Old October 4th, 2012, 08:56 PM   #21
World8115
Registered User
 
Join Date: Oct 2010
Posts: 6,149
Likes (Received): 223

These were the next stage of RRs to be taken (RR 15 wrongly written) - link. Out of that RRs 11, 16 & 22 were approved on July 28th 2012 - link. I dont know about RR 5 but I think RR 15 has been delayed due to acquisition of properties
__________________
W o R l D 8 i i5
- In Urbanity I trust
World8115 no está en línea   Reply With Quote

Sponsored Links
 
Old October 4th, 2012, 09:09 PM   #22
Prodigist
High-derabaD
 
Prodigist's Avatar
 
Join Date: Jul 2006
Location: Hyderabad
Posts: 1,596
Likes (Received): 63

Quote:
Originally Posted by World8115 View Post
These were the next stage of RRs to be taken (RR 15 wrongly written) - link. Out of that RRs 11, 16 & 22 were approved on July 28th 2012 - link. I dont know about RR 5 but I think RR 15 has been delayed due to acquisition of properties
That RFP was given out in Jan 2011. And it took then 18 months to tender three roads. That's slow.

Last edited by Prodigist; October 4th, 2012 at 09:23 PM.
Prodigist no está en línea   Reply With Quote
Old October 20th, 2012, 09:12 PM   #23
World8115
Registered User
 
Join Date: Oct 2010
Posts: 6,149
Likes (Received): 223

rem. Radial roads tenders by HMDA

Construction tenders for RR 5 & 15

Bid Notice - http://www.hmda.gov.in/Tenders/Bid%2...26-09-2012.pdf
Quote:
Bids are invited from eligible bidders for the construction and completion of Works being taken up with the Loan Assistance of JICA, for Strengthening and widening of Radial Roads in and around Hyderabad City,
1) Radial Road No. 5 from Shaikpet to ORR at Kokapet in the stretch from Km 0.00 to 5.80. - RR5
2) Radial Road No. 15 from Radika Junction on Tirmalgiri- Kushaiguda Road to ORR at Yadgarpally Junction the stretch from Km 0.0 to 15.15. - RR 15
DPRs for RRs: 7,20, 21 & 30

RFP - http://www.hmda.gov.in/Tenders/NIT%2...2020,21,30.pdf
Quote:
Consulting Services for preparation of Detailed Project Report for Improvement of Radial Road No. 7,20,21 & 30 in Hyderabad being taken up with the loan assistance of JICA. - link
__________________
W o R l D 8 i i5
- In Urbanity I trust
World8115 no está en línea   Reply With Quote
Old October 20th, 2012, 10:29 PM   #24
World8115
Registered User
 
Join Date: Oct 2010
Posts: 6,149
Likes (Received): 223

RR 15 (Radhika X Road-Yadgarpalli)

I made a map with the most probable route that goes with the maps provided in HMDA bid document. As expected the route goes through Jawahar Nagar.

See in Google Maps
__________________
W o R l D 8 i i5
- In Urbanity I trust
World8115 no está en línea   Reply With Quote
Old October 21st, 2012, 12:23 AM   #25
kdlara007
Registered User
 
Join Date: Nov 2008
Posts: 176
Likes (Received): 6

Question

Guys,I remember, There should be a separate thread for Hyderabad radial roads in the subforum. Apparently, I cannot find it. Does anybody know what happened to that thread?
kdlara007 no está en línea   Reply With Quote
Old October 22nd, 2012, 01:39 PM   #26
Prodigist
High-derabaD
 
Prodigist's Avatar
 
Join Date: Jul 2006
Location: Hyderabad
Posts: 1,596
Likes (Received): 63

Nice finds there about the Raidial Roads, World
If we finish 5 radial roads every year like this, the entire project will finish in 5 years.

That thread for Radial Roads was created not once but twice. The posts ended up being moved to this thread.

Himayatnagar main road has be relaid completely. Only fault is that they haven't raised the manhole levels yet so there are a few depressions. And milling was going on near Narayanguda.
Prodigist no está en línea   Reply With Quote
Old October 22nd, 2012, 06:36 PM   #27
World8115
Registered User
 
Join Date: Oct 2010
Posts: 6,149
Likes (Received): 223

Have req. Mods for the thread.

That list of RRs is good but old and some end points were changed meanwhile. You can refer this document for RRs that are being currently being executed - Status Report on Outer Ring Road Project (Aug 2012). I think the RRs 5 & 15 the construction is only for 2 lane Not sure though, had seen that in an old document
__________________
W o R l D 8 i i5
- In Urbanity I trust
World8115 no está en línea   Reply With Quote
Old October 23rd, 2012, 06:22 AM   #28
URSA009
Registered User
 
Join Date: Aug 2011
Posts: 134
Likes (Received): 13

Quote:
Originally Posted by Prodigist View Post
Nice finds there about the Raidial Roads, World
If we finish 5 radial roads every year like this, the entire project will finish in 5 years.

That thread for Radial Roads was created not once but twice. The posts ended up being moved to this thread.

Himayatnagar main road has be relaid completely. Only fault is that they haven't raised the manhole levels yet so there are a few depressions. And milling was going on near Narayanguda.
Actually I hope they start cutting old road before relaying new one, that's the norm at least in the developed world.....in some areas in the city roads height has increased so much that the buildings seem to be in a trench. Near Y junction some of the manholes are like half a feet or a feet higher than the road, makes absolutely no sense, looks like they are preparing for when the road is relaid and grows to that height.
URSA009 no está en línea   Reply With Quote
Old October 25th, 2012, 01:07 PM   #29
World8115
Registered User
 
Join Date: Oct 2010
Posts: 6,149
Likes (Received): 223

Starting with pics

Radial Road 4 (RR 4) from Tipu Khan Bridge to Narsingi ORR Junction on Gandipet Road

Quote:
Originally Posted by World8115 View Post
Gandipet Road

CC: World8115



__________________
W o R l D 8 i i5
- In Urbanity I trust
World8115 no está en línea   Reply With Quote
Old October 25th, 2012, 01:13 PM   #30
World8115
Registered User
 
Join Date: Oct 2010
Posts: 6,149
Likes (Received): 223

__________________
W o R l D 8 i i5
- In Urbanity I trust
World8115 no está en línea   Reply With Quote
Old October 25th, 2012, 03:39 PM   #31
aniketh87
From Hydra-bad
 
Join Date: May 2011
Location: Bangalore/Hyderabad
Posts: 140
Likes (Received): 1

i have recently traveled in that route ...by looking at the rate of development around this place...it may become another hitech city for hyd....
aniketh87 no está en línea   Reply With Quote
Old October 25th, 2012, 04:41 PM   #32
Prodigist
High-derabaD
 
Prodigist's Avatar
 
Join Date: Jul 2006
Location: Hyderabad
Posts: 1,596
Likes (Received): 63

Quote:
Originally Posted by URSA009 View Post
Actually I hope they start cutting old road before relaying new one, that's the norm at least in the developed world.....in some areas in the city roads height has increased so much that the buildings seem to be in a trench. Near Y junction some of the manholes are like half a feet or a feet higher than the road, makes absolutely no sense, looks like they are preparing for when the road is relaid and grows to that height.
Is cutting different from milling?
Prodigist no está en línea   Reply With Quote
Old November 25th, 2012, 12:59 AM   #33
ZaheerH
Registered User
 
Join Date: Dec 2010
Posts: 239
Likes (Received): 27

Radial Road 22

Hyderabad, November 24:


Chief Minister N Kiran Kumar Reddy will launch the Hyderabad Metro Rail works at Uppal here on Sunday.

Addressing a press conference at Metro Rail Bhavan here on Sunday, Hyderabad Metro Rail Limited Managing Director NVS Reddy said that the launching of works was a momentous occasion for Hyderabadis. Besides launching the works, the Chief Minister will unveil of the plaque for launching the Metro Rail works and also lay the foundation stone for Radial Road No 22 by the Chief Minister at Uppal Metro Rail depot. An event will also be held between the Metro Rail piers (pillars SING 18 & SING 19) opposite Genpact at Uppal.
ZaheerH no está en línea   Reply With Quote
Old November 25th, 2012, 01:04 AM   #34
ZaheerH
Registered User
 
Join Date: Dec 2010
Posts: 239
Likes (Received): 27

He probably means milling

Quote:
Originally Posted by Prodigist View Post
Is cutting different from milling?
He probably means milling where the old pavement is scraped before laying the new one.
ZaheerH no está en línea   Reply With Quote
Old November 26th, 2012, 06:26 PM   #35
World8115
Registered User
 
Join Date: Oct 2010
Posts: 6,149
Likes (Received): 223

Foundation laid for Radial Road

Quote:
Work on laying three Radial Roads to provide connectivity from the Inner Ring Road to the Outer Ring Road will be taken up next month.

Chief minister N Kiran Kumar Reddy laid the foundation stone on Sunday for one of the three _ RR-22 from Nagole Junction to Gowrelly Crosssroad (14.75 km) _ which will be laid at a cost of `45 crore. The Nagole Jn-Gowrelly RR-22 will pass through Bandlaguda. The work is entrusted to SLMI Infra Projects Ltd.

The other two are RR-11 from Jeedimetla to Saregudem (8.55 km, `93 cr) and RR-16 from ECIL Crossroads to Cheriyal Crossroad (10.18 km, `69.51 cr).

Besides, two RRs are in the pipeline.

The five radial roads, together, will have a length of 57.80 km and will cost `287.51 crore. For the three RRs (33.50 km), `207.51 crore has been sanctioned.

HMDA officials told Express that the state government accorded administrative sanction in July this year for taking up improvement of RRs 11, 16 and 22 under the Japan International Cooperation Agency (JICA) loan agreement.

For RR-5 from Shaikpet to Kokapet (5.80 km, `31.50 cr) and RR 15 from Radhika Junction, Kushaigua to Yadgarpally (15.15 km, `48.50 cr), procurement process has been initiated and is expected to be completed on November 29.

They said HMDA proposed 33 RRs with length of 390 km. As all the roads cannot be taken up at one go as it requires `3,000 cr and with JICA agreeing to lend only `380 cr to HMDA, the RRs will be developed in phases.

Of the 33 RRs, seven have been completed for a length of 53.72 km costing `341.17 cr. They are ANGRAU-Himayatsagar (RR-2, 6.6 km, `51.53 cr), Rethibowli Jn-AP Police Academy (RR-3, 10.5 km, `57.67 cr), Cantonment Y Jn at Langar House to Gandipet T Jn (RR-4, 6.8 km, `41.02 cr), Bairamuluguda-Bongulur Gate (RR-25 , 13.24 km, `87.13 cr), Pahadisherif police stn to Tukkuguda (RR-28, 7.29 km, `43.48 cr), Laxmiguda Crossroads to Mamidipally (RR-29, 7.7 km, `51.54 cr) and Extension Financial District to Kokapet (RR-33, 1.55 km, `8.80 cr).

The five RRs on NH having a length of 83.35 km were widened and improved.
__________________
W o R l D 8 i i5
- In Urbanity I trust
World8115 no está en línea   Reply With Quote
Old December 3rd, 2012, 08:31 AM   #36
World8115
Registered User
 
Join Date: Oct 2010
Posts: 6,149
Likes (Received): 223

HMDA seeks approval to work on 16 radial roads

The Hindu
Quote:

The Hindu Work underway at the radial road near AP Police Academy on the Outer Ring Road in Hyderabad on Wednesday. Photo: G.Ramakrishna

The Hyderabad Metropolitan Development Authority (HMDA) has approached the government seeking approvals to take up work on 16 radial roads (RR) running to a total length of about 195 km.



The proposal submitted to the government sought ‘in principle’ approval to utilise available savings under Japan International Cooperation Agency (JICA) loan agreement including Forex savings, for an approximate cost of Rs.1,500 crore.

The HMDA has identified a total of 33 RRs to provide improved connectivity between existing Inner Ring Road and the Outer Ring Road that is taking shape around the city.

Of this, seven stretches for a length of 53.27 km have already been completed. Costing nearly Rs.341.17 crore, the completed RRs connect the ORR western and southern sectors.

For the rest of the RRs, the works would be grounded soon including three at a cost of Rs.207.51 crore at Jeedimetla, ECIL Crossroads and Nagole Junction scheduled for December.

For two others, at Shaikpet and Radhika Junction, the administrative sanctions were already accorded.
__________________
W o R l D 8 i i5
- In Urbanity I trust
World8115 no está en línea   Reply With Quote
Old December 3rd, 2012, 02:33 PM   #37
Dilip Kumar
Registered User
 
Join Date: Nov 2012
Posts: 10
Likes (Received): 0

Radial Road 16 Map - ECIL x Road to Cheeryal X Road

The 10.18 KMs long Radial Road No. 16 from ECIL x Road to Cheryaal ORR Junction

Navigate through this route on Google Maps

Last edited by Dilip Kumar; December 3rd, 2012 at 02:39 PM.
Dilip Kumar no está en línea   Reply With Quote
Old December 3rd, 2012, 04:23 PM   #38
World8115
Registered User
 
Join Date: Oct 2010
Posts: 6,149
Likes (Received): 223

Work will start in Decemeber, I would like to know what they will do with the road till Kushaiguda 90 degree right turn as it is already 4 laned. And hope the Chakripuram & Rampally X Roads are made proper junctoins
__________________
W o R l D 8 i i5
- In Urbanity I trust
World8115 no está en línea   Reply With Quote
Old December 3rd, 2012, 05:05 PM   #39
World8115
Registered User
 
Join Date: Oct 2010
Posts: 6,149
Likes (Received): 223

Radial Road 11, RR 11 (Jeedimetla - Saregudem)

See in Google Maps
__________________
W o R l D 8 i i5
- In Urbanity I trust
World8115 no está en línea   Reply With Quote
Old January 2nd, 2013, 08:51 AM   #40
World8115
Registered User
 
Join Date: Oct 2010
Posts: 6,149
Likes (Received): 223

x-posting

Quote:
Originally Posted by Gudavalli View Post




RRR plan has a 290-km long road network circling the city beyond the ORR

With the Outer Ring Road (ORR) starting to finally fall in place, the Hyderabad Metropolitan Development Authority (HMDA) is now looking forward to laying the Regional Ring Road (RRR).

Proposed in the Master Plan, which has been submitted to the government for approval, the ambitious RRR plan has a 290-km long road network circling the city beyond the ORR.

After the HMDA jurisdiction was expanded with inclusion of parts of surrounding districts of Medak, Nalgonda, Mahabubnagar and Ranga Reddy, the HMDA proposed the RRR to connect key locations in these districts and also link it with the national highways.

Initially, the new road network was proposed as 60-metre wide but the Chief Minister, N. Kiran Kumar Reddy, suggested widening it and asked the officials to study similar peripheral road networks in cities such as Bangalore.

90-metre wide road

Following the instructions and a study, the HMDA has decided on a 90-metre wide RRR which earned the Chief Minister’s approval.

According to officials, the RRR proposal, after suggestions and objections in the draft Master Plan, has been fixed at 290-km long and 90-metre wide.

“Once the government’s approval for the Master Plan is received, work on alignments for the road and other related works will be taken up,” said an official.

The RRR would be given a shape by strengthening the existing roads and adding new stretches wherever linkages were found missing.
[/QUOTE]
__________________
W o R l D 8 i i5
- In Urbanity I trust
World8115 no está en línea   Reply With Quote


Reply

Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 11:28 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.1.2 (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd.
vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd. (Resources saved on this page: MySQL 21.43%)

SkyscraperCity - In Urbanity We Trust

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu