Old May 16th, 2009, 07:46 AM   #101
napoleon
Liberty, Equality, Frate
 
napoleon's Avatar
 
Join Date: Apr 2006
Posts: 55,057
Likes (Received): 1648

Extended train line hurts ferry operator

Bangkokpost Published: 16/05/2009 at 12:00 AM


Ferry operators under the Taksin Bridge complained of a drop in revenue with the opening of the extended BTS electric railway line for commuting to Wong Wian Yai yesterday.

The operators said if people continued to shun the boats in favour of the train, they may have to change jobs.

The extended route from the Taksin station to the newly-constructed Wong Wian Yai station will serve commuters free of charge for three months. Ferry operators are not certain if customers will return after the free-ride period ends.

Boonserm Supaporn, the owner of Subthananakorn Co that operates ferries on the section of the river, complained yesterday that customers dwindled in number after the 2.2km-long extended line to Thon Buri came into service yesterday morning.

He expects the number of regulars using his ferry service, which charges three baht a ride, would drop by 30% on weekdays from 12,000 people a day and by 70-80% on weekends from 7,000 passengers a day.

Compared to the electric train, catching a ferry would no doubt be less convenient as the pier has no road access and commuters have to make a long walk to reach his pier, Mr Boonserm said.

If the train takes too many customers away from him, he might have to close the service and turn the place into a floating restaurant, he said.

At the moment he only plans to cut the number of ferries that are in service and the service hours from 5.30am-11pm to 5.30am-8pm. A plan to bring in new boats has been put off.

Without any cutbacks, his company, which has 70 employees, might not survive for too long, Mr Boonserm said.

The Bangkok Metropolitan Administration (BMA), which supervises the BTS railway system, expects the extended section from Onnuj to Soi Sukhumvit 105 road (Soi Baring) to become operational in early 2011.

Last edited by napoleon; May 16th, 2009 at 07:54 AM.
napoleon no está en línea   Reply With Quote

Sponsored Links
 
Old May 16th, 2009, 07:52 AM   #102
goffy-bz
Memory Time Approved
 
goffy-bz's Avatar
 
Join Date: Mar 2009
Location: ( ._.)BKK(._. )
Posts: 1,032
Likes (Received): 17



โดยส่วนตัว ไม่ค่อยเห็นด้วยที่จะใช้ พื้นที่บนสถานีมาเปิดร้านขายของเพราะมัน
แออัดจนเกินไป แต่อย่างว่าเป็นเรื่องของธุรกิจเลยต้องทำ
__________________
เมื่อไหร่สหไดโนภาพจะสูญพันธุ์
จะสีไหนก็คนไทยด้วยกัน
rainbowคลิ๊กที่นี่
goffy-bz no está en línea   Reply With Quote
Old May 18th, 2009, 03:50 PM   #103
000000
Registered User
 
Join Date: Jul 2008
Location: Bangkok and Nonthaburi
Posts: 193
Likes (Received): 0

สถานีวงเวียนใหญ่มันกว้างมากนะครับ แล้วเหมือนจะออกแบบมาเพื่อให้มีร้านค้าด้วย สังเกตจากมีการกั้นห้องรอไว้แล้ว

ทำก็ดีนะครับ จะได้มีตังค์เข้ากระเป๋าแล้วเอาไปสร้างส่วนต่อขยาย แหะๆ (กะอีแค่สองสถานี55+)
000000 no está en línea   Reply With Quote
Old May 18th, 2009, 04:10 PM   #104
one-la-view
Sa-was-dee Thailand!
 
one-la-view's Avatar
 
Join Date: Jan 2009
Location: Bangkok
Posts: 271
Likes (Received): 1

สถานีใหญ่หน่อยอย่างสยามหรือศาลาแดงก็มีพื้นที่แบ่งเป็นล๊อกให้เช่านะครับ
one-la-view no está en línea   Reply With Quote
Old May 18th, 2009, 06:12 PM   #105
BODYholic
Singaypore
 
BODYholic's Avatar
 
Join Date: Aug 2005
Posts: 1,016
Likes (Received): 25

Quote:
Originally Posted by napoleon View Post
Extended train line hurts ferry operator

Bangkokpost Published: 16/05/2009 at 12:00 AM


Ferry operators under the Taksin Bridge complained of a drop in revenue with the opening of the extended BTS electric railway line for commuting to Wong Wian Yai yesterday.
น่าสงสาร.

I actually like this pier which offers very good views.
__________________
ถ้าหากมีความรักก็ย่อมมีความหวัง
quis custodiet ipsos custodes?
BODYholic no está en línea   Reply With Quote
Old May 19th, 2009, 02:19 AM   #106
Thailand92
Registered User
 
Join Date: Jan 2009
Posts: 92
Likes (Received): 5

Quote:
Originally Posted by napoleon View Post
Extended train line hurts ferry operator

Bangkokpost Published: 16/05/2009 at 12:00 AM
Well, I don't know what to say. It's really bad for them. But the time had
changed, every thing's change, maybe it's time for them to change also.
Maybe, to renovate all the ferry and change into something interesting like
to give a tour along the river or something like that would be great. Just
the idea..
Thailand92 no está en línea   Reply With Quote
Old May 19th, 2009, 11:03 AM   #107
napoleon
Liberty, Equality, Frate
 
napoleon's Avatar
 
Join Date: Apr 2006
Posts: 55,057
Likes (Received): 1648

มท.-กทม.เปิดศึกงัดข้อ

Dailynews 19/05/2009


รายงานข่าวแจ้งว่า แม้เปิดใช้รถไฟฟ้าส่วนต่อขยายจากสาทร-ตากสิน ไปฝั่งธนบุรี 2.2 กม. ไปแล้ว แต่งานจัดซื้อและติดตั้งระบบสถานีและวางรางโครงการนี้ที่ กทม.ว่าจ้างบริษัทชิโน-ไทฯ ตั้งแต่เดือน ม.ค. 2550 สิ้นสุดสัญญา ต.ค. 2550 วงเงิน 1,033 ล้านบาท ยังมีปัญหาตรวจรับงานไม่ได้แค่เพียงตรวจรับสภาพไว้เพราะผู้รับเหมาขอขยายเวลาไป 180 วัน หนีจ่ายค่าปรับวันละ 2 ล้านบาท รวม 360 ล้านบาท

ขณะที่มติ ครม. ให้ขยายเวลาเฉพาะงานก่อสร้างเท่านั้นซึ่งสัญญานี้ กทม.ว่าจ้างเป็นงานจัดซื้อและติดตั้งระบบจึงไม่เข้าข่ายได้รับอนุมัติ ขณะที่สำนักงานกฎหมายและคดีตีความว่าหากการทำงานมีลักษณะก่อสร้างมากกว่าจัดซื้อก็ขยายเวลาได้ ซึ่งสำนักการจราจรและขนส่งอยู่ระหว่างพิจารณา และมีการวิพากษ์วิจารณ์ว่า ถ้างานก่อสร้างมากกว่า แล้วทำไมเสนอโครงการเป็นงานจัดซื้อและติดตั้งระบบ ขณะที่ล่าสุดมีการผลักดันจากกระทรวงมหาดไทยมายังผู้บริหาร กทม.ให้อนุมัติขยายเวลา

เพราะบริษัทดังกล่าวมีนามสกุลของนักการเมืองใหญ่ในระดับเจ้ากระทรวงถือหุ้นใหญ่อยู่ เมื่อผู้บริหาร กทม.ยังไม่อนุมัติ ทำให้ขณะนี้ทุกโครงการของกทม.ที่เสนอไปที่กระทรวงมหาดไทยถูกยื้อไว้ไม่ผ่านการอนุมัติให้ เช่น โครงการที่ต้องใช้งบอุดหนุนจากรัฐบาล รวมทั้งโครงการรถไฟฟ้าสายสีเขียวจากหมอชิต-สะพานใหม่ และจากแบริ่ง-สำโรง ที่กทม.ขอให้นำเสนอครม.ขอโอนกลับมาก่อสร้างเองด้วย
napoleon no está en línea   Reply With Quote
Old May 20th, 2009, 08:38 AM   #108
Yappofloyd
Registered User
 
