daily menu » rate the banner | guess the city | one on one

Go Back   SkyscraperCity > World Forums > Infrastructure and Mobility > Railways

Railways Heavy rail: Intercity, Commuter and Freight


Reply

 
Thread Tools Display Modes
Old December 9th, 2012, 01:56 PM   #141
Suburbanist
SPQR
 
Suburbanist's Avatar
 
Join Date: Dec 2009
Posts: 14,822
Likes (Received): 1068

Quote:
Originally Posted by trainrover View Post
The French which, eh? Eliminating the margin of error shall probably proove to bite no matter whomever really HARD in the ass.
You don't measure margin of error of fast trains with full in-cab signaling based on time, but rather based on braking distance, wither using block signals with PTC or the more modern dynamic signaling.

A high-speed train can come to a halt from 300km/h in less than 70 seconds under emergency stop protocols with safety (though a bit of discomfort for passengers). You don't need more than that as a safety margin, you don't want to have the train ddriver deciding whether to stop or not, you want a system that detects a faulty/broken/crashed train or railway with intrusion of foreign object and then suddenly deploys emergency stop activation in your trains in milliseconds.
__________________
Dream of the year: a city without streets.
Suburbanist está en línea ahora   Reply With Quote

Sponsored Links
 
Old December 9th, 2012, 09:24 PM   #142
trainrover
Lucy-Kellaway's 4 ∞
 
trainrover's Avatar
 
Join Date: May 2006
Posts: 5,151
Likes (Received): 21

So many clawbacks being reported are enough to make wonder whether redundancy is no longer devised. Although I haven't done the arithmetic, a 6' headway at great speed strikes me as pushing the braking distance should operations go awry, let alone a 1' one.
trainrover no está en línea   Reply With Quote
Old December 10th, 2012, 08:01 AM   #143
K_
Registered User
 
Join Date: Jan 2010
Posts: 1,887
Likes (Received): 11

Quote:
Originally Posted by trainrover View Post
So many clawbacks being reported are enough to make wonder whether redundancy is no longer devised. Although I haven't done the arithmetic, a 6' headway at great speed strikes me as pushing the braking distance should operations go awry, let alone a 1' one.
Well, maybe it's time for some arithmetic then.

3' at 360kph means 18km between trains. The normal stopping distance at that speed is about 9 km. So there is still quite a bit of safety margin there.

If you want to reduce headways to 2', you reduce train separation to 12km. That means that your safety margin gets reduced. There are two things you now need to do:
- Shorten your stopping distance. That can be done using eddy current brakes.
- Improve the signalling. That is what ETCS is for. 2' headways at 200kph are already in daily use. The LGV from Paris to Lyon uses 4 minutes as minimum headway, using a system that was originally designed for 5', and will go to 3' soon. It might even go to 2' as this is probably going to be a lot cheaper than building an additional LGV...

So 6' is being very prudent...
K_ no está en línea   Reply With Quote
Old December 10th, 2012, 01:26 PM   #144
chornedsnorkack
Registered User
 
Join Date: Mar 2009
Posts: 2,603
Likes (Received): 25

Note that off-peak the headways are easy to keep. The xx:30 express train leaves Taibei 6 minutes before the xx:36 milk train, and never approaches. Since it is 24 minutes faster than the xx:00 milk train, it reaches Zuoying 6 minutes after the xx:00 milk train.
chornedsnorkack no está en línea   Reply With Quote
Old December 10th, 2012, 04:19 PM   #145
makita09
Registered User
 
Join Date: Sep 2009
Posts: 2,393
Likes (Received): 26

Quote:
Originally Posted by trainrover View Post
So many clawbacks being reported are enough to make wonder whether redundancy is no longer devised. Although I haven't done the arithmetic, a 6' headway at great speed strikes me as pushing the braking distance should operations go awry, let alone a 1' one.
You have the whole concept back to front. Braking distance is a distance in space. Headway is a distance in time. They are not the same thing. Signalling systems separate trains by the necessary distance in space, not time. The headway is something that is an output after the safety of the system has been guaranteed.

Breaking characteristics > Signal block length > then at this point we can go back a calculate minimum headway.

Rather than sticking with a misapprehension, there are lots of sources on the web help understand how signalling systems function.
__________________
I think about everything that exists. This is a far smaller topic compared to most.
makita09 no está en línea   Reply With Quote
Old December 10th, 2012, 07:52 PM   #146
Silver Swordsman
Registered User
 
Join Date: Nov 2011
Posts: 253
Likes (Received): 5

Implementing a new system will obviously cost manpower, time and money. Right now, in Taiwan, there simply isn't a need to ramp up frequency that much. Not saying that it can't, but right now, I don't think it's a feasible thing to do business-wise. Just because you can doesn't mean you should. However, there are recent reports that THSR plans to ramp up the number of services to over 200 per day... so I guess that will definitely mean higher frequencies. (200 trains north and south over 18hrs)
__________________
My Virtual-Model Railroad: High Speed Rail in RCT3
Project Anniversary: Click Here
Silver Swordsman no está en línea   Reply With Quote
Old December 10th, 2012, 08:17 PM   #147
chornedsnorkack
Registered User
 
Join Date: Mar 2009
Posts: 2,603
Likes (Received): 25

Quote:
Originally Posted by Silver Swordsman View Post
Implementing a new system will obviously cost manpower, time and money. Right now, in Taiwan, there simply isn't a need to ramp up frequency that much. Not saying that it can't, but right now, I don't think it's a feasible thing to do business-wise.
The THSR trainsets are now all (30 existing, 4 under construction) 12 cars each.

Would it be useful to add smaller trains, e. g. 8 car trains, to THSR so as to increase frequencies without excessive cost?
chornedsnorkack no está en línea   Reply With Quote
Old December 11th, 2012, 02:46 AM   #148
trainrover
Lucy-Kellaway's 4 ∞
 
trainrover's Avatar
 
Join Date: May 2006
Posts: 5,151
Likes (Received): 21

Good, sounds better I imagined the distance between HSTs running at full speed much less than 12Km.
trainrover no está en línea   Reply With Quote
Old December 11th, 2012, 08:28 AM   #149
K_
Registered User
 
Join Date: Jan 2010
Posts: 1,887
Likes (Received): 11

Quote:
Originally Posted by chornedsnorkack View Post
Note that off-peak the headways are easy to keep. The xx:30 express train leaves Taibei 6 minutes before the xx:36 milk train, and never approaches. Since it is 24 minutes faster than the xx:00 milk train, it reaches Zuoying 6 minutes after the xx:00 milk train.
In this case it makes sense. However they could use the extra 6 minutes to maybe add in another stop on the milk train. I don't know if the times of other trains in Taibei and Zuoying are coordinated with those on the high speed line.

On the Swiss network the departure times of trains are coordinated at the major hubs, and for that reason trains are run as closely as possible on the high speed line from Bern to Olten (with 2' headways), even though with six trains per hour they could spread them out more.
K_ no está en línea   Reply With Quote
Old December 14th, 2012, 11:20 PM   #150
trainrover
Lucy-Kellaway's 4 ∞
 
trainrover's Avatar
 
Join Date: May 2006
Posts: 5,151
Likes (Received): 21

11 Dec 2012 :
Proposed railway service penalties unnnecessary, CN Rail, CP Rail chiefs argue

trainrover no está en línea   Reply With Quote
Old December 15th, 2012, 11:38 AM   #151
Silver Swordsman
Registered User
 
Join Date: Nov 2011
Posts: 253
Likes (Received): 5

Quote:
Originally Posted by chornedsnorkack View Post
The THSR trainsets are now all (30 existing, 4 under construction) 12 cars each.

Would it be useful to add smaller trains, e. g. 8 car trains, to THSR so as to increase frequencies without excessive cost?
I've thought about that as well, but it seems that because the 700T is an EMU, rearranging trainsets is difficult. If they want 8car consists, they're going to need a completely new different trainset.

I think, for now, Taiwanese peeps still see trains as "trains" with a timetable, instead of a fast metro service (with insane frequency.)
__________________
My Virtual-Model Railroad: High Speed Rail in RCT3
Project Anniversary: Click Here
Silver Swordsman no está en línea   Reply With Quote
Old December 15th, 2012, 02:02 PM   #152
k.k.jetcar
Registered User
 
k.k.jetcar's Avatar
 
Join Date: Jul 2008
Location: Sapporo
Posts: 996
Likes (Received): 36


It's also helpful to have consistent train lengths when the occasional cancelled service (due to breakdown, accident, etc.) needs to be replaced with a spare trainset- you can provide seating for all passengers with reserved tickets who were scheduled to be on the cancelled service. This is one reason why JR Central only runs 16 car trains on the Tokaido Shinkansen.
k.k.jetcar no está en línea   Reply With Quote


Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 04:13 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.1.2 (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd.
vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd. (Resources saved on this page: MySQL 20.00%)

SkyscraperCity - In Urbanity We Trust

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu