February 8th, 2004, 04:06 PM
Hi,
It seems no progress since few weeks ago...does it halt?
choon
baqthier
February 8th, 2004, 04:21 PM
Last month I checked the scalfolding nets were in process of changing to new ones :)
choon
February 9th, 2004, 03:21 AM
Hi bathier,
I passed by yesterday 09.02.2004 4:30pm...
choon
szehoong
February 9th, 2004, 06:18 AM
Originally posted by choon
Hi bathier,
I passed by yesterday 09.02.2004 4:30pm...
choon
......errrr......any progress? :?
I remember seeing em replacing the scaffolding ...that's all ;)
hypermount
February 22nd, 2004, 03:49 PM
Where is that place?
What monorail?
TYW
February 23rd, 2004, 06:35 AM
xi tian di :lol:
wash sky and ground:D
ZaHiRnYa???
February 24th, 2004, 05:10 AM
Originally posted by TYW
xi tian di :lol:
wash sky and ground:D
What is that :D Tak paham la :bash:
TYW
February 24th, 2004, 09:53 AM
Originally posted by ZaHiRnYa???
What is that :D Tak paham la :bash:
that's what it means in Chinese lah:D
ZaHiRnYa???
February 25th, 2004, 02:25 AM
Originally posted by TYW
that's what it means in Chinese lah:D
but you mention something like WASH SKY AND GROUND mah...that does not make any sense what :?
TYW
February 25th, 2004, 09:48 AM
Originally posted by ZaHiRnYa???
but you mention something like WASH SKY AND GROUND mah...that does not make any sense what :?
that's what i mean lah, xi tian di sounds like wash sky and ground in Chinese;)
ZaHiRnYa???
February 25th, 2004, 10:02 AM
Originally posted by TYW
that's what i mean lah, xi tian di sounds like wash sky and ground in Chinese;)
Okay...but then again, what does it mean and its relations to the construction project then :?
TYW
February 25th, 2004, 10:28 AM
Originally posted by ZaHiRnYa???
Okay...but then again, what does it mean and its relations to the construction project then :?
i tot jalan xi tian di is where the monorail is gonna be built??
ZaHiRnYa???
February 25th, 2004, 10:39 AM
Originally posted by TYW
i tot jalan xi tian di is where the monorail is gonna be built??
Yeah..Jalan Jalan Cari Makan located at the end of the monorail line. Near Brickfield. The second building already almost completed and the already remove the scaffolding. They painted the building white in color. Probably the first layer of color for the building. :D
szehoong
February 25th, 2004, 11:28 AM
Originally posted by ZaHiRnYa???
Yeah..Jalan Jalan Cari Makan located at the end of the monorail line. Near Brickfield. The second building already almost completed and the already remove the scaffolding. They painted the building white in color. Probably the first layer of color for the building. :D
Wow! :eek:
You know a lot! :D ....What's this Jalan-Jalan Cari Makan thingy? :? I;ve heard of Jalan-Jalan but not this :?
Yea...like you've mentioned the white colour is probably the undercoat.......;)
ZaHiRnYa???
March 5th, 2004, 06:31 AM
Originally posted by szehoong
You know a lot! :D ....What's this Jalan-Jalan Cari Makan thingy? :? I;ve heard of Jalan-Jalan but not this :?
Is it a different project altogether? So, if the construction of the building alongside the river is not for Jalan-Jalan, then what is the construction for :?
szehoong
March 5th, 2004, 08:18 AM
Originally posted by ZaHiRnYa???
Is it a different project altogether? So, if the construction of the building alongside the river is not for Jalan-Jalan, then what is the construction for :?
It is all part of the same project lah! :D
I saw it a few days ago and it is still white but now with glass already......construction seems to be going on fast - which is a very good sign! :okay:
ZaHiRnYa???
March 5th, 2004, 11:06 AM
Originally posted by szehoong
It is all part of the same project lah! :D
I saw it a few days ago and it is still white but now with glass already......construction seems to be going on fast - which is a very good sign! :okay:
Then why previously you told me that I was a totally a different project altogether. Making people confuse la macam nie :bleep:
szehoong
March 5th, 2004, 11:51 AM
Originally posted by ZaHiRnYa???
Then why previously you told me that I was a totally a different project altogether. Making people confuse la macam nie :bleep:
When did I told ya that? :?
ZaHiRnYa???
March 6th, 2004, 05:54 AM
Originally posted by szehoong
When did I told ya that? :?
Donno. Can't remember when :D
choon
March 6th, 2004, 06:53 PM
any latest pic?
choon
szehoong
March 9th, 2004, 08:19 AM
Originally posted by choon
any latest pic?
choon
You go there and take some pictures for us to see lah! :D
baqthier
April 25th, 2004, 01:27 PM
Things are going on there pretty fast! I hope it doesn't suck like the Kelana Jaya Giant :D
ZaHiRnYa???
April 26th, 2004, 12:21 PM
Things are going on there pretty fast! I hope it doesn't suck like the Kelana Jaya Giant :D
What do ur mean by suck???
I think Giant Kelana Jaya is not that bad, just that considering the amount of hype surrounding it, it was a bit of a let down. ;)
ZaHiRnYa???
May 6th, 2004, 05:19 AM
The model for the Monorail Jalan Jalan :
http://www.monorails.org/webpix%202/KL15.jpg
And picture taken by me....
http://img38.photobucket.com/albums/v116/zahirnya/100_0154.jpg
ZaHiRnYa???
May 6th, 2004, 05:26 AM
Another 2 picture of the construction progress....
http://img38.photobucket.com/albums/v116/zahirnya/100_0156.jpg
http://img38.photobucket.com/albums/v116/zahirnya/100_0155.jpg
Sorry bout the greenery leaf stuff...Hard to actually take picture from that angle...:ohno:
baqthier
May 6th, 2004, 05:41 AM
Greenery is nice! It frames the thing mah. BTw, thanks for the pics of the model! Is the hi-rise suppose to be a hotel then?
TYW
May 7th, 2004, 05:48 PM
http://img38.photobucket.com/albums/v116/zahirnya/100_0154.jpg
this is the front or the back?
ZaHiRnYa???
May 9th, 2004, 01:54 AM
http://img38.photobucket.com/albums/v116/zahirnya/100_0154.jpg
this is the front or the back?
No idea. But the picture was taken with the river on the front...
TYW
May 10th, 2004, 12:32 PM
No idea. But the picture was taken with the river on the front...
from the model it looks like that is the front coz the river is in the front
baqthier
May 10th, 2004, 12:51 PM
Any more info on this project? Cannot find the site liao!
Ijud
May 17th, 2004, 05:31 AM
KL Monorail to be expanded to Mid Valley and Jalan Jalan eateries to be ready by year end!!
The Star 17/5/2004
Early maiden profit expected for KLIG
ALTHOUGH KL Infrastructure Group Bhd (KLIG) has its work cut out for it to boost revenue stream and turn itself into a profitable outfit by the year ending April 30, 2007, the KL Monorail operator is taking it all in its stride.
In fact, executive director Al-Jeffery Ibrahim in an interview with StarBiz recently, has expressed optimism that the group may expect its first profit earlier than the projected 2007.
And the reasons for such optimism? At the top of the list is the group's plan to extend the monorail system from Jalan Tun Sambanthan, Brickfields, to Mid Valley.
“We have just submitted our plans to the relevant authorities and discussions will start this week on the project, with approval expected to be obtained within the year.
“We hope to start construction by the end of the year or early next year and complete the project within nine months to a year,” Al-Jeffery said, adding that the station would be located outside Cititel Hotel in Mid Valley.
He said the 2km plus extension would incur an investment of about RM30mil to be generated via internal funds and borrowings.
That said, he expects the extension to contribute “significantly” to the monorail's ridership upon completion, as Mid Valley is a very good catchment area with high traffic flow.
Al-Jeffery said the group had just completed the link between its monorail station and the Star (Sistem Transit Aliran Ringan Sdn Bhd) LRT station at Hang Tuah and Titiwangsa, and would commence construction to connect its Bukit Nanas station and Putra's (Projek Usahasama Transit Ringan Automatik Sdn Bhd) Dang Wangi station.
The Bukit Nanas–Dang Wangi link is expected to be completed within three months. Other links include connecting the monorail's station at KL Sentral with Express Rail Link and the KTM Commuter System stations.
“This will provide us with a well-integrated transit network, thus making it more convenient for our passengers to use the LRT and increase ridership for all the operators,” he said, adding that KL Monorail currently had 11 stations.