Join Date: Jan 2005
Location: Bangkok & Melbourne
Posts: 948
Likes (Received): 41

Quote:
Originally Posted by Thailand92 View Post
Well, I don't know what to say. It's really bad for them. But the time had
changed, every thing's change, maybe it's time for them to change also.
Maybe, to renovate all the ferry and change into something interesting like
to give a tour along the river or something like that would be great. Just
the idea..
Two points.

Firstly, the Taksin ext was originally planned to open in Dec 04! Then mid 2006, early 2007, Aug 2007, March 2008, Aug 2008, late 2008 etc. So the ferry operator has had extra years to operate free of competition AND plenty of time to come up with a new business plan for when the BTS started operating.

Secondly, I think that it is normal for transport operators to overstate their patronage drops in such circumstances in order to maximise potential govt assistance.
Yappofloyd no está en línea   Reply With Quote
Old May 20th, 2009, 08:41 AM   #109
Yappofloyd
Registered User
 
Join Date: Jan 2005
Location: Bangkok & Melbourne
Posts: 948
Likes (Received): 41

I have travelled on the extension twice now and both times there were delays in the running times. Last night during peak hour there were substational delays.

Waiting at Siam at 5:40pm, it took just over 10 mins for the first train to arrive (behind me, the Sukhumvit line had 4 trains arrive & depart). Obviously, some delay earlier on the line was reverberating through the schedule. The train was the most sardine packed BTS I had ever caught in 9.5 years of travel on the system. Thereafter, each station stop further delayed the service as it took 2-3 times to close the doors. The train then had to wait a few mins before the switching point prior to S6. Half of the train disembarked at S6 but also a fair number of people embarked to cross the river. Arrival time at S8 was 6:22 so it gives you some idea of the overall delay.

During a later return journey to Siam, the train waited at a point for 4 mins once clearing the switch which allowed an S8 bound train to proceed. There was no loss of power so it was unclear to me why this occured unless there was a red light due to delays ahead. However, I have noted that all W1 bound trains stop at this point albeit usually briefly for about 30 secs.

One of the problems with the switching point east of S6 is that it is about 300m west of the station. If it was closer to the station it would save quite a bit of time. (The switching point west of S6 on Saphan Taksin bridge is only about 70 m west of the station so W1 bound trains can wait closer to S6 before proceeding once cleared.

S7 & S8 seem to be operating very smoothly. The BTS staff are doing well from what I have seen in directing pax to each train on S6 and thus minimising delays at the station. Staff are communicating with whoever is controlling/monitoring the points. The scheduling delays are seemingly occuring primarily at the eastern switching point as EVERY S8 bound train ends up stopping and waiting for at least 2-3 mins from what I have observed.

The on time performance of the Silom line is going to a mess for a number of weeks but the situation will improve a little each week. However, making a new switch closer to S6 will make a big difference (the terminating track runs all the way to the east end of S6).
Yappofloyd no está en línea   Reply With Quote
Old May 21st, 2009, 06:56 AM   #110
napoleon
Liberty, Equality, Frate
 
napoleon's Avatar
 
Join Date: Apr 2006
Posts: 55,057
Likes (Received): 1648

ชิโน-ไทฯไม่ถูกปรับ360ล. กทม.ไฟเขียวยอมรับมติครม.มัดให้ช่วยเหลือ

Dailynews 21/05/2009


เมื่อวันที่ 20 พ.ค. นายธีระชน มโนมัยพิบูลย์ รองผู้ว่าราชการกรุงเทพมหานคร (กทม.) ชี้แจงปัญหากรณีบริษัทชิโน-ไทฯ ขอขยายเวลางานจัดซื้อและติดตั้งระบบขนส่งมวลชนส่วนต่อขยายสายสีลมจากสาทร-ตากสิน ระยะทาง 2.2 กม. ไปฝั่งธนบุรี ที่กทม.เปิดให้บริการรถไฟฟ้าแล้ว แต่ยังไม่สามารถตรวจรับงานแค่ตรวจรับสภาพไว้แลกกับการไม่ถูกปรับ 360 ล้านบาทว่า ขณะนี้ตนได้อนุมัติให้บริษัทขยายเวลาการก่อสร้างได้ เนื่องจากนายพงศ์ศักติฐ์ เสมสันต์ ปลัดกทม. เป็นผู้ลงนามและเสนอต่อตนเพื่อ เห็นชอบให้ขยายเวลาก่อสร้างได้ หลังจากเรื่องนี้เป็นประเด็นในการวิพากษ์วิจารณ์และข้อถกเถียงกันมานานหากว่าบริษัทอ้างว่าการทำงานมีลักษณะของการก่อสร้างมากกว่าการจัดซื้อและติดตั้งซึ่งสวนทางกับสัญญาโครงการที่ระบุเป็นงานจัดซื้อและติดตั้ง เหตุที่ต้องอนุมัติต่อสัญญาให้ เนื่องจากเอกสารที่ปลัดกทม.เสนอมาได้ระบุข้อหารือจากกรมบัญชีกลางเกี่ยวกับมติครม.ในการช่วยเหลือผู้รับเหมาที่ให้ขยายเวลาก่อสร้างได้หากเป็นงานจัดซื้อและติดตั้งที่มีเนื้องานก่อสร้างมากกว่า แม้จะขัดแย้งกับระเบียบพัสดุกทม. ที่ตั้งโครงการเป็นงานจัดซื้อและติดตั้งเพราะมีลักษณะของงานจัดซื้อมากกว่างานก่อสร้างก็ตาม

นายธีระชน กล่าวต่อว่า นอกจากนี้เมื่อตรวจสอบที่มาของโครงการพบว่าโครงการนี้มีวงเงิน 1,033 ล้านบาท ซึ่งใช้ชื่อโครงการเป็นงานจัดซื้อและติดตั้ง สมัยนายสมัคร สุนทรเวช เป็นผู้ว่าฯกทม.เมื่อปี 2545 บริษัท ยูดีซีฯ ซึ่งเป็นที่ปรึกษาได้จัดทำรายละเอียดการประมูลโครงการนี้เห็นว่ามีลักษณะของงานติดตั้งและก่อสร้างก้ำกึ่งกันโดยมีงานจัดซื้อและติดตั้งมากกว่างานก่อสร้างเล็กน้อยราว 54-46% เมื่อประกวดราคามีผู้ยื่นซอง 3 รายโดยบริษัทอิตาเลี่ยนไทยและนวรัตน์พัฒนาการเสนองานจัดซื้อมาก กว่าการก่อสร้างราว 52-48% แต่บริษัทชิโน-ไทฯ เสนอว่ามีลักษณะของงานก่อสร้างมากกว่าราว 54-46% เห็นว่าโครงการนี้มีความก้ำกึ่งในการระบุว่าจะเป็นงานจัดซื้อหรือเข้าข่ายงานก่อสร้าง การอนุมัติให้ขยายเวลาก่อสร้างดังกล่าวยอมรับว่ามีความกังขาเพราะการพิจารณาเรื่องนี้นานมาก รวมทั้งสอบถามไปที่กรมบัญชีกลางและให้สำนักงานกฎหมายและคดีช่วยพิจารณาแต่ตัดสินใจอนุมัติให้เพราะมติ ครม. เปิดช่องให้กทม.ช่วยเหลือ ผู้รับเหมา.
napoleon no está en línea   Reply With Quote
Old May 21st, 2009, 01:19 PM   #111
trewut
Registered User
 
trewut's Avatar
 
Join Date: Apr 2009
Posts: 1,252
Likes (Received): 27

ส่วนต่อขยายนี้เกี่ยวกับนายสมัครด้วยหรืออ่านแล้วงงๆ
หรือเป็นแค่ส่วนโครงสร้างทางวิ่ง

Last edited by trewut; May 21st, 2009 at 01:30 PM.
trewut no está en línea   Reply With Quote
Old May 21st, 2009, 01:34 PM   #112
napoleon
Liberty, Equality, Frate
 
napoleon's Avatar
 
Join Date: Apr 2006
Posts: 55,057
Likes (Received): 1648

Quote:
Originally Posted by trewut View Post
ส่วนต่อขยายนี้เกี่ยวกับนายสมัครด้วยหรืออ่านแล้วงงๆ
หรือเป็นแค่ส่วนโครงสร้างทางวิ่ง
Nice pic.

napoleon no está en línea   Reply With Quote
Old May 21st, 2009, 08:39 PM   #113
BODYholic
Singaypore
 
BODYholic's Avatar
 
Join Date: Aug 2005
Posts: 1,016
Likes (Received): 25

More interesting than nice. A skytrain graciously bypassed the traffic jam.
__________________
ถ้าหากมีความรักก็ย่อมมีความหวัง
quis custodiet ipsos custodes?
BODYholic no está en línea   Reply With Quote
Old May 22nd, 2009, 07:04 AM   #114
one-la-view
Sa-was-dee Thailand!
 
one-la-view's Avatar
 
Join Date: Jan 2009
Location: Bangkok
Posts: 271
Likes (Received): 1

Quote:
Originally Posted by BODYholic View Post
More interesting than nice. A skytrain graciously bypassed the traffic jam.
car drivers gonna be jealous, how they go that fast!
one-la-view no está en línea   Reply With Quote
Old May 22nd, 2009, 07:32 AM   #115
mbokudake
Valde Carus Meus Nichkhun
 
mbokudake's Avatar
 
Join Date: Mar 2008
Location: Hong Kong/ Pathum Thani/ Bangkok
Posts: 1,085
Likes (Received): 39

They all would hop onto the trains in the next day.
__________________
"NO.1にならなくてもいい
もともと特別なOnly one"

SMAP
"ไม่ต้องเป็นที่หนึ่ง แต่ขอให้แค่เป็นหนึ่งเดียว"
mbokudake no está en línea   Reply With Quote
Old May 22nd, 2009, 12:12 PM   #116
trewut
Registered User
 
trewut's Avatar
 
Join Date: Apr 2009
Posts: 1,252
Likes (Received): 27


Last edited by trewut; May 22nd, 2009 at 12:18 PM.
trewut no está en línea   Reply With Quote
Old May 27th, 2009, 11:11 AM   #117
trewut
Registered User
 
trewut's Avatar
 
Join Date: Apr 2009
Posts: 1,252
Likes (Received): 27

Picture by thaitransit



trewut no está en línea   Reply With Quote
Old May 29th, 2009, 02:22 PM   #118
napoleon
Liberty, Equality, Frate
 
napoleon's Avatar
 
Join Date: Apr 2006
Posts: 55,057
Likes (Received): 1648

Pic By I_Nui


napoleon no está en línea   Reply With Quote
Old June 1st, 2009, 09:08 PM   #119
napoleon
Liberty, Equality, Frate
 
napoleon's Avatar
 
Join Date: Apr 2006
Posts: 55,057
Likes (Received): 1648

More Pics

http://thaitransit.blogspot.com/2009...-wian-yai.html
napoleon no está en línea   Reply With Quote
Old June 2nd, 2009, 01:02 AM   #120
n_pon88
wishing i was in bkk
 
n_pon88's Avatar
 
Join Date: Mar 2009
Location: LDN/BKK
Posts: 367
Likes (Received): 10

ooo guys you have to have a look at this website.
http://www.greenline-extension.com/

enjoy
n_pon88 no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 04:42 PM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu