|
|
| daily menu » rate the banner | guess the city | one on one |
|
|||||||
| Hyderabad Project news from Hyderabad and Secunderabad |
![]() |
|
|
Thread Tools | Rate Thread | Display Modes |
|
|
#1 | ||
|
Registered User
Join Date: Oct 2010
Posts: 6,153
Likes (Received): 223
|
Musi Revitalization Project
Musi River
Quote:
Quote:
__________________
W o R l D 8 i i5 - In Urbanity I trust
|
||
|
|
|
|
|
#2 |
|
Registered User
Join Date: Oct 2010
Posts: 6,153
Likes (Received): 223
|
--Delete--
__________________
W o R l D 8 i i5 - In Urbanity I trust
Last edited by World8115; August 30th, 2012 at 08:19 PM. |
|
|
|
|
|
#3 | ||
|
Registered User
Join Date: Oct 2010
Posts: 6,153
Likes (Received): 223
|
The ugly side of Musi beautification project
TOI Quote:
TOI Quote:
__________________
W o R l D 8 i i5 - In Urbanity I trust
Last edited by World8115; August 30th, 2012 at 08:19 PM. |
||
|
|
|
|
|
#4 | |
|
Registered User
Join Date: Oct 2010
Posts: 6,153
Likes (Received): 223
|
X-posting from Hyd projects thread
Quote:
__________________
W o R l D 8 i i5 - In Urbanity I trust
|
|
|
|
|
|
|
#5 | ||
|
Registered User
Join Date: Oct 2010
Posts: 6,153
Likes (Received): 223
|
GHMC struggles to hide a slowly choking Musi river
Postnoon Quote:
DC Quote:
__________________
W o R l D 8 i i5 - In Urbanity I trust
|
||
|
|
|
|
|
#6 | |
|
Registered User
Join Date: Oct 2010
Posts: 6,153
Likes (Received): 223
|
x-posting from projects thread
Quote:
__________________
W o R l D 8 i i5 - In Urbanity I trust
|
|
|
|
|
|
|
#7 | |
|
Registered User
Join Date: Aug 2011
Location: Hyderabad, Bath
Posts: 8,620
Likes (Received): 400
|
Quote:
|
|
|
|
|
|
|
#8 | |
|
Registered User
Join Date: Oct 2010
Posts: 6,153
Likes (Received): 223
|
Facelift for Monda Market, General Bazaar soon
Quote:
__________________
W o R l D 8 i i5 - In Urbanity I trust
|
|
|
|
|
|
|
#9 | |
|
Registered User
Join Date: Aug 2011
Location: Hyderabad, Bath
Posts: 8,620
Likes (Received): 400
|
Quote:
|
|
|
|
|
|
|
#10 | |
|
Registered User
Join Date: Aug 2011
Location: Hyderabad, Bath
Posts: 8,620
Likes (Received): 400
|
Quote:
|
|
|
|
|
|
|
#11 |
|
Registered User
Join Date: Oct 2010
Posts: 6,153
Likes (Received): 223
|
Clean Musi, 21.5 km of riverfront and RRs on both sides, I hope that day comes soon
__________________
W o R l D 8 i i5 - In Urbanity I trust
|
|
|
|
|
|
#12 |
|
Registered User
Join Date: Jul 2007
Posts: 7
Likes (Received): 0
|
http://www.slideshare.net/umeshvarma...beautification
Came across this presentation. Most of the deadlines look very old.. but interesting presentation. |
|
|
|
|
|
#13 |
|
Registered User
Join Date: Aug 2012
Posts: 29
Likes (Received): 9
|
HYDERABAD: After several false starts on the Musi revitalization plan, the Greater Hyderabad Municipal Corporation (GHMC) has finally decided to take up the mega project soon. The 21-kilometre stretch between Bapughat and Nagole would not only be rid of encroachments and stink, but would also be made a recreation zone on the lines of Necklace Road in a couple of years at a cost of Rs 752 crore.
Consultant Aarvee Associates, engaged by the GHMC, has recently submitted detailed project report (DPR) on Musi river revitalization , which would be sent to the Union ministry of environment and forests (MOEF) since funds are being released under the National River Conservation Plan (NRCP). Some works under 'Save Musi' project like construction of rubber dams and diversion of sewer lines into the river were carried out both by the Corporation and Hyderabad Metropolitan Water Supply and Sewerage Board (HMWS&SB) under the Jawaharlal Nehru National Urban Renewal Mission (JNNURM) three years ago. However , some works like development of river drives and removing encroachments were not completed. Under the new plan, flood retaining walls along the river banks from Bapughat to Nagole would be constructed. These retaining walls would take care of flood in the river besides preventing encroachments on the river front. It has been proposed to improve river drives on south bank of Bapughat to Attapur, Golnaka bridge to Amberpet STP and Nagole bridge to Nagole STP. The other works being planned under the project are re-sectioning of riverbed to improve carrying capacity of the river, remove sludge from the riverbed, provision of drains, approach roads, parks, bathing ghats, crematoria, graveyards in addition to renovating the existing ones. Plans have also been prepared to provide more platforms and steps leading to the river at bathing ghats and crematoria. It has been proposed to develop parks at four places and provide adequate number of benches, lighting and landscaping of park area with fountains, flowerbeds, commercial activities like kiosks, food courts, public information centres etc. Renovation of park near Nagole bridge, including additional two-lane road bridge for better connectivity , and seamless enter-exit facility to the park. To maintain river water pool, it has been proposed to construct two rubber dams at Nagole in addition to the existing two opposite Salarjung Museum and the High Court. GHMC officials said the MoEF had agreed to support the Musi revitalization plan a couple of years ago after inspecting the entire river area and okayed the proposal . Then, the consultant was engaged for preparation of DPRs in November last. "The Rs 752-crore project will be implemented in two phases. In the first phase, works between Bapughat and Nagole bridge will be taken up at a cost of Rs 493 crore, while in the second phase works near Nagole bridge and Nagole STP will be taken at a cost of 258 crore. The Centre will bear 70% of the cost, while the state government has to bear the rest, 30%, of the project cost," GHMC commissioner MT Krishna Babu said. Rubber dam on the Musi river in Hyderabad, India Charakteristics: Rubber dam in km 22,1 is part of revitalization the Musi river in Hyderabad Lokality: Weir km 22,1 on the Musi river, Hyderabad, Andhra Pradesh, India Pöyry´srole in the project: Detail design (technological part) Supply and erection of Rubber dam and other equipment Supervision (2009) Commissioning: 2009 Contact person Oldrich Neumayer Head of the Department 332 - Hydroengineering II. oldrich.neumayer@poyry.com Ivo Vaněk ivo.vanek@poyry.com |
|
|
|
|
|
#14 | |
|
Registered User
Join Date: Oct 2010
Posts: 6,153
Likes (Received): 223
|
Musi revival project makes no progress
Quote:
__________________
W o R l D 8 i i5 - In Urbanity I trust
|
|
|
|
|
|
|
#15 | |
|
Registered User
Join Date: Aug 2011
Location: Hyderabad, Bath
Posts: 8,620
Likes (Received): 400
|
Quote:
|
|
|
|
|
|
|
#16 |
|
High-derabaD
Join Date: Jul 2006
Location: Hyderabad
Posts: 1,598
Likes (Received): 64
|
I hope they can do this exercise without any political interference.
|
|
|
|
|
|
#17 | |
|
Registered User
Join Date: Aug 2011
Location: Hyderabad, Bath
Posts: 8,620
Likes (Received): 400
|
Quote:
|
|
|
|
|
![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|