Old September 1st, 2009, 04:12 PM   #1
PCK
Street Soldier!!
 
PCK's Avatar
 
Join Date: Aug 2005
Location: Colombo
Posts: 529
Likes (Received): 1

Hambantota | Billion Dollar Port





With a view to realization of the full potential of the development of harbour facility in Hambantota and recognition of integrating port development with regional development, a comprehensive consultancy study utilizing consultant having experience in greenfield port construction whose work has been acceptable to international lending agencies is in the final stage.

Port of Hambantota is planned as a Service and Industrial Port and subsequently it could be developed as a transshipment port depending on the increasing cargo volumes.

In view of urgency, short term plan has been prepared for a service port as phase 1 of the project in order to cater for the immediate demands in accordance with the master plan. The Main components are two nos. of berth with 500m length, and the Breakwater of about 1.8 km and the proposed port will have depth of 15m. presently negotiations are being held with Government of China for funding arrangements.

Project Staff -
Client -
Project Director - Priyath Bandu Wickrama – Chairman
Dy. Project Director - Agil Hewageegana – Deputy Chief Engineer

Engineer -

Chief Engineer - Janaka Kurukulasuriya – Ports Authority

Contractor –

China Harbour Engineering Co & Sinohydro Corporation ltd JV

Project Features –
Phase 1 of the project will cater for initial requirements as identified in Feasibility Study. The proposed port is planned to have the two breakwater arms on the seaside to ensure the safe navigation and the basin and quay walls within the lagoon called “Karagam Lewaya”, having an access channel across the Hambantota - Colombo main road. The main important feature of this project is the construction of the quay wall and basin in dry condition after constructing a cofferdam along the perimeter. The main parameters of the phase 1 are as follows:


·Design Vessel 100,000 DWT
·Approach Channel Width 210m
·Approach Channel Depth 16m
·
Turning Circle 600m
·
Quay Length( General cargo) 600m
·
Service Quay 105 m
·
Oil Quay 310 m
·
Depth of Basin 16m
·
Cost of the Construction Works US $ 361 million
·
Date of Commencement 15th January 2008
·
Project Duration 39 months





__________________
You Ain't Famous Until My Mother Has Heard Of You...
PCK no está en línea   Reply With Quote

Sponsored Links
 


 

Tags
china, construction, hambantota port, mega, southern sri lanka

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 01:11 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.1.2 (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd.
vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd. (Resources saved on this page: MySQL 33.33%)

SkyscraperCity - In Urbanity We Trust

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu