė zhvillimit tė qėndrueshėm. Iniciativa tė tilla bėjnė tė mundur qė institucionet publike tė jenė promotore tė politikave tė gjelbėrta dhe miqėsore me mjedisin.
Energjia diellore po shihet gjithnjė e mė tepėr si energji alternative dhe si njė mėnyrė pėr tė reduktuar ndikimin nė mjedis tė shkaktuar nga metodat kryesore tė prodhimit tė energjisė. Duke u konsideruar energji e rinovueshme (e gjelbėr), ajo gjithnjė e mė shumė po tėrheq vėmendjen e vendimmarrėsve. Nė Shqipėri pėrdorimi i kėsaj alternative ėshtė ende nė hapat e para dhe e pėrdorur kryesisht nga sektori privat (vetėm pėr ngrohjen e ujit sanitar).
Me anė tė kėtij projekti, Bashkia e Tiranės synon pėrmirėsimin e cilėsisė sė jetesės sė 272 fėmijėve dhe 40 edukatoreve tė ēerdheve nr. 1 dhe 8 nė Tiranė, pėrmes promovimit tė energjisė diellore, si energji alternative dhe miqėsore me mjedisin, pėr ngrohjen e ambienteve gjatė periudhės sė dimrit si dhe ngrohjen e ujit sanitar pėrgjatė gjithė vitit.
http://www.tirana.gov.al/?cid=1,62,3543
Grupi_Armiqsor July 7th, 2010, 07:46 PM Kerko ta zgjerosh nje ēik horizontin shoku se kush po diskuton me veten e vet ketu po me dukesh ti.
Shokuuuu :)...me sa shof une...vetem une ne kte forum merr vesh ndonje gje rreth ksaj ceshtje (pervec mbase Altini qe ka mbaru per inxhinjeri elektrike).
Kshuqe SHOKUUUUUU...me respekt...po mos u mundo te me MESOSH mua rreth dickaje qe ti ke mesuar nga Wikipedia dhe Top Kanali...
Juve mund te mos ju pelqej ajo qe po ju them une...po kjo s'do te thot qe merrni vesh se per cfar po flisni ;)
Kshuqe...me respekt...po degjo c'po te them ;)
Politika per te kufizuar rritjen e konsumit , psh.incentivimin i paisjeve elektroshtepiake ose idustriale me konsum te ulet ose dhe panelet diellor per uje te ngrot,ose dhe vetem llampat per ndriēim,as qe i merren parasysh .
LOL :) SHOKUUUUU...."politika" e kufizimit te energjise??
Konsumatori e vendos vet se car pajisje do blej apo jo...
GJithsei...ju vazhdoni me "politikat"
Rezultati gjithsesi eshte qe Shqiperia ka nga kostot me te larta ne Ballkan per energji...dhe nga rritjet e konsumit me te madh.
SHOKUUU...sa eshte rritja e kerkeses ne energji ne Shiqiperi ne VIT? Beji pak llogaritjet...
--------------
Ndryshimi ktu midis meje dhe jush...ka te bej me presh ne bythe dhe me fluturime ;)
--------------
Enegji si ajo djellore dhe e eres , jane te paleverdisshme per privatet ne Shqiperi : e vertet . Mbase jo dhe aq per bizneset (sidomos ajo djellore) qe kane ne dispozicione me shume kapital dhe interes per te investuar....
SHOKUUUU :) Kush te doj te blej panele djellore apo mullinj me ere apo me pordhe...sa te dojne.
Ju nuk e kuptoni cfar po them une. Une po them qe sado qe te blihen...nuk do bejne ndryshim ne RRJET ne pergjithsi.
Ti meqe e paske kaq problem qe njerzit te blejne panele djellore..shko jepi ca pare per ti blere ;)
Thua qe energjia djellore duhet mbeshtetu me gjenerator dhe TEC-e ne perjudhen ku ulet prodhushmeria e tyre. Pse jo me HEC-e?
SHOKUUUU :) Sepse HEC-i ka dicka qe quhet...rezervuar :)
Ne vere kur HEC-et prodhjone pak ka diell me bollek, ne dimer kur ka pak diell ka uje me bollek apo jo ?
SHOKUUUU :) Sa kapacitet kan HEC-et ne Shqiperi? Sa panele djellore duhen ndertuar per te arritur dhe 1%...nje perqind...te kapacitetit te ktyre HEC-eve???
Kur ta merrni vesh ju...do jet shume vone.
Edhe keto s'mjaftojne , shume mire , te ndertojme edhe TEC-e por jo 3 , vetem 2
Pse 2? Se thua ti? Une them ZERO.
SHOKUUUU...kto gjera nuk i vendos ti me deshiren tende...i vendos ligji i thermodinamikes :)
Ti kur s'di c'te thuash me, thua po diskuton me veten. Dhe me e forta eshte se leshon ca genjeshtra kot mbasi kot dhe pastaj kur kapesh ngushte e ndryshon muhabetin si te te vije per mbare. Nejse, nqs ashtu kujton se fiton argumente, ashtu vazhdo.
Po ti nuk merr vesh as 1/4 e asaj qe kam shkruar une. Po s'eshte ktu problemi. Eshte qe edhe duke mos marr vesh rreth ceshtjes...vazhdon te diskutosh me presh ne bythe per cfar "DUHET TE BEHET!"
Sic thash me siper...ti mund te kesh shume idera per cfar duhet dhe s;duhet dhe si duhet...po ne fund e vendos ligji i thermodinamikes se cfar DO behet :)
RolexAL August 17th, 2010, 09:30 AM QCkN4qsz3cM
SADOSI August 17th, 2010, 11:36 AM Si nuk ju shkon mendja gazetareve te pyesin sa KwH kėta parqet edhe HEC-at do te jen.
Edit; Found it.
Ministri Prifti deklaron se janė nė fazėn e oponencės teknike 32 HEC-e tė tjerė
Ministri i Ekonomisė, Tregtisė dhe Energjetikės, Dritan Prifti, tha tė hėnėn se, "vetėm gjatė 7-mujorit tė parė tė vitit 2010 METE ka trajtuar nė vazhdimėsi aplikime pėr ndėrtimin e 51 hidrocentraleve, ndėrsa ka lidhur kontratat pėr 19 HEC-e dhe 32 tė tjera janė nė fazėn e oponencės teknike, tenderimit apo negocimit". Gjatė njė konference pėr shtyp, ministri Prifti theksoi se, "investimi pėr ndėrtimin e 51 HEC-eve kap vlerėn e pėrgjithshme 258.811.707 euro, me fuqi tė instaluar 215 MW". "Strukturat e METE po shqyrtojnė gjithashtu kėrkesat pėr ndėrtimin e 8 parqeve eolike, tė paraqitura tek ne gjatė kėtij viti, me njė investim tė pėrgjithshėm qė kap shumėn prej 433.998.454 euro", nėnvizoi ministri Prifti, duke shtuar se fuqia e pėrgjithshme e instaluar e kėtyre parqeve ėshtė 375 MW. Sipas tij, vetėm ditėt e fundit janė paraqitur nga kompani tė huaja kėrkesa pėr ndėrtimin e 4 parqeve tė reja tė energjisė me erė. "Investimi i pėrgjithshėm pėr ndėrtimin e 51 HEC-eve dhe 8 parqeve me erė ėshtė 692.810.161 euro, me fuqi tė pėrgjithshme tė instaluar 590 MW", u shpreh ministri Prifti. Ai ftoi tė gjithė kompanitė shqipatre dhe tė huaja qė janė tė interesuara pėr tė investuar nė sektorin energjetik tė jenė tė vėmendshme pėr tenderat qė do tė hapen nė javėt nė vazhdim pėr HEC apo parqe me erė, pasi investimet nė energjetikė, sidomos nė energji tė rinovueshme, janė me shumė leverdi ekonomike. Prifti tha se qeveria garanton blerjen e energjisė nga koncesionarėt me ēmime shumė tė leverdisshme, duke eliminuar riskun e investimit, ndėrkohė qė ofrohen lehtėsira tė tjera si ēertifikatat jeshile, apo licencime tė shpejta nėpėrmjet Qendrės Kombėtare tė Licencimit pėr lejet pas-koncesionare. Ministri i Ekonomisė, Tregtisė dhe Energjetikės, Dritan Prifti, bėri tė ditur gjithashtu se, "Bashkimi Europian po jep mbėshtetje tė madhe financiare pėr investimet nė Shqipėri pėr energjitė e rinovueshme, nga era, biomasa, dielli, uji, etj", duke theksuar se kompanitė e huaja dhe shqiptare qė investojnė nė Shqipėri kanė tashmė mundėsinė tė pėrfitojnė edhe nga programe tė Bashkimit Europian apo programe tė tjera europiane pėr tė investuar nė prodhimin e energjisė sė rinovueshme.
Mashkullore August 17th, 2010, 01:28 PM ^^ Venia ne pune e ketyre HEC-eve dhe potencialisht TEC-it te Vlores (shpresoj qe demtimi te riparohet sa me pare e te vihet ne pune edhe ky) do kontribuoj dukshem ne rritjen ekonomike te Shqiperise. :cheers:
Mashkullore August 18th, 2010, 12:50 AM Fshehtėsi hisja e Kosovės nė Sibovc
Prishtinė, 17 gusht - Ende nuk dihet se sa do tė jetė pjesėmarrja e qeverisė nė mihjen e Sibovcit, e cila do tė shfrytėzohet nga investitori i projektit Kosova e Re edhe se Qeveria e Kosovės ka paralajmėruar se kėtė fundvit do tė nisė ndėrtimi i kėtij termocentrali, shkruan gazeta Zeri.
Edhe pse kanė kaluar tashmė katėr vjet prejse ka nisur ky projekt Qeveria nuk ėshtė nė gjendje tė japė detaje pėr mėnyrėn e shfrytėzimit tė thėngjillit dhe hisen e saj nė kėtė mihje. Deri tash janė dhėnė 5 milionė euro pėr zhvendosjen e banorėve nga kjo mihje dhe me dhjetėra miliona tė tjerė pėr hapjen e saj. Ekspertėt e ekonomisė thonė se Qeveria nuk e ka definuar sesa do tė pėrfitoj Kosova nga ky aset i rėndėsishėm dhe se mė shumė po favorizohet investitori privat sesa vet shteti nė kėtė projekt.
Tashmė dihet se Sibovci shkon me pakon e projektit pėr ndėrtimine termocentralit “Kosova e re”, por asnjė detaj pėr tė nuk ėshtė bėrė i ditur. Burime tė “Zėrit” brenda qeverisė sė Kosovės tregojnė se komiteti drejtues i projektit “Kosova e Re” ka vendosur qė Qeveria tė futet me pjesėmarrje 25 pėr qind, ku pėrfshihet edhe mihja. Kryetarja e Komisionit pėr energjetike pranė Kuvendit tė Kosovės, Myzejene Selmani, tha se ka dėrguar me dhjetėra kėrkesa pėr detaje rreth Sibovcit dhe askush nga Ministria pėr Energjetikė nuk i ka dhėnė detaje se ēfarė po ndodh me kėtė mihje.
“Asnjė pėrgjigje, asnjė e dhėnė, pėr kėtė aset shtetėror, pėr kėtė pasuri, tė cilėn e lakmojnė investitorėt, sepse vetėm nė kėtė mihje ka thėngjill pėr 40 vjetėt e ardhshėm”, ka thėnė pėr gazetėn “Zėri”, Selmani. Ajo kritikoi ashpėr
ministren e Energjetikės dhe Minierave Justina Pula duke thėnė se ka dėshtuar keq me projektin “Kosova e Re”.
Ish-ministri pėr Energjetike dhe Miniera, Ethem Ēeku, tha se ēėshtja e Sibovcit nuk ėshtė shumė me rėndėsi se sa do tė paguajė taksė ndėrtuesi i termocentralit Kosova e Re, por pjesėmarrja e qeverisė nė pronėsinė e mihjes sė Sibovcit.
“Investitorit po i jepet komplet insfrastriktura, mihja, dy blloqet e Kosovės B. Kurse Kosova nuk dihet se sa do ta ketė pėrfitimin nga ky projekt”, ka thėnė Ēeku. Zyrtarėt e KEK-ut patėn bėrė tė ditur kohė mė parė pėr media se qė nga viti 2007 kanė nisur me largimin e djerrinės nė Sibovcin Jugperėndimor, nga e cila janė larguar me mijėra metra kub djerrinė.
http://www.koha.net/index.php?cid=1,5,31473
Me ne fund po fillon ndertimi edhe i ketij termocentrali. U deshten 10 vjet per te filluar kete projekt qe eshte dashur te jete prioriteti numer nje ne Kosoven e pasluftes. Shpresoj qe edhe termat te jene sa me te favorshem!
Ermir August 25th, 2010, 09:38 PM KESH shlyen 120 milionė euro borxhe me eksport
Tiranė, 25 gusht
Korporata Elektroenergjetike Shqiptare (KESH) arriti tė sigurojė rreth 80 milionė euro tė ardhura nga eksporti pėr 6 muajt e parė tė vitit. Sipas drejtorit tė pėrgjithshėm Engjėll Zeqo, me tė ardhurat e krijuara u shlye njė pjesė e konsiderueshme e borxheve, nė masėn e rreth 120 milionė eurove.
Aktualisht eksportet i kemi ndėrprerė pėr shkak tė prodhimit tė ulėt dhe pėr tė ruajtur balancat e lejuara (rezervat) nė hidrocentrale. Jemi duke importuar energjinė e shkėmbyer me Kosovėn, ndėrsa nė muajin shtator do tė ketė njė takim me krerėt e KEK-ut lidhur me nivelet e energjisė sė depozituar, tha pėr Shqip drejtori i KESH-it, Zeqo.
Tė dhėnat e fundit mbi sektorin energjetik nė vend tregojnė pėr njė nivel prodhimi rreth 11 milionė kilovat energji, kurse konsumi arrin nė 18 milionė kilovat. Zeqo tregon se diferenca e mbetur sigurohet nga importi qė kryen OSSH-ja dhe konsiderohet sasia e humbur nė rrjet. Sa i takon nivelit tė hidrocentralit tė Fierzės, kuota aktuale shėnon 287.7 metra.
Lidhur me problemet e hasura me termocentralin e Vlorės, kreu i KESH-it tregon se kėrkoi ndėrprerjen e zbatimit tė projektit dhe financimin e mbetur nga Banka Botėrore, pasi u konstatuan dy defekte te tubat qė shėrbejnė pėr furnizimin e naftės dhe ftohjen e TEC-it. Pasi vėrtetuam me prova defektet nė dy tuba, ku njėri nuk ėshtė puthitur si duhet, kurse tjetri del mbi nivelin e detit, kėrkova rishikimin e punimeve dhe ndalimin e testeve, duke vėnė nė dijeni ministrat pėrgjegjės dhe Bankėn Botėrore. Nuk kam bėrė asgjė mė shumė, veēse respektimin e kontratės, ku thotė se malli merret nė dorėzim pasi jep tė gjitha garancitė, qė shkojnė deri nė 25 vjet, deklaron pėr gazetėn Zeqo.
Aktualisht, kompania italiane ka marrė pėrsipėr tė rregullojė defektin, duke u angazhuar pėr njė pėrfundim tė punimeve deri nė muajin nėntor pėr tubin e naftės, kurse i gjithė procesi pėr fillimin e punimeve tė TEC-it tė jetė gati nė qershor 2011-n.
Zeqo tregon se nuk parashikohen efekte negative nė sektorin energjetik nga shtyrja me njė vit e prodhimit nga TEC-i, pasi nivelet e hidrocentraleve nė vend garantojnė njė furnizim normal me energji.
Pėr vite tė tėra KESH-i ka kryer vetėm shkėmbim tė energjisė elektrike, por nė dy vitet e fundit, me vendim qeverie u lejua tregtimi me ēmim burse. Situata me reshjet e dendura nė veri tė vendit, ku janė tė pėrqendruara hidrocentralet mė tė mėdha, favorizoi KESH-in, i cili rriti prodhimin dhe shtoi eksportet. Pėrveē fatkeqėsisė nga pėrmbytjet nė zonėn e Mbishkodrės, pėr KESH-in, viti 2010 konsiderohet me shumė fat, pasi arriti tė shlyente brenda 6 muajve mė shumė se gjysmėn e borxhit tė akumuluar nga marrėveshjet tregtare me bankat dhe huat e qeverisė, pėr qėllime importi nė vitet e krizės.
http://www.koha.net/index.php?cid=1,5,32253
Buddy Holly August 25th, 2010, 10:02 PM Marreveshja KESH-KEK eshte duke funksionuar per mrekulli. :cheers:
RolexAL August 25th, 2010, 10:22 PM Marreveshja KESH-KEK eshte duke funksionuar per mrekulli. :cheers:
Siē duhet te funksionoj ēdo gje mes Kosoves dhe Shqiperise.:cheers::cheers:
RolexAL August 25th, 2010, 11:29 PM HEC-i i Zhurit, Kosova vazhdon projektin
Qeveria e Kosovės ecėn pėrpara me projektin e hidrocentralit tė Zhurit. Kjo pavarėsisht kritikave tė fundit nga Shqipėria.
Ministrja kosovare e energjetikės, Justina Shiroka Pula njoftoi se investitorėt pėr ndėrtimin me koncesion tė hidrocentralit tė Zhurit kanė shprehur interesin e tyre pranė kėsaj ministrie. Interesim pėr projektin e HEC-it tė Zhurit kanė shprehur kėshtu, dy konsorciume dhe njė kompani. Ato janė:
Konsorsiumi: KI Kelag International GmbH (Austri) & Strabag (Austri)
Konsorsiumi: Palet Inşaat (Turqi) & Union D Energy System Development Corporation (Angli)
Kompania: Limak Group (Turqi)
Ministria e Energjetikės nėpėrmjet njė komunikate pėr shtyp ka mirėpritur paraqitjen e investitorėve potencialė pėr Hidrocentralin e Zhurit dhe shpreh kėnaqėsinė qė kompanitė e paraqitura janė kompani shumė serioze nga shtetet mike tė Kosovės.
Ftesa pėr shprehjen e interesit pėr HEC-in e Zhurit ėshtė bėrė me 15 qershor 2010, ndėrsa afati i fundit pėr shprehjen e interesit nga investitorėt privatė ishte sot me 25 gusht 2010 nė ora 11:00.
Kėto janė tė vetmet detaje qė zbulon Ministria e Energjitikės nė Prishtinė rreth ndėrtimit tė hidrocentralit qė po ngjall debate nė Shqipėri. Prej disa ditėsh, kjo ministri nuk po i pėrgjigjet as interesimit tė Top-Channel rreth fazės sė realizimit dhe planet e kėtij dikasteri pas reagimeve nė Shqipėri.
http://top-channel.tv/artikull.php?id=190663&ref=fp
Buddy Holly August 25th, 2010, 11:48 PM Kete sic duket po tentojne ta bejne me te madhe se c'eshte. Zhuri sigurisht se nuk do te ndertohet pa u bere nje marreveshje paraprake mes dy qeverive, keshtuqe nuk ka nevoje per panik. Ekzistojne rregulla qe e rregullojne sasine e ujit qe duhet te kaloje nga pika A ne piken B dhe keto rregulla do respektohen besoj. Ne anen tjeter, edhe Shqiperia duhej te ishte konsultuar me Kosoven para se te jipte licenca per hidrocentrale uji i te cilave ka burimin ne Kosove.
Besoj se nje marreveshje do te arrihet dhe njiashtu besoj se disa mediume jane duke e zmadhuar kete gje per ceshtje politike.
Zwanse August 26th, 2010, 03:09 AM Ne anen tjeter, edhe Shqiperia duhej te ishte konsultuar me Kosoven para se te jipte licenca per hidrocentrale uji i te cilave ka burimin ne Kosove.
Per cfare duhet te konsultohet Shqiperia me Kosoven, Hecet ne Shqiperi nuk i prishin rrjedhen natyrale lumejve te Kosoves. Lumejt zbresin nga Kosova ne Shqiperi dhe pastaj derdhen ne det, cfaredo heci ose barriere qe te ndertohet ne territorin e Shqiperise nuk ka asnje ndikim te lumejt e Kosoves. Ky eshte rregulli qe rrjedha natyrale e lumit nuk duhet te deformohet (vetem nqs bien dakort dy shtetet).
Marrveshjet nderkombetare ne kete rast veprojne vetem nqs heci (apo diga te themi) i nje vendi ndikon ne rrjedhen e lumit te shteti tjeter, ne kete rast heci i Zhurit than 3 lumej te vegjel ne Kukes, qe perdoren gjeresisht nga popullsia fshatase ne zonat ku keto lumej kalojne. Edhe nga vitet 60 donte ta ndertonte Jugosllavia nje hec te tille por nuk ra dakort qeveria e atehershme shqiptare dhe Jugosllavia nuk e ndertoi. Per nje arsye te ngjashme me duket se nuk u ndertua heci i Skavices sepse permbyste disa toka ne Maqedoni (Jugosllavi ateher), nuk pranoi qev. jugosllave dhe u la si projekt.
