#U/C-Bahrain Bay: "FOUR SEASONS HOTEL" | 50F

concepts :













[IMG]http://*************************/images/jpgs/bahrain/four_seasons_hotel_bahrain_f211111.jpg[/IMG]











Quote:

يؤمن أكثر من 2000 وظيفة جديدة
فندق «الفور سيزونز» يضخ 300 مليون دينار في الاقتصاد البحريني





يبشر انطلاق الأعمال الإنشائية لفندق الفور سيزونز في البحرين بإحساس متجدد بالتفاؤل في قطاعات العمالة والعقارات في المملكة. وهذا الفندق الذي يقع في خليج البحرين ويطل على الواجهة البحرية، على الساحل الشمالي الشرقي لمدينة المنامة، سوف يقام بكُلفة قدرها 2,5 مليار دولار، ومن المتوقع أن يستكمل إنشاء المشروع في إبريل 2014 ويتوقع أن يوفر فرص عمل جديدة، رأسمال جديد ويبشر بموجة جديدة من التفاؤل في العديد من القطاعات الرئيسية في البحرين.
وتأكيدا للآثار الإيجابية للمشروع الجديد أوضح بوب فينسنت، الرئيس التنفيذي لخليج البحرين والذي سوف يتولى تنسيق تنفيذ المشروع أنه «سوف يضخ المشروع الإنشائي الذي يستمر مدة 29 شهرا نحو 300 مليون دينار بحريني في اقتصاد البحرين وهو ما ستكون له فوائد مالية واضحة كما أنه سيكون تعبيرا إيجابيا للغاية عن الثقة في البلاد بصفتها مركزا تجاريا حيويا».
وأكد بوب فينسنت أن إنشاء أحدث فندق ضمن هذه السلسلة من الفنادق من فئة الخمس نجوم وهو فندق الفور سيزونز في خليج البحرين سوف يؤمن تحقيق فوائد كثيرة بجلب العديد من فرص العمل للقوى العاملة في البلاد. وأضاف قائلا: «ينظر إلى الشروع في تنفيذ العقد الرئيسي لفندق الفور سيزونز خليج البحرين على أنه التزام هام بإعادة تنشيط أعمال الإنشاءات في البحرين وجذب مزيد من الاهتمام بالإقراض للقطاع العقاري من قبل البنوك المحلية. بالإضافة إلى ذلك فإن هناك فوائد جمة من توفير أكثر من 2000 فرصة عمل خلال مراحل الإنشاء فضلا عن مشاركة المقاولين البحرينيين من الباطن والكثير من الموردين خلال مراحل الإنشاء فضلا عن تأمين أكثر من 700 وظيفة دائمة وجميع هذه الأمور سوف تؤكد التحسن الشامل في اقتصاد البحرين».
وبارتفاع قدره 201 مترا و50 طابقا و263 غرفة للعملاء فإن مجمع الفندق سوف يعطي دفعة قوية لقطاع الضيافة في البحرين وسوف يرسي معيارا جديدا في وسائل الإقامة الفخمة والمترفة في البلاد. ويضم الفندق ناديا صحيا من فئة الخمس نجوم ومنشآت ترفيهية ومطعما معلقا باسم «سكاي بود»، مرافق من الدرجة الأولى للولائم والمؤتمرات، إضافة إلى أربعة مطاعم راقية ومناظر بانورامية جميلة لغرف وأجنحة النزلاء، وبوجه عام تم تصميم المشروع بالكامل بحيث يحتل الفندق موقع الصدارة بين قطاع الفنادق في البحرين وينتقل بها إلى عهد جديد من الفخامة والرفاهية. سوف يتم تنسيق تنفيذ المشروع من قبل فريق إدارة خليج البحرين ومن ثم فإن إنشاء الفندق سوف يضم نفس المستوى من التصميم العصري والكفاءة في إدارة المشاريع التي وضعت خليج البحرين في موقع متميز لإنشاء المشاريع الكبرى على الواجهة البحرية للساحل الشمالي.




hmd no está en línea   Reply With Quote

Sponsored Links
 
Old May 10th, 2012, 01:22 AM   #2
hmd
Registered User
 
Join Date: Sep 2011
Posts: 330
Likes (Received): 9



hmd no está en línea   Reply With Quote
Old May 10th, 2012, 03:58 AM   #3
Yaghuth
Registered User
 
Yaghuth's Avatar
 
Join Date: Apr 2009
Posts: 2,989
Likes (Received): 138

looks nice ,,
Yaghuth no está en línea   Reply With Quote
Old May 10th, 2012, 07:00 AM   #4
purplerain08
Registered User
 
purplerain08's Avatar
 
Join Date: Mar 2012
Location: Abu Dhabi
Posts: 111
Likes (Received): 1

very nice
__________________
defying gravity
purplerain08 no está en línea   Reply With Quote
Old May 11th, 2012, 12:10 AM   #5
Naif Saudi
Registered User
 
Naif Saudi's Avatar
 
Join Date: Mar 2011
Location: JEDDAH
Posts: 6,026
Likes (Received): 1423

Great News

Good luck to Bahrain
__________________
Tomorrow will be better only optimism
︷︸
Naif Saudi no está en línea   Reply With Quote
Old May 25th, 2012, 02:49 PM   #6
hmd
Registered User
 
Join Date: Sep 2011
Posts: 330
Likes (Received): 9



hmd no está en línea   Reply With Quote
Old May 25th, 2012, 03:07 PM   #7
hmd
Registered User
 
Join Date: Sep 2011
Posts: 330
Likes (Received): 9

thay are building this project very fast !!

the constraction works are 24/7 !! even in the night !
hmd no está en línea   Reply With Quote
Old May 26th, 2012, 01:21 AM   #8
LeKemono
Registered User
 
Join Date: Nov 2009
Location: Manama
Posts: 147
Likes (Received): 1

Great!
Now that's what Im talkin about
LeKemono no está en línea   Reply With Quote
Old May 26th, 2012, 06:11 AM   #9
Raggi01
Registered User
 
Join Date: May 2011
Location: Dubai
Posts: 63
Likes (Received): 2

hmd you have breathed new life into the bahrain forum and I thank you for that. Keep it up!
I was wondering if you can tell us or possibly take pictures about the progress of the villamar towers?
Raggi01 no está en línea   Reply With Quote
Old May 27th, 2012, 03:17 PM   #10
hmd
Registered User
 
Join Date: Sep 2011
Posts: 330
Likes (Received): 9

Quote:
Originally Posted by Raggi01 View Post
hmd you have breathed new life into the bahrain forum and I thank you for that. Keep it up!
I was wondering if you can tell us or possibly take pictures about the progress of the villamar towers?
welcom bro , and thanks .

about the villamar thay have recently signing a new contract with new constraction combany , in Condition that the new combany will own some area in the 3 towers.

but unfortunately thay did'nt start the works on the towers yet .
hmd no está en línea   Reply With Quote
Old May 28th, 2012, 08:38 AM   #11
purplerain08
Registered User
 
purplerain08's Avatar
 
Join Date: Mar 2012
Location: Abu Dhabi
Posts: 111
Likes (Received): 1

Quote:
Originally Posted by hmd View Post
welcom bro , and thanks .

about the villamar thay have recently signing a new contract with new constraction combany , in Condition that the new combany will own some area in the 3 towers.

but unfortunately thay did'nt start the works on the towers yet .
-- whats the name of the company HMD?
__________________
defying gravity
purplerain08 no está en línea   Reply With Quote
Old May 28th, 2012, 10:12 AM   #12
bahraini_87
Registered User
 
Join Date: Jul 2005
Posts: 581
Likes (Received): 0

50 F for a hotel ( somthing WOW )

thank you soooo much hamad
bahraini_87 no está en línea   Reply With Quote
Old May 28th, 2012, 12:43 PM   #13
hmd
Registered User
 
Join Date: Sep 2011
Posts: 330
Likes (Received): 9

Quote:
Originally Posted by purplerain08 View Post
-- whats the name of the company HMD?
i think it is " al hamad constraction company " .
hmd no está en línea   Reply With Quote
Old May 28th, 2012, 12:44 PM   #14
hmd
Registered User
 
Join Date: Sep 2011
Posts: 330
Likes (Received): 9

Quote:
Originally Posted by bahraini_87 View Post
50 F for a hotel ( somthing WOW )

thank you soooo much hamad
welcom bro
hmd no está en línea   Reply With Quote
Old June 7th, 2012, 08:50 AM   #15
purplerain08
Registered User
 
purplerain08's Avatar
 
Join Date: Mar 2012
Location: Abu Dhabi
Posts: 111
Likes (Received): 1

Four Seasons Bahrain logs 500,000hrs accident free

Quote:
The Four Seasons Hotel Bahrain Bay project has logged over 500,000 accident-free working hours on site since it commenced, and its management team has confirmed that construction is currently ahead of schedule, with the fifth level of towers now completed.

The hotel towers will rise to reach 50 floors at height of 201m, containing 263 guest rooms, and featuring the suspended ‘Sky Pod’ restaurant on a bridge between the two towers. The project will also create 700 jobs, many of which have been filled by Bahraini nationals.

“We have been impressed on this particular project with the skilled labour available locally and their ability to respond to our demanding schedule. We have been able to identify high quality sub-contractors with efficient material supply lines and hard-working teams,” said Philippe Dessoy, general manager at Six Construct Middle East.

An anchor project on the Bahrain Bay development, the Four Seasons is being managed by Hisham Abdulrahman Jaffer (HAJ), with Skidmore, Owings & Merrill and COWI Gulf providing consultancy. Project work is set to be completed for April 2014.

“We have been extremely impressed with the way Six Construct has initiated the startup stages of the main works. Working in partnership with a number of local contractors, they have responded to a demanding critical path and timeline,” said Bob Vincent, general manager of bayside developments.

Contractor Six Construct are employing a 1200-strong team for the project, utilising a two-shiftwork pattern to optimise project completion.

“As one of the cornerstone components of Bahrain Bay, we all understand that a project of this scale is an opportunity to demonstrate Bahrain’s emergence from the global financial crisis, and its sustainability as a GCC tourism hub," said Vincent.

The project is predicted to result in direct and indirect economic benefits for Bahrain reaching $300m over the next five to seven years, with GCC tourism expected to contribute strongly to these benefits.

“As the project further evolves towards our targeted opening in 2014; we will see further evidence of how the construction, tourism and government sectors of Bahrain are collaborating to support growth opportunities.”

Six Construct were selected for this landmark project due to their renowned portfolio of large scale construction projects delivered on time, without compromising standards. Six Construct works include the Burj Khalifa, Ferrari World Abu Dhabi, the Khalifa Stadium in Doha and Bahrain’s North Manama Causeway.
http://www.constructionweekonline.co...accident-free/
__________________
defying gravity
purplerain08 no está en línea   Reply With Quote
Old June 12th, 2012, 04:14 PM   #16
hmd
Registered User
 
Join Date: Sep 2011
Posts: 330
Likes (Received): 9

Four Seasons Hotel and Resort Ahead of Schedule




3rd June 2012, MANAMA: Following its official launch earlier this year, Four Seasons Hotel and Resort Bahrain has confirmed the project is currently ahead of schedule, with the fifth level of towers now completed and over 500,000 working hours logged on site. The project is predicted to result in direct and indirect economic benefits for Bahrain that will equal approximately USD300m over the next five to seven years, with GCC tourism expected to contribute strongly to these benefits. Contractor Six Construct – who have developed major projects in the region such as the Burj Khalifa (Dubai), Ferrari World (Abu Dhabi), Khalifa Stadium (Doha) and Bahrain’s North Manama Causeway – have a 1200-strong team, who are utilising a two-shiftwork pattern to optimise project completion.


Commenting on the progress, Mr. Bob Vincent, who is overseeing the project’s implementation, said: “This project is key not just for the real estate sector, but also on a national economic level. As one of the cornerstone components of Bahrain Bay, we all understand that a project of this scale is an opportunity to demonstrate Bahrain’s emergence from the global financial crisis, and its sustainability as a GCC tourism hub. We have been extremely impressed with the way Six Construct has initiated the startup stages of the main works. Working in partnership with a number of local contractors, they have responded to a demanding critical path and timeline. As the project further evolves towards our opening in 2014; we will see further evidence of how the construction, tourism and government sectors of Bahrain work together to support growth opportunities.”

The Four Seasons Hotel and Resort Bahrain demonstrates that Bahrain is committed to emerging from recent issues with a strengthened economy, as Vincent confirmed: “The project shows a commitment from the investment community in future GCC tourism both on a business and leisure level.”

Mr. Philippe Dessoy, General Manager, Six Construct Middle East, identified local resources as a key factor in the speed of progress. He commented: “Six Construct has had implemented projects in Bahrain over the past 30 years. We have been impressed on this particular project with the skilled labour available locally and their ability to respond to our demanding schedule. We have been able to identify high quality sub-contractors with efficient material supply lines and hard-working teams.” Six Construct were selected for this landmark project due to their renowned portfolio of large scale construction projects delivered on time, without compromising standards.

At 201 meters tall, 50-storeys, and 263 guest rooms, the hotel complex is set to bolster Bahrain’s hospitality credentials, and set a new standard in luxury accommodation. Complete with 5-star spa and leisure facilities, suspended ‘Sky Pod’ restaurant, first-class banqueting and conferencing capabilities, four fine dining outlets, and panoramic views for guestrooms and suites, the project has been designed to lead Bahrain’s hotel offerings into a new era


http://www.bahrainbay.com/internalnews.html?id=75
hmd no está en línea   Reply With Quote
Old June 12th, 2012, 09:44 PM   #17
Walhaan
Registered User
 
Join Date: Feb 2008
Posts: 64
Likes (Received): 0

Very impressive .. Thank you for sharing the article
Walhaan no está en línea   Reply With Quote
Old June 13th, 2012, 12:32 PM   #18
Benjie369
Registered User
 
Join Date: Jun 2012
Posts: 5
Likes (Received): 0

That's constructed so beautifully and I just love that Design and actually that's pretty appreciated, for this purpose there must a the greatest architectures of the time. Anyway I have some plans and when I'll make it fulfill then I'll surely share here.
__________________
homes for sale bozeman
Benjie369 no está en línea   Reply With Quote
Old June 15th, 2012, 07:10 AM   #19
the ro0ok
Registered User
 
the ro0ok's Avatar
 
Join Date: Jan 2011
Posts: 353
Likes (Received): 3

nice design, with nice construction, but still this four season won't beat the one in Doha !
Doha will host the second four season in 2013 !! which is much better than this one !
I still like it though
__________________
Milwaukee
the ro0ok no está en línea   Reply With Quote
Old July 15th, 2012, 08:47 AM   #20
bahraini_87
Registered User
 
Join Date: Jul 2005
Posts: 581
Likes (Received): 0

this one is growing very very fast
bahraini_87 no está en línea   Reply With Quote


Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 10:13 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.1.2 (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd.
vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd. (Resources saved on this page: MySQL 20.00%)

SkyscraperCity ☆ High there, what's up!

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu