daily menu » rate the banner | guess the city | one on one

Go Back   SkyscraperCity > Asian Forums > Philippine Forums > Around the Philippines > Transport, Urban Planning and Infrastructure > Highways and Roadways


Global Announcement

SkyscraperCity needs your help to do some house cleaning! please click here for more info!



Reply

 
Thread Tools Display Modes
Old October 26th, 2012, 11:52 AM   #841
krrra
Crash N Burn
 
krrra's Avatar
 
Join Date: Apr 2010
Location: Republic of the Philippines
Posts: 946
Likes (Received): 12

Quote:
Originally Posted by Transporter89
pasensya na po sa sobrang laki ng pics hindi ma.resize
pakisend ng pic, ako ang magpost
__________________
PILIPINAS NUMBER ONE!
krrra no está en línea   Reply With Quote

Sponsored Links
 
Old October 26th, 2012, 01:58 PM   #842
Transporter89
Registered User
 
Transporter89's Avatar
 
Join Date: Mar 2010
Location: Quezon City
Posts: 872
Likes (Received): 79


na.ayus na.. si mod ata nag.resize
__________________

Life is one big road with lots of signs. So when you riding
through the ruts. Don't your thoughts, put your vision to reality. Wake up and live!
Transporter89 no está en línea   Reply With Quote
Old October 26th, 2012, 03:35 PM   #843
krrra
Crash N Burn
 
krrra's Avatar
 
Join Date: Apr 2010
Location: Republic of the Philippines
Posts: 946
Likes (Received): 12

tanong ko lang yung current C6 ay gagawing expressway diba? o another alignment?
__________________
PILIPINAS NUMBER ONE!
krrra no está en línea   Reply With Quote
Old November 5th, 2012, 01:31 AM   #844
expatdingdong
BANNED
 
Join Date: Aug 2011
Posts: 101
Likes (Received): 103

http://business.inquirer.net/91066/p...ost-govt-p500m

the government’s proceeds from the Daang Hari link may be cut in half after it was revtealed that the Department of Public Works and Highways approved a last-minute change in the project’s interconnection design without the consent of the operator of the South Luz

taena NOYNOYING!!!...... after 30 months of Presidency, the only PPP underway (which to note was a carry over from Evil Gloria's regime) is still problematic..... what a great executive branch we have
expatdingdong no está en línea   Reply With Quote
Old November 5th, 2012, 07:13 AM   #845
Transporter89
Registered User
 
Transporter89's Avatar
 
Join Date: Mar 2010
Location: Quezon City
Posts: 872
Likes (Received): 79


hey! ilipat mo sa SLEX thread

baka masita ka ng moderator
__________________

Life is one big road with lots of signs. So when you riding
through the ruts. Don't your thoughts, put your vision to reality. Wake up and live!
Transporter89 no está en línea   Reply With Quote
Old November 6th, 2012, 03:34 AM   #846
wheel of steel
Registered User
 
wheel of steel's Avatar
 
Join Date: Jul 2007
Posts: 6,056
Likes (Received): 34

Quote:
Originally Posted by expatdingdong View Post
http://business.inquirer.net/91066/p...ost-govt-p500m

the government’s proceeds from the Daang Hari link may be cut in half after it was revtealed that the Department of Public Works and Highways approved a last-minute change in the project’s interconnection design without the consent of the operator of the South Luz

taena NOYNOYING!!!...... after 30 months of Presidency, the only PPP underway (which to note was a carry over from Evil Gloria's regime) is still problematic..... what a great executive branch we have
No! We actually have a great executive branch, with a philosophy that by just jailing the expresident, we can already expect prosperity.....
__________________

Where Economic Miracle Awaits You!!!

