daily menu » rate the banner | guess the city | one on one

Go Back   SkyscraperCity > Asian Forums > India > Metropolitan Projects > Hyderabad

Hyderabad Project news from Hyderabad and Secunderabad


Reply

 
Thread Tools Rate Thread Display Modes
Old July 11th, 2010, 06:50 PM   #1
su_hyd
Registered User
 
Join Date: Mar 2009
Posts: 250
Likes (Received): 20

Hyderabad Roads & Flyovers

IU's edit: thread title changed. Please use this thread for all road and flyover projects in the Hyderabad met region.
___

Outer Ring Road is a game changing mega infrastructure project of Hyderabad that is currently under progress and is expected to be complete by 2012.

Equally important, Radial Roads connecting the core city (Inner Ring Road) to the ORR.

Total number of radial roads ~ 33

Planned total cost = 2500 crores.

Starting the NH7 road that connects core city to the new Airport, the radial roads are numbered 1 to 29 in the clock wise direction in the following map.

ORR & Radial Roads Map (click on it to view large)


Last edited by IndiansUnite; July 26th, 2010 at 03:57 AM.
su_hyd no está en línea   Reply With Quote

Sponsored Links
 
Old July 11th, 2010, 07:04 PM   #2
su_hyd
Registered User
 
Join Date: Mar 2009
Posts: 250
Likes (Received): 20

Radial roads miss deadline

http://www.deccanchronicle.com/hyder...s-deadline-298

Hyderabad, Oct. 9: The Cash-strapped Hyderabad Metropolitan Development Authority (HMDA) expects to develop only seven out of the proposed 33 radial roads by December 2010, the deadline for completion of all the roads. The radial roads were proposed to improve connectivity to the outer ring road (ORR) from various parts of the city.

About Rs 2,500 crore are required to widen all the radial roads to four and six lanes depending upon the feasibility and the number of private properties to be acquired. Of the estimated total, Rs 750 crore is needed for land acquisition.

The officials are confident of completing the seven radial roads by the deadline because the Japan International Cooperation Agency (JICA) has agreed to provide Rs 350 crore loan of the required Rs 480 crore.

A senior official in HMDA said the radial roads, some of which are presently as narrow as 30 feet at several places, were identified after a traffic study. The road development plan includes widening, construction of footpath, median, and beautification works.

The HMDA officials are planning to request the government to direct GHMC, R&B and Panchayat Raj department to bear the cost of the remaining 26 radial roads as these stretches fall under their respective jurisdictions.

Earlier, the state government had requested the Centre to release the required money under the Jawaharlal Nehru National Urban Renewal Mission (JNNURM) for these roads. But the Centre rejected the proposal citing that such roads do not fall in the priority list of JNNURM. Efforts are on to ensure that the remaining 26 roads are completed along with ORR by March 2012, the official said
su_hyd no está en línea   Reply With Quote
Old July 11th, 2010, 07:15 PM   #3
su_hyd
Registered User
 
Join Date: Mar 2009
Posts: 250
Likes (Received): 20

Radial Roads Completed

The following radial roads are completed so far

- NH7 connecting to IRR to Shamshabad Airport (RR1 - Radial Road 1)
- NH9 connecting IRR to ORR from LB Nagar to Pedamberpet (RR24)
- NH7 connecting IRR to ORR at Medchal (RR12)


there are few other RR's that are currently in progress but couldn't confirm their completion based on the google maps.
su_hyd no está en línea   Reply With Quote
Old July 12th, 2010, 05:27 AM   #4
iceman_ina
Registered User
 
Join Date: Aug 2008
Posts: 62
Likes (Received): 0

Quote:
Originally Posted by su_hyd View Post
there are few other RR's that are currently in progress but couldn't confirm their completion based on the google maps.
AFAIK, four lanes in place or WIP:

1, 2, 30, 6(till tellapur), 7, 8, 9, 10, 12, 13, 19, 24, 25, 28 and 29.
iceman_ina no está en línea   Reply With Quote
Old July 12th, 2010, 05:12 AM   #5
iceman_ina
Registered User
 
Join Date: Aug 2008
Posts: 62
Likes (Received): 0

I could identify 32 roads. I hope all of them are correct

image hosted on flickr
iceman_ina no está en línea   Reply With Quote
Old July 13th, 2010, 12:51 AM   #6
su_hyd
Registered User
 
Join Date: Mar 2009
Posts: 250
Likes (Received): 20

Radial Road 29 or P7 Road

RR29 also called P7 road is an L shaped road that runs parallel to "NH7" & "Srisailam State Highway" and is alternate route connecting IRR to the new Airport.

Looks like the road is almost complete based on the following google pictures.





Stretches that are yet to be complete.....



Cross-section of the P7 road - Very well planned road.

jpg

Last edited by su_hyd; July 13th, 2010 at 01:09 AM.
su_hyd no está en línea   Reply With Quote
Old July 13th, 2010, 01:21 AM   #7
su_hyd
Registered User
 
Join Date: Mar 2009
Posts: 250
Likes (Received): 20

Radial Road 2 (IRR <to> Himayat Sagar)

It's almost complete...or may be already complete...





Couple of stretches under progress....

su_hyd no está en línea   Reply With Quote
Old July 17th, 2010, 08:00 PM   #8
su_hyd
Registered User
 
Join Date: Mar 2009
Posts: 250
Likes (Received): 20

Another completed Radial Road (RR30) - Road connecting Gachibowli > Financial District > ORR

su_hyd no está en línea   Reply With Quote
Old July 26th, 2010, 01:48 AM   #9
Babji
Registered User
 
Join Date: Mar 2006
Posts: 5,709
Likes (Received): 1

Date:26/07/2010 URL: http://www.thehindu.com/2010/07/26/s...2659110300.htm
Quote:
New firm to study flyover merger point

Special Correspondent

HYDERABAD: Yet another effort is being made to remove the new Greenlands flyover and old Begumpet Rail over Bridge (RoB) merger point, the cause of many fatal accidents.

GHMC has managed to find a technical firm, Pragati Consultants, to study the work, come out with fresh designs for submission to the South Central Railway (SCR) for approvals to remove the small erstwhile footpath causing danger to motorists besides being a bottleneck, senior officials said.

SCR's contention has been that removal of the footpath would weaken the very RoB itself and are amenable to change their mind only if the designs are approved by their own engineers as well as IIT professors.

The method was followed when the new flyover work was taken up as the municipal corporation itself then took up structure work atop the rail tracks which is usually the railways' domain.

Noted consultant Mahesh Tandon, initially nominated to prepare designs for removing the footpath in the median, was eased out of the work following a few construction mishaps on Delhi Metro as well as critical remarks he had attracted following the Punjagutta flyover incident. Pragati was chosen after three earlier tenders elicited no response, said senior officials.

Safety features: In between, following a public outcry over several fatal accidents due to the footpath being in the middle, GHMC had put up a few safety features a year ago. These included rumble strips (speed breakers) with solar studs, chevron markings, and collapsible vertical poles with radium stickers, solar reflective raised object markers, cautionary sign boards and blinkers . But, most of them seem to have worn out now.
Babji no está en línea   Reply With Quote
Old July 26th, 2010, 03:56 AM   #10
IndiansUnite
->
 
IndiansUnite's Avatar
 
Join Date: Apr 2006
Location: Hanooz Dilli dur ast
Posts: 10,472

Flyover u/c in Hitech city infront of Cyber towers

July 10
Copyright Marcel (Link to gallery)





IndiansUnite no está en línea   Reply With Quote
Old July 26th, 2010, 04:54 AM   #11
iceman_ina
Registered User
 
Join Date: Aug 2008
Posts: 62
Likes (Received): 0

which flyover is this? the kphb-mmts-hitech city one??
iceman_ina no está en línea   Reply With Quote
Old July 26th, 2010, 04:57 AM   #12
IndiansUnite
->
 
IndiansUnite's Avatar
 
Join Date: Apr 2006
Location: Hanooz Dilli dur ast
Posts: 10,472

Yes. Here's the location on google maps
IndiansUnite no está en línea   Reply With Quote
Old July 26th, 2010, 05:10 AM   #13
iceman_ina
Registered User
 
Join Date: Aug 2008
Posts: 62
Likes (Received): 0

ok. So its yet another one. The one i thought is a railway ROB just north of this one on same road. That one has been in construction forever due to SCR. I feel railway ministry is so inefficient in India.
iceman_ina no está en línea   Reply With Quote
Old July 26th, 2010, 02:00 PM   #14
hyderabadnawab
Registered User
 
Join Date: Dec 2006
Location: New York / Hyderabad
Posts: 158
Likes (Received): 0

Across India, even in highway projects, most of the four laning work will be completed and the only portion that will be delayed generally is a rail over bridge. I have seen tons of examples for these kind of situations. I just don't know why no one does anything about this.
hyderabadnawab no está en línea   Reply With Quote
Old July 27th, 2010, 12:57 AM   #15
su_hyd
Registered User
 
Join Date: Mar 2009
Posts: 250
Likes (Received): 20

I agree with you on this....managing critical path items (rail over bridge, flyover) in a project is key for success of any infrastructure project. Unfortunately, dealing with Indian Railways is painfully slow.


Quote:
Originally Posted by hyderabadnawab View Post
Across India, even in highway projects, most of the four laning work will be completed and the only portion that will be delayed generally is a rail over bridge. I have seen tons of examples for these kind of situations. I just don't know why no one does anything about this.
su_hyd no está en línea   Reply With Quote
Old July 27th, 2010, 04:01 AM   #16
iceman_ina
Registered User
 
Join Date: Aug 2008
Posts: 62
Likes (Received): 0

update on peripheral ring road

source:eenadu

Quote:
Summary:
*Will be brownfield project and include current roads mostly
*45-meter wide roads, 4 lanes
*Connects Tupran - Bibinagar - Choutuppal - Agapally - Shadnagar - Chevella - Shankarpalli - Yeddumailaram - Sangareddi - Tupran
image hosted on flickr
iceman_ina no está en línea   Reply With Quote
Old February 13th, 2011, 02:56 AM   #17
Babji
Registered User
 
Join Date: Mar 2006
Posts: 5,709
Likes (Received): 1

Quote:
Originally Posted by iceman_ina View Post
source:eenadu
image hosted on flickr
no mention of any time line ...
Babji no está en línea   Reply With Quote
Old July 28th, 2010, 02:34 AM   #18
iceman_ina
Registered User
 
Join Date: Aug 2008
Posts: 62
Likes (Received): 0

eenadu

Railway permissions delay Kukatpally RoB & Shamshabad RoB.

*SCR has repeated delayed HMDA's structural designs for kukatpally RoB (connecting cyber towers to JNTU) in the past two years. Construction is expected to take atleast another year.

*work on Shamshabad ROB is slow as SCR is giving permission for 4/5 hrs work every one or two days due to train traffic.
iceman_ina no está en línea   Reply With Quote
Old July 28th, 2010, 03:25 AM   #19
iceman_ina
Registered User
 
Join Date: Aug 2008
Posts: 62
Likes (Received): 0

Sakshi

New Flyover at Tolichowki Jn.

The Jn is major connecting mehadipatnam, gachibowli, qutubshahi tombs (golkonda also) and banjara hills, leading to high traffic volumes.

Very old Hanuman temple in the middle of Jn is a major bottleneck leading to frequent accidents.

GHMC to appoint consultant to carry out feasibility study.
iceman_ina no está en línea   Reply With Quote
Old August 1st, 2010, 05:39 PM   #20
Ron7
Registered User
 
Join Date: Jun 2010
Location: Hyderabad
Posts: 168
Likes (Received): 8

8-lane roads on the anvil

In a move to decongest entry points into the city, the National Highway Authority of India (NHAI) has proposed eight-laning on two important stretches of road — Erragadda-Patancheru and Malakpet-LB Nagar. The NHAI released Rs 100 crore for the project which will also have service roads on both sides of the highway.

A meeting of high-level officials of various departments convened by R&B principal secretary, Ms Lakshmi Parthasarathy, on Thursday discussed the plan of action for implementing the project. Officials of GHMC, metro water works and Central power discom were also present.

Sources said the NHAI informed that it was ready to lay the road provided the state authorities make the land available . Presently, the road width on these two stretches varies between 100 ft and 120 ft. “The NHAI proposed to make the width a uniform 200 ft,” a senior official said. According to a preliminary survey, about 600 structures would have to be either partially or fully demolished. Electric poles and water and sewerage lines would have to be shifted and trees translocated. The exact cost the state has to bear will be arrived at after thorough inspection property-wise, an official pointed out.

Widening the two roads would help the metro project as one line passes through these two stretches.
Ron7 no está en línea   Reply With Quote


Reply

Tags
hitec city jntu flyover, hyderabad, hyderabad flyover, hyderabad roads, orr, radial roads

Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 09:50 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.1.2 (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd.
vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd. (Resources saved on this page: MySQL 33.33%)

SkyscraperCity - In Urbanity We Trust

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu