Maxximus
May 11th, 2009, 12:50 AM
It was presented to the new Bologna Palazzetto Sport, intended to become a major public facilities for the conduct of international competitions, already accredited by the city to welcome the world of basketball in 2014, designed by Performa A + U. The new arena will have a capacity of not less than 15,000 spectators and conforming to the standards of European basketball competitions and world, but will also carry out non-sporting activities such as shows.
For this reason, the project is integrated with other land to be allocated to sports covered multipurpose spaces for games and recreational activities, conference rooms, facilities and management, commercial areas declined mainly sport and wellness areas and catering. I expected more spacious park equipped with sports fields and outdoor play spaces, green spaces equipped and connective aggregation.
The area chosen for the intervention, although for some time included in the local town planning instruments, was still strong characterization of the landscape typical bolognese. The idea driving the project was to insert the new volume built with minimum impact and exalting, simultaneously, the environmental values of the area. The main building is designed as a macro-soil root ball lifted under which there are volumes built, while, above, is organizing a large park that forms a "green system" with the ecological corridor off Zenetta. The overall effect will be that of a hill that is part of the landscape and, at the same time, a structure which is enclosed by vegetation. The root ball is crossed by canyons creating a system of squares and courtyards behind the park. The visible part of the buildings, the Open always perimeter artificial wants to draw the suggestion of the root ball through the treatment of various cosmetic strongly characterized in terms of optimizing energy performance of the volumes.
* Urban and architectural project: PERFORMA A + U
* Architectural Project dell'arena sport: A + U PERFORMA with Arup and Arup Sport Italia
* Client: Development S.r.l. 77
* Area: 25,000 sqm sports Arena
* Rehabilitation Center and gyms mq 5000
* Wellness center and 38,000 square meters
* 22,000 sqm Eduteinement
* Start of work: 2009-2010
* Delivery Arena: 2013
Masterplan
http://i36.tinypic.com/14ihb7m.jpg
http://i35.tinypic.com/2ijkx85.jpg
http://i34.tinypic.com/2uduqvc.jpg
http://i36.tinypic.com/2usvg4g.jpg
http://i33.tinypic.com/dqkhaa.jpg
http://i34.tinypic.com/98y6wm.jpg
For this reason, the project is integrated with other land to be allocated to sports covered multipurpose spaces for games and recreational activities, conference rooms, facilities and management, commercial areas declined mainly sport and wellness areas and catering. I expected more spacious park equipped with sports fields and outdoor play spaces, green spaces equipped and connective aggregation.
The area chosen for the intervention, although for some time included in the local town planning instruments, was still strong characterization of the landscape typical bolognese. The idea driving the project was to insert the new volume built with minimum impact and exalting, simultaneously, the environmental values of the area. The main building is designed as a macro-soil root ball lifted under which there are volumes built, while, above, is organizing a large park that forms a "green system" with the ecological corridor off Zenetta. The overall effect will be that of a hill that is part of the landscape and, at the same time, a structure which is enclosed by vegetation. The root ball is crossed by canyons creating a system of squares and courtyards behind the park. The visible part of the buildings, the Open always perimeter artificial wants to draw the suggestion of the root ball through the treatment of various cosmetic strongly characterized in terms of optimizing energy performance of the volumes.
* Urban and architectural project: PERFORMA A + U
* Architectural Project dell'arena sport: A + U PERFORMA with Arup and Arup Sport Italia
* Client: Development S.r.l. 77
* Area: 25,000 sqm sports Arena
* Rehabilitation Center and gyms mq 5000
* Wellness center and 38,000 square meters
* 22,000 sqm Eduteinement
* Start of work: 2009-2010
* Delivery Arena: 2013
Masterplan
http://i36.tinypic.com/14ihb7m.jpg
http://i35.tinypic.com/2ijkx85.jpg
http://i34.tinypic.com/2uduqvc.jpg
http://i36.tinypic.com/2usvg4g.jpg
http://i33.tinypic.com/dqkhaa.jpg
http://i34.tinypic.com/98y6wm.jpg