KLIG also plans to eventually extend its operating hours from 6am to midnight from the current 6am to 10pm by year-end, once the relevant approval is obtained.
The group currently has 12 two-car trains, each of which can carry 214 passengers and has a ridership of over 30,000 a day on average.
Al-Jeffery said the group had no plans at the moment to increase the number of trains/cars as it was coping quite well with the current ridership.
“There is still a lot of capacity on our trains and we have the ability to handle 80,000 passengers a day. We coped well even with 90,000 passengers a day on New Year's eve (Dec 31),” he said, adding that with the current population of Kuala Lumpur, KLIG only needed to increase frequency without having to increase the number of trains.
Besides the local market, KLIG has also set its sights on global expansion.
Al-Jeffery said KLIG would “piggyback” on parent MTrans Holdings Sdn Bhd's expansion overseas.
“MTrans is prospecting and taking part in various tenders in 12 countries in the Middle East and Asia. Our total exposure is about US$4bil worth of potential contracts. The spin-off would be new businesses in terms of management and operations of the monorail system, maintenance, project management, media planning/advertising and property management,” he said.
Besides the monorail, another revenue generator for the group would be its recent foray into bus services.
The group has widened its scope of transportation services to include inter-city express bus services. KLIG had in April acquired a 70% stake in five bus companies – Mutiara Pahim Sdn Bhd, Ballan Sdn Bhd, Mekar Express Sdn Bhd, Eltabina Jaya Sdn Bhd and Darul Naim Express Sdn Bhd.
Al-Jeffery said the acquisition provided the group with a ready fleet of 120 buses.
“The bus service covers the whole peninsula. It is also synergistic to our core business as we can cross-sell the bus tickets to our riders at the monorail stations.
“Another plus point is that the MTrans group manufactures buses so any fleet expansion would definitely be cheaper for us,” he said, adding that contribution to revenue would start in FY2005.
He said the group would also be looking at new joint-venture arrangements to establish a network of mini and stage buses operating within Kota Baru and its vicinity.
“We have the operating licence for mini and stage buses in Kota Baru. We are currently thrashing out the details. It will be part of our expansion plans and would consist of new buses,” he said.
Other sources of revenue are in the areas of advertising and property development.
Al-Jeffery said the media business had been very good with demand exceeding supply, as its advertising space was located in prime areas.
“We expect advertising revenue to hit RM17mil in FY2005,” he said, adding that advertisers could now advertise on the group's new fleet of buses.
KLIG is currently constructing a new lifestyle destination called Jalan-Jalan, a riverfront development of over 300,000 sq ft comprising 35 restaurants and bistros, and up to 110 specialised retail outlets.
“We will be opening the area in stages. The first phase, which consists of the eateries, is expected to be completed by year-end. Next will be JJ Bazaar, which will connect KL Sentral to the Tun Sambanthan station. Plans are also under way to set up a petting zoo,” he said
KLIG, through its subsidiary KL Monorail System Sdn Bhd, owns a 40-year concession for the construction, operation and maintenance of the RM1.18bil KL Monorail.
ZaHiRnYa???
May 17th, 2004, 06:50 AM
An extremely good news for KLites. Especially when they finally want to extend the line to connect it to MidValley. Definitely going to be a hit for local people :D
baqthier
May 17th, 2004, 07:57 AM
Woohoo! Monorail to Midvalley! But so what? Sure mahal maybe. I'll still take the free bus..unless if I'm on the way from BB :tongue:
ZaHiRnYa???
May 17th, 2004, 08:26 AM
Apa la...dulu complaint bila takde direct transport to MidValley...now dah nak ada pun lagi nak complaint :D
tomkat
May 17th, 2004, 09:10 AM
I thought monorail will go straight into Mid Valley Mall phase 2..? I guess it will not. Is the expansion happening now?
ethan
May 17th, 2004, 02:07 PM
wow....currently KTM komuter is building a station there. now with monorail it is really easy to go to mid valley. However, anyone know what is the progress of putrajaya monorail????
szehoong
May 17th, 2004, 05:43 PM
I thought monorail will go straight into Mid Valley Mall phase 2..? I guess it will not. Is the expansion happening now?
yea...that's what I tot too cos I saw the KL Monorail extension plan before and also Midvalley's expansion plan - both suggesting the station and alignment to be along Klang River :?
Anyway its all good news and I can't wait for its completion :okay:
szehoong
May 17th, 2004, 05:44 PM
However, anyone know what is the progress of putrajaya monorail????
Very slow........they are now 'concentrating' on the Monorail bridge :D
szehoong
May 17th, 2004, 05:47 PM
Woohoo! Monorail to Midvalley! But so what? Sure mahal maybe. I'll still take the free bus..unless if I'm on the way from BB :tongue:
aiyoh...orang ni banyak complain lah! :D
I dun like waiting for bus .......hmm.....I wonder would the free bus still would be operational once KTM Komuter (in August 2004) and KL Monorail starts serving MidValley City :sly:
:D
ZaHiRnYa???
May 18th, 2004, 04:45 AM
aiyoh...orang ni banyak complain lah! :D
I dun like waiting for bus .......hmm.....I wonder would the free bus still would be operational once KTM Komuter (in August 2004) and KL Monorail starts serving MidValley City :sly:
:D
He always like that la. What to do :D
I like to walk to MidValley from Bangsar LRT station rather than waiting for the bus. Walking is good for you :happy:
Kevinkhoo1986
May 18th, 2004, 09:09 AM
I never heard of this road name. Look weird yet cool....
ZaHiRnYa???
May 19th, 2004, 02:21 AM
I never heard of this road name. Look weird yet cool....
What road :?
baqthier
June 14th, 2004, 04:02 PM
What road :?
I think he thought Jalan Jalan XiTianDi is a road name :D
baqthier
June 14th, 2004, 04:03 PM
http://www.theedgedaily.com/cms/content.jsp?id=com.tms.cms.article.Article_1414d962-cb73c03a-10bbd420-9650ed43
11-06-2004: KLIG defers placement of 52m new shares
By Tong Yee Siong
KL Infrastructure Group Bhd has deferred a proposed private placement of up to 52 million new shares in view of the current market conditions.
In a statement on June 11, KLIG said it would make further announcements at a later date on any intention to proceed with the placement or other fundraising proposals.
The placement was proposed last December to finance the construction of Jalan-Jalan Xintiandi, a RM50 million urban leisure riverfront development in Brickfields, Kuala Lumpur.
Part of the proceeds was also for the subscription of shares in Ready Network Sdn Bhd, which is to operate and integrate public transportation in the Klang Valley including the light rail transit systems, the feeder bus service as well as Intrakota and Park May bus operations.
baqthier
September 14th, 2004, 12:19 AM
Any updates? Pics please! :)
szehoong
September 14th, 2004, 03:57 AM
Any updates? Pics please! :)
No update! .....just passed by last week and it is still the same......no construction activity :( ........your pictures are still current! :D
Ijud
September 14th, 2004, 06:45 AM
The Star, 14th September 2004
MTRANS Holdings Sdn Bhd, through units Monorail Malaysia Technology Sdn Bhd (MMT) and KL Infrastructure Group Bhd (KLINFRA), has signed an agreement with Gangnam District, Seoul, to establish a joint-venture company to develop a 6.7km monorail system in the South Korean district on a privatised basis.
Mtrans said in a statement the monorail system, costing US$175mil, would be based on MTrans Monorail, which was implemented for the KL Monorail in Kuala Lumpur.
MMT would be the designated turnkey electronics and machinery supplier while KLINFRA the project manager and system integrator.
MTrans said the civil works would be awarded through open tender.
The Gangnam District has committed to subsidising 40% of the project cost and would subscribe for an equity interest of up to 25% in the proposed joint venture company, it said.
Samsung Life Insurance had also indicated interest to subscribe to part of this equity.
MMT/KLINFRA will seek to raise the balance of project cost through a combination of equity and external borrowings.
MTrans said the project was subject to approvals of the relevant South Korean and Malaysian authorities. – Bernama
weiaze
September 14th, 2004, 07:43 PM
Xintiandi is the "Bangsar" of Shanghai. It consists of beautifully restored historical buildings. I hope ours will be similarly nice. Take a look:
http://www.greatmirror.com/index.cfm?chapterid=720&countryid=129&picid=12
Ijud
October 29th, 2004, 04:36 AM
The Star: 29th. October 2004
KLIG sees steady income from Jalan-Jalan project
KL MONORAIL operator KL Infrastructure Group Bhd (KLIG) expects its RM50mil property development-cum-lifestyle destination project, Jalan-Jalan, to contribute positively to its revenue next year.
Managing director Patrick Wong said the project, which would have a 300,000-sq-ft riverfront development comprising 35 restaurants and bistros, and up to 110 specialty retail outlets, was expected to be completed by the second quarter next year.
“We are trying our best to see how we can increase our revenue,” he told reporters after the company's AGM in Kuala Lumpur yesterday.
For its financial year ended April 30, KLIG suffered an audited net loss of RM46.24mil on RM15.08mil revenue, a shortfall of RM4.2mil from the forecast net loss of RM42mil as stated in the company’s prospectus last year.
He said the project was delayed partly due to rising raw material costs and pending approval from Kuala Lumpur City Hall.
The first phase of the project, situated along the Klang River in Brickfields, was earlier scheduled to be opened for business by year-end.
Wong said the company had also applied for a RM30mil loan under the Tourism Infrastructure Fund provided by Bank Pembangunan dan Infrastruktur Malaysia Bhd to part-finance the construction work of the project.
“In principle, it has been approved. Hopefully, it will be finalised some time next month.”
Wong said KLIG also planned to increase income by intensifying promotional and lifestyle events to generate daily ridership on its monorail network.
“Conservatively, we would like to achieve ridership of between 60,000 and 80,000 a day,” he said, adding that the current daily ridership was between 35,000 and 40,000.
He said KLIG was also awaiting Government approval to extend the monorail network through the construction of a 2km spur line from its main station in the city centre to Mid Valley Megamall, which was expected to increase its daily ridership by at least 5,000.
The proposed spur line will incur an investment of RM30mil, which will come from internal funds and borrowings.
“We submitted the proposal to the Government four months ago. If approved, we can complete the construction within 12 months,” he said.
KLIG, through its subsidiary KL Monorail System Sdn Bhd, owns a 40-year concession for the construction, operation and maintenance of the RM1.18bil KL Monorail.
Ijud
October 29th, 2004, 06:51 AM
Utusan Malaysia: 29 Oktober 2004
Projek `Jalan-Jalan Xintiandi' siap 2005
KUALA LUMPUR 28 Okt. - KL Infrastructure Group Bhd., penyedia perkhidmatan pengangkutan awam menjangka pembangunan Projek `Jalan-Jalan Xintiandi' bernilai RM50 juta dekat stesen monorel Tun Sambanthan siap sepenuhnya pada suku kedua tahun 2005.
Pengarah Urusannya, Patrick Wong, berkata projek itu yang dibina khusus untuk menyediakan persekitaran liburan dalam suasana runcitan fiesta dan mesra pejalan kaki serta dihubungkan oleh terusan buatan manusia, akan memperkenalkan aktiviti tepian sungai.
"Jalan-Jalan Xintiandi'' menawarkan kaedah peruncitan baru yang menarik dengan jualan barangan makanan dan hiburan, katanya pada sidang media selepas mesyuarat agung tahunan syarikat di sini, hari ini.
"Bagi projek ini, kami memohon pinjaman RM30 juta di bawah dana prasarana pelancongan daripada Bank Pembangunan, yang akan digunakan untuk kerja-kerja pembinaan,'' katanya.
Bagi tahun kewangan berakhir 30 April 2004, KL Infrastructure mencapai perolehan RM15 juta dan mencatat kerugian selepas cukai RM46.2 juta berikutan perbelanjaan akruan faedah.
KL Infrastructure terlibat dalam operasi transit monorel, perkhidmatan media/periklanan dan pembangunan hartanah.
Dalam usaha mempelbagaikan perniagaannya, Wong berkata syarikat itu telah meneroka perniagaan bas.
Syarikat itu juga telah menyiapkan pembelian 70 peratus pegangan dalam Darul Naim Express Sdn. Bhd. dengan harga RM980,000.
Wong berkata, KL Infrastructure juga mencadangkan kemudahan pengangkutan pengantara dari stesen monorel Tun Sambanthan ke Mid Valley, yang merupakan sebahagian daripada cabangan lanjutan yang disediakan di bawah konsesi KL Monorail ketika ini. - Bernama
ZaHiRnYa???
November 5th, 2004, 09:45 AM
They resume the construction already. Now in the midst of putting the glass wall.
Ijud
November 5th, 2004, 09:54 AM
Yuppz... I saw some of the glass wall are already up!! :okay:
ZaHiRnYa???
November 5th, 2004, 10:38 AM
Finally they resume it. I like to see it complete ASAP!!!! :D
Ijud
November 5th, 2004, 10:43 AM
But I wonder why they preserved a big tree in the middle of dat building larr :? They wanna do like KLIA's satellite building izit??
ZaHiRnYa???
November 5th, 2004, 10:46 AM
Ehh...okay what. I like that standalone tree in the middle. Good job preserving it. :righton:
Ijud
November 5th, 2004, 10:51 AM
But it looks scary larr... dunno why :?
ZaHiRnYa???
November 5th, 2004, 11:00 AM
What...remind you of "Pontianak Harum Sundal Malam" ke?
baqthier
November 6th, 2004, 08:48 AM
The project stopped for a few months kar?
ZaHiRnYa???
November 8th, 2004, 06:32 AM
The project stopped for a few months kar?
Yeah...not a single movement since the last time I posted the picture in the forum. Only started last week.
Ijud
November 8th, 2004, 06:34 AM
What...remind you of "Pontianak Harum Sundal Malam" ke?
Haha... kalau ade Maya Karin tak kisah arr :D
ZaHiRnYa???
November 8th, 2004, 06:36 AM
Haha... kalau ade Maya Karin tak kisah arr :D
La...setakat minah tak reti berlakun tu tak payah la. Habis duit je tengok wayang.
Ijud
November 8th, 2004, 06:44 AM
Pity her larr bro... dier baru nak cube2... :D
ZaHiRnYa???
November 8th, 2004, 07:08 AM
Pity her larr bro... dier baru nak cube2... :D
Baru nak cuba :? I don't think so :D
Ijud
November 8th, 2004, 07:34 AM
But I wonder... Sungai Kelang air dier berkelodak macam air lumpur kan?? Kalu macam kat Singapore's Clark Quay tu lain arr cerite... air sungai dier bersih... so orang suka larr duduk makan tepi sungai... tapi camne pulak ngan Jalan-Jalan nie?? Takut orang muntah loya pulak nanti :D :?
ZaHiRnYa???
November 8th, 2004, 07:37 AM
Didn't you heard that they want to have this so-called-programme to make Sungai Klang river as clean as like Clark Quay?
Ijud
November 8th, 2004, 07:58 AM
Serious :? Is it started yet?? Sungai Klang masih boleh diselamatkan!!! :D
ZaHiRnYa???
November 8th, 2004, 08:22 AM
Serious :? Is it started yet?? Sungai Klang masih boleh diselamatkan!!! :D
Donno, I don't think they start it yet, if not you will definitely see the changes :D
baqthier
February 20th, 2005, 06:49 AM
has it completed?
choon
February 26th, 2005, 06:38 PM
halt or resume? pics taken on 26.02.2004
http://img.photobucket.com/albums/v651/pelican71/P2260006.jpg
http://img.photobucket.com/albums/v651/pelican71/P2260004.jpg
baqthier
February 27th, 2005, 12:03 PM
My guess is...slow progress
baqthier
April 23rd, 2005, 08:19 PM
Angin pun takdak in the media regarding this nowadays....
szehoong
April 24th, 2005, 07:32 PM
^^^ Unfortunately yes....nothing at all.......still the same as months before :(
ZaHiRnYa???
April 25th, 2005, 01:45 AM
But..there was a news about it in newspaper 2 months ago, mentioning that the project will be completed by the end of this year :?
baqthier
July 24th, 2005, 04:09 PM
updates? :D
ZaHiRnYa???
July 25th, 2005, 03:58 AM
Still the same mah..nothing much change :(
choon
August 14th, 2005, 03:43 PM
picture taken on 14.08.2005
it seems "dead"
http://img361.imageshack.us/img361/2043/p81400195hj.jpg (http://imageshack.us)
ZaHiRnYa???
August 19th, 2005, 03:16 AM
I believe so. Hope something can be done fast to avoid another 'eyesore' in KL :(
baqthier
August 19th, 2005, 05:57 PM
such a small complex by kl standards also can tergendala..aiyo :bash:
nazrey
January 29th, 2006, 09:10 AM
KL SENTRAL & MONORAIL CITY
http://img22.imageshack.us/img22/1957/klmono1gc.jpg
nazrey
January 29th, 2006, 09:11 AM
http://img22.imageshack.us/img22/1766/klmono16at.jpg
nazrey
February 9th, 2007, 03:30 PM
Is it dead forever!...
http://farm1.static.flickr.com/136/382023866_ce8c0301fd_b.jpg
nazrey
February 9th, 2007, 03:31 PM
http://img22.imageshack.us/img22/1957/klmono1gc.jpg
AhChuan
February 9th, 2007, 03:34 PM
^^ Is tht KL sentral??? Coz i can see the twin hotel....
^tamago^
February 9th, 2007, 03:46 PM
Yes.... but Jalan Jalan XiTianDi?
TYW
February 9th, 2007, 04:13 PM
^^ he is showing the smaller building near the turn of the monorail track
nazrey
February 9th, 2007, 04:22 PM
The model for the Monorail Jalan Jalan :
http://www.monorails.org/webpix%202/KL15.jpg
Monorail Jalan Jalan! :lol:
pedang
February 10th, 2007, 01:51 PM
dah jadi rumah antu
dengilo
February 10th, 2007, 02:47 PM
U guys remember giga world project???
ZaHiRnYa???
February 10th, 2007, 05:05 PM
U guys remember giga world project???
the entire project already been scrapped right?
dengilo
February 13th, 2007, 05:28 AM
i am glad they did that !but this was the general area for that projectlah
mrtfreak
February 13th, 2007, 06:49 AM
Why didn't they just finish this? There's always some fanfare but nothing is produced in terms of results.
allurban
February 13th, 2007, 09:18 AM
Why didn't they just finish this? There's always some fanfare but nothing is produced in terms of results.I notice that this is a pattern with the KL Monorail project...
Remember the initial delay ^^ +
The promised extension into KL Sentral property :nuts: +
The plan for extension to MidValley :lol: +
The plan for car parks over the Klang River :bash: +
The plan for 4 monorail lines :ohno: +
The plan for 3 car trains :lol:
Everytime these ideas were introduced, everytime a promise was made, nothing came out of it...
Maybe it has something to do with management at KLIG?
Anyways, I now think that the original project which would have gone to MidValley and Kampung Pasir...can be scrapped.
However, consider this...
1) What is the KL Monorail? They call it PRT (People-Mover Rapid Transit) and they used to call it LRT Sistem 3.
KL Monorail is not LRT, it is a people mover and it should not pretend to be anything but a people mover.
2) Who uses the KL Monorail? Well-heeled professionals, shoppers, and tourists, perhaps? People who work along Jalan Raja Chulan, in the Golden Triangle, and like to spend time in places like Bukit Bintang....
So...the monorail project should cater for these people...which is why an extension to Kg. Pasir will be a costly failure.
So....how about an extension to Bangsar :banana: :cheers:
Yes, Bangsar...site of watering holes, restaurants, and places to see and be seen...
How would it work? It gets interesting.
Step 1 - from Midvalley to Bangsar....a line that connects Midvalley to Bangsar. The line will cross the Klang River and pass along Jalan Pantai Baru, to bring monorail service to Kerinchi, Menara TM, and the Tenaga buildings, as well as a link to the Kelana Jaya line (at Abdullah Hukum).
It would then travel through Bukit Pantai area before approaching Bangsar Baru from the north side.....and ending the line at Bangsar Baru (for now).
The station at Midvalley would be built closer to the north point than the old location (which was across from Abdullah Hukum LRT station).
There would be another station across the river, possibly equidistant between Abdullah Hukum and Kerinchi and the Tenaga Nasional complex.
Step 2 - Build a connection between MidValley and Brickfields. Here there are two options.
Option A - Follow the river and route through Brickfields along Jalan Tun Sambanthan. This allows the line to end at Pasar Seni and the Pusat Bandaraya, instead of KL Sentral. An expnasion to the station at KL Sentral would link the two monorail lines. However, even though the claim is that monorail construction doesnt dont interfere as much, this option would lead to serious traffic on Jalan Tun Sambanthan...which is already totally jammed.
Option B - follow the river all the way to the current site of the monorail Jalan Jalan.
Step 3 (if Step 2 option be is chosen) - connect the new monorail line to the old monorail line...
There are two ways to do this. One way is to tear down the Jalan Jalan complex to allow for a new transfer station (connected to Tun Sambanthan Station) at the site of the Jalan Jalan Complex.
Another way is to retain the complex, but bring the monorail in from across the river, with the transfer station at an expanded Tun Sambanthan station. In this case, a new switching complex would have to be constructed, as well as a new platform at Tun Sambanthan.
If this option is chosen, then KL Monorail service would have to shut down between KL Sentral and Tun Sambanthan station for the connection and testing period. A new switch and bypass would be necessary.
If the two lines are linked, then during the construction process I would like to see the buildings beside KL Sentral Monorail station torn down (at least the one beside the outbound platform). The switching complex would be removed and both tracks would be extended across Jalan Tun Sambanthan into the KL Sentral lot.
I also think that for future consideration...the switches for the monorail should be after the terminus station, and not before...because if the switch is built after the station, then future expansion is easier.
I like the idea of a completely new line that only connects with the existing monorail at KL Sentral station...but an integrated monorail is effective as well. So both options are good, but the point is to bring service to places that would have the demand.
Anyways, this is the idea in its infancy. The main thing is to build the new line and then figure out how to connect it to the original line....if that is what is needed. This way, the monorail serves the needs of the people who can afford to use it (business people) or the people who want to use it (tourists, shoppers).
Your thoughts are appreciated.
Cheers, m
mrtfreak
February 13th, 2007, 04:10 PM
About the system, I think again, a case of poor planning. Having switched before terminal stations and only 2 switches between the revenue lines at that. What happens if a train stalls or meets with an accident? Or not even that, say someone fell off the platform. The whole line will be affected since there aren't any switches in between the terminus stations. Poor planning. Or maybe low budget. :bash:
Anyway, I think they can give up on Jalan Jalan. Firstly, its not very complete. Secondly, its kind of out of the way. And yes, good points Allurban on the mid-valley extension, the 3 car trains. I don't think its really surprising that monorails haven't really fared well globally (look at Jakarta monorail, Seattle monorail; only Japan has it done well).
Anyway, they shouldn't touch monorails anymore. Its good that they completed this line, but I just foresee more problems in future (case in point, Putrajaya Monorail).
nazrey
April 28th, 2007, 05:11 PM
by asuh23
http://farm1.static.flickr.com/226/463434849_b79d3b0355_b.jpg
ZaHiRnYa???
April 28th, 2007, 05:15 PM
such an ugly abandoned building...
nazrey
April 28th, 2007, 05:28 PM
But I think it such the most beautiful abandoned building in Malaysia...!
ZaHiRnYa???
April 28th, 2007, 05:29 PM
i dont think so..
TYW
April 28th, 2007, 05:47 PM
But I think it such the most beautiful abandoned building in Malaysia...!
ha ha...i think it is the most beautiful abandoned building too!!
nazrey
May 24th, 2007, 06:34 AM
by TERS KOSE
http://farm1.static.flickr.com/225/508648197_08d90127d8_o.jpg
dengilo
May 24th, 2007, 06:57 AM
Once and for all Jalan XiTianDi is Sentral station for now until it makes its way into the main terminal one day!!
nazrey
June 20th, 2007, 07:39 AM
http://img28.picoodle.com/img/img28/8/6/20/f_545m_6ac64da.jpg
nazrey
August 9th, 2007, 01:32 PM
http://img02.picoodle.com/img/img02/9/10/13/f_019m_8e23c03.jpg
nazrey
October 13th, 2007, 06:12 PM
http://img29.picoodle.com/img/img29/9/8/9/f_77m_0d558c2.jpg
nazrey
March 6th, 2008, 03:47 PM
http://img28.picoodle.com/img/img28/8/6/20/f_545m_6ac64da.jpg
http://img02.picoodle.com/img/img02/9/10/13/f_019m_8e23c03.jpg
New Project??!?
by Cyanne
http://img26.picoodle.com/img/img26/4/3/6/f_23141633306m_9bf6d1c.jpg
Sheik
March 7th, 2008, 02:00 PM
It's a new budget hotel
nazrey
October 8th, 2008, 05:22 AM
by kitkongboon
http://farm4.static.flickr.com/3102/2897348077_0b58990719_b.jpg
patchay
November 10th, 2009, 06:03 PM
this thread has many good photos...............
i didnt know the building was cladded with glass... today its quite naked......