View Full Version : KAKKANAD l Skyline Ivy League l 20 fl X 6 l Under Construction


scorpiogenius
July 12th, 2008, 12:22 AM
Ivy League
20 floors X 6 towers
Kakkanad

Builder: Skyline Builders (http://www.skylinebuilders.com)
Location: Kakkanad, Cochin
Area: 6 acres
Architect: Sony Mathai Lalichan

http://i34.tinypic.com/a2g00.jpg

scorpiogenius
July 12th, 2008, 12:33 AM
Location Map

http://i38.tinypic.com/33ok7yq.jpg

The 6 acre plot lies just across the fence from the 400 acre Smart City project by Dubai Internet City. 4 km from Kakkanad Civil Station and 1 km from Infopark Entrance. Waterbodies on 2 sides of the site make the site more attractive.

Layout

http://i34.tinypic.com/2wlyaz4.jpg

2, 3 bedroom options in 6 towers
1 tower accomodates 114 units
6 apartments on each floor
Total Units: 684

scorpiogenius
July 12th, 2008, 12:45 AM
Status update: April 2008

This project was launched on August 1st 2007.

http://img145.imageshack.us/img145/9881/image084vs5.jpg (http://imageshack.us)

http://img145.imageshack.us/img145/3392/image101fm6.jpg (http://imageshack.us)

Smart City, Phase I will be rising just across that compound wall. There is a stream running adjascent to the Yale block which joins Kadambrayar running just beyond those coconut trees.
http://img145.imageshack.us/img145/9936/image136pt4.jpg (http://imageshack.us)

Thats the road leading to our site. And thats our car you see there. You can also see 4 shadows in the foreground, the tallest one is my friend, near to him my wife's brother, then my brother and the smallest shadow in the right corner is myself, clicking the mobile camera...:D:D
http://img145.imageshack.us/img145/9350/image137xg5.jpg (http://imageshack.us)

scorpiogenius
September 8th, 2008, 02:03 PM
The first two towers well on its way. Yale, seen on the right has gone 5 floors high.. Sylvania, (left), now into its 4th floor :):)

http://i36.tinypic.com/5yt4ao.jpg

Sylvania
http://i38.tinypic.com/331kldz.jpg

scorpiogenius
September 28th, 2008, 08:09 PM
Watch this video on Ivy League :okay:

IRxp34D8SgU&feature=related

scorpiogenius
October 6th, 2008, 09:36 AM
October updates on Sylvania :okay::okay:

http://i36.tinypic.com/73ch9h.jpg

http://i36.tinypic.com/3449hub.jpg

http://i36.tinypic.com/34ye8gy.jpg

scorpiogenius
November 11th, 2008, 07:49 PM
Works progressing quickly on the towers.

http://i34.tinypic.com/msj807.jpg

Sylvania into the 7th floor... 13 more to go

http://i34.tinypic.com/fa2d86.jpg

http://i34.tinypic.com/zurymu.jpg

ImBoredNow
November 12th, 2008, 09:51 PM
:lol: Nice community name and building names!
Hopefully the builder can contribute in other ways from his Ivy league experience if he had any.

scorpiogenius
November 12th, 2008, 11:12 PM
:lol: Nice community name and building names!
Hopefully the builder can contribute in other ways from his Ivy league experience if he had any.

I doubt it...An Ivy League product doing business in Kerala??? naaaaah :lol::lol:

scorpiogenius
March 18th, 2009, 05:29 PM
Sylvania is well onto its 13th floor

http://i44.tinypic.com/33cn637.jpg

http://i40.tinypic.com/2upbeop.jpg

http://i43.tinypic.com/dvsm4i.jpg

zhiemi
March 18th, 2009, 07:02 PM
I doubt it...An Ivy League product doing business in Kerala??? naaaaah :lol::lol:

Why not? You never know :D


Lol the names are very witty.

Nice project!

scorpiogenius
June 14th, 2009, 11:17 PM
Sylvania

http://i43.tinypic.com/245kcih.jpg

http://i44.tinypic.com/9i7mf7.jpg

http://i40.tinypic.com/j8likg.jpg

Entry Road

http://i44.tinypic.com/282pe1e.jpg

India101
August 29th, 2009, 03:27 AM
Update from Skyline website:

Yale -

Work in progress as on August 2009

RCC – 20th floor Slab completed.
Ceiling Plastering - 19th floor in progress.
Masonry - 18th floor in progress.
Internal Plastering - 7th floor in progress.
Electrical Chasing - 13th floor in progress.
Door frame fixing - 17th floor in progress.

http://img198.imageshack.us/img198/4707/yale.jpg


Sylvania -

Work in Progress as on 8th July 2009

RCC - 16th floor is in progress.
Ceiling Plastering - 10th floor in progress.
Masonry works - 9th floor in progress.
Internal Plastering- 3rd floor in progress.

http://img42.imageshack.us/img42/4280/sylvania.jpg

http://img268.imageshack.us/img268/5097/sylvania1.jpg


Harvard -

Work in progress as on 8th July 2009

RCC - 13th floor Columns in progress.
Ceiling Plastering - 10th floor in progress.
Masonry works - 7th floor has been completed.
Internal Plastering - 3rd Floor in progress.

http://img132.imageshack.us/img132/1865/harvardl.jpg

http://img193.imageshack.us/img193/4222/harvard1.jpg


Columbia -

Work in Progress as on 8th July 2009

RCC - 19th floor in progress.
Ceiling Plastering - 15th floor in progress.
Masonry works - 14th floor in progress.
Internal Plastering- 2nd floor in progress.

http://img42.imageshack.us/img42/345/columbiad.jpg

http://img188.imageshack.us/img188/6568/columbia1.jpg

scorpiogenius
September 9th, 2009, 12:08 PM
Sylvania into 20th floor

http://i25.tinypic.com/104er13.jpg

Columbia Topped out

http://i26.tinypic.com/ixe0x1.jpg

View from the 14th floor of Sylvania block

http://i25.tinypic.com/30c0wlj.jpg

scorpiogenius
September 9th, 2009, 12:19 PM
Calm, green and serene environment; the road leading to Ivy League seen here. The road is exclusive and ends with Ivy League, so the mad hustle and bustle of the outer city won't be affecting the residential complex.

http://i28.tinypic.com/9jeqtc.jpg

Kadambrayar, as seen from our balcony :) There is also a waterbody just behind the Columbia block and beyond it is the sprawling Studio complex planned by Navodaya Appachan.

http://i32.tinypic.com/2pzbf36.jpg

Eastern side of the complex

http://i29.tinypic.com/uy79w.jpg

And thats Veegaland!

http://i32.tinypic.com/14t28zo.jpg

scorpiogenius
November 21st, 2009, 07:42 PM
The complex seen from the road leading to Eadchira

http://i50.tinypic.com/hujbco.jpg

from across the new Infopark bridge

http://i49.tinypic.com/4uwjk7.jpg

scorpiogenius
November 21st, 2009, 07:44 PM
Columbia (block 4)

http://i47.tinypic.com/2802olc.jpg

Looking east from floor 14

http://i46.tinypic.com/xe39dw.jpg

Hindustani
November 22nd, 2009, 07:15 PM
nice update. thanks.

India101
February 8th, 2010, 08:39 AM
Feb 2010 Update:

Yale

Work in progress as on February 2010

Internal Plastering -19th floor - in progress.
External Plastering - in progress.
Plumbing Concealed works - progressing in 13th floor.
Sump tank works - in progress.
Lift Machine Room - Brick work in progress.
Internal Painting - Putty application in progress.

http://i49.tinypic.com/2hobgd2.jpg


Sylvania

Work in Progress as on February 2010

RCC - Lift Machine Room and Over head tank works in progress.
Ceiling Plastering - Completed.
Masonry works - 19th floor in progress.
Electrical Chasing - Progress in 16th floor.
Plumbing - Concealed works completed in 7th floor.
Internal Plastering - 9th floor in progress.
External Plastering - In progress.

http://i48.tinypic.com/20zr59x.jpg


Harvard

Work in progress as on February 2010

RCC - Lift Machine Room in progress.
Ceiling Plastering - Completed.
Masonry works - 19th floor in progress.
Electrical Chasing - Progress in 19th floor.
Plumbing - Concealed works progress in 11th floor.
Internal Plastering - 16th floor completed.
External Plastering - Progressing.

http://i50.tinypic.com/2r7n43c.jpg

http://www.skylinebuilders.com/crux-skyline/store_images/0001/0480/Hvrd2.jpg


Columbia

Work in progress as on February 2010

External Plastering - in progress.
Plumbing Concealed works - progressing in 10th floor.
Sump Tank Wall - Reinforcement Works in progress.
Lift Machine Room - Roof slab casted.
Internal Painting - Putty application in progress.
Main Floor Tiling - Second floor in progress.

http://i45.tinypic.com/11vse4h.jpg

http://www.skylinebuilders.com/crux-skyline/store_images/0001/0472/Picture122.jpg

India101
March 21st, 2010, 04:58 AM
Can the title be changed to T/O

March 2010

Yale

Work in progress as on March 2010

Internal Plastering - Completed.
External Plastering - in progress.
Plumbing Concealed works - progressing in 15th floor.
Sump tank works - Earth excavation work in progress.
Lift Machine Room - Brick masonry 50 % completed.
Internal Painting - Putty application 12th floor in progress.
Recreation Hall - First floor masonry works in progress.
Club House - First floor slab shuttering in progress.
Swimming Pool - RCC Works in progress.

http://i40.tinypic.com/33azz91.jpg


Sylvania

Work in progress as on March 2010

RCC - Completed.
Ceiling Plastering - Completed.
Masonry works - Completed.
Electrical Chasing - Progress in 17th floor.
Plumbing - Concealed works progress in 7th floor.
Internal Plastering - 14th floor in progress.
Application of Putty on internal walls - Putty application works in progress.
External Plastering - In Progress.
Recreation Hal - Masonry-First floor masonry works in progress.
Club House - RCC-First floor slab shuttering in progress.
Swimming Pool - RCC-Works in progress.

http://i41.tinypic.com/wa2hw5.jpg


Harvard

Work in progress as on March 2010

RCC - Lift Machine Room and Over head tank works in progress.
Ceiling Plastering - Completed.
Masonry works - Completed.
Electrical Chasing - Completed.
Plumbing - Concealed works progress in 12th floor.
Internal Plastering - 19th floor completed.
Application of Putty on internal walls - Putty application in progress.
External Plastering - In Progress.
Recreation Hal - Masonry-First floor masonry works in progress.
Club House - RCC-First floor slab shuttering in progress.
Swimming Pool - RCC-Works in progress.


http://i39.tinypic.com/9hjnkn.jpg


Columbia

Work in progress as on March 2010

External Plastering - 60% completed.
Plumbing Concealed works - progressing in 12th floor.
ump Tank wall - Structural Works 30% completed.
Lift Machine Room - Internal plastering in progress.
Internal Painting - Putty application 8th floor progress.
Main Floor Tiling - Third floor in progress.
Recreation Hall - First floor masonry works in progress.
Club House - First floor slab shuttering in progress.
Swimming Pool - RCC Works in progress.


http://i43.tinypic.com/2lt0jev.jpg

India101
August 9th, 2010, 01:41 PM
Can the title be changed to T/O!

July 2010

Yale

Work in progress as on July 2010

External Plastering - completed.
Plumbing - External Duct works in progress.
Lift Machine Room - Erection works in progress.
Toilet Dado - In Progress.
Internal Painting - Primer completed.
Recreation Hall - External Plastering works in progress.
Club House - Ground Floor Masonry works and First Floor ceiling plastering works in progress.
Swimming Pool - Deck area filling completed.

http://img10.imageshack.us/img10/4707/yale.jpg


Sylvania

Work in progress as on July 2010

External Plastering 80% completed.
Toilet Dado - 8th floor completed.
Plumbing - Concealed works progressing in 13th floor.
Main Flooring - In Progress.
Recreation Hall - Plastering - Internal & external Plastering in progress.
Club House - Masonry & Plastering - Ground Floor masonry and First floor Ceiling Plastering in progress.
Swimming Pool - Deck area filling completed.

http://img148.imageshack.us/img148/4274/syl.jpg

http://img32.imageshack.us/img32/4741/sylhar.jpg


Harvard

Work in progress as on July 2010

External Plastering - Completed.
Toilet Dado - 13th floor completed.
Plumbing - Concealed works progressing in 17th floor.
Main Flooring - In Progress.
Recreation Hall - Plastering - Internal & external Plastering in progress.
Club House - Masonry & Plastering -Ground Floor masonry and First floor Ceiling Plastering in progress.
Swimming Pool - Deck area filling completed.


http://img829.imageshack.us/img829/4269/harward.jpg

http://img824.imageshack.us/img824/231/hrwd.jpg


Columbia

Work in progress as on July 2010

External Plastering - completed.
Plumbing - Concealed works completed.
Sump tank - Side wall RCC works in progress.
Lift Machine Room - Erection works in progress.
Internal Painting - Primer works completed.
Toilet Dado - Progressing in 12th Floor.
Recreation Hall - External Plastering works in progress.
Club House - Ground Floor Masonry works and First Floor ceiling plastering works in progress.
Swimming Pool - Deck area filling completed.

http://img706.imageshack.us/img706/2594/colmb.jpg

India101
August 9th, 2010, 01:43 PM
Pool

http://img814.imageshack.us/img814/6742/pool.jpg

Club House

http://img822.imageshack.us/img822/3079/clubh.jpg

http://img833.imageshack.us/img833/2967/rclub.jpg

Skyline (http://www.skylinebuilders.com/index.php?option=com_content&view=article&id=70&Itemid=31&crux_prj_id=1)

scorpiogenius
August 9th, 2010, 09:00 PM
Can the title be changed to T/O!


Not so soon my dear! We still have 3-4 months to go before the complex is anywhere near opening. Columbia will be the first block ready to be handed over. I'll probably get my sale deed by early next year give that my apartment block, Sylvania will be ready by Jan 2011. :)

Another news is that the Ivy League project has received CRISIL's 7-star rating, the lone project in the whole of the state to achieve it. :cheers:

http://www.hindu.com/2010/07/30/stories/2010073051070500.htm

India101
August 10th, 2010, 12:45 PM
T/O = Topped out. But I just remembered about the other two blocks. We shall keep it u/c for now.

NoahsArk
March 13th, 2011, 03:07 AM
Hi,
I'm in talks with Skyline Builders to purchase a flat in either Harvard or Columbia,First of all thank you for posting alot of useful information and pictures here -I,m not inKochi and all of this gives me a better perspective on the Project.
From what I hear...everything looks good - The price I am being offered is 2590@Sq/ft from the 2nd to the 6th floor. What do you think about this rate. And its just across the Smart City and Kakanad seems to be booming with all the projects that are lined up in the Kochi-Everything sounds good,but I'm thinking if there's something I'm missing here.. I'm not looking for bad news but do any of you have any information thats skeptical and doubtful as far as the project is concerned. ?

e_arunsid
April 25th, 2011, 04:32 PM
http://img232.imageshack.us/img232/8308/harward2.jpg (http://img232.imageshack.us/i/harward2.jpg/)

http://img545.imageshack.us/img545/4183/syld.jpg (http://img545.imageshack.us/i/syld.jpg/)

India101
April 26th, 2011, 02:14 PM
This project is taking a really long time. Thought it would be done by now.

sakrishna
May 17th, 2011, 07:29 PM
http://oi55.tinypic.com/2hhf688.jpg

India101
May 18th, 2011, 05:55 AM
Will they launch Cornell at the same time as Princeton or later?

sakrishna
May 18th, 2011, 08:14 AM
Will they launch Cornell at the same time as Princeton or later?

No idea India 101. I think Cornell will be launched without much delay.

India101
October 25th, 2011, 10:25 AM
Not best quality pics, but the towers look neat.

More Photos ---> Skyline Builders (http://www.skylinebuilders.com/index.php?option=com_content&view=article&id=70&Itemid=31&crux_prj_id=1#)
http://img849.imageshack.us/img849/5914/65314517.jpghttp://www.skylinebuilders.com:80/crux-skyline/store_images/0001/5302/IMG-7625.jpg
http://img684.imageshack.us/img684/4984/sarea.jpghttp://img46.imageshack.us/img46/6592/ivyz.jpg

Malayaali
October 25th, 2011, 10:28 AM
Well, its in handover stage and still the thread title says something else!

India101
October 25th, 2011, 10:35 AM
Princeton still has quiet a bit to go. Currently on the 8th floor :)

http://oi55.tinypic.com/2hhf688.jpg

October
Copyright Skyline
http://img84.imageshack.us/img84/5086/ptnn.jpg

Malayaali
October 25th, 2011, 11:25 AM
Princeton still has quiet a bit to go. Currently on the 8th floor :)

OH, I C :) Thanks

e_arunsid
October 25th, 2011, 12:14 PM
Not best quality pics, but the towers look neat.

More Photos ---> Skyline Builders (http://www.skylinebuilders.com/index.php?option=com_content&view=article&id=70&Itemid=31&crux_prj_id=1#)
http://img849.imageshack.us/img849/5914/65314517.jpghttp://www.skylinebuilders.com:80/crux-skyline/store_images/0001/5302/IMG-7625.jpg
http://img684.imageshack.us/img684/4984/sarea.jpghttp://img46.imageshack.us/img46/6592/ivyz.jpg

Looks really nice...:)

Malayaali
December 13th, 2011, 05:03 PM
Skyline Ivy League Pictures

Truly splendid!! I love it :)

http://www.skylinebuilders.com/crux-skyline/store_images/0001/5992/0016-new.jpg

http://www.skylinebuilders.com/crux-skyline/store_images/0001/6084/TDM6046.jpg

http://www.skylinebuilders.com/crux-skyline/store_images/0001/5996/0033.jpg

http://www.skylinebuilders.com/crux-skyline/store_images/0001/6000/0083.jpg

http://www.skylinebuilders.com/crux-skyline/store_images/0001/6004/0084-new.jpg

http://www.skylinebuilders.com/crux-skyline/store_images/0001/6008/0091-new.jpg

http://www.skylinebuilders.com/crux-skyline/store_images/0001/6012/0107.jpg

http://www.skylinebuilders.com/crux-skyline/store_images/0001/6016/0122-new.jpg

http://www.skylinebuilders.com/crux-skyline/store_images/0001/6020/0140-new.jpg

http://www.skylinebuilders.com/crux-skyline/store_images/0001/6024/0154.jpg

http://www.skylinebuilders.com/crux-skyline/store_images/0001/6028/0186-new.jpg

http://www.skylinebuilders.com/crux-skyline/store_images/0001/6032/0212-new-f.jpg

http://www.skylinebuilders.com/crux-skyline/store_images/0001/6036/0228-new.jpg

http://www.skylinebuilders.com/crux-skyline/store_images/0001/6040/0244-new.jpg

http://www.skylinebuilders.com/crux-skyline/store_images/0001/6044/0256-new.jpg

http://www.skylinebuilders.com/crux-skyline/store_images/0001/6048/0267-new.jpg

http://www.skylinebuilders.com/crux-skyline/store_images/0001/6052/0278-new.jpg

http://www.skylinebuilders.com/crux-skyline/store_images/0001/6056/cornell-cover.jpg

http://www.skylinebuilders.com/crux-skyline/store_images/0001/6064/gardenfinal.jpg

http://www.skylinebuilders.com/crux-skyline/store_images/0001/6068/gardennew.jpg

http://www.skylinebuilders.com/crux-skyline/store_images/0001/6072/gatefinal.jpg

http://www.skylinebuilders.com/crux-skyline/store_images/0001/6076/pg-6.jpg

http://www.skylinebuilders.com/crux-skyline/store_images/0001/6080/poolside.jpg

Pics courtesy: Skyline

vjkrishn
April 7th, 2012, 09:38 AM
PRINCETON AS ON MARCH 2012

RCC - 16th floor slab casting in progress.
Ceiling plastering - 13th Floor in progress.
Masonry - 11th and 13th floor in progress.
Internal Plastering - 3rd floor in plastering.
External Plastering - Below 5th floor, south side in progress.
Sample Flat 2A - Tiling works almost completed.
http://img710.imageshack.us/img710/2784/ptn1.jpg

CORNELL AS ON MARCH 2012

RCC - 7th floor columns casting nearing completion. 8th floor slab casting in progress.
Ceiling Plastering - 5th floor in progress.
Masonry - 3rd floor in progress. 4th floor started

http://img27.imageshack.us/img27/4385/aimg8502.jpg

India101
April 29th, 2012, 10:56 AM
Princeton as of April 12

RCC - 17th floor columns in progress. 18th floor slab shuttering and reinforcement in progress.
Ceiling Plastering - 15th floor in progress.
Masonry - 14th floor in progress.
Internal Plastering - 7th floor in progress.
External Plastering - 5th - 9th floor, In progress.
Sample flat 2 A - Works nearing completion.

http://img140.imageshack.us/img140/7752/ptnx.jpg

MORE UPDATES (http://www.skylinebuilders.com/index.php?option=com_content&view=article&id=70&Itemid=31&crux_prj_id=18)

Cornell as of April

RCC - 9th floor columns casting in progress.10th floor slab shuttering and reinforcement in progress.
Ceiling Plastering - 7th floor in progress.
Masonry - 5th floor in progress.
Internal Plastering - 2nd floor in progress.

http://img33.imageshack.us/img33/2788/img8671z.jpg