Subic-Clark, Batangas, Metro Cebu, CDO-Iligan
wheel of steel no está en línea   Reply With Quote
Old November 6th, 2012, 05:46 AM   #847
kratos1211
Registered User
 
kratos1211's Avatar
 
Join Date: Feb 2008
Posts: 690
Likes (Received): 2

PPP project changes may cost gov’t P500M
Daang Hari road has yet to start 11 months after award
By Daxim L. Lucas Philippine Daily Inquirer

The government’s proceeds from the Daang Hari link may be cut in half after it was revealed that the Department of Public Works and Highways approved a last-minute change in the project’s interconnection design without the consent of the operator of the South Luzon Expressway to which the tollway will connect.

Due to the snag, work on the 4-kilometer tollroad—won by the Ayala group with a P902-million bid—has yet to begin almost 11 months after the project was awarded, according to official documents obtained by the Inquirer.
More importantly, a source involved with the project said the new design proposal approved by the DPWH would cost anywhere between P250 million and P500 million—a so-called “variation order” that would have to be shouldered by the government. The variation order would reduce the government’s net proceeds from the Daang Hari project to as low as P400 million from the original winning bid of the Ayala group.

The source explained that instead of using the rotunda design that was bid out by the DPWH, the Ayala group submitted two construction plans, which the DPWH accepted shortly before the financial bids were opened late last year.

“The new design that DPWH accepted is very different from the one they originally approved,” the official said. “Instead of a roundabout, there will now be a bigger toll plaza, while the connection to [the northbound lanes of] SLEx will require a longer tunnel under it.”

The official explained that the Ayala proposal approved by DPWH was meant to connect to the existing SLEx design without taking into account the highway’s upcoming expansion, which would increase its number of lanes from eight to 10 to accommodate growing vehicular traffic volume—a provision built into the original concession of SLEx’s operator, South Luzon Tollways Corp. (SLTC).

Read more
__________________
IF YOU BUILD IT, THEY WILL COME
kratos1211 no está en línea   Reply With Quote
Old December 29th, 2012, 05:57 AM   #848
yhuanista07
Sustainable Development
 
yhuanista07's Avatar
 
Join Date: May 2009
Location: City of San Jose Del Monte
Posts: 605
Likes (Received): 125


(not the official Master Plan)

Quote:
Super City
(Araneta Properties)
Araneta Properties is preparing a master plan for the development of a 248.11-hectare property in SJDM city. The major components of the master plan consists of upper-middle to high-end residential lots and townhouses complemented by a leisure center, including a country club, a commercial center and university center. Additional components of the plan are a nature park, corporate business center and mass housing.

The Proposed C-6 Portion from MRT-7 San Jose Del Monte to NLEX-Bocaue
Ciudad De Victoria (CdV) A.K.A Philippine Arena Complex...
__________________
SAN JOSE DEL MONTE CITY
Disaster Resilient and Evergreen Super City
"Where buildings rise and greeneries grow"

Ongoing Major Private Investments:
ALTARAZA Town Center | MRT-7 City | Colinas Verdes | MOLDEX New City | Skyline Hospital | Starmall Expansion | ABS-CBN Soundstage


URBAN FORM follows INFRASTRUCTURE.

philippinearena, spearhead liked this post

Last edited by yhuanista07; December 29th, 2012 at 06:10 AM.
yhuanista07 no está en línea   Reply With Quote
Old December 29th, 2012, 06:08 AM   #849
yhuanista07
Sustainable Development
 
yhuanista07's Avatar
 
Join Date: May 2009
Location: City of San Jose Del Monte
Posts: 605
Likes (Received): 125

this portion of C-6 is included in MRT-7 project... luckily ready na ang budget ng MRT-7. AFAIK, From SLEX to SJDM (MRT-7 Araneta Properties) lang ang portion na Expressway then 6 lane asphalt road na to NLEX...
__________________
SAN JOSE DEL MONTE CITY
Disaster Resilient and Evergreen Super City
"Where buildings rise and greeneries grow"

Ongoing Major Private Investments:
ALTARAZA Town Center | MRT-7 City | Colinas Verdes | MOLDEX New City | Skyline Hospital | Starmall Expansion | ABS-CBN Soundstage


URBAN FORM follows INFRASTRUCTURE.
yhuanista07 no está en línea   Reply With Quote
Old January 16th, 2013, 07:28 AM   #850
butterflier27
Registered User
 
Join Date: Jan 2013
Posts: 17
Likes (Received): 0

Guys, meron na C6 road that links Taytay to Bicutan. While this is better than nothing, it's not exactly an expressway road that anyone would except (well-lit, good asphalt quality, proper road signs, etc.).

Do you have any news/insights about the government's plans? Is this is going to ultimately be a toll expressway (similar to SLEX, STAR, NLEX, SCTEX) in the future that links Bulacan-Rizal-Laguna?

Just asking lang po...
butterflier27 no está en línea   Reply With Quote
Old January 16th, 2013, 08:29 AM   #851
absinthe_888
Registered User
 
absinthe_888's Avatar
 
Join Date: May 2007
Posts: 10,246
Likes (Received): 78

Hindi ba talagang originally expressway ang plano dito which costs about USD $1B?
absinthe_888 está en línea ahora   Reply With Quote
Old January 19th, 2013, 04:41 PM   #852
cocoy_01
Tantya-metric
 
cocoy_01's Avatar
 
Join Date: Oct 2006
Location: Manila
Posts: 4
Likes (Received): 0

Anu na balita dito? Any idea where exactly is the SJDM station? Im thinking of buying a property here. Manila/QC ako, ok kaya pag sa SJDM pa kung Via CAR?
cocoy_01 no está en línea   Reply With Quote
Old January 21st, 2013, 03:18 AM   #853
spearhead
Global Neutral Observer
 
spearhead's Avatar
 
Join Date: Feb 2008
Location: North America/Asia Pacific
Posts: 4,947
Likes (Received): 414

So tuloy na'tong MRT 7.
__________________

"Until philosophers rule as kings or those who are now called kings and leading men genuinely and adequately philosophise, that is, until political power and philosophy entirely coincide, while the many natures who at present pursue either one exclusively are forcibly prevented from doing so, cities will have no rest from evils,... nor, I think, will the human race."




-Plato



IT'S MORE FUN IN THE PHILIPPINES


The Queen, Kate, Junior, and 20,987 others liked this post
spearhead no está en línea   Reply With Quote
Old January 22nd, 2013, 10:08 PM   #854
le Reine
Finding destiny
 
le Reine's Avatar
 
Join Date: Oct 2005
Posts: 4,472
Likes (Received): 43

Quote:
Originally Posted by yhuanista07 View Post

(not the official Master Plan)




The Proposed C-6 Portion from MRT-7 San Jose Del Monte to NLEX-Bocaue
Ciudad De Victoria (CdV) A.K.A Philippine Arena Complex...
May at-grade na stations? Pangit!
__________________
“Some Filipinos write and speak with passion. If they could get their elite to share their sentiments and act, what could they not have achieved?”-Lee Kuan Yew
le Reine no está en línea   Reply With Quote
Old January 23rd, 2013, 02:12 AM   #855
philippinearena
Secret :D
 
philippinearena's Avatar
 
Join Date: Sep 2012
Posts: 730
Likes (Received): 21

Quote:
Originally Posted by yhuanista07 View Post

(not the official Master Plan)




The Proposed C-6 Portion from MRT-7 San Jose Del Monte to NLEX-Bocaue
Ciudad De Victoria (CdV) A.K.A Philippine Arena Complex...
Ano ba to hindi na sa Marilao/Bocaue boundary ang daan? Inilipat na ba ng sta. maria?Sure na ba to?
__________________
Whoever exalts himself will be humbled, and whoever humbles himself will be exalted.
philippinearena no está en línea   Reply With Quote
Old January 28th, 2013, 01:39 PM   #856
davidwebb
a.k.a. Lloyd
 
Join Date: Oct 2004
Location: Ortigas Center / Angono, Rizal
Posts: 71
Likes (Received): 1

Quote:
Originally Posted by krrra View Post

C-6 Expressway and Global Link (South Section)
Project Objective :
To decongest C-5 and Metro Manila Roads
Project Description : Construction of a 6-lane expressway from Quirino Highway, San Jose del Monte to Sucat, Muntinlupa. Major facilities include 7 interchanges, 2 junctions, and 2 main toll plazas. Design speed is 100 km/hr for expressway and 50 km/hr for ramps L = 59.5 kms. (including Global City Access Link Road with a total of 3 kms.)
No. of lanes = 4-6
Project Cost : PhP 44.59 Billion (US$ 1,036.98 Million)
Project Status : Supplemental Study to re-evaluate Phase I (Sucat to Marcos Highway) is on-going and to be completed on September 2012 Government Support : ROW P 3.99 B
Project Status : Supplemental Feasibility Study completed by KOICA Study Team in December 2012. Finalization of the report for the said study is on-going.

Submission to NEDA March 2013
NEDA review and approval April 2013
Detailed Design and Construction 2014-2017
davidwebb no está en línea   Reply With Quote
Old January 28th, 2013, 04:03 PM   #857
librero
San Josenyong Gala
 
librero's Avatar
 
Join Date: May 2011
Location: San Jose del Monte
Posts: 430
Likes (Received): 150

Thanks for the update sir...
__________________
Gitnang Luzon... Aking Rehiyon...

ANGELES CITY-AURORA-BATAAN-BULACAN-NUEVA ECIJA-OLONGAPO CITY-PAMPANGA-TARLAC-ZAMBALES
Visit San Jose del Monte on the Web
Isang San Josenyo... Isang Bulakenyo... Isang Pilipino...
librero no está en línea   Reply With Quote
Old January 29th, 2013, 02:21 PM   #858
philippinearena
Secret :D
 
philippinearena's Avatar
 
Join Date: Sep 2012
Posts: 730
Likes (Received): 21

Quote:
Originally Posted by davidwebb View Post
Project Status : Supplemental Feasibility Study completed by KOICA Study Team in December 2012. Finalization of the report for the said study is on-going.

Submission to NEDA March 2013
NEDA review and approval April 2013
Detailed Design and Construction 2014-2017
Ay bakit ganyan 2014 pa simula ng construction??? Kala ko pa naman this year
__________________
Whoever exalts himself will be humbled, and whoever humbles himself will be exalted.
philippinearena no está en línea   Reply With Quote
Old January 29th, 2013, 02:23 PM   #859
librero
San Josenyong Gala
 
librero's Avatar
 
Join Date: May 2011
Location: San Jose del Monte
Posts: 430
Likes (Received): 150

Pero hindi pa rin sure yang time table na yan... Remember, pwedeng tumambay ng pagkatagal tagal niyan sa sa NEDA at mapurnada na naman ang simula ng construction...
__________________
Gitnang Luzon... Aking Rehiyon...

ANGELES CITY-AURORA-BATAAN-BULACAN-NUEVA ECIJA-OLONGAPO CITY-PAMPANGA-TARLAC-ZAMBALES
Visit San Jose del Monte on the Web
Isang San Josenyo... Isang Bulakenyo... Isang Pilipino...
librero no está en línea   Reply With Quote
Old January 29th, 2013, 11:49 PM   #860
philippinearena
Secret :D
 
philippinearena's Avatar
 
Join Date: Sep 2012
Posts: 730
Likes (Received): 21

Quote:
Originally Posted by librero View Post
Pero hindi pa rin sure yang time table na yan... Remember, pwedeng tumambay ng pagkatagal tagal niyan sa sa NEDA at mapurnada na naman ang simula ng construction...
Umaasa akong magagawa ng paraan ni Ang iyan
__________________
Whoever exalts himself will be humbled, and whoever humbles himself will be exalted.
philippinearena no está en línea   Reply With Quote


Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 05:40 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.1.2 (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd.
vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd. (Resources saved on this page: MySQL 18.75%)

SkyscraperCity ☆ High there, what's up!

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu