A joint venture of NESPAK and Nayyar Ali Dada has been appointed as the project consultant for providing designing and contract management for Lahore Expo Centre.

According to a press release here today, one billion rupee worth project spreading over 400 canals would be a world class exhibition center under a public-private partnership company Expo Lahore Private Limited.

The master plan of the project has already been prepared and approved by the Board of Directors, which is headed by the federal minister of state and commerce and chairman export promotion bureau.

The master plan includes four exhibition halls, each with an area of 6,000 square meters, a warehouse, a congress centre with auxiliary conference rooms and a cafeteria. Spaces have also been earmarked for a modern hotel a high rise office building called technology tower and a shopping mall with entertainment facilities.

The building and structure of the Lahore Expo Centre will have a unique character comparable to the latest facilities of global standard. Site investigations have already been completed and the first of the three contracts will soon be awarded to commence by next month. The completion period of the project is 24 months, the spokesman added.
 
See less See more
1
#4 ·
how can they make such a big project with just 1 billion ruppes, thats not even 10 million dollars, eden tower in gulberg cost one billion ruppes and its only 16 storys, plus in this project there making a few big things.

and is it possible to complete a 40 storey building in 24 months.
 
#5 ·
pakboy said:
how can they make such a big project with just 1 billion ruppes, thats not even 10 million dollars, eden tower in gulberg cost one billion ruppes and its only 16 storys, plus in this project there making a few big things.

and is it possible to complete a 40 storey building in 24 months.
1 Billion rupees is just for the Exhibition Center which will be made by the Govt."The master plan includes four exhibition halls, each with an area of 6,000 square meters, a warehouse, a congress centre with auxiliary conference rooms and a cafeteria"

The tower and the hotel will be constructed by a private investor. For which EOI and RFQ have been invited.

Yes a 40 storey building can be made in 24 months (Hashoo group has said that they will complete PC tower within 20-24 months).
 
#7 ·
^Its underconstruction and so is the hotel, dont know about the Technology Tower.

PHA Lahore has also started work on the land around the expo centre.

BTW The project is free from LDA rules, Technology Tower will have no problems with LDA.
 
#8 ·
The road leading to the Expo Centre is also under renovation these days. I think the road's name is Khayaban-e-Jinnah... It's a narrow road - only 2 lanes on each side with a service lane and a wide green belt in the middle. btw, a new Pizza Hut branch has opened nearby that road. :)
 
#11 ·
Techno, the Expo centre will have (almost) direct approaches from at least two different roads.
1) from Canal, this road certainly needs some uplifting - a new pizza hut branch has opened there (not sure if its the biggest in Pakistan - I wouldn't claim that).
2) from Johar Town main road (off Molana Showkat Ali Road), this road is currently under-going renovation - its still really narrow! isn't good! they should decrease the width of the green belt in the middle of the road. they can easily put an extra lane on each side! Anyhow, this road goes straight to Showkat Khanum Hospital and then towards Raiwind road. the road from the hospital to raiwind rd is a single road with two-way traffic with only two lanes. its name is Khayaban-e-Jinnah.
 
#12 · (Edited)
Expo center

One of the approaches mentioned by huit is not direct approach. IInd direct approac would be from canal through a double road before bypass road. This road is in the middle of Suparco pulley and bypass shukat khanum road(still single road called death road these days). The road links canal with expo center. On one side of the road is J block and on the other side of the road lies H block. Still no construction activity on the site yet.
 
#21 ·
President Musharaf is going to lay foundation stone of the project tentatively on 16th of october. For this prepation are being made. In first phase two main halls shall be constructed. In 2nd Phase Shpppig mall & technology tower shall be construed on commercial basis. The project cost of first phase is 1000 million. All the money shall be provided by Govt. Out of 1000 m, 300m have already been released.
 