Old August 31st, 2009, 09:49 AM   #1
desert burner
real gooner
 
desert burner's Avatar
 
Join Date: Apr 2009
Location: asia
Posts: 4,588
Likes (Received): 2

Sangoro Power Plant | Hydro-Electricity | U/C

The outlook of Kenya’s energy sector is promising following the launch of the second phase of the Sondu Miriu hydroelectric power project.

The completion of the Sangoro power plant scheduled for 2011 is expected to inject an additional 21.2 megawatts.

This, says KenGen’s Sondu Miriu hydroelectric power project manager Alfred Abiero, will bring the grand production of Sondu Miriu to 81.2 megawatts.

Sinohydro Corporation Ltd, a Chinese construction company, is handling the construction at the Sangoro Power plant project while Nippon Koei of Japan is the consultant engineer.

The two firms won the bids in an international tender placed by KenGen. “The Sangoro Hydropower project gives us a chance to generate more power to meet the country’s energy requirements,” Mr Abiero told journalists who recently toured the site. “Work at the new site has started in earnest and we are confident it will be completed on time,” he added.

Sangoro power project is expected to cost Sh4.5 billion with the New Japan International Cooperation Agency (New Jica) sponsoring it to the tune of Sh3 billion and KenGen contributing the remainder of the funds.

Besides putting up the hydropower generation station, the Chinese contractor will also construct a five-kilometre transmission line to connect Sang’oro to the main Sondu Miriu power station to be stepped down to Kisumu substation. The Sang’oro power plant will also incorporate the nearby Magwagwa dam.

The first phase of the Sondu Miriu was officially launched in 2007 with the funding from the Japan Bank for International Cooperation (JBIC), now New Jica. It injects 60 megawatts into the national grid. The Sangoro power plant is among more than 10 other ongoing power generation projects across the country.
desert burner no está en línea   Reply With Quote

Sponsored Links
 
Old August 31st, 2009, 09:52 AM   #2
desert burner
real gooner
 
desert burner's Avatar
 
Join Date: Apr 2009
Location: asia
Posts: 4,588
Likes (Received): 2

the government with its own problem have really done tremendous job in upscaling infrastructure development.
desert burner no está en línea   Reply With Quote
Old July 18th, 2011, 07:00 PM   #3
Dhuks
Registered User
 
Dhuks's Avatar
 
Join Date: May 2011
Location: Away from the drones
Posts: 3,245
Likes (Received): 150

Date of completion is this year. Did it get off the ground?
Dhuks no está en línea   Reply With Quote
Old July 18th, 2011, 08:41 PM   #4
Mkenyasili
Registered User
 
Mkenyasili's Avatar
 
Join Date: Jun 2011
Location: Laurinburg
Posts: 1,464
Likes (Received): 96

Yes it did Sondu Miriu is U/C if not completed i think I went to school near there the Japanesse are doing a splendid job there.
Mkenyasili no está en línea   Reply With Quote
Old July 25th, 2011, 11:03 AM   #5
Ivern
Registered User
 
Join Date: Nov 2009
Posts: 145
Likes (Received): 0

Sondu miriu is already complete and Songoro is well under way for completion later in the year..........the songoro plant will inject 21.1 MW in the national grid. However, all these projects are dwarfed by the country's need for energy...take this, Kenya needs not less than 3000MW injected into the grid within the next 6 years whether or not we are to attain MDGs. Injecting a mere 21MW into the grid is like chicken feed to a hungry elephant....What Kenya need's is a Grand project to inject atleast 1500 MW into the grid and that can only be Nuclear!!
Ivern no está en línea   Reply With Quote


Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 07:08 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.1.2 (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd.
vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd. (Resources saved on this page: MySQL 33.33%)

SkyscraperCity ☆ High there, what's up!

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu