View Full Version : BELGRADE | Projects & Construction


Pages : [1] 2

Sawovsky
November 30th, 2008, 06:26 PM
Usce tower twins (first one with Antenna already exist) 134m, 25f

http://www.differentia-nis.org/images/beograd/usce2.jpg

DP Towers 42f, ???m

http://img152.imageshack.us/img152/4636/planet02se8.jpg

Delta Tower 36f, ???m

http://www.blic.rs/_customfiles/Image/slike/2008/07_jul/10/beograd/kule-x1.jpg

Campus 41, 4 towers 25f, 100-120m

http://www.visuals.beobuild.net/data/media/4/080318-CampusPark-01.jpg

Red Star Apartmens tower 25f, ???m

http://www.mtsmondo.com/gallery/view_photo.php?IDPhoto=133708

Verano Tower ~40f , ???m

http://www.x-build.net/4images/data/media/1/verano-tower03.jpg

Beograd Plaza 30+f, ???m

http://i33.************/bj77vc.jpg
http://i38.************/293zst1.jpg
And most capital project is in block 26 ,four 50f towers.
Тhis is just a model, how will thеy use that area ,not a final design of objects.

http://www.blic.rs/_customfiles/Image/slike/2007/novembar/08/beograd/blok26_v.jpg

Manolo_B2
November 30th, 2008, 07:29 PM
DP Towers 42f, ???m

http://www.deltarealestate.rs/mediaFile/27/planet02.jpg

i heard that those towers won't be realized... is this true? :)

Singidunum
November 30th, 2008, 07:44 PM
I think that this thread should go to City/Metro Compilations

i heard that those towers won't be realized... is this true? :)

They decided to build them in a different location after first the municipal council tried to cut their height and then even sold part of the plot to a different company which affects their whole plan which includes a shopping mall. They still need to decide on a new location though.

Singidunum
November 30th, 2008, 07:49 PM
And most capital project is in block 26 ,four 50f towers.
Тhis is just a model, how will thеy use that area ,not a final design of objects.

http://www.blic.rs/_customfiles/Image/slike/2007/novembar/08/beograd/blok26_v.jpg

They will be designed by Norman Foster so hopefully something good will come out.

Sawovsky
November 30th, 2008, 07:53 PM
Аdded Beograd Plaza center

**RS**
December 7th, 2008, 08:18 AM
All projects look great.

Sawovsky
December 19th, 2008, 11:26 AM
The look of Belgrade from Kalemegdan fortress in future :)

http://img78.imageshack.us/img78/9955/beogradql5.jpg

:cheers: :cheers: :cheers:

Rastacoqui
December 19th, 2008, 01:02 PM
wow.... Serbia has some great developments coming their way!

Chupavi
December 19th, 2008, 01:58 PM
Kempinski Hotel chain and a 140 meters high mixed use tower
New Belgrade


http://media3.dropshots.com/photos/547244/20081219/135243.jpg

Sawovsky
December 19th, 2008, 03:38 PM
Belgrade City Gallery

http://www.beobuild.rs/visuals/data/media/13/trG-r-01.jpg

http://www.beobuild.rs/visuals/data/media/13/trG-p-kolarceva.jpg

http://www.beobuild.rs/visuals/data/media/13/trG-r-04.jpg

Sawovsky
December 19th, 2008, 04:17 PM
Engel Dorcol Marina

http://www.beobuild.rs/visuals/data/media/13/mardor-02.jpg

http://www.beobuild.rs/visuals/data/media/13/mardor-03.jpg

http://www.beobuild.rs/visuals/data/media/13/mardor-01.jpg

http://www.beobuild.rs/visuals/data/media/13/mardor-04.jpg

Sawovsky
December 20th, 2008, 11:38 AM
First Shopping City for Belgrade

http://www.yukapital.com/images/projects/ibarska2.jpg


http://www.yukapital.com/images/projects/ibarska.jpg


http://www.yukapital.com/images/projects/ibarska5.jpg


Video Animation of Shopping City

http://vimeo.com/2499802?pg=embed&sec=2499802



www.Beobuild.rs

raqn
December 20th, 2008, 03:15 PM
Obavezno ubaci i Airport City;)
Ja bih, ali idem za 15min na par dana u NS...

Sawovsky
December 20th, 2008, 03:49 PM
Airport City Belgrade

http://www.beobuild.rs/visuals/data/media/13/acb1.jpg

http://www.beobuild.rs/visuals/data/media/13/acb3.jpg

http://www.beobuild.rs/visuals/data/media/13/acb4.jpg

Current development;

http://media4.dropshots.com/photos/547244/20081128/184648.jpg

Sawovsky
December 20th, 2008, 03:58 PM
Hotel in Rajiceva Street

http://www.beobuild.rs/visuals/data/media/3/081228-HRJ-02.jpg

http://www.beobuild.rs/visuals/data/media/3/081228-HRJ-04.jpg

Chupavi
December 22nd, 2008, 06:49 PM
Ada Ciganlija Bridge
Decemer 2008 start, to be finished in 2010

http://media5.dropshots.com/photos/547244/20081222/093314.jpg

http://media5.dropshots.com/photos/547244/20081222/093323.jpg

http://media3.dropshots.com/photos/547244/20081222/093333.jpg

Construction update:

http://media5.dropshots.com/photos/547244/20081201/120254.jpg

http://media4.dropshots.com/photos/547244/20081201/124924.jpg

more info at:
http://www.beobuild.rs/read.php/212.html
http://www.savabridge.com/

GreenAlbanian
December 22nd, 2008, 08:25 PM
I have few questions! What is the Airport City, is it something next to airport, used for/by airport infrastructure or what?!

That Dorcol docks project looks amazing, do u have any other info on whether it will get constructed still or if any of the work was done so far?!

Cheers! :)

Sawovsky
December 22nd, 2008, 08:45 PM
^^Airport City is business and hotels area in New Belgrade.Name Airport City came from the fact that it's located at the same place where an old Belgrade airport was located.

Dorcol marina is waiting for some bureaucracy to be finished, and they expect to start project at some point in next year.

Vrachar
December 22nd, 2008, 09:22 PM
Airport City Belgrade construction update:

http://www.beobuild.rs/visuals/data/media/13/1-1.jpg

http://www.beobuild.rs/visuals/data/media/13/2-1.jpg

http://www.beobuild.rs/visuals/data/media/13/9.jpg

Hangars of old Belgrade airport:
http://www.beobuild.rs/visuals/data/media/13/8.jpg

http://www.beobuild.rs/visuals/data/media/13/7_3.jpg

http://www.beobuild.rs/visuals/data/media/1/080827-ACB-02.jpg

http://www.beobuild.rs/visuals/data/media/1/080630-ACB-01.jpg

http://www.beobuild.rs/visuals/data/media/1/081021-ACB-04.jpg

Source: Beobuild.rs

Vrachar
December 22nd, 2008, 10:13 PM
Belville - "Universiade Village" building for the 25th Summer Universiade in 2009 in Belgrade.

After the Universiade 2009, the universiade Village "Belville" will become an attractive new residential area with various unique facilities.

http://www.beobuild.rs/visuals/data/media/3/071207-BLVL-VS-03.jpg

http://www.beobuild.rs/visuals/data/media/3/071207-BLVL-VS-23.jpg

http://www.beobuild.rs/visuals/data/media/3/071207-BLVL-VS-21.jpg

http://www.beobuild.rs/visuals/data/media/3/071207-BLVL-VS-16.jpg

http://www.beobuild.rs/visuals/data/media/3/071207-BLVL-VS-05.jpg

Source: Beobuild.rs


Constructuction update (photos by raqn (http://www.skyscrapercity.com/member.php?u=136423)):

http://i414.photobucket.com/albums/pp229/radoyache/IMG_2277.jpg

http://i414.photobucket.com/albums/pp229/radoyache/IMG_2278.jpg

http://i414.photobucket.com/albums/pp229/radoyache/IMG_2279.jpg

http://i414.photobucket.com/albums/pp229/radoyache/IMG_2281.jpg

http://i414.photobucket.com/albums/pp229/radoyache/IMG_2284.jpg

http://i414.photobucket.com/albums/pp229/radoyache/IMG_2286.jpg

Beg
December 22nd, 2008, 10:38 PM
wow! :applause:

Sawovsky
December 22nd, 2008, 11:18 PM
Verano HQ in Block 23

http://www.beobuild.rs/visuals/data/media/1/071208-VN23-01.jpg

c/u

http://www.beobuild.rs/visuals/data/media/1/081128-VN23-01.jpg

Sawovsky
December 22nd, 2008, 11:20 PM
VIG Plaza

http://www.beobuild.rs/visuals/data/media/4/080617-VIGP-VS-02.jpg

http://www.beobuild.rs/visuals/data/media/4/080617-VIGP-VS-03.jpg

c/u

http://www.beobuild.rs/visuals/data/media/1/081127-VIG-07.jpg

Sawovsky
December 22nd, 2008, 11:23 PM
Sava City, business quart near Sava river, New Belgrade

http://www.beobuild.rs/visuals/data/media/13/image1.jpg

http://www.beobuild.rs/visuals/data/media/13/image4.jpg

c/u

http://www.beobuild.rs/visuals/data/media/1/081128-SVG-01.jpg

http://www.beobuild.rs/visuals/data/media/1/081128-SVG-02.jpg

http://www.beobuild.rs/visuals/data/media/1/081021-SVG-19.jpg

http://www.beobuild.rs/visuals/data/media/1/081021-SVG-20.jpg

Sawovsky
December 22nd, 2008, 11:31 PM
Aqua Park in Block 44, New Belgrade

http://www.x-build.net/4images/data/media/7/mapa.jpg


c/u

http://www.beobuild.rs/visuals/data/media/13/3.jpg

http://www.beobuild.rs/visuals/data/media/13/2.jpg

http://www.beobuild.rs/visuals/data/media/13/5.jpg

Chupavi
December 23rd, 2008, 01:53 PM
AVALA Tower special

Avala tower was 202, 87 meters tall and it was built between 1960 and 1965
It was a pride and a land mark of Belgrade.
The Tower was very unique; it was the only tower who had a triangle in its base and one of the rare ones that had 3 legs without direct reliance.

http://media4.dropshots.com/photos/547244/20081223/133225.jpg

On 29th April 1999. during the NATO bombing of Serbia, the tower was destroyed.
Why?
National tv used one of his antenna to broadcast a Tv program which, NATO says, make it a legitim target?????

http://media5.dropshots.com/photos/547244/20081223/133235.jpg

http://media5.dropshots.com/photos/547244/20081223/133247.jpg

Ten years after on 29th April 2009 the tower is back!
Not bigger and taller.... but completely the same! once again proudly above Belgrade the tower will stand!

http://media3.dropshots.com/photos/547244/20081223/133242.jpg

construction update

http://media3.dropshots.com/photos/547244/20081029/125733.jpg

http://media4.dropshots.com/photos/547244/20081029/125530.jpg

sorry that i get little bit emotional about Avala tower. :)

Amel_Gorazde
December 24th, 2008, 06:07 PM
fino se beograd ugradijo, jeli ekonomija dobra??

Chupavi
December 25th, 2008, 01:19 PM
fino se beograd ugradijo, jeli ekonomija dobra??

Pa sta da ti kazem ono sto radi i donosi pare se prodalo ono sto ne radi nece niko da kupi i propada. Sve se svodi na trgovinu i usluge nesto malo na proizvodnju. Kao svuda u okruzenju nista bolje nista gore.

Chupavi
December 25th, 2008, 01:41 PM
More photo about Airport city Belgrade
where the construction never stop :banana::banana::banana:

http://media6.dropshots.com/photos/547244/20081225/132729.jpg

http://media8.dropshots.com/photos/547244/20081225/132719.jpg

http://media6.dropshots.com/photos/547244/20081225/132702.jpg

http://media7.dropshots.com/photos/547244/20081225/042313.jpg

http://media6.dropshots.com/photos/547244/20081225/042213.jpg

http://media6.dropshots.com/photos/547244/20081204/214824.jpg

http://media4.dropshots.com/photos/547244/20081128/180334.jpg

new-sk
December 25th, 2008, 03:42 PM
nice projects!belgrade is really developing with full speed!

Sawovsky
December 26th, 2008, 12:21 PM
Usce Shopping Center

http://www.beobuild.rs/visuals/data/media/3/080516-USC-VS-01.JPG

http://www.beobuild.rs/visuals/data/media/3/080516-USC-VS-02.JPG


CONSTRUCTION UPDATE:

http://www.beobuild.rs/visuals/data/media/1/081128-USCC-04.jpg

http://www.beobuild.rs/visuals/data/media/1/081128-USCC-23.jpg

Sawovsky
December 26th, 2008, 12:23 PM
Energoprojekt Office Building

http://www.beobuild.rs/visuals/data/media/4/073112-EN26-01.jpg

c/u

http://www.beobuild.rs/visuals/data/media/1/081021-EN26-05.jpg

tonycro
December 27th, 2008, 11:47 AM
woooow , amazing projects :master: :okay:
:banana:

f.e.s.b.r.
December 28th, 2008, 10:16 PM
he first buildings looks gorgeous.. i like that

Sawovsky
January 6th, 2009, 03:44 PM
New Air Traffic Control Center

http://www.beobuild.rs/visuals/data/media/3/080614-FLC-VS-01.jpg

http://www.beobuild.rs/visuals/data/media/3/080614-FLC-VS-02.jpg

http://www.beobuild.rs/visuals/data/media/3/080614-FLC-VS-03.jpg

Sawovsky
January 6th, 2009, 03:49 PM
National Museum Reconstruction

http://www.beobuild.rs/visuals/data/media/13/exter1.jpghttp://www.beobuild.rs/visuals/data/media/13/exter4.jpghttp://www.beobuild.rs/visuals/data/media/13/exter6.jpg

http://www.beobuild.rs/visuals/data/media/13/enter8.jpghttp://www.beobuild.rs/visuals/data/media/13/enter7.jpghttp://www.beobuild.rs/visuals/data/media/13/enter10.jpg

Sawovsky
January 6th, 2009, 03:50 PM
Zepter Offices in Blok 8

http://www.beobuild.rs/visuals/data/media/4/080226-BL8-VS-04.jpg
http://www.beobuild.rs/visuals/data/media/4/080226-BL8-VS-02.jpg
http://www.beobuild.rs/visuals/data/media/4/080226-BL8-VS-01.jpg

Sawovsky
January 6th, 2009, 03:54 PM
Quanto Shopping Centre

http://www.beobuild.rs/visuals/data/media/4/080226-QNT-VS-01.jpg
http://www.beobuild.rs/visuals/data/media/4/080226-QNT-VS-02.jpg

Sawovsky
January 6th, 2009, 03:56 PM
Tri Lista Duvana Offices

http://www.beobuild.rs/visuals/data/media/3/080108-HRJ-01.jpg

construction update

http://www.beobuild.rs/visuals/data/media/1/081001-3LDV-04.jpg

Sawovsky
January 6th, 2009, 04:07 PM
Višnjička Plaza

http://www.beobuild.rs/visuals/data/media/3/080907-PLZV-03.jpg
http://www.beobuild.rs/visuals/data/media/3/080907-PLZV-04.jpg

Sawovsky
January 6th, 2009, 04:10 PM
Verano Business Centre in Trosarina

http://www.beobuild.rs/visuals/data/media/13/Trosarina04.jpg
http://www.beobuild.rs/visuals/data/media/13/Trosarina05.jpg

Sawovsky
January 6th, 2009, 04:12 PM
Kalenic Marketplace Reconstruction

http://www.beobuild.rs/visuals/data/media/13/kalenic_rn-04.jpg
http://www.beobuild.rs/visuals/data/media/13/kalenic_rn-03.jpg
http://www.beobuild.rs/visuals/data/media/13/kalenic_rn-02.jpg
http://www.beobuild.rs/visuals/data/media/13/kalenic_rn-01.jpg

Sawovsky
January 6th, 2009, 04:13 PM
Stari Mlin(Old Mill) Complex

http://www.beobuild.rs/visuals/data/media/13/starimlin1.jpg
http://www.beobuild.rs/visuals/data/media/13/starimlin3.jpg
http://www.beobuild.rs/visuals/data/media/13/starimlin2.jpg

Chupavi
January 14th, 2009, 05:21 PM
a little bit more about Verano HQ in Block 23
new render

http://media8.dropshots.com/photos/547244/20090114/074423.jpg

and CA

http://media7.dropshots.com/photos/547244/20081228/123301.jpg

http://media8.dropshots.com/photos/547244/20081224/215453.jpg

Sawovsky
January 15th, 2009, 07:40 PM
Hotel Metropol

http://www.beobuild.rs/visuals/data/media/3/080706-MTRP-VS-01.jpg

c/u

http://www.beobuild.rs/visuals/data/media/1/081230-MTRP-12.jpg
http://www.beobuild.rs/visuals/data/media/1/081230-MTRP-18.jpg
http://www.beobuild.rs/visuals/data/media/1/081230-MTRP-01.jpg

Sawovsky
January 18th, 2009, 06:37 PM
Main routes to be finished till 2015.

http://upload.wikimedia.org/wikipedia/commons/thumb/1/14/Beogradski_Metro.svg/1000px-Beogradski_Metro.svg.png

Sawovsky
January 24th, 2009, 11:28 AM
http://www.beobuild.rs/visuals/data/media/1/081230-GRNJ-02.jpg

http://www.beobuild.rs/visuals/data/media/1/081230-GRNJ-01.jpg

Sawovsky
January 24th, 2009, 11:29 AM
http://www.beobuild.rs/visuals/data/media/1/081230-GTSQ-03.jpg

http://www.beobuild.rs/visuals/data/media/1/081230-GTSQ-12.jpg

Sawovsky
January 24th, 2009, 11:40 AM
http://www.beobuild.rs/visuals/data/media/1/081230-AV19-30.jpg

http://www.beobuild.rs/visuals/data/media/1/081230-AV19-15.jpg

http://www.beobuild.rs/visuals/data/media/1/081230-AV19-01.jpg

http://www.beobuild.rs/visuals/data/media/1/081230-AV19-17.jpg

Sawovsky
January 25th, 2009, 09:40 PM
The location proposed for marina ‘Ada Ciganlija’ development takes the area of 14.16 hectares. The water surface occupies about 7.60 ha (54%), and the land part of the marina the remaining 6.56 ha (46%). It might be said that with this ratio between the water and the land part marina ‘Ada Ciganlija’ ideally corresponds to the world average (55% - 45%). However, the significant part of the Marina’s land section is already occupied with public communication facilities (Savski quay along the Radnicka Street, pedestrian paths, bicycle paths and so on) as well as with water supply and other infrastructure objects (bank fortification, embankment, sewage collectors along the Radnicka Street), which reduce or limit the usage of the land part of the marina location.

The specific feature of the location is that it belongs to both the protected zone of the Belgrade waterworks wells and sport – recreational zone of ‘Ada Cingalija’, which is one of the most attractive places in Belgrade with outstanding natural and visual qualities.

Marina ‘Ada Ciganlija’ should be the first example of the authentic marina on our rivers, which will, because of the Danube’s proximity, be of international importance.

The construction and arrangement of the Marina in Cukaricki branch is a comprehensive and a major investment project.

It has been planned to carry out the project in three stages.

Upon the completion of the final stage, marina ‘Ada Ciganlija’ would have the capacity of:

600 moorings for boats of all categories up to 18 m of length at aquatorium and

430 places for boats on the ground, of which 70 places in a hangar

The Preliminary design of the Marina is currently being prepared.

Marina ‘Ada Ciganlija’ has two parts: water surface – aquatorium and the land part – territory.

The aquatorium consists of the area for boat mooring and the area for access, manoeuvring and other nautical activities of the boats.

The territory, the land part of the Marina, comprises the operational bank with a ramp and a crane for handling the boats, area for boat stay on the ground, administrative, commercial, hospitality and sanitary buildings, workshops for boat maintenance and repair, car park for clients, gas station for supply, traffic, pedestrian, green and other free areas at the marina’s location.


http://www.parking-servis.co.rs/media/images/editor_uploads/Image/marina_ada_ciganlija_03.jpg

http://www.parking-servis.co.rs/media/images/editor_uploads/Image/marina_ada_ciganlija_02.jpg

http://www.parking-servis.co.rs/media/images/editor_uploads/Image/marina_ada_ciganlija_01.jpg

liman_drzava
January 27th, 2009, 09:03 PM
Main routes to be finished till 2015.

http://upload.wikimedia.org/wikipedia/commons/thumb/1/14/Beogradski_Metro.svg/1000px-Beogradski_Metro.svg.png

Are you sure? This is a plan from 1976. I don't believe that they are even considering to build more than one line for start... Is idea for LRT metro finally abandoned and they are going for real metro now? What are the leatest official news?

Sawovsky
January 27th, 2009, 10:27 PM
Are you sure? This is a plan from 1976. I don't believe that they are even considering to build more than one line for start... Is idea for LRT metro finally abandoned and they are going for real metro now? What are the leatest official news?

Main routes to be finished till 2015.

;)

Minister Mrkonjic sad that they will use plan that you quoted, but by 2015 only 2-3 main of them will be made , and then each year city will spend some many for other routes.

Main routes, will be done by 2015.

http://www.beobuild.rs/visuals/data/media/10/090122-BGMT-01.jpg

liman_drzava
January 27th, 2009, 10:47 PM
;)

Minister Mrkonjic sad that they will use this plan, but by 2015 only 2-3 main of them will be made , and then each year city will spend some many for other routes.

Main routes, will be done by 2015.

http://www.beobuild.rs/visuals/data/media/10/090122-BGMT-01.jpg

:banana::cheers: Knowing him... it'll probably be close to that... Belgrade is desperate for metro, and it must be a priority no.1!

Dziggy
January 29th, 2009, 01:45 PM
Belgrade Metro - (Never) Ending Story?

Belgrade still lacks an independent mass transit system, despite the fact that it crossed the benchmark of one million inhabitants long time ago. Population density, which is already exceptionally high, brings unbearable traffic jams, the existing public transport system is incapable of shuttling passengers from one outlying end of the city to another efficiently, and the suburban railway system “Beovoz” cannot meet its expected role, due to inadequate infrastructure and due to obsolete rolling stock.

City planners were contemplating the possibility of introducing the subway into Belgrade’s transit system since the end of 1950’s. Words started turning into deeds in the 1970’s, during the tenure of Mayor Branko Pešić, when the decision was made to build the new Belgrade railway junction, which would include tunnels under Vračar and Dedinje. Upon completion of the railway junction, construction of a subway system was planned in accordance with plans made by the team led by Branislav Jovin, Belgrade’s chief urban planner. Belgrade railway junction is still incomplete, the new central railway station Prokop is only partially completed, and hence the current central railway station is not relocated, although tunnels and the new railway bridge are already in service. The original subway construction plan from 1976 was abandoned, in favor of the expansion of the existing tram network in early 1980’s. This brought the first chapter of the idea to build a subway system in Belgrade to an ignominious end. The same project was later re-launched for a number of times, but it was used for short-term political gains.

The exceptionally unsatisfactory performance of urban infrastructure in the last couple of years, once again brought discussions on subway construction under the spotlight. However, this time city authorities rejected the plan from 1976, and brought independent experts in order to establish the need for a rail transit system.

After hiring of “Juginus”, a company from Belgrade, and the Spanish “Inecco” in 2006, a conclusion was made that the ideal system, which would meet the needs of Belgrade, would be a light rail system, named Belam (Beogradski laki metro - Beolgrade light metro). This decision was severely criticized by a large number of urban planners, led by Branislav Jovin, while architects close to city authorities were advocating the construction of Belam, which brought substantial polarization between the opponents and proponents of the light railway system in Belgrade. The public can still remember announcements that the construction will start “next spring”. That spring never came, and the idea about the construction of the light railway system inconspicuously faded out.

Big public pressure and the obvious necessity of a new transit system, once again opens the issue of construction of the Belgrade subway system. Namely, at the session of the National Council for infrastructure, Belgrade subway is, according to the Minister for infrastructure Milutin Mrkonjić, the third most important project in Serbia, after road and railway networks. Although metro thus became a national issue, contradictory statements started to arrive, from two persons who will have the key influence on this project – the aforementioned Minister of Infrastructure Mrkonjić and the Mayor of Belgrade, Dragan Đilas.

Mrkonjić already stated that the subway should be built in accordance with the original project, designed by Branisla Jovin, dating from 1976, where the first line was envisaged to run from Vukov Spomenik through Terazije to Fontana, in New Belgrade. Simultaneously, construction of the second line, which would run from the building of Parliament to Autokomanda is also planned. Mayor Đilas appeared to be quite reserved when it came to precise statements, especially regarding the determination of the model according to which the construction will follow (the project from 1976, or Belam?). During his visit to Moscow, the Mayor used the opportunity in order to establish contacts with experts from Russia and to consult about modalities for financing the subway construction. If our politicians are trustworthy, contacts with the Chinese, Spaniards, Germans and French are already established, who are interested to finance the construction by providing affordable loans, bud under the precondition that their companies will be the main contractors. As far as the financing model is concerned, the public still does not have relevant information about planned modalities, taking into account that due to the global financial crisis, it is increasingly difficult to obtain the capital, needed for realization of such a large project.

The Minister of infrastructure Milutin Mrkonjić stated on 18th of December that in three months it will be known what kind of subway system Belgrade needs to build. At almost the same time, Dragan Đilas stated that experts for subway systems from different European countries will arrive in Belgrade next January, in order to evaluate the current situation and to submit their proposals. Đilas also stated that the decision will be made until the end of April 2009, which converges with the three months deadline set by Mrkonjić. Besides, Đilas said that the construction will commence only after the technical documentation is drafted, and when the information regarding the price, builder and completion dates becomes available.

In order to understand the conceptual differences between the project from 1976 and the Belam, it is necessary to highlight their key features. This will be accompanied with appropriate plans, which will clearly demonstrate advantages and disadvantages, as well as some basic technical details.The project of Belgrade subway system from 1976 was divided into a number of stages. During the first stage, construction of two lines was to be completed, the M1 and M2 respectively, and subsequent stages were planned to be reserved for expansion of the subway network. Lines M1 and M2 once again came under the spotlight, due to statements made by Milutin Mrkonjić i Branislav Jovin. Both lines would run largely underground, except on smaller sections (for example, over the river Sava), which guarantees its independence from surface traffic. This subway system envisaged the flow of up to 40,000 passengers per hour in one direction, using standard high-floor trains, with third-rail power supply and the gauge of 1,435 mm (in comparison, Belgrade tram gauge is 1,000 mm). Trains would be up to 2.7 m wide, and up to 40 m long. Third rail power supply has an advantage over the overhead power supply, when it comes to the height of tunnels, since they are usually 20-30% lower than those using the overhead power supply.

The planned section of M1 would run from Konjarnik through Novi Beograd to Zemun. The line is planned to run entirely underground below the Kralja Aleksandra Boulevard and Terazije, where it would surface near the park next to the School of Economics, near the central railway station. From there, the line crosses the river Sava, over the road-rail bridge, whose construction is planned on the spot of the current old Sava Bridge. According to the original project, the realization of this corridor would demand a complete reconfiguration, or upgrade of the old Sava bridge, or its demolition, in order to build the new road-rail bridge. The alternative would be relocation of the subway bridge on the middle of the Sava amphitheatre, or between the Gazela bridge and the old Sava Bridge, where the river Sava could be crossed directly, reaching the Zoran Đinđić Boulevard. Another possibility is construction of a tunnel, but it is questionable how realistic this solution would be, mainly due to the difference in altitude between the Terazije ridge and the bank of the Sava river. Another important factor, of course, is the price of such undertaking.

After the crossing of the Sava, the line M1 would run through the corridor under the Intercontinental hotel and the Zoran Đinđić Boulevard for a few kilometers to Fontana, where it would turn to Zemun via Stari Merkator. Also, this envisages construction of a large depot, for maintenance of rolling stock, which would be located between Zemun railway station and Grmečka Street. The section between Autokomanda and Kalemegdan would be connected with line M2, which would share the route with line M1 on a short section near the house of parliament. This line would connect Prokop, Klinički centar and Slavija Square with Trg Republike Square, Knez Mihajlova Street and Kalemegdan. The southern branch of M2 at Autokomanda and the branch at Prokop would be constructed so that the line could be extended from Autokomanda to Voždovac, and that a new line could be built, stretching from Prokop to Banovo Brdo. Today, construction of the whole M2 line is planned, but as far as the construction of line M1 is concerned, only the stretch from Vukov Spomenik to Fontana, in Novi Beograd, is planned.

The competing project, the Belam, also envisages the main route from Konjarnik to Zemun (line 1), but with a partially changed path of the line and station locations, as well as two shorter lines, to Banovo Brdo through Novi Beograd (line 3) and Prokop (line 2). This system also envisages 1435 mm gauge, but the system would not be completely independent from surface traffic, unlike the project from 1976. The whole Belam network would be independent on 80% of the overall track length, and the rest would be integrated into existing thoroughfares, which might spell troubles during operation of the system. The envisaged capacity is 20,000 passengers per hour, which would be transported in vehicles 2.7 m wide and about 35 meters long. Power would be supplied by overhead cables, which enables trains to surmount bigger gradients, but it also requires higher ceilings in tunnels.

Line 1 also follows the route Kralja Aleksandra Boulevard, but on that section it would run on surface, and at Vukov Spomenik it would descend under ground, continuing through the house of parliament. There, instead to Terazije, as it would the case with the plan from 1973, the Belam would continue towards Trg republike Sqare and Knez Mihajlova street, to Varoš Kapija, from where it would run on surface. From there, the line would continue to Novi Beograd, passing a new bridge, or on an annex built with the Brankov bridge.

In Novi Beograd, the line would run right next to Ušće business centre, where it would cross a small underground section in order to enter into the Milentija Popovića street, where it would turn right, towards the Zorana Đinđića Boulevard. From there – mostly on surface, Line 1 follows the path next to the Novi Beograd municipality building through Mihajla Pupina Boulevard, all the way to the Tvornička street in Zemun.

Line 3 is planned to run from Belgrade Arena, crossing the new bridge over the Sava River to Banovo Brdo. In order to avoid confusion, it is important to note that although tracks for the subway system will be laid on the new bridge, it does not mean that these tracks are intended exclusively for the Belam, since the subway project from 1976 also envisages construction of the new bridge, on almost the same location, albeit in later stages. This line would run through Banovo Brdo entirely underground. Belams’s counterpart to the line M2 planned in 1976 is the Line 2, which would connect Banovo Brdo, Prokop, Central hospital, Slavija and the center of Belgrade, through a tunnel. Contrary to the rival concept, line 2 would not end at the House of Parliament, instead, it ends near the School of Law. For the future site of Belam’s technical base, the existing tram depot in Novi Beograd was chosen.

As its main advantage, the designers of Belam point to the fact that the line 1 covers a significant part of central zones, and the possibility of attaining total independence from the surface traffic with additional investment. As an advantage they also point its price, which would be roughly one half of the price needed to complete the subway system in accordance to the project from 1976. On the other hand, the subway system planned in 1976 would be completely independent from the surface traffic from the beginning, and as such represents an investment for the future. Despite the relatively lengthy construction period (7 years, versus 4 years needed to finish he Belam), such system is considered to be a quality investment, which inevitably carries bigger price tag than Belam. In the best case, the price for construction the subway system according to the plan from 1976 would stand at 1.2 billion Euros, while construction of Belam would cost at least 500 million Euros.

Although the subway project from 1976 is visionary, it did not envisage radical urban change which came after the breakup of former Yugoslavia. 35 years have passed since this plan was unveiled, and Belgrade is not the same as it once was. On the other hand, Belam represents an interesting approach, but this concept cannot satisfy long term needs. Because of the existing polarization among local experts, who advocate one or two solutions presented, it is almost impossible to establish neutral communication in order to find some solution, which would meet the current and future needs of Belgrade. Therefore, the best solution would be to make a brand new project, which could use the exploits of the existing two projects, but with original solutions in order to solve key problems, such as the crossing of the Sava, connecting central and suburban areas, as well as the appropriate concepts for future vehicles. First steps towards decisions for construction of the infrastructure project of the century in Belgrade confirm the idea that foreign urban planners should be brought in order to achieve some neutral and compromise solutions. Maybe it is not important who will providide the solution if it represents the best public transport solution for the people of Belgrade and if it represents a good opportunity for the local economy.

www.beobuild.net


BTW, beobuild is the site that informs about constructions in Belgrade, all updates can be read in english language, so if you want to se the situation in Belgrade, feel free to visit www.beobuild.com

Sawovsky
January 29th, 2009, 01:59 PM
Dziggy not .com , .rs ;)

Chupavi
February 9th, 2009, 10:39 AM
some update on Sava Bridge on 06. february 2009

photo by our friend Vrachar

http://i41.************/10eiw0j.jpg

http://i41.************/245dhrs.jpg

http://i41.************/vxbz29.jpg

Chupavi
February 19th, 2009, 02:45 PM
Project for Reconstruction and Adaptation of the Museum of Science and Technology Search

At the end of 2005, by the decision of the government, the Museum of Science and Technology received, as its new location, the first public thermo power plant building, located in Dorćol. While solving the problem of housing for the museum, the inevitable need for reconstruction of this building became apparent. Reconstruction is needed in order to meet the requirements for the complete, modern functioning of the museum. Because of this, the Museum of Science and Technology is one of the cultural institutions that is to be reconstructed using funds from the National Investment Plan. The famous architect Boris Podrecca has been entrusted with creating the design of the building.

http://media6.dropshots.com/photos/547244/20090219/053208.jpg
http://media7.dropshots.com/photos/547244/20090219/053212.jpg
http://media8.dropshots.com/photos/547244/20090219/053216.jpg
http://media8.dropshots.com/photos/547244/20090219/053204.jpg

**RS**
February 21st, 2009, 11:42 AM
Verano Business Centre in Trosarina

http://www.beobuild.rs/visuals/data/media/13/Trosarina04.jpg
http://www.beobuild.rs/visuals/data/media/13/Trosarina05.jpg

Cool project! Belgrade becomes ultramodern!

Chupavi
February 27th, 2009, 04:41 PM
New renders for DT at Autokomanda

http://www.m-y-s.com/user_files/projects/retail/01_pictures/autokomanda_01.jpg

http://www.m-y-s.com/user_files/projects/retail/autocomanda/autokomanda_03.jpg

http://www.m-y-s.com/user_files/projects/retail/autocomanda/autokomanda_04.jpg

Brko
February 27th, 2009, 07:00 PM
Beograđani bravo,imate stvarno super projekte,ali vas molim da editirate tagove na svim svojim dretvama da se čovjek može snaći.

Sawovsky
February 28th, 2009, 11:06 PM
^^Djuko(tako ti beshe ime?) retko ko na Sr forumu uopshte obraca paznju na tagove :)

Sawovsky
February 28th, 2009, 11:10 PM
New tennis center "25. Maj" , Serbian Open will be played there.

http://i42.************/2zo9jyq.jpg

Chupavi
March 2nd, 2009, 10:00 AM
update for B23
http://i44.************/2usa06u.jpg
http://i40.************/ifpdg6.jpg

Sawovsky
March 3rd, 2009, 02:57 PM
"The Lighthouse" Tower (250m) on Dunabe by famous Daniel Libeskind (http://en.wikipedia.org/wiki/Daniel_Libeskind) , representing Sava and Dunabe merging into each other.

http://i42.************/2s0envn.jpg

Sawovsky
March 5th, 2009, 12:39 AM
C/U Verano HQ

http://i44.************/j9ybs8.jpg

raqn
March 5th, 2009, 05:10 AM
Ispravka - ovo je B23 sa zadnje strane.

Sawovsky
March 5th, 2009, 06:13 PM
^^Lupio sam Energoprojket, hteo sam Verano da napishem, a to b23 je samo neki nadimak koji su mu forumashi dali ;)

Sawovsky
March 5th, 2009, 10:30 PM
New urban quart on ex "Shipyard Belgrade"

http://www.abaconsult.rs/images/nagrade/plakat.jpg

Brko
March 5th, 2009, 11:50 PM
Sawovsky meni su tagovi ipak važni jer ponekad neku dretvu nikako ne mogu pronaći bez pomoći tagova pa sam zato editiro i ovu dretvu.Nekad sam bio Đuka,a sad sam Stipson što je jako blizu mom stvarnom imenu pa je točnije da me zoveš Stipson.

Ova studija transformacije kompleksa brodogradilišta mi je fascinantna,ali bilo bi bolje da ova dva najvišlja nebodera nisu jedan kraj drugog.U kojoj su fazi svi ovi projekti,šta je izgledno od toga svega da će se sagraditi ?

Sawovsky
March 6th, 2009, 12:03 AM
Ova studija transformacije kompleksa brodogradilišta mi je fascinantna,ali bilo bi bolje da ova dva najvišlja nebodera nisu jedan kraj drugog.U kojoj su fazi svi ovi projekti,šta je izgledno od toga svega da će se sagraditi ?

Pazi ovako postoje tri osnovna problema kod gradnje u Bgu:

1.Nereshena pravno-imovinska pitanja( nasletstvo komunizma jel te, sve je nashe shto i tvoje :bash: )

2. Smarachka birokratija i vlast koja ne zna ni shta hoce, i gradski urbanisti koji fasciniraju svojom nestrucnoshcu.

3.Infrastruktura, tj izmeshtanje zeleznice, Luke Beograd i obilaznica oko Beograda(ta tri koche gradnju pola grada :bash:)

Ali dosta od ovog je izvesno za gradju u skorije vreme.Iz prvog posta sve sem Verano Kule bi trebalo da krene ove godine ili pochetkom sledece.
Za blok 26 josh nemam informacija kako stoje stvari.
Za Kempinski Hotel je skoro bila vest da su zavrshili sa birokratijom i da bi trebalo da krenu sa radovima.
Marina Dorcol je isto zavrshila sa Birokratijom i krece na prolece, Airport City se uveliko gradi i zavrshava. Hotel u Rajicevoj je krenuo jesenas da se radi, most na adi isto tako.
Belville se radi za univerzijadu i vec se zavrshava, Verano HQ je isto blizu kraju, i gomila Plazinih molova/hotela.Ako te josh nesho konkretno interesuje pitaj :)
U suhtini jedino ono shto ima veze sa obalom Save i Dunava(dakle i brodogradilishte) nema izgleda da se radi u skoriji vreme, jer im predstoje gomila infrastrukturinih radova kao i reshavanja pravno-imovinskih odnosa.

Goyazny
March 6th, 2009, 09:59 AM
Zar brodogradiliste nije kupio Zepter?
sada je tamo MillSped , jos uvek, mada su napravili kargo centar u Shimanovcima , pre par godina, jos.

U vezi birokratije, pogledaj film Gaja Richija Rockenrolla. Ovi nasi uz urbanizma su mala deca...

Madas, kako stvari sada stoje, svi investitori koji su se izborili sa birokratijuom, prosle godine pukli su u Bankama i na berzi. Bojim se da love nema....
Osim Miskovica.

Sawovsky
March 6th, 2009, 02:10 PM
Daniel Libeskind in Belgrade


The Port of Belgrade is located between city neighborhood “Dorćol” and Danube, taking up one of the potentially most exclusive piece of land Belgrade has to offer at the moment. Today it is characterized by large old warehouses, chaos, transit traffic, disorganization of the space, and the city center, located 10 minutes away, has no contact with it. Since the Port was privatized, the ambitions have risen, and the new company – The Port of Belgrade, A.D. – didn’t waste time, they employed the world famous architect Daniel Libeskind to create a master plan for the Danube’s waterfront in Belgrade.

Daniel Libeskind, born 1946 in Łódź, Poland, made his world fame by winning the competition to be the master plan architect for the reconstruction of the World Trade Center site in New York. On March 2nd, in the amphitheater of the Belgrade’s Faculty of Architecture, he presented the master plan for the development of the Port of Belgrade. Students, professors, experts and press showed unexceptional interest in it – the amphitheater was full, and in the halls TV screens were installed, broadcasting the presentation live.

Master plan for the Port of Belgrade will completely reorganize the space, with partial preservation of some buildings and change of their function. The interesting idea of this plan is to divide the whole area in seven quarters with a specific characteristic, where each would be a sustainable neighborhood for itself. Every quarter would have its spaces for relaxation in a form of well organized greenery. As the main goal of this project is sustainability, although project includes large urbanization of the area, the whole neighborhood is enriched with a large and dynamical park. Beside this large public park space, the entire project includes number of different venues that will ensure function and quality of the neighborhood.

The water basin inside the Port will be used as a marina with a variety of contents provided in the buildings surrounding it. A special place is reserved for the culture – right next to basin there would be a library, while the central position will be held by Museum of Applied Art. The investors know as well that they must avoid constructing a mono-functional development, like New Belgrade was couple decades ago. The contents of this neighborhood will attract people to come to this area, in an attempt to return this riverfront to its supposed function. Francuska Street will be extended to the river, forming a Waterfront Plaza in its end. On this Plaza Libeskind planed a large ‘Icon Tower’, 60 to 70 floors high, which would dominate the port, even maybe Belgrade, and could be seen from all important places of interest in Belgrade, but especially from Danube river. The waterfront will be also divided into several sections, and apart from the classical “stair-case” promenade, there will be a marina and a large beach, where residents of Belgrade and their guest could enjoy warm days.

All quarters, envisaged by this master plan, would consist of buildings in different sizes and shapes. Although it is a very large development area, this way it is possible to avoid architectural repetitions and template construction. With very well organized leisure areas, Liebeskind managed to break high density concept of this project common for the old part of Belgrade. Some even criticized that the area won’t connect well with its surroundings, but Mr. Libeskind said he hoped that future development would bring near-by areas closer to his concept. Representatives of the Port of Belgrade showed determination to put this project into practice, however, they have stressed that this big project was almost never before introduced in our city and that its implementation may take up to a decade or more. The development of this project is very conditioned with infrastructure growth and some of the areas could even start development soon with the existing one. The rest of the project should be followed by substantial infrastructure investment on the side of the local government.

The key word is "maybe", since the project itself is a vision with a strong perspective, that was introduced in the eve of probably the largest economic crisis that happened to the mankind. However, we can still hope that this master plan will not end up as one of the many forgotten ideas. As Libeskind said ‘The Empire State Building’ was built during the depression years, still one is sure, projects like this could prevent recession becoming a depression.

http://www.beobuild.rs/visuals/data/media/5/090302-LUBG-12.jpg

http://www.beobuild.rs/visuals/data/media/5/090302-LUBG-09.jpg

http://www.beobuild.rs/visuals/data/media/5/090302-LUBG-02.jpg

Chupavi
March 11th, 2009, 03:42 PM
^^
Very nice project! I hope that we will have something from it!

CrazySerb
March 13th, 2009, 09:20 PM
Well, since we have the Engel Marina, Belgrade Shipyard and Belgrade Port projects presented, its only right to present Zemun Quay as well:)

Just another piece in the Belgrade waterfront puzzle...

http://www.beobuild.rs/visuals/data/media/4/071118-ZMKJ-VS-02.jpg

http://www.beobuild.rs/visuals/data/media/4/071118-ZMKJ-VS-03.jpg

http://www.beobuild.rs/visuals/data/media/4/071118-ZMKJ-VS-04.jpg

http://www.beobuild.rs/visuals/data/media/4/071216-ZMKJ-VS-03.jpg

http://www.beobuild.rs/visuals/data/media/4/071216-ZMKJ-VS-01.jpg

Alle
March 13th, 2009, 09:31 PM
Delta Tower looks like a smaller version of the Capricorn Tower in Dubai. It is a good design though, depending on the surroundings.

The Airport City is looking especially good.

Chupavi
March 14th, 2009, 03:23 AM
Perhaps a litle bit

Capricorn Tower in Dubai
http://farm1.static.flickr.com/21/24287628_1f14ab7819.jpg?v=0

Delta tower
http://www.beobuild.rs/visuals/data/media/13/delta-rn-blok20-01.jpg
http://www.beobuild.rs/visuals/data/media/13/delta-rn-blok20-02.jpg
http://www.beobuild.rs/visuals/data/media/13/delta-rn-blok20-03.jpg
http://www.beobuild.rs/visuals/data/media/13/delta-rn-blok20-04.jpg
http://www.beobuild.rs/visuals/data/media/13/delta-rn-blok20-05.jpg

Delta Tower is a mixed use development, strategically located at a prime plot in New Belgrade. Comprised of three interconnected entities, this development will satisfy all contemporary business requirements – the perfect combination of an ideal location and excellent amenities. A 35-floor class A office tower will provide an excellent working environment.

The five-star Intercontinental hotel will feature a modern conference centre, spa, and health club in addition to its 325 luxurious rooms, placed on 13 floors. The exclusive shopping arcade with accompanying restaurants and cafés will create a meeting point not only for businesspeople, but also for the whole surrounding community.

All three entities will be serviced by a three-level underground garage. Because of its close proximity to the centre, it will represent the heart of the city’s new business district – New Belgrade.

An agreement was signed on May 17th, 2007 in Delta Holding's office headquarters between the company and the Intercontinental hotel chain regarding the management of the future hotel to be built in Blok 20. As opposed to the former Intercontinental hotel that is now called Hotel Sava Beograd, the future hotel will not use a licence. Instead, the hotel will be completely managed by the hotel group. Delta M will build the object, but management will be handed over to the Intercontinental hotel chain.

The complex of buildings will feature a 35 storey office tower and the 15 storey hotel building. Both buildings will be joined by a shopping mall. The hotel will have 325 rooms. Delta M originally intended to sign such an agreement with the Hilton hotel chain.

Chupavi
March 16th, 2009, 10:13 PM
here some C\U
AVALA tower
http://www.beobuild.rs/visuals/data/media/1/090308-AVL-01.jpg
http://www.beobuild.rs/visuals/data/media/1/090308-AVL-03.jpg
http://www.beobuild.rs/visuals/data/media/1/090308-AVL-05.jpg

all pictures taken from http://www.beobuild.rs

Chupavi
March 16th, 2009, 10:18 PM
Usce shopping center C/U

http://www.beobuild.rs/visuals/data/media/1/090314-USCC-19.jpg
http://www.beobuild.rs/visuals/data/media/1/090314-USCC-23.jpg
http://www.beobuild.rs/visuals/data/media/1/090314-USCC-03.jpg

all pictures taken from http://www.beobuild.rs

Chupavi
March 16th, 2009, 10:22 PM
and C/U of B23 (from Mordor :))

http://www.beobuild.rs/visuals/data/media/1/090308-VN23-07.jpg

source http://www.beobuild.rs

Goyazny
March 19th, 2009, 11:36 AM
and C/U of B23 (from Mordor :))

http://www.beobuild.rs/visuals/data/media/1/090308-VN23-07.jpg

source http://www.beobuild.rs

Is it Peugeot commercial?

Chupavi
March 19th, 2009, 05:05 PM
^^
It s a VERANO building you can t pass if you don t drive a PEUGEOT :lol::lol::lol:

Sawovsky
March 20th, 2009, 03:48 PM
Is it Peugeot commercial?

hahahahah, I didn't notice that :lol::lol::lol:

Chupavi
March 25th, 2009, 01:29 AM
The works to construct new bridge over Sava River are following specified dynamics. It is the largest infrastructure investment for the last three decades, and its significance gives it a special position among other projects in Belgrade.

http://www.beobuild.rs/visuals/data/media/4/080624-MADA-VS-08.jpg

At the moment, the most intensive activity is on the Cukarica side of the Sava River, right next to the ‘Pekarska industrija’, and on the tip of Ada Ciganlija as well. On the Cukarica side they are already doing pilings for the foundation that will hold the structure. At the same time, on the tip of Ada Ciganlija fillings and the stabilization of the ground is almost completed. Together with securing it, they are also equipping the construction site. Just a couple of days after our visit they installed a concrete factory for the construction of the main 200-meter-high carrying pillar of the bridge.

http://www.beobuild.rs/visuals/data/media/1/090323-ADAM-11.jpg
http://www.beobuild.rs/visuals/data/media/1/090323-ADAM-01.jpg
http://www.beobuild.rs/visuals/data/media/1/090323-ADAM-09.jpg
source Beobuild (http://www.beobuild.rs)

Jim856796
March 27th, 2009, 02:54 AM
The city of Belgrade came up with a proposal to remodel the Beogradanka skyscraper by cleaning the exterior facade, rebuilding the entry to the building, and even reopening the restaurant of the top floor which has been closed since sometime in the 1990s for safety reasons.

Sawovsky
March 27th, 2009, 08:51 AM
^^ They already revivaled and cleaned the lower parts od Beogradjanka, I hope they will do the same with the rest of the tower, and a restaurant on the top would be fabulous :master::master::master:

http://i42.************/s0xulv.jpg

http://i42.************/euqbkj.jpg

Jim856796
March 27th, 2009, 03:13 PM
And I counted the floors of the Beogradjanka and found out that it actually has 24 floors, not 30 as a lot of sources claim.

Sawovsky
March 27th, 2009, 06:37 PM
Which sources? It's very well know thing that Beogradjanka has 24 flours.

Chupavi
March 29th, 2009, 01:48 AM
One of the forgoten project "Balkanska 2" or shortly B2 (the inteligent builing)

http://www.beobuild.rs/visuals/data/media/13/B2-1zelena.jpg
http://www.beobuild.rs/visuals/data/media/13/B2-3zelena.jpg
http://www.beobuild.rs/visuals/data/media/13/B2---4zelena.jpg

and thanks God you can see the difference on the ground! They change the project for the better one:)
http://www.beobuild.rs/visuals/data/media/1/090308-B2-04.jpg
http://www.beobuild.rs/visuals/data/media/1/090308-B2-02.jpg
http://www.beobuild.rs/visuals/data/media/1/090308-B2-01.jpg
http://www.beobuild.rs/visuals/data/media/1/081230-B2-29.jpg
http://www.beobuild.rs/visuals/data/media/1/081230-B2-28.jpg

source http://www.beobuild.rs

Chupavi
March 29th, 2009, 02:04 AM
by the left side of the B2 should be something like this

http://www.re-a-c-t.org/images/terazijska%20terasa%2001%201.jpg
http://www.re-a-c-t.org/images/terazijska%20terasa%2002.jpg
http://www.re-a-c-t.org/images/terazijska%20terasa%2007.jpg
http://www.re-a-c-t.org/images/terazijska%20terasa%2006.jpg

source http://www.re-a-c-t.org/projects/terazije_terrace.php

Sawovsky
March 30th, 2009, 10:18 PM
TC Usce is almost finished, i think that design it's very unique and momunental. (more pics here: http://www.beobuild.rs/forum/viewtopic.php?id=273&p=30 )

http://i41.************/rh3hc0.jpg

http://i42.************/zkij2t.jpg

http://i44.************/2e4l1k9.jpg

Sawovsky
March 30th, 2009, 10:21 PM
B23 Update

http://i40.************/sw4sht.jpg
http://i41.************/10d9l3m.jpg
http://i42.************/v3nb6q.jpg
http://i39.************/16c7tza.jpg
http://i44.************/8yrxid.jpg
http://i40.************/2d7bq60.jpg
http://i41.************/30m4n06.jpg
http://i40.************/jzwvg3.jpg
http://i41.************/1zgvx5l.jpg
http://i43.************/1ilusx.jpg
http://i43.************/2re1xed.jpg
http://i41.************/106hvk0.jpg
http://i39.************/29y174p.jpg
http://i39.************/2ign0cp.jpg
http://i42.************/30nht84.jpg
http://i44.************/ezrjw3.jpg
http://i43.************/33u4j94.jpg
http://i43.************/2hsanet.jpg
http://i41.************/22lwzp.jpg
http://i40.************/b9bqqo.jpg
http://i44.************/155lblu.jpg
http://i44.************/6qfdk5.jpg
http://i39.************/2jfhmp3.jpg
http://i43.************/16i5f20.jpg
http://i44.************/2v9vhnk.jpg
http://i40.************/2b76z7.jpg
http://i42.************/2zp89y1.jpg
http://i42.************/kf5k4m.jpg
http://i41.************/1zjaf8.jpg
http://i39.************/1fkd43.jpg
http://i42.************/33pczyx.jpg
http://i44.************/2j3402p.jpg
http://i39.************/35lhtmd.jpg
http://i39.************/a0j7o8.jpg
http://i41.************/2jcbx8l.jpg
http://i39.************/5xj29u.jpg
http://i43.************/73mbg0.jpg
http://i39.************/sv6n4m.jpg
http://i41.************/4vh1m1.jpg
http://i44.************/10qffnk.jpg

Sawovsky
March 30th, 2009, 10:21 PM
3LD Update

http://i40.************/15x505x.jpg
http://i42.************/mwf5e0.jpg
http://i43.************/mlimmp.jpg
http://i39.************/rj3wis.jpg
http://i44.************/5xk2s4.jpg
http://i41.************/jua2w1.jpg
http://i41.************/w057df.jpg
http://i41.************/35nd5bm.jpg
http://i41.************/2rykgvl.jpg
http://i43.************/33p94e1.jpg
http://i42.************/11blm6h.jpg
http://i43.************/24ocdfp.jpg
http://i43.************/20r7o8w.jpg
http://i41.************/2vru107.jpg
http://i44.************/noamp1.jpg
http://i40.************/2hda45z.jpg
http://i43.************/etwkrb.jpg
http://i42.************/vzwujc.jpg
http://i43.************/34dojsj.jpg

CrazySerb
March 31st, 2009, 01:59 AM
Sawovsky, you don't have to post every single photo here, just the best two or three;)

Other then that, great job:applause:

Sawovsky
March 31st, 2009, 09:18 AM
^^^ Crazy I know you are saying that cuz od the last to updates, but it really wasn't in the mood the choose the few best pics, so i posted every single picture :D

novaguy
March 31st, 2009, 01:59 PM
^you should have waited till you were in the MOOD!Way to many pictures.

Chupavi
April 10th, 2009, 02:24 PM
C/U for AVALA tower :banana:

http://i40.************/a0ykjc.jpg
http://i42.************/3452d8i.jpg
http://i42.************/nbviok.jpg
photo milos

http://img19.imageshack.us/img19/3246/dscf5039.jpg
close up
http://img19.imageshack.us/img19/3595/dscf5039e.jpg
photo raja iz ćoška

Chupavi
April 10th, 2009, 04:47 PM
Beleville practicly finished
project that is a part of the coming Universiade

http://www.beobuild.rs/visuals/data/media/1/090407-BLVL-14.jpg
http://www.beobuild.rs/visuals/data/media/1/090407-BLVL-13.jpg
http://www.beobuild.rs/visuals/data/media/1/090407-BLVL-07.jpg
http://www.beobuild.rs/visuals/data/media/1/090407-BLVL-22.jpg

Chupavi
April 16th, 2009, 09:42 AM
B 23 new renders and C/U

http://www.beobuild.rs/visuals/data/media/3/090415-B23-VS-01.jpg
http://www.beobuild.rs/visuals/data/media/3/090415-B23-VS-02.jpg
http://www.beobuild.rs/visuals/data/media/3/090415-B23-VS-03.jpg
http://www.beobuild.rs/visuals/data/media/3/090415-B23-VS-06.jpg

http://www.beobuild.rs/visuals/data/media/1/090415-B23-15.jpg
http://www.beobuild.rs/visuals/data/media/1/090415-B23-14.jpg
http://www.beobuild.rs/visuals/data/media/1/090415-B23-16.jpg
http://www.beobuild.rs/visuals/data/media/1/090415-B23-11.jpg

http://www.beobuild.rs

Hepec
April 22nd, 2009, 10:15 PM
I love the airport city!!

However,(and this is my personal opinion) it would be nice to see a city the size of Belgrade finally get a Skyscraper or two. Lets be honest, you guys keep posting the projects that have been proposed years ago. Obviously there's nothing happening here. Verano, Delta, all these other "Master plans". Did any of these break ground yet? Is there anything tall built besides USCE?

Especially now that economy sucks, I see it hard to realise any project anywhere not just in Belgrade. So I wish you guys the best. It would be nice cluster of high rises close together soon.

Goyazny
April 23rd, 2009, 09:28 AM
I love the airport city!!

However,(and this is my personal opinion) it would be nice to see a city the size of Belgrade finally get a Skyscraper or two. Lets be honest, you guys keep posting the projects that have been proposed years ago. Obviously there's nothing happening here. Verano, Delta, all these other "Master plans". Did any of these break ground yet? Is there anything tall built besides USCE?

Especially now that economy sucks, I see it hard to realise any project anywhere not just in Belgrade. So I wish you guys the best. It would be nice cluster of high rises close together soon.

Fair comment.

Chupavi
May 5th, 2009, 10:57 AM
Ada Bridge construction update (01.05.2009.) by Vrachar:
http://www.blic.rs/_customfiles/Image/slike/2008/10_oktobar/21/beograd/most-v.jpg

http://i20.photobucket.com/albums/b223/dljgmail/razno/P5016413_resize.jpg

http://i20.photobucket.com/albums/b223/dljgmail/razno/P5016415_resize.jpg

SkaNdErBeG
May 5th, 2009, 01:38 PM
http://i44.************/ezrjw3.jpg

http://i43.************/33u4j94.jpg

glass looks cheap...

Chupavi
May 6th, 2009, 02:37 PM
^^
In my point of view they are very good, that pictures don't show well.
here is a better one.

http://i43.************/ngvazc.jpg

Sawovsky
May 7th, 2009, 03:26 AM
I love the airport city!!

However,(and this is my personal opinion) it would be nice to see a city the size of Belgrade finally get a Skyscraper or two. Lets be honest, you guys keep posting the projects that have been proposed years ago. Obviously there's nothing happening here. Verano, Delta, all these other "Master plans". Did any of these break ground yet? Is there anything tall built besides USCE?

Especially now that economy sucks, I see it hard to realise any project anywhere not just in Belgrade. So I wish you guys the best. It would be nice cluster of high rises close together soon.

Talking about proposed projects, a fresh new one :D

Napred Tower in blok 26

http://www.beobuild.rs/visuals/data/media/3/090427-VS-B26NAPRED-01.jpg

http://www.beobuild.rs/visuals/data/media/3/090427-VS-B26NAPRED-02.jpghttp://www.beobuild.rs/visuals/data/media/3/090427-VS-B26NAPRED-04.jpghttp://www.beobuild.rs/visuals/data/media/3/090427-VS-B26NAPRED-06.jpghttp://www.beobuild.rs/visuals/data/media/3/090427-VS-B26NAPRED-03.jpg

Stephanie-kun
May 7th, 2009, 04:34 AM
I think that new york is an inspiration.

Goyazny
May 7th, 2009, 08:51 AM
glass looks cheap...

Skenderbeg, at your avatar, is it a new render for construction in Pristina center? Works started?
BTW, this project looks great.

Chupavi
May 11th, 2009, 02:42 PM
The construction site on Avala is very well organized and managed while workers of “Ratko Mitrovic Dedinje d.o.o.” are molding the fifth platform. According to officials there, all concrete works should be finished in a month, when they will start installing glass facade elements. This facade will be installed on the tower’s gondola, but it will cover the entrance and elevator room as well. It makes a small change to a solution on the old tower destroyed by NATO bombs in 1999, where glass facade was only on top.
Beobuild

http://www.beobuild.rs/visuals/data/media/1/090506-AVL-20.jpg
http://www.beobuild.rs/visuals/data/media/1/090506-AVL-02.jpg
http://www.beobuild.rs/visuals/data/media/1/090506-AVL-07.jpg
http://www.beobuild.rs/visuals/data/media/1/090506-AVL-13.jpg
http://www.beobuild.rs/visuals/data/media/1/090506-AVL-14.jpg
http://www.beobuild.rs/visuals/data/media/1/090506-AVL-17.jpg

C-Carter
May 11th, 2009, 02:46 PM
Hello everyone, I see Belgrade has grown a lot.. what a beautiful renders and projects, there is any Subway/Metro Project to Build in the Serbian Capital?

raqn
May 13th, 2009, 01:04 PM
Hello everyone, I see Belgrade has grown a lot.. what a beautiful renders and projects, there is any Subway/Metro Project to Build in the Serbian Capital?

It's complicated. There are plans for metro system for decades now. But, we have stupid politicians that keep delaying start of construction, or are trying to push idea that something like LRT is enough. We'll see, there are some indications that Russian or Chinese goverment could fund the project if their companies build it (1. line), and that the construction may start relatively soon. For further info's, you should ask here http://www.skyscrapercity.com/showthread.php?t=289545&page=46

Luo
May 13th, 2009, 03:45 PM
Is it possible that most of projects are in the middle of nothing?? For example, i really like the spiral tower, but it seems out of the city center.

Sawovsky
May 13th, 2009, 04:52 PM
Is it possible that most of projects are in the middle of nothing?? For example, i really like the spiral tower, but it seems out of the city center.

Most of a skyscraper projects are in a New Belgrade area. It's a modern and well urbanised city center, developed in last 50-60 years.
As you can see below, it's not "in the middle of nothing" , but you might had receive that impression 'cuz it's full of wide malls, parks, greens surfaces...

Only thinks in lack are - skyscrapers :D

But, with realization of all this projects in next 5 years, it will have even better skyline :)

http://img255.imageshack.us/img255/8017/000nbgdpanwd6.jpg

CHIsentinel
May 14th, 2009, 12:14 AM
I like the aerial shots from the tower, I didn't realize Belgrade was so green!! Very nice!

Chupavi
May 22nd, 2009, 12:37 PM
At this link http://www.savabridge.com you can watch on the web cam in real time
how Sava bridge is growing

Galandar
May 24th, 2009, 05:18 PM
Nice developments in Belgrade

Goyazny
May 25th, 2009, 09:17 AM
Nasty concrete housing blocks , thank's God, have been redecorated with nice Parks.

Source Little lighting, Beobuild

http://i39.************/34pyxyf.jpg

http://i39.************/2k4y1x.jpg

http://i44.************/55fp90.jpg

http://i40.************/2n8pgrm.jpg

http://i41.************/k0gjys.jpg

http://i40.************/6zlgm1.jpg

Galandar
May 26th, 2009, 01:16 AM
^^Parks look so nice

Sawovsky
May 30th, 2009, 10:31 PM
http://i86.photobucket.com/albums/k93/zexland/BEOGRAD%20-%20BELGRADE%20Future%20project/ResizeofPicture1.jpg

http://i86.photobucket.com/albums/k93/zexland/BEOGRAD%20-%20BELGRADE%20Future%20project/ResizeofPicture10.jpg

http://i86.photobucket.com/albums/k93/zexland/BEOGRAD%20-%20BELGRADE%20Future%20project/ResizeofPicture2.jpg

http://i86.photobucket.com/albums/k93/zexland/BEOGRAD%20-%20BELGRADE%20Future%20project/ResizeofPicture3.jpg

http://i86.photobucket.com/albums/k93/zexland/BEOGRAD%20-%20BELGRADE%20Future%20project/ResizeofPicture4.jpg

http://i86.photobucket.com/albums/k93/zexland/BEOGRAD%20-%20BELGRADE%20Future%20project/ResizeofPicture5.jpg

http://i86.photobucket.com/albums/k93/zexland/BEOGRAD%20-%20BELGRADE%20Future%20project/ResizeofPicture6.jpg

http://i86.photobucket.com/albums/k93/zexland/BEOGRAD%20-%20BELGRADE%20Future%20project/ResizeofPicture7.jpg

http://i86.photobucket.com/albums/k93/zexland/BEOGRAD%20-%20BELGRADE%20Future%20project/ResizeofPicture8.jpg

http://i86.photobucket.com/albums/k93/zexland/BEOGRAD%20-%20BELGRADE%20Future%20project/ResizeofPicture9.jpg

Chupavi
June 2nd, 2009, 05:32 PM
A new bridge project over Danube!
A so cold Chinese bridge will be 1.499 m long, 29,10 m wide
width 6 lines, 2 bicycle and 2 walk sides
the construction will begun at the end of 2010

this is one of three proposal

http://www.blic.rs/_customfiles/Image/slike/2009/06_jun/02/beograd/most-x.jpg

grochu
June 3rd, 2009, 12:15 AM
Hm small render. Have you got two others? :) this one looks fine, but nothing special

Chupavi
June 3rd, 2009, 11:13 AM
This bridge is not in the city center that's why he is a bit ugly :lol:
the other 2 render are uglier :lol:

http://i43.************/2gxl5yt.jpg

but the other one (the construction already begun) is lovely :cheers:

http://www.beoland.com/aktuelnosti/pic/07/070604_2.jpg

CrazySerb
June 5th, 2009, 05:09 AM
Project: Airport City Belgrade - ~200,000 square meters of office space

(its called "airport city" due to its location on the grounds of former Belgrade airport)

Current situation:
http://i637.photobucket.com/albums/uu98/boris1988/2heh7xx.jpg

http://i637.photobucket.com/albums/uu98/boris1988/9tiyjd.jpg

http://i637.photobucket.com/albums/uu98/boris1988/2nbyerr.jpg

http://i637.photobucket.com/albums/uu98/boris1988/23r8y29.jpg

Five more towers will be built

http://www.beobuild.rs/visuals/data/media/3/080108-ACB-01.jpg

Chupavi
June 10th, 2009, 05:15 PM
Update on Sava bridge

http://i41.************/24zdijn.jpg
http://i43.************/4q0qhc.jpg
http://i39.************/2n1alg0.jpg

(photo shmeksi)

corvus_edin
June 12th, 2009, 06:04 PM
^^^ all of them in the same blue-green glass?

.

Chupavi
July 12th, 2009, 11:59 PM
C/U for B23

http://i30.************/30hlif9.jpg

http://www.beobuild.rs/visuals/data/media/1/090705-VN23-16.jpg

Sawovsky
July 13th, 2009, 10:36 PM
VIG Plaza

http://www.beobuild.rs/visuals/data/media/1/090705-VIG-01.jpg

http://www.beobuild.rs/visuals/data/media/1/090705-VIG-04.jpg

http://www.beobuild.rs/visuals/data/media/1/090705-VIG-08.jpg

Sawovsky
July 15th, 2009, 01:47 AM
Sava City

http://www.beobuild.rs/visuals/data/media/1/090705-SVG-02.jpg

http://www.beobuild.rs/visuals/data/media/1/090705-SVG-03.jpg

http://www.beobuild.rs/visuals/data/media/1/090705-SVG-05.jpg

http://www.beobuild.rs/visuals/data/media/1/090705-SVG-06.jpg

http://www.beobuild.rs/visuals/data/media/1/090705-SVG-10.jpg

http://www.beobuild.rs/visuals/data/media/1/090705-SVG-12.jpg

http://www.beobuild.rs/visuals/data/media/1/090705-SVG-13.jpg

http://www.beobuild.rs/visuals/data/media/1/090705-SVG-07.jpg

Sawovsky
July 15th, 2009, 11:55 PM
Energoprojekt

http://www.beobuild.rs/visuals/data/media/1/090705-EN26-01.jpg

http://www.beobuild.rs/visuals/data/media/1/090705-EN26-03.jpg

http://www.beobuild.rs/visuals/data/media/1/090705-EN26-05.jpg

http://www.beobuild.rs/visuals/data/media/1/090705-EN26-06.jpg

http://www.beobuild.rs/visuals/data/media/1/090705-EN26-12.jpg

http://www.beobuild.rs/visuals/data/media/1/090705-EN26-17.jpg

Chupavi
July 22nd, 2009, 03:24 PM
A litle update what is going on with constructions and projects in Belgrade city.

http://i30.************/29bebus.jpg

http://i28.************/8yyvt0.jpg

http://i27.************/10p3xgg.jpg

http://i25.************/119bj2w.jpg

http://i30.************/k03m6x.jpg

http://i30.************/23mmqt3.jpg

http://i32.************/2q3ud1x.jpg


The crisis is taking first victimes.

http://i25.************/1hwjk4.jpg

http://i26.************/dcq4c1.jpg

http://i30.************/sltavr.jpg

http://i31.************/2rzcl7s.jpg

http://i32.************/2088osz.jpg

http://i30.************/2dtyrg7.jpg

There are more projects, I will upload them in few days

Chupavi
July 23rd, 2009, 11:27 AM
And here is some more

http://i27.************/al5e6g.jpg

http://i27.************/ra7pee.jpg

http://i29.************/2zp86m8.jpg

http://i28.************/vmuebn.jpg

http://i30.************/r1h1sh.jpg

http://i30.************/2w4lje8.jpg

http://i28.************/6hhtft.jpg

http://i30.************/312jrr4.jpg

Goyazny
July 23rd, 2009, 12:01 PM
Chups, great presentation. Thank's.

Chupavi
July 31st, 2009, 02:03 PM
http://i31.************/wi517a.jpg

http://i31.************/2isxir4.jpg

http://i25.************/6ymykn.jpg

Markhoz
August 2nd, 2009, 03:15 PM
I love the Belgrade projects, amazing!!
Hi from Ourense City, Galicia-Spain.

Capricorn8
August 2nd, 2009, 04:53 PM
Good to see Serbia is building infrastructure.
You guys deserve to live a descent life.
Best regards from Russia.
Pomoz Bog!

P.S. I read in the press, that Partizan Belgrade is nearly bankrupt, how does this correlare with new stadium on the picture above?

Chupavi
August 3rd, 2009, 12:48 AM
^^
Partizan iz doing fine, the other Belgrade club, Red Star (Crvena Zvezda) is having a money problem.

Sawovsky
August 6th, 2009, 02:13 PM
Really nice work Chupavi! :cheers:

CrazySerb
August 9th, 2009, 07:57 AM
Great job with compiling all these projects, Chupavi:okay:


Avala tower reconstruction update:

http://i271.photobucket.com/albums/jj157/Nurko7000/obilaznica/DSC_9128.jpg

http://i271.photobucket.com/albums/jj157/Nurko7000/obilaznica/DSC_9154.jpg

http://i271.photobucket.com/albums/jj157/Nurko7000/DSC_9216.jpg

http://i271.photobucket.com/albums/jj157/Nurko7000/DSC_9216-1.jpg

http://i27.************/2dtbyps.jpg

http://i28.************/14wzx4o.jpg


Photos by Nurko & bgexplorer (Beobuild) :cheers:

Chupavi
August 27th, 2009, 10:20 AM
Some interesting googl earth pictures of a new bridge
originally posted by Vrachar
http://i20.photobucket.com/albums/b223/dljgmail/razno/Ada1.jpg

before the construction started
http://i20.photobucket.com/albums/b223/dljgmail/razno/Ada2.jpg

Chupavi
August 27th, 2009, 10:21 AM
Avala tower is very close to be finished

photo by Gidra
http://img196.imageshack.us/img196/560/23809.jpg

Chupavi
September 11th, 2009, 04:25 PM
Ada Bridge
http://i28.************/9psxs3.jpg

www.alo.rs

Youris
October 9th, 2009, 01:00 PM
Great stuff! Helped me a lot on my investigation on some hotel projects in Belgrade. Thanks!

Le Clerk
October 9th, 2009, 01:56 PM
Belgrade has some very neat projects. Good architecture but low rises. Why not high rises?

Singidunum
October 9th, 2009, 02:22 PM
City administration thinks that there is no need for "colossal naked architecture"

Le Clerk
October 9th, 2009, 02:33 PM
City administration thinks that there is no need for "colossal naked architecture"

"Collosal", maybe. But "naked"?

In any case, we have the same discussion here, and the bad think is that the city approves high rises in some areas where they should not be approved. The city just reject a Zaha Hadid tower proposal of more than 200 m in the center of the city... and we thought they would approve it. But this is just an exception.

I think high rises are good for the city view and for saving administration money and nearby nature. City sprawl is still a discussion of efficiency vs. comfort. However, it is also true that certain city areas should be spared of high rises or even modern buildings.

noir-dresses
October 10th, 2009, 11:21 AM
Should keep all the high rise's in one area, and make a new central business district.

You guy's have some nice project's there

Chupavi
October 22nd, 2009, 11:52 PM
Avala tower :cheers:

http://i33.************/2v1qkhi.jpg
photo stek

http://i37.************/4jkneu.jpg
photo ACR_

Chupavi
October 30th, 2009, 12:31 AM
Ada bridge
http://photos-g.ak.fbcdn.net/hphotos-ak-snc1/hs086.snc3/15340_164693726739_794946739_2665618_5461289_n.jpg

http://photos-a.ak.fbcdn.net/hphotos-ak-snc1/hs086.snc3/15340_164693731739_794946739_2665619_1179310_n.jpg

http://photos-a.ak.fbcdn.net/hphotos-ak-snc1/hs086.snc3/15340_164693791739_794946739_2665625_192959_n.jpg

BennyYarnell
October 30th, 2009, 09:57 AM
glass looks cheap...

It's probably just the filter on his lens. It makes the glass appear streaked and uneven.

Brko
November 1st, 2009, 04:25 PM
Kakva je ovo nova plava zgrada u pozadini ove slike dole ? Jel imate možda slike te zgrade iz blizine ?

http://www.imagesforme.com/upload/b0e84c39.jpg

Wuxa
November 1st, 2009, 10:41 PM
^^ Evo ti sa beobuild-a

http://www.beobuild.rs/read.php/198.html

Brko
November 2nd, 2009, 12:23 PM
^^ Wuxa hvala.:)

cardinals1
November 4th, 2009, 08:19 PM
^^
Here's a video of that building.

uZUDeMIZpbE

Chupavi
November 5th, 2009, 04:31 PM
VIG Plaza

http://www.beobuild.rs/visuals/data/media/1/091027-VIG-30.jpg
http://www.beobuild.rs/visuals/data/media/1/091027-VIG-24.jpg
http://www.beobuild.rs/visuals/data/media/1/091027-VIG-33.jpg
http://www.beobuild.rs/visuals/data/media/1/091027-VIG-16.jpg

www.beobuild.rs

lukaszek89
November 5th, 2009, 09:25 PM
Belgrade has big potenitial;)

YU-AMC
November 9th, 2009, 10:31 PM
It's all the western funds from the seaside building Belgrade. As they would say in 1970-1980s during the SFRJ days. haha

Bogdan BMB
November 14th, 2009, 01:20 AM
Nasty concrete housing blocks , thank's God, have been redecorated with nice Parks.

Source Little lighting, Beobuild

http://i39.************/34pyxyf.jpg

http://i39.************/2k4y1x.jpg

http://i44.************/55fp90.jpg

http://i40.************/2n8pgrm.jpg

http://i41.************/k0gjys.jpg

http://i40.************/6zlgm1.jpg

Very beautiful park :cheers:

Where is this?

Wuxa
November 14th, 2009, 01:39 AM
^^ New Belgrade :)

http://i586.photobucket.com/albums/ss303/Wuxa/aaa-1.jpg

Bogdan BMB
November 16th, 2009, 01:49 AM
^^ :cheers:

Chupavi
November 21st, 2009, 01:51 PM
ADA Bridge

http://www.beobuild.rs/visuals/data/media/1/091027-MADA-24.jpg


and now some pics by Archangel

This should grow to 200m!!
http://img693.imageshack.us/img693/5351/p1020377.jpg

http://img256.imageshack.us/img256/1954/p1020391w.jpg

http://img26.imageshack.us/img26/75/p1020378o.jpg

Bez_imena
December 12th, 2009, 12:53 PM
Exclusive Preview: Blok 12
http://i49.************/2v3iz2h.jpg
The media and public are already introduced to the plans to develop part of the block 12, facing Nikola Tesla boulevard in New Belgrade. Like the rest of the block where YUBC centre is now placed, this land lot was also a property of the Energoprojekt. This company was very serious in planning this development, waiting to find a proper partner that would help financing, just like the office building in block 26.

Their plans envisaged a hotel with 22.000sq/m and over 400 rooms and apartments, project which was several times presented and mentioned on our site. Change of plans happened with worsening economic conditions, so this exclusive land got a new owner and its development will be managed by the company “Razvoj Blok 12”, formed especially for this purpose. In the meantime new renders and space utilization plans were unveiled with possible building organization. According to plans we had opportunity to study, it is obvious that the new investor have chosen higher density, better utilization and assigned different functionality.

General urban plan for this block allows construction of high rise buildings and the general purpose of the land is for construction of residential and commercial facilities. Allowed occupancy of this block is 30%, while the rest of the space is considered public and green spaces. The location of block 12 is one of the most attractive in New Belgrade and overlooks Danube key on one side and SIV building on other. It is serviced by high infrastructure and great transport connections.

It is possible to develop around 130000 sq/m of gross space of which half will be used for residential purpose. Estimates say that there is a need and possibility of constructing a shopping centar as a part of the complex, that could have 10.000sq/m per floor area. Spaces between buildings are planned to be arranged with a lot of public greenery and water applications, while the parking would be completely solved by underground garage space.

As this city space got its new organization, we want to present the last design proposed by architect studio “Laguarda.Low Architects LLC”. They envisaged 2 or 3 high rise buildings with variable number of floors, depending on the needs of the investor and specifications of the detailed regulation plan. One of the proposals holds two buildings and a shopping center positioned in the corner, while other idea sees third high rise and a commercial lifestyle center in its base.

We are presenting exclusive latest models, in expectations of the further development of this significant investment. These models of the renowned architect studios are just confirming enormous investment potential of this location.

http://i46.************/29lmdyw.jpghttp://i46.************/353cas9.jpg
http://i49.************/25jjb6u.jpghttp://i49.************/2lnf50.jpg

http://www.beobuild.rs/read.php/384.html

Chupavi
January 18th, 2010, 01:17 PM
News from the bridge!

http://img76.imageshack.us/img76/3923/mostdpu4.jpg

http://www.beograd.rs/beoinfo/1374330_most_na_Adi_v.jpg

http://www.beograd.rs/beoinfo/1374336_most_na_Savi_v.jpg

BosnianLion
January 22nd, 2010, 10:34 PM
Great Projects :cheers:

Sawovsky
February 6th, 2010, 03:44 PM
Djokovic tennis complex

http://www.beobuild.rs/visuals/data/media/4/100204-TNDJ-01.jpg

http://www.beobuild.rs/visuals/data/media/4/100204-TNDJ-02.jpg

http://www.beobuild.rs/visuals/data/media/4/100204-TNDJ-03.jpg

SaRaJeVo-City
February 7th, 2010, 02:08 AM
^^awesome project..

CrazySerb
February 28th, 2010, 06:58 AM
Some more images of Belgrade's new waterfront project, as envisioned by Daniel Lebeskind:

http://behance.vo.llnwd.net/profiles2/150483/projects/422990/1504831266250594.jpg

http://behance.vo.llnwd.net/profiles2/150483/projects/422990/1504831266251162.jpg

http://behance.vo.llnwd.net/profiles2/150483/projects/422990/1504831266584619.jpg

NemanjaR.
March 1st, 2010, 07:53 PM
Red Star Apartmens tower 25f, ???m

http://www.mtsmondo.com/gallery/view_photo.php?IDPhoto=133708

Jel znas nesto vise o ovome? Jel ima nekakve veze sa Zvezdom?

NemanjaR.
March 1st, 2010, 07:54 PM
Red Star Apartmens tower 25f, ???m

http://www.mtsmondo.com/gallery/view_photo.php?IDPhoto=133708

Jel znas nesto vise o ovome? Jel ima nekakve veze sa Zvezdom?

CrazySerb
March 13th, 2010, 02:40 AM
New project in New Belgrade's Block 65 - a mixed office/residential complex to be built starting this summer, at a cost of ~200 million euros.

http://i43.************/2em1wef.jpg

Chupavi
March 16th, 2010, 07:54 PM
Sava bridge update!
all photos by Archangel
great job man! Respect man!

see next post
:lol:

Bg-Archangel
March 16th, 2010, 11:02 PM
you posted them wrongly since I can't see the pictures :D

http://img233.imagevenue.com/loc85/th_67665_P1040174_122_85lo.jpg (http://img233.imagevenue.com/img.php?image=67665_P1040174_122_85lo.jpg) http://img153.imagevenue.com/loc257/th_67685_P1040175_122_257lo.jpg (http://img153.imagevenue.com/img.php?image=67685_P1040175_122_257lo.jpg) http://img200.imagevenue.com/loc139/th_67712_P1040176_122_139lo.jpg (http://img200.imagevenue.com/img.php?image=67712_P1040176_122_139lo.jpg) http://img12.imagevenue.com/loc53/th_67728_P1040177_122_53lo.jpg (http://img12.imagevenue.com/img.php?image=67728_P1040177_122_53lo.jpg) http://img208.imagevenue.com/loc445/th_67750_P1040178_122_445lo.jpg (http://img208.imagevenue.com/img.php?image=67750_P1040178_122_445lo.jpg) http://img214.imagevenue.com/loc818/th_67769_P1040179_122_818lo.jpg (http://img214.imagevenue.com/img.php?image=67769_P1040179_122_818lo.jpg) http://img232.imagevenue.com/loc551/th_67787_P1040180_122_551lo.jpg (http://img232.imagevenue.com/img.php?image=67787_P1040180_122_551lo.jpg) http://img178.imagevenue.com/loc169/th_67801_P1040181_122_169lo.jpg (http://img178.imagevenue.com/img.php?image=67801_P1040181_122_169lo.jpg) http://img24.imagevenue.com/loc33/th_67820_P1040182_122_33lo.jpg (http://img24.imagevenue.com/img.php?image=67820_P1040182_122_33lo.jpg) http://img230.imagevenue.com/loc442/th_67835_P1040183_122_442lo.jpg (http://img230.imagevenue.com/img.php?image=67835_P1040183_122_442lo.jpg) http://img42.imagevenue.com/loc351/th_67844_P1040184_122_351lo.jpg (http://img42.imagevenue.com/img.php?image=67844_P1040184_122_351lo.jpg) http://img194.imagevenue.com/loc127/th_67859_P1040185_122_127lo.jpg (http://img194.imagevenue.com/img.php?image=67859_P1040185_122_127lo.jpg) http://img111.imagevenue.com/loc576/th_67873_P1040186_122_576lo.jpg (http://img111.imagevenue.com/img.php?image=67873_P1040186_122_576lo.jpg) http://img180.imagevenue.com/loc703/th_67892_P1040187_122_703lo.jpg (http://img180.imagevenue.com/img.php?image=67892_P1040187_122_703lo.jpg) http://img254.imagevenue.com/loc94/th_67910_P1040188_122_94lo.jpg (http://img254.imagevenue.com/img.php?image=67910_P1040188_122_94lo.jpg) http://img250.imagevenue.com/loc23/th_67923_P1040189_122_23lo.jpg (http://img250.imagevenue.com/img.php?image=67923_P1040189_122_23lo.jpg) http://img270.imagevenue.com/loc387/th_67941_P1040190_122_387lo.jpg (http://img270.imagevenue.com/img.php?image=67941_P1040190_122_387lo.jpg) http://img146.imagevenue.com/loc577/th_67956_P1040191_122_577lo.jpg (http://img146.imagevenue.com/img.php?image=67956_P1040191_122_577lo.jpg) http://img25.imagevenue.com/loc179/th_67970_P1040192_122_179lo.jpg (http://img25.imagevenue.com/img.php?image=67970_P1040192_122_179lo.jpg) http://img201.imagevenue.com/loc254/th_67987_P1040193_122_254lo.jpg (http://img201.imagevenue.com/img.php?image=67987_P1040193_122_254lo.jpg) http://img12.imagevenue.com/loc129/th_68001_P1040194_122_129lo.jpg (http://img12.imagevenue.com/img.php?image=68001_P1040194_122_129lo.jpg) http://img200.imagevenue.com/loc141/th_68016_P1040195_122_141lo.jpg (http://img200.imagevenue.com/img.php?image=68016_P1040195_122_141lo.jpg) http://img40.imagevenue.com/loc114/th_68029_P1040196_122_114lo.jpg (http://img40.imagevenue.com/img.php?image=68029_P1040196_122_114lo.jpg) http://img145.imagevenue.com/loc591/th_68048_P1040197_122_591lo.jpg (http://img145.imagevenue.com/img.php?image=68048_P1040197_122_591lo.jpg) http://img169.imagevenue.com/loc945/th_68061_P1040199_122_945lo.jpg (http://img169.imagevenue.com/img.php?image=68061_P1040199_122_945lo.jpg) http://img24.imagevenue.com/loc487/th_68076_P1040200_122_487lo.jpg (http://img24.imagevenue.com/img.php?image=68076_P1040200_122_487lo.jpg)

Bg-Archangel
April 8th, 2010, 03:51 PM
New pictures of Bridge across Ada Ciganlija: http://www.skyscrapercity.com/showthread.php?p=53037483#post53037483

Singidunum
April 22nd, 2010, 01:01 AM
Avala TV Tower is open again after ten years :cheers:

http://img686.imageshack.us/img686/3431/1388343avalskitoranjv.jpg

http://cache.daylife.com/imageserve/0aVa51t7Yg3PK/1000x.jpg

http://cache.daylife.com/imageserve/02qn7DSgBf23B/1000x.jpg

http://cache.daylife.com/imageserve/0b6FaYj2AP8mm/1000x.jpg

http://cache.daylife.com/imageserve/0gJr13U5DLcS9/x900.jpg

http://cache.daylife.com/imageserve/0dA9b1n9on5dU/x900.jpg

http://cache.daylife.com/imageserve/03Qjg2Jbyyezr/x900.jpg

http://cache.daylife.com/imageserve/0fkT5LDeHy2Be/x900.jpg

http://cache.daylife.com/imageserve/0aFq7HRafx2Dq/x900.jpg

http://cache.daylife.com/imageserve/09zD1CX37E0il/900x.jpg

:cheers:

LordMarshall
April 22nd, 2010, 09:02 AM
great to see it back up

MasonicStage™
April 22nd, 2010, 09:30 AM
wow, nice fireworks! :okay:

srpskizmaj
May 23rd, 2010, 01:57 PM
Does anyone have any updates about Freeways in Serbia? What is a current status? Does anyone have most up to date map which shows also work areas ?
What about plans of Freeways toword Montenegro?
I am also interested in seeing update in construction of new Railroad Station in Belgrade.

Kosovo je srbija :cheers

Sawovsky
May 25th, 2010, 02:22 PM
Does anyone have any updates about Freeways in Serbia? What is a current status? Does anyone have most up to date map which shows also work areas ?
What about plans of Freeways toword Montenegro?
I am also interested in seeing update in construction of new Railroad Station in Belgrade.

Kosovo je srbija :cheers:

http://www.skyscrapercity.com/showthread.php?t=489142&page=53

liburni
May 26th, 2010, 05:40 AM
Does anyone have any updates about Freeways in Serbia? What is a current status? Does anyone have most up to date map which shows also work areas ?
What about plans of Freeways toword Montenegro?
I am also interested in seeing update in construction of new Railroad Station in Belgrade.

Kosovo je srbija :cheers

what does the last part have anything to do with you question?

This is your first post and you are already trolling.

And I cant believe moderators allow Sawovsky to have such a hateful signature:ohno:

Bg-Archangel
May 27th, 2010, 02:37 PM
it's not hatefull, don't be sso nationalistic both :) back on topic

Today's update of Bridge across Ada in Belgrade

http://img12.imageshack.us/img12/5182/p1050470y.th.jpg (http://img12.imageshack.us/i/p1050470y.jpg/) http://img156.imageshack.us/img156/2527/p1050462z.th.jpg (http://img156.imageshack.us/i/p1050462z.jpg/) http://img534.imageshack.us/img534/1301/p1050469.th.jpg (http://img534.imageshack.us/i/p1050469.jpg/) http://img442.imageshack.us/img442/5664/p1050461u.th.jpg (http://img442.imageshack.us/i/p1050461u.jpg/) http://img710.imageshack.us/img710/3748/p1050467u.th.jpg (http://img710.imageshack.us/i/p1050467u.jpg/) http://img580.imageshack.us/img580/1130/p1050460.th.jpg (http://img580.imageshack.us/i/p1050460.jpg/) http://img31.imageshack.us/img31/710/p1050466r.th.jpg (http://img31.imageshack.us/i/p1050466r.jpg/) http://img532.imageshack.us/img532/3670/p1050459.th.jpg (http://img532.imageshack.us/i/p1050459.jpg/) http://img200.imageshack.us/img200/8761/p1050465w.th.jpg (http://img200.imageshack.us/i/p1050465w.jpg/) http://img217.imageshack.us/img217/4443/p1050456s.th.jpg (http://img217.imageshack.us/i/p1050456s.jpg/) http://img686.imageshack.us/img686/1949/p1050464o.th.jpg (http://img686.imageshack.us/i/p1050464o.jpg/) http://img535.imageshack.us/img535/6687/p1050455.th.jpg (http://img535.imageshack.us/i/p1050455.jpg/) http://img689.imageshack.us/img689/6797/p1050463j.th.jpg (http://img689.imageshack.us/i/p1050463j.jpg/) http://img375.imageshack.us/img375/271/p1050454.th.jpg (http://img375.imageshack.us/i/p1050454.jpg/) http://img24.imageshack.us/img24/8648/p1050453i.th.jpg (http://img24.imageshack.us/i/p1050453i.jpg/) http://img687.imageshack.us/img687/7254/p1050445q.th.jpg (http://img687.imageshack.us/i/p1050445q.jpg/) http://img691.imageshack.us/img691/6156/p1050452s.th.jpg (http://img691.imageshack.us/i/p1050452s.jpg/) http://img215.imageshack.us/img215/8350/p1050444bz.th.jpg (http://img215.imageshack.us/i/p1050444bz.jpg/) http://img41.imageshack.us/img41/3778/p1050451x.th.jpg (http://img41.imageshack.us/i/p1050451x.jpg/) http://img443.imageshack.us/img443/4703/p1050443.th.jpg (http://img443.imageshack.us/i/p1050443.jpg/) http://img514.imageshack.us/img514/365/p1050449.th.jpg (http://img514.imageshack.us/i/p1050449.jpg/) http://img199.imageshack.us/img199/2279/p1050442i.th.jpg (http://img199.imageshack.us/i/p1050442i.jpg/) http://img44.imageshack.us/img44/2140/p1050448.th.jpg (http://img44.imageshack.us/i/p1050448.jpg/) http://img188.imageshack.us/img188/1566/p1050441a.th.jpg (http://img188.imageshack.us/i/p1050441a.jpg/) http://img188.imageshack.us/img188/2025/p1050447k.th.jpg (http://img188.imageshack.us/i/p1050447k.jpg/) http://img64.imageshack.us/img64/5959/p1050440.th.jpg (http://img64.imageshack.us/i/p1050440.jpg/) http://img692.imageshack.us/img692/1373/p1050446.th.jpg (http://img692.imageshack.us/i/p1050446.jpg/)

srpskizmaj
May 27th, 2010, 10:10 PM
what does the last part have anything to do with you question?

This is your first post and you are already trolling.

And I cant believe moderators allow Sawovsky to have such a hateful signature:ohno:


Thank you for link poining to motorway construction status. I appreciate that.
This is my first post but how stong !!! This shouldn't hurt you as it is true. Kosovo is Serbia forever.
I love Avala Tower. It is great and looks beautiful. I'll try to visit this place next year.
I have seen many posts about project i in Belgrade but there is no much update. Can anyone show what has been successiful finished?
Does anyone have any phonos of Cental railroad station in Belgrade which was started but I think never finished.
What about metro? Airport city? What about bridges (na Adi, savi i dunavu)?
What about station "Vukov Spomenik"
Thank you to everyone who would like to share pictures.

All the best Serbs :lol:

Sawovsky
May 28th, 2010, 08:22 AM
what does the last part have anything to do with you question?

This is your first post and you are already trolling.


The fact that he sad "kosovo je srbija" in Serbian means that he wasn't trolling, it was more like a salute to as Serbians.


And I cant believe moderators allow Sawovsky to have such a hateful signature:ohno:

It's not hateful, it is an old traditional anthem of Montenegro, and it's directed to ottoman occupants, so it has nothing to do with Albanians ;)

http://en.wikipedia.org/wiki/Onamo,_'namo!


Thank you to everyone who would like to share pictures.

All the best Serbs :lol:

This thread is more like a presentation of Belgrade P&C to a global community of ssc(this site), for more detailed informations you should ask on a link below, wich is a thread about Belgrade p&c, but in serbian part of skyscrapercity and it's much more active.

http://www.skyscrapercity.com/showthread.php?t=442214&page=467

Chupavi
May 31st, 2010, 07:03 PM
New plans for a Red Star stadium!

http://www.mondo.rs/slike/vesti/001/715/v171574p0.jpg

http://www.mondo.rs/slike/vesti/001/715/v171574p2.jpg

more news as it come

Aireos
June 10th, 2010, 02:11 AM
Block 65 looks very good.

Bez_imena
June 12th, 2010, 11:33 AM
Shipyard Belgrade

http://behance.vo.llnwd.net/profiles2/150483/projects/422990/1504831273535302.jpg

http://behance.vo.llnwd.net/profiles2/150483/projects/422990/1504831273535762.jpg

http://behance.vo.llnwd.net/profiles2/150483/projects/422990/1504831273535330.jpg

http://behance.vo.llnwd.net/profiles2/150483/projects/422990/1504831273535928.jpg

http://behance.vo.llnwd.net/profiles2/150483/projects/422990/1504831273535942.jpg

http://behance.vo.llnwd.net/profiles2/150483/projects/422990/1504831273535957.jpg

http://behance.vo.llnwd.net/profiles2/150483/projects/422990/1504831273536236.jpg

http://behance.vo.llnwd.net/profiles2/150483/projects/422990/1504831273536251.jpg

http://behance.vo.llnwd.net/profiles2/150483/projects/422990/1504831273536266.jpg

http://behance.vo.llnwd.net/profiles2/150483/projects/422990/1504831273536597.jpg

http://behance.vo.llnwd.net/profiles2/150483/projects/422990/1504831273536672.jpg

http://behance.vo.llnwd.net/profiles2/150483/projects/422990/1504831273536689.jpg

CrazySerb
June 13th, 2010, 03:58 AM
Actually, that's Port of Belgrade, on Danube river.:)

Belgrade shipyard is located on Sava river and there's a similar project for its redevelopment:

http://www.abaconsult.rs/images/nagrade/plakat.jpg

Le Clerk
June 13th, 2010, 11:43 AM
Amazing projects proposed for Belgrade Port and Belgrade Shipyard! :applause:

Is there a timeline for any of them? :):cheers:

Honest_John
June 26th, 2010, 04:47 PM
Timeline is like from here to eternity! :lol:

Sawovsky
June 29th, 2010, 02:06 AM
Timeline is like from here to eternity! :lol:

More like from distant future to eternity :lol:

Bez_imena
July 2nd, 2010, 01:54 PM
Plans for Block 65 Development
http://i50.************/bi2p1z.jpg

Today the public was introduced with a new ambitious project of urban development of block 65 in New Belgrade. What was presented is a multifunctional complex which could set new standards in sustainability and offers highest quality features for modern city life.

The project is planned to be built in block 65, on the corner of Omladinskih Brigada Street and future route of the inner city half ring road (UMP), holding impressive 152.437 sqm of residential and office space. The buildings making this complex vary in height and form, so they break the usual uniformity of the New Belgrade’s blocks. The land lot for this development covers an area of 30.316 sqm and it is planned to construct 106.106 sqm of space above ground and another 46.331 sqm in underground floors including an underground garage with 545 parking places. The space in the buildings will be organized in 514 residential units and 100 commercial units, where entire office and business apartment segment will hold 37.058 sqm.

http://i46.************/1zzj39u.jpghttp://i47.************/2h4yusn.jpg

This complex is clearly divided into two sections, where in one dominates residential space while other houses large shopping center and office tower with offices and business apartments. It is interesting that when this tower is finished, it will be the tallest building of that kind in Belgrade with 39 floors and 146 meters tall structure.

According to the investors, they had special demand with the designers to bring the spirit of old town to New Belgrade. The complex will fully use all the advantages of comfort and privacy that offers life in New Belgrade, but also it will have features characteristic for the old town like small squares and pedestrian areas. This is especially visible in the design and function of the ground floors. The architectural solution was made by London studio "Fletcher Priest".

What we found very interesting is the fact that this project intends to fulfill ecological standards of sustainability through different innovative technologies, eco-materials, renewable energy and optimal use of available natural resources. It is announced that the complex will use underground water, rain water and part of the energy used will be from solar and wind installations.

The construction is planned in two phases, where the first phase will include the construction of the residential section of the complex on the opposite side of Omladinskih brigade street, while the second phase will covers the construction of the shopping mall and office tower. The first phase will commence in September 2010, with plans to complete the entire complex in 2013. This investment is estimated to be worth 170 million Euros and it will be the largest single investment in Belgrade this year. the investor is international company "PSP-Farman Holding".

http://i47.************/14dgflz.jpg
http://i49.************/5yhqgm.jpg
http://i50.************/2s00k1c.jpg

http://www.beobuild.rs/read.php/419.html

Hepec
July 2nd, 2010, 05:31 PM
Wow, this would dwarf all other projects on Balkans.

Singidunum
July 28th, 2010, 02:35 PM
Ada bridge - July 2010 update

http://www.beobuild.rs/visuals/data/media/1/100727-MADA-01.jpg

http://www.beobuild.rs/visuals/data/media/1/100727-MADA-22.jpg

http://www.beobuild.rs/visuals/data/media/1/100727-MADA-52.jpg

http://www.beobuild.rs/visuals/data/media/1/100727-MADA-35.jpg

http://www.beobuild.rs/visuals/data/media/1/100727-MADA-25.jpg

EagleX
July 30th, 2010, 03:49 PM
^^Can't wait to see it done!
I just hope that the Port of Belgrade will be constructed.:)

Singidunum
August 18th, 2010, 09:45 PM
http://img299.imageshack.us/img299/6951/beznaslovat.png

http://img245.imageshack.us/img245/5936/beznaslova2.png

This was the initial plan by Adrian Smith

http://www.beobuild.rs/visuals/data/media/3/080723-HKP-VS-02.jpg

Honest_John
August 27th, 2010, 01:19 PM
I think that original project is better because it goes way nicer with Danube! It's simple, clean and elegant! This new one is ok, but nothing special, could fit in nicely in M.Milankovica Blvd perhaps.

Chupavi
September 9th, 2010, 12:04 PM
Ada bridge

http://www.savabridge.com/images/poze/august2/august07.jpg
http://www.savabridge.com

http://a.imageshack.us/img337/1715/img8333b.jpg
posted by dovlisa at www.beobuild.rs

Bez_imena
September 12th, 2010, 08:15 PM
http://i55.************/2nv7c53.jpg

Bez_imena
September 20th, 2010, 02:10 PM
Finished projects - Blue Center

http://i56.************/2i0bxub.jpg

Another project from our selection is on the market now, so we are moving it to a category of finished ones. We have also prepared you a complete photo report of the exterior and interior of the building, as we did our small tour of the complex. It is office building in New Belgrade’s block 26 on the corner of Spanskih boraca street and Mihajla Pupina boulevard.

This commercial and business project called “Blue Center” has 50.000 sq/m of space on ten floors, including first class office and commercial space served by 392 parking places in its two-level underground garage. The leasable area is modern and flexible to meet all needs of its future tenants.

The construction of this business block started more than 5 years ago. The development was initiated by construction firm “Energoprojekt”, but due to financial problems they temporarily halted works and started searching for partner in this project. In the mid 2007. Greek company “Blue House” signed a contract with plans to invest in completion and the construction works continued. In the beginning of 2008 construction site was reactivated and the building was completed in given deadline. During 2010 most of the finishing works on the interior were completed and surroundings were arranged with greenery and movables.

This is second office building in block 26, which was promoted as new business district. Plans for the development and urbanization of this block envisaged construction of more than half a million square meters of multifunctional space, creating conditions for investors to build a number of high rise office towers.

http://i56.************/2ppkc47.jpg
http://i54.************/730aa8.jpg
http://i55.************/2lucnk7.jpg

www.beobuild.rs

lestanac
September 20th, 2010, 09:25 PM
da ozivim malo ovu temu.... iako je poslednji post u 2..... xD
kao 1. drago mi je sto se u ovoliko broju i ovoliko brzom vremenu menja Beograd... ali stvarno ne mogu da verujem da postoje neke budale koje ne zele da postave jos prepoznatljivih zgrada za bg.... kao prvo, sada su u "trendu" visoke zgrade.... sto mi uopste nije jasno sto se to kod nas ne ostvaruje.... bas bzvz.... znam da nismo bogati.... ali ipak..... ako imaju para za ovoliko gradnje, mogu barem da naprave neku zgradu od 300 m.... to bi bilo dovoljno..... u redu je za Avalski toranj, to je vec na perifieriji grada.... ovako u beogradu nema nista toliko prepoznatljivo.... postoje, anravno hram, beogradjanka, zgrada usce..... sada ce simbol postati i ovaj most.... to mi je bas drago, jer izgleda moderno....
eng
to revive this topic a bit .... though the last post in the 2 pm .... xD
as 1. I am glad it is in such great numbers and so many rapid changes over time Belgrade ... but I really can not believe that there are some fools who do not want to put more recognizable buildings in Belgrade .... First, now in the world are really "trendy" high building .... But I just don't understand why isn't that achieved here ..... I know that we are not rich .... but still ..... If you have the money for such a huge number of building sites, they can at least make a building of 300 m. ... that would be enough ..... it's okay for Avala tower, it's on the side of the city..... but nothing else so recognizable .... There are of course temple of St. Sava, "beogradjanka", Usce tower ..... I like the thing that Ada bridge is going to be another symbol of Belgrade .... I'm just happy for it, because it looks really modern .... hope to see something finished from this...

Bez_imena
September 24th, 2010, 04:58 PM
http://i53.************/29azhxu.jpg

Bez_imena
October 4th, 2010, 04:38 PM
Gazela Bridge - report

Three months have passed since the reconstruction of “Gazela” bridge commenced. So far, the reconstruction included modernization of access ramps and the repair of the top mainframe steel structure. The next phase of reconstruction will entail significant repair work of the bridge beneath the car lanes, on the steel structure of the main span.

The repair of the access ramps involved complete demolition of the old concrete barriers and and the installation of new ones, along with a construction of new steel banisters. Further, the construction crew removed the existing driving barriers and installed new ones between the lanes on the concrete section of the bridge. The new barriers are installed on a brand new steel structure, reinforcing their strength.

All access ramps at the Mostar interchange (Savska Street and Vojvoda Misica Blvd.) will reopen on the 6th of October, 2010. The access ramps on the New Belgrade end of the bridge will remain closed until the end of October 2010 due to delays in the initial construction start date.

Following the completion of this reconstruction phase, there are no planned construction road blocks until next Spring. After a short break, starting March 15th, 2011 a new phase of reconstruction will commence, at which point there will be significant road blocks and traffic delays due to construction. The city officials are working on possible alternative routes in order to mitigate the traffic congestion anticipated due to bridge lane closures. As updates become available, new information will be posted.


http://www.beobuild.rs/visuals/data/media/1/100929-GZL-33.jpg

http://www.beobuild.rs/visuals/data/media/1/100929-GZL-39.jpg

http://www.beobuild.rs/visuals/data/media/1/100929-GZL-43.jpg

www.beobuild.rs

Galandar
October 4th, 2010, 05:40 PM
Singidunum, I am really suprised to see your avatar :eek: Thanks a lot! :cheers1:

Bez_imena
October 7th, 2010, 07:15 PM
Casa di Gloria

http://i52.************/2rxejrm.jpg

Two nights ago in the very center of Belgrade and in the presence of numerous guests from the local political, cultural and public life, opened a new residential project "Casa di Gloria". The investor of the project is Italian company “Edil Italiana".

The building is located on the corner of Knjeginje Zorke street and Makenzijeva street and represents the first investment in line, as Italian investor "Edil Italiana" has long-term investment plans for Belgrade.
On seven floors “Casa di Gloria” houses a total of 30 apartments with highly variable structure from 50m2 to 200m2, with very similar surface area apartments offering various layouts.
The project is offering high standards of living comfort: high quality construction, finishing works and functionality of interior solutions.
Exclusive agent selling residential and commercial space in “Casa di Gloria” is a company CB Richard Ellis.

beobuild.rs
www.casadigloria.com

Bez_imena
October 14th, 2010, 04:08 PM
http://i52.************/2cmuqva.jpghttp://i55.************/110kajm.jpg (www.west65.rs)


West65 is designed as a mixed-use complex encompassing residential, commercial, office, business apartments and service facilities.
It is the investor’s intent to build a new landmark of New Belgrade, offering its future occupants uncompromising quality and comfort in addition to modern design and concept.

LOCATION
West 65 is situated on one of the most attractive locations in New Belgrade - at the corner of Omladinskih brigada Street and the inner city half-ring road route. The location features very well-developed traffic infrastructure and public transportation network, enabling quick and convenient access to all parts of the city. The immediate vicinity of the complex abounds in shopping, office and service centres, thus adding to the quality of life and business.

ABOUT WEST
West65 represents a contemporary mixed-use complex designed to meet all requirements of modern living. Thanks to the peculiar urban and architectural concept, the complex shall reflect the spirit, charm and atmosphere of old Belgrade. West 65 was designed by Fletcher Priest, a renowned London architectural firm, and architects of PSP-Farman Holding.

West 65 concept includes residential buildings varying in form and number of floors, a unique mixed-use tower, a shopping centre, spacious pedestrian areas, retail and service stores within the ground floors of residential buildings, a square in the centre of the complex and a two-level underground garage. Similarly to pedestrian zones typical for downtown city areas and prestigious shopping centres, West65 shall comprise numerous carefully chosen contents, including famous brand-name stores, catering and service establishments, a supermarket and specialized stores for consumer goods, a spa and wellness centre, leisure facilities and many other amenities.

TOWER
According to the architectural design, one of the most modern and tallest buildings in Belgrade, having a unique and distinctive form, is planned to be built at the corner of Omladinskih brigada Street and the inner city half-ring road route.

According to the conceptual design, the tower will contain two separate organizational units. The first organizational unit will contain A-class office space, whereas the second one shall comprise apartments serviced according to standards of international hotel operators.

* Tower area: 37 058 m˛
* Tower height: 146 m
* Floors in tower: GF+39
* Individual floor area: 900 to 1200m2
* Apartment area: 80 to 200 m2

RESIDENTIAL
The residential segment of the complex provides future residents with privacy and comfort reflecting the atmosphere of downtown pedestrian zones.
The diversity of functions and predefined uses of the commercial and service segment of the complex will be able to satisfy all the usual and everyday needs of a modern man.
Up-to-date architectural solutions, technological innovations, top-class and environment-friendly materials, responsible management and all-in-one-place concept altogether represent a guarantee for a high quality of living.

http://i52.************/2ihqatx.jpg

B4zeS--4DCg?

kubura
October 15th, 2010, 05:34 PM
Kolika je vrednost projekta?

Bez_imena
October 15th, 2010, 07:41 PM
170 miliona evra. :)

Bez_imena
November 18th, 2010, 03:04 PM
Restoration of Pionirski park fountain

As a part of the Pionirski Park reconstruction, began the restoration of the famous fountain "Girl with a jug”, which will be modernized, enriched with new fountain jets and equipped with completely new lighting effects.

http://i54.************/mv3s5y.jpg

Restoration of the Pionirski Park was announced over 3 years ago, but due to lack of funds delayed several times. According to recent announcements, the reconstruction could start next spring. Since this is a park that is protected as a natural asset, it needs a number of special permits, so the overall reconstruction could begin. The works would include repair of paths and terraces, revitalization of the monuments, fountains and fountain repair, restoration of vegetation, replacement of furniture and equipment, repair and upgrading of drainage, irrigation systems and installing decorative lighting, and set up a small music pavilion.

As part of a plan to renovate the park, the Secretariat for public utility services with the consent of the Institute for Protection of Monuments of Culture will complete the rehabilitation of park’s fountain. Renovation project includes the construction of a new recirculating fountain, new water and light effects in the pool, and construction of a pump-filter control room. To ensure the required quality of water in the pool and avoid unnecessary cost of using fresh drinking water, the fountain will have integrated system of circulation and filtration of drinking water, thus saving energy and water. For these and other technical requirements under the fountain was built control room from which will be used to manage system pump, filters and fountain lighting. The entire reconstruction project was prepared by a reputable institute for water management "Jaroslav Cerni”.

Currently, the newly built concrete structure of the fountain is being covered with "Africa Red" stone slabs, which will cover the outer and inner walls of the ground floor, and around the fountain will be built and small plateau with stone slabs of the same type. We performed a tour of the works, where we made a small photo report for you.

http://www.beobuild.rs/visuals/data/media/3/101115-KRCG-02.jpg
http://www.beobuild.rs/visuals/data/media/1/101116-KRCG-02.jpg
http://www.beobuild.rs/visuals/data/media/1/101116-KRCG-03.jpg

Bez_imena
November 30th, 2010, 11:46 AM
National Museum - Reconstruction

http://i55.************/x2md1f.jpg

Today the announcement held in the building of the National Museum declared the winner of the competition for conceptual architectural design for adaptation and extension of this building. At the two-stage competition for the preliminary design and spatial analysis program of reconstruction of the National Museum in Belgrade, the first prize won a project of Vladimir Lojanica, which we present on this occasion to the general public.

Up until World War II museum was housed in the Novi Dvor building, but after the liberation it moved into the building of Hipotekarna banka, in today's Republic Square, where he remained until now. This was exactly the building which was subject of competition for adaptations, in order to provide even better functionality and provide more exhibition space for extra large and almost priceless collection that the museum owns. The museum is now closed to visitors for 8 years, and during that time there was several attempts to find a solution that would provide the necessary conditions to preserve and display cultural treasures.

Previous attempts to develop and implement a plan of repairs have failed precisely because of high price of the planned works, but any serious renovation and modernization of this building is inevitably an expensive proposition. Especially if we bear in mind that this is a building which was not originally designed for that purpose and significant limitations of the given location. As before, today's preliminary proposals also include underground extension as a spatial expansion of exhibition and other usable space. As this is the only way to effectively extend the building, not to jump out of the existing vistas, the cost question remains and therefore its feasibility. According to Mr. Lojanica whose work won the contest, special effort has been invested for the financial side of the project to remain on the rational side.

To remind readers, the Board of the Museum decided in its internal discussion that a solution for this building should include reconstruction of existing building, and therefore abandoned the idea for the Museum to build a new building that would create a functional, architectural and technical characteristics necessary for that purpose. Price difference between these two projects is relatively small, bearing in mind advantages of the new facility by implementing all the modern applications of the museum space. The decision was made in accordance with the traditions and habits of citizens, so the museum will be kept in the former bank building, and strict conditions are to determine the parameters by which the facility will be further adjusted to the new function.

Conceptual design Vladimir Lojanica and his team involves increasing the exhibition space for more than a third, and other modifications will offer significantly more space and improved working conditions for other services. The extension would be located below the plateau to the Republic Square, and the museum atrium is to be placed under the roof, which will provide even more space. Asymmetric exhibition space and a prominent feature of the main staircase gives a special ambience for all visitors, but reconstruction also includes other content that should enrich the experience for all guests.

The winning paper is a preliminary design, and is only one step on the way to solving problems of the National Museum. We are presenting winning proposal in detail plans, photos and even video walk-through simulation.

beobuild.com

uF2fKQOxGDs&

EUSERB
November 30th, 2010, 09:52 PM
I was just passing through Belgrade yesterday and fell in love with it,just looking from the highway!I've been to BG before but everytime i pass through it i always love it even more!

Bez_imena
December 22nd, 2010, 09:19 PM
http://i52.************/fmpeth.jpg

After almost 30 years, this September saw announcement for an international competition for conceptual design of the Centre for Promotion of Science in New Belgrade’s block 39. Professional community has shown great interest in this competition in which they received 232 entries from 47 countries worldwide. The winner of international competition for the architectural design of the Centre for the Promotion of Science in Belgrade Block 39 is Austrian architect Wolfgang Tschapeller, which by international election commission offered the best solution to meet the needs of its function and location in which the object is being located.

Austrian architect offered a unique solution in which object will have two main levels to include exhibition space, conference rooms, science labs and planetarium.

It was announced that the project documentation will be completed by spring 2011, when the start of construction of the center is planned. The completion of the building is optimistically scheduled for 2012 year.

http://www.beobuild.rs/visuals/data/media/4/101217-CPNT39-02.jpg

http://www.beobuild.rs/visuals/data/media/4/101217-CPNT39-04.jpg

http://www.beobuild.rs/visuals/data/media/4/101217-CPNT39-05.jpg

http://www.beobuild.rs/visuals/data/media/4/101217-CPNT39-06.jpg

beobuild.rs

Bez_imena
February 22nd, 2011, 02:40 PM
New Hotel in Block 11a

According to the news from the hotel group "Falkensteiner", already announced project of hotel construction in New Belgrade's block 11a could enter the realization very soon. According to investors, the necessary permits were obtained in December last year. The project investment will be carried by joint venture of "Falkensteiner Michael's Tourism Group” and investment fund "MOF Beta Estate AG”.

This is a project of 24,200 square meters, which will be built on the site of Block 11a in New Belgrade, near the center of VIG Plaza building and “Energoprojekt” headquarters in the Mihajlo Pupin boulevard. The value of investment is estimated at 40 million Euros, while the completion of the project is planned for the second quarter of 2012.

This modern complex will include interconnected hotel and office tower of 11 floors (ground + 11 floors). A four-star hotel will have 171 room, suites, conference room, an area designed for ceremonies and celebrations, spa and "Executive lounge". The renowned architect originally from Belgrade, Boris Podrecca, who lives and works in Vienna, is the author of entire concept of this modern city hotel in New Belgrade.

http://www.beobuild.rs/visuals/data/media/4/110221-FKST-01.jpg

http://www.beobuild.rs/visuals/data/media/4/110221-FKST-02.jpg

beobuild.rs

Bez_imena
March 24th, 2011, 07:24 PM
New Belgrade Bridge - 200m

http://img535.imageshack.us/img535/4206/16822561.jpg

http://img196.imageshack.us/img196/2160/75407970.jpg

http://www.skyscrapercity.com/showthread.php?t=834560

madridhere
March 24th, 2011, 11:56 PM
WWWWWoowwww very futuristic projects!!!!:nuts::nuts::nuts:

Bez_imena
April 18th, 2011, 03:56 PM
Interesting new residential building in Belgrade

"Infinity" Belgrade

In all parts of the world, the best and the most durable works of architecture are those that are inspired by their surroundings as their natural part. Inspired by water, which shaped the position, life and soul of Belgrade, top architectural team has designed "Infinity", the new concept of life in the very center of the city, in the borough of Dorćol.

Project "Infinity" gathers top architects, designers, engineers, horticulturists. "Infinity" comprises six residential-business suites. Each of them occupies one floor, except for the suite on the seventh floor, which is a two-storey suite.

This unique building in the capital city will enable its tenants completely digitalized control over all communication devices, lighting and air conditioning systems, fire protection system, security, and even music.

Modern technology enables designing of an optimal, flexible and integrated system that can be completely adapted to the specific way and style of life, current activities, mood and habits of tenants.

Such technologies make it possible for a family of today to program the variety of work regimes for the systems in a smart home, which can depend on the criteria like relaxation, rational consumption of energy, or safety.

Central control console "touch screen" or remote controllers can be used to control lighting, heating, air conditioning, household appliances, as well as the facility's surveillance system.

http://img512.imageshack.us/img512/3734/infinityvn1.png

A big outlet with the window and the entrance facing the street occupies the ground floor, the first floor and the basement of the facility. The garage for passenger vehicles is situated on the underground floors of the facility, which can be accessed via car elevator. All floors are connected to each others by means of stairs and private elevator.

- Our opinion was that the apartment at 100 square meters can not be comfortable, and that is why "Infinity" suites occupy about 240 square meters each.

The street facade is double, covered by quality glass, which only one Dutch company accepted to do. Original glass facade is made of specific material that has, so far, been used only in construction of one hotel and one yachting club. Its role is to prevent noise, as well as to create another ambient because that space will serve as a big jardinere. The idea is that various plants be planted in it. The most imaginative horticulturists are hired to create a Mediterranean oasis of freshness and greenery in the heart of the city.

The research of the structure of urban apartments led the authors to finely balance day and night zones, and create an apartment in which the privacy of each member of the family is as important as the premises where all the family members gather. What is even more important, according to the authors, is the existence of different ambiental zones where every member of the family can find his or her own corner, in accordance with his or her needs and affinities.

http://i56.************/qqrdx2.jpg

http://i55.************/avig6d.jpg

http://i54.************/2aim3xd.jpg


http://www.smartko.com/cms_upload/publication/files/30_infinity_dnevna.jpg

http://www.smartko.com/cms_upload/publication/files/30_infinity_spavaca.jpg

http://www.smartko.com/cms_upload/publication/files/30_infinity_kuhinja.jpg

http://www.smartko.com/cms_upload/publication/files/30_infinity_kupatilo.jpg

www.infinity-beograd.com

Bez_imena
April 19th, 2011, 09:06 PM
Kempinski Hotel Belgrade

Kempinski Hotels will manage the former Hotel Yugoslavia in Serbia’s capital Belgrade. The opening of the 280-room luxury hotel is scheduled for 2012, after complete renovation of the existing building.

Kempinski Hotel Belgrade is prominently situated on the River Danube, an integral part of Belgrade’s vibrant new waterfront centre. Belgrade, one of Europe’s oldest cities, is the capital of Serbia. It has about 1,700,000 million inhabitants and is the fourth largest city in Southeast Europe after Istanbul, Athens and Bucharest.

The 5-star luxury hotel will be part of a new complex comprising of spacious wellness facilities, shopping outlets, several restaurants, approximately 1500 m2 of meeting space and underground parking. Residential apartments will be added at a later stage. A casino, which is part of the complex, is already open. Designed not only to serve the business traveller, but also as the ideal leisure resort, the hotel aims to be the perfect combination of both – a unique City Resort. Famed and innovative architects Adrian Smith + Gordon Gill Architecture will focus on contemporary and timeless design, combined with innovative details. A unique park with fountains will surround the hotel, making it an oasis of tranquillity. Innovative restaurants serving trend-setting cuisine will offer discerning travellers the best dining experience in the city.

http://i54.************/2n07g28.jpg

http://i56.************/9940hh.jpg

Bez_imena
May 20th, 2011, 11:42 PM
Bank building HQ in block 11a

In recent years, block 11 is one of the most active construction sites in New Belgrade, and therefore one of the most important in the city. Several very interesting projects of combined use were initiated covering over 100,000 square meters. With its modern architectural expression they represent the face of New Belgrade in the new millennium.

In this exclusive New Belgrade’s block, in addition to already completed VIG Plaza, also started construction of a hotel belonging to the Falkensteiner chain, and parcel of the former Chinese embassy was rented to a domestic investor. In addition to these projects, recently has been announced yet another significant building in this block. This is a new business headquarters of Intesa bank on the corner of Mihajlo Pupin boulevard and Ulice Tresnjinog cveta, which will cover 30,000 square meters while the value of the entire investment is estimated at 45 million Euros. The building will be built to the highest LEED environmental standards, and the project is architectural work of well-known Belgrade architect Vladimir Lojanica, with co-author Anja Ivana Milic, architect in front of the “Arhipro” studio.

http://i52.************/rku7gy.jpg

Commercial property bank. It is a corner building, approximately 30,000 m2 floor area, underground and above ground. About 200 parking spaces in underground levels. Total number of floors is 12+ground floor. Important features of the object that I would highlight multi-level entrance hall with a gallery of artwork and café for visitors with the possibility of going out to the summer garden, a nursery for employees' children, multifunctional hall with 200 seats, a restaurant for guests and employees with a roof terrace, and recreation facilities and business apartments.

http://www.beobuild.rs/visuals/data/media/3/110509-INTESA-VS-08.jpg

beobuild.rs

Bez_imena
June 4th, 2011, 11:47 PM
Public Prosecutor's Office unveiled

The architectural competition for the new building of the Public Prosecutor's Office, which is planned in Kneza Milosa street not far from the Ministry of Foreign Affairs, was completed a month ago. Winners were from ARCVS studio and this time we are presenting our visitors with an exclusive presentation of the winning solution, which won the first prize in competition with four other proposals.

Although the competition for the preliminary design is completed, the project is still in the process of collecting documents and we can’t reliably tell when will start the preparation of project documentation or construction.

Building of the Prosecutor’s office will cover eight floors above ground, which will hold 12,170 square meters, with an additional 6,760 square meters in the underground section. Following the ideas of architects from ARCVS studio, the ground floor did not insist on the usual forms, like the colonnades, large staircase or portals. Their proposal was somewhat spontaneous in design with a direct communication with the street and passers-by, relying on a strong line of trees in the street of Knez Milos. If we take into account the fact that the contact of a such institution with the public is through the halls and waiting rooms, then this concept of visual and functional communication of the ground floor with porch and sidewalk in front of the building, is more than justified.

According to the architects, a problem that could not have been avoided is the traffic cutting off the sidewalk with ramps. Cars will therefore need to access the garage from the front of the building, crossing the sidewalk. It is the only functional complaint we have, which the authors could not resolve differently in given conditions.

Object’s height follows already established line in this street, and as ARCVS bureau said, the facility is designed to correspond to a rich plastics on the façade of the Polish Embassy on its left side, then moderation of the residential building and aesthetics of the dome of the Ministry of Foreign Affairs building on the right side.

http://i52.************/50mxyw.jpg

http://i51.************/jr3860.jpg

http://i54.************/2s67m7b.jpg

beobuild.rs

Bez_imena
June 29th, 2011, 10:57 PM
Dimitrija Tucovica
RESIDENTIAL / BUSINESS BUILDING

The future mix use project in Dimitrija Tucovica street no.32-38 will cover 6.400m² gross of residential and commercial space. The project is located in a very attractive place along the street Dimitrija Tucovica that rapidly changes its appearance
in a street of modern architectecture, only 2,5 km from the central pedestrian zone (KnezMihajlovastreet).
Its potential is recognized by many investors who build tens
of thousands sq.mof housing and sale space.

http://i51.************/ffbdid.jpg

Galandar
June 30th, 2011, 10:33 AM
Kempinski Hotel Belgrade


So I did not get? Is it approved or under construction? Opening in 2012 means it must be u/c now

Bez_imena
August 26th, 2011, 06:09 PM
New bridge
FlGUdOCeLyY

Bez_imena
August 26th, 2011, 06:16 PM
Belgrade Plaza

http://i52.************/2pyq076.jpg

Region: Serbia
Project type: Apart-hotel and business center with a shopping gallery
Size: 70,000 (GBA)
Opening: 2014
Plaza share: 100
Project status: Planning stage

www.plazacenters.com

malkosen09
September 1st, 2011, 04:41 AM
Wow...it looks so beautiful and lovely...!!

Galandar
September 5th, 2011, 01:34 AM
Belgrade Plaza

http://i52.************/2pyq076.jpg

Region: Serbia
Project type: Apart-hotel and business center with a shopping gallery
Size: 70,000 (GBA)
Opening: 2014
Plaza share: 100
Project status: Planning stage

www.plazacenters.com

It reminds me very much of an under construction project in Baku, Azerbaijan

http://www.sonnamir.com/content/galeri/rozah7bqppacpor7.jpg

http://www.sonnamir.com/content/galeri/rm89gq7ccvv719lt.jpg

http://farm3.static.flickr.com/2468/5793096221_3f364d9a8e_b.jpg

Bez_imena
September 11th, 2011, 10:47 PM
http://i53.************/t69owk.jpg

http://i51.************/2ur5tl5.jpg

http://i56.************/2u5ceg5.jpg

www.beobuild.rs/read.php/501.html

Bez_imena
September 11th, 2011, 10:50 PM
http://i51.************/nzorxs.jpg

http://i52.************/2dhwktx.jpg

http://i51.************/bjet13.jpg

http://www.beobuild.rs/read.php/472.html

Bez_imena
September 11th, 2011, 10:55 PM
http://i52.************/2csdi8h.jpg

http://i55.************/2bqupu.jpg

http://i54.************/23iihj7.jpg

http://www.beobuild.rs/read.php/462.html

vizionaru
September 16th, 2011, 10:29 AM
Any news with this? Is it still on?

http://www.visuals.beobuild.net/data/media/4/080318-CampusPark-01.jpg

Bez_imena
September 17th, 2011, 10:15 PM
^^ On Hold :(

http://i54.************/2zsqloz.jpg

http://i54.************/2mrtixx.jpg

ST-DISPET
December 8th, 2011, 10:47 PM
^^ On Hold :(

http://i54.************/2zsqloz.jpg

http://i54.************/2mrtixx.jpg

koliko ima sanse da se ovako nesto napravi u BG?????:nuts::nuts:

Bez_imena
December 10th, 2011, 01:13 AM
Sledece godine konacno pocinje izgradnja :cheers2:
Umesto 4 gradice se 2 kule, sto i nije tako lose jer bi ovako plac bio prenatrpan.

Bez_imena
January 6th, 2012, 11:59 PM
Ada Bridge

http://bktvnews.com/wp-content/uploads/2012/01/most-na-adi.jpg

http://www.dodaj.rs/f/2G/109/3kDgQo40/202209030-most-preko-ade.jpg

http://www.dodaj.rs/f/1h/ds/IJBh2CT/202210055-most-preko-ade.jpg

http://www.dodaj.rs/f/1w/LC/Pjiwr4U/202212osvetljen-most-pre.jpg

http://www.dodaj.rs/f/3H/7P/3anvDmy6/202214osvetljen-most-pre.jpg

http://www.dodaj.rs/f/o/12u/3J7xbtQN/202216osvetljen-most-pre.jpg

http://www.dodaj.rs/f/D/ye/3OVPaom/120102-mada-01.jpg

Bez_imena
January 7th, 2012, 12:02 AM
Marriott announces arrival

http://www.dodaj.rs/f/2a/qP/3HwTjbOQ/111205-marriot-vs-01.jpg

In partnership with Marriott International, as part of their hotel brand "Courtyard", they announced opening the first facility of this chain in Serbia.

"Marriott" is one of the largest hotel chains in the world and has over 3600 facilities in 71 countries. As part of its portfolio "Marriott" offers a different types of categorization and accommodation for its customers. With this arrangement, which has been agreed with the PSP Farman, Belgrade will receive hotel "Courtyard by Marriott", which covers the upper middle business class and it will be the first hotel by Marriott group in Serbia.

"We continue to recognize the strong development opportunities across Southeast Europe and look forward to our further expansion in Serbia," said Amy McPherson, president and CEO of Marriott International in Europe. "With the increasing frequency of business travel to Belgrade, we are confident that the Courtyard by Marriott brand, and especially our newly announced European prototype of Courtyard, will meet market needs".

As for the building in which hotel will be located, it is the former building of the "Jugodrvo" at the Republic Square in downtown Belgrade. The building is located next to the National Theater and National Museum and the town's pedestrian zone of Knez Mihailova Street. The former office and retail headquaters of "Jugodrvo" will experience the partial aesthetic and functional modification, and eventually will have 107 rooms of high category. The hotel will include enclosed swimming pool, fitness center and spa, business center, meeting rooms, shops and two floors of underground parking as well.

The construction works will start in the second half of 2012.

beobuild.rs

liburni
January 7th, 2012, 03:06 AM
the bridge looks awsome!

Bez_imena
April 7th, 2012, 10:37 PM
Elgolf starts construction of residential and business complex in Surcin in 2013 - Israelis not to give up project worth USD 1 billion

When it was announced in 2008, the construction of an elite 300-hectare residential and business complex with a golf course in Becmen, Surcin drew a great attention of the public. Ever since, the Israeli consortium has been moving step by step towards the implementation of this project worth USD 1 billion. People at the company Elgolf, which is the authorized representative of the Israeli investment fund, confirm to eKapija that the construction of aforementioned multifunctional complex is not given up.

- Members of the investment fund from the USA and Israel should come to Surcin in April to sign a protocol on the commencement of construction with the representatives of that borough. We are negotiating with architects to design a zoning ordinance for that 300-hectare area. It will take 5 to 6 months to finish the work, so that we expect the ordinance to be adopted by the borough in autumn, when we could start working on designs for the parts of the complex that will be built the first. We expect the construction of roads and accompanying infrastructure to kick off in May or June 2013 and be followed by the construction of first residential and business facilities - Vojkan Vuletic from Elgolf says in a talk with eKapija.

Our interlocutor points out that the investment fund was looking for a suitable space all around southeast Europe few years ago and that it liked the one in Surcin the most.

There is no doubt that this project is still current and that its implementation continues. The Israeli investment fund, whose shareholders are mainly American Jews, rented the location for the period of 99 years and already paid USD 2.6 million for the first ten years – says Vuletic.

As he explained, the presale of residential and business units has already started.

Life in a green oasis near the capital

Vuletic says that between 15,000 and 16,000 privileged people will have a chance to enjoy the view of dark green grass on the golf course and the peaceful surface of the lake.

A residential complex that should meet all demands of a contemporary man will be situated only fifteen minutes of driving away from Belgrade, but still far enough from all the crowd and noise of the capital. This multifunctional complex will be an oasis capable of providing each tenant with top comfort and quality of life. Potential buyers can choose between five different types of residential units.

The plan is to build single-family villas along the edge of the lake and the golf course. This most exclusive residential zone within the complex will comprise two-floor houses with a cellar and a swimming pool, each built on a lot spanning between 500 and 750 square meters. Construction of two-family villas in the northern part of the complex is also in the pipeline.

A patio suite complex, with four suites in a cluster, will be located on the western side of the lake. There should also be park suites - various suites and duplexes situated around a linear park, with common facilities and an educational complex on the northern side of the boulevard.

Residential blocks along the circular boulevard will include apartments spanning 80 square meters each.

Business center

A commercial and business center should be situated at the main northwest entrance to the complex.

- The plan is to build a 30,000-square-meter shopping mall and two hotels. Negotiations with large hotel chains are underway, so that both hotels will be modeled after the typical facility of the hotel group we sign an agreement with – says Vojkan Vuletic.

Aside from hotels, there should also be a spa center, congress center, country club, etc.

According to the preliminary design, a zone with sports facilities will be located along the northern edge of the complex. It should include tennis, futsal and basketball courts, indoor swimming pools, bowling and squash arenas, gyms, etc.

The biggest golf course in Serbia

Harradine Golf, one of the world's most famous golf course design companies, and its architect Peter Harradine have designed an 18-hole golf course in line with the highest professional standards.

- The future golf course should be built on an area spanning 62 hectares. It will be the first 18-hole golf course in Serbia.

People at Elgolf also announce that domestic construction companies will be hired to build the complex in Becmen. They say that the complex is most likely to be finished in 5.5 years, meaning that we can expect the opening ceremony in late 2017.

http://www.elgolf.rs/images/map-plan.jpg

www.ekapija.com
www.elgolf.rs

Bez_imena
April 7th, 2012, 10:43 PM
New Residential complex - "Stepa Stepanović"

http://www.dragantrifunovic.com/helivideo/stepa/03.jpg

http://www.dragantrifunovic.com/helivideo/stepa/04.jpg

http://www.dragantrifunovic.com/helivideo/stepa/06.jpg

http://www.dragantrifunovic.com/helivideo/stepa/07.jpg

http://www.dragantrifunovic.com/helivideo/stepa/09.jpg

http://www.dragantrifunovic.com/helivideo/stepa/25.jpg

http://www.dragantrifunovic.com/helivideo/stepa/34.jpg

Bez_imena
April 7th, 2012, 10:59 PM
Airport City Belgrade - phase III

http://www.airportcitybelgrade.com/images/bd/galleries/future-2010/01.jpg

http://www.airportcitybelgrade.com/images/bd/galleries/future-2010/02.jpg

http://www.airportcitybelgrade.com/images/bd/galleries/future-2010/03.jpg

http://www.airportcitybelgrade.com/images/bd/galleries/future-2010/04.jpg

http://www.airportcitybelgrade.com/images/bd/galleries/future-2010/05.jpg

Bez_imena
April 23rd, 2012, 03:15 PM
New development in block 20

http://i43.************/5zpk78.jpg

http://i40.************/nlssk7.jpg

The new business center being built in New Belgrade’s block 20, next to the building of “Rad” company. It is an energy-business complex that will become the new administrative headquarters of EPS (Electric Power Industry of Serbia) and EDB (Belgrade Electrical Distribution), including infrastructure facility for a system transformer (110/10 kV, 2x40 MVA,).

The projected gross area of the complex is 42 250 m2, which includes the external and connecting facilities, and an gross area of technical and commercial buildings A and B is about 30,000 m2.

All preparatory work has been completed and currently they’re performing construction work as a part of the first phase - up to a ground level. The contractors working on the building are "AR Gradnja", "Gradina", "Novkol" and "Termoinzenjering", all from Belgrade. According to the officials, the deadline for completing the first phase of construction is May 2012 and a final deadline for the entire complex is 24-30 months depending on the implementation of tender procedures and planning and financial capabilities of EPS.
beobuild.rs

http://i42.************/15pr9zn.jpg

http://i40.************/iwu3kj.jpg

Galandar
April 23rd, 2012, 03:42 PM
Ada bridge is so nice. I saw it live and it looks really fabulous :cheers:

Bez_imena
May 16th, 2012, 03:53 PM
Delta Planet

Project type: shopping mall
Size: 200,000 sqm
Opening: 2014
Price: 200 million euros

http://www4.slikomat.com/11/0516/tu-01-Del.jpg

http://www4.slikomat.com/11/0516/98-04-Del.jpg

http://www4.slikomat.com/11/0516/b24-06-Del.jpg

http://www4.slikomat.com/11/0516/a9a-05-Del.jpg

http://www4.slikomat.com/11/0516/xsn-09-Del.jpg

Bez_imena
May 16th, 2012, 06:14 PM
^^
http://www.beobuild.rs/visuals/data/media/6/120516-DTP-11.jpg

Delta Holding presented today a redesigned and updated design for its retail center project "Delta Planet". It was announced as the largest and the most modern shopping center in the region and its construction will start in spring next year.

We wrote about this development before, when it was presented to the public several years ago. Then the project included complex of commercial and business facilities. Next to a huge shopping center it also envisaged two tall office towers. Bad news for those who were expecting highrise to shoot up on this plot is that office part of the development was completely abandoned, but the shopping center is now expanded and enriched with new contents. State of the economy and the real estate markets virtually halted the construction of office space, and in this case, this trend of withdrawing from this segment is also noticeable.

New design is presenting us with a center of 200,000 square meters of total area with 250 different shops. Shops, services, restaurants and cafes are spread on two levels with a simple communication around the building. Below these two levels there will be a hypermarket, and on the top level is located a part designed for entertainment with cinema, spa and wellness area, various sports facilities and a similar offers for fans of healthy living.

A special feature is a large green garden that will be located on the roof, covering an area of 6,500 square meters. In addition, it will hold the first IMAX theater in Serbia, as well as 50 completely new brands on Serbian market. All visitors will have 2300 parking spaces at their disposal, whether it's underground garage or outdoor parking.

Among the other announcements we want to draw attention to the solution of the facade. It will practically have two faces, where side looking toward the highway will hold impressive LED display of about 5000 square meters, while the opposite side of the building as a contrast will be set up with vertical greenery and plant facade made all of natural materials. LED display will have the extraordinary features and dynamic colors to draw admiring glances from all drivers on the highway, while the side toward Tabanovačka Street will create a green wall and pleasant setting with paths for all passers-by. The main entrance to the building will be from the direction of the roundabout Autokomanda with spacious plaza and outdoor cafes. It also stated that the center will use modern green technology, so the center will have their own wells for technical water, renewable energy sources, and special emphasis is placed on energy efficiency.

Also, given the assurances that the new center will honor memory of the Cannon shed Park, located near the future site. In later phases of construction it would be desirable for the investor to contribute to the additional marking of the memorial park.

The entire project is estimated at 200 million and plan is to be open by the fall 2014.
beobuild.rs

aFAGWnmsO3o&

Majevčan
May 16th, 2012, 06:50 PM
Wasn't Deltaplanet supposed to have towers?

Minsk
May 16th, 2012, 07:17 PM
Fantastic project! I like its design very much.

sreckovic
May 19th, 2012, 02:48 PM
Wasn't Deltaplanet supposed to have towers?

Yes, but they changed the entire project :) You can see the old one on beobuild site, but trust me this one is much better

Bez_imena
June 29th, 2012, 09:49 PM
Old Mill growing new

We have made a visit to the site of the "Old Mill" where construction of a new hotel is underway. Currently the work is primarily focused on the construction of the underground level, but also on a very demanding restoration of the old mill building, which is protected by the state.

The underground part extends almost the entire surface of the complex and it will serve as a garage space for the hotel guests with access from the front of the building or Vojvode Misica Boulevard. The works on the ground have progressed significantly; even foundations of the future office tower are getting shape.

In parallel with the concrete works on the underground floor, sophisticated reconstruction of the old mill building is also underway. This facility is protected by the state because of its historical importance. This implies that the reconstruction will completely preserve the old look of the building and its facade. Very poor state of the mortar requires that the facility is practically broken down brick by brick, so it could be recreated to the original appearance. The same block of bricks will be reused for the new mill, which is a great curiosity in the whole endeavor. Also a number of items that were in the building were preserved, including the beautiful columns of cast steel, which will again be part of the interior or exterior settings.

At the back of the mill building they are pouring foundation for the hotel tower, they’re finishing remaining excavation and works on the underground garage. The concrete core of the hotel tower is completed up to a ground level and on the top plate they erected a temporary building in which the interior designers are preparing a sample room. Designers will have opportunity to realize their proposal, try out the materials, elements of the finishing works, and many aesthetic details. The test room shall be finished and fitted with furniture in the next three weeks, when it will be presented to the board of investors and financiers.

At the request of hotel operator, in this case Rezidor group, there was also a minor optimization in order to improve functionality to meet the demands and needs of guests. The hotel will be part of the "Radisson Blu" brand and it will provide the highest standards in a 4-star category.

According to information we received, the deadline for completion of all concrete works on the underground floors is August this year. All parts of the complex are constructed simultaneously, and construction work on all buildings of the complex will be finished by the beginning of the 2014.

http://www.beobuild.rs/visuals/data/media/3/120628-SMLIN-VS-01.jpg

http://www.beobuild.rs/visuals/data/media/3/120628-SMLIN-VS-02.jpg
beobuild.rs

Ulpia-Serdica
June 30th, 2012, 06:08 AM
^^

Awesome revitalization project :cheers:

Bez_imena
July 17th, 2012, 10:31 PM
Square Nine Hotel - Belgrade
http://i48.************/2yphe2b.jpg

Square Nine Hotel is located in Belgrade's pretty old-town neighbourhood Stari Grad, only a few blocks away from the Kalamegdan Park and the Danube, and just across from Students Square.

On the ground level, the common areas are ample and integrated, such as the lobby, the bar, the restaurant and a little piazza which succeed one another. On the basement level, a swimming pool haloed by a beam of natural light is succeeded by a gym, spa and sauna, while on the top floor a small bar overlooks the square across the street.

The rooms are split into 3 categories – 32 sqm or 47 sqm double rooms, and 90 sqm suites – taking up 5 levels of the building and totaling 45 units. Each floor features a different hall adjacent to the elevators, with unique and unexpected pieces of furniture.

The ambience is that of low-key eloquence and coziness. The choice of materials (wood, stone and leather), as well as the furnishings (a varied selection of vintage pieces by Scandinavian and North American designers, dating from the 1930s to the 1960s) and the many objects purchased at local antique shops and markets, contribute to this warm and understated mood, at once elegant, plain and unpretentious.

http://i50.************/2li7kf6.jpg

http://i45.************/jg4lzl.jpg

http://i47.************/2gvocpy.jpg

http://i49.************/1w1mv.jpg

http://i48.************/24q1gg9.jpg

http://i48.************/14kyuc7.jpg

http://i48.************/oh5w8n.jpg

Belgrade Square Nine Hotel on the Forbes top hotel list

The Forbes magazine has put the Square Nine Hotel in Belgrade on the list of the best new hotels in the world. The hotel offers top quality accommodation and the accompanying contents, the Forbes reports.
Belgrade has always has an avant-garde quality compared to other cities in east Europe, says Nebojsa Kostic, one of the hotel’s owners. The hotel meets all the requirements of an urban entrepreneur, Kostic says.
www.squarenine.rs

Bez_imena
August 10th, 2012, 04:12 PM
Spanning Danube

http://i48.************/30ccepk.jpg

The construction of bridge over the Danube that will connect Zemun and Borča banks is making excellent progress with builders using advantage of low water levels to build supporting pillars. At the same time, the construction of access roads is also going as planned with groundwork finished on 5 kilometer long stretch of the future access route.

A number of columns on the Borča side are completed, with 150 piles competed in the process . On the side of the Zemun works are on hold, as builders are awaiting permit after the technical assessment of the impact of works on the surrounding buildings. It is expected that licenses could arrive any day now, enabling start of the construction to in Zemun as well. In the meantime, they erected first and second pillars, which are in the water and therefore not included in the aforementioned building permit.

On Borča side of the river they recently completed the first pair of columns in the river, while the underwater concrete work is underway on other three. The technology used to build pillars includes making of a steel box or cofferdam around the piles, which are drilled inside large steel pipes. Metal cofferdam is then dried using water pumps, allowing construction of the pillars. To be able to pump it dry, divers are working underwater welding on the chest, closing the holes and stopping water penetrating. In this phase of the construction, record low water levels of the Danube are a great relief.

At the inundation of the bridge, or the part that goes from the embankment to the first pillar in the water, was completed in most of the work when it comes to building piers. It remains to complete two pairs of pillars, one on dry land and one pair of partially flooded columns. Behind the embankment, the bridge will have set of columns that will lower it to the ground and connected to the access roads, and they are also completed.

The works on the access roads are also intensive, and along the new route there will be several structures, whether small bridges or omissions in the water channels. Groundworks have been completed on almost 5 kilometers, and a good part of the route is set for the first layers of the road surface. Three concrete irrigation culverts are now completed, with concrete works underway on two more. Next in line is the first bridge structure over one of the major channels.

Works are progressing at the projected rate and on-site concrete batching plant with impressive capacity was set, so the building of the main structure will be able to start soon. This bridge will have two independent structures with three lanes in each direction and over 20 km of access roads. The opening is scheduled for the beginning of 2014 and main contractor is CRBC (China Road & Bridge Corporation).

http://i49.************/a26edx.jpg

http://i47.************/r859on.jpg

http://i48.************/28195bd.jpg

http://i47.************/21lsrb6.jpg

http://i50.************/28cjznk.jpg
beobuild.rs

Bez_imena
August 22nd, 2012, 01:18 PM
West 65

http://i.imgur.com/QZzCN.jpg

http://i.imgur.com/Ap81U.jpg

http://www.west65.rs/wp-content/gallery/gal-1/west65_05.jpg

www.west65.rs

Bez_imena
August 22nd, 2012, 01:33 PM
Science development in block 39

The preparatory work on the construction site of the future science complex in New Belgrade began this summer. The science center along with the center for nano science and materials planed in New Belgrade’s block 39 are a part of broader strategy for the development of country's scientific infrastructure.

http://i45.************/s1oua8.png

Currently on the site there is an ongoing first or preparatory phase and the deadline for completion of this stage is 120 days, or November this year. In this phase they will complete groundwork, pitch stabilization and piles drilling.

On site works begun only a few weeks ago and during this time the ground was cleared of vegetation and excavation started. Earth and gravel are mined and then transferred to the second part of the parcel where they are used for the filling and leveling. Because of the months-long drought, the ground material is watered from separate tanks to avoid raising dust during transportation. This ground surface is quite difficult to handle, so in this phase special attention is paid to its stabilization. When the work on the excavation is completed in about 10 days, they will start drilling first piles.

As noted above, the complex will consist of two buildings or the Center for the Promotion of Science and Nano Center. The Center for the promotion of science is a facility of 29,000 square meters with a number of features including exhibit space, a planetarium, a conference segment of the science club. The price for this segment is 40 million for construction, plus 20 million for equipment. Nano Center is dedicated to development of nano technologies and materials with 13,400 square meters of gross floor space. This building will be organized in two functional areas providing labs and offices. Price of this part of the complex is estimated at 20 million Euros, with an additional 20 million for its equipment.

http://i48.************/219nbdy.jpg

http://i49.************/1zgx2dh.jpg
www.beobuild.rs

Bez_imena
September 12th, 2012, 02:03 PM
Belgrade's Metropol Palace opens its door to first guests

http://i48.************/2eq98v7.jpg

Metropol Palace, the most famous hotel in ex-Yugoslavia, today opened its door to first guests.

- Today we opened the lobby, lobby bar, restaurant, banquet hall and floors with rooms in the main building of the hotel. I am sure that this iconic hotel will again be the place where the citizens of Belgrade, as well as people from all around the world, will be happy to meet, hang out and enjoy what Metropol Palace has to offer - said Gerasimos Perdikaris, general manager of the hotel.

Although its exterior is identical to the one of the former Metropol, the hotel exudes a brand new line of sophisticated style. A blend of contemporary architectural work and the respect for traditional architectural and artistic values of old Metropol is what makes this hotel unique in Serbia and the rest of the world.

Aside from being completely functional, the hotel exudes luxury and elegance. The interior of new Metropol links a fantastic and unique history of the hotel with modern artistic and cutting-edge technological details, thus creating an one-of-the-kind and astonishing experience, both peaceful and exciting at the same time. The hotel features the biggest banquet hall in Belgrade, where all kinds of events can be organized - from big conferences and trade fairs to weddings and various celebrations.
ekapija.com

http://i47.************/2645b1h.jpg

http://i46.************/2i9nk9u.jpg

http://i49.************/10rkc3c.jpg

http://i46.************/2e0u7fc.jpg

http://i47.************/2s1rfp5.jpg

Singidunum
October 13th, 2012, 08:43 PM
Beko Complex by Zaha Hadid

http://www.dodaj.rs/f/2W/Gv/2Jsw9P8Q/th65d1300db123ce22f6e256.jpg

http://www.dodaj.rs/f/3L/Uo/it1Xyqk/th65d1300db123ce22f6e256.jpg

http://www.dodaj.rs/f/45/GQ/uCl7W7g/th65d1300db123ce22f6e256.jpg

http://www.dodaj.rs/f/H/7Z/2KtVM1gj/th65d1300db123ce22f6e256.jpg

http://www.dodaj.rs/f/2P/Oz/qWSvyx/th65d1300db123ce22f6e256.jpg

smokiboy
October 13th, 2012, 09:15 PM
Wow -- these renderings are incredible. When was this proposed? How realistic is it that it will be built?

I see this as a set for future Sci-Fi movies :)

Bez_imena
October 15th, 2012, 09:20 PM
Beton Hala by Sou Fujimoto

http://www.dodaj.rs/f/3o/Qr/4Z8SvL1d/betonhala01a.jpg

http://www.dodaj.rs/f/1y/10p/YpqqBnx/betonhala01.jpg

http://www.dodaj.rs/f/3V/mr/3A9bPMsD/betonhala02.jpg

http://www.dodaj.rs/f/r/jZ/1lRxZIuT/betonhala03.jpg

http://www.dodaj.rs/f/o/QT/3BFGypaG/betonhala05.jpg

http://www.dodaj.rs/f/3F/Pi/VZ4Wkmk/betonhala06.jpg

http://www.dodaj.rs/f/u/md/1Vd7mjIG/betonhala09.jpg

http://www.dodaj.rs/f/3L/oM/34CK7yyk/betonhala21.jpg

http://www.dodaj.rs/f/17/CK/3BkW5kZ8/betonhala19.jpg