Shqiperia duhet te mbroje interesat e rajonit qe preket se per ate eshte votuar, te vere veton. Psh ky projekt i hecit te Zhurit nxjerr jashte funksionimit nje Hec te vogel qe po ndertohet aktualisht ne Kukes dhe qe bazohet ne lumin e Ēajės. Ky lum praktikisht thahet fare nqs behet heci i Zhurit dhe investimi i hecit te Cajes (ne fakt ka nje emer tjeter zyrtar heci po se mbaj mend mire) shkon dem fare. Si ky Hec jane edhe disa hece te vegjel qe priten te ndertohen ne Kukes (per te cilat jane dhene lejet, ne mos kan filluar te ndertohen).
shpirtkosova August 26th, 2010, 04:17 AM Per cfare duhet te konsultohet Shqiperia me Kosoven, Hecet ne Shqiperi nuk i prishin rrjedhen natyrale lumejve te Kosoves. Lumejt zbresin nga Kosova ne Shqiperi dhe pastaj derdhen ne det, cfaredo heci ose barriere qe te ndertohet ne territorin e Shqiperise nuk ka asnje ndikim te lumejt e Kosoves. Ky eshte rregulli qe rrjedha natyrale e lumit nuk duhet te deformohet (vetem nqs bien dakort dy shtetet).
Marrveshjet nderkombetare ne kete rast veprojne vetem nqs heci (apo diga te themi) i nje vendi ndikon ne rrjedhen e lumit te shteti tjeter, ne kete rast heci i Zhurit than 3 lumej te vegjel ne Kukes, qe perdoren gjeresisht nga popullsia fshatase ne zonat ku keto lumej kalojne. Edhe nga vitet 60 donte ta ndertonte Jugosllavia nje hec te tille por nuk ra dakort qeveria e atehershme shqiptare dhe Jugosllavia nuk e ndertoi. Per nje arsye te ngjashme me duket se nuk u ndertua heci i Skavices sepse permbyste disa toka ne Maqedoni (Jugosllavi ateher), nuk pranoi qev. jugosllave dhe u la si projekt.
Shqiperia duhet te mbroje interesat e rajonit qe preket se per ate eshte votuar, te vere veton. Psh ky projekt i hecit te Zhurit nxjerr jashte funksionimit nje Hec te vogel qe po ndertohet aktualisht ne Kukes dhe qe bazohet ne lumin e Ēajės. Ky lum praktikisht thahet fare nqs behet heci i Zhurit dhe investimi i hecit te Cajes (ne fakt ka nje emer tjeter zyrtar heci po se mbaj mend mire) shkon dem fare. Si ky Hec jane edhe disa hece te vegjel qe priten te ndertohen ne Kukes (per te cilat jane dhene lejet, ne mos kan filluar te ndertohen).
Normal qe as njera shtet nuk mund ti ndaloje investime ne territorin e vet por kur e marim parasysh qe jemi te dy nje komb duhet qe edhe te kemi konsiderate ndaj njeri tjetrit, nese hidrocentrali I Zhurit demton ne qfardo menyre qytetaret e Shqiperise, Kosova duhet ta ndaloje ket investim.
Buddy Holly August 26th, 2010, 08:20 AM Per cfare duhet te konsultohet Shqiperia me Kosoven, Hecet ne Shqiperi nuk i prishin rrjedhen natyrale lumejve te Kosoves. Lumejt zbresin nga Kosova ne Shqiperi dhe pastaj derdhen ne det, cfaredo heci ose barriere qe te ndertohet ne territorin e Shqiperise nuk ka asnje ndikim te lumejt e Kosoves. Ky eshte rregulli qe rrjedha natyrale e lumit nuk duhet te deformohet (vetem nqs bien dakort dy shtetet).
Si per cfare? Po nuk ka vetem Shqiperia te drejte te perdor kete uje per prodhim te rrymes. Duhej te konsultohej per nivelin e ujit qe do te mund te perdorej per rryme, plus qe planet e Kosoves per HC Zhurin nuk jane as te reja apo sekrete; studimi i fizibilitetit eshte kryer me 2005.
Shqiperia duhet te mbroje interesat e rajonit qe preket se per ate eshte votuar, te vere veton. Psh ky projekt i hecit te Zhurit nxjerr jashte funksionimit nje Hec te vogel qe po ndertohet aktualisht ne Kukes dhe qe bazohet ne lumin e Ēajės. Ky lum praktikisht thahet fare nqs behet heci i Zhurit dhe investimi i hecit te Cajes (ne fakt ka nje emer tjeter zyrtar heci po se mbaj mend mire) shkon dem fare. Si ky Hec jane edhe disa hece te vegjel qe priten te ndertohen ne Kukes (per te cilat jane dhene lejet, ne mos kan filluar te ndertohen).
Edhe Kosova duhet te mbroje interesat e saja dhe te ndertoje HC qe i nevojitet dhe qe do te perdor ujin qe buron ne territorin e vet. Neqofte se ka nevoje, te zvogelohet paksa kapaciteti i Zhurit dhe ta devijoje nje sasi te mjaftueshme te ujit per ne keto vendbanime, po jo te ndalet komplet.
Arbenit August 26th, 2010, 10:58 AM Si per cfare? Po nuk ka vetem Shqiperia te drejte te perdor kete uje per prodhim te rrymes. Duhej te konsultohej per nivelin e ujit qe do te mund te perdorej per rryme, plus qe planet e Kosoves per HC Zhurin nuk jane as te reja apo sekrete; studimi i fizibilitetit eshte kryer me 2005.
Edhe Kosova duhet te mbroje interesat e saja dhe te ndertoje HC qe i nevojitet dhe qe do te perdor ujin qe buron ne territorin e vet. Neqofte se ka nevoje, te zvogelohet paksa kapaciteti i Zhurit dhe ta devijoje nje sasi te mjaftueshme te ujit per ne keto vendbanime, po jo te ndalet komplet.
Edhe mos te harrohet se sa shume hektare toke pune jane vershuar ne territorin e Kosoves me ndertimin e liqenit te Fierzes.
Liqeni i Fierzes eshte ndertu ne kohen e Enverit dhe Titos. "Ata dy" kane arrite me u marre vesh per kete pune, keshtu qe, besoj (shpresoj :( ) se edhe keta te sotit do te merren vesh. Ishte dashte te jete me lehte tash se ne kohen e qafirave, me u marre vesh Kosova me Shqiperine.
Zwanse August 26th, 2010, 12:34 PM plus qe planet e Kosoves per HC Zhurin nuk jane as te reja apo sekrete; studimi i fizibilitetit eshte kryer me 2005.
Le te behen studime pafund, hapur ose fshehur por nuk funksionon ne kete menyre. rregullat nderkombetare jane te qarta: rrjedha e nje lumi qe kalon ne dy shtete (ose me shume) nuk duhet te ndryshohet artificialisht pa rene dakort mes dy shteteve. Le te behet studime plot por pa u rene dakort me shtetin tjeter nuk e nderton dot sipas ligjeve nderkombtare. Cdo Hec apo dige qe behet ne Shqiperi nuk demton asnje rrjedh lumi ne territorin e Kosoves (por mund ta demtoje ne territorin e Shqiperise). Keshtu funksionon ne cdo vend te botes, jo tani po per 70 vite kshu.
Dy raste konkrete ti solla me lart. Po kete Hecin e Zhurit ka dashur ta ndertoje Jugosllavia por nuk u lejua nga Shqiperia e asaj kohe (per te njejtat arsye qe duhet te mos e lejoje edhe sot), ose edhe hecin e Skavices qe donte ta ndertonte Shqiperia nuk e lejoi Jugosllavia sepse permbyteshin toka ne Maqedoni.
Edhe mos te harrohet se sa shume hektare toke pune jane vershuar ne territorin e Kosoves me ndertimin e liqenit te Fierzes.
Liqeni i Fierzes eshte ndertu ne kohen e Enverit dhe Titos. "Ata dy" kane arrite me u marre vesh per kete pune, keshtu qe, besoj (shpresoj :( ) se edhe keta te sotit do te merren vesh. Ishte dashte te jete me lehte tash se ne kohen e qafirave, me u marre vesh Kosova me Shqiperine.
Ajo ceshtje eshte mbyllur sepse vendet rane ne marreveshje. Kshu qe sja vlen te merremi me kete muhabet jo sa u permbyten kaq hektare jo aq, per kohen ndertimi u be sipas rregullave.
Edhe sic e thash ky Zhuri jo vetem qe than tre lumej te vegjel (Ēajės, Bushtricės dhe njė me O....) qe perdoren nga popullata per qellime bujqesore por dhe per te cilin jan dhene leje per hece te vegjel, njeri biles po ndertohen aktualisht te lumi i Cajes.
shpirtkosova August 26th, 2010, 01:18 PM Problemi eshte qe Shqiperia zyrtarishte nuk e ka kundershtuar por "ekspertet". Kush jan ekspertet? Prandaj HC e Zhurit e ben plotsishte te ligjshme.
Arbenit August 26th, 2010, 02:24 PM Edhe sic e thash ky Zhuri jo vetem qe than tre lumej te vegjel (Ēajės, Bushtricės dhe njė me O....) qe perdoren nga popullata per qellime bujqesore por dhe per te cilin jan dhene leje per hece te vegjel, njeri biles po ndertohen aktualisht te lumi i Cajes.
Ti po thua se HEC-i i Zhurit se do t'i thaje tre lumenj. Ne ēka bazohesh kur e thua kete. A e ke pare projektin e HEC-it te Zhurit? A beson se Kosova do t'i thej te gjitha ligjet nderkombetare ne lidhje me rrjedhen e lumenjeve nga nje shtet ne tjetrin, dhe t'a demtoj Shqiperine. A beson se ky HEC do te ndertohet pa u taku(ar) ekspertet dhe zyrtaret e Kosoves dhe Shqiperise?
Buddy Holly August 26th, 2010, 03:02 PM Le te behen studime pafund, hapur ose fshehur por nuk funksionon ne kete menyre. rregullat nderkombetare jane te qarta: rrjedha e nje lumi qe kalon ne dy shtete (ose me shume) nuk duhet te ndryshohet artificialisht pa rene dakort mes dy shteteve. Le te behet studime plot por pa u rene dakort me shtetin tjeter nuk e nderton dot sipas ligjeve nderkombtare. Cdo Hec apo dige qe behet ne Shqiperi nuk demton asnje rrjedh lumi ne territorin e Kosoves (por mund ta demtoje ne territorin e Shqiperise). Keshtu funksionon ne cdo vend te botes, jo tani po per 70 vite kshu.
Ti do te thuash qe shteti qe eshte pronar i burimit te ujit nuk guxon ta perdor ate uje se mos po prishen planet ne shtetin tjeter? Sic ka te drejte Shqiperia te ndertoje hidrocentrale ne territorin e vet, po ate te drejte e ka edhe Kosova. Puna eshte se si te mirren vesh qe te dy te ndertojne hidrocentralet e tyre pa i penguar njeri-tjetrit, jo si te ndertoje vetem Shqiperia e Kosova, vendi ku buron uji qe Shqiperia do ta perdor, te mbetet me gishta ne goje.
Dy raste konkrete ti solla me lart. Po kete Hecin e Zhurit ka dashur ta ndertoje Jugosllavia por nuk u lejua nga Shqiperia e asaj kohe (per te njejtat arsye qe duhet te mos e lejoje edhe sot), ose edhe hecin e Skavices qe donte ta ndertonte Shqiperia nuk e lejoi Jugosllavia sepse permbyteshin toka ne Maqedoni.
Jugosllavia e asaj kohe investoi ne termocentrale dhe hidrocentralet i la per kohera tjera nga aspekti ekonomik, jo per shkak se Shqiperia nuk e "lejoi". Marredheniet asokohe ishin te tilla qe Jugosllavise (apo Shqiperise) nuk i bente shume pershtypje se a e "lejonte" Shqiperia te ndertonte dic ne territorin e vet apo jo.
Edhe sic e thash ky Zhuri jo vetem qe than tre lumej te vegjel (Ēajės, Bushtricės dhe njė me O....) qe perdoren nga popullata per qellime bujqesore por dhe per te cilin jan dhene leje per hece te vegjel, njeri biles po ndertohen aktualisht te lumi i Cajes.
Ku bazohesh ti ne keto informata? Dhe nuk duhet te ndertohej nje hidrocentral 300MW per shkak se eshte duke u ndertuar nje hidrocentral 2-3MW? Bazuar ne cilen logjike?
Plus qe ai hidrocentral mund shume lehte te kompensohej nga Kosova dhe rryma qe do te prodhohej nga ai hidrocentral t'i transferohej KESH-it direkt nga KEK-u pa kompensim.
Kulla August 26th, 2010, 03:53 PM Albania electricity production up significantly in the first half 2010
Balkans Business News Correspondent in Tirana - 26.08.2010
Albanias National Institute of Statistics has revealed that domestic production of electrical energy reached 4,554 GWh in first semester of 2010, marking a considerable increase of 52.1% year-on-year.According to the statistical offices figures, Albanias total sources of electrical power increased by 26.7% in first half 2010.The main impact on domestic production was provided by the substantial rise in hydro plants production of energy, up 52% year-on-year, representing 98% of total domestic production.According to the new report, the import (including exchanges) of electrical power decreased by 76% in first half of 2010.
http://www.balkans.com/open-news.php?uniquenumber=68372
|
|