daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine

Go Back   SkyscraperCity > World Development News Forums > Supertalls > Proposed Supertalls



Reply

 
Thread Tools
Old August 23rd, 2010, 05:50 AM   #701
korea2002
Registered User
 
korea2002's Avatar
 
Join Date: Nov 2007
Location: Jeonju,서울,한국
Posts: 6,007
Likes (Received): 712

Big News-Tower Continue Construction-2010.8.10

Busan Lotte Town, 04 November to resume civil tawodong

Busan teopagi notice period
Lotte Group, "no more reason to slow down
Housing does not mean giving up "


Introduction of a residential facility which was suspended in controversial high-rise building construction in Busan Lotte Town will resume the following November. Busan is the 10th deputy ryujaeyong construction "sign done Lotte Shopping (weeks), Jung-dong Busan Busan Lotte enters the old town site of Busan Metropolitan City Office of Civil teopagiwa wolkke 04 to 11 have been undertaken to inform the doctor," he said. Lotte Group measures the day "for civil engineering with a indoor building with no direct correlation as there is no reason to slow down more than 04. Coming in October-Mart, as soon as the high-rise tower designed Cine Ma-dong-dong will embark on public works with the underlying" is confirmed.



Lotte Group in May last year before the hotel and business facilities on the east tower is designed primarily to accommodate residential facilities asking for a change of the content and purpose of the landfill construction virtually halted tawodong. Especially this last November in Busan Maritime Affairs "in 2002, including hotels, office, condo 'and other tourist facilities' would permit to build a residential facility to increase profitability So they introduced a landfill is contrary to the purpose," he disposed of while rejecting We were asked to postpone indefinitely the possibility.



Flow Construction Officer, "The Rise of the Lotte Group chairman Shin Kyuk-Ho 04 tawodong commitment to the cause seems to be resumed," he said. Heonamsik before the market last January 3, Busan Busan Busan Lotte found to meet the new president and confirmed its commitment to build Town (seen Jan. 5, you press 2), a known.



Lotte Group, said that "a residential facility to resume public works does not mean giving up," he drew the line. First, while housing permits continue teopagireul jaechujin is also offered. Lotte town ▷ ▷ jeomdong Birch opened late last year following the opening of the 25th-storey department stores Singwan ▷ 10 ▷ 108 Ma-dong, Cine-story tower is composed of copper. Projects approved in February last year, such a hotel and office tower, will house entertainment facilities.


Focus-Lotte(Main Developer) will resume Lotte Super Tower(Lotte Town Final Stage-4 stage-2016 Completion) in November,Lotte Town 3 Phase(Cinema Center & Lotte Mart Grocery Store) will be design in October.

In addition to this news,2 stage(Entertainment Phase) will open in August 26th.


Very good News for Lotte Super Tower's Construction of Underground Phase.
korea2002 no está en línea   Reply With Quote

Sponsored Links
 
Old August 23rd, 2010, 06:45 AM   #702
korea2002
Registered User
 
korea2002's Avatar
 
Join Date: Nov 2007
Location: Jeonju,서울,한국
Posts: 6,007
Likes (Received): 712

Development News-2010.7.12

Sale postponed the skyscraper row jugeoheoyongdoen Busan

WBC · Haeundae Tourist Resort, the time delay or schedule Kopetsky
"Not considered feasible to blame for the recession"


100 floors to be built in Busan, and out of the construction and sale of high-rise buildings has been postponed after another. "If the railroad allowed jugeosiseolman process will proceed," said out loud, quite different from the attitude struck the end of last year. Experts, "the aftermath of the recession, but without considering the feasibility promotion because" he is criticizing.

Haeundae Centum Busan World Business Center enters the Earth (WBC · 111 level) in the second half of the year when the sale was postponed to next year. No contractors have chosen the most important project financing (PF) have been delayed since. The sea breeze into a residential facility designed to withstand changes relief appearance changed recently been completed. Sign enforce the Solomon group, said that "the construction and design changes, the recession that the sale is expected to be delayed than expected. Now as construction companies, both here and in touch, and hearing the proposed changes through design, if I can get the speed," he said.

Busan Industrial Sites Committee earlier in December last year, 'Without the residential business for fall' to fit the needs of the Solomon group of 500 households with high housing facilities to allow the installation of the district planning and development plan for proposed changes have been disappointing. Solomon, chairman of the group at the time of the choeyoungmyeong "according to the design changes received final building permits be completed 2015 Construction started in October 2010 plan," he had said.

Haeundae beach in front of the Haeundae Tourist Resort (117 stories) also demolished last April, but could in the time of sale is pending. Reach 3 trillion won project financing (PF) because investors have not been finalized yet. Sign underwent triple-Square (weeks) to Ho, Managing Director, "By the end of the end of the basic design and feasibility analysis should be selected through the contractors," said "The time of sale it is difficult to conclude," he said. Triple Square (weeks) is also a residential facility late last year, nearly 995 households with permission from the start of the second half of this year, has promised. Busan, 04 ahead of the tourist resort town recognized as a public service to fit the land. Pusan Solidarity for Participatory Democracy, Professor sondongho the "preferential treatment, while taking a fight in the name of economy and allow housing gave a big mistake in Busan. Last May on suspicion surrounding the introduction of a residential facility for the prosecution had requested the investigation," he said.

Jung-gu, Busan Lotte Town (130 stories) also indecisive state. Maritime Port Authority, Busan Lotte Shopping, the landfill side to change the purpose (housing the introduction) is not approved to do business if you can not rise has been holding out. Deteriorating in recent public opinion in the second half are expected to chakgongman jihadong Mart East, and has been known.


Refer to Underlined Sentence,same as Front Development Information.
korea2002 no está en línea   Reply With Quote
Old October 3rd, 2010, 04:13 AM   #703
korea2002
Registered User
 
korea2002's Avatar
 
Join Date: Nov 2007
Location: Jeonju,서울,한국
Posts: 6,007
Likes (Received): 712

SOM Architects-Busan Lotte Super Tower

Busan Lotte World Tower











Busan, South Korea

Situated on a prominent waterfront site in Korea, the Busan Lotte World Tower is poised to become the new gateway to East Asia. Standing at over 510 meters, the landmark tower holds a vast 6.3 million sf mixed-use program consisting of office, hotel, condo, retail and entertainment facilities and underground parking. The streetscape is enlivened by a vibrant retail podium, while the waterfront side features raised parks and plazas that connect directly to the promenade.

The tower’s shape and massing are driven by the compact site, the complex program, the desire to optimize views, and strict structural requirements. Tower setbacks occur at transitions between major program components and are arranged with a clock-wise spin to animate the façades. Concrete outrigger walls transfer perimeter column loads to six mega-columns, allowing each tier to have an independent column layout appropriate for its function. Environmental sustainability features of the tower include natural ventilation, thermal regulation, double skin, louvers, and a sea-water cooling system.

Project Facts

Completion Year: 2013
Project Area: 585,000 m2
Building Height: 510 m
Number of Stories: 126


Design Works completed...
on November 2010,Underground Construction works will start soon.
Links-http://www.som.com/content.cfm/busan_lotte_world_tower
korea2002 no está en línea   Reply With Quote
Old October 3rd, 2010, 04:44 AM   #704
korea2002
Registered User
 
korea2002's Avatar
 
Join Date: Nov 2007
Location: Jeonju,서울,한국
Posts: 6,007
Likes (Received): 712

Homepage-Introduction of the Busan Lotte Project






Captured sites


Lotte Town(Second Supertall Lotte World Complex Development) Homepage Grand Open!(Korean/English)
http://www.lottecorp.com/
Seoul Lotte Town(Jamsil)-123 floor, 555m-2010 October start!
Busan Lotte Town-126 floor,510m-2010 November start(Underground floor works)
Developer is Lotte Group.
korea2002 no está en línea   Reply With Quote
Old October 5th, 2010, 02:59 PM   #705
mattomatto
Registered Loser
 
Join Date: Jun 2010
Location: London
Posts: 181
Likes (Received): 0

This is a fantastic addition to Busan, a city I would very much like to go to again
mattomatto no está en línea   Reply With Quote
Old October 5th, 2010, 03:38 PM   #706
10fireflies
Fire-flies
 
Join Date: Oct 2010
Posts: 7
Likes (Received): 0

About time Korea has taken in projects of this magnitude in terms of the height of skyscrapers! woohoo
10fireflies no está en línea   Reply With Quote
Old October 6th, 2010, 05:48 AM   #707
boschb
boschb
 
boschb's Avatar
 
Join Date: Jul 2010
Location: Langley(Vancouver) BC
Posts: 716
Likes (Received): 17

site pics would be great
boschb no está en línea   Reply With Quote
Old October 6th, 2010, 02:49 PM   #708
ArtZ
Registered User
 
ArtZ's Avatar
 
Join Date: Feb 2006
Location: Bydgoszcz
Posts: 1,182
Likes (Received): 915

Excellent tower.
ArtZ no está en línea   Reply With Quote
Old November 12th, 2010, 03:51 PM   #709
korea2002
Registered User
 
korea2002's Avatar
 
Join Date: Nov 2007
Location: Jeonju,서울,한국
Posts: 6,007
Likes (Received): 712

korea2002's Report

Monthly Korean Supertall News(Source-Korean Portal Site-2010.11 )

Good News

1.Seoul Lotte Super Tower(123 floor)'s Final Permission for Construction start was approved(2010.11.11)
2.Busan Lotte Super Tower(130 floor)'s Groundbreaking started(2010.11.10)
3.WBC Solomon Tower(Busan-111 floor)'s Contractor is two Major Construction Company(?? VS ??)
4.Triple Square Resort(117 floor)'s site Demolition work completed(2010.11.10)
5.BIFC(Busan Int'l Financial Center)'s tenant negotiated Developer(2010.10.22)
6.Yeouido Parc1 and SIFC's Good Progress(2010.11.12)
7.Yongsan IBD's New Masterplan decided

Bad News

151 Incheon Tower's Development will be reduced(from 151 to 102).
korea2002 no está en línea   Reply With Quote
Old November 13th, 2010, 07:33 AM   #710
Manitopiaaa
Illuminati Leader
 
Manitopiaaa's Avatar
 
Join Date: Mar 2006
Location: USA - Latin America
Posts: 3,389
Likes (Received): 3500



I like it even if it is just a big Commerzbank Tower
Manitopiaaa no está en línea   Reply With Quote
Old November 13th, 2010, 06:01 PM   #711
korea2002
Registered User
 
korea2002's Avatar
 
Join Date: Nov 2007
Location: Jeonju,서울,한국
Posts: 6,007
Likes (Received): 712

Big News-Super Tower Construction started-2010.10.16

Lotte Group finished test bore hole,Super Tower Construction started.

a little progress.....

Completion is 2016.



many Heavy Machine for Super Tower Construction.........







at the same time,Seoul Lotte Project(123 floor Supertall Building Project)'s Final Permission was approved.


Overview(2010.10.17)
korea2002 no está en línea   Reply With Quote
Old November 13th, 2010, 06:56 PM   #712
korea2002
Registered User
 
korea2002's Avatar
 
Join Date: Nov 2007
Location: Jeonju,서울,한국
Posts: 6,007
Likes (Received): 712

130 floor Super Tower Construction Updates-2010.11.13

From Local News(Busan Yonhap News)
Test bore hole was finished,Lotte Group started Super Tower's Structural Construction.and SOM's Concrete Design work finished about 80%.
So,on March,2011,Lotte will submit Documents for Residential Part to Busan Marine Authority.

From Lotte Construction
Super Tower Progress
2010.11~2011.3-Groundbreaking work
2011.2 or 2011.3~2012.3-Underground Part Construction(Under-6 floors)
2012.3~2016.5-Upper Construction(1~130 floors)





U/C Section.
korea2002 no está en línea   Reply With Quote
Old November 28th, 2010, 05:15 AM   #713
korea2002
Registered User
 
korea2002's Avatar
 
Join Date: Nov 2007
Location: Jeonju,서울,한국
Posts: 6,007
Likes (Received): 712

Construction Updates-2010.11.23





Construction Movement is fast~~!!!
Developer(Lotte Group)'s Willing reflected to Busan Lotte Town Development.
korea2002 no está en línea   Reply With Quote
Old November 28th, 2010, 07:44 AM   #714
korea2002
Registered User
 
korea2002's Avatar
 
Join Date: Nov 2007
Location: Jeonju,서울,한국
Posts: 6,007
Likes (Received): 712

Development News-2010.11.27

Lotte Shopping Co., 107 Floor jaechujin Busan Lotte Tower

Plans to reapply for landfill purposes, including changes

Building permits, preferential fertilization naejulttaen government inevitably

Lotte Shopping Co., 107 balhyeotdeon policy abandoned two-storey building of the 'Busan Lotte Tower (contour) is jaechujin construction. Lotte Shopping Lotte already received from the government to dispose of non residential towers installed in the controversial policy presupposes the construction of two days is expected to start.

Lotte Shopping official said, "Sooner or later, Jung-dong, Busan Lotte Town Lotte Department Store in nearby gwangbokjeom Busan Lotte Tower will begin construction of the Works," said "From next year, mid-thickness is available full-scale building construction," he said on the 24th.

Lotte Tower, 107 stories above the ground, the height is planned to 510m. Lotte's construction company built the towers to be completed in the first half of 2016 plans.

This business of the Ministry of Land 'land reclamation purposes can not be changed to' the inclusion of housing is virtually impossible to promote business. Lotte officials late last year to include residential facilities, Ministry of Land, etc., and busanhaeyangcheong Lotte Town's landfill for a change of purpose 'and can not be changed naetjiman was suspended. This site originally 'hotel and tourism facilities the paper' should be used only with permission or I Landfill place.

The purpose of this change in Lotte reclamation plans to re-apply. Lotte officials "in charge of exterior design, design changes, the United States 80% of SOM's chogocheungbu advanced stage," said "drawing out early next year, will reapply changes landfilling purposes," he said.

Lotte Shopping Lotte Tower, including residential facilities like this to push ahead with building permits as if there is a preferential fertilization is expected to be inevitable.

Local citizens' groups "in order to introduce a residential facility for reclamation purposes that can not be changed," said "If you change the purpose of the planned landfill, if the authorities of certain companies to increase business profitability Lead would be awful," he said .


Focus-Lotte Group operated Lotte Super Tower's Construction and Development Documental Modification for Residential Part will submit in 2011.
korea2002 no está en línea   Reply With Quote
Old November 28th, 2010, 07:49 PM   #715
kanye
Moderator
 
kanye's Avatar
 
Join Date: Sep 2008
Location: Austria
Posts: 4,020
Likes (Received): 4308

Isn't this more like Prep?
kanye no está en línea   Reply With Quote
Old November 29th, 2010, 05:52 PM   #716
Cristobal_illo
iPhone lover!
 
Cristobal_illo's Avatar
 
Join Date: May 2007
Location: Santiago, Chile
Posts: 741
Likes (Received): 21

Yeah. I think this building is Prep, not U/C...
__________________
COSTANERA CENTER with 300m and 64 fl.
Latin American's Tallest Building...
Cristobal_illo no está en línea   Reply With Quote
Old November 29th, 2010, 09:12 PM   #717
giovani kun
====(^.^)====
 
giovani kun's Avatar
 
Join Date: Jan 2007
Location: 世界 に
Posts: 2,832
Likes (Received): 322

so it's 107 fl or 130fl ?
giovani kun no está en línea   Reply With Quote
Old November 29th, 2010, 10:03 PM   #718
spectre000
Registered User
 
spectre000's Avatar
 
Join Date: Jul 2008
Location: St. Paul
Posts: 5,659
Likes (Received): 1194

Quote:
Originally Posted by giovani kun View Post
so it's 107 fl or 130fl ?
Who knows. The design changes all the time it seems. This shouldn't be in the U/C forum. I think all they did was bury some slurry wall formworks into the ground for the future tower. But not actual piles for the foundation.
spectre000 está en línea ahora   Reply With Quote
Old November 30th, 2010, 03:28 PM   #719
Blue Flame
Get Silly!
 
Blue Flame's Avatar
 
Join Date: Jul 2009
Location: Lexington,KY
Posts: 1,885
Likes (Received): 232

Nice to see actual work begining on the site of the tower. I hope it begins construction soon.
__________________
A cynic is nothing but a realist with experience.
Blue Flame no está en línea   Reply With Quote
Old December 18th, 2010, 07:09 AM   #720
korea2002
Registered User
 
korea2002's Avatar
 
Join Date: Nov 2007
Location: Jeonju,서울,한국
Posts: 6,007
Likes (Received): 712

Busan Lotte Super Tower Construction Updates

12/02

Piling test is going on....





korea2002 no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 05:56 PM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu