Honble Minister for Highways and Minor Ports inspected the progress of construction of Outer Ring Road, Chennai
Quote:
Development Activites on (Elevated)Outer Ring Road happenning in chennai ....
jayak914 no está en línea   Reply With Quote

Sponsored Links
 
Old November 7th, 2012, 05:08 AM   #1302
தமிழன்
Registered User
 
தமிழன்'s Avatar
 
Join Date: Aug 2012
Location: CHENNAI
Posts: 656
Likes (Received): 5

Under one govt it’s go, under another it’s stop

http://www.thehindu.com/news/cities/...cle4071595.ece
__________________
கற்றது கைமண் அளவு, கல்லாதது உலகளவு-ஔவையார்
தமிழன் no está en línea   Reply With Quote
Old December 7th, 2012, 06:15 AM   #1303
arunmani
Registered User
 
Join Date: Feb 2007
Posts: 156
Likes (Received): 8

Quote:
Originally Posted by jayak914 View Post
Honble Minister for Highways and Minor Ports inspected the progress of construction of Outer Ring Road, Chennai


Development Activites on (Elevated)Outer Ring Road happenning in chennai ....
Just curious, what is the purpose of the pipe railing on top of the parapet wall on the bridges.
arunmani no está en línea   Reply With Quote
Old December 7th, 2012, 10:54 AM   #1304
proprashanth
Registered User
 
Join Date: Apr 2010
Location: Chennai
Posts: 519
Likes (Received): 112

Quote:
Originally Posted by arunmani View Post
Just curious, what is the purpose of the pipe railing on top of the parapet wall on the bridges.
it's just a design to give a better look...
proprashanth no está en línea   Reply With Quote
Old December 7th, 2012, 08:43 PM   #1305
engineer.akash
Belgaum Admirer
 
engineer.akash's Avatar
 
Join Date: Oct 2008
Location: Belgaum
Posts: 27,327
Likes (Received): 746

Quote:
Originally Posted by arunmani View Post
Just curious, what is the purpose of the pipe railing on top of the parapet wall on the bridges.
That is a safety rail used during maintenance work by the workers to tie their safety belts to it.
__________________
LOVE INDIA SERVE INDIA

TIER TWO CITIES RAKSHAK
engineer.akash no está en línea   Reply With Quote
Old December 8th, 2012, 05:03 PM   #1306
rsrikanth05
Ladkiyon ka Hero
 
rsrikanth05's Avatar
 
Join Date: Mar 2009
Location: Kovai
Posts: 6,079
Likes (Received): 70

So, the pillars that I saw on the banks of the Cooum when traffic from Central to Koyambedu wsa diverted was of the CETL?
rsrikanth05 no está en línea   Reply With Quote
Old December 9th, 2012, 04:57 AM   #1307
chevycorvette
Registered User
 
Join Date: Sep 2011
Posts: 85
Likes (Received): 7

Detailed information and Timelines of Chennai Bangalore Expressway.Found this in a Japanese Website.Hope they meet these timelines.As per the plan the :

PPP Part (135 Kms) Construction will start in October 2014 be completed by March 2017.
ODA (Official Development Assistance by Japan) will Start in Mar 2015 and will be completed by Oct 2017.

So the Expressway is expected to be fully Operational by Oct 2017 unless there are Delays.

http://www.jetro.go.jp/jetro/activit...aitaku_01e.pdf

Last edited by chevycorvette; December 9th, 2012 at 05:29 AM.
chevycorvette no está en línea   Reply With Quote
Old December 9th, 2012, 12:42 PM   #1308
ranga
Registered User
 
Join Date: Nov 2006
Location: Hyderabad
Posts: 2,871
Likes (Received): 111

Quote:
Originally Posted by rsrikanth05 View Post
So, the pillars that I saw on the banks of the Cooum when traffic from Central to Koyambedu wsa diverted was of the CETL?
This project is shelved why talk about it.The pillars constructed for this project will remain as a sore thumb for the tax payers.
ranga no está en línea   Reply With Quote
Old December 9th, 2012, 12:49 PM   #1309
rsrikanth05
Ladkiyon ka Hero
 
rsrikanth05's Avatar
 
Join Date: Mar 2009
Location: Kovai
Posts: 6,079
Likes (Received): 70

Quote:
Originally Posted by ranga View Post
This project is shelved why talk about it.The pillars constructed for this project will remain as a sore thumb for the tax payers.
Wasn't this a BOT being built by Soma?
rsrikanth05 no está en línea   Reply With Quote
Old December 9th, 2012, 02:12 PM   #1310
ranga
Registered User
 
Join Date: Nov 2006
Location: Hyderabad
Posts: 2,871
Likes (Received): 111

Quote:
Originally Posted by rsrikanth05 View Post
Wasn't this a BOT being built by Soma?
exactly.waiting for termination compensation the state govt will have to bear it.
ranga no está en línea   Reply With Quote
Old December 9th, 2012, 02:25 PM   #1311
rsrikanth05
Ladkiyon ka Hero
 
rsrikanth05's Avatar
 
Join Date: Mar 2009
Location: Kovai
Posts: 6,079
Likes (Received): 70

Well, let's hope it takes off. Atleast the section between Maduravoyal and Koyambedu.
rsrikanth05 no está en línea   Reply With Quote
Old December 10th, 2012, 02:16 AM   #1312
udhaya
Registered User
 
Join Date: Aug 2012
Posts: 351
Likes (Received): 85

Quote:
Originally Posted by chevycorvette View Post
Detailed information and Timelines of Chennai Bangalore Expressway.Found this in a Japanese Website.Hope they meet these timelines.As per the plan the :

PPP Part (135 Kms) Construction will start in October 2014 be completed by March 2017.
ODA (Official Development Assistance by Japan) will Start in Mar 2015 and will be completed by Oct 2017.

So the Expressway is expected to be fully Operational by Oct 2017 unless there are Delays.

http://www.jetro.go.jp/jetro/activit...aitaku_01e.pdf
this is the new expressway to bangalarore and different.
udhaya no está en línea   Reply With Quote
Old December 10th, 2012, 08:21 AM   #1313
ferrari_fan
Forza!
 
ferrari_fan's Avatar
 
Join Date: Jan 2006
Location: Chennai + Hyderabad
Posts: 3,619
Likes (Received): 152

Quote:
Originally Posted by engineer.akash View Post
That is a safety rail used during maintenance work by the workers to tie their safety belts to it.
Thanks Akash - that's interesting - I had no idea..
ferrari_fan no está en línea   Reply With Quote
Old December 10th, 2012, 12:13 PM   #1314
tamilbala
Registered User
 
Join Date: Sep 2009
Posts: 443
Likes (Received): 106

The Metal Dividers kept around each and every pillars are removed, so logically speaking, the project is KILLED.

Now they will start lating New & well built road till the pillars, and traffic flow will be smooth soon.
tamilbala no está en línea   Reply With Quote
Old December 10th, 2012, 01:06 PM   #1315
rsrikanth05
Ladkiyon ka Hero
 
rsrikanth05's Avatar
 
Join Date: Mar 2009
Location: Kovai
Posts: 6,079
Likes (Received): 70

Quote:
Originally Posted by tamilbala View Post
The Metal Dividers kept around each and every pillars are removed, so logically speaking, the project is KILLED.

Now they will start lating New & well built road till the pillars, and traffic flow will be smooth soon.
That only indicates that pillar work is done.
They might launch a gantry somewhere.
rsrikanth05 no está en línea   Reply With Quote
Old January 28th, 2013, 11:36 PM   #1316
karkal
Registered User
 
karkal's Avatar
 
Join Date: Jan 2012
Posts: 5,793
Likes (Received): 1467

Ray of hope for Port-Maduravoyal project





Quote:
State wants NHAI to realign elevated expressway along Cooum and resume work

The State government has set the ball rolling to revive a stalled project — the Chennai Port-Maduravoyal elevated expressway along the Cooum.

The Water Resources Department (WRD) has written to the National Highways Authority of India (NHAI), which is implementing the project, to realign the expressway and proceed with the Rs. 1,815-crore project.

Last March, WRD had issued a ‘stop’ notice for work along the Cooum river stating the proposed expressway encroached on the waterway in some parts.

WRD had permitted work on a 4.5-km stretch — from Egmore to Chetpet — along the banks of the river.

WRD also said that pile caps constructed at Chetpet, along Spurtank Road, were found to be built up to the maximum flood-level limit of the river rather than the bank.This would obstruct free flow of water, particularly when the river runs to its brim during floods, said a WRD official.

In its letter, WRD has asked NHAI to rectify the problem of an alignment change in places such as Spurtank Road and downstream of Choolaimedu bridge.

The NHAI should also present the revised alignment before the high-level steering committee comprising representatives from six departments for approval.

It must then be sent to the State government for a final nod before work is resumed.

As the project has been put on hold for nearly a year, the river bed has been engulfed by thick vegetation on stretches near Spurtank Road and Ethiraj Salai. The waterway also faces the threat of encroachments.

According to NHAI, however, there is no deviation from the original alignment approved by the State government.

Though the WRD had asked it to stop work on section-I (from Port to Koyambedu), work on section-II of the project (from Koyambedu to Maduravoyal) has also been put on hold.

As a result, the concessionaire (the company that is to build, operate and transfer the project after 21 years) has raised claims for idle machinery and sought compensation for the delay and escalation of prices of construction material.

According to an official, there would be at least a 10 per cent increase in project cost.

So far, nearly Rs. 500 crore has been spent on the project and just 20 per cent of the work has been completed.

NHAI will take a call on the future course of action once it receives the letter from WRD, the official said.

The Tamil Nadu government is yet to complete its share of the work in terms of relief and rehabilitation of dwellers along the Cooum river and acquisition of the land.

Keywords: Port-Maduravoyal project, NHAI, WRD, Cooum river, elevated expressway project
karkal no está en línea   Reply With Quote
Old January 29th, 2013, 09:18 AM   #1317
Indian Sun
Registered User
 
Join Date: Dec 2007
Location: Chennai | Seattle
Posts: 4,050
Likes (Received): 131

"Ray of Hope" nu solliye namma ellam pozhudha kazhichaachu.
__________________
500px | flickr |
Indian Sun no está en línea   Reply With Quote
Old January 29th, 2013, 05:58 PM   #1318
ranga
Registered User
 
Join Date: Nov 2006
Location: Hyderabad
Posts: 2,871
Likes (Received): 111

Quote:
Originally Posted by Indian Sun View Post
"Ray of Hope" nu solliye namma ellam pozhudha kazhichaachu.
The State govt woke up only after SOMA,the concessionaire for this project raised compensation claims with the state govt.Now the concerned dept WRD is enacting a drama to show that NHAI is at fault but does not hold any water.The project is not only abandoned but the SG has to shell out huge compensation to SOMA as per the agreement after spending Rs500 crores by NHAI.What a waste of time and money.The SG deliberately took no steps for the past 10 months since the stoppage of the work inspite of the CG top officials from the ministry of surface transport making all efforts to revive this project.There is no ray of hope for not only this project but any project so long as this govt is in power.
ranga no está en línea   Reply With Quote
Old February 1st, 2013, 11:01 AM   #1319
skysun
Registered User
 
Join Date: Jul 2012
Posts: 2,922
Likes (Received): 530

Karunanidhi speaks on stalled expressway - The Hindu article

http://thehindu.com/news/cities/chen...le4366095.ece/

Karunanidhi speaks on stalled
expressway
1 February 2013 , By Staff Reporter
The proposed elevated expressway between Chennai Port and Maduravoyal would put an end to traffic congestion, said DMK president and former chief minister, M. Karunanidhi.

In a statement here, the DMK chief said the Rs. 1,815-crore project would have been completed this year had the State government allowed it to progress as per schedule.

Quoting the report ‘Ray of hope for Port-Maduravoyal project’ that appeared in The Hindu on Tuesday, he said the State government was taking measures to revive the project.

National Highways Authority of India (NHAI) had said it did deviate from the alignment approved by the State government.

The 19-km-long elevated expressway is being implemented in two phases, with phase-1 running from Chennai Port to Koyambedu along the Cooum, and phase-2 from Koyambedu to Maduravoyal on Poonamallee High Road.

If the project is completed, trailers carrying freight to Chennai Port can take this expressway and connect to the golden quadrilateral without entering city limits, he said.

Keywords: Maduravoyal expressway, Chennai Port

Last edited by skysun; February 1st, 2013 at 05:55 PM.
skysun no está en línea   Reply With Quote
Old February 1st, 2013, 02:36 PM   #1320
tamilbala
Registered User
 
Join Date: Sep 2009
Posts: 443
Likes (Received): 106

Why not just finish off the Stretch between Madhuravoyal & Koyambedu first, the Phase II?

Here there is no criss crossing with Coovam, so vehicles can start using and the Poonamalli Road can breeze easily.

In this stretch, all the pillars foundation work are over. If properly planned, this work can be completed with in 6 months.

With the first 4.5kms already approved and this 5km stretch, almost 50% work on the Expess way will be over.
tamilbala no está en línea   Reply With Quote


Reply

Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 09:29 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.1.2 (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd.
vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd. (Resources saved on this page: MySQL 21.43%)

SkyscraperCity - In Urbanity We Trust

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu