Old June 5th, 2012, 04:52 AM   #801
krrra
Crash N Burn
 
krrra's Avatar
 
Join Date: Apr 2010
Location: Republic of the Philippines
Posts: 946
Likes (Received): 12

Quote:
Originally Posted by mach000 View Post
I think old design pa yan when it was originally to have an own exit in SLEX. TRB did not approve the new exit because it is too close to Susana Heights exit.

The new design will utilise the Susana Heights exit and expand the toll interchange and expand the SLEX bridge.
besides its wise to utilize susana heights exit na wala pang 1 km ang layo sa daang hari road, teka meron bang road linking susana and daang hari?
__________________
PILIPINAS NUMBER ONE!
krrra no está en línea   Reply With Quote

Sponsored Links
 
Old June 5th, 2012, 11:17 AM   #802
kismaytami
Registered User
 
Join Date: Jun 2012
Posts: 8
Likes (Received): 0

Quote:
Originally Posted by krrra View Post
besides its wise to utilize susana heights exit na wala pang 1 km ang layo sa daang hari road, teka meron bang road linking susana and daang hari?
Kung ang design ay magu-utilize ng Susana Heights exit... I could only imagine the horrible traffic congestion this will bring to motorists entering and leaving Susana Heights exit. Petiks ang mga teller diyan sa Susana Heights exit, kapag 7-10PM 5 to 15 minutes ang exit. Entry naman kapag 7-8AM minsan, lumalagpas ng Madrigal overpass ang pila, imagine ia-abot lang ng teller sa driver ang toll card.
kismaytami no está en línea   Reply With Quote
Old June 5th, 2012, 11:21 AM   #803
kismaytami
Registered User
 
Join Date: Jun 2012
Posts: 8
Likes (Received): 0

Quote:
Originally Posted by mach000 View Post
The firms behind Cavitex and SLEX-Daang Hari are two different entities. Hence, it is unfair to compare both projects.

From what you have mentioned, it looks like Cavitex is delayed substantially. This says a lot what kind of a firm and people are behind Cavitex.

While this is Ayala's first foray in tollroad infrastructure, I am giving Ayala the benefit of the doubt that they will finish by next year provided all ROW and approvals from govt have no delays.
Ayala is the same firm behind Manila Water diba? And Manila Water is the firm behind the long and lasting bakbak and kalkal project along EDSA-Guadalupe which caused monstrous traffic before, and until now hindi pa rin tapos...
kismaytami no está en línea   Reply With Quote
Old June 5th, 2012, 11:31 AM   #804
krrra
Crash N Burn
 
krrra's Avatar
 
Join Date: Apr 2010
Location: Republic of the Philippines
Posts: 946
Likes (Received): 12

Quote:
Originally Posted by kismaytami View Post
Kung ang design ay magu-utilize ng Susana Heights exit... I could only imagine the horrible traffic congestion this will bring to motorists entering and leaving Susana Heights exit. Petiks ang mga teller diyan sa Susana Heights exit, kapag 7-10PM 5 to 15 minutes ang exit. Entry naman kapag 7-8AM minsan, lumalagpas ng Madrigal overpass ang pila, imagine ia-abot lang ng teller sa driver ang toll card.
stick to original plan na lang, may sariling entry/exit road ang daang hari link, susana heights ay exit to muntinlupa, at magiging malaki ang volume traffic ng mga cavite bound motorists
__________________
PILIPINAS NUMBER ONE!
krrra no está en línea   Reply With Quote
Old June 5th, 2012, 01:22 PM   #805
krrra
Crash N Burn
 
krrra's Avatar
 
Join Date: Apr 2010
Location: Republic of the Philippines
Posts: 946
Likes (Received): 12

Complete description of Daang Hari-SLEX Link.

http://ppp.gov.ph/wp-content/uploads...2411_Part2.pdf
__________________
PILIPINAS NUMBER ONE!
krrra no está en línea   Reply With Quote
Old June 5th, 2012, 06:16 PM   #806
mach000
Registered User
 
Join Date: Jan 2010
Posts: 172
Likes (Received): 1

Quote:
Originally Posted by krrra View Post
besides its wise to utilize susana heights exit na wala pang 1 km ang layo sa daang hari road, teka meron bang road linking susana and daang hari?
Sa ngayon walang link pa Susana Heights and Daang Hari.

It is too late to revert back to the original design of having a new exit in SLEX because govt has already approved the link to Susana Heights.

Ideally, mas maganda talaga meron sariling exit.
mach000 no está en línea   Reply With Quote
Old June 5th, 2012, 06:22 PM   #807
mach000
Registered User
 
Join Date: Jan 2010
Posts: 172
Likes (Received): 1

Quote:
Originally Posted by kismaytami View Post
Ayala is the same firm behind Manila Water diba? And Manila Water is the firm behind the long and lasting bakbak and kalkal project along EDSA-Guadalupe which caused monstrous traffic before, and until now hindi pa rin tapos...
Yes. Ayala owns Manila Water. Lets wait and see the expected start date of construction. Then we will see progress from thereon and start scrutiny of this project.
mach000 no está en línea   Reply With Quote
Old June 6th, 2012, 04:22 AM   #808
krrra
Crash N Burn
 
krrra's Avatar
 
Join Date: Apr 2010
Location: Republic of the Philippines
Posts: 946
Likes (Received): 12

Quote:
Originally Posted by mach000

Sa ngayon walang link pa Susana Heights and Daang Hari.

It is too late to revert back to the original design of having a new exit in SLEX because govt has already approved the link to Susana Heights.

Ideally, mas maganda talaga meron sariling exit.
august 2013 or november 2013 ang opening?
__________________
PILIPINAS NUMBER ONE!
krrra no está en línea   Reply With Quote
Old June 6th, 2012, 04:42 PM   #809
mach000
Registered User
 
Join Date: Jan 2010
Posts: 172
Likes (Received): 1

Quote:
Originally Posted by krrra View Post
august 2013 or november 2013 ang opening?
As per PPP website, August 2013.

As per DPWH website, November 2013.

I think August 2013 is the new target completion date as approved by the govt.

Lets see if construction can start July in order to finish by August of next year.
mach000 no está en línea   Reply With Quote
Old June 6th, 2012, 06:28 PM   #810
krrra
Crash N Burn
 
krrra's Avatar
 
Join Date: Apr 2010
Location: Republic of the Philippines
Posts: 946
Likes (Received): 12

sa dpwh website, old design ang nakalagay kaya nov 2013 ang completion, ppp website has the accurate figures
__________________
PILIPINAS NUMBER ONE!
krrra no está en línea   Reply With Quote
Old July 16th, 2012, 06:21 AM   #811
BuhayDaan
Registered User
 
Join Date: Jul 2012
Posts: 3
Likes (Received): 0

sana sa bandang gitna ilagay ung toll plaza para kapag magkaroon ng traffic build up hindi aabot sa Susana Heights Interchange...


-------------------------------------
buhaydaan.blogspot.com
BuhayDaan no está en línea   Reply With Quote
Old August 20th, 2012, 11:08 PM   #812
El_Toro
Registered User
 
El_Toro's Avatar
 
Join Date: Feb 2011
Location: California
Posts: 596
Likes (Received): 2

https://www.facebook.com/photo.php?f...type=1&theater

- sana ganito rin ang kapal ng concrete with rebars pa sa mga roads natin sa Pinas
El_Toro no está en línea   Reply With Quote
Old August 22nd, 2012, 04:26 PM   #813
happosai
<<-Pusit Hunter->>
 
happosai's Avatar
 
Join Date: Feb 2009
Location: Manila
Posts: 4,972
Likes (Received): 27

Tapos bubutasin lang ng MWSS, PLDT, etc...
happosai no está en línea   Reply With Quote
Old August 23rd, 2012, 07:44 AM   #814
Christian_123
MMMPPH!
 
Christian_123's Avatar
 
Join Date: Jul 2009
Posts: 1,287
Likes (Received): 180

Oo nga, ganda ganda ng kalye tapos sisirain lang nila...
__________________
Mas mabuti nang sumabit sa mga sanga ang tren kaysa sumabit sa mga tanga. -happosai
Christian_123 no está en línea   Reply With Quote
Old August 23rd, 2012, 09:47 AM   #815
happosai
<<-Pusit Hunter->>
 
happosai's Avatar
 
Join Date: Feb 2009
Location: Manila
Posts: 4,972
Likes (Received): 27

At kung mamalas malasin ka. Di na nila sisimentuhan. Tatabunan na lang. At kung sinuwerte kang simentuhan.. Wala pang 1inch ang kapal ng semento..
happosai no está en línea   Reply With Quote
Old August 24th, 2012, 07:35 AM   #816
absinthe_888
Registered User
 
absinthe_888's Avatar
 
Join Date: May 2007
Posts: 10,264
Likes (Received): 78

Yan din ang problema kaya ang panget ng kalsada sa Pinas. Substandard na nga, mas substandard pa yung patchwork ng mga utility companies.
absinthe_888 no está en línea   Reply With Quote
Old August 29th, 2012, 10:46 AM   #817
slamm
Registered User
 
Join Date: Aug 2012
Location: QC
Posts: 32
Likes (Received): 1

Passed C6 coming from Pasig - Pinagbuhatan (Mercedes Ave) last weekend and how i hope they really improve on the access and condition of this road. There are mother potholes on the side caused by poor drainage mostly if you look at it.
slamm no está en línea   Reply With Quote
Old August 30th, 2012, 04:56 AM   #818
mean machine
Registered User
 
Join Date: Feb 2010
Posts: 25
Likes (Received): 0

fyi, construction has already started on the expansion of the Susana Heights exit.
mean machine no está en línea   Reply With Quote
Old August 30th, 2012, 02:09 PM   #819
LhexiMont
Registered User
 
LhexiMont's Avatar
 
Join Date: Jul 2005
Location: Muntinlupa and Middle East
Posts: 892
Likes (Received): 14

Quote:
Originally Posted by mean machine View Post
fyi, construction has already started on the expansion of the Susana Heights exit.
It seems that JP Rizal bridge over SLEX near the Susana Heights interchange is being expanded also .
LhexiMont no está en línea   Reply With Quote
Old August 31st, 2012, 01:53 PM   #820
kismaytami
Registered User
 
Join Date: Jun 2012
Posts: 8
Likes (Received): 0

Quote:
Originally Posted by mean machine View Post
fyi, construction has already started on the expansion of the Susana Heights exit.
Pics?
kismaytami no está en línea   Reply With Quote


Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 03:22 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.1.2 (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd.
vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd. (Resources saved on this page: MySQL 20.00%)

SkyscraperCity ☆ High there, what's up!

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu