|
|
| daily menu » rate the banner | guess the city | one on one |
|
|
#1 |
|
.
Join Date: Apr 2006
Location: Bucharest
Posts: 1,746
Likes (Received): 0
|
BUCHAREST | Floreasca City Sky Tower | 137m | 37 fl | Com
![]() ![]() Raiffeisen evolution (RE) develops a multi-functional centre with a shopping and entertainment complex as well as two office buildings in Bucharest. Floreasca City Center (FCC) consists of a centre for shopping, entertainment and business. The gross area amounts to approx. 214.000 m² with rentable area of approx. 120.000 m² and more than 2.000 parking places. The shopping and entertainment centre has a gross floor area of approx. 110,000 m² and is divided into 3 basement floors with approx. 1,300 parking spaces and 3 upper floors with sales areas (ground floor and 1st upper floor) as well as a food court and a cinema center in the 2nd upper floor. The „Office Wing“, an office building with 7 floors and a polygonal ground plan (gross floor area approx. 26,000 m²) floats above the shopping mall. This structure features a transparent light glass façade. In the floor connecting the structure with the mall, there is a fitness centre which has a direct exit to the generous open space on the roof of the shopping mall. The second office building is designed as a high-rise building (Tower) with a height of 131 m. With 37 upper floors and 5 basement floors (gross floor area approx. 78,000 m²), this Tower will be the highest building in Bucharest. A restaurant and conference rooms are situated in the two uppermost floors. The façade of the Tower has an oblong structure over 4 floors with transparent, translucent and opaque areas. In the uppermost floors the façade opens up and becomes entirely transparent. image hosted on flickr ![]() image hosted on flickr image hosted on flickr![]() image hosted on flickr image hosted on flickr![]() The entire project is scheduled to be completed by the end of 2009. Rentable area: Construction stage I - Promenada Mall * Shopping & Entertainment 30,000 m² * Office Wing 19,000 m² * Parking 1,400 cars Construction stage II - SkyTower * Office 33,000 m² * Parking 510 cars Construction stage III - Offices * Office 12,000 m² * Parking 200 cars Webcams: North & South Bucharest Projects & Construction Thread
__________________
underground
Last edited by Sbz2ifc; April 14th, 2008 at 06:27 PM. |
|
|
| Tags |
| bucharest, romania |
| Thread Tools | |
| Display Modes | |
|
|