|
|
| daily menu » rate the banner | guess the city | one on one |
|
|
#181 |
|
Bonsai
Join Date: Aug 2005
Location: Munich
Posts: 7,396
Likes (Received): 1
|
Here the list of done and topped out towers in Dubai:
http://www.emporis.com/en/wm/ci/bu/s...t=9&ht=2&sro=0
__________________
Peptastic |
|
|
|
|
#182 |
|
Rrrraaaaaahhhhhhh!!!!!!!
Join Date: Apr 2005
Location: Cork
Posts: 10,452
Likes (Received): 9
|
OK Let's see the progress once again. Here are projects that started somewhat. I recon everything else is dead
Nakheel Tower (>3000ft) Started some ground works but then was put on hold for a year apparantly. I think that year will turn into an infinite amount of time. ![]() Anara (2148ft) Cancelled. Same developers as Princess Tower and Elite Residence. They demolished the existing building, now the area is being used as a carpark :haha: ![]() Pentominium (2027ft) 5 piling rigs on site doing lots of work. There are more piles here than for the burj dubai and deeper too. I think this will go on hold after the piling finishes but who knows. ![]() Dubai Towers (1804ft, ?ft, ?ft, 1148ft) On Hold. Was briefly started but the company is in deep deep shit. Was hit hard by corruption and now also the financial crisis. Amazingly their dubai towers doha is still getting built although I think they handed it over to the government of Qatar. ![]() One Park Avenue (1804ft) On Hold. Was briefly started by Meraas who pretty much appeared and disappeared in the time of a quantum fluctuation. Like my nerdy joke here? :haha: ![]() Burj Al Alam (1675ft) On Hold. A massive hole in the ground. Has always been insanely slow that it was hard to tell whether it was on hold or not. I think there's a 1% chance this will get built ![]() ![]() Burj Al Fattan (around 1500ft) The existing building is being demolished right now (at an insanely slow pace). Apparantly the company behind this have quite a bit of money so who knows, might even get built (although I doubt it). ![]() Marina 106 Some prep work going on. A big hole has been dug and maybe piling going on by now as well. The site is visible just to the left of the top of 23 Marina. ![]() Damac Heights (1398ft) The piling contractor came and left. On Hold ![]() Princess Tower (1358ft) Rising ![]() Marina 101 (1352ft) Starting to rise now. Don't think it's very fast but not slow either. ![]() The Lighthouse (1319ft) Piling still going on. They will have to chose a main contractor soon. We will see then if they have the financing or not. ![]() Emirates Park Towers (1296ft and 1296ft) Rising nicely. Cladding should come soon ![]() 23 Marina (1276ft) Rising at a good steady pace ![]() Elite Residence (1247ft) Just starting to rise properly now. We'll see what the pace is soon enough ![]() Almas Tower (1191ft) Topped out. Will be finished soon ![]() LamTara towers (1181ft and 1050ft). On hold however was already very very slow before TSHTF ![]() Al Attar (1120ft) On Hold now. Was quite slow anyway but let's hope they finish it so at least it doesn't remain like this ![]() The Torch (1109ft) Rising ![]() Al Yacoub (1083ft) Very slow construction (was quick beforehand but has slowed down). I think this will go on hold soon like al attar tower ![]() The Skyscraper (1083ft) Was on hold for ages but recently restarted. Could easily go on hold again. ![]() The Index (1076ft) Topped out. ![]() HHHR Tower (1040ft) Very fast construction. Almost topped out, just need to put on the spire now ![]() Ocean Heights (1017ft) Rising very quickly (1 floor every 5 days) ![]() Infinity Tower (1007ft) Original construction disaster fixed, now rising very quickly.
|
|
|
|
|
#183 |
|
Rrrraaaaaahhhhhhh!!!!!!!
Join Date: Apr 2005
Location: Cork
Posts: 10,452
Likes (Received): 9
|
Basically the original big list has been cut into about half the original size:
Before ![]() After ![]() What I think may go on hold in the future: Pentominium - We will see in a few months when the piling is finished and they need a main contractor Lighthouse - Again we will see if they get a main contractor or not. Burj Al Fattan - Who knows if they will actually start building when the hotel is demolished. Apparantly this company has a lot of funds though Marina 106 - If this goes on hold it will happen randomly without anyone knowing the reason The Skyscraper - Again this is al attar. They might finish it in 2012, or 2020. Last edited by malec; March 1st, 2009 at 03:22 AM. |
|
|
|
|
#184 |
|
Registered User
Join Date: Aug 2007
Posts: 1,865
Likes (Received): 4
|
The crisis hit Dubai hard!!! But despite the crisis they continu to build om smaller and more achievable projects. Well smaller... whats small in Dubai??? (joke)
|
|
|
|
|
#185 |
|
I love Skyscrapers
Join Date: May 2006
Location: Near Ingolstadt in Bavaria
Posts: 28,297
Likes (Received): 401
|
lets wait 1 or 2 years and see what happens when the economy gets better again. at the moment we can't expect much
__________________
Download the most up-to-date list of all Supertalls on this planet here: Last Tower added: Eurasia - Moscow - 309m The Supertall-City-Ranking: Last City added: Changzhou Follow me on Twitter: @Minecraft_87 Visit my Photo-Website: www.foto-kotzur.de
|
|
|
|
|
#186 |
|
Registered User
Join Date: Dec 2008
Posts: 110
Likes (Received): 0
|
Kind of Sad Anara isn't going to get build.
Although, I wouldn't be surprised if the design comes back AFTER the financial crisis. ![]() I'm also kind of happy the Lighthouse MIGHT get build, very beautiful design. ![]() Even with the financial crisis 70% chance 25 towers WILL get build. This is VERY good. And Burj Dubai is one of them.
|
|
|
|
|
#187 |
|
Ironborn member
Join Date: Jan 2003
Location: Pike
Posts: 21,553
Likes (Received): 704
|
Anara was my favourite supertall project worldwide
Hopefully we'll see new waves of mega projecs once the crisis is over.
__________________
What is dead may never die, but rises again, harder and stronger. List of skyscrapers in Shenzhen.
|
|
|
|
|
#188 |
|
Registered User
Join Date: Aug 2008
Location: Wassenaar
Posts: 1,755
Likes (Received): 0
|
wow, the crisis is quite a blow for dubai
|
|
|
|
|
#189 |
|
Rrrraaaaaahhhhhhh!!!!!!!
Join Date: Apr 2005
Location: Cork
Posts: 10,452
Likes (Received): 9
|
I want to focus on under construction projects and Culwulla already made a great thread with his diagram updates. I have decided to add to that thread and basically, move this thread over there. So this thread will now be closed and I will use that thread from now on.
|
|
|
| Thread Tools | |
| Display Modes | |
|
|