Civic body defers decision on Pal-Umara low level bridge on Tapi river

SURAT: Commuters in Pal and Umara areas in the city are upset following the Surat Municipal Corporation's (SMC) public works committee has deferred its decision on approving the Rs 88 crore worth of the proposed low-level bridge on river Tapi connecting Pal and Umara.

Official sources said the SMC's bridge cell has proposed a low-level bridge across the river connecting the areas of Pal and Umara in order to ease the traffic movement on the Sardar Bridge and the upcoming cable-stayed bridge.

Along with the bridge proposal, the bridge cell has sought the permission of demolishing the residential structures coming in the way of the approach road of the proposed bridge in Umara.

However, the residents of Umara led by some of the political leaders have opposed the proposed alignment for the construction of the approach road of the bridge connecting Pal and Umara.

Sources said that the bridge cell has zeroed in on both the locations in Umara and Pal after a thorough study. However, it is not possible for the civic body to change the existing location of the bridge. There is one option left with the civic body but it is not viable as the Bhata area is still not come under the city limit.

A senior officer with the bridge cell told TOI "It is a question of only seven to eight properties falling under the line of the approach road at Umara. We have to look at the larger interest of the people in both the areas as this proposed bridge is going to ease the traffic problems"

Source :- http://timesofindia.indiatimes.com/c...w/15077586.cms
meetmus2fa no está en línea   Reply With Quote

Sponsored Links
 
Old July 27th, 2012, 03:10 PM   #122
MeetRathore
Registered User
 
Join Date: Jun 2012
Posts: 545
Likes (Received): 90

Update on Flyover at Bhatar Circle
Contractor showed awesome speed, piling work of all the pillar got completed.
Even, concrete filling process started of pillars...

Rebaring Process for the secondary level of pillars will start soon...

MeetRathore no está en línea   Reply With Quote
Old July 27th, 2012, 03:30 PM   #123
meetmus2fa
Registered User
 
Join Date: Jul 2010
Posts: 2,485
Likes (Received): 130

Quote:
Originally Posted by MeetRathore View Post
Update on Flyover at Bhatar Circle
Contractor showed awesome speed, piling work of all the pillar got completed.
Even, concrete filling process started of pillars...

Rebaring Process for the secondary level of pillars will start soon...

That bridges are part of BRT ??????
meetmus2fa no está en línea   Reply With Quote
Old July 27th, 2012, 04:12 PM   #124
MeetRathore
Registered User
 
Join Date: Jun 2012
Posts: 545
Likes (Received): 90

Nope they are not... They are for common traffic
MeetRathore no está en línea   Reply With Quote
Old July 27th, 2012, 06:43 PM   #125
AjayGJ21
Followtruth
 
AjayGJ21's Avatar
 
Join Date: Jan 2011
Posts: 603
Likes (Received): 93

What a amazing speed kept by the contractors of Bhatar and Sosyo circle flyovers. It's like never before. They have start construction just quickly after they were appointed as developer by SMC.
SMC's job also highly appreciated here. They have announced these project in Budget and in just 2 months, work is on full swing.
AjayGJ21 no está en línea   Reply With Quote
Old July 27th, 2012, 06:44 PM   #126
AjayGJ21
Followtruth
 
AjayGJ21's Avatar
 
Join Date: Jan 2011
Posts: 603
Likes (Received): 93

What a amazing speed kept by the contractor of Bhatar and Sosyo circle flyovers. It's like never before. They have start construction just quickly after they were appointed as developer by SMC.
SMC's job also highly appreciated here. They have announced these project in Budget and in just 2 months, work is on full swing.
AjayGJ21 no está en línea   Reply With Quote
Old July 27th, 2012, 07:17 PM   #127
MeetRathore
Registered User
 
Join Date: Jun 2012
Posts: 545
Likes (Received): 90

Exactly !!! Actually it is b'coz of new process which is implemented by SMC... Process of Piling which is proved to be very much effective as well as faster too...
MeetRathore no está en línea   Reply With Quote
Old July 31st, 2012, 07:37 AM   #128
meetmus2fa
Registered User
 
Join Date: Jul 2010
Posts: 2,485
Likes (Received): 130

New Hope Bridge





Quote:
રૂ.પ૮.૯૮ કરોડના અંદાજ સામે વિજય મિસ્ત્રી કન્સ્ટ્રક્શન કંપનીની ૭૦.૬પ કરોડની ઓફર સૌથી લોએસ્ટ નીકળી, સૌથી ઊંચી ઓફર રણજિત બિલ્ડકોનની રૂ.૯૦.૪૬ કરોડની આવી
More :- DivyaBhaskar
meetmus2fa no está en línea   Reply With Quote
Old July 31st, 2012, 07:42 AM   #129
meetmus2fa
Registered User
 
Join Date: Jul 2010
Posts: 2,485
Likes (Received): 130



Approved amount for the bridge was INR 58.98 Crore

Lowest bid from Vipul mistry construction for INR 70.65 Crore

Bridge will be extended till Adajan Depo

On the rive side of the bridge fountain will be developed.

American agency will be consulted for fountain spending 16000 dollar.

Same agency has developed same type of fountain in Seoul Korea
meetmus2fa no está en línea   Reply With Quote
Old July 31st, 2012, 10:59 AM   #130
gandhi.rushabh1992
amdavad meri jaan
 
gandhi.rushabh1992's Avatar
 
Join Date: Dec 2010
Location: Ahmedabad
Posts: 5,103
Likes (Received): 517

Quote:
Originally Posted by meetmus2fa View Post
We were discussing about how this type of bridge would look on the Sabarmati...but Tapi beat us to it
__________________
AHMEDABAD - Up, Close & Personal


A-h-m-e-d-a-b-a-d PAST & PRESENT
gandhi.rushabh1992 no está en línea   Reply With Quote
Old July 31st, 2012, 11:30 AM   #131
meetmus2fa
Registered User
 
Join Date: Jul 2010
Posts: 2,485
Likes (Received): 130

Quote:
Originally Posted by gandhi.rushabh1992 View Post
We were discussing about how this type of bridge would look on the Sabarmati...but Tapi beat us to it
But lets see whether it will materialize or not as lowest tender receives is 16% higher than the approved amount
meetmus2fa no está en línea   Reply With Quote
Old July 31st, 2012, 08:08 PM   #132
meetmus2fa
Registered User
 
Join Date: Jul 2010
Posts: 2,485
Likes (Received): 130

Hope bridge news in English

Quote:
SURAT: The Surat Municipal Corporation ( SMC) on Monday received a lowest tender of Rs 70 crore for the construction of the prestigious bridge on river Tapi connecting Adajan Patia and Chowk Bazaar where the 135-year-old Hope bridge once stood.

In a move to appease the heritage lovers and the denizens in the diamond city who lost their legal battle in the Gujarat High Court and the Supreme Court to save the 135-year-old historical bridge from demolition, the SMC's bridge department came up with a unique design for the new bridge that would replicate the Hope bridge structure.
More on TOI
meetmus2fa no está en línea   Reply With Quote
Old August 2nd, 2012, 08:11 PM   #133
MeetRathore
Registered User
 
Join Date: Jun 2012
Posts: 545
Likes (Received): 90

Tendering is not a big issue, if their will be any fluctuation in Bid price & Expected amount, then SMC & Contractor can negotiate it... And if its matter of bridges, then how we can under estimate SMC
MeetRathore no está en línea   Reply With Quote
Old August 2nd, 2012, 10:30 PM   #134
meetmus2fa
Registered User
 
Join Date: Jul 2010
Posts: 2,485
Likes (Received): 130

Quote:
Originally Posted by MeetRathore View Post
Tendering is not a big issue, if their will be any fluctuation in Bid price & Expected amount, then SMC & Contractor can negotiate it... And if its matter of bridges, then how we can under estimate SMC
But our Cable Stayed bridge delayed for 5 years due to high tenders
meetmus2fa no está en línea   Reply With Quote
Old August 3rd, 2012, 06:21 AM   #135
MeetRathore
Registered User
 
Join Date: Jun 2012
Posts: 545
Likes (Received): 90

Reason--- EA (Estimated Amount) of tender was not right. Later on then several changes were made in Estimated Amount and then tenders were brought up again for the Bidding Process... thats why it got delayed...
MeetRathore no está en línea   Reply With Quote
Old August 3rd, 2012, 11:10 PM   #136
meetmus2fa
Registered User
 
Join Date: Jul 2010
Posts: 2,485
Likes (Received): 130

6 New bridges

Quote:
The standing committee of Surat Municipal Corporation (SMC) has for the first time approved projects worth Rs 331.55 crore in its two hour meeting held here on Friday. It approved the estimates of six new bridges, decided to expand the capacity of sewerage treatment plant and not to give concessions to patients in special rooms of SMIMER Hospital.

Standing committee chairman Bhimji Patel told TOI, "Four of the six bridges to come up will be financed under chief minister's Sadbhavna Mission programme." About Rs 2,100 crore have been sanctioned for Surat under this programme.

The bridges, which will be constructed under this scheme are a BRTS route flyover at Puna Gam at the cost of Rs 30.92 crore, a rail overbridge at Utran-Mota Varacha at the cost of Rs 48.40 crore, a rail overbridge at Bhestan on Surat-Mumbai main line at the cost of Rs 60.59 crore and a three-lane flyover from Welcome Gate of the city on Surat-Kamrej road to Savji Korat junction on Varacha main road. Two bridges will be built at Sarthana-Simada and Magob-Dumbhal also
Read More TOI
meetmus2fa no está en línea   Reply With Quote
Old August 7th, 2012, 06:10 AM   #137
AjayGJ21
Followtruth
 
AjayGJ21's Avatar
 
Join Date: Jan 2011
Posts: 603
Likes (Received): 93

Cable-stayed bridge will not be ready before polls
Quote:
SURAT: Surat Municipal Corporation (SMC) is upbeat over completing its dream project - the cable-stayed bridge by May 2013. The first phase of the work for the project is almost over. However, the ruling BJP will not be able to showcase it as its achievement during the assembly elections to be held by December 2012.

Executive engineer SMC BK Ghadiya said, "We have completed laying foundations of piers at the 16 proposed locations. About 40 per cent of the work is over."

At present, work on the approach roads on both sides of river at Adajan and Athwalines is going on. The construction work of super structure at Adajan is also on. The work for the main portion of the Rs 143.65 crore bridge - 998 metre-long with a middle cable portion of 300 metres - has begun while that for sub and super structure is likely to start his month.

"The cable portion will take time. We would need to tread cautiously. Load bearing and balancing need to be done properly. We feel final portion of the bridge will take 10 months' time," said Jatin Shah, city engineer, SMC.

The SMC had assured people that the bridge would be completed within 30 months, i.e., by April-May 2013.
Now, the work has gathered speed for the first of its kind bridge in the country.

"The bridge will be Surat's shaan," said Bhimji Patel, chairman, standing committee, SMC.
AjayGJ21 no está en línea   Reply With Quote
Old August 7th, 2012, 02:28 PM   #138
AjayGJ21
Followtruth
 
AjayGJ21's Avatar
 
Join Date: Jan 2011
Posts: 603
Likes (Received): 93

NH6 (Hazira-Kolkata), which is being converted into 4 lane. Its also extended to Hazira port to provide port connectivity.
It is interesting to know that this road is going to be the part of Surat ORR(Outer Ring Road). Here are some pics of Nh6 uc passing through Surat.






Overbridge at Sachin jn.




SURAT Sez looking from NH6(Surat ORR).


AjayGJ21 no está en línea   Reply With Quote
Old August 7th, 2012, 03:21 PM   #139
meetmus2fa
Registered User
 
Join Date: Jul 2010
Posts: 2,485
Likes (Received): 130

Awesome pics jay gr8 efforts keem pics coming
meetmus2fa no está en línea   Reply With Quote
Old August 7th, 2012, 04:51 PM   #140
AjayGJ21
Followtruth
 
AjayGJ21's Avatar
 
Join Date: Jan 2011
Posts: 603
Likes (Received): 93

Thanks..
Whenever I get opportunity, I will devote ma everything.
AjayGJ21 no está en línea   Reply With Quote


Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 01:02 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.1.2 (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd.
vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd. (Resources saved on this page: MySQL 20.00%)

SkyscraperCity - In Urbanity We Trust

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu