|
|
| daily menu » rate the banner | guess the city | one on one |
|
|||||||
| Infrastructure & Transport Infrastructure projects, transport & mobility |
![]() |
|
|
Thread Tools | Display Modes |
|
|
#1 | |||
|
In the brig
Join Date: Oct 2007
Posts: 30,478
Likes (Received): 323
|
Pan-European Corridor IX
Corridor IX is the second Pan-European Corridor going through Romania, and even though there are far prospects to see motorway works on this corridor, we could still discuss it. Thanks.
![]() Quote:
Proposed motorways: A5: Albița - Focșani - Ploiești 314 km ![]() Quote:
Quote:
Last edited by Le Clerk; August 20th, 2010 at 03:54 PM. |
|||
|
|
|
|
|
#2 |
|
Registered User
Join Date: Apr 2008
Location: Bucuresti si Bacau
Posts: 519
Likes (Received): 20
|
In prima imagine, Coridorul IX o ia pe la Iasi, nu pe la Albita. Ar trebui rezolvata problema, pentru ca nu se face confuzie.
|
|
|
|
|
|
#3 |
|
Registered User
Join Date: Sep 2008
Posts: 5,348
Likes (Received): 121
|
chiar vroiam sa mai intreb despre aceasta chestie....
Acum am auzit un zvon ca ar trebui sa iasa pe piata un mare proiect de infrastructura....si indiciile ma duc spre acest proiect. Stie cineva ceva? In mod logic ar fi sa se liciteze constructia...sau concesiunea...deoarece in 2008 Lousi Berge a inceput refacerea SF-ului si cred ca e cam gata, inclusiv restul docuemntelor care tin de contract. Cu toate astea nici unul din guvern, mt sau cnadnr nu a vorbit despre acest proiect ca imediata posibilitate. |
|
|
|
|
|
#4 | |
|
In the brig
Join Date: Oct 2007
Posts: 30,478
Likes (Received): 323
|
Quote:
Edit: Harta Coridorului IX este aproximativa. Nu inseamna ca A5 trebuie neaparat sa iasa pe la Iasi, desi as intreba si eu pe unii mai priceputi decat mine de ce proiectul prevede ca A5 sa iasa pe la Albita si nu pe la Iasi? |
|
|
|
|
|
|
#5 |
|
Registered User
Join Date: Mar 2009
Location: Augsburg
Posts: 496
Likes (Received): 1
|
Poate sunt mai multe ramuri.
|
|
|
|
|
|
#6 | |
|
Registered User
Join Date: Sep 2008
Location: Braila/Bucharest
Posts: 3,143
Likes (Received): 22
|
Quote:
|
|
|
|
|
|
|
#7 |
|
Registered User
Join Date: Apr 2008
Location: Bucuresti si Bacau
Posts: 519
Likes (Received): 20
|
Da, dar totusi sunt harti ce nu par facute pe un laptop acasa la cineva care prevad un "ocol" prin Iasi.
|
|
|
|
|
|
#8 |
|
Reaching for the stars
Join Date: Feb 2010
Location: Bucharest
Posts: 4,131
Likes (Received): 6
|
E stupid ca pe acest coridor sa nu fie si Iasiul pus... se poate face fie un "S" cum s-a intamplat la Nadlac-Arad-Timisoara, fie un drum expres Iasi-Albita.Prin S inteleg: coridorul urca spre Albita unde este interchange pt cine vrea sa iasa din tara si apoi continua in nord spre Iasi, se face o centura de sud a orasului si se "termina" in viitoarea A6 Iasi-Tg Mures. Asa scoti tot traficul greu din Iasi si legi si Coridorul IX de A3-A6, deci de Europa Centrala si pe sud de Bucuresti/Constanta/Coridorul IV. Sunt doar cativa km in plus... 20-30 km... sigur ar finanta UE si bucatica aia pt ca are sens. Cine vrea sa intre de pe CIX pe A3/CIV nu trebuie sa vina pana in Bucuresti......... pot sa faca la Albita dreapta spre Iasi si apoi spre Tg Mures-Cluj-HU... si din A3 pe la Sebes de exemplu intra pe CIV si apoi spre Arad-Nadlac-HU. Din punctul meu de vedere asa trebuie sa discutam cu UE... sunt cateva legaturi de 20-30-40 km care FAC DIFERENTA!!!
__________________
On Sep 12, 2011, I took the decision to STOP posting infrastructure updates & pictures, comments or any other type of post on SSC. The decision is final and is long overdue. As a sign of appreciation and respect for the Romanian moderators and a few Romanian users, I will not edit all my 4100+ messages. I dedicate all the "work" I've done with passion on SSC to these handful of users. I will only continue to read SSC and be available for these users on PM. Thank you. |
|
|
|
|
|
#9 |
|
In the brig
Join Date: Oct 2007
Posts: 30,478
Likes (Received): 323
|
Cred ca asa se va face. E de-a dreptul absurd sa nu fie dusa pana la Iasi si chiar mai sus pana la Suceava ca sa ia traficul din Ucraina. De fapt propunerea mea ar fi fost asta in albastru, care poate prelua si traficul din Ucraina, face legatura si cu Iasiul si Suceava, Galatiul si Braila, si viitorul pod peste Dunare de la Calarasi-Silistra (care e deja agreat intre Romania si Bulgaria):![]() E un proiect urias (sunt vreo 600 km de autostrada acolo, dar cred ca va trebui facut la un moment dat), chiar daca portiunea pe care este actualul DN2 ar fi lasata asa un timp si lucrat numai la portiunile unde nu exista DN2. |
|
|
|
|
|
#10 |
|
Registered User
Join Date: Mar 2009
Location: Augsburg
Posts: 496
Likes (Received): 1
|
http://www.google.ro/url?sa=t&source...31Q54rltK0VMcw
![]() Eu nu mai inteleg nimic. Observ ca pe foarte multe site-uri traseul coridorului IX apare ca Ploiesti-Focsani-Bacau-Vaslui-Albita. De exemplu: http://www.wall-street.ro/articol/Ec...u-Focsani.html si una mai recenta http://www.monitorulvn.ro/monitorul_...ea-2-94502.htm Atunci cum s-a ajuns la varianta directa Focsani - Albita sau varianta prin Iasi? |
|
|
|
|
|
#11 |
|
We are all pax.
Join Date: May 2008
Location: Bucharest
Posts: 1,580
Likes (Received): 84
|
Varianta clasica a coridorului IX este Bucuresti - Buzau - Focsani - Albita. Traseul a suferit modificari in functie de culoarea politica a celor ce s-au aflat la putere. Extinderea pana la Bacau de exemplu a aparut in timpul guvernarii PNL-PD. Cu hartile nu stam rau deloc, implementarea e durerea
|
|
|
|
|
|
#12 |
|
Registered User
Join Date: Sep 2008
Posts: 5,348
Likes (Received): 121
|
un coridor muuuuult mai bun pentru noi, romania, daca aveam cohones era....
Drajna-Slobozia-Galati-Braila-Iasi.....iar in drept la albita sa se faca o mica iesire pana la granita. Diferentele de kilometraj era foarte mici, si legai orase importante (Slobozia, Galati, Braila) la sistemul de autostrazi existent. |
|
|
|
|
|
#13 | |
|
Reaching for the stars
Join Date: Feb 2010
Location: Bucharest
Posts: 4,131
Likes (Received): 6
|
Quote:
__________________
On Sep 12, 2011, I took the decision to STOP posting infrastructure updates & pictures, comments or any other type of post on SSC. The decision is final and is long overdue. As a sign of appreciation and respect for the Romanian moderators and a few Romanian users, I will not edit all my 4100+ messages. I dedicate all the "work" I've done with passion on SSC to these handful of users. I will only continue to read SSC and be available for these users on PM. Thank you. |
|
|
|
|
|
|
#14 | |
|
In the brig
Join Date: Oct 2007
Posts: 30,478
Likes (Received): 323
|
Quote:
Da, dar lasi orase importante precum Focsani si Bacau in afara autostrazilor. Desi de pe DN2 ar fi scos o mare parte din trafic. Uite ce am propus eu:Quote:
|
|
|
|
|
|
|
#15 |
|
Registered User
Join Date: Sep 2008
Location: Braila/Bucharest
Posts: 3,143
Likes (Received): 22
|
Intr-adevar aceasta mi se pare cea mai buna propunere. Nu trebuie construit totul de la inceput la profil de autostrada, se poate incepe cu sectiunile mai problematice, cum ar fi bypassuri la Bacau, Roman, Adjud, Tecuci, zona Draganesti-Liesti, Galati-Braila, Slobozia-Drajna, podul peste Dunare la Silistra. Apoi, pe masura ce traficul creste, se pot uni aceste sectiuni. M-am intors ieri pe la Silistra si am asteptat 3 bacuri pana sa trec, deci un pod pare sa fie fezabil acolo.
|
|
|
|
|
|
#16 |
|
Registered User
Join Date: Sep 2008
Posts: 5,348
Likes (Received): 121
|
nu prea are sens sa construiesti o autostrada complet paralel, sau deservind exact aceleasi orase cu o alta mare legatura rutiera.
aglomerarea Braila-Galati e cel putin la fel de importanta ca Arad-Timisoara, si mult mai importanta decat multe alte orase, fie ele si foarte mari. De asemenea e calr ca Targu Mures-Iasi trebuie legat la coridorul 9, indiferent care si cum o fi el. |
|
|
|
|
|
#17 |
|
Proud "mitic"
Join Date: May 2009
Location: Ploiesti & Iasi
Posts: 548
Likes (Received): 11
|
nicio veste nimic...? parca in 2011 trebuiau sa inceapa lucrarile la ploiesti-focsani
__________________
Building your future doesn't mean demolishing your past! |
|
|
|
|
|
#18 |
|
Registered User
Join Date: Sep 2008
Posts: 5,348
Likes (Received): 121
|
cred ca si-au dat seama baietii ca a devenit clar pentru toata lumea ca nu putem duce 4-5 proiecte mari in paralel (MT, guvern, CNADNR, autoritati locale, si mai ales regi ai asflatului)...si nu mai ies in presa cu declaratii si promisiuni de nimic.
|
|
|
|
|
|
#19 |
|
In the brig
Join Date: Oct 2007
Posts: 30,478
Likes (Received): 323
|
Am inteles ca prioritatea spre Moldova e deocamdata legatura intre Tg. Mures si Iasi. Sunt in lucru studiile de fezabilitate.
|
|
|
|
|
|
#20 |
|
Aradean
Join Date: Feb 2009
Location: Arad, RO
Posts: 1,666
Likes (Received): 90
|
si e si normal din punctul meu de vedere. De bine de rau, legatura Moldovei cu Bucurestiul e destul de ok insa cu Transilvania e destul de anevoioasa si foarte aglomerata.
__________________
“Can you imagine what I would do if I could do all I can?” - Sun Tzu |
|
|
|
![]() |
| Thread Tools | |
| Display Modes | |
|
|