|
|
| daily menu » rate the banner | guess the city | one on one |
|
|
|
|
#1 |
|
By Spirit
Join Date: Sep 2002
Location: S I N G A P O R E
Posts: 26,215
Likes (Received): 2
|
Japan's Shimuzu wins bid to build T-3 at Changi
http://straitstimes.asia1.com.sg/mon...75021,00.html?
March 4, 2003 JAPANESE construction firm Shimizu has been awarded a $1 billion contract to build Changi Airport's third passenger terminal. The Civil Aviation Authority of Singapore confirmed media reports yesterday that the contract, awarded solely to Japan's third-largest general contractor, will be signed in May. Shimizu was one of 11 parties that put in a bid for the contract when the Government called for a tender in September 2001. Scheduled for completion in 2006, the third terminal will have a handling capacity of 20 million passengers. That will enable Changi Airport to cope with a total of 64 million passengers a year. The airport handled less than half that number - 29 million passengers - for the whole of last year. A key architectural feature of the new terminal, which will span four storeys and have 28 boarding gates, is the liberal use of glass panels that will allow natural light to illuminate the terminal. Shimizu declined to comment on the details of the deal when contacted in Tokyo yesterday. The Japanese firm has clinched a total of 360 billion yen (S$5.3 billion) worth of contracts from the Republic since 1980, when it first undertook an office building project here. |
|
|
|
|
|
#2 |
|
By Spirit
Join Date: Sep 2002
Location: S I N G A P O R E
Posts: 26,215
Likes (Received): 2
|
Very impressive pictures!
This will definitely help Changi maintain its number 1 position. I saw the new subway at the airport..looks cool, although unless I was really free and had little luggage, I would take a taxi. |
|
|
|
|
|
#3 | |
|
By Spirit
Join Date: Sep 2002
Location: S I N G A P O R E
Posts: 26,215
Likes (Received): 2
|
Quote:
|
|
|
|
|
|
|
#4 |
|
By Spirit
Join Date: Sep 2002
Location: S I N G A P O R E
Posts: 26,215
Likes (Received): 2
|
<table cellpadding=4 cellspacing=0 width=98% class="quoteBox">
<td align=left valign=center> <smallfont> <b>Quote</B> <I>originally posted by BrizzyChris </i></b> </smallfont> </td> <tr><td align=left valign=top>Yes, Changi has 2 runways at the moment. Does anyone know if the inter-terminal train shuttle will be extended to T3?</td></tr> </table> They should, although T3 seems to be a bit further off. |
|
|
|
|
|
#5 |
|
By Spirit
Join Date: Sep 2002
Location: S I N G A P O R E
Posts: 26,215
Likes (Received): 2
|
A rendering and information from SOM's website
This new airline terminal completes a multi-phase masterplan that began in the 1970's. The form of this phase is intended to be compatible with the existing terminal while simultaneously yielding a unique experience. In evaluating the design requirements for T3, it became evident that there needed to be a clearer hierarchy of spaces within the terminal. In order to achieve this goal, SOM designed a feature roof that spans the Ticketing Hall and Departure Hall. Comparatively, the surrounding landscaped roofs covering the concourses and ancillary spaces linking the existing terminals are lower and less articulated. A system of louvers both above and below the feature roof baffles the tropical sunlight admitted through the skylights. These louvers limit the amount of direct light on the terminal floor and allow the space to be filled with diffused, ambient light. The careful positioning of louvers gives the ceiling a soft, organic character. The lightweight, perforated aluminum composite panels benefit the acoustics of the space while reflecting both natural and artificial light. The louvers are supported by a system of cables that also helps stabilize the roof trusses. The total structure consists of 220m long by 4m deep steel truss-supported roof with cable bracing and tension-net point-fixed glass fa�e. The light modulation system contains 1,100 skylights and 215,000 cable-supported perforated aluminum louvers. Due to its size, scale and articulation, the roof's effect is quite atmospheric.
|
|
|
|
|
|
#6 |
|
By Spirit
Join Date: Sep 2002
Location: S I N G A P O R E
Posts: 26,215
Likes (Received): 2
|
State-of-the-Art Baggage Handling System
When Singapore Changi Airport's Terminal 3 opens in 2006, it will have a S$121 million state-of-the-art baggage handling system that will enhance Changi Airport's position as an aviation hub in the region. The fully-automated baggage system will include a high-speed inter-terminal baggage transfer system and an automated early bag storage facility.
A key feature of the new baggage handling system is a high-speed inter-terminal baggage transfer system. Baggage of transfer passengers making connections at different terminals will be transported individually through underground tunnels at a speed of 7m/s. This means it will take only about three minutes for a bag to be transported from one terminal to the other. The baggage handling system will also have an automated early baggage storage system, where bags that are checked-in early or transfer bags with long connection times are stored. Besides allowing for automatic bag storage and retrieval, the system is also able to automatically update changes in flight itinerary of passengers and thus discharge the bags to the right connecting flights. The new baggage system will also have an integrated multi-level baggage security screening system to automatically screen bags. The baggage handling system in Terminal 3 will also be able to support the operations of new large aircraft, such as the Airbus A380. Of the eight baggage claim belts in Terminal 3's Arrival Hall, four are designed to support the new large aircraft. Work on the new baggage handling system will begin in the last quarter of 2003 and is expected to be completed in 2005. |
|
|
|
|
|
#7 |
|
Moderator
Join Date: Sep 2002
Location: Brisbane
Posts: 6,023
Likes (Received): 101
|
Thank you heaps, I've been waiting for so long to see some renderings of T3. But I am still a little confused as to its location within the airport. Will it be north of T1?
|
|
|
|
|
|
#8 |
|
Moderator
Join Date: Sep 2002
Location: Brisbane
Posts: 6,023
Likes (Received): 101
|
Yes, Changi has 2 runways at the moment.
Does anyone know if the inter-terminal train shuttle will be extended to T3? |
|
|
|
|
|
#9 |
|
Melbourne Zealot
Join Date: Sep 2002
Location: Melbourne, Australia
Posts: 1,356
Likes (Received): 0
|
That clear span bridge looks like Santiago Clatrava's work. Anyone know the architect? But the ceiling is...disturbing! hehe
|
|
|
|
|
|
#10 |
|
ไทย Amazing Thailand 泰国
Join Date: Sep 2002
Location: Bangkok
Posts: 3,357
Likes (Received): 4
|
looks like it's gonna be a very modern terminal...ccol
__________________
'BANGKOK-THAILAND' --> Los Angeles --> Melbourne, Australia! --> & now back to amazing Bangkok, Thailand again Bangkok Skyline Links Thai forum | Bangkok Skyscrapers Info | Amazing Thailand | Bangkok City |
|
|
|
|
|
#11 |
|
Registered User
Join Date: Sep 2002
Location: London
Posts: 678
Likes (Received): 0
|
it looks sorta weird.. seems like the roof is falling due to earthquake. mmm.
SOM could have done better.
|
|
|
|
|
|
#12 |
|
Here Since 2002
Join Date: Sep 2002
Location: Sydney/Metro Manila
Posts: 6,715
Likes (Received): 2
|
real cool pictures
changi is really big!! btw how many runways does it have?
__________________
dafuq I've been here ten years?! |
|
|
|
|
|
#13 |
|
Boeing 747-412 9V-SPK
Join Date: Oct 2002
Location: Singapore (Yishun)
Posts: 383
Likes (Received): 0
|
Great pics hier!! I remember going pass part of the T3 which has completed construction (i think!) and boy was the glass good!
![]() Can't wait to see how the rest of the terminal turns out!
__________________
Singapore Roars! into SSC - Visit our forum today! Lion City in the sun, Tropical paradise on earth ----------------------------------------------------- Skyscrapers.com - Stuff on architectural styles, facade materials and building structures etc. | HowStuffWorks.com - Skyscrapers | Popular Science mag - How high can they build? | Popular Science mag - New sturdier, safer, and smarter skyscrapers. | Asian forumers post count thread | Asian and Middle Eastern Skyscraper Forums Stats thread | Singapore U/C thread |
|
|
|
|
|
#14 |
|
Chasing the skies
Join Date: Oct 2002
Location: Palmdale, California
Posts: 2,236
Likes (Received): 0
|
<table cellpadding=4 cellspacing=0 width=98% class="quoteBox">
<td align=left valign=center> <smallfont> <b>Quote</B> <I>originally posted by Roscoe </i></b> </smallfont> </td> <tr><td align=left valign=top> I wished LAX could be this awesome.</td></tr> </table>Indeed. Anywho Changi T3 looks like a really awesome sight to behold when arriving.
|
|
|
|
|
|
#15 |
|
Registered User
Join Date: Nov 2002
Posts: 6,158
Likes (Received): 0
|
CHANGI AIRPORT / Terminal 3
these are renderings of the currently under construction terminal. (please also go to pg3 for amazing and large renditions scanned from a book)
![]() ![]() Singapore Changi Airport's Terminal 3 will have a flat but intriguing roof consisting of many skylights allowing natural light into the terminal building. The roof will limit the amount of direct sunlight into the building through the use of louvres suspended above and below the skylights, filling Terminal 3 with diffused, ambient light during the day. At night, artificial light bounced off the ceiling creates a soothing and comfortable environment for passengers. This unique feature of Terminal 3 will also be seen by passengers waiting to collect their bags at the baggage claim hall. ![]() ![]() Passengers using Terminal 3 can expect to move around with ease and minimum dependence on signages. This is possible as Terminal 3 will adopt a see-through layout concept, making it easier for travellers to orientate themselves. This is part of the four guiding principles adopted by the Civil Aviation Authority of Singapore (CAAS) when designing Terminal 3, namely, clarity, natural lighting, external views and maintainability. Terminal 3 and its associated works will cost S$1.5 billion. It will add a capacity of 20 million passengers a year, bringing the total capability of Changi Airport to 64 million passengers till the year 2020. When opened in 2006, Terminal 3 will add another 28 aerobridge gates to Changi Airport, with up to eight that will be designed to handle the new generation of large aircraft, the A380. Last edited by RafflesCity; April 6th, 2004 at 01:11 AM. |
|
|
|
|
|
#16 |
|
The Monkey King
Join Date: Jan 2003
Location: Singapore 新加坡 Singapura சிங்கப்ப
Posts: 11,897
Likes (Received): 0
|
NEW NEW NEW!!!! HUGE renderings and illustrations of Changi Terminal 3!!!
These renderings and text are taken out from a book entitled "Changi by Design – Architecture of the
World’s Best Airport" by Nirmal Kishnani. Painstakingly scanned and OCRed for your viewing and reading pleasure! ![]() (note: there are also text and illustrations for the existing terminals, which I will provide in future)
__________________
Majulah Singapura 前进吧,新加坡!Onward Singapore முன்னேறட்டும் சிங்கப்பூர் "My Settlement of Singapore continues to thrive most wonderfully - it is all and everything I could wish and, if no untimely fate awaits it, promises to become the Emporium and the pride of the East" - Sir Thomas Stamford Raffles, 10th September 1820 |
|
|
|
|
|
#17 |
|
The Monkey King
Join Date: Jan 2003
Location: Singapore 新加坡 Singapura சிங்கப்ப
Posts: 11,897
Likes (Received): 0
|
In the processes that shaped the issues and priorities of T3 three schemes were generated and evaluated,
each with a somewhat exaggerated emphasis. The Wave was an allegory of movement. The curvature of the roof tracked departing passenger flow through the building, rising and falling to give emphasis to space and activity. ![]() ![]() ![]() ![]()
__________________
Majulah Singapura 前进吧,新加坡!Onward Singapore முன்னேறட்டும் சிங்கப்பூர் "My Settlement of Singapore continues to thrive most wonderfully - it is all and everything I could wish and, if no untimely fate awaits it, promises to become the Emporium and the pride of the East" - Sir Thomas Stamford Raffles, 10th September 1820 |
|
|
|
|
|
#18 |
|
The Monkey King
Join Date: Jan 2003
Location: Singapore 新加坡 Singapura சிங்கப்ப
Posts: 11,897
Likes (Received): 0
|
The Eye was an expression of technology, an anatomical analogy for the skylight above the Departure Hall,
made up of a matrix of steel and glass. ![]()
__________________
Majulah Singapura 前进吧,新加坡!Onward Singapore முன்னேறட்டும் சிங்கப்பூர் "My Settlement of Singapore continues to thrive most wonderfully - it is all and everything I could wish and, if no untimely fate awaits it, promises to become the Emporium and the pride of the East" - Sir Thomas Stamford Raffles, 10th September 1820 |
|
|
|
|
|
#19 |
|
deceased
Join Date: Dec 2003
Location: Singapore
Posts: 2,222
Likes (Received): 0
|
Really cool. Many airports seem to have that 'curve' shape, though, especially the newer ones in Japan. Kansai International and Fukuoka International's departure halls have the effect too. In fact, i find the two look exactly alike from the inside.
__________________
http://e2e.sg -- http://e2e.deviantart.com
"All I want is a warm bed, a kind word, and unlimited power." - Ashleigh Brilliant |
|
|
|
|
|
#20 |
|
Tan
Join Date: Dec 2002
Location: Singapore
Posts: 4,282
Likes (Received): 1
|
Wow!!!
I never knew of the wave thing!!! Will it be built? Thanks Huaiwei for scanning them!!
|
|
|
|
![]() |
| Thread Tools | |
| Display Modes | |
|
|