|
|
| daily menu » rate the banner | guess the city | one on one |
|
|
|
|
#1 |
|
thaichitsiga
Join Date: Jun 2006
Location: CARDIFF
Posts: 682
Likes (Received): 0
|
Angola | Reabilitação dos Sistemas de Água
![]() Project name: water suppply project of Lubango , Huila Province Angola Porject address: Lubango of Huila province of Angola Project chief: according to the general planning of the city, the well water is still the main water source. The total water quantity of water source is 60 thousand ton/d. After centralizing the whole water source will be treated in the water plant. Because of the good quality of water source, the porject can adopt relative simple process(as: coagulation+sedimentation+filtration+disinfection ) to treat the water and make the effluent meet the international standard of dringing water. Project kind: water supply project Technical index: 60 thousand ton/d ![]() Project name: water supply project of Namibe Namibe province Angola Project address: Namibe city of Namibe pronince of Angola Project chief: according to the development state and population of city, the project make sure the scale of water supply. The city adopts water basin to distribute the drinking water. So the new water supply system also adopts water basin to distribute the drinking water. The project adopts the advanced process and technique to ensure the process steadily and reliably. The design of water distribution pipeline should consider fully and use the exiting water supply establishment that working well to make sure the safe of water supply. Project kind: water supply project Technical index: 25 thousand ton/d ![]() Project name: Rehabilitation project of water supply system in LUANDA, ANGOLA Project address: LUANDA of ANGOLA Project chief: This project belong to the no 1 water supply contains water intake and water pump station rehabilitation. The first phase task of this project is the rehabilitation of water intake and water pump station and the design scale is 65.4 thousand ton/d. The second phase contains the water intake extension, ne new water pump station and water supply pipeline. Project kind: water supply project Technical index: 60 thousand ton/d ![]() Project name: Rehabilitation project of water supply system in HUAMBO, ANGOLA Project address: Huambo of Angola Project chief: The design scale of old water plant is 12 thousand ton/d, the design scale of new water plant is 20.64 thousand ton/d. The design flow of new water plant rehabilitation project also contains 5% self water consumption of old and new water plant, 3.2% leak water of pipeline. So the intake water quantity is 32.64 thousand ton/d. Project kind: water supply project Technical index: 20 thousand ton/d en.tjaijie.com
__________________
DONT COUNT WHAT YOU HAVE LOST ONLY WHAT YOU HAVE LEFT |
|
|
|
|
|
#2 |
|
skxawng by tsu'tey
Join Date: Jun 2009
Location: Pandora
Posts: 6,532
Likes (Received): 0
|
muito bom saber que eles pensam em água...obrigado thaichitsiga...mas acredito que aqui neste thread não seria a melhor ideia para postares esse projecto...pois...aqui é simplesmente so para prédios,casas...and whateva's...you feel me primo???
|
|
|
|
|
|
#3 | |
|
thaichitsiga
Join Date: Jun 2006
Location: CARDIFF
Posts: 682
Likes (Received): 0
|
Quote:
__________________
DONT COUNT WHAT YOU HAVE LOST ONLY WHAT YOU HAVE LEFT |
|
|
|
|
|
|
#4 | |
|
skxawng by tsu'tey
Join Date: Jun 2009
Location: Pandora
Posts: 6,532
Likes (Received): 0
|
Quote:
|
|
|
|
|
|
|
#5 |
|
Registered User
Join Date: Apr 2005
Posts: 25,626
Likes (Received): 56
|
I should have looked that such a thread exists...most of the news I just posted in the Reconstruction thread...which should be here..Anyway, here is one more
![]() ![]() Source: http://www.engesique.com.br/wp-conte...ela-africa.png |
|
|
|
![]() |
| Thread Tools | |
| Display Modes | |
|
|