Old July 22nd, 2007, 02:57 PM   #1
sofiane
Registered User
 
Join Date: Apr 2006
Location: Paris (France)
Posts: 571
Likes (Received): 1

OUJDA | Angad Airport Terminal II | 28.000 m² | 990 MDH | 2.700.000 pax | #Completed

Construction d’une nouvelle aérogare sur une superficie de 20.000 m².

sofiane no está en línea   Reply With Quote

Sponsored Links
 
Old May 10th, 2008, 07:41 PM   #2
Slaoui
BANNED
 
Join Date: Jan 2008
Location: Paris
Posts: 7,720
Likes (Received): 2

OUJDA | New terminal | U#C

Version Française :

Nouveau terminal pour l'aéroport Oujda-Angad

La première pierre du projet d'extension de l'aéroport a été posée le lundi 9 juillet 2007 par SM le Roi Mohammed VI, accompagné de SA le Prince Moulay Ismail. Une enveloppe budgétaire de 650 millions DH a été débloquée.

Le projet comprend :

la construction, en 30 mois, d'un nouveau terminal d'une capacité de 2 millions de passagers par an, sur une surface de 18.000 m2, comprenant un bloc technique et une tour de contrôle;
l'extension du Parking-avions pour atteindre une capacité de 15 appareils moyen courrier;
la construction d'une seconde piste d'envol;
l'aménagement de nouveaux parkings de 800 véhicules;
le réaménagement des installations et infrastructures existantes;
la réalisation d’un taxiway parallèle à la piste;
l'aménagement de bretelles de liaison avec la nouvelle zone terminale;
le balisage lumineux et l'éclairage des parkings avions.
Ces travaux sont rendus nécessaires par l'augmentation de la fréquentation touristique que connaît la région, notamment l'essor de la station balnéaire de Saïdia, située sur la côte méditerranéenne.

English version :

New terminal fort the Oujda-Angad Airport

The cost of this project is about 650 millions DH

For this price we have :

The construction, in 30 months, of a new terminal with a capacity of 2 million passengers a year, on a surface of 18.000m2, a technical block and a control tower;
the extension of Car parks-planes to affect a capacity of 15 devices average mail;
the construction of a second takeoff runway;
The developmentof new car parks of 800 vehicles;
the reorganization of the installations and existing infrastructures;
the realization of a taxiway parallel to the runway;
the development of braces of connection with the new terminal zone;
the brilliant tagging and the lighting of car parks planes.


Last edited by Slaoui; May 11th, 2008 at 02:48 AM.
Slaoui no está en línea   Reply With Quote
Old May 11th, 2008, 12:53 AM   #3
Titeuf
Registered User
 
Titeuf's Avatar
 
Join Date: Apr 2008
Location: Safi, Morocco
Posts: 11
Likes (Received): 0

Looks beautiful! but small a little bit, no?
Titeuf no está en línea   Reply With Quote
Old May 11th, 2008, 02:35 AM   #4
Rabat_M6_lover
BANNED
 
Join Date: Dec 2007
Posts: 182
Likes (Received): 0

i like it
with your avatare titeuf i though i posted a reply looooooooooooooooooool
Rabat_M6_lover no está en línea   Reply With Quote
Old May 11th, 2008, 02:47 AM   #5
Slaoui
BANNED
 
Join Date: Jan 2008
Location: Paris
Posts: 7,720
Likes (Received): 2

De rien !
Slaoui no está en línea   Reply With Quote
Old May 12th, 2008, 03:38 AM   #6
muvo
Registered User
 
Join Date: Mar 2008
Posts: 9
Likes (Received): 0

looks great
muvo no está en línea   Reply With Quote
Old July 5th, 2008, 02:45 AM   #7
maghribi75
Registered User
 
Join Date: Jul 2008
Location: Fes (Canada)
Posts: 4
Likes (Received): 0

reminds me of Star Trek
maghribi75 no está en línea   Reply With Quote
Old July 11th, 2008, 12:55 AM   #8
Slaoui
BANNED
 
Join Date: Jan 2008
Location: Paris
Posts: 7,720
Likes (Received): 2

Yes, a little bit
Slaoui no está en línea   Reply With Quote
Old August 8th, 2008, 01:59 AM   #9
Yazoo
Registered User
 
Yazoo's Avatar
 
Join Date: May 2006
Location: New York City
Posts: 495
Likes (Received): 0

Yazoo no está en línea   Reply With Quote
Old August 18th, 2008, 08:55 PM   #10
skytrax
Big boss!
 
skytrax's Avatar
 
Join Date: Nov 2006
Location: Luanda
Posts: 19,434
Likes (Received): 104

wooow beautiful
__________________
Não sou Luandense nem Angolano, nem sequer Lisboeta ou Português. Sou sim, um Cidadão do Mundo!

Angolan Forum | Luanda pictures | my World Trip

~> SkyscraperCity Angola on Facebook <~
skytrax no está en línea   Reply With Quote
Old September 28th, 2008, 09:44 PM   #11
Slaoui
BANNED
 
Join Date: Jan 2008
Location: Paris
Posts: 7,720
Likes (Received): 2

Slaoui no está en línea   Reply With Quote
Old October 14th, 2008, 10:59 PM   #12
Meki
The only one in the world
 
Meki's Avatar
 
Join Date: Sep 2008
Location: Amsterdam
Posts: 72
Likes (Received): 0

Beautifel
__________________
Islam video's on Youtube!
Meki no está en línea   Reply With Quote
Old October 24th, 2008, 06:57 AM   #13
timo9
think 想 大 big!
 
timo9's Avatar
 
Join Date: Oct 2008
Posts: 10,197
Likes (Received): 316

AIRPORT | Oujda | Angad Airport Terminal II

Il est plus un projet, le Terminal II est en construction maintenant et son ouverture est prévu pour 2010.
timo9 no está en línea   Reply With Quote
Old October 24th, 2008, 05:39 PM   #14
Slaoui
BANNED
 
Join Date: Jan 2008
Location: Paris
Posts: 7,720
Likes (Received): 2

Faut lire, y'a déjà un sujet 2 posts plus bas !

http://www.skyscrapercity.com/showthread.php?t=624489
Slaoui no está en línea   Reply With Quote
Old December 29th, 2008, 03:54 PM   #15
timo9
think 想 大 big!
 
timo9's Avatar
 
Join Date: Oct 2008
Posts: 10,197
Likes (Received): 316

Quote:
Originally Posted by Slaoui View Post
Faut lire, y'a déjà un sujet 2 posts plus bas !

http://www.skyscrapercity.com/showthread.php?t=624489
this is an invalid link
__________________
timo9 no está en línea   Reply With Quote
Old December 30th, 2008, 12:06 AM   #16
Slaoui
BANNED
 
Join Date: Jan 2008
Location: Paris
Posts: 7,720
Likes (Received): 2

U-C mais aucunes photos...
Slaoui no está en línea   Reply With Quote
Old January 17th, 2009, 05:28 PM   #17
timo9
think 想 大 big!
 
timo9's Avatar
 
Join Date: Oct 2008
Posts: 10,197
Likes (Received): 316

Quote:
Originally Posted by Slaoui View Post
U-C mais aucunes photos...
http://www.mtpnet.gov.ma/MET_New/Fr/...e+en+cours.htm
__________________
timo9 no está en línea   Reply With Quote
Old January 17th, 2009, 05:33 PM   #18
timo9
think 想 大 big!
 
timo9's Avatar
 
Join Date: Oct 2008
Posts: 10,197
Likes (Received): 316

PLAN DE MASSE GLOBALE


NOUVELLE ZONE TERMINALE


* Réalisation d’une aérogare de 15 000 m² pour traiter un trafic de 1.2 million attendu à l’horizon 2010;
* Réalisation d’un Taxiway parallèle;
* Aménagement de bretelles de liaison avec la nouvelle zone terminale;
* Extension du Parking avions pour permettre une Capacité globale de 12 avions moyen courrier;
* Balisage lumineux et éclairage parkings avions.

http://www.mtpnet.gov.ma/MET_New/Fr/...e+en+cours.htm
__________________
timo9 no está en línea   Reply With Quote
Old March 26th, 2009, 11:39 PM   #19
timo9
think 想 大 big!
 
timo9's Avatar
 
Join Date: Oct 2008
Posts: 10,197
Likes (Received): 316

Quote:
...La pose de la première pierre par SM le Roi, le 09 juillet 2007, pour la construction du nouveau Terminal est un signe fort pour l’intérêt particulier que revêt le secteur aéroportuaire dans cette région. Le nouveau terminal aura une superficie de 20.000 m², offrant une capacité additionnelle de 2 millions de passagers par an.

Le communiqué de l'ONDA a tenu aussi à rappeler d'autres projets en cours d'execution:

* La construction d’une tour de contrôle ;
* Un parking avions d’une capacité additionnelle de 10 avions moyen courrier ;
* Un accès routier avec un parking véhicule doté de 800 places.
* Aménagement des abords ;
* Espaces verts et plantations, éclairage extérieur

Et pour faire face aux contraintes géographiques qui entravent le décollage normal des avions, le projet inclut également une nouvelle piste d’envol, orientée Nord-Sud, de 3000 m de long et de 45 m de large et l'aménagement de bretelles de liaison avec la nouvelle zone terminale.

L'ouverture est programmé pour l'été 2010 afin d'accompagner le boom touristique que connait la région.


aeronautique.ma
__________________

Last edited by timo9; March 26th, 2009 at 11:45 PM.
timo9 no está en línea   Reply With Quote
Old February 10th, 2010, 04:27 PM   #20
Gadiri
Moderator
 
Gadiri's Avatar
 
Join Date: Oct 2009
Location: Paris-Agadir
Posts: 30,653
Likes (Received): 206

Quote:
Originally Posted by [Prinny Man] View Post





On voit bien ici les 6 Passerelles téléscopiques.
Prinnyman, merci pour tes efforts.

On vient bien l'avancée des travaux de superstructures. Les pylônes soutenant les travaux sont à leur place, et les passerelles déjà montée prête à l'installation.



Quote:
Originally Posted by Slaoui View Post
Version Française :

Nouveau terminal pour l'aéroport Oujda-Angad


Le projet comprend :

la construction, en 30 mois, d'un nouveau terminal d'une capacité de 2 millions de passagers par an, sur une surface de 18.000 m2, comprenant un bloc technique et une tour de contrôle;
l'extension du Parking-avions pour atteindre une capacité de 15 appareils moyen courrier;
la construction d'une seconde piste d'envol;
l'aménagement de nouveaux parkings de 800 véhicules;
le réaménagement des installations et infrastructures existantes;
la réalisation d’un taxiway parallèle à la piste; l'aménagement de bretelles de liaison avec la nouvelle zone terminale;
le balisage lumineux et l'éclairage des parkings avions.
Ces travaux sont rendus nécessaires par l'augmentation de la fréquentation touristique que connaît la région, notamment l'essor de la station balnéaire de Saïdia, située sur la côte méditerranéenne.
Quote:
Originally Posted by timo9 View Post
PLAN DE MASSE GLOBALE
J'avais pas trop fait attention qu'une nouvelle piste serait créee, car sur le plan de masse on n'apercevait que la réalisation d'un taxiway qui lui n'a pas été réalisé.
Cet aéroport à de la gueule, avec des infrastructures meilleure que celle de Casablanca. 2 pistes ! Quelle belle porte d'entrée du Royaume.


Last edited by Gadiri; February 10th, 2010 at 04:34 PM.
Gadiri no está en línea   Reply With Quote


Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 11:04 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.1.2 (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd.
vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd. (Resources saved on this page: MySQL 33.33%)

SkyscraperCity ☆ High there, what's up!

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu