daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine

Go Back   SkyscraperCity > Infrastructure and Mobility Forums > Highways & Autobahns

Highways & Autobahns All about automobility



Reply

 
Thread Tools
Old August 1st, 2013, 02:42 PM   #6121
Le Clerk
AUTOBANN.ED
 
Le Clerk's Avatar
 
Join Date: Oct 2007
Posts: 31,953
Likes (Received): 3232

__________________
Rebuilding Bucharest's History: Lipscani Area |Victoriei Ave. | Elisabeta Bld.
Yes, it's Dracula's Castle
Best picture collection of UNESCO sites in Romania
Castles and Mansions in Romania
Le Clerk no está en línea   Reply With Quote

Sponsored Links
 
Old August 1st, 2013, 02:42 PM   #6122
Le Clerk
AUTOBANN.ED
 
Le Clerk's Avatar
 
Join Date: Oct 2007
Posts: 31,953
Likes (Received): 3232

__________________
Rebuilding Bucharest's History: Lipscani Area |Victoriei Ave. | Elisabeta Bld.
Yes, it's Dracula's Castle
Best picture collection of UNESCO sites in Romania
Castles and Mansions in Romania
Le Clerk no está en línea   Reply With Quote
Old August 1st, 2013, 03:36 PM   #6123
panda80
Registered User
 
panda80's Avatar
 
Join Date: Sep 2008
Location: Braila/Bucharest
Posts: 3,418
Likes (Received): 136

Quote:
Originally Posted by Le Clerk View Post
Lots 2&3 (50 km), currently U/C, should open next year.
Unfortunately we don't even have a contract for lots 2 and 3, but rumours say that sometime in the next days the contract with the constructors will be signed. So these lots are not yet U/C, and will finish in 2016 at best.
__________________
my clinched highways
my travelogue Now Thassos, Greece
panda80 no está en línea   Reply With Quote
Old August 1st, 2013, 09:30 PM   #6124
medicu' de garda
Registered User
 
medicu' de garda's Avatar
 
Join Date: May 2010
Location: Bucharest
Posts: 1,237
Likes (Received): 556

Quote:
Originally Posted by Le Clerk View Post
Lots 2&3 (50 km), currently U/C, should open next year.
Oh, for crying out loud, if you don't know something for sure, just dont post it at all!! Lots 2 and 3 haven't even been signed yet, and besides, chances are that they will be the most difficult lots built till now, similar to Orastie-Sibiu lot 3, with plenty of surprises and difficult terrain. We'll be lucky if they are ready be end of 2015, but more likely 2016! Stop missinforming people!

Lot 4 starts near Ilia (interchange included), and ends at Soimus interchange, which will be rebuilt. Lots 2 and 3 start from Dumbrava interchange (already built), and ends at Ilia. The limit between them is at the top of the hill near Cosevita, no interchange though. It's unclear how one lot could be used without the other one being ready, since there will be a lot of earthworks on that hill, with viaducts and potential tunneling works.
__________________
Trust me, I'm an east-european doctor.

and802, cricric, MichiH liked this post
medicu' de garda no está en línea   Reply With Quote
Old August 2nd, 2013, 10:19 AM   #6125
Le Clerk
AUTOBANN.ED
 
Le Clerk's Avatar
 
Join Date: Oct 2007
Posts: 31,953
Likes (Received): 3232

Quote:
Originally Posted by medicu' de garda View Post
Oh, for crying out loud, if you don't know something for sure, just dont post it at all!! Lots 2 and 3 haven't even been signed yet, and besides, chances are that they will be the most difficult lots built till now, similar to Orastie-Sibiu lot 3, with plenty of surprises and difficult terrain. We'll be lucky if they are ready be end of 2015, but more likely 2016! Stop missinforming people!
Oh, noes, someone made a mistake!
Yeah, so I mixed Sibiu-Orastiu with Lugoj-Deva.

It's good that you are the info beacon here!
__________________
Rebuilding Bucharest's History: Lipscani Area |Victoriei Ave. | Elisabeta Bld.
Yes, it's Dracula's Castle
Best picture collection of UNESCO sites in Romania
Castles and Mansions in Romania

Last edited by Le Clerk; August 2nd, 2013 at 10:30 AM.
Le Clerk no está en línea   Reply With Quote
Old August 2nd, 2013, 10:53 AM   #6126
medicu' de garda
Registered User
 
medicu' de garda's Avatar
 
Join Date: May 2010
Location: Bucharest
Posts: 1,237
Likes (Received): 556

I can recomend you a good eye-doctor .


Btw, I forgot to mention that Lugoj-Deva lots 2 and 3 have official constructors, after all the legal problems have been sorted out a few weeks ago, but the contracts still haven't been signed yet. It shouldn't take much longer, IMO.
__________________
Trust me, I'm an east-european doctor.
medicu' de garda no está en línea   Reply With Quote
Old August 2nd, 2013, 11:06 AM   #6127
Le Clerk
AUTOBANN.ED
 
Le Clerk's Avatar
 
Join Date: Oct 2007
Posts: 31,953
Likes (Received): 3232

I have already one for some time.
__________________
Rebuilding Bucharest's History: Lipscani Area |Victoriei Ave. | Elisabeta Bld.
Yes, it's Dracula's Castle
Best picture collection of UNESCO sites in Romania
Castles and Mansions in Romania
Le Clerk no está en línea   Reply With Quote
Old August 4th, 2013, 10:02 AM   #6128
Le Clerk
AUTOBANN.ED
 
Le Clerk's Avatar
 
Join Date: Oct 2007
Posts: 31,953
Likes (Received): 3232

A rare sight - works on A3 motorway between the ringroad and Bucharest suburbs:

Quote:
Originally Posted by CornelB View Post
Data viitoare cand mai anunt ca plec sa fac fotografii, sa imi spuneti ca trebuie sa pun si card de memorie in aparat.

Asadar, azi dimineata am fost sa fac niste fotografii pe A3 si sa testez offroad un Audi A6 Allroad.

Primul strat de asfalt pe sensul CB-Popasului:
Spre Popasului


Spre centura


Trebuia sa iau o bordura in gura.






Se uda balastul pe sensul Popasului-Centura







Mi-am luat amintire, un "trofeu" ce statea aruncat in santul de colectare


Atat a fost memoria aparatului, insa atunci cand faci offroad cu un A6 Allroad pe langa santier si muncitori, atragi atentia, oamenii te intreaba cat "baga" si se deschid la vorba.
Asa am aflat de la un sef din capatul dinspre Popasului, ca nodul ar trebui deschis (eu nu cred) de 1 Decembrie.
Oricum, se lucra pe toata lungimea segmentului, veneau cu balastul stabilizat catre Popasului iar la pasaj punea armatura pentru piloni.
__________________
Rebuilding Bucharest's History: Lipscani Area |Victoriei Ave. | Elisabeta Bld.
Yes, it's Dracula's Castle
Best picture collection of UNESCO sites in Romania
Castles and Mansions in Romania

MichiH liked this post
Le Clerk no está en línea   Reply With Quote
Old August 6th, 2013, 02:42 PM   #6129
Le Clerk
AUTOBANN.ED
 
Le Clerk's Avatar
 
Join Date: Oct 2007
Posts: 31,953
Likes (Received): 3232

According to builders, Orastie-Vintu (24 km) and Sebes motorway by-pass (9 km) will be opened on 1 September.
__________________
Rebuilding Bucharest's History: Lipscani Area |Victoriei Ave. | Elisabeta Bld.
Yes, it's Dracula's Castle
Best picture collection of UNESCO sites in Romania
Castles and Mansions in Romania
Le Clerk no está en línea   Reply With Quote
Old August 6th, 2013, 02:48 PM   #6130
bogdymol
bogdymod
 
bogdymol's Avatar
 
Join Date: Feb 2010
Posts: 9,761

Quote:
Originally Posted by Le Clerk View Post
According to builders, Orastie-Vintu (24 km) and Sebes motorway by-pass (9 km) will be opened on 1 September.
So you are telling us that this bridge will be completed in less than 1 month?

Quote:
Originally Posted by adiarc View Post


Pictures were shot yesterday.
__________________
Been in A BG CZ D F GR H HR I PL RO RSM SK SLO SRB UK US V
Drove in A CZ D GR H HR I PL RO RSM SK SLO SRB UK US
join eRepublik!
bogdymol no está en línea   Reply With Quote
Old August 6th, 2013, 02:57 PM   #6131
Le Clerk
AUTOBANN.ED
 
Le Clerk's Avatar
 
Join Date: Oct 2007
Posts: 31,953
Likes (Received): 3232

"Acording to builders". We'll see if they manage.
__________________
Rebuilding Bucharest's History: Lipscani Area |Victoriei Ave. | Elisabeta Bld.
Yes, it's Dracula's Castle
Best picture collection of UNESCO sites in Romania
Castles and Mansions in Romania
Le Clerk no está en línea   Reply With Quote
Old August 6th, 2013, 03:12 PM   #6132
bogdymol
bogdymod
 
bogdymol's Avatar
 
Join Date: Feb 2010
Posts: 9,761

As an engineer I can say that this bridge is not 1 month from completion.

We will just have to wait and see what happens in 1 month...
__________________
Been in A BG CZ D F GR H HR I PL RO RSM SK SLO SRB UK US V
Drove in A CZ D GR H HR I PL RO RSM SK SLO SRB UK US
join eRepublik!

and802 liked this post
bogdymol no está en línea   Reply With Quote
Old August 6th, 2013, 03:43 PM   #6133
and802
Registered User
 
Join Date: Jul 2009
Location: Izabelin
Posts: 485
Likes (Received): 42

Quote:
Originally Posted by bogdymol View Post
As an engineer I can say that this bridge is not 1 month from completion.

We will just have to wait and see what happens in 1 month...

as a complete engineering-ignorant I can say that this bridge is not 1 month from complition as well
and802 está en línea ahora   Reply With Quote
Old August 6th, 2013, 03:56 PM   #6134
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 32,823
Likes (Received): 3773

As a citizen, I can say 1 september could also be 2014
__________________

my clinched highways • highway pictures @ Flickr and Youtube
ChrisZwolle no está en línea   Reply With Quote
Old August 6th, 2013, 04:09 PM   #6135
Le Clerk
AUTOBANN.ED
 
Le Clerk's Avatar
 
Join Date: Oct 2007
Posts: 31,953
Likes (Received): 3232

Quote:
Originally Posted by bogdymol View Post
As an engineer I can say that this bridge is not 1 month from completion.

We will just have to wait and see what happens in 1 month...
They are also saying it as engineers, aren't they?

BTW: that bridge is apparently NOT in the section I mentioned.
__________________
Rebuilding Bucharest's History: Lipscani Area |Victoriei Ave. | Elisabeta Bld.
Yes, it's Dracula's Castle
Best picture collection of UNESCO sites in Romania
Castles and Mansions in Romania
Le Clerk no está en línea   Reply With Quote
Old August 6th, 2013, 04:18 PM   #6136
bogdymol
bogdymod
 
bogdymol's Avatar
 
Join Date: Feb 2010
Posts: 9,761

That bridge is part of the eastern Sebes bypass. Now I understand from the Romanian forum that they want to open just the western part of Sebes bypass, not the entire bypass.
__________________
Been in A BG CZ D F GR H HR I PL RO RSM SK SLO SRB UK US V
Drove in A CZ D GR H HR I PL RO RSM SK SLO SRB UK US
join eRepublik!

MichiH liked this post
bogdymol no está en línea   Reply With Quote
Old August 6th, 2013, 04:23 PM   #6137
Le Clerk
AUTOBANN.ED
 
Le Clerk's Avatar
 
Join Date: Oct 2007
Posts: 31,953
Likes (Received): 3232

So, no mistery anymore.
__________________
Rebuilding Bucharest's History: Lipscani Area |Victoriei Ave. | Elisabeta Bld.
Yes, it's Dracula's Castle
Best picture collection of UNESCO sites in Romania
Castles and Mansions in Romania
Le Clerk no está en línea   Reply With Quote
Old August 6th, 2013, 04:47 PM   #6138
bogdymol
bogdymod
 
bogdymol's Avatar
 
Join Date: Feb 2010
Posts: 9,761

I was [partially] wrong. The section of Sebes bypass that will open will be the eastern one, not the western one. You can see on this map what will open (with red line), and the place where is that problematic railway overpass (with blue):

Quote:
Originally Posted by raak View Post
am desenat cu rosu ceea ce zice articolul ca va fi gata la 1 sept
__________________
Been in A BG CZ D F GR H HR I PL RO RSM SK SLO SRB UK US V
Drove in A CZ D GR H HR I PL RO RSM SK SLO SRB UK US
join eRepublik!

mcarling liked this post
bogdymol no está en línea   Reply With Quote
Old August 6th, 2013, 04:49 PM   #6139
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 1,366
Likes (Received): 442

Quote:
Originally Posted by bogdymol View Post
they want to open just the western part of Sebes bypass, not the entire bypass.
This would fix at least one of the biggest problems in Sebes. The daily jam on DN7 junction to DN1 is a glorious mess (you usually loose about 20 minutes at the Western city entry in the afternoon)! There is no problem on the DN1 in front of that junction, but I guess the problem will only be moved eastwards when the whole traffic reaches Sebes on DN7. About ten policemen managed the traffic through Sebes on an afternoon last week. Thus the traffic flow was a little bit better.
MichiH no está en línea   Reply With Quote
Old August 6th, 2013, 04:55 PM   #6140
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 1,366
Likes (Received): 442

Quote:
Originally Posted by bogdymol View Post
I was [partially] wrong. The section of Sebes bypass that will open will be the eastern one, not the western one
Ok... But they should change the right of way on DN7/DN1 from north to west instead of north to east to avoid jams.

btw: The traffic lights at that junction were off in the last few days. Is that common? Why have they disabled it?
MichiH no está en línea   Reply With Quote


Reply

Tags
highways, infrastructure, motorways, romania

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 09:47